ML103360141: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
Line 111: Line 111:


==SUMMARY==
==SUMMARY==
:
Were all the Critical Elements performed satisfactorily?          Yes          No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:                        Satisfactory            Unsatisfactory Comments:
Were all the Critical Elements performed satisfactorily?          Yes          No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:                        Satisfactory            Unsatisfactory Comments:
Evaluators Name:                                                  (Print)
Evaluators Name:                                                  (Print)
Line 232: Line 231:


==SUMMARY==
==SUMMARY==
:
Were all the Critical Elements performed satisfactorily?          Yes          No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:                            Satisfactory          Unsatisfactory Comments:
Were all the Critical Elements performed satisfactorily?          Yes          No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:                            Satisfactory          Unsatisfactory Comments:
Evaluators Name:                                                    (Print)
Evaluators Name:                                                    (Print)
Line 334: Line 332:
                         .1) Mechanical Drawings
                         .1) Mechanical Drawings
                         .2) Electrical Drawings K/A        K/A Number              Importance (RO/SRO)
                         .2) Electrical Drawings K/A        K/A Number              Importance (RO/SRO)
System Generic          2.2.13              4.1 Suggested Testing Environment:      Simulator Actual Testing Environment:            Simulator          Plant          Control Room
System Generic          2.2.13              4.1 Suggested Testing Environment:      Simulator Actual Testing Environment:            Simulator          Plant          Control Room Testing Method:        Simulate                    Faulted:      Yes          No Perform              Alternate Path:      Yes          No Time Critical:      Yes          No Estimated Time to Complete:15 minutes                  Actual Time Used:              minutes
.
Testing Method:        Simulate                    Faulted:      Yes          No Perform              Alternate Path:      Yes          No Time Critical:      Yes          No Estimated Time to Complete:15 minutes                  Actual Time Used:              minutes


==References:==
==References:==
Line 345: Line 341:


==SUMMARY==
==SUMMARY==
:
Were all the Critical Elements performed satisfactorily?        Yes          No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:                        Satisfactory          Unsatisfactory Comments:
Were all the Critical Elements performed satisfactorily?        Yes          No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:                        Satisfactory          Unsatisfactory Comments:
Evaluators Name:                                                (Print)
Evaluators Name:                                                (Print)
Line 471: Line 466:


==SUMMARY==
==SUMMARY==
:
Were all the Critical Elements performed satisfactorily?          Yes          No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:                        Satisfactory            Unsatisfactory Comments:
Were all the Critical Elements performed satisfactorily?          Yes          No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:                        Satisfactory            Unsatisfactory Comments:
Evaluators Name:                                                  (Print)
Evaluators Name:                                                  (Print)

Latest revision as of 10:04, 11 March 2020

2010 Clinton Power Station Initial License Examination As-Administered Admin JPMs
ML103360141
Person / Time
Site: Clinton Constellation icon.png
Issue date: 08/03/2010
From: French T
Exelon Nuclear
To:
NRC/RGN-III
References
JPM412
Download: ML103360141 (44)


Text

CLINTON POWER STATION Job Performance Measure Admin A MCR B RO panel walk downs JPM Number: 412 Revision Number: 00 Date: 08/31/2010 Developed By: Tallion French 08/31/2010 Instructor Date Validated By:

SME or Instructor Date Reviewed By:

Operations Representative Date Approved By:

Training Department Date

JPM Number: 412 Clinton Power Station Job Performance Measure (JPM)

JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation. Prior to JPM usage, revalidate JPM using steps 8 and 11 below.

________ 1. Task description and number, JPM description and number areidentified.

________ 2. Knowledge and Abilities (K/A) references are included.

________ 3. Performance location specified. (in-plant, control room, or simulator)

________ 4. Initial setup conditions are identified.

________ 5. Initiating and terminating cues are properly identified.

________ 6. Task standards identified and verified by SME review.

________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).

________ 8. Verify the procedure referenced by this JPM matches the most current revision of that procedure:

Procedure Rev. _____ Date _____________

________ 9. Pilot test the JPM:

a. verify cues both verbal and visual are free of conflict, and
b. ensure performance time is accurate.

