{{#Wiki_filter:JOB PERFORMANCE MEASURE Page 1 of 6 UNIT:   1       REV #:
{{#Wiki_filter:JOB PERFORMANCE MEASURE Page 1 of 6 UNIT:     1           REV #:     8           DATE:
8         DATE:
TUOI NUMBER:     ANO-1-JPM-RO-EFW01 SYSTEM:   Emergency Feedwater and EFIC TASK:     Reset the Steam Driven Emergency Feedwater pump after an overspeed trip.
TUOI NUMBER:
ANO-1-JPM-RO-EFW01 SYSTEM: Emergency Feedwater and EFIC TASK:   Reset the Steam Driven Emergency Feedwater pump after an over speed trip.
JTA: (10615100401)
JTA: (10615100401)
KA VALUE RO:
KA VALUE RO:   3.4    SRO:  3.8         KA  
3.4    SRO:  3.8     KA  


==REFERENCE:==
==REFERENCE:==
 
061 A2.04 APPROVED FOR ADMINISTRATION TO:     RO:   X       SRO:    X TASK LOCATION:   INSIDE CR:             OUTSIDE CR:     X   BOTH:
061 A2.04 APPROVED FOR ADMINISTRATION TO: RO:
SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):
X       SRO:    X   TASK LOCATION: INSIDE CR:
PLANT SITE:   Perform/Simulate   SIMULATOR:                 LAB:
OUTSIDE CR:
POSITION EVALUATED:   RO:           SRO:
X     BOTH:       SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):
ACTUAL TESTING ENVIRONMENT:   SIMULATOR:         PLANT SITE:       LAB:
PLANT SITE:
TESTING METHOD:   SIMULATE:       PERFORM:
Perform/Simulate SIMULATOR:
APPROXIMATE COMPLETION TIME IN MINUTES:       10 Minutes REFERENCE(S):   1106.006 Rev. 060-00-0 EXAMINEE'S NAME:                                                     SSN:   -       -
LAB:             POSITION EVALUATED: RO:         SRO:
EVALUATOR'S NAME:
ACTUAL TESTING ENVIRONMENT: SIMULATOR:       PLANT SITE:     LAB:
 
TESTING METHOD: SIMULATE:     PERFORM:
 
APPROXIMATE COMPLETION TIME IN MINUTES:
10 Minutes REFERENCE(S):
1106.006 Rev. 060-00-0 EXAMINEE'S NAME:
SSN:       -     -     EVALUATOR'S NAME:
THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:
THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:
SATISFACTORY:
SATISFACTORY:                         UNSATISFACTORY:
UNSATISFACTORY:
PERFORMANCE CHECKLIST COMMENTS:
PERFORMANCE CHECKLIST COMMENTS:
Start Time                   Stop Time                     Total Time SIGNED DATE:
Start Time                     Stop Time                   Total Time SIGNED                                             DATE:
 
JOB PERFORMANCE MEASURE Page 2 of 6 SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.
JOB PERFORMANCE MEASURE Page 2 of 6 SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.
JOB PERFORMANCE MEASURE Page 3 of 6 JPM INITIAL TASK CONDITIONS
 
: P7A tripped on overspeed during an EFIC actuation.
JOB PERFORMANCE MEASURE Page 3 of 6 JPM INITIAL TASK CONDITIONS:
P7A tripped on overspeed during an EFIC actuation.
INITIATING CUE:
INITIATING CUE:
The SM/CRS directs you to manually reset P7A turbine per 1106.006 Exhibit "A".
The SM/CRS directs   you to manually reset P7A turbine per 1106.006 Exhibit A.
 
JOB PERFORMANCE MEASURE Page 4 of 6 THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:
JOB PERFORMANCE MEASURE Page 4 of 6 THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:
The examiner shall review the "Briefing Checklist - System Walkthrough" portion of 1064.023 Attachment 6 with the examinee.
The examiner shall review the Briefing Checklist - System Walkthrough portion of 1064.023 Attachment 6 with the examinee.
JPM INITIAL TASK CONDITIONS:
JPM INITIAL TASK CONDITIONS:   P7A tripped on overspeed during an EFIC actuation.
P7A tripped on overspeed during an EFIC actuation.
TASK STANDARD:   P7A turbine has been reset.
TASK STANDARD:
TASK PERFORMANCE AIDS:   1106.006, Exhibit A or section 12.0
P7A turbine has been reset.
TASK PERFORMANCE AIDS:
1106.006, Exhibit A or section 12.0
_____________________________________________________________________________________
_____________________________________________________________________________________
JOB PERFORMANCE MEASURE Page 5 of 6 INITIATING CUE:
JOB PERFORMANCE MEASURE Page 5 of 6 INITIATING CUE:
The SM/CRS directs you to manually reset P7A turbine per 1106.006 Exhibit "A".
The SM/CRS directs you to manually reset P7A turbine per 1106.006 Exhibit A.
CRITICAL ELEMENTS (C): _2, 3, 8 _
PERFORMANCE CHECKLIST      STANDARDS                  N/A        SAT    UNSAT
: 1. Verify steam supply  Called control room to valves(SV-2613, SV-  verify SV-2613, SV-2663 AND CV-2613,    2663, CV-2613, CV-2663    ______    _______  ______
CV-2663) closed.      are closed.
POSITIVE CUE:
Control Room confirms SV-2613, SV-2663, CV-2613 and CV-2663 are closed.
(C)  2. Position the          Turned K3 Trip/
trip/throttle valve  Throttle valve to allow reset.      handwheel clockwise      _______    _______ _______
until sliding nut is POSITIVE CUE:              in a position to allow The latch lever will        engagement with trip engage the trip hook.      hook (C)  3. Pull spring-loaded    Pulled connecting rod connecting rod        to move head lever against spring        away from tappet and    _______    _______ _______
force to move head    tappet nut.
lever away from tappet and tappet nut.
POSITIVE CUE:
Head lever is away from tappet/tappet nut.
: 4. Lift and release      Lifted and released tappet assembly.      tappet assembly.        _______    _______  ______
POSITIVE CUE:
Tappet lifted and released.
: 5. Verify tappet nut    Verified tapped nut locates in the        located in the trip-trip-reset position  reset position on the    _______    _______  _____
on head bracket.      head bracket.
POSITIVE CUE:
Tappet nut located in the trip-reset position.


