ML003716758: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 16: | Line 16: | ||
=Text= | =Text= | ||
{{#Wiki_filter:JPM- ANO-2-JPM-NRC-PZR02 | {{#Wiki_filter:JPM- ANO-2-JPM-NRC-PZR02 PAGE 1 OF 6 JOB PERFORMANCE MEASURE UNIT: 2 REV #: 8 DATE: | ||
SYSTEM/DUTY AREA | SYSTEM/DUTY AREA: Pressurizer Pressure Control System TASK: Equalize RCS and PZR Boron JTA#: 20105030401 KA VALUE RO: 3.7 SRO: 3.5 KA | ||
: | |||
3.7 SRO: | |||
3.5 KA | |||
==REFERENCE:== | ==REFERENCE:== | ||
010 A4.01 APPROVED FOR ADMINISTRATION TO: RO: X SRO: X TASK LOCATION: INSIDE CR: X OUTSIDE CR: BOTH: | |||
010 A4.01 APPROVED FOR ADMINISTRATION TO | |||
: | |||
X TASK LOCATION | |||
: | |||
X OUTSIDE CR: | |||
BOTH: | |||
SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE): | SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE): | ||
PLANT SITE | PLANT SITE: SIMULATOR: Perform LAB: | ||
: | POSITION EVALUATED: RO: SRO: | ||
SIMULATOR: | ACTUAL TESTING ENVIRONMENT: SIMULATOR: X PLANT SITE: LAB: | ||
Perform LAB: | TESTING METHOD: SIMULATE: PERFORM: X APPROXIMATE COMPLETION TIME IN MINUTES: 6 Minutes REFERENCE(S): OP 2103.005 Rev 027-02-0 and AOP 2203.028 EXAMINEE'S NAME: SSN: - - | ||
POSITION EVALUATED | EVALUATOR'S NAME: | ||
: | |||
SRO: | |||
ACTUAL TESTING ENVIRONMENT | |||
: | |||
X PLANT SITE: | |||
LAB: | |||
TESTING METHOD | |||
: | |||
PERFORM: | |||
X APPROXIMATE COMPLETION TIME IN MINUTES | |||
: | |||
OP 2103.005 Rev 027-02-0 and AOP 2203.028 EXAMINEE'S NAME | |||
: | |||
SSN: | |||
EVALUATOR'S NAME: | |||
THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN HIS JPM AND IS DETERMINED TO BE: | THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN HIS JPM AND IS DETERMINED TO BE: | ||
SATISFACTORY: | SATISFACTORY: UNSATISFACTORY: | ||
UNSATISFACTORY: | |||
PERFORMANCE CHECKLIST COMMENTS: | PERFORMANCE CHECKLIST COMMENTS: | ||
Start Time Stop Time Total Time SIGNED__________________________________ DATE: _____________________ | |||
SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION. | |||
JPM- ANO-2-JPM-NRC-PZR02 PAGE 2 OF 6 JOB PERFORMANCE MEASURE THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE: | |||
The examiner shall review the "Briefing Checklist - System Walkthrough" portion of OP 1064.023 Attachment 6 with the examinee. | |||
JPM INITIAL TASK CONDITIONS: 100% Power Operation. A power escalation has been completed. | |||
JPM- ANO-2-JPM-NRC-PZR02 | |||
The examiner shall review the "Briefing Checklist - System Walkthrough" portion of OP 1064.023 Attachment 6 with the examinee.JPM INITIAL TASK CONDITIONS | |||
: | |||
A power escalation has been completed. | |||
Chemistry reports that RCS boron is 800 PPM and PZR boron is 855 PPM. | Chemistry reports that RCS boron is 800 PPM and PZR boron is 855 PPM. | ||
TASK STANDARD | TASK STANDARD: Spray Valve (2CV-4651)isolated. THIS IS AN ALTERNATE SUCCESS PATH JPM. | ||
: | TASK PERFORMANCE AIDS: OP 2103.005 section 7.0 and AOP 2203.028. | ||
THIS IS AN ALTERNATE SUCCESS PATH JPM. | SIMULATOR SETUP: Run CASE FILE JPM03. This will open A spray valve 100% and trip the breaker when the valve indicates intermediate position. | ||
TASK PERFORMANCE AIDS | |||
: | |||
SIMULATOR SETUP | |||
: | |||
The following malfunctions/overrides need to be triggered (case file JPM03 will do all of them): | The following malfunctions/overrides need to be triggered (case file JPM03 will do all of them): | ||
Set T5 file to sprayvlv this will trigger T5 when 2CV-4651 red light is energized. | Set T5 file to sprayvlv this will trigger T5 when 2CV-4651 red light is energized. | ||
T5 2CV- | T5 2CV-4651_a value = 1.0 T5 2HS-4651-3 false (green light) | ||
T5 2 HS-4651-5 false (red light) | T5 2 HS-4651-5 false (red light) | ||
( | JPM- ANO-2-JPM-NRC-PZR02 PAGE 3 OF 6 JOB PERFORMANCE MEASURE INITIATING CUE: | ||
