Callaway: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) No edit summary |
StriderTol (talk | contribs) No edit summary |
||
| Line 24: | Line 24: | ||
|Docket=05000486 | |Docket=05000486 | ||
|is cancelled=Yes | |is cancelled=Yes | ||
}}{{Site unit | |||
|Unit number=3 | |||
|Power=1,600 MW | |||
|Docket=05200037 | |||
|is cancelled=Yes | |||
|Reactor type=Evolutionary Power Reactor | |||
}} | }} | ||
}} | }} | ||
Latest revision as of 22:32, 20 March 2021
| Plant | |
|---|---|
| Company | Ameren |
| Where | Steedman, Missouri |
| Regulatory | |
| Region | NRC Region 4 |
| ISFSI docket | 07201045 |
| wikipedia link | |
| Docket | 05000483 |
|---|---|
| Licensed Power Level (Thermal) | 3,565 MWt |
| Unit type | Westinghouse PWR 4-Loop |
| Containment | Ambient Pressure |
| Status | |
| NRC Website | |
| Docket | 05000486-Canceled |
|---|---|
| Licensed Power Level (Thermal) | 1150 MWe |
| Status | |
"MWe" is not declared as a valid unit of measurement for this property.
| Docket | 05200037-Canceled |
|---|---|
| Licensed Power Level (Thermal) | 1,600 MW |
| Unit type | Evolutionary Power Reactor |
| Status | |