Latest revision as of 20:08, 2 February 2020
Similar Documents at Cook |
---|
Category:Letter
MONTHYEARIR 05000315/20230042024-01-31031 January 2024 Integrated Inspection Report 05000315/2023004 and 05000316/2023004 ML24004A1582024-01-19019 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0039 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) AEP-NRC-2024-01, Emergency Plan Revision 482024-01-0808 January 2024 Emergency Plan Revision 48 AEP-NRC-2023-56, Report Per Technical Specification 5.6.6 for Inoperability of Unit 1 Post Accident Monitoring Reactor Coolant (Loop 3 Cold Leg) Wide Range Temperature Recorder Thermal Sensor2023-12-20020 December 2023 Report Per Technical Specification 5.6.6 for Inoperability of Unit 1 Post Accident Monitoring Reactor Coolant (Loop 3 Cold Leg) Wide Range Temperature Recorder Thermal Sensor ML23352A3502023-12-19019 December 2023 Dc. Cook Nuclear Power Plant, Units 1 Biennial Licensed Operator Requalification Program Inspection and Request for Information ML23338A2642023-12-0505 December 2023 Confirmation of Initial License Examination AEP-NRC-2023-45, Unit 2 - Schedular Exemption for Enhanced Weapons, Firearms, Background Checks, and Security Event Notifications Implementation2023-11-16016 November 2023 Unit 2 - Schedular Exemption for Enhanced Weapons, Firearms, Background Checks, and Security Event Notifications Implementation IR 05000315/20234042023-11-0606 November 2023 Cyber Security Inspection Report 05000315/2023404 and 05000316/2023404 ML23310A1152023-11-0606 November 2023 Notification of the NRC Baseline Inspection and Request for Information, Inspection Report 05000316/2024002 IR 05000315/20234032023-09-19019 September 2023 Security Baseline Inspection Report 05000315/2023403 and 05000316/2023403 IR 05000315/20230112023-08-31031 August 2023 Functional Engineering Inspection - Commercial Grade Dedication Report 05000315/2023011 and 05000316/2023011 ML23242A1832023-08-30030 August 2023 Notification of NRC Baseline Inspection and Request for Information; Inspection Report05000315/2023004 AEP-NRC-2023-40, Annual Report of Loss-of-Coolant Accident Evaluation Model Changes2023-08-29029 August 2023 Annual Report of Loss-of-Coolant Accident Evaluation Model Changes IR 05000315/20234022023-08-11011 August 2023 Security Baseline Inspection Report 05000315/2023402 and 05000316/2023402 AEP-NRC-2023-34, Supplement to Request for Approval of Change Regarding Neutron Flux Instrumentation2023-08-0202 August 2023 Supplement to Request for Approval of Change Regarding Neutron Flux Instrumentation IR 05000315/20230022023-07-24024 July 2023 Integrated Inspection Report 05000315/2023002 and 05000316/2023002 ML23178A2422023-06-28028 June 2023 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch III IR 05000315/20230122023-06-22022 June 2023 Biennial Problem Identification and Resolution Inspection Report 05000315/2023012 and 05000316/2023012 IR 05000315/20235012023-06-21021 June 2023 Emergency Preparedness Biennial Exercise Inspection Report 05000315/2023501 and 05000316/2023501 AEP-NRC-2023-29, Core Operating Limits Report2023-06-19019 June 2023 Core Operating Limits Report ML23159A0192023-06-13013 June 2023 Information Meeting with a Question and Answer Session to Discuss NRC 2022 End-Of-Cycle Plant Performance Assessment of Donald C. Cook Nuclear Plant, Units 1 and 2 AEP-NRC-2023-32, Response to NRC Regulatory Issue Summary 2023-1 Preparation and Scheduling of Operator Licensing Examinations2023-06-0606 June 2023 Response to NRC Regulatory Issue Summary 2023-1 Preparation and Scheduling of Operator Licensing Examinations AEP-NRC-2023-33, Renewable Operating Permit2023-06-0505 June 2023 Renewable Operating Permit AEP-NRC-2023-30, Follow-Up Notification of Ph Non-Compliance for Turbine Room Sump2023-06-0101 June 2023 Follow-Up Notification of Ph Non-Compliance for Turbine Room Sump AEP-NRC-2023-27, Annual Radiological Environmental Operating Report2023-05-15015 May 2023 Annual Radiological Environmental Operating Report ML23131A3282023-05-11011 May 2023 D.C. Cook Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection 05000315/2023404 and 05000316/2023404 IR 05000315/20230012023-05-0303 May 