________ 10. If the JPM cannot be performed as written with proper responses, then revise the JPM.

________ 11. When JPM is revalidated, SME or Instructor sign and date JPM cover page.

SME/Instructor Date SME/Instructor Date SME/Instructor Date Page 2 of 10

JPM Number: 412 Clinton Power Station Job Performance Measure (JPM)

Revision Record (Summary)

Revision Date Description 00 08/31/10 New JPM Page 3 of 10

JPM Number: 412 Clinton Power Station Job Performance Measure (JPM)

Simulator Setup Instructions (This page is applicable only to JPMs performed in the Simulator.)

1. Reset the simulator to IC-01.

NOTE: It is permissible to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.

2. Load the log taking JPM 412 lesson on the simulator.
3. When the above steps are completed for this and other JPMs to be run concurrently, then validate the concurrently run JPMs if applicable.
4. This completes the setup for this JPM.

Page 4 of 10

JPM Number: 412 Clinton Power Station Job Performance Measure (JPM)

READ TO THE OPERATOR I will explain the initial conditions, which step(s) to simulate or discuss, and provide the initiating cues. When you complete the task successfully, the objective of this Job Performance Measure will be satisfied.

No equipment or controls will be manipulated during this evaluation, only Simulated Actions will occur.

TASK STANDARDS:

  • The evolution completed IAW OP-AA-101-111 Roles and Responsibilities of On-shift Personnel.

TOOLS, EQUIPMENT, OTHER SPECIAL REQUIREMENTS:

  • Log sheet for panel walk down.
  • Red pen available PROCEDURAL/

REFERENCES:

  • Log sheet EVALUATOR INSTRUCTIONS:

Instructions for evaluator, they should know/understand during JPM. The following are examples:

  • Amplifying cues are provided within the JPM steps.

INITIAL CONDITIONS:

The plant is operating at 97% power.

Page 5 of 10

JPM Number: 412 Clinton Power Station Job Performance Measure (JPM)

INITIATING CUE:

CAUTION All pre-job briefings are completed.

Do NOT shine any type light into a panel.

You are the B RO complete hourly panel walk down.

Inform the CRS when you have completed the panel walk down and give the CRS the log sheet for review.

START TIME:

Page 6 of 10

JPM Number: 412 Clinton Power Station Job Performance Measure (JPM)

PERFORMANCE INFORMATION Critical steps are denoted with an asterisk (*) to the left of the step number and appear in BOLDED letters. Failure to meet the standards for a critical step constitutes failure of the Job Performance Measure. The sequence of steps is assumed unless denoted in the comments section of the JPM.

PERFORMANCE STEPS

  • 1) Identifies the MC and CY tank capacities are less than 66% combined Standard: Logs are circled in red or CRS informed Cue: 1. None Comments SAT UNSAT Comment Number Page 7 of 10

JPM Number: 412 Clinton Power Station Job Performance Measure (JPM)

2) Identifies the turbine generator gas pressure is less than 75 psig Standard: Notifies CRS need to add hydrogen to main generator Cue: IF asked: Another RO will dispatch area operator to add H2 to the generator.

Comments SAT UNSAT Comment Number

  • 3) Identifies the FC pump amps are in the red zone of the meter Standard: Logs are circled in red or CRS informed Cue: None Comments SAT UNSAT Comment Number
  • 4) ADS air pressures are out of band low Standard: Logs are circled in red or CRS informed Cue: None Comments SAT UNSAT Comment Number TERMINATING CUES:

Logs are completed and deficiencies identified.