CRITICAL ELEMENTS (C):
JOB PERFORMANCE MEASURE Page 6 of 6 PERFORMANCE CHECKLIST         STANDARDS         N/A     SAT     UNSAT
_2, 3, 8 _PERFORMANCE CHECKLIST STANDARDS N/A SAT UNSAT 1.Verify steam supply valves(SV-2613, SV-
: 6. Verify tappet nut  Observed Tappet nut to in the proper      verify flat side position.          aligned with long axis _______  _______  ______
 
of pump (parallel to POSITIVE CUE:              shaft).
2663 AND CV-2613, CV-2663) closed.
Flat sides aligned.
POSITIVE CUE
: 7. Verify spring      Verified spring tension holds      tension holding spring-loaded      connecting rod in      _______  _______  ______
: Control Room confirms SV-2613, SV-2663, CV-2613
connecting rod in  position (holding head position.          lever against tappet nut.
POSITIVE CUE:
Spring tension is holding connecting rod in position.
(C) 8. Fully open the      Turned the trip/throttle valve trip/throttle handwheel until valve  _______  _______ _______
POSITIVE CUE:              CV-6601A is fully Handwheel in full open    open.
position.
NEGATIVE CUE:
Handwheel will not open the trip/throttle valve.
: 9. Close trip          Rotated CV6601A throttle/valve      handwheel 3/4 turn in (CV6601A) handwheel close direction.      _______ ________ _______
3/4 turn in close direction.
POSITIVE CUE:
Handwheel 3/4 turn from open.
: 10. Verify P7A trip    Verified K12-B5 clear alarm clear.        by calling control      ______  _______  ______
room.
POSITIVE CUE:
K12-B5 is clear.
NEGATIVE CUE:
K12-B5 is in Alarm.
: 11. Notify Control Room Notified CR.
P-7A is ready for  (May have been        _______  _______  ______
restart.            performed in the previous step)
END


and CV-2663 are closed.
JOB PERFORMANCE MEASURE Page 1 of 5 UNIT:    1         REV #:   1           DATE:
Called control room to verify SV-2613, SV-
TUOI NUMBER:     ANO-1-JPM-RO-MUP05 SYSTEM: Makeup and Purification System TASK:  Restoring Seal Injection Flow JTA: 13035030601 KA VALUE RO: 3.3       SRO:   3.2         KA  
 
2663, CV-2613, CV-2663
 
are closed.
___________________(C)2.Position the trip/throttle valve
 
to allow reset.
POSITIVE CUE
: The latch lever will engage the trip hook.
Turned K3 Trip/
Throttle valve
 
handwheel clockwise
 
until sliding nut is
 
in a position to allow
 
engagement with trip
 
hook_____________________(C)3.Pull spring-loaded connecting rod
 
against spring
 
force to move head
 
lever away from
 
tappet and tappet nut.POSITIVE CUE
: Head lever is away from tappet/tappet nut.
Pulled connecting rod to move head lever
 
away from tappet and
 
tappet nut.
_____________________4.Lift and r elease tappet assembly.
POSITIVE CUE
: Tappet lifted and released.Lifted and released tappet assembly.
____________________5.Verify tappet nut locates in the
 
trip-reset position
 
on head bracket.
POSITIVE CUE
: Tappet nut located in the trip-reset position.
Verified tapped nut located in the trip-
 
reset position on the
 
head bracket.
___________________
JOB PERFORMANCE MEASURE Page 6 of 6 PERFORMANCE CHECKLIST STANDARDS N/A SAT UNSAT 6.Verify tappet nut in the proper
 
position.POSITIVE CUE
: Flat sides aligned.
Observed Tappet nut to verify flat side
 
aligned with long axis
 
of pump (parallel to
 
shaft).____________________7.Verify spring tension holds
 
spring-loaded
 
connecting rod in
 
position.POSITIVE CUE
: Spring tension is holding connecting rod in
 
position.Verified spring tension holding
 
connecting rod in
 
position (holding head
 
lever against tappet
 
nut.____________________(C)8.Fully open the trip/throttle valve POSITIVE CUE
: Handwheel in full open position.NEGATIVE CUE
: Handwheel will not open the trip/throttle valve.
Turned the trip/throttle
 
handwheel until valve
 
CV-6601A is fully
 
open._____________________9.Close trip throttle/valve (CV6601A) handwheel
 
3/4 turn in close
 
direction.
POSITIVE CUE
: Handwheel 3/4 turn from open.Rotated CV6601A handwheel 3/4 turn in
 
close direction.
______________________10.Verify P7A trip alarm clear.
POSITIVE CUE
: K12-B5 is clear.
NEGATIVE CUE
: K12-B5 is in Alarm.
Verified K12-B5 clear by calling control
 
room.___________________11. Notify Control Room P-7A is ready for
 
restart.Notified CR.(May have been
 
performed in the
 
previous step)
____________________END JOB PERFORMANCE MEASURE Page 1 of 5 UNIT:    1     REV #: 1         DATE: TUOI NUMBER:
ANO-1-JPM-RO-MUP05 SYSTEM: Makeup and Purification System          
 
