{{#Wiki_filter:May 9, 2012    
{{#Wiki_filter:UNITED STATES
Mr. Matthew W. Sunseri
                              NUCLEAR REGULATORY COMMISSION
President and Chief Executive Officer
                                                REGION I V
Wolf Creek Nuclear Operating Corporation
                                          1600 EAST LAMAR BLVD
P.O. Box 411
                                      ARLINGTON, TEXAS 76011-4511
Burlington, KS  
                                              May 9, 2012
66839  SUBJECT: WOLF CREEK NUCLEAR OPERATING CORPORATION  
Mr. Matthew W. Sunseri
- NRC AUGMENTED INSPECTION TEAM FOLLOW-UP INSPECTION PLANNING LETTER, INSPECTION REPORT 05000482/2012009
President and Chief Executive Officer
Dear Mr. Sunseri:
Wolf Creek Nuclear Operating Corporation
The purpose of this letter is to notify you that U.S. Nuclear Regulatory Commission Region IV staff will conduct the augmented inspection team follow
P.O. Box 411
-up inspection at your Wolf Creek Generating Station.
Burlington, KS 66839
  The inspection will be comprised of one senior resident, one resident and two regional reactor inspector
SUBJECT:       WOLF CREEK NUCLEAR OPERATING CORPORATION - NRC AUGMENTED
s from the NRC Region
                INSPECTION TEAM FOLLOW-UP INSPECTION PLANNING LETTER,
IV office. The inspection will be conducted in accordance with Inspection Procedure
                INSPECTION REPORT 05000482/2012009
93800 and multiple reactor oversight process baseline inspection procedures.
Dear Mr. Sunseri:
The schedule for the inspection is as follows:
The purpose of this letter is to notify you that U.S. Nuclear Regulatory Commission Region IV
  In-office preparation
staff will conduct the augmented inspection team follow-up inspection at your Wolf Creek
: May 21 - 25, 2012   Onsite inspection
Generating Station. The inspection will be comprised of one senior resident, one resident and
: May 28 - June 1, 2012
two regional reactor inspectors from the NRC Region IV office. The inspection will be
Experience has shown that this inspection is resource intensive both for the NRC inspectors and your staff.
conducted in accordance with Inspection Procedure 93800 and multiple reactor oversight
  In order to minimize the impact to your onsite resources and to ensure a productive inspection, we have enclosed a request for documents needed for this inspection. Please note that the documents
process baseline inspection procedures.
are requested to be provided by May 14, 2012. We request that during the onsite inspection week, you ensure that copies of analyses, evaluations, or  
The schedule for the inspection is as follows:
documentation regarding the root cause of the failures of the main generator output breaker and the startup transformer
In-office preparation: May 21 - 25, 2012
are available. Also, appropriate personnel knowledgeable  
Onsite inspection: May 28 - June 1, 2012
of each of the unresolved items documented in Inspection Report 0500482/2012008
Experience has shown that this inspection is resource intensive both for the NRC inspectors
should be available to support the inspector s at the site during the inspection.
and your staff. In order to minimize the impact to your onsite resources and to ensure a
We have discussed the schedule for th
productive inspection, we have enclosed a request for documents needed for this inspection.
is inspection activit
Please note that the documents are requested to be provided by May 14, 2012. We request
y with your staff and understand that our regulatory contact for this inspection will be
that during the onsite inspection week, you ensure that copies of analyses, evaluations, or
William Muilenburg of your licensing organization. If there are any questions about this inspection or the material requested, please contact the team lead , John Dixon
documentation regarding the root cause of the failures of the main generator output breaker and
, at 361-972-2507 or by email , john.dixon@nrc.gov
the startup transformer are available. Also, appropriate personnel knowledgeable of each of the
.     U N I T E D S T A T E S N U C L E A R R E G U L A T O R Y C O M M I S S I O N R E G I O N I V1600 EAST LAMAR BLVD
unresolved items documented in Inspection Report 0500482/2012008 should be available to
A R L I N G T O N , T E X A S 7 6 0 1 1-4511 
support the inspectors at the site during the inspection.
M. Sunseri - 2 - This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget, C ontrol No. 3150 0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget  
We have discussed the schedule for this inspection activity with your staff and understand that
Control No. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC'
our regulatory contact for this inspection will be William Muilenburg of your licensing
s document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading
organization. If there are any questions about this inspection or the material requested, please
-rm/adams.html
contact the team lead, John Dixon, at 361-972-2507 or by email, john.dixon@nrc.gov.
(the Public Electronic Reading Room).
 