STOP TIME:

Page 8 of 10

JPM Number: 412 Clinton Power Station Job Performance Measure (JPM)

Operators Name:

Job

Title:

NLO RO SRO STA SRO Cert JPM

Title:

MCR B RO panel walk downs JPM Number: JPM 412 Admin A Revision Number: 00 Task Number and

Title:

OP-AA-101-111 Roles and Responsibilities of On-shift Personnel K/A System K/A Number Importance (RO/SRO)

Generic 2.1.18 3.6 Suggested Testing Environment: Simulator Actual Testing Environment: Simulator Plant Control Room Testing Method: Simulate Faulted: Yes No Perform Alternate Path: Yes No Time Critical: Yes No Estimated Time to Complete: 20 minutes Actual Time Used: minutes

References:

OP-AA-101-111 Roles and Responsibilities of On-shift Personnel.

EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name: (Print)

Evaluators Signature: Date:

Page 9 of 10

Clinton Power Station Job Performance Measure (JPM)

Initial Conditions The plant is operating at 97% power.

Initiating Cue CAUTION All pre-job briefings are completed.

No equipment or controls will be manipulated during this evaluation, only Simulated Actions will occur. (This statement should be removed if this is a Simulator JPM)

Do NOT shine any type light into a panel.

You are the B RO complete hourly panel walk down.

Inform the CRS when you have completed the panel walk down and give the CRS the log sheet for review.

Page 10 of 10

CLINTON POWER STATION Job Performance Measure Admin B.

License Maintenance Check JPM Number: 409 Revision Number: 00 Date: 08/31/2010 Developed By: Tallion French 08/31/2010 Instructor Date Validated By:

SME or Instructor Date Reviewed By:

Operations Representative Date Approved By:

Training Department Date

JPM Number: 409 Clinton Power Station Job Performance Measure (JPM)

JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation. Prior to JPM usage, revalidate JPM using steps 8 and 11 below.

________ 1. Task description and number, JPM description and number areidentified.

________ 2. Knowledge and Abilities (K/A) references are included.

________ 3. Performance location specified. (in-plant, control room, or simulator)

________ 4. Initial setup conditions are identified.

________ 5. Initiating and terminating cues are properly identified.

________ 6. Task standards identified and verified by SME review.

________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).

________ 8. Verify the procedure referenced by this JPM matches the most current revision of that procedure:

Procedure Rev. _____ Date _____________

________ 9. Pilot test the JPM:

a. verify cues both verbal and visual are free of conflict, and
b. ensure performance time is accurate.

________ 10. If the JPM cannot be performed as written with proper responses, then revise the JPM.

________ 11. When JPM is revalidated, SME or Instructor sign and date JPM cover page.

SME/Instructor Date SME/Instructor Date SME/Instructor Date Page 2 of 11

JPM Number: 409 Clinton Power Station Job Performance Measure (JPM)

Revision Record (Summary)

Revision Date Description Rev # 00 8/31/2010 New JPM Page 3 of 11

JPM Number: 409 Clinton Power Station Job Performance Measure (JPM)

Simulator Setup Instructions (This page is applicable only to JPMs performed in the Simulator.)

1. Admin JPM.

NOTE: It is permissible to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.

2. When the above steps are completed for this and other JPMs to be run concurrently, then validate the concurrently run JPMs if applicable.
3. This completes the setup for this JPM.

Page 4 of 11

JPM Number: 409 Clinton Power Station Job Performance Measure (JPM)

READ TO THE OPERATOR I will explain the initial conditions, which step(s) to simulate or discuss, and provide the initiating cues. When you complete the task successfully, the objective of this Job Performance Measure will be satisfied.

No equipment or controls will be manipulated during this evaluation, only Simulated Actions will occur.

TASK STANDARDS:

TOOLS, EQUIPMENT, OTHER SPECIAL REQUIREMENTS:

  • Attachment 1 PROCEDURAL/

REFERENCES:

EVALUATOR INSTRUCTIONS:

  • Amplifying cues are provided within the JPM steps.
  • All pre-job briefings are completed.

INITIAL CONDITIONS:

The plant is operating at 98% power.

Today is 1/31/2011.

Page 5 of 11

JPM Number: 409 Clinton Power Station Job Performance Measure (JPM)

You have been asked to complete a license maintenance check on yourself prior to going home on your relief week IAW OP-AA-105-102 and the ESOMS log attachment.