TASK:  Restoring Seal Injection Flow          
 
JTA: 13035030601 KA VALUE RO:
3.3     SRO: 3.2       KA  


==REFERENCE:==
==REFERENCE:==
 
003 A4.01 APPROVED FOR ADMINISTRATION TO: RO:       X       SRO:     X TASK LOCATION: INSIDE CR:             OUTSIDE CR:       X    BOTH:
003 A4.01 APPROVED FOR ADMINISTRATION TO: RO:
SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):
X       SRO:   X   TASK LOCATION: INSIDE CR:
PLANT SITE: Simulate           SIMULATOR:                   LAB:
OUTSIDE CR:
POSITION EVALUATED: RO:             SRO:
X    BOTH:       SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):
ACTUAL TESTING ENVIRONMENT: SIMULATOR:             PLANT SITE:       LAB:
PLANT SITE:
TESTING METHOD: SIMULATE:               PERFORM:
Simulate         SIMULATOR:
APPROXIMATE COMPLETION TIME IN MINUTES:         10 minutes REFERENCE(S): 1202.007 Rev. 005-01-0 EXAMINEE'S NAME:                                                 SSN:      -      -
LAB:             POSITION EVALUATED: RO:
EVALUATOR'S NAME:
SRO:       ACTUAL TESTING ENVIRONMENT: SIMULATOR:
PLANT SITE:
LAB:     TESTING METHOD: SIMULATE:
PERFORM:
APPROXIMATE COMPLETION TIME IN MINUTES:
10 minutes REFERENCE(S):
1202.007 Rev. 005-01-0                    
 
EXAMINEE'S NAME:
SSN:      -      -     EVALUATOR'S NAME:
THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:
THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:
SATISFACTORY:
SATISFACTORY:                           UNSATISFACTORY:
UNSATISFACTORY:
PERFORMANCE CHECKLIST COMMENTS:
PERFORMANCE CHECKLIST COMMENTS:
Start Time                   Stop Time                     Total Time SIGNED DATE:
Start Time                       Stop Time                       Total Time SIGNED                                               DATE:
 
JOB PERFORMANCE MEASURE Page 2 of 5 SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.
JOB PERFORMANCE MEASURE Page 2 of 5 SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.
JOB PERFORMANCE MEASURE Page 3 of 5 JPM INITIAL TASK CONDITIONS
 
:* Plant has been in a Degraded Power condition for ~5 minutes.
JOB PERFORMANCE MEASURE Page 3 of 5 JPM INITIAL TASK CONDITIONS:
* Plant has been in a Degraded Power condition for ~5 minutes.
* Examinee is extra Control Room Operator.
* Examinee is extra Control Room Operator.
* EOP 1202.007 completed through step 12.
* EOP 1202.007 completed through step 12.
INITIATING CUE:
INITIATING CUE:
The Control Room Supervisor dispatches you to restore total Seal Injection flow to 8 to 12 GPM per 1202.007 step 13.
The Control Room Supervisor dispatches you to restore         total Seal Injection flow to 8 to 12 GPM per 1202.007 step 13.
 
JOB PERFORMANCE MEASURE Page 4 of 5 THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:
JOB PERFORMANCE MEASURE Page 4 of 5 THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:
The examiner shall review the "Briefing Checklist - System Walkthrough" portion of 1064.023 Attachment 6 with the examinee.
The examiner shall review the Briefing Checklist - System Walkthrough portion of 1064.023 Attachment 6 with the examinee.
JPM INITIAL TASK CONDITIONS:
JPM INITIAL TASK CONDITIONS: Plant has been in a Degraded Power condition for
Plant has been in a Degraded Power condition for
~5 minutes. Examinee is extra Control Room Operator. EOP 1202.007 completed through step 12.
~5 minutes. Examinee is extra Control Room Operator. EOP 1202.007 completed through step 12.
TASK STANDARD:
TASK STANDARD: Seal Injection Flow of 8 to 12 GPM established.
Seal Injection Flow of 8 to 12 GPM established.
TASK PERFORMANCE AIDS: Hand held radio (actual performance only)
 
TASK PERFORMANCE AIDS:
Hand held radio (actual performance only)
Copy of 1202.007 Degraded Power (applicable steps)
Copy of 1202.007 Degraded Power (applicable steps)


JOB PERFORMANCE MEASURE Page 5 of 5 INITIATING CUE:
JOB PERFORMANCE MEASURE Page 5 of 5 INITIATING CUE:
The Control Room Supervisor dispatches you to restore total Seal Injection flow to 8 to 12 GPM per 1202.007 step 13.
The Control Room Supervisor dispatches you to restore total Seal Injection flow to 8 to 12 GPM per 1202.007 step 13.
CRITICAL ELEMENTS (C):
CRITICAL ELEMENTS (C): 1, 2, 3 (C)       PERFORMANCE CHECKLIST           STANDARDS           N/A       SAT       UNSAT (C)   1. Close MU-1207-1.       Turned valve handwheel in the clockwise POSITIVE CUE:               direction until MU-MU-1207-1 will not turn any 1207-1 was closed.
1, 2, 3 (C)PERFORMANCE CHECKLIST STANDARDS N/A SAT UNSAT (C)1.Close MU-1207-1.
further in the clockwise direction.
POSITIVE CUE:
(C)   2. Contact Control Room   Control Room was by Telephone or Radio. Contacted by Telephone or Radio POSITIVE CUE:
MU-1207-1 will not turn any further in the clockwise
The Control Room directs that MU-1207-3 be opened 1 full turn.
 
(C)   3. Operator opens MU-     Turned handwheel for 1207-3 one turn.       MU-1207-3 counter-POSITIVE CUE:               clockwise one turn.
direction.
Control Room reports total Seal Injection flow is 10 GPM.
Turned valve handwheel in the clockwise
NEGATIVE CUE:
 
Control Room reports total Seal Injection flow is zero.
direction until MU-
END
 
1207-1 was closed.(C)2.Contact Control Room by Telephone or Radio.
POSITIVE CUE:
The Control Room directs that MU-1207-3 be opened 1
 
full turn.
Control Room was Contacted by Telephone
 
or Radio (C)3.Operator opens MU-1207-3 one turn.
POSITIVE CUE:
Control Room reports total Seal Injection flow is 10


GPM.NEGATIVE CUE:
Page 1 of 8 JOB PERFORMANCE MEASURE UNIT: ______1_______    REV # _____0_________    DATE: ______________________________
Control Room reports total Seal Injection flow is
TUOI NUMBER:_ANO-1-JPM-RO-MFW03_____________
 
