Line 47: |
Line 47: |
| / | | / |
| ". Docket No. 50-315 | | ". Docket No. 50-315 |
| : -
| |
|
| |
|
| ==Dear .Hr. Keppler:== | | ==Dear .Hr. Keppler:== |
|
| |
|
| Pursuant to the requirements of Appendix A Technical Specifications and the United States Nuclear Regulatory Commission Regulatory- | | Pursuant to the requirements of Appendix A Technical Specifications and the United States Nuclear Regulatory Commission Regulatory-Guide 1.16, Revision 4, Section 2.a, the following report is submitted: |
| " ,
| |
| Guide 1.16, Revision 4, Section 2.a, the following report is submitted: | |
| RO 50-315/76-21 Sincerely, | | RO 50-315/76-21 Sincerely, |
| ,c'.M. | | ,c'.M. |
Line 59: |
Line 56: |
| 'ssaQ | | 'ssaQ |
| ,Plan t1anager | | ,Plan t1anager |
| ,
| |
| ./bab | | ./bab |
| ~/g~ OX~ | | ~/g~ OX~ |
| + ~'=I~~maSP< | | + ~'=I~~maSP< |
| CC: . R.S.. Hunter ~g Soli~ | | CC: . R.S.. Hunter ~g Soli~ |
| .J.E. Dola'n G.E. Lien R. Kilburn | | .J.E. Dola'n G.E. Lien R. Kilburn IR.J. Vollen BPI R.>Q. Callen NPSC |
| .
| |
| | |
| IR.J. Vollen BPI R.>Q. Callen NPSC | |
| .K.g. Baker RO:III P.l<. Steketee, Esq. | | .K.g. Baker RO:III P.l<. Steketee, Esq. |
| R~ Halsh, Esq. | | R~ Halsh, Esq. |
Line 101: |
Line 94: |
| 12 'I3 iln PERSONi~IEL IN JURIES NUMBER OESCRIPTION | | 12 'I3 iln PERSONi~IEL IN JURIES NUMBER OESCRIPTION |
| ~00 7 | | ~00 7 |
| P~g 09 .,11 0 12 IIA PROBABLE CONSEQUElICES | | P~g 09 .,11 0 12 IIA PROBABLE CONSEQUElICES Q~g -NA 7 89 LOSS OR OAMAGE TO "ACILITY TYPE OESCAIPTION |
| - -
| |
| Q~g -NA 7 89 LOSS OR OAMAGE TO "ACILITY TYPE OESCAIPTION | |
| ,Q~g ~Z NA 7 89 10 80 PUBLICITY l'lA 7 89 AOOII'IONAL FACTORS 1 A PR0~1tl OF TFSTS ~~]P,LQQ~.35DEH'I'le Ql Dg/ERNINF Tllg OPERABILITY QJ'CCA..L=Z. | | ,Q~g ~Z NA 7 89 10 80 PUBLICITY l'lA 7 89 AOOII'IONAL FACTORS 1 A PR0~1tl OF TFSTS ~~]P,LQQ~.35DEH'I'le Ql Dg/ERNINF Tllg OPERABILITY QJ'CCA..L=Z. |
| ci Kb9L 7 | | ci Kb9L 7 |
Similar Documents at Cook |
---|
Category:Letter
MONTHYEARAEP-NRC-2024-77, U2C28 Steam Generator Tube Inspection Report2024-10-21021 October 2024 U2C28 Steam Generator Tube Inspection Report AEP-NRC-2024-80, Independent Spent Fuel Storage Installation Registration of Dry Spent Fuel Storage Cask2024-10-15015 October 2024 Independent Spent Fuel Storage Installation Registration of Dry Spent Fuel Storage Cask AEP-NRC-2024-79, Unit 2, Independent Spent Fuel Storage Installation - Registration of Dry Spent Storage Cask2024-09-26026 September 2024 Unit 2, Independent Spent Fuel Storage Installation - Registration of Dry Spent Storage Cask AEP-NRC-2024-78, Reply to a Notice of Violation: EA-24-0472024-09-23023 September 2024 Reply to a Notice of Violation: EA-24-047 05000316/LER-2024-002-01, Manual Reactor Trip Following Rapid Downpower for Steam Leak2024-09-12012 September 2024 Manual Reactor Trip Following Rapid Downpower for Steam Leak IR 05000315/20244022024-09-10010 September 2024 Security Baseline Inspection Report 05000315/2024402 and 05000316/2024402, Independent Spent Fuel Storage Installation Security Inspection Report 07200072/2024401 AEP-NRC-2024-69, Core Operating Limits Report2024-09-0909 September 2024 Core Operating Limits Report IR 05000315/20243012024-09-0505 September 2024 NRC Initial License Examination Report 05000315/2024301 and 05000316/2024301 ML24225A0022024-09-0303 September 2024 Issuance of Amendment Nos. 363 and 344 Revising Technical Specifications Section 3.8.1, AC Sources-Operating, for a One-Time Extension of a Completion Time IR 05000315/20240112024-08-30030 August 2024 NRC Inspection Report 05000315/2024011 and 05000316/2024011 and