Determine if you will be proficient for the next quarter. If not, determine the number of watches required to maintain proficiency. Based on the current report, on what day will your license be active until.

START TIME:

Page 6 of 11

JPM Number: 409 Clinton Power Station Job Performance Measure (JPM)

PERFORMANCE INFORMATION Critical steps are denoted with an asterisk (*) to the left of the step number and appear in BOLDED letters. Failure to meet the standards for a critical step constitutes failure of the Job Performance Measure. The sequence of steps is assumed unless denoted in the comments section of the JPM.

PERFORMANCE STEPS

  • 1) Candidate determines the minimum hours of watch standing for credit for proficiency has NOT been met.

Standard: Shift: as defined for maintaining an active license must be a minimum of 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> in duration.

MAINTAIN an active license by actively performing the functions of RO, SRO, or SROL.

RO licenses by performing the duties of the Unit RO and/or Unit Assist RO for a minimum of seven 8-hour or five 12-hour shifts per calendar quarter, including turnover to the next shift. The second Unit Assist RO (fourth RO) can receive watchstanding credit because duties are analogous to the duties of the first Unit Assist RO (third RO - who is required by Technical Specifications).

Cue:

Comments SAT UNSAT Comment Number Page 7 of 11

JPM Number: 409 Clinton Power Station Job Performance Measure (JPM)

  • 2) Candidate determines they need total of twenty more hours of watch standing in order to maintain their license active. Any one of the following combinations is acceptable.

- two twelve hours shifts

- one twelve hour and one eight hour

- three eight hour shifts Standard: The hours that are less than 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> do not count and the candidate determines that they need a minimum of two shifts before the quarter expires to keep the license active.

Cue:

Comments SAT UNSAT Comment Number Page 8 of 11

JPM Number: 409 Clinton Power Station Job Performance Measure (JPM)

3) Candidate determines their license will be active until 31 March 2011.

Standard: If the candidates determines all hours count they would conclude that their license would be active until Q-2 June 30th 2011.

Cue:

Comments SAT UNSAT Comment Number TERMINATING CUES:

Candidate has determined based on the log report from ESOMS that they need two more shifts.

STOP TIME:

Page 9 of 11

JPM Number: 409 Clinton Power Station Job Performance Measure (JPM)

Operators Name:

Job

Title:

NLO RO SRO STA SRO Cert JPM

Title:

License Maintenance Check JPM Number: 409 Admin B Revision Number: 00 Task Number and

Title:

LP85801.2.1.4 Knowledge of individual licensed operator responsibilities related to shift staffing, such as medical requirements, no solo operation, maintenance of active license status, 10CFR55, etc.

K/A System K/A Number Importance (RO/SRO)

Generic 2.1.4 3.3 Suggested Testing Environment: Class Room Actual Testing Environment: Simulator Plant Control Room Testing Method: Simulate Faulted: Yes No Perform Alternate Path: Yes No Time Critical: Yes No Estimated Time to Complete: 14 minutes Actual Time Used: minutes

References:

OP-AA-105-102 Rev.9 EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name: (Print)

Evaluators Signature: Date:

Page 10 of 11

Clinton Power Station Job Performance Measure (JPM)

Initial Conditions The plant is operating at 98% power.

Today is 1/31/2011.

Initiating Cue You have been asked to complete a license maintenance check on yourself prior to going home on your relief week IAW OP-AA-105-102 and the ESOMS log attachment.

Determine if you will be proficient for the next quarter. If not, determine the number of watches required to maintain proficiency. Based on the current report, on what day will your license be active until.

Page 11 of 11

CLINTON POWER STATION Job Performance Measure Admin C Print Reading/Tag out verification JPM Number: JPM411 Revision Number: 00 Date: 08/31/2010 Developed By: Tallion French 08/31/10 Instructor Date Validated By:

SME or Instructor Date Reviewed By:

Operations Representative Date Approved By:

Training Department Date

JPM Number: JPM411 Clinton Power Station Job Performance Measure (JPM)

JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation. Prior to JPM usage, revalidate JPM using steps 8 and 11 below.