2023 Integrated Inspection Report 05000315/2023001 and 05000316/2023001 AEP-NRC-2023-19, Annual Radioactive Effluent Release Report2023-04-30030 April 2023 Annual Radioactive Effluent Release Report ML23117A0062023-04-27027 April 2023 Review of the Spring 2022 Steam Generator Tube Inspections Report ML23114A1142023-04-25025 April 2023 Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection AEP-NRC-2023-23, Annual Report of Individual Monitoring for 20222023-04-24024 April 2023 Annual Report of Individual Monitoring for 2022 AEP-NRC-2023-24, Notification of Ph Non-Compliance for Turbine Room Sump2023-04-12012 April 2023 Notification of Ph Non-Compliance for Turbine Room Sump AEP-NRC-2023-20, Annual Report of Property Insurance2023-04-0303 April 2023 Annual Report of Property Insurance AEP-NRC-2023-15, Decommissioning Funding Status Report2023-03-28028 March 2023 Decommissioning Funding Status Report ML23076A0212023-03-20020 March 2023 Request for Information for NRC Commercial Grade Dedication Inspection; Inspection Report 05000315/2023011; 05000316/2023011 IR 05000315/20234012023-03-16016 March 2023 Security Baseline Inspection Report 05000315/2023401 and 05000316/2023401 ML23066A1882023-03-0707 March 2023 Information Request to Support Upcoming Problem Identification and Resolution (Pi&R) Inspection at Donald C. Cook Nuclear Plant IR 05000315/20220062023-03-0101 March 2023 Annual Assessment Letter for Donald C. Cook Nuclear Plant, Units 1 and 2 (Report 05000315/2022006 and 05000316/2022006) IR 05000315/20220042023-02-0101 February 2023 Integrated Inspection Report 05000315/2022004 and 05000316/2022004 and Exercise of Enforcement Discretion AEP-NRC-2023-11, Form OAR-1, Owner'S Activity Report2023-01-31031 January 2023 Form OAR-1, Owner'S Activity Report IR 05000315/20230102023-01-31031 January 2023 Phase 4 Post-Approval License Renewal Inspection Report 05000315/2023010 and 05000316/2023010 AEP-NRC-2023-02, Request for Approval of Change Regarding Neutron Flux Instrumentation2023-01-26026 January 2023 Request for Approval of Change Regarding Neutron Flux Instrumentation ML22363A5622023-01-0404 January 2023 Relief Request ISIR-5-06 Related to ASME Code Case N-729-6 Supplemental Examination Requirements of Reactor Vessel Closure Head Penetration Nozzles AEP-NRC-2022-66, Report Per Technical Specification 5.6.6 for Inoperability of Unit 2 Post Accident Monitoring Neutron Flux Monitoring2022-12-15015 December 2022 Report Per Technical Specification 5.6.6 for Inoperability of Unit 2 Post Accident Monitoring Neutron Flux Monitoring AEP-NRC-2022-46, Notification of Deviation from Electric Power Research Institute (EPRI) Materials Reliability Program 2019-008, Interim Guidance for NEI 03-08 Needed Requirements for Us PWR Plants for Management of Thermal Fatigue in2022-12-12012 December 2022 Notification of Deviation from Electric Power Research Institute (EPRI) Materials Reliability Program 2019-008, Interim Guidance for NEI 03-08 Needed Requirements for Us PWR Plants for Management of Thermal Fatigue in ML22340A1392022-11-30030 November 2022 Submittal of Revision 31 to Updated Final Safety Analysis Report and 10CFR50.71(e) Updated and Related Site Change Reports IR 05000315/20220112022-11-0404 November 2022 Design Basis Assurance Inspection (Teams) Inspection Report 05000315/2022011 and 05000316/2022011 IR 05000315/20220032022-10-28028 October 2022 Integrated Inspection Report 05000315/2022003 and 05000316/2022003 AEP-NRC-2022-58, U1C31 Steam Generator Tube Inspection Report2022-10-24024 October 2022 U1C31 Steam Generator Tube Inspection Report AEP-NRC-2022-61, Request for Relief Related to American Society of Mechanical Engineers (ASME) Code Case N-729-6 Supplemental Examination Requirements, ISIR-5-062022-10-24024 October 2022 Request for Relief Related to American Society of Mechanical Engineers (ASME) Code Case N-729-6 Supplemental Examination Requirements, ISIR-5-06 2024-01-08
[Table view] |
Text
NIIC FoIIM 196 U.S. NVCLI!AllIICGVLATOIIv"OMMISSION OOCKET NVMIIIIII IZ16) ~" I 50-3156 NUMINE I'II.E A NRC DISTB IDUTION FoII PART 50 DOCI(ET MATERIAL To: , B.C; Rusche F<<<<:Indiana 8 Michigan Power Co. OATE OF OOCVMENT New York, .N.Y.