Notice of Violation AEP-NRC-2024-51, Annual Report of Loss-Of-Coolant Accident Evaluation Model Changes2024-08-28028 August 2024 Annual Report of Loss-Of-Coolant Accident Evaluation Model Changes AEP-NRC-2024-76, Unit 2 - Supplement to License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating2024-08-28028 August 2024 Unit 2 - Supplement to License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating 05000316/LER-2024-003, Plant Shutdown Required by Technical Specifications Due to Reactor Coolant System Identified Leakage2024-08-22022 August 2024 Plant Shutdown Required by Technical Specifications Due to Reactor Coolant System Identified Leakage IR 05000315/20240052024-08-21021 August 2024 Updated Inspection Plan for Donald C. Cook Nuclear Plant, Units 1 and 2 (Report 05000315/2024005 and 05000316/2024005) AEP-NRC-2024-61, Unit 2 - Response to Request for Additional Information for Neutron Flux Instrumentation License Amendment Request2024-08-15015 August 2024 Unit 2 - Response to Request for Additional Information for Neutron Flux Instrumentation License Amendment Request ML24221A2702024-08-0808 August 2024 Unit 2 Independent Spent Fuel Storage Installation - Registration of Dry Spent Fuel Storage Cask AEP-NRC-2024-62, Unit 2, Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Cask2024-08-0707 August 2024 Unit 2, Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Cask ML24256A1482024-08-0202 August 2024 2024 Post Examination Submittal Letter AEP-NRC-2024-47, Form OAR-1, Owners Activity Report2024-07-30030 July 2024 Form OAR-1, Owners Activity Report ML24183A0162024-07-25025 July 2024 Review of Reactor Vessel Material Surveillance Program Capsule W Technical Report ML24169A2142024-07-25025 July 2024 Issuance of Amendment No. 362 Regarding Change to Technical Specification 3.4.12, Low Temperature Overpressure Protection System IR 05000315/20240022024-07-24024 July 2024 Integrated Inspection Report 05000315/2024002 and 05000316/2024002 05000316/LER-2024-002, Manual Reactor Trip Following Rapid Downpower for Steam Leak2024-07-15015 July 2024 Manual Reactor Trip Following Rapid Downpower for Steam Leak ML24197A1262024-07-15015 July 2024 Unit 2 - Request for Additional Information (RAI) for License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating ML24191A0692024-07-0909 July 2024 Operator Licensing Examination Approval - Donald C. Cook Nuclear Power Plant, July 2024 AEP-NRC-2024-56, Unit 2, Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Cask2024-07-0808 July 2024 Unit 2, Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Cask AEP-NRC-2024-48, Response to Request for Additional Information (RAI) for License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating2024-07-0202 July 2024 Response to Request for Additional Information (RAI) for License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating ML24176A1012024-06-21021 June 2024 57143-EN 57143 - Paragon Energy Solutions - Update 1 (Final) - 10CFR Part 21 Final Notification: P21-05242024-FN, Rev. 0 AEP-NRC-2024-45, Report Per Technical Specification 5.6.6 for Inoperability of Post Accident Monitoring Neutron Flux Monitoring2024-06-13013 June 2024 Report Per Technical Specification 5.6.6 for Inoperability of Post Accident Monitoring Neutron Flux Monitoring ML24163A0132024-06-12012 June 2024 Request for Information for the NRC Age-Related Degradation Inspection: Inspection Report 05000315/2024012 and 05000316/2024012 ML24159A2522024-05-30030 May 2024 10 CFR 50.71(e) Update and Related Site Change Reports AEP-NRC-2024-23, Core Operating Limits