SYSTEM/DUTY AREA:_Main Feedwater System             _________________________________
zero.Turned handwheel for MU-1207-3 counter-
 
clockwise one turn.END Page 1 of 8 JOB PERFORMANCE MEASURE UNIT: ______
1_______REV # _____
0_________DATE: ______________________________
TUOI NUMBER:_
ANO-1-JPM-RO-MFW03_____________
SYSTEM/DUTY AREA:_
Main Feedwater System
_________________________________
TASK:_Shutdown of last MFWP and place Auxiliary Feedwater Pump in Service.__________
TASK:_Shutdown of last MFWP and place Auxiliary Feedwater Pump in Service.__________
JTA#:__100__________________________
JTA#:__100__________________________
KA VALUE RO:__
KA VALUE RO:__2.9_____ SRO:__2.9_____ KA  
2.9_____ SRO:__
2.9_____ KA  


==REFERENCE:==
==REFERENCE:==
__
__059 A4.04     __________________
059 A4.04
APPROVED FOR ADMINISTRATION TO:   RO:____X___ SRO:___X_____
__________________
TASK LOCATION:  INSIDE CR:____X____ OUTSIDE CR:_________ BOTH:________
APPROVED FOR ADMINISTRATION TO: RO:____
X___ SRO:___
X_____TASK LOCATION:  INSIDE CR:____
X____ OUTSIDE CR:_________ BOTH:________
SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):
SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):
PLANT SITE:_______________ SIMULATOR:___
PLANT SITE:_______________ SIMULATOR:___PERFORM_______ LAB:__________________
PERFORM_______ LAB:__________________
POSITION EVALUATED:  RO:__________   SRO:___________
POSITION EVALUATED:  RO:__________
ACTUAL TESTING ENVIRONMENT: SIMULATOR:__________ PLANT SITE:__________ LAB:________
SRO:___________ACTUAL TESTING ENVIRONMENT: SIMULATOR:__________ PLANT SITE:__________ LAB:________
TESTING METHOD: SIMULATE:_________   PERFORM:___________
TESTING METHOD: SIMULATE:_________
APPROXIMATE COMPLETION TIME IN MINUTES:__10 MINUTES________________________________
PERFORM:___________
REFERENCE(S):___1106.016 REV. 039-00-0                 ______________________________
APPROXIMATE COMPLETION TIME IN MINUTES:__
10 MINUTES
________________________________
REFERENCE(S):___
1106.016 REV. 039-00-0
______________________________
______________________________________________________________________
______________________________________________________________________
EXAMINEE'S NAME:________________________________
EXAMINEE'S NAME:________________________________       SSN ______-_____-____________
SSN ______-_____-____________
EVALUATOR'S NAME:__________________________________________________________________
EVALUATOR'S NAME:__________________________________________________________________
THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:
THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:
SATISFACTORY:________________
SATISFACTORY:________________         UNSATISFACTORY:_________________
UNSATISFACTORY:_________________
PERFORMANCE CHECKLIST COMMENTS:
PERFORMANCE CHECKLIST COMMENTS:
___________________________________________________________________________________
___________________________________________________________________________________
___________________________________________________________________________________
___________________________________________________________________________________
___________________________________________________________________________________
____________ Start Time          ____________ Stop Time      ____________ Total Time


___________________________________________________________________________________
Page 2 of 8 SIGNED ________________________________ DATE: _______________________
____________ Start Time
SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.
____________ Stop Time
____________ Total Time Page 2 of 8 SIGNED ________________________________ DATE: _______________________
SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A


QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.
Page 3 of 8 JPM INITIAL TASK CONDITIONS:
Page 3 of 8 JPM INITIAL TASK CONDITIONS:
* Plant Shutdown in progress.
* Plant Shutdown in progress.
* Reactor Power ~1%.
* Reactor Power ~1%.
* "A" Main Feed Pump (P-1A) in service providing flow to both OTSG's.* No planned maintenance activities.
* A Main Feed Pump (P-1A) in service providing flow to both OTSGs.
* No planned maintenance activities.
INITIATING CUE:
INITIATING CUE:
The SM/CRS directs you to start P-75 Auxiliary Feedwater Pump and shutdown P-1A "A" Main Feedwater Pump per 1106.016 Section 21
The SM/CRS directs you to start P-75 Auxiliary Feedwater Pump and shutdown P-1A A Main Feedwater Pump per 1106.016 Section 21 Shutting Down Last MFWP and Placing Aux Feedwater Pump (P-75) into Service.


"Shutting Down Last MFWP and Placing Aux Feedwater Pump (P-75) into
Page 4 of 8 TUOI NUMBER:_ANO-1-JPM-RO-MFW03______
 
THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:
Service".
Page 4 of 8 TUOI NUMBER:_
ANO-1-JPM-RO-MFW03
______THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:
The examiner shall review the "Briefing Checklist - System Walkthrough" portion of OP 1064.023 Attachment 6 with the examinee.
The examiner shall review the "Briefing Checklist - System Walkthrough" portion of OP 1064.023 Attachment 6 with the examinee.
JPM INITIAL TASK CONDITIONS:
JPM INITIAL TASK CONDITIONS: Plant shutdown in progress. Reactor Power ~1%._______
Plant shutdown in progress. Reactor Power ~1%._______
A Main Feed Pump (P-1A) in service providing flow to both OTSGs._________________
"A" Main Feed Pump (P-1A) in service providing flow to both OTSG's._________________
No planned maintenance activities.               __________________________________
No planned maintenance activities.
TASK STANDARD: A Main Feedwater pump is shutdown and the Auxiliary Feedwater Pump_
__________________________________
___is supplying feedwater to the OTSGs. __________________________________________
TASK STANDARD:  
"A" Main Feedwater pump is shutdown and the Auxiliary Feedwater Pump_
___is supplying feedwater to the OTSGs. _
_________________________________________
____________________________________________________________________________________
____________________________________________________________________________________
____________________________________________________________________________________
____________________________________________________________________________________
____________________________________________________________________________________
____________________________________________________________________________________
TASK PERFORMANCE AIDS:__
TASK PERFORMANCE AIDS:__1106.016 Section 21.0  ____________________________________
1106.016 Section 21.0  ____________________________________
____________________________________________________________________________________
____________________________________________________________________________________
____________________________________________________________________________________
____________________________________________________________________________________
____________________________________________________________________________________
____________________________________________________________________________________
Page  5 of 8 TUOI NUMBER:_
ANO-1-JPM-RO-MFW03
______INITIATING CUE:
The SM/CRS directs you to start P-75 Auxiliary Feedwater Pump and shutdown P-1A "A" Main Feedwater Pump per 1106.016 Section 21 "Shutting Down Last MFWP and Placing Aux Feedwater Pump (P-75) into Service"
.CRITICAL ELEMENTS (C):
1, 2, 3, 7, 9 (C)PERFORMANCE CHECKLIST STANDARD N/A SAT UNSAT (C)1.Verify TRIP ON LOSS OF MFP BYPASSED (KO8-F4)