  Sincerely, /RA/ Neil O'Keefe, Chief Project Branch B Division of Reactor Projects
M. Sunseri                                   -2-
Dockets:   50-482 Licenses: NPF-42 Enclosure: Augmented Inspection Team Follow
This letter does not contain new or amended information collection requirements subject to the
-up Inspection Document Request
Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection
cc: Electronic distribution
requirements were approved by the Office of Management and Budget, Control No. 3150 0011.
for Wolf Creek Nuclear Operating Corporation
The NRC may not conduct or sponsor, and a person is not required to respond to, a request for
     
information or an information collection requirement unless the requesting document displays a
M. Sunseri
currently valid Office of Management and Budget Control No.
- 3 -   Electronic distribution by RIV:
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and
Regional Administrator (Elmo.Collins@nrc.gov
its enclosure will be available electronically for public inspection in the NRC Public
) Deputy Regional Administrator (Art.Howell@nrc.gov
Document Room or from the Publicly Available Records (PARS) component of NRC's
) DRP Director (Kriss.Kennedy@nrc.gov
document system (ADAMS). ADAMS is accessible from the NRC Web site at
) DRP Deputy Director (Troy.Pruett@nrc.gov
http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
) Acting DRS Director (Tom.Blount@nrc.gov
                                                Sincerely,
) Acting DRS Deputy Director (Patrick.Louden@nrc.gov
                                                  /RA/
) Senior Resident Inspector (Chris.Long@nrc.gov
                                                Neil OKeefe, Chief
) Resident Inspector (Charles.Peabody@nrc.gov
                                                Project Branch B
) Branch Chief, DRP/
                                                Division of Reactor Projects
B (Neil.Okeefe@nrc.gov
Dockets: 50-482
) Senior Project Engineer, DRP/
Licenses: NPF-42
B (Leonard.Willoughby@nrc.gov , Project Engineer, DRP/
Enclosure: Augmented Inspection Team Follow-up Inspection Document Request
B (Nestor.Makris@nrc.gov
cc: Electronic distribution for Wolf Creek Nuclear Operating Corporation
) WC Administrative Assistant (Shirley.Allen@nrc.gov
 
) Public Affairs Officer (Victor.Dricks@nrc.gov
M. Sunseri                                 -3-
) Public Affairs Officer (Lara.Uselding@nrc.gov
Electronic distribution by RIV:
) Project Manager (Randy.Hall@nrc.gov
Regional Administrator (Elmo.Collins@nrc.gov)
) Acting Branch Chief, DRS/TSB (Dale.Powe r s@nrc.gov) RITS Coordinator (Marisa.Herrera@nrc.gov
Deputy Regional Administrator (Art.Howell@nrc.gov)
) Regional Counsel (Karla.Fuller@nrc.gov
DRP Director (Kriss.Kennedy@nrc.gov)
) Congressional Affairs Officer (Jenny.Weil@nrc.gov) OEMail Resource
DRP Deputy Director (Troy.Pruett@nrc.gov)
  Only inspection reports to the following:
Acting DRS Director (Tom.Blount@nrc.gov)
RIV/ETA: OEDO
Acting DRS Deputy Director (Patrick.Louden@nrc.gov)
(Michael.McCoppin@nrc.gov
Senior Resident Inspector (Chris.Long@nrc.gov)
)              R:\_REACTORS\WC\2012\WC2012009 Inspection Planning Ltr.doc SUNSI Rev Compl.
Resident Inspector (Charles.Peabody@nrc.gov)
  Yes  No ADAMS Yes  No Reviewer Initials
Branch Chief, DRP/B (Neil.Okeefe@nrc.gov)
NFO Publicly Avail
Senior Project Engineer, DRP/B (Leonard.Willoughby@nrc.gov,
  Yes  No Sensitive  Yes  No Sens. Type Initials
Project Engineer, DRP/B (Nestor.Makris@nrc.gov)
NFO RIV:SRI:DRP/B D:DRP/B   JDixon NO'Keefe    /RA/ /RA/   05/9/2012 05/9/2012   OFFICIAL RECORD COPY
WC Administrative Assistant (Shirley.Allen@nrc.gov)
    T=Telephone           E=E
Public Affairs Officer (Victor.Dricks@nrc.gov)
-mail        F=Fax  
Public Affairs Officer (Lara.Uselding@nrc.gov)
    Augmented Inspection Team Follow
Project Manager (Randy.Hall@nrc.gov)
-up Inspection Document Request
Acting Branch Chief, DRS/TSB (Dale.Powers@nrc.gov)
  Inspection Dates:
RITS Coordinator (Marisa.Herrera@nrc.gov)
  In-office preparation: May 2 1 - 2 5, 2012     Onsite : May 28, 2012  
Regional Counsel (Karla.Fuller@nrc.gov)
- June 1, 2012
Congressional Affairs Officer (Jenny.Weil@nrc.gov)
  Inspection Procedures:
OEMail Resource
IP 93800 , Augmented Inspection Team
Only inspection reports to the following:
Various Reactor Oversight Process
RIV/ETA: OEDO (Michael.McCoppin@nrc.gov)
Baseline Inspection Procedures
R:\_REACTORS\WC\2012\WC2012009 Inspection Planning Ltr.doc
  Inspecto r s:   John Dixon, Senior Resident Inspector, South Texas Project
SUNSI Rev Compl.         Yes  No       ADAMS       Yes  No Reviewer Initials   NFO
    Mica Baquera, Resident Inspector, Palo Verde
Publicly Avail           Yes  No       Sensitive  Yes  No Sens. Type Initials NFO
    John Watkins, Reactor Inspector
RIV:SRI:DRP/B       D:DRP/B
    Nnaerika Okonkwo, Reactor Inspector
JDixon               NOKeefe
  Information Requested for the In
  /RA/               /RA/
-Office Preparation Week
05/9/2012           05/9/2012
The following information should be sent to the Region IV office in hard copy or electronic format (ims.certrec.com database preferred), in care of John Dixon, by May 14, 2012. The inspector s will select specific items from the information requested below and then request from your staff additional documents needed during the onsite inspection week. Also, we request that you categorize the documents in your response with the numbered list below.  
OFFICIAL RECORD COPY                               T=Telephone   E=E-mail        F=Fax
Please provide requested documentation electronically if possible. If requested documents are large and only hard copy formats are available, please inform the inspector
 