Report2024-05-23023 May 2024 Core Operating Limits Report 05000316/LER-2024-001, Reactor Trip Due to Main Turbine Trip from a High-High Thrust Bearing Position Trip2024-05-20020 May 2024 Reactor Trip Due to Main Turbine Trip from a High-High Thrust Bearing Position Trip ML24141A2162024-05-20020 May 2024 —Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection AEP-NRC-2024-40, Unit 2 - Supplement to License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating2024-05-16016 May 2024 Unit 2 - Supplement to License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating AEP-NRC-2024-41, Annual Radiological Environmental Operating Report2024-05-15015 May 2024 Annual Radiological Environmental Operating Report IR 05000315/20240012024-05-14014 May 2024 Integrated Inspection Report 05000315/2024001 and 05000316/2024001 AEP-NRC-2024-07, Unit 2 - Transmittal of Report of Changes to the Emergency Plan2024-05-14014 May 2024 Unit 2 - Transmittal of Report of Changes to the Emergency Plan AEP-NRC-2024-26, Transmittal of Donald C. Cook Nuclear Plant, Emergency Plan Revision 492024-05-14014 May 2024 Transmittal of Donald C. Cook Nuclear Plant, Emergency Plan Revision 49 IR 05000315/20244012024-05-14014 May 2024 – Security Baseline Inspection Report 05000315/2024401 and 05000316/2024401 AEP-NRC-2024-24, Form OAR-1, Owners Activity Report2024-05-0707 May 2024 Form OAR-1, Owners Activity Report ML24115A2152024-05-0707 May 2024 LTR: CNP Non-Acceptance with Opportunity TS 3-8-1 ML24256A1472024-05-0606 May 2024 DC Cook 2024 NRC Examination Submittal Letter: Submittal ML24116A0002024-05-0202 May 2024 – Regulatory Audit in Support of Review of the Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors AEP-NRC-2024-35, Response to NRC Regulatory Issue Summary 2024-01 Preparation and Scheduling of Operator Licensing Examinations2024-04-30030 April 2024 Response to NRC Regulatory Issue Summary 2024-01 Preparation and Scheduling of Operator Licensing Examinations AEP-NRC-2024-28, 2023 Annual Radioactive Effluent Release Report2024-04-29029 April 2024 2023 Annual Radioactive Effluent Release Report AEP-NRC-2024-31, Annual Report of Individual Monitoring2024-04-24024 April 2024 Annual Report of Individual Monitoring AEP-NRC-2024-02, Unit 2 License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating2024-04-0303 April 2024 Unit 2 License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating AEP-NRC-2024-29, (CNP) Unit 2 - Request for Relief Related to American Society of Mechanical Engineers (ASME) Code Case N-729-6 Supplemental Examination Requirements, ISIR-5-072024-04-0303 April 2024 (CNP) Unit 2 - Request for Relief Related to American Society of Mechanical Engineers (ASME) Code Case N-729-6 Supplemental Examination Requirements, ISIR-5-07 AEP-NRC-2024-19, Annual Report of Property Insurance2024-04-0101 April 2024 Annual Report of Property Insurance 2024-09-09
[Table view] Category:Licensee Event Report (LER)
MONTHYEAR05000316/LER-2024-002-01, Manual Reactor Trip Following Rapid Downpower for Steam Leak2024-09-12012 September 2024 Manual Reactor Trip Following Rapid Downpower for Steam Leak 05000316/LER-2024-003, Plant Shutdown Required by Technical Specifications Due to Reactor Coolant System Identified Leakage2024-08-22022 August 2024 Plant Shutdown Required by Technical Specifications Due to Reactor Coolant System Identified Leakage 05000316/LER-2024-002, Manual Reactor Trip Following Rapid Downpower for Steam Leak2024-07-15015 July 2024 Manual Reactor Trip Following Rapid Downpower for Steam Leak 05000316/LER-2024-001, Reactor Trip Due to Main Turbine