alarm.POSITIVE CUE
Page 5 of 8 TUOI NUMBER:_ANO-1-JPM-RO-MFW03______
: TRIP ON LOSS OF MFP BYPASSED is in alarm.
INITIATING CUE:
Verified K08-F4 TRIP ON LOSS OF MFP BYPASSED alarm in
The SM/CRS directs you to start P-75 Auxiliary Feedwater Pump and shutdown P-1A A Main Feedwater Pump per 1106.016 Section 21 Shutting Down Last MFWP and Placing Aux Feedwater Pump (P-75) into Service.
 
CRITICAL ELEMENTS (C):  1, 2, 3, 7, 9 (C)      PERFORMANCE CHECKLIST                STANDARD            N/A    SAT    UNSAT
solid or fast flashing.
: 1. Verify TRIP ON LOSS OF     Verified K08-F4 TRIP ON LOSS (C)      MFP BYPASSED (KO8-F4)      OF MFP BYPASSED alarm in alarm.                      solid or fast flashing.
_______________(C)2 Verify Aux FW Pump Recirc to E-11A (FW-1) open.
_____  _____  _____
POSITIVE CUE
POSITIVE CUE:
: The auxiliary operator reports that the Aux FW Pump
TRIP ON LOSS OF MFP BYPASSED is in alarm.
 
2   Verify Aux FW Pump Recirc   Called and requested the to E-11A (FW-1) open.       auxiliary operator to verify (C)                                  the Aux FW Pump Recirc to E-POSITIVE CUE:                    11A (FW-1) open.            _____  _____  _____
Recirc is open.
The auxiliary operator reports that the Aux FW Pump Recirc is open.
Called and requested the auxiliary operator to verify
(C) 3. Start the Aux Feedwater     Placed the control switch, Pump (P-75).                located on C-11, to the start position.
 
POSITIVE CUE:                                                _____  _____  _____
the Aux FW Pump Recirc to E-
P-75 breaker red light is on, green light is off
 
: 4. Verify MFW Pump H/A         Verified A MFW Pump H/A station in Hand.            station in Hand by verifying white manual light on.
11A (FW-1) open.
POSITIVE CUE:                                                _____  _____  _____
_______________(C)3.Start the Aux Feedwater Pump (P-75).
Manual white light ON.
POSITIVE CUE
: 5. Open FW Pump Recirc         Contacted the Auxiliary Condenser Sprays (CV-2856   Operator and directed the and CV-2857).               Auxiliary Operator to open CV-2856 and CV-2857.        _____  _____  _____
: P-75 breaker red light is on, green light is off Placed the control switch, located on C-11, to the
POSITIVE CUE:
 
Auxiliary Operator reports that CV-2856 and CV-2857 open.
start position.
: 6. Slowly decelerate A      Decelerated A MFWP using MFWP while monitoring      toggle switch on A MFW Pump feed valve P.              H/A station.
_______________4.Verify MFW Pump H/A station in Hand.
_____  _____  _____
POSITIVE CUE
POSITIVE CUE:
: Manual white light ON.
A MFWP speed is going down.
Verified "A" MFW Pump H/A station in Hand by verifying
 
white manual light on.
_______________5. Open FW Pump Recirc Condenser Sprays (CV-2856
 
and CV-2857).
POSITIVE CUE
: Auxiliary Operator reports that CV-2856 and CV-2857 open.Contacted the Auxiliary Operator and directed the
 
Auxiliary Operator to open


Page 6 of 8 Page 7 of 8 TUOI NUMBER:_ANO-1-JPM-RO-MFW03______
(C)      PERFORMANCE CHECKLIST                STANDARD            N/A  SAT    UNSAT (C)  7. Verify P-75 maintains 70  Selected Measured Variable psid.                      on MFW Pump H/A stations and monitored feed valve P. _____ _____  _____
POSIITIVE CUE:
A feed valve P is 80 psid, B feed valve P is 75 psid.
: 8. Verify Startup Valves        Monitored A and B (CV2623 and CV-2673)      Startup level indicators and maintain low level limits  verified level maintained at _____ _____  _____
on both SGs.              ~31 inches.
POSITIVE CUE:
A and B Startup levels are at 31 inches.
(C)  9. Trip A MFWP.              Placed A MFWP Trip/Reset switch in the trip position.
POSITIVE CUE:                                                _____ _____  _____
Green pump tripped light on, red latched light out
: 10. Close MFWP P-1A Feedpump    Placed MFWP P-1A Feedpump Recirc (CV2874).          Recirc Controller in manual and lowered demand to zero. _____ _____  _____
POSITIVE CUE:
MFWP P-1A Feedpump Recirc valve is closed.
11 Close FW Pump Recirc        Contacted the Auxiliary Condenser Sprays (CV-2856  Operator and directed the and CV-2857).              Auxiliary Operator to close  _____ _____  _____
CV-2856 and CV-2857.
CV-2856 and CV-2857.
_______________6. Slowly decelerate "A" MFWP while monitoring feed valve D P.POSITIVE CUE
:"A" MFWP speed is going down.
Decelerated "A" MFWP using toggle switch on A MFW Pump
H/A station.
_______________
Page  6 of 8 Page  7 of 8 TUOI NUMBER:_
ANO-1-JPM-RO-MFW03
______(C)PERFORMANCE CHECKLIST STANDARD N/A SAT UNSAT (C)7. Verify P-75 maintains
³70 psid.POSIITIVE CUE
:"A" feed valve D P is 80 psid,"B" feed valve D P is 75 psid.
Selected Measured Variable on MFW Pump H/A stations and monitored feed valve D P._______________8. Verify Startup Valves (CV2623 and CV-2673)
maintain low level limits
on both SGs.
POSITIVE CUE:
POSITIVE CUE:
"A" and "B" Startup levels are at 31 inches.
Auxiliary Operator reports that CV-2856 and CV-2857 closed.
Monitored "A" and "B" Startup level indicators and
12  When pump coasts down     When pump coasted down, verify turning gear        observed red and amber engages.                  lights for turning gear on to verify turning gear       _____ _____  _____
 