s and provide subject documentation during the first day of the onsite inspection. If you have any questions regarding  
          Augmented Inspection Team Follow-up Inspection Document Request
Inspection Dates:               In-office preparation: May 21 - 25, 2012
                                Onsite : May 28, 2012 - June 1, 2012
Inspection Procedures:         IP 93800, Augmented Inspection Team
                                Various Reactor Oversight Process Baseline Inspection
                                Procedures
Inspectors:                     John Dixon, Senior Resident Inspector, South Texas Project
                                Mica Baquera, Resident Inspector, Palo Verde
                                John Watkins, Reactor Inspector
                                Nnaerika Okonkwo, Reactor Inspector
Information Requested for the In-Office Preparation Week
The following information should be sent to the Region IV office in hard copy or electronic
format (ims.certrec.com database preferred), in care of John Dixon, by May 14, 2012. The
inspectors will select specific items from the information requested below and then request from
your staff additional documents needed during the onsite inspection week. Also, we request
that you categorize the documents in your response with the numbered list below. Please
provide requested documentation electronically if possible. If requested documents are large
and only hard copy formats are available, please inform the inspectors and provide subject
documentation during the first day of the onsite inspection. If you have any questions regarding
this information request, please call the lead inspector as soon as possible.
this information request, please call the lead inspector as soon as possible.
For the following items as related to the Augmented Inspection Team inspection, as documented in Inspection Report 05000482/2012008, please provide associated condition reports, work orders, root cause and/or apparent cause investigations, design basis documents, UFSAR descriptions, technical specification requirements, plans of actions, and risk profiles:
For the following items as related to the Augmented Inspection Team inspection, as
1. Main generator output breaker fault
documented in Inspection Report 05000482/2012008, please provide associated condition
2. Startup transformer fault
reports, work orders, root cause and/or apparent cause investigations, design basis documents,
3. Turbine driven auxiliary feedwater pump operation at low flow, pressure, and speed
UFSAR descriptions, technical specification requirements, plans of actions, and risk profiles:
4. Turbine driven auxiliary feedwater mechanical overspeed trip device settings
    1. Main generator output breaker fault
5. Emergency diesel generator B ground
    2. Startup transformer fault
6. ESW water hammer
    3. Turbine driven auxiliary feedwater pump operation at low flow, pressure, and speed
7. ESW piping corrosion
    4. Turbine driven auxiliary feedwater mechanical overspeed trip device settings
8. Source range nuclear instrument NI
    5. Emergency diesel generator B ground
-31 response on loss of cavity cooling
    6. ESW water hammer
9. Failure to maintain fire water pressure
    7. ESW piping corrosion
10. Training/Operation/Procedures for temporary diesel-driven fire pump
    8. Source range nuclear instrument NI-31 response on loss of cavity cooling
11. Diesel-driven fire pump and temporary diesel
    9. Failure to maintain fire water pressure
-driven fire pump differences
    10. Training/Operation/Procedures for temporary diesel-driven fire pump
12. Diesel-driven fire pump unavailability
    11. Diesel-driven fire pump and temporary diesel-driven fire pump differences
13. Security issue
    12. Diesel-driven fire pump unavailability
   