________ 1. Task description and number, JPM description and number are identified.

________ 2. Knowledge and Abilities (K/A) references are included.

________ 3. Performance location specified. (in-plant, control room, or simulator)

________ 4. Initial setup conditions are identified.

________ 5. Initiating and terminating cues are properly identified.

________ 6. Task standards identified and verified by SME review.

________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).

________ 8. Verify the procedure referenced by this JPM matches the most current revision of that procedure:

Procedure Rev. _____ Date _____________

________ 9. Pilot test the JPM:

a. verify cues both verbal and visual are free of conflict, and
b. ensure performance time is accurate.

________ 10. If the JPM cannot be performed as written with proper responses, then revise the JPM.

________ 11. When JPM is revalidated, SME or Instructor sign and date JPM cover page.

SME/Instructor Date SME/Instructor Date SME/Instructor Date Page 2 of 10

JPM Number: JPM411 Clinton Power Station Job Performance Measure (JPM)

Revision Record (Summary)

Revision Date Description 00 8/31/10 New JPM Page 3 of 10

JPM Number: JPM411 Clinton Power Station Job Performance Measure (JPM)

READ TO THE OPERATOR I will explain the initial conditions, which step(s) to simulate or discuss, and provide the initiating cues. When you complete the task successfully, the objective of this Job Performance Measure will be satisfied.

TASK STANDARDS:

  • Applicant determines that two tags are incorrect and makes corrections to OP-AA-109-101.

TOOLS, EQUIPMENT, OTHER SPECIAL REQUIREMENTS:

PROCEDURAL/

REFERENCES:

EVALUATOR INSTRUCTIONS:

  • Passport and EDMS are down.

Page 4 of 10

JPM Number: JPM411 Clinton Power Station Job Performance Measure (JPM)

INITIAL CONDITIONS:

The plant is at rated conditions and CCW pump B needs to be tagged out for oil change. Passport and EDMS are down.

INITIATING CUE:

CAUTION All pre-job briefings are completed.

Do NOT shine any type light into a panel.

Determine if the provided clearance order has adequate boundaries. Perform independent technical review of the worker tag out.

START TIME:

Page 5 of 10

JPM Number: JPM411 Clinton Power Station Job Performance Measure (JPM)

PERFORMANCE INFORMATION Critical steps are denoted with an asterisk (*) to the left of the step number and appear in BOLDED letters. Failure to meet the standards for a critical step constitutes failure of the Job Performance Measure. The sequence of steps is assumed unless denoted in the comments section of the JPM.

PERFORMANCE STEPS

1) Verifies 1HSCC005 in correct position Standard: Determines that 1HSC005 is in the correct position Pull to Lock (PTL)

Cue:

Comments SAT UNSAT Comment Number Page 6 of 10

JPM Number: JPM411 Clinton Power Station Job Performance Measure (JPM)

  • 2) Verifies 1CC002A is the incorrect component.

Standard: Determines that 1CC002A is incorrect and should be 1CC002B Cue: Examinee may need to be told to complete the independent technical review.

Comments SAT UNSAT Comment Number

3) Verifies 1CC225B is the correct component.

Standard: Verifies 1CC225B is the correct component.

Cue:

Comments SAT UNSAT Comment Number

  • 4) Verifies 1AP08EN is NOT correct position.

Standard: Determines that 1AP08EN is NOT in the correct position RACKED OUT.

L/O is locked open.

Cue:

Comments SAT UNSAT Comment Number TERMINATING CUES:

Applicant submits his attachment 14 parts one and two of OP-AA-109-101. Based on the wrong breaker position and wrong valve.