POSITIVE CUE:                  engaged.
verified level maintained at
Turning gear amber and red lights are on.
 
13  Open A MFWP steam       Directed the Auxiliary leakoff and Seat drain     Operator to open MS-85, RS-valves:                    92, and RS-93.
~31 inches.
MS-85                                                  _____ _____  _____
_______________(C)9. Trip "A" MFWP.
RS-92 RS-93 POSITIVE CUE:
POSITIVE CUE
Auxiliary Operator reports MS-85, RS-92, and RS-93 are open.
: Green pump tripped light on, red latched light out Placed "A" MFWP Trip/Reset switch in the trip position.
_______________10. Close MFWP P-1A Feedpump Recirc (CV2874).
POSITIVE CUE
: MFWP P-1A Feedpump Recirc valve is closed.
Placed MFWP P-1A Feedpump Recirc Controller in manual
 
and lowered demand to zero.
_______________11 Close FW Pump Recirc Condenser Sprays (CV-2856
 
and CV-2857).
POSITIVE CUE
: Auxiliary Operator reports that CV-2856 and CV-2857 closed.Contacted the Auxiliary Operator and directed the
 
Auxiliary Operator to close
 
CV-2856 and CV-2857.
_______________12 When pump coasts down verify turning gear
 
engages.POSITIVE CUE
: Turning gear amber and red lights are on.
When pump coasted down, observed red and amber
 
lights for turning gear on
 
to verify turning gear
 
engaged._______________13 Open "A" MFWP steam leakoff and Seat drain


valves:
Page 8 of 8 END
MS-85 RS-92 RS-93 POSITIVE CUE
: Auxiliary Operator reports MS-85, RS-92, and RS-93 are open.Directed the Auxiliary Operator to open MS-85, RS-


92, and RS-93.
Page 1 of 6 JOB PERFORMANCE MEASURE UNIT: ______1_______    REV # ______3_______    DATE: ______________________________
_______________
TUOI NUMBER:_ANO-1-JPM-RO-HYD01_____________
Page 8 of 8 END Page  1 of 6 JOB PERFORMANCE MEASURE UNIT: ______
SYSTEM/DUTY AREA:_HYDROGEN RECOMBINER AND PURGE CONTROL SYSTEM_____________________
1_______REV # ______
TASK:_PLACE HYDROGEN RECOMBINER M55A IN OPERATION__________________________________
3_______DATE: ______________________________
JTA#:_10285120101___________________________
TUOI NUMBER:_
KA VALUE RO:__4.0_____ SRO:__4.0_____ KA  
ANO-1-JPM-RO-HYD01
_____________
SYSTEM/DUTY AREA:_
HYDROGEN RECOMBINER AND PURGE CONTROL SYSTEM
_____________________
TASK:_PLACE HYDROGEN RECOMBINER M55A IN OPERATION
__________________________________
JTA#:_10285120101
___________________________
KA VALUE RO:__
4.0_____ SRO:__
4.0_____ KA  


==REFERENCE:==
==REFERENCE:==
__
__028 A4.01_________________
028 A4.01_________________
APPROVED FOR ADMINISTRATION TO:   RO:____X___ SRO:___X_____
APPROVED FOR ADMINISTRATION TO: RO:____
TASK LOCATION:  INSIDE CR:____X____ OUTSIDE CR:_________ BOTH:________
X___ SRO:___
X_____TASK LOCATION:  INSIDE CR:____
X____ OUTSIDE CR:_________ BOTH:________
SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):
SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):
PLANT SITE:_______________ SIMULATOR:___
PLANT SITE:_______________ SIMULATOR:___PERFORM_______ LAB:__________________
PERFORM_______ LAB:__________________
POSITION EVALUATED:  RO:__________   SRO:___________
POSITION EVALUATED:  RO:__________
ACTUAL TESTING ENVIRONMENT: SIMULATOR:__________ PLANT SITE:__________ LAB:________
SRO:___________ACTUAL TESTING ENVIRONMENT: SIMULATOR:__________ PLANT SITE:__________ LAB:________
TESTING METHOD: SIMULATE:_________   PERFORM:___________
TESTING METHOD: SIMULATE:_________
APPROXIMATE COMPLETION TIME IN MINUTES:__15 MINUTES________________________________
PERFORM:___________
REFERENCE(S):__1104.031 REV. 012-01-0 _____________________________________________
APPROXIMATE COMPLETION TIME IN MINUTES:__
15 MINUTES
________________________________
REFERENCE(S):__
1104.031 REV. 012-01-0
_____________________________________________
______________________________________________________________________
______________________________________________________________________
EXAMINEE'S NAME:________________________________
EXAMINEE'S NAME:________________________________       SSN ______-_____-____________
SSN ______-_____-____________
EVALUATOR'S NAME:__________________________________________________________________
EVALUATOR'S NAME:__________________________________________________________________
THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:
THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:
SATISFACTORY:________________
SATISFACTORY:________________       UNSATISFACTORY:_________________
UNSATISFACTORY:_________________
PERFORMANCE CHECKLIST COMMENTS:
PERFORMANCE CHECKLIST COMMENTS:
___________________________________________________________________________________
___________________________________________________________________________________
___________________________________________________________________________________
___________________________________________________________________________________
___________________________________________________________________________________
____________ Start Time          ____________ Stop Time      ____________ Total Time