-4651B in the CCW direction to MANUAL. | The SS/CRS directs, " Equalize RCS and PZR boron concentration using OP 2103.005 step 7.1, RCP A spray valve, 2CV-4651." | ||
Place 2HS-4643 to ON | CRITICAL ELEMENTS (C): 2, 3, 4, 5 PERFORMANCE CHECKLIST STANDARDS (Circle One) | ||
: 1. Verify spray valve, 2CV-4651, On panel 2C04 verified red lights N/A SAT UNSAT isolation valves 2CV-4655 AND ON, green lights OFF for 2CV-4655 2CV-4656 are OPEN. and 2CV-4656. | |||
(C) 2. Place RCP A spray valve On panel 2C04, rotated 2HS-4651B N/A SAT UNSAT MAN/AUTO select switch in the CCW direction to MANUAL. | |||
(2HS-4651B) to MANUAL. | |||
(C) 3. Energize all available Backup On panel 2C04 placed the following N/A SAT UNSAT Heaters. handswitches to ON: | |||
Place 2HS-4643 to ON Place 2HS-4644 to ON Place 2HS-4645 to ON Place 2HS-4646 to ON AND Observed the red light ON and green light OFF above each of the above backup heater handswitches. | |||
EXAMINERS NOTE: | |||
When 2CV-4651 is taken to open, the valve will open 100% and then trip the breaker. | |||
(C) 4. Open 2CV-4651, RCP A spray On panel 2C04 WHEN RCS pressure N/A SAT UNSAT valve partially. starts increasing, throttled 2CV-4651 to the open position. | |||
EXAMINERS NOTE: | |||
The following step may be completed after entering the AOP 2203.028, but entering the AOP is NOT critical for successful completion of this JPM. | |||
JPM- ANO-2-JPM-NRC-PZR02 PAGE 4 OF 6 JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARDS (Circle One) | |||
(C) 5. Close PZR Spray Block Valves. On panel 2C04, placed handswitch N/A SAT UNSAT for 2CV-4655 and 2CV-4656 to "CLOSE". | |||
Observed green lights ON, red lights OFF for 2CV-4655 and 2CV-4656. | |||
END | |||
JPM- ANO-2-JPM-NRC-PZR02 PAGE 5 OF 6 JOB PERFORMANCE MEASURE QUESTION: | |||
ANSWER: | |||
JPM- ANO-2-JPM-NRC-PZR02 | |||
JPM- ANO-2-JPM-NRC-PZR02 PAGE 6 OF 6 JOB PERFORMANCE MEASURE EXAMINEES COPY JPM INITIAL TASK CONDITIONS: | |||
JPM- ANO-2-JPM-NRC-PZR02 | 100% Power Operation. A power escalation has been completed. Chemistry reports that RCS boron is 800 PPM and PZR boron is 855 PPM. | ||
100% Power Operation. | |||
A power escalation has been completed. Chemistry reports that RCS boron is 800 PPM and PZR boron is 855 PPM. | |||
INITIATING CUE: | INITIATING CUE: | ||
The SS/CRS directs, " Equalize RCS and PZR boron concentration using OP 2103.005 step 7.1, RCP | The SS/CRS directs, " Equalize RCS and PZR boron concentration using OP 2103.005 step 7.1, RCP A spray valve, 2CV-4651."}} | ||
."}} |
Latest revision as of 06:43, 24 November 2019
ML003716758 | |
Person / Time | |
---|---|
Site: | Arkansas Nuclear |
Issue date: | 04/24/2000 |
From: | NRC Region 4 |
To: | |
References | |
-RFPFR | |
Download: ML003716758 (6) | |
Text
JPM- ANO-2-JPM-NRC-PZR02 PAGE 1 OF 6 JOB PERFORMANCE MEASURE UNIT: 2 REV #: 8 DATE:
SYSTEM/DUTY AREA: Pressurizer Pressure Control System TASK: Equalize RCS and PZR Boron JTA#: 20105030401 KA VALUE RO: 3.7 SRO: 3.5 KA
REFERENCE:
010 A4.01 APPROVED FOR ADMINISTRATION TO: RO: X SRO: X TASK LOCATION: INSIDE CR: X OUTSIDE CR: BOTH:
SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):
PLANT SITE: SIMULATOR: Perform LAB:
POSITION EVALUATED: RO: SRO:
ACTUAL TESTING ENVIRONMENT: SIMULATOR: X PLANT SITE: LAB:
TESTING METHOD: SIMULATE: PERFORM: X APPROXIMATE COMPLETION TIME IN MINUTES: 6 Minutes REFERENCE(S): OP 2103.005 Rev 027-02-0 and AOP 2203.028 EXAMINEE'S NAME: SSN: - -
EVALUATOR'S NAME:
THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN HIS JPM AND IS DETERMINED TO BE:
SATISFACTORY: UNSATISFACTORY:
PERFORMANCE CHECKLIST COMMENTS:
Start Time Stop Time Total Time SIGNED__________________________________ DATE: _____________________
SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.
