ML12314A266: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
Line 119: Line 119:
Beaver Valley Unit 2 2LOT8 October 3,2012                          Page 1 of 2
Beaver Valley Unit 2 2LOT8 October 3,2012                          Page 1 of 2


  * ,;
2LOT8 NRC Examination Student Questions During Exam and Proctor Responses Time        Individual                                    Question/Response 1040              RO    Question # 36 Are you looking for the final state result or some intermediate time frame?
2LOT8 NRC Examination Student Questions During Exam and Proctor Responses Time        Individual                                    Question/Response 1040              RO    Question # 36 Are you looking for the final state result or some intermediate time frame?
Response: We are looking for the initial response to the transmitter failure. NOT long term or final condition. This clarification was written on a flipchart and all candidates were made aware of the clarification.
Response: We are looking for the initial response to the transmitter failure. NOT long term or final condition. This clarification was written on a flipchart and all candidates were made aware of the clarification.

Latest revision as of 22:02, 1 March 2020

Miscellaneous Exam Material (Folder 1)
ML12314A266
Person / Time
Site: Beaver Valley
Issue date: 10/18/2012
From: David Silk
Operations Branch I
To: Rudolph W
FirstEnergy Nuclear Operating Co
Jackson D
Shared Package
ML12136A033 List:
References
TAC U01850
Download: ML12314A266 (7)


Text

2LOT8 NRC Exam ANSWER KEY

1. .J

@ © @ -.. © @ 51. @ © ~ @ @

2. @ @ @ /"'"

@ 52. @ © @ @

~

3. @ @ "'"\ c'3 ......., @ © @ © @
4. @
5. @

~

©

- @ ©

-', @ ©

,r/

\J

  • 54.

55.

©

© @

©

©

6. @ © - @ @ 56. @ ~

@ @ '~© '-'

~.-"

7. @ © @ @ .--/

@ 57. '-

@ © @ @ :© "-"'

© -

'/'

8. .J © @ J @ © @ 58. @ '- © -'
9. @ © ~) J @ © @ 59. '- © @ .@. © '-'"
10. @ © ) ,~

@ © @ 60. @ @ @ ',- @

11. @
12. )

)

© @

"' © 61.

62.

©

©

©

@ ©

".~

,r

13. @ © @ '\ @ 63. @ © '-' @ @.
14. '\ @ © @ ""'" © @ 64. \... © @ @ © @
15. @ -; @ @ © --/ 65. @ © '-
16. ..J"\ @ © @ @ @ 66. \,

('

© @ 91. ,, ~ '

©

~.

17. @ @ @ "-" @ E57. ........, @ © @ 92. ,@ @

@ '\ @

18.

"@ © . @ © - 68. @ © @

© @ @ © @ @

~

19. @ 69. @ © -.../
20. ) @ © @ "'\

@ © @ 70. @ © .

' @ ©

©~

21. @ ')

© @ 71. @ '- @ @

22. @ ©

" .-. © @ 72. '

@ © @ @ '- © @

23. @ © >> --.. © @ 73. @ © "-' ' © @
24. @ © '"""'\

@ .... ~

@ '74. "-"' © @ @ '

25. @

" @ \ @ © @ '75. '-' © @ 100. '- @ © @

2LOT8 NRC Examination Student Questions During Exam and Proctor Responses Time Individual Question/Response 0841 RO Question # 15 Regarding the generator capacity curve: Is this line the gas pressure number or this solid line?

Response: I cannot answer that for you. This is our approved plant curve.

0908 SRO-I Question # 88 Since I have entered the MSP, I have tripped all bistables. Therefore, both channels are technically INOPERABLE. Do you want me to answer this based on the bistable tripping or the as found values?

Response: Answer based on the "As found" values. This clarification was written on a flipchart and all candidates were made aware of the clarification.

0911 SRO-I Question # 34 Choice B states "consistent". Does this mean equal to OR consistent with steam table for Psat equals Tsat?

Response: There is sufficient information to answer the question.