___________________________________________________________________________________
Page 2 of 6 SIGNED ________________________________ DATE: _______________________
____________ Start Time
SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.
____________ Stop Time
____________ Total Time Page 2 of 6 SIGNED ________________________________ DATE: _______________________
SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A


QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.
Page 3 of 6 JPM INITIAL TASK CONDITIONS:
Page 3 of 6 JPM INITIAL TASK CONDITIONS
* A Loss of Coolant Accident (LOCA) has occurred.
:* A Loss of Coolant Accident (LOCA) has occurred.
* Containment hydrogen concentration is 2.0%.
* Containment hydrogen concentration is 2.0%.
* Both hydrogen recombiners are shutdown.
* Both hydrogen recombiners are shutdown.
Line 512: Line 293:
* Pre-LOCA containment temperature was 120°F.
* Pre-LOCA containment temperature was 120°F.
INITIATING CUE:
INITIATING CUE:
The SM/CRS directs you to place both Hydrogen Recombiners (M55A/B) in standby and then place M55A in operation at the power required
The SM/CRS directs you to place both Hydrogen Recombiners (M55A/B) in standby and then place M55A in operation at the power required for containment pressure and pre-loca containment temperature per 1104.031 Section 8.0 Placing Hydrogen Recombiner (M55A or M55B) in Operation.


for containment pressure and pre-loca containment temperature per
Page 4 of 6 TUOI NUMBER:_ANO-1-JPM-RO-HYD01______
 
THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:
1104.031 Section 8.0 Placing Hydrogen Recombiner (M55A or M55B) in
 
Operation.
Page 4 of 6 TUOI NUMBER:_
ANO-1-JPM-RO-HYD01
______THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:
The examiner shall review the "Briefing Checklist - System Walkthrough" portion of OP 1064.023 Attachment 6 with the examinee.
The examiner shall review the "Briefing Checklist - System Walkthrough" portion of OP 1064.023 Attachment 6 with the examinee.
JPM INITIAL TASK CONDITIONS:
JPM INITIAL TASK CONDITIONS: A Loss of Coolant Accident (LOCA) has occurred.________
A Loss of Coolant Accident (LOCA) has occurred.________
Containment hydrogen Concentration is 2.0%. Both hydrogen recombiners are shutdown.
Containment hydrogen Concentration is 2.0%. Both hydrogen recombiners are shutdown.
Containment pressure is 20.4 psia. Pre-LOCA containment temperature was 120°F.
Containment pressure is 20.4 psia. Pre-LOCA containment temperature was 120°F.____
____TASK STANDARD:
TASK STANDARD: Hydrogen recombiner M55A in operation at power setting of 52.5 KW to 54 KW on JI-1000.          ________________________________________________________
Hydrogen recombiner M55A in operation at power setting of 52.5 KW to 54 KW on JI-1000.          ________________________________________________________
____________________________________________________________________________________
____________________________________________________________________________________
____________________________________________________________________________________
____________________________________________________________________________________
____________________________________________________________________________________
 
TASK PERFORMANCE AIDS:___1104.031_Section 8.0______________________________________
____________________________________________________________________________________
____________________________________________________________________________________
TASK PERFORMANCE AIDS:
___1104.031_Section 8.0
______________________________________
____________________________________________________________________________________
____________________________________________________________________________________
____________________________________________________________________________________
____________________________________________________________________________________


____________________________________________________________________________________
Page 5 of 6 TUOI NUMBER:_ANO-1-JPM-RO-HYD01_
Page 5 of 6 TUOI NUMBER:_
ANO-1-JPM-RO-HYD01_
INITIATING CUE:
INITIATING CUE:
The SM/CRS directs you to place both Hydrogen Recombiners (M55A/B) in standby and then place M55A in operation at the power required for containment pressure and pre-
The SM/CRS directs you to place both Hydrogen Recombiners (M55A/B) in standby and then place M55A in operation at the power required for containment pressure and pre-loca containment temperature per 1104.031 Section 8.0 Placing Hydrogen Recombiner (M55A or M55B) in Operation.
CRITICAL ELEMENTS (C):_2, 9, 10_
(C)      PERFORMANCE CHECKLIST                STANDARD              N/A    SAT UNSAT
: 1. Verify power adjust        Verified power adjust potentiometers are set at  potentiometers set to zero zero.                      on C26 (if not already at zero used knurled knob on      ____    ____  ____
POSITIVE CUE:                  power adjust potentiometers Power adjust potentiometers    on C26 and turned to the for M55A/B are set at zero on  left and set at zero using C26.                            HS-7472 and HS-7473).
: 2. Turn hydrogen recombiners    Turned on hydrogen M55A and M55B on.          recombiners M55A and M55B (C)                                  using HS-7470 and HS-7471 on POSITIVE CUE:                  C26.                            ____    ____  ____
M55A/B red lights ON.
NEGATIVE CUE:
M55A/B green lights ON.
: 3. Select thermocouple #1, 2    Thermocouple #1, 2 or 3 or 3 to input to          selected to input to TI-2300 recombiner temperature    and TI-2301 using indicators TI-2300 and    handswitches HS-7474 and HS-    ____    ____  ____
TI-2301.                  7475 on C26.
POSITIVE CUE: thermocouple
    #1, 2 or 3 selected as desired to input to TI-2300 and TI-2301.
: 4. Increase power to ~5 KW      Slowly adjusted and then hold for ten      potentiometers clockwise minutes.                  until power on JI-1000 and JI-1001 on C26 indicated ~5    ____    ____  ____
POSITIVE CUE:                  KW.
Power on JI-1000 and JI-1001 indicates 5KW.
NOTE: evaluator inform examinee that ten minutes have elapsed after one minute at 5 KW.