Trip from a High-High Thrust Bearing Position Trip2024-05-20020 May 2024 Reactor Trip Due to Main Turbine Trip from a High-High Thrust Bearing Position Trip 05000316/LER-2017-0012017-05-19019 May 2017 1 OF 5, LER 17-001-00 for Cook, Unit 2 re Containment Hydrogen Skimmer Ventilation Fan #1 Inoperable Longer than Allowed by Technical Specifications 05000316/LER-2016-0022017-02-0909 February 2017 Emergency Diesel Generators Declared Inoperable Due to a Manufacturing Design Issue, LER 16-002-00 for Donald C. Cook Nuclear Plant Unit 2 Regarding Emergency Diesel Generators Declared Inoperable Due to a Manufacturing Design Issue 05000316/LER-2016-0012016-08-31031 August 2016 Manual Reactor Trip Due To Moisture Separator Heater Expansion Joint Failure, LER 16-001-00 for Donald C. Cook Nuclear Plant, Unit 2 Regarding Manual Reactor Trip Due To Moisture Separator Heater Expansion Joint Failure ML16193A3902016-07-15015 July 2016 Donald C. Cook Nuclear Plant Unit 2 - A Loss of Main Condenser Event Occurred Due to a Storm-Induced Debris Damage of the Circulating Water System Pumps in the Forebay (LER-316-2014-003-00) 05000315/LER-2015-0022016-01-18018 January 2016 -Technical Specification Violation due to Inoperable Residual. Heat Removal Pump, LER 15-002-01 for D.C. Cook, Unit 1, Regarding Technical Specification Violation Due to Inoperable Residual Heat Removal Pump 05000316/LER-2015-0012016-01-15015 January 2016 Manual Reactor Trip Due To A Secondary Plant Transient, LER 15-001-01 for D.C. Cook, Unit 2, Regarding Manual Reactor Trip Due to a Secondary Plant Transient ML0528703602005-10-0505 October 2005 Special Report for D. C. Cook Unit 2 Re Unit 2 Reactor Coolant Inventory Tracking System ML0508903452005-03-22022 March 2005 LER 99-001-01 Donald C. Cook Nuclear Plant Unit 2, Regarding Supplemental LER for Degraded Component Cooling Water Flow to Containment Main Steam Line Penetrations ML0210601432002-04-12012 April 2002 LER 02-02-00, Donald C. Cook Nuclear Plant Unit 2, Technical Specification 3.9.4.c Was Violated During Core Alteration ML0209205342002-03-15015 March 2002 LER 99-012-01 for Cook Nuclear Plant, Unit 1 Re Auxiliary Building ESF Ventilation System May Not Be Capable of Maintaining ESF Room Temperature Post-Accident ML9936300511999-12-20020 December 1999 LER 99-S004-00, Intentionally Falsifying Documentation Results in Unauthorized Unescorted Access, on 11/18/99. with Letter Dated 12/20/99 05000315/LER-1999-027, LER 315/99-027-00, Underrated Fuses Used in 250 Vdc System Could Result in Lack of Protective Coordination1999-11-29029 November 1999 LER 315/99-027-00, Underrated Fuses Used in 250 Vdc System Could Result in Lack of Protective Coordination ML18219E1521978-09-27027 September 1978 Submit Licensee Event Report Nos. RO 78-051/03L-0 & RO 78-052/03L-0 ML18219B5201978-09-27027 September 1978 09/27/1978 Letter Enclosure of Licensee Event Report ML18219B5211978-09-19019 September 1978 09/19/1978 Letter Enclosure of Licensee Event Report ML18219E1531978-09-18018 September 1978 Submit Licensee Event Report No. RO 78-050/03L-0 ML18219B5541978-09-18018 September 1978 Letter from Indiana & Michigan Power Co to NRC Submitting Licensee Event Report (RO 78-062/03L-0) ML18219B5551978-09-12012 September 1978 Letter from Indiana & Michigan Power Co to NRC Submitting Licensee Event Reports (RO 78-56/03L-1 and RO 78-061/03L-0) ML18219E1541978-09-12012 September 1978 Submit Licensee Event Report No. RO 78-049/03L-0 ML18219E1551978-09-0808 September 1978 Submit Licensee Event Report No. RO 78-048/03L-0 ML18219B5561978-09-0808 September 1978 