ML20055F757: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 18: Line 18:
=Text=
=Text=
{{#Wiki_filter:.
{{#Wiki_filter:.
* 1
1 OPERATING DATA REPORT DOCKET No.
          ',                                OPERATING DATA REPORT DOCKET No. 50-364 DATE   3/2/90 COMPLETED BY     D. N. Morey TELEPHONE (205)899-5156 OPERATING STATUS Notes
50-364 DATE 3/2/90 COMPLETED BY D. N. Morey TELEPHONE (205)899-5156 OPERATING STATUS Notes
: 1. Unit Names-         -Joseph H. Farley - Unit 2                 1) Cumulative data since
: 1. Unit Names-
: 2. Reporcing Period:     Februhry 1990                                 7-30-81, date of
-Joseph H. Farley - Unit 2
      -3.-Licensed Thermal Power (HWt):         2,65E'                         commercial operation.
: 1) Cumulative data since
4.-Nameplate Rating (Gross HWe):           860
: 2. Reporcing Period:
: 5. Design Electrical Rating (Net HWe): 829
Februhry 1990 7-30-81, date of
: 6. Maximum Dependable Capacity (Gross HWe):     868.6
-3.-Licensed Thermal Power (HWt):
: 7. Maximum Dependable Capacity (Net HWe):       828.2
2,65E' commercial operation.
4.-Nameplate Rating (Gross HWe):
860
: 5. Design Electrical Rating (Net HWe):
829
: 6. Maximum Dependable Capacity (Gross HWe):
868.6
: 7. Maximum Dependable Capacity (Net HWe):
828.2
: 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons: N/A
: 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons: N/A
: 9. Power Level To Which Restricted, If Any (Net HVe):         N/A                                   +
: 9. Power Level To Which Restricted, If Any (Net HVe):
: 10. Reasons For Restrictions, If Any:       N/A This Month     Tr-to-Date       Cumulative
N/A
: 11. Hours In Reporting Period                           672             1,416         75,265
+
: 12. Number Of Hours Reactor Vas Critical               672.0           1,416           65,299.1 l
: 10. Reasons For Restrictions, If Any:
: 13. Reactor Reserve Shutdown Hours                       0.0                 0.0           138.0
N/A This Month Tr-to-Date Cumulative
: 14. Hours Generator On-Line                           672.0             1,416.0 _       64,488.0
: 11. Hours In Reporting Period 672 1,416 75,265
: 15. Unit Reserve Shutdown Hours                           0.0                 0.0           0.0
: 12. Number Of Hours Reactor Vas Critical 672.0 1,416 65,299.1 l
: 16. Gross' Thermal Energy Generated (MVH)       1,631,313         3,601,619     163,857,886
: 13. Reactor Reserve Shutdown Hours 0.0 0.0 138.0
: 17. Gross Electrical Energy Generated (MVH)       537,460         1,192,390     _53,858,932
: 14. Hours Generator On-Line 672.0 1,416.0 _
: 18. Net Electrical Energy Generated (HVH)         509,660         1,134,424     51,077,814
64,488.0
: 19. Unit Service Factor                                 100.0             100.0           85.7
: 15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
:20. Unit Availability Factor                             100.0               100.0           85.7
: 16. Gross' Thermal Energy Generated (MVH) 1,631,313 3,601,619 163,857,886
    .21. Unit Capacity Factor (Using HDC Net)                   91.6               96.7           83.0
: 17. Gross Electrical Energy Generated (MVH) 537,460 1,192,390
: 22. Unit Capacity Factor (Using DER Net)                 91.5               96.6           81.9 l>   :23. Unit Forced Outage Rate                                   0                 0.0           4.5 l1     24. Shutdowns Scheduled over Next 6 Honths (Type, Date, and Duration of Each):
_53,858,932
L           .N/A
: 18. Net Electrical Energy Generated (HVH) 509,660 1,134,424 51,077,814
  =
: 19. Unit Service Factor 100.0 100.0 85.7
:20. Unit Availability Factor 100.0 100.0 85.7
.21. Unit Capacity Factor (Using HDC Net) 91.6 96.7 83.0
: 22. Unit Capacity Factor (Using DER Net) 91.5 96.6 81.9 l>
:23. Unit Forced Outage Rate 0
0.0 4.5 l1
: 24. Shutdowns Scheduled over Next 6 Honths (Type, Date, and Duration of Each):
L
.N/A
=
25 If Shut Down At End Of Report Period, Estimated Date of Startup: N/A
25 If Shut Down At End Of Report Period, Estimated Date of Startup: N/A
: 26. Units In Test Status (Prior to Commercial Operation):
: 26. Units In Test Status (Prior to Commercial Operation):
Forecast       Achieved l
Forecast Achieved l
INITIAL CRITICALITY                               05/06/81         05/08/81 INITIAL ELECTRICITY                               05/24/81         05/25/81 COMMERCIAL OPERATION                               08/01/81         07/30/81 i       Form 2/30 9007190159 900711 DR ADOCK0500g4}}
INITIAL CRITICALITY 05/06/81 05/08/81 INITIAL ELECTRICITY 05/24/81 05/25/81 COMMERCIAL OPERATION 08/01/81 07/30/81 i
Form 2/30 9007190159 900711 ADOCK0500g4 DR}}

