ML12263A060

From kanterella
Jump to navigation Jump to search
Initial Operator Licensing Operating Test and Written Examination Approval (Beaver Valley Power Station Unit No. 2)
ML12263A060
Person / Time
Site: Beaver Valley
Issue date: 09/19/2012
From: Diane Jackson
Operations Branch I
To: Harden P
FirstEnergy Nuclear Operating Co
Shared Package
ML12136A033 List:
References
Download: ML12263A060 (4)


Text

-ffi UNITED STATES NUCLEAR REGULATORY COIUMISSION REGION I 21OO RENAISSANCE BOULEVARD, SUITE 1OO KING OF PRUSSIA, PENNSYLVANIA,I 940&271 3 September 19,2012 Mr. PaulA. Harden Site Vice President FirstEnergy Nuclear Operating Company Beaver Valley Power Station P. O. Box 4, Route 168 Shippingport, PA 15077 -0004

SUBJECT:

lNlTlAL OPERATOR LICENSING OPERATING TEST AND WRITTEN EXAMTNATTON APPROVAL (BEAVER VALLEY POWER STATION UNIT NO. 2)

Dear Mr. Harden:

The purpose of this letter is to confirm the final arrangements for the upcoming operator licensing examinations at Beaver Valley Unit 2.

The U.S. Nuclear Regulatory Commission (NRC) has completed its review of the operator license applications submitted in connection with this examination and separately provided a list of approved applicants to Mr. W. Rudolph, Operations Training Superintendent. Note that any examination waivers and application denials have been addressed in separate correspondence.

The NRC has approved the subject examinations and hereby authorizes you to administer the written examinations in accordance with NUREG-1021, "Operator Licensing Examinations Standards for Power Reactors," Revision 9, Supplement 1, on the week of October 1,2012.

The NRC staff will administer the operating tests during the week of September 24,2012. This examination has undergone extensive review by my staff and representatives responsible for licensed operator training at your facility. Based on this review I have concluded that the examination meets the guidelines of NUREG-1021for content, operational, and discrimination validity. By administering this examination, you also agree that it meets NUREG-1021 guidelines, and is appropriate for measuring the qualifications of licensed operator applicants at your facility. lf you determine that this examination is not appropriate for licensing operators at your facility, do not administer the examination and contact me at (610) 337-5306.

P. Harden 2 Please contact your Chief Examiner, David Silk, at 610-337-5372, it you have any questions or identify any errors or changes in the license level (reactor operator or senior reactor operator) or type of examination (partial or complete written examination and/or operating test) specified for each applicant.

Sincerely, Operations Branch Division of Reactor Safety Docket No.: 50-412 License No.: NPF-73

ML V Non-sensitive V Publicly Available V suNstReview n Sensitive n Non-PubliclyAvailable OFFICE RI/DRS/OB RI/DRS/OB NAME DSiIK DJackson DATE 9t17t12 9119112 P. Harden Distribution:

W. Dean, RA (RIORAMAIL Resource)

D. Lew, DRA (RIORAMAIL Resource)

D. Roberts, DRP (RIDRPMAlL Resource)

J. Clifford, DRP (RlDRPMail Resource)

C. Miller, DRS (RlDRSMail Resource)

P. Wilson, DRS (RlDRSMail Resource)

G. Hunegs, DRP S. Barber, DRP A. Dugandzic, DRP D. Spindler, DRP, SRI E. Bonney, DRP, Rl P. Garrett, DRP, Resident AA S. Kennedy, Rl OEDO D. Jackson, DRS D. SIIK, DRS C. Bixler, DRS RidsNRRPM BeaverVal ley Resource RidsN rrDorlLpll -2 Resou rce ROPreports Resource D. Bearde