JPM- ANO-2-JPM-NRC-PZR02 PAGE 2 OF 6 JOB PERFORMANCE MEASURE THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:
The examiner shall review the "Briefing Checklist - System Walkthrough" portion of OP 1064.023 Attachment 6 with the examinee.
JPM INITIAL TASK CONDITIONS: 100% Power Operation. A power escalation has been completed.
Chemistry reports that RCS boron is 800 PPM and PZR boron is 855 PPM.
TASK STANDARD: Spray Valve (2CV-4651)isolated. THIS IS AN ALTERNATE SUCCESS PATH JPM.
TASK PERFORMANCE AIDS: OP 2103.005 section 7.0 and AOP 2203.028.
SIMULATOR SETUP: Run CASE FILE JPM03. This will open A spray valve 100% and trip the breaker when the valve indicates intermediate position.
The following malfunctions/overrides need to be triggered (case file JPM03 will do all of them):
Set T5 file to sprayvlv this will trigger T5 when 2CV-4651 red light is energized.
T5 2CV-4651_a value = 1.0 T5 2HS-4651-3 false (green light)
T5 2 HS-4651-5 false (red light)
JPM- ANO-2-JPM-NRC-PZR02 PAGE 3 OF 6 JOB PERFORMANCE MEASURE INITIATING CUE:
The SS/CRS directs, " Equalize RCS and PZR boron concentration using OP 2103.005 step 7.1, RCP A spray valve, 2CV-4651."
CRITICAL ELEMENTS (C): 2, 3, 4, 5 PERFORMANCE CHECKLIST STANDARDS (Circle One)
- 1. Verify spray valve, 2CV-4651, On panel 2C04 verified red lights N/A SAT UNSAT isolation valves 2CV-4655 AND ON, green lights OFF for 2CV-4655 2CV-4656 are OPEN. and 2CV-4656.
(C) 2. Place RCP A spray valve On panel 2C04, rotated 2HS-4651B N/A SAT UNSAT MAN/AUTO select switch in the CCW direction to MANUAL.
(2HS-4651B) to MANUAL.
(C) 3. Energize all available Backup On panel 2C04 placed the following N/A SAT UNSAT Heaters. handswitches to ON:
Place 2HS-4643 to ON Place 2HS-4644 to ON Place 2HS-4645 to ON Place 2HS-4646 to ON AND Observed the red light ON and green light OFF above each of the above backup heater handswitches.
EXAMINERS NOTE:
When 2CV-4651 is taken to open, the valve will open 100% and then trip the breaker.
(C) 4. Open 2CV-4651, RCP A spray On panel 2C04 WHEN RCS pressure N/A SAT UNSAT valve partially. starts increasing, throttled 2CV-4651 to the open position.
EXAMINERS NOTE:
The following step may be completed after entering the AOP 2203.028, but entering the AOP is NOT critical for successful completion of this JPM.
JPM- ANO-2-JPM-NRC-PZR02 PAGE 4 OF 6 JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARDS (Circle One)
(C) 5. Close PZR Spray Block Valves. On panel 2C04, placed handswitch N/A SAT UNSAT for 2CV-4655 and 2CV-4656 to "CLOSE".
Observed green lights ON, red lights OFF for 2CV-4655 and 2CV-4656.
END
JPM- ANO-2-JPM-NRC-PZR02 PAGE 5 OF 6 JOB PERFORMANCE MEASURE QUESTION:
ANSWER:
JPM- ANO-2-JPM-NRC-PZR02 PAGE 6 OF 6 JOB PERFORMANCE MEASURE EXAMINEES COPY JPM INITIAL TASK CONDITIONS:
100% Power Operation. A power escalation has been completed. Chemistry reports that RCS boron is 800 PPM and PZR boron is 855 PPM.
INITIATING CUE:
The SS/CRS directs, " Equalize RCS and PZR boron concentration using OP 2103.005 step 7.1, RCP A spray valve, 2CV-4651."