    13. Security issue
    Inspector Contact Information:
 
John Dixon
Inspector Contact Information:
Sr. Resident Inspector 361-972-2507 john.dixon@nrc.gov
John Dixon
  Mailing Address:
Sr. Resident Inspector
US NRC Region IV
361-972-2507
Attn: John Dixon
john.dixon@nrc.gov
1600 East Lamar Blvd.
Mailing Address:
Arlington, TX 76011
US NRC Region IV
-4511
Attn: John Dixon
1600 East Lamar Blvd.
Arlington, TX 76011-4511
}}
}}

Latest revision as of 04:42, 12 November 2019

IR 05000482-12-009, Wolf Creek Nuclear Operating Corporation - NRC Augmented Inspection Team Follow-up Inspection Planning Letter
ML12131A459
Person / Time
Site: Wolf Creek Wolf Creek Nuclear Operating Corporation icon.png
Issue date: 05/09/2012
From: O'Keefe N
NRC/RGN-IV/DRP/RPB-B
To: Matthew Sunseri
Wolf Creek
O'Keefe N
References
IR-12-009
Download: ML12131A459 (5)


See also: IR 05000482/2012009

Text

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION I V

1600 EAST LAMAR BLVD

ARLINGTON, TEXAS 76011-4511

May 9, 2012

Mr. Matthew W. Sunseri

President and Chief Executive Officer

Wolf Creek Nuclear Operating Corporation

P.O. Box 411

Burlington, KS 66839

SUBJECT: WOLF CREEK NUCLEAR OPERATING CORPORATION - NRC AUGMENTED

INSPECTION TEAM FOLLOW-UP INSPECTION PLANNING LETTER,

INSPECTION REPORT 05000482/2012009

Dear Mr. Sunseri:

The purpose of this letter is to notify you that U.S. Nuclear Regulatory Commission Region IV

staff will conduct the augmented inspection team follow-up inspection at your Wolf Creek

Generating Station. The inspection will be comprised of one senior resident, one resident and

two regional reactor inspectors from the NRC Region IV office. The inspection will be

conducted in accordance with Inspection Procedure 93800 and multiple reactor oversight

process baseline inspection procedures.

The schedule for the inspection is as follows:

In-office preparation: May 21 - 25, 2012

Onsite inspection: May 28 - June 1, 2012

Experience has shown that this inspection is resource intensive both for the NRC inspectors

and your staff. In order to minimize the impact to your onsite resources and to ensure a

productive inspection, we have enclosed a request for documents needed for this inspection.

Please note that the documents are requested to be provided by May 14, 2012. We request

that during the onsite inspection week, you ensure that copies of analyses, evaluations, or

documentation regarding the root cause of the failures of the main generator output breaker and

the startup transformer are available. Also, appropriate personnel knowledgeable of each of the

unresolved items documented in Inspection Report 0500482/2012008 should be available to

support the inspectors at the site during the inspection.

We have discussed the schedule for this inspection activity with your staff and understand that

our regulatory contact for this inspection will be William Muilenburg of your licensing

organization. If there are any questions about this inspection or the material requested, please

contact the team lead, John Dixon, at 361-972-2507 or by email, john.dixon@nrc.gov.

M. Sunseri -2-

This letter does not contain new or amended information collection requirements subject to the

Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection

requirements were approved by the Office of Management and Budget, Control No. 3150 0011.