Latest revision as of 14:44, 17 December 2024

Corrected Monthly Operating Rept for Feb 1990 for Jm Farley Nuclear Plant Unit 2
ML20055F757
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 02/28/1990
From: Dennis Morey
ALABAMA POWER CO.
To:
Shared Package
ML20055F742 List:
References
NUDOCS 9007190159
Download: ML20055F757 (1)


Text

.

1 OPERATING DATA REPORT DOCKET No.

50-364 DATE 3/2/90 COMPLETED BY D. N. Morey TELEPHONE (205)899-5156 OPERATING STATUS Notes

1. Unit Names-

-Joseph H. Farley - Unit 2

1) Cumulative data since
2. Reporcing Period:

Februhry 1990 7-30-81, date of

-3.-Licensed Thermal Power (HWt):

2,65E' commercial operation.

4.-Nameplate Rating (Gross HWe):

860

5. Design Electrical Rating (Net HWe):

829

6. Maximum Dependable Capacity (Gross HWe):

868.6

7. Maximum Dependable Capacity (Net HWe):

828.2

8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons: N/A
9. Power Level To Which Restricted, If Any (Net HVe):

N/A

+

10. Reasons For Restrictions, If Any:

N/A This Month Tr-to-Date Cumulative

11. Hours In Reporting Period 672 1,416 75,265
12. Number Of Hours Reactor Vas Critical 672.0 1,416 65,299.1 l
13. Reactor Reserve Shutdown Hours 0.0 0.0 138.0
14. Hours Generator On-Line 672.0 1,416.0 _

64,488.0

15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
16. Gross' Thermal Energy Generated (MVH) 1,631,313 3,601,619 163,857,886
17. Gross Electrical Energy Generated (MVH) 537,460 1,192,390

_53,858,932

18. Net Electrical Energy Generated (HVH) 509,660 1,134,424 51,077,814
19. Unit Service Factor 100.0 100.0 85.7
20. Unit Availability Factor 100.0 100.0 85.7

.21. Unit Capacity Factor (Using HDC Net) 91.6 96.7 83.0

22. Unit Capacity Factor (Using DER Net) 91.5 96.6 81.9 l>
23. Unit Forced Outage Rate 0

0.0 4.5 l1

24. Shutdowns Scheduled over Next 6 Honths (Type, Date, and Duration of Each):

L

.N/A

=

25 If Shut Down At End Of Report Period, Estimated Date of Startup: N/A

26. Units In Test Status (Prior to Commercial Operation):

Forecast Achieved l

INITIAL CRITICALITY 05/06/81 05/08/81 INITIAL ELECTRICITY 05/24/81 05/25/81 COMMERCIAL OPERATION 08/01/81 07/30/81 i

Form 2/30 9007190159 900711 ADOCK0500g4 DR