0912 SRO-I Question # 97 Choice S, Does this mean the US physically looks at the meter or justs verifies via paperwork?

Response: You have sufficient information to answer the question.

0915 RO Question # 36 What is meant by NSA position in Choice D? Does this mean demand OR valve position/control?

Response: You have sufficient information to answer the question.

0924 RO Question # 40 Does this reflect auto actions as a direct result of stated actions which already occurred OR does it include things which will occur in the future?

Response: There is sufficient information to answer the question.

1015 RO Question # 49 Does this mean eventually OR right now?

Response: There is sufficient information to answer the question.

1019 RO Question # 65 Should choice Dread 1856 psig?

Response: There is sufficient information to answer the question.

1022 SRO-I Question # 61 Is the question asking minimum Cb (Fuel Pool) to require TS action?

Response: There is sufficient information to answer the question.

1035 SRO-I Question # 34 Does consistent mean the same as PZR Temp? (Essentially the same question asked by M. Phillips at 0911)

Response: There is sufficient information to answer the question.

1037 RO Question # 54 3rd bullet - SI from what signal? AND Did we have Train "A" only on both the reactor trip and the SI or just the SI?

Response: There is sufficient information to answer the question.

Beaver Valley Unit 2 2LOT8 October 3,2012 Page 1 of 2

2LOT8 NRC Examination Student Questions During Exam and Proctor Responses Time Individual Question/Response 1040 RO Question # 36 Are you looking for the final state result or some intermediate time frame?

Response: We are looking for the initial response to the transmitter failure. NOT long term or final condition. This clarification was written on a flipchart and all candidates were made aware of the clarification.

1110 SRO*I Question # 64 Does this include all available indications computer and bench board?

Response: Yes!

1129 SRO*I Question # 87 Does this mean "Direct" or eventual (long term) impact? (regarding item (1)

Response: Eventual (long term) 1212 SRO*I Question # 98 Is this a batch release OR a continuous release?

Response: There is sufficient information to answer the question.

1236 RO Question # 64 Does this include the plant computer?

Response: Yes!

1252 RO Question # 50 Is this immediate OR long term alarm?

Response: There is sufficient information to answer the question.

1320 SRO*I Question # 83 Can I assume the operators took the correct procedure transitions?

Response: Yes!

1330 RO Question # 49 Is the question implying that a loss of cooling water will cause the EDG to trip?

Response: There is sufficient information to answer the question.

1407 RO Question # 9 Is this immediate or eventually?

Response: There is sufficient information to answer the question.

1415 SRO*I Question # 95 Are there any annunciators in?

Response: There is sufficient information to answer the question.

1510 SRO-I Question # 68 Is 2FWS-F1475 yellow CH IV?

Response: The mark number should be 2MSS-F1475 and yes it is the yellow channel. I Beaver Valley Unit 2 2LOT8 October 3, 2012 Page 2 of 2

Beaver Valley 2LOT8 NRC Written Exam Seating Chart 10/3/12 Rear Lun~h Tables I i Door SRO-I 10lIl 1101 RO 10lIl 1101 SRO-I

-4 Feet -4 Feet

-4 Feet -4 Feet -4 Feet Room 103 BVPS Training Center

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

Silk, David From: Munro, John Sent: Thursday, September 20,201210:21 AM To: Silk, David Cc: McHale, John: Jackson, Donald

Subject:

ES-302 - Simulator Exam Administration w/2 examiners for 2 applicants - Beaver Valley September 2012 examination Dave - After our discussion concerning the ES-302 guidance that precludes using different examiners on the simulator examination for individual applicants -- "However, simulator operating tests consisting of multiple scenarios shall not be divided among examiners." - I discussed the question with management. Given that the two affected applicants would be removed from their crews and replaced with surrogates to meet this criteria and the other SRO-I applicants will be administered 3 scenarios, IOlB authorizes Region I in this situation to evaluate these two SRO-I applicants with 2 examiners. This allowance is predicated on the fact that the two examiners will both be in the simulator for the 3 scenarios administered to these applicants.

Also, this allowance is granted for this exam only and should not be applied to other examinations.

1