J.R. Burton OhTE AECEIVEO I ALETTEA .LINOTOAIZEO PFIOP INPUT FOAM NUMOFA OF COPIES AECEIVEO Ixl oA I G INAL QVNC LASS IF I E 0 I V C3 COP OESCAIPTION ENCLOSURE Ltr. notarized 6-'11-76...
Request for a two week exteI)sion deadline for. ACKNOWLEDGED surveillance testing from June 26, 1976 to.
July 10,, 1976.....; DO NOT REMOVE
( 1 Signed Cy, Receivedf .
(2 Pages)
PLANT KQZ: Cook II' SAFETY FOR ACTION/INF0 Rh1AT I ON ENVXRO ASSIGNED AD: ASSXGNED AD .
BRANCH ASST')e CHIEF:
P OJECT KKNAGER:
XC ~
BRANCEl CEIXEF ~
PROJECT IIANAGER ..
LXC ~ ASST, INTERNAL D ISTRI BUTION FIL aXZrrxmc:E KLXR NRC PDR EXHEHA ERNST I & E ~ 2 QJii} l BENAROYA AT,T.ARD
@ET D SPANGLER GOSSXCK 6 STAFF ENGINEER N XPPOLITO XE SXTE TECII QASE KNIGHT OPERATING REACTORS GAI ~ulILL IANA SXH"IEXL STELLO. STEPP LE PAHLICKX H ULIIAN OPERATXiNG TECH PROJECT MhNAGEIIENT REACTOR SAFETY E IS F.iilIUT SITE ANAT.YSIS I OXD ROSS SIIAO VOLLHER PE COLLINS NOVAK BAER BUi'ICII IIOUSTON ROSZTOCZY SCIIUI'.NCI'.R J ~ COLLINS PETERSOI'I CIIECK GRIi IES KREGER Hl.'LTZ I IEI TEHES AT 6 I ST.TI'. SAFI'.TY fc E~TR SKOVIIOLT SALTZIIAN h IIAI.YSTS RIITIIFI~G )ENTON 6 IIUI.T.l".R EX'I'L<<NALDISTR II3UTION CONT<
> 'ltQ'f < )fl4P." '"t ) < t')V
""'-'VI'V
LjIeggfitafy gg gy" INDIANA II MICHIGAN POWER COMPANY P. O. BOX 18 BO WL I N G G R E EN STAT ION NEW YORK, N.. 0 04
~~aaexame 8 VNI~
CF' Donald C. Cook Nuclear Docket No. 50-315 DPR No. 58 June l~l, 1976 Nr. Bernard Rusche, Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C. 20555
Dear Mr. Rusche:
We hereby request a temporary extension of the Technical Specification surveillance testing time interval for the Donald C.
Cook Nuclear Plant Unit 1 diesel generators. Surveillance Require-ment 4.8.1.1.2.b requires that each diesel generator be demonstrated operable at least once per 18 months during shutdown by conducting a series of inspections, trips, startup on safety injection signal and loadings. This requirement is in addition to the 31 day load-ing tests conducted per Surveillance Requirement 4.8.1.1.2.a which are being performed in accordance with the requirements.
The 18 month time interval for the above extensive diesel generator testing, including the allowable extension per Surveillance Requirement 4.0.2.a, ends on June 26, 1976. We had planned on shutting.;down the Unit over a weekend in June 1976 to conduct the tests. However, due to forced outages and curtailments of other units and to system load requirements, it is essential that the Donald C. Cook Nuclear Plant, Unit 1 be kept in service until the long 4th of July weekend.
~ ~
~ ~
~ ~
Nr. Bernard Rusche June ll, 1976 We therefore request a two week extension of the deadline for surveillance testing per 4.8.1.1.2.b from June 26, 1976 to July 10, 1976.
Very truly yours, John R. Burton Secretary Sworn to and subscribed to before me this 11th day of June 1976 in New York County, New York Notary ublic KATHLEEN BARRY NOTARY PUfluC, State ol New York No. 41-4606/92 Qualified ln Queens Ccunty Certifiate filed in New York County Cctr.nutation inspires church 30, fP77 cc: Gerald Charnoff R. J. Vollen R. C. Callen P. W. Steketee R. Walsh John Tillinghast R. S. Hunter R. W. Jurgensen