STOP TIME:

Page 7 of 10

JPM Number: JPM411 Clinton Power Station Job Performance Measure (JPM)

Operators Name:

Job

Title:

NLO RO SRO STA SRO Cert JPM

Title:

Print Reading/Tag out verification JPM Number: JPM411 Admin C Revision Number: 00 Task Number and

Title:

LP85146.01.01 Given a situation requiring the use of the following documents be able to recognize when they are required to be referenced while operating the plant performing an out of service, or on an exam in accordance with the student text:

.1) Mechanical Drawings

.2) Electrical Drawings K/A K/A Number Importance (RO/SRO)

System Generic 2.2.13 4.1 Suggested Testing Environment: Simulator Actual Testing Environment: Simulator Plant Control Room Testing Method: Simulate Faulted: Yes No Perform Alternate Path: Yes No Time Critical: Yes No Estimated Time to Complete:15 minutes Actual Time Used: minutes

References:

EO2-1CC99 sheet 2 MO5-1032 sheet 1 Page 8 of 10

JPM Number: JPM411 Clinton Power Station Job Performance Measure (JPM)

EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name: (Print)

Evaluators Signature: Date:

Page 9 of 10

Clinton Power Station Job Performance Measure (JPM)

Initial Conditions The plant is at rated conditions and CCW pump B needs to be tagged out for oil change. Passport and EDMS are down.

CAUTION All pre-job briefings are completed.

Do NOT shine any type light into a panel.

Initiating Cue Determine if the provided clearance order has adequate boundaries. Perform independent technical review of the worker tag out.

Page 10 of 10

CLINTON POWER STATION Job Performance Measure Admin D Read Survey Map JPM Number: 410 Revision Number: 00 Date: 08/31/2010 Developed By: Tallion French 08/31/2010 Instructor Date Validated By:

SME or Instructor Date Reviewed By:

Operations Representative Date Approved By:

Training Department Date

JPM Number: 410 Clinton Power Station Job Performance Measure (JPM)

JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation. Prior to JPM usage, revalidate JPM using steps 8 and 11 below.

________ 1. Task description and number, JPM description and number areidentified.

________ 2. Knowledge and Abilities (K/A) references are included.

________ 3. Performance location specified. (in-plant, control room, or simulator)

________ 4. Initial setup conditions are identified.

________ 5. Initiating and terminating cues are properly identified.

________ 6. Task standards identified and verified by SME review.

________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).

________ 8. Verify the procedure referenced by this JPM matches the most current revision of that procedure:

Procedure Rev. _____ Date _____________

________ 9. Pilot test the JPM:

a. verify cues both verbal and visual are free of conflict, and
b. ensure performance time is accurate.

________ 10. If the JPM cannot be performed as written with proper responses, then revise the JPM.

________ 11. When JPM is revalidated, SME or Instructor sign and date JPM cover page.

SME/Instructor Date SME/Instructor Date SME/Instructor Date Revision Record (Summary)

Page 2 of 13

JPM Number: 410 Clinton Power Station Job Performance Measure (JPM)

Revision Date Description 00 08/31/10 New JPM Page 3 of 13

JPM Number: 410 Clinton Power Station Job Performance Measure (JPM)

Simulator Setup Instructions (This page is applicable only to JPMs performed in the Simulator.)

1. Administrative NOTE: It is permissible to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.
2. Attachment 1 is the survey map.
3. Attachment 2 is the Question sheet.
4. When the above steps are completed for this and other JPMs to be run concurrently, then validate the concurrently run JPMs if applicable.
5. This completes the setup for this JPM.

Page 4 of 13

JPM Number: 410 Clinton Power Station Job Performance Measure (JPM)

READ TO THE OPERATOR I will explain the initial conditions, which step(s) to simulate or discuss, and provide the initiating cues. When you complete the task successfully, the objective of this Job Performance Measure will be satisfied.

No equipment or controls will be manipulated during this evaluation, only Simulated Actions will occur.

TASK STANDARDS:

  • The evolution completed IAW RP-AA-203 EXPOSURE CONTROLS AND LIMITS Rev. 03.

TOOLS, EQUIPMENT, OTHER SPECIAL REQUIREMENTS:

  • Calculator PROCEDURAL/

REFERENCES:

  • RP-AA-203 EXPOSURE CONTROLS AND LIMITS Rev. 03.