Letter from Indiana & Michigan Power Co to NRC Submitting Licensee Event Reports (RO 78-059/03L-1 and RO 78-060/03L-0) ML18219B5571978-09-0505 September 1978 Letter from Indiana & Michigan Power Co to NRC Submitting License Event Report RO 78-059/03L-0 ML18219B5581978-08-30030 August 1978 Letter from Indiana & Michigan Power Co to NRC Submitting Licensee Event Report RO 78-058/03L-0 ML18219B5621978-08-22022 August 1978 Letter from Indiana & Michigan Power Co to NRC Submitting Licensee Event Reports (RO 78-056/03L-0 and RO 78-057/03L-0) ML18219B5611978-08-18018 August 1978 Letter from Indiana & Michigan Power Co to NRC Submitting Licensee Event Reports (RO 78-052/03L-0, RO 78-053/03L-0, RO 78-054-03L-0 and RO 78-055/03L-0) ML18219E1561978-08-15015 August 1978 Submit Licensee Event Report No. RO 78-047/03L-0 ML18219E1581978-08-14014 August 1978 Submit Licensee Event Report Nos. RO 78-043/03L-1 & RO 78-044/03L-1 ML18219E1571978-08-14014 August 1978 Submit Licensee Event Report Nos. RO 78-045/03L-0 & RO 78-046/03L-0 ML18219E1601978-08-11011 August 1978 Submit Licensee Event Report Nos. 1978-043-03L & 1978-044-03L ML18219B5641978-08-10010 August 1978 Letter from Indiana & Michigan Power Co to NRC Submitting Licensee Event Report (RO 78-051/03L-0) ML18219B5651978-08-0909 August 1978 Letter from Indiana & Michigan Power Co to NRC Submitting Licensee Event Report (RO 78-049/03L-1) ML18219B5661978-08-0808 August 1978 Letter from Indiana & Michigan Power Co to NRC Submitting Licensee Event Report (RO 78-050/03L-0) ML18219B5671978-08-0404 August 1978 Letter from Indiana & Michigan Power Co to NRC Submitting Licensee Event Report (RO 78-049/03L-0) ML18219B5681978-08-0202 August 1978 Letter from Indiana & Michigan Power Co to NRC Submitting Licensee Event Reports (RO 78-029/03L-1 and RO 78-048/03L-0) ML18219B5691978-07-21021 July 1978 Letter from Indiana & Michigan Power Co to NRC Submitting Licensee Event Reports (RO 78-019/03L-1 and RO 78-023/03L-1) ML18219B5701978-07-18018 July 1978 Letter from Indiana & Michigan Power Co to NRC Submitting Licensee Event Report (RO 78-047/03L-0) ML18219B5711978-07-11011 July 1978 Letter from Indiana & Michigan Power Co to NRC Submitting Licensee Event Report (RO 78-043/03L-0), Submitted Late Due to a Paper Defect ML18219B5721978-07-11011 July 1978 Letter from Indiana & Michigan Power Co to NRC Submitting Licensee Event Reports (RO 78-034/03L-1, RO 78-044/03L-0, RO 78-045/03L-0, RO 78-046/03L-0) ML18219B5731978-07-0505 July 1978 Letter from Indiana & Michigan Power Co to NRC Submitting Licensee Event Report (RO 78-042/03L-0) ML18219B5751978-06-29029 June 1978 Letter from Indiana & Michigan Power Co to NRC Submitting Licensee Event Report (RO 50-316/78-037), Stating Corrective Actions Taken IR 05000316/19780371978-06-29029 June 1978 Letter from Indiana & Michigan Power Co to NRC Submitting Licensee Event Report (RO 50-316/78-037), Stating Corrective Actions Taken ML18219B5771978-06-22022 June 1978 D.C. Cook - Submit Licensee Event Report RO 78-036/03L-0 for Unit 2 ML18219B5761978-06-21021 June 1978 Letter from Indiana & Michigan Power Co to NRC Submitting Licensee Event Report (RO 78-035/03L-0), a Resubmittal of LER 78-034/03L-0 Dated 6/19/1978 ML18219B5781978-06-19019 June 1978 D.C. Cook - Submit Licensee Event Report RO 50-316/78-034/03L-0 for Unit 2 IR 05000316/19780341978-06-19019 June 1978 D.C. Cook - Submit Licensee Event Report RO 50-316/78-034/03L-0 for Unit 2 ML18219B5221978-06-0606 June 1978 06/06/1978 Letter Licensee Event Report 2024-09-12
[Table view] |
Text
NRC FORM 195 DOCKET NUMBER" I2. NI 50-315 .
