ML12314A266

From kanterella
Jump to navigation Jump to search

Miscellaneous Exam Material (Folder 1)
ML12314A266
Person / Time
Site: Beaver Valley
Issue date: 10/18/2012
From: David Silk
Operations Branch I
To: Rudolph W
FirstEnergy Nuclear Operating Co
Jackson D
Shared Package
ML12136A033 List:
References
TAC U01850
Download: ML12314A266 (7)


Text

2LOT8 NRC Exam ANSWER KEY

1.

.J @ © @

-.. © @

51. @ © ~
2. @

/"'" @

52.

@ ©

3. @

~ @

"'"\\ @

c'3

\\J

@ © @

~

'-' @ © @

4. @ ©

@ © @

54.

@ ©

@ © ""

5. @

,r/ @ © @

55. "-' © @

© @

6. @ © -
56. @

~

@ '~© '-'

7.

@ © @

~.-"

.--/ @

57.

@ © @

@ :©

, '/'

8.

.J © @

J

@ © @

58. @ © -

©

9.

@ © ~)

J

@ © @

59.

'- © @

.@. ©

10. @ © )

,~ @ © @

60.
11. @

)

"' © @

61.

@ © '

© @

12.

) © @

62.

@ © @

.-., @ © @

13. @ © ".~

@ '\\ @

63.

@ © '-'

,r

14. '\\ @ © @

""'" © @

64.

\\... © @

@ © @

15. @ -; @

@ ©

--/

65.

@ © '-

16.

"\\

..J @ © @

66.

('

\\,

© @

91.,, ~ '
17. @

~. @

E57.

........, @ © @

92.,@

© @

18. " © @

. @ © '\\

68.

@ © @

19.

--.. @ © @

~ @ © @

69.

@ ©

-.../

20. ) @ © @

"'\\ @ © @

70.

@ ©. '

@ ©

21. @ '),@

,............ © @

71.

@ © ~

22. @ © "

.-. © @

72.

@ © @

@ '- © @

23. @ ©

--.. © @

73. @ © "-'

' © @

24. @ ©

'"""'\\

@ ~

'74.

"-"' © @

25. @ "

\\

@ © @

'75.

'-' © @

100. '-

@ © @

2LOT8 NRC Examination Student Questions During Exam and Proctor Responses Time Individual Question/Response 0841 RO Question # 15 Regarding the generator capacity curve: Is this line the gas pressure number or this solid line?

Response: I cannot answer that for you. This is our approved plant curve.

0908 SRO-I Question # 88 Since I have entered the MSP, I have tripped all bistables. Therefore, both channels are technically INOPERABLE. Do you want me to answer this based on the bistable tripping or the as found values?

Response: Answer based on the "As found" values. This clarification was written on a flipchart and all candidates were made aware of the clarification.

0911 SRO-I Question # 34 Choice B states "consistent". Does this mean equal to OR consistent with steam table for Psat equals Tsat?

Response: There is sufficient information to answer the question.

0912 SRO-I Question # 97 Choice S, Does this mean the US physically looks at the meter or justs verifies via paperwork?

Response: You have sufficient information to answer the question.

0915 RO Question # 36 What is meant by NSA position in Choice D? Does this mean demand OR valve position/control?

Response: You have sufficient information to answer the question.

0924 RO Question # 40 Does this reflect auto actions as a direct result of stated actions which already occurred OR does it include things which will occur in the future?

Response: There is sufficient information to answer the question.

1015 RO Question # 49 Does this mean eventually OR right now?

Response: There is sufficient information to answer the question.

1019 RO Question # 65 Should choice Dread 1856 psig?

Response: There is sufficient information to answer the question.

1022 SRO-I Question # 61 Is the question asking minimum Cb (Fuel Pool) to require TS action?

Response: There is sufficient information to answer the question.

1035 SRO-I Question # 34 Does consistent mean the same as PZR Temp? (Essentially the same question asked by M. Phillips at 0911)

Response: There is sufficient information to answer the question.

1037 RO Question # 54 3rd bullet - SI from what signal? AND Did we have Train "A" only on both the reactor trip and the SI or just the SI?

Response: There is sufficient information to answer the question.

Beaver Valley Unit 2 2LOT8 October 3,2012 Page 1 of 2

2LOT8 NRC Examination Student Questions During Exam and Proctor Responses Time Individual Question/Response 1040 RO Question # 36 Are you looking for the final state result or some intermediate time frame?

Response: We are looking for the initial response to the transmitter failure. NOT long term or final condition. This clarification was written on a flipchart and all candidates were made aware of the clarification.

1110 SRO*I Question # 64 Does this include all available indications computer and bench board?

Response: Yes!

1129 SRO*I Question # 87 Does this mean "Direct" or eventual (long term) impact? (regarding item (1)

Response: Eventual (long term) 1212 SRO*I Question # 98 Is this a batch release OR a continuous release?

Response: There is sufficient information to answer the question.

1236 RO Question # 64 Does this include the plant computer?

Response: Yes!

1252 RO Question # 50 Is this immediate OR long term alarm?

Response: There is sufficient information to answer the question.

1320 SRO*I Question # 83 Can I assume the operators took the correct procedure transitions?

Response: Yes!

1330 RO Question # 49 Is the question implying that a loss of cooling water will cause the EDG to trip?

Response: There is sufficient information to answer the question.

1407 RO Question # 9 Is this immediate or eventually?

Response: There is sufficient information to answer the question.

1415 SRO*I Question # 95 Are there any annunciators in?

Response: There is sufficient information to answer the question.

1510 SRO-I Question # 68 Is 2FWS-F1475 yellow CH IV?

Response: The mark number should be 2MSS-F1475 and yes it is the yellow channel.

I Beaver Valley Unit 2 2LOT8 October 3, 2012 Page 2 of 2

Beaver Valley 2LOT8 NRC Written Exam Seating Chart 10/3/12 Rear Lun~h Tables I i

Door SRO-I 10lIl 1101 RO 10lIl 1101 SRO-I

-4 Feet

-4 Feet

-4 Feet

-4 Feet

-4 Feet Room 103 BVPS Training Center

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

Silk, David From:

Munro, John Sent:

Thursday, September 20,201210:21 AM To:

Silk, David Cc:

McHale, John: Jackson, Donald

Subject:

ES-302 - Simulator Exam Administration w/2 examiners for 2 applicants - Beaver Valley September 2012 examination Dave - After our discussion concerning the ES-302 guidance that precludes using different examiners on the simulator examination for individual applicants -- "However, simulator operating tests consisting of multiple scenarios shall not be divided among examiners." - I discussed the question with management. Given that the two affected applicants would be removed from their crews and replaced with surrogates to meet this criteria and the other SRO-I applicants will be administered 3 scenarios, IOlB authorizes Region I in this situation to evaluate these two SRO-I applicants with 2 examiners. This allowance is predicated on the fact that the two examiners will both be in the simulator for the 3 scenarios administered to these applicants.

Also, this allowance is granted for this exam only and should not be applied to other examinations.

1