The NRC may not conduct or sponsor, and a person is not required to respond to, a request for

information or an information collection requirement unless the requesting document displays a

currently valid Office of Management and Budget Control No.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and

its enclosure will be available electronically for public inspection in the NRC Public

Document Room or from the Publicly Available Records (PARS) component of NRC's

document system (ADAMS). ADAMS is accessible from the NRC Web site at

http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Neil OKeefe, Chief

Project Branch B

Division of Reactor Projects

Dockets: 50-482

Licenses: NPF-42

Enclosure: Augmented Inspection Team Follow-up Inspection Document Request

cc: Electronic distribution for Wolf Creek Nuclear Operating Corporation

M. Sunseri -3-

Electronic distribution by RIV:

Regional Administrator (Elmo.Collins@nrc.gov)

Deputy Regional Administrator (Art.Howell@nrc.gov)

DRP Director (Kriss.Kennedy@nrc.gov)

DRP Deputy Director (Troy.Pruett@nrc.gov)

Acting DRS Director (Tom.Blount@nrc.gov)

Acting DRS Deputy Director (Patrick.Louden@nrc.gov)

Senior Resident Inspector (Chris.Long@nrc.gov)

Resident Inspector (Charles.Peabody@nrc.gov)

Branch Chief, DRP/B (Neil.Okeefe@nrc.gov)

Senior Project Engineer, DRP/B (Leonard.Willoughby@nrc.gov,

Project Engineer, DRP/B (Nestor.Makris@nrc.gov)

WC Administrative Assistant (Shirley.Allen@nrc.gov)

Public Affairs Officer (Victor.Dricks@nrc.gov)

Public Affairs Officer (Lara.Uselding@nrc.gov)

Project Manager (Randy.Hall@nrc.gov)

Acting Branch Chief, DRS/TSB (Dale.Powers@nrc.gov)

RITS Coordinator (Marisa.Herrera@nrc.gov)

Regional Counsel (Karla.Fuller@nrc.gov)

Congressional Affairs Officer (Jenny.Weil@nrc.gov)

OEMail Resource

Only inspection reports to the following:

RIV/ETA: OEDO (Michael.McCoppin@nrc.gov)

R:\_REACTORS\WC\2012\WC2012009 Inspection Planning Ltr.doc

SUNSI Rev Compl. Yes No ADAMS Yes No Reviewer Initials NFO

Publicly Avail Yes No Sensitive Yes No Sens. Type Initials NFO

RIV:SRI:DRP/B D:DRP/B

JDixon NOKeefe

/RA/ /RA/

05/9/2012 05/9/2012

OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax

Augmented Inspection Team Follow-up Inspection Document Request

Inspection Dates: In-office preparation: May 21 - 25, 2012

Onsite : May 28, 2012 - June 1, 2012

Inspection Procedures: IP 93800, Augmented Inspection Team

Various Reactor Oversight Process Baseline Inspection

Procedures

Inspectors: John Dixon, Senior Resident Inspector, South Texas Project

Mica Baquera, Resident Inspector, Palo Verde

John Watkins, Reactor Inspector

Nnaerika Okonkwo, Reactor Inspector

Information Requested for the In-Office Preparation Week

The following information should be sent to the Region IV office in hard copy or electronic

format (ims.certrec.com database preferred), in care of John Dixon, by May 14, 2012. The

inspectors will select specific items from the information requested below and then request from

your staff additional documents needed during the onsite inspection week. Also, we request

that you categorize the documents in your response with the numbered list below. Please

provide requested documentation electronically if possible. If requested documents are large

and only hard copy formats are available, please inform the inspectors and provide subject

documentation during the first day of the onsite inspection. If you have any questions regarding

this information request, please call the lead inspector as soon as possible.

For the following items as related to the Augmented Inspection Team inspection, as

documented in Inspection Report 05000482/2012008, please provide associated condition

reports, work orders, root cause and/or apparent cause investigations, design basis documents,

UFSAR descriptions, technical specification requirements, plans of actions, and risk profiles:

1. Main generator output breaker fault

2. Startup transformer fault

3. Turbine driven auxiliary feedwater pump operation at low flow, pressure, and speed

4. Turbine driven auxiliary feedwater mechanical overspeed trip device settings

5. Emergency diesel generator B ground

6. ESW water hammer

7. ESW piping corrosion

8. Source range nuclear instrument NI-31 response on loss of cavity cooling

9. Failure to maintain fire water pressure

10. Training/Operation/Procedures for temporary diesel-driven fire pump

11. Diesel-driven fire pump and temporary diesel-driven fire pump differences

12. Diesel-driven fire pump unavailability

13. Security issue

Inspector Contact Information:

John Dixon

Sr. Resident Inspector

361-972-2507

john.dixon@nrc.gov

Mailing Address:

US NRC Region IV

Attn: John Dixon

1600 East Lamar Blvd.

Arlington, TX 76011-4511