FILE NUMBER NRC DISTRIBUTION FDR PART 60 DOCI(ET MATERIAL- INCIDENT REPORT TO: FROM: DATE OF DOCUMENT
'NDXANA
& MICHIGAN POWER COMPANY 5/25/76
'MR~J.. KHPPL& BRXDGMANq MICHIGAN DATE RECEIVED R, W JURGENSEN 5/28/76 J8fLE TTE R QNOTORIZED PROP INPUT FORM NUMBER OF COPIES RECEIVED 0 ORIGINAL PkV N C LASS IF I E D PKC'OPV NONE SXGNED DESCRIPTION ENCLOSURE LTR, TRANS THE FOLLOWXNG: LICENSEE EVENT RPT. (RO 50-315/76-21) ON 5/11/76 CONCERNING AN INDICATED QUADRANT POWER TILT OF 1 '23 WHICH WAS CALCULATED USING THE,EXCORE,NUCLEAR XNSTRUMEhlTATXON READINGS WHILE XN.MODE 1 AT 60% POWER,,
ACKNOWLEDGED
-P) (2-~) DQ NOT REMOVE PLANT NAME: NOTE: IF PERSOVaKL EXPOSURE IS INVOLVED SEND DIRECTLY TO KREGER/J. COLLXNS COOK 81 SAFETY FOR ACTION/INFORMATION ENVIRO BRANCH CHIEF:
W 3 CYS FOR ACTION LIC ASST:
W/ CY ACRS CYS HOLDING/ ENT TO LA INTERNAL DISTRIBUTION E FIL I &.E 2 SCHROEDER/IPPOL'XTO 0 0 ~~i I NOVAK CHECK gy>~IES S >EI,'
T ~
EDESCO IIACChl FTSr;N BAi R SllAO VOT.T.l IF RQBUhI; Il KRI+HIQJ~OI.Q NS EXTERNAL DISl I'IIDUTION CONTROL NUfvlAFR LPDR: T JO EPH MI TIC NSXC
&877'IIC I ()IIM 19ti IZ ylII
~ 5 1I 4
% 1 0 ~
t 'p
/ ~
V F '
0 r e ll f r
/
4+1 E
I A
/MIAfJA 'N/C Y/GAPJ PO "JEB CO/7PAPJYi DONALD C. COOK NUCLEAR PLANT P.O. Bov 458, Bridjmnn, Michigan 40100 May 25, 1976
/
/
ter.. J.G. Keppler, Regional Director Office of Inspection and Enforcement
, United States. Nuclear Regulatory Comin'ission Region III 799 Roosevelt Road Glen Ellyn, IL 60137 Operating License DPR-58
/
". Docket No. 50-315
Dear .Hr. Keppler:
Pursuant to the requirements of Appendix A Technical Specifications and the United States Nuclear Regulatory Commission Regulatory-Guide 1.16, Revision 4, Section 2.a, the following report is submitted:
RO 50-315/76-21 Sincerely,
,c'.M.
rge en/
'ssaQ
,Plan t1anager
./bab
~/g~ OX~
+ ~'=I~~maSP<
CC: . R.S.. Hunter ~g Soli~
.J.E. Dola'n G.E. Lien R. Kilburn IR.J. Vollen BPI R.>Q. Callen NPSC
.K.g. Baker RO:III P.l<. Steketee, Esq.
R~ Halsh, Esq.
Gf .Charnoff, Esq.
~
G: Olson 53%V J.)1. Hennigan PNSRC R.S. Keith
=Dir., IE (40 copies)
'ir., tlIPC (4 copies)
~
I U
OO'ITFIOL O'.OCKI~ (PLcA E PRINT ALL, FGIJIREO I;)i-OR:r)ATIO;.