EVALUATOR INSTRUCTIONS:

  • Amplifying cues are provided within the JPM steps.

INITIAL CONDITIONS:

The plant is operating at 97%.

Page 5 of 13

JPM Number: 410 Clinton Power Station Job Performance Measure (JPM)

INITIATING CUE:

Your preparing to enter the RT B Pump room to vent RT Pump per 3303.01 section 8.1.4.3.

You have been tasked with reviewing the survey map and identifying the items listed on Enclosure 2 and determining your dose if you stay by RT pump B valve 1G33F010B for 4 minutes.

START TIME:

Page 6 of 13

JPM Number: 410 Clinton Power Station Job Performance Measure (JPM)

PERFORMANCE INFORMATION Critical steps are denoted with an asterisk (*) to the left of the step number and appear in BOLDED letters. Failure to meet the standards for a critical step constitutes failure of the Job Performance Measure. The sequence of steps is assumed unless denoted in the comments section of the JPM.

PERFORMANCE STEPS

  • 1) What is the highest contamination level?

Standard:

Cue:

Comments SAT UNSAT Comment Number Page 7 of 13

JPM Number: 410 Clinton Power Station Job Performance Measure (JPM)

  • 2) What is the highest contact radiation level?

Standard:

Cue:

Comments SAT UNSAT Comment Number

  • 3) What is the highest dose rate level?

Standard:

Cue:

Comments SAT UNSAT Comment Number Page 8 of 13

JPM Number: 410 Clinton Power Station Job Performance Measure (JPM)

  • 4) Where is the low dose waiting area after entering the HCA?

Standard:

Cue:

Comments SAT UNSAT Comment Number

5) What is the dose for venting RT pump B?

Standard:

Cue:

Comments SAT UNSAT Comment Number TERMINATING CUES:

The candidate turns in the answer sheet.

STOP TIME:

Page 9 of 13

JPM Number: 410 Clinton Power Station Job Performance Measure (JPM)

What is the highest contamination level? 15K What is the highest contact radiation level ? 700 mr on the 1G33F005B What is the highest general area dose rate level? 60 mr Where is the low dose waiting area after entering Z120 at 8 mr the HCA?

What is the estimated dose for venting RT pump 4min/60minX60mr/hr=4mr B ?

Page 10 of 13

JPM Number: 410 Clinton Power Station Job Performance Measure (JPM)

Operators Name:

Job

Title:

NLO RO SRO STA SRO Cert JPM

Title:

Read Survey Map Admin D JPM Number: 410 Revision Number: 00 Task Number and

Title:

102405.01 Apply the administrative requirements of the ALARA program K/A System K/A Number Importance (RO/SRO)

Generic 2.3.7 3.5 Suggested Testing Environment: Simulator Actual Testing Environment: Simulator Plant Control Room Testing Method: Simulate Faulted: Yes No Perform Alternate Path: Yes No Time Critical: Yes No Estimated Time to Complete: 20 minutes Actual Time Used: minutes

References:

RP-AA-203 EXPOSURE CONTROLS AND LIMITS Rev. 03 EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name: (Print)

Evaluators Signature: Date:

Page 11 of 13

Clinton Power Station Job Performance Measure (JPM)

Initial Conditions The plant is operating at 97%.

Initiating Cue Your preparing to enter the RT B Pump room to vent RT Pump per 3303.01 section 8.1.4.3.

You have been tasked with reviewing the survey map and identifying the items listed on Enclosure 2 and determining your dose if you stay by RT pump B valve 1G33F010B for 4 minutes.

Page 12 of 13

Clinton Power Station Job Performance Measure (JPM)

Enclosure 2 What is the highest contamination level?

What is the highest contact radiation level level?

What is the highest general area dose rate level?

Where is the low dose waiting area after entering the HCA?

Determine your dose if you stay by RT pump B valve 1G33F010B for 4 minutes?

Page 13 of 13