1 OCENSFE LICENSE EVENT NAihiE UCENSE NINMBEA TYPE TYPE Jog II I 0 C C 0 0 0 0 0 0 0 0 0 4 1 1 1 1 Lool32 J
~
7 89 14 'l5 25 26 30 31 AEPOR" P=NOAT CATEGORY c',i
'<<Ri C
~
OOCKET NUhIBEA EVENT OATE REPORT OAZE T
TYi'i:'oclooN P ~L 0 5 0 0 3 1l5 0 5 1 1 7 6 0 5 2 5 716 7 0 5? '59 59 60 O'I 68 69 ~ 74 75 00 I
EVEI4T OESCRIPTIOiN Q~g 'LlHILE IN NODE 1 AT 60, PO'HER, AN INDICATED QUMRANT PO';JER TILT OF 1.023 ltAS CALCULAT D 7 89 80 USING TH EXCORE IlUCLEAR INSTRUMENTATION READItlGS. AN INCORE THERNOCOUPLE HAP 'lAS 7 09 80 QogI TAKEN AND IT CO:lFIRilED THAT A TILT DID EXIST. AN INCORE llOVABLE DETECTOR t'lAP 101-83 7 89 mt 7 8 9 tl 7
Qn I09 ITS V S l l'F 0-50-.315 j2.6; ZU:,'0'RhlE SYSTEhl CAUSE COMPUN NT COhlPONcaIT COQc COOc COi.lPO"IFNT COOE SUPPL'cA I IAiNUFACTURcA VX)IATIOI4
[oar] ~RB E CI0 II II 0 0 ~N M 1 2 0 7 . 8 9 10 11 , 12 17 48 CAUSE OESCR!PTION tm09 DURING ROD DROP TESTING RCCA E-3 llAS FOUND TO BE STUCK AND 1NDICATIONS ARE'THAT 7 0 9 80 IT E-3 KI I 89 THAT SUBSEQUENT EXERCISING HOVEMENTS TO FREE RESULTED IN A PORTION OF RCCA 80 BREAKING OFF AND BEING LEFT INSERTED I'l THE CORE. PRELININARY (SEE SUPPLEtlENT) 7 89 METHOO OF F ACIUTY STATUS ~ % POlVEA OTHER STATUS OISCOVEAY OISCOVEAY OESCRIPTION Q~g 1. ~os o NA SHIFT SURVEILLANCE 7.0 9 FORhl OF
. 10 12 13 44 45 46 ACTIVITY COATENT
~
Qg 7 8 ABEASEO
~7 9
~
OF AELEAiSE 10 11 NA AhlOUi4T OF ACTIVITY LOCATIOi4 OF AEI.EASE PERSONNEL EXPOSURES NUiVIBEA TYPE OESCRIPTION 7
tii3]
89
~00 0 11 Z
12 'I3 iln PERSONi~IEL IN JURIES NUMBER OESCRIPTION
~00 7
P~g 09 .,11 0 12 IIA PROBABLE CONSEQUElICES Q~g -NA 7 89 LOSS OR OAMAGE TO "ACILITY TYPE OESCAIPTION
,Q~g ~Z NA 7 89 10 80 PUBLICITY l'lA 7 89 AOOII'IONAL FACTORS 1 A PR0~1tl OF TFSTS ~~]P,LQQ~.35DEH'I'le Ql Dg/ERNINF Tllg OPERABILITY QJ'CCA..L=Z.
ci Kb9L 7
PFIONE:M616~M~3 EXt. Gi 0 331 iJII col
RO-50-315-76-21 SUPPLEtlENT TO EVENT DESCRIPTIOi'l AND 1,009 IN THE LOWER HALF OF THE CORE. HOWEVER, ANALYSIS OF tfAP 101-83 DID INDICATE A FLUX DEPRESSION NEAR ASSEMBLY E-3. FURTHER If'lVESTIGATION INDICATED A StQLL PORTION OF ROD CLUSTER COiNTROL ASSEMBLY (RCCA) E-3. HAD BEEN LEFT IN THE CQRE. AT THIS POINT, RCCA E-3 WAS DECLARED INOPERABLE AND POWER OPERATION llAS LIMITED TO A MAXIMUM OF 75/ PO'LtER UNDER TECHNICAL SPECIFICATIONS 3/4.1.3.
SUPPLEMENT TO CAUSE DESCRIPTION ANALYSIS If'lDICATES THAT ONE (1) OR TWO (2) FINGERS ARE IN THEIR GUIDE. TUBES IN THE CORE (RCCA CONTAII'lS TWENTY (20) FINGERS). BY EXAMINING TRACES FROM INCORE DETECTORS F-3 AND D-3 ADJACENT TO E-3, IT IS CONCLUDED THAT THE FINGERS LEFT IN THE CORE ARE FULLY INSERTED OVER THEIR ENTIRE LENGTH.
I