loca containment temperature per 1104.031 Section 8.0 Placing Hydrogen Recombiner (M55A or M55B) in Operation.
Page 6 of 6 TUOI NUMBER:_ANO-1-JPM-RO-HYD01______
CRITICAL ELEMENTS (C):_
(C)       PERFORMANCE CHECKLIST               STANDARD               N/A     SAT UNSAT
2, 9, 10_(C)PERFORMANCE CHECKLIST STANDARD N/A SAT UNSAT 1.Verify power adjust potentiometers are set at
: 5. Slowly increase power to Increased power to ~10 KW 10 KW.                   using power adjust potentiometers on C26.
 
POSITIVE CUE:
zero.POSITIVE CUE
Power is at 10 KW on JI-1000                                   ____    ____  ____
: Power adjust potentiometers for M55A/B are set at zero on
and JI-1001.
 
: 7. Hold power at 10 KW for   Waited 10 minutes with power 10 minutes.              constant at 10 KW.
C26.Verified power adjust potentiometers set to zero
POSITIVE CUE:
 
Inform examinee that ten minutes have elapsed after one minute at 10 KW.
on C26 (if not already at
NOTE:
 
Evaluator inform examinee to disregard taking data every 30 minutes on Attachment D.
zero used knurled knob on
: 8. Slowly increase power to    Increased power on M55A to 20 KW on M55A and hold   ~20 KW using power adjust for 5 minutes.            potentiometer on C26.
 
POSITIVE CUE:                                                  ____    ____  ____
power adjust potentiometers
Power at 20 KW on JI-1000.
 
NOTE: inform examinee that five minutes have elapsed after 1 minute at 20 KW.
on C26 and turned to the
: 9. Determine power required    Determined recombiner power (C)       from Attachment B based   using Attachment B to be on containment pressure. between 52.5 and 54.0 KW.       ____    ____  ____
 
: 10. Slowly increase power to  Power increased to 52.5 to 52.5 - 54.0 KW range. 54 range using power adjust potentiometer on C26.
left and set at zero using
POSITIVE CUE:
 
(C)  Hydrogen concentration                                         ____    ____  ____
HS-7472 and HS-7473).
decreasing on QI-7457 and M55A maintaining power at determined value.
____________(C)2.Turn hydrogen recombiners M55A and M55B on.
POSITIVE CUE
: M55A/B red lights ON.
NEGATIVE CUE
: M55A/B green lights ON.
Turned on hydrogen recombiners M55A and M55B
 
using HS-7470 and HS-7471 on
 
C26.____________3.Select thermocouple #1, 2 or 3 to input to
 
recombiner temperature
 
indicators TI-2300 and
 
TI-2301.POSITIVE CUE: thermocouple
#1, 2 or 3 selected as
 
desired to input to TI-2300
 
and TI-2301.
Thermocouple #1, 2 or 3 selected to input to TI-2300
 
and TI-2301 using
 
handswitches HS-7474 and HS-
 
7475 on C26.
____________4.Increase power to ~5 KW and  then hold for ten
 
minutes.POSITIVE CUE
: Power on JI-1000 and JI-1001 indicates 5KW.
NOTE: evaluator inform examinee that ten minutes
 
have elapsed after one minute
 
at 5 KW.Slowly adjusted potentiometers clockwise
 
until power on JI-1000 and
 
JI-1001 on C26 indicated ~5
 
KW.____________
Page 6 of 6 TUOI NUMBER:_
ANO-1-JPM-RO-HYD01______(C)PERFORMANCE CHECKLIST STANDARD N/A SAT UNSAT 5.Slowly increase power to 10 KW.POSITIVE CUE
: Power is at 10 KW on JI-1000 and JI-1001.
Increased power to ~10 KW using power adjust
 
potentiometers on C26.
____________7.Hold power at 10 KW for 10 minutes.
POSITIVE CUE
: Inform examinee that ten minutes have elapsed after one minute at 10 KW.
Waited 10 minutes with power constant at 10 KW.
NOTE: Evaluator inform examinee to disregard taking data every 30 minutes on Attachment D.
8.Slo wly increase power to 20 KW on M55A and hold for 5 minutes.
POSITIVE CUE
: Power at 20 KW on JI-1000.
NOTE: inform examinee that five minutes have elapsed
 
after 1 minute at 20 KW.
Increased power on M55A to
~20 KW using power adjust
 
potentiometer on C26.
____________(C)9.Determine power required from Attachment B based
 
on containment pressure.
Determined recombiner power using Attachment B to be
 
between 52.5 and 54.0 KW.
____________(C)10.Slowly increase power to 52.5 - 54.0 KW range.
POSITIVE CUE
: Hydrogen concentration decreasing on QI-7457 and
 
M55A maintaining power at
 
determined value.
NEGATIVE CUE:
NEGATIVE CUE:
Hydrogen concentration
Hydrogen concentration increasing on QI-7457.
 
END
increasing on QI-7457.
Power increased to 52.5 to 54 range using power adjust


potentiometer on C26.
Page 1 of 7 JOB PERFORMANCE MEASURE UNIT: ______1_______    REV # ______1________    DATE: ______________________________
____________END Page 1 of 7 JOB PERFORMANCE MEASURE UNIT: ______
TUOI NUMBER:_ANO-1-JPM-RO-PZR02_____________
1_______REV # ______
SYSTEM/DUTY AREA:_PRESSURIZER SYSTEM_______________________________________________
1________DATE: ______________________________
TASK:_EQUALIZE BORON CONCENTRATIONS BETWEEN RCS AND PRESSURIZER____________________
TUOI NUMBER:_
ANO-1-JPM-RO-PZR02_____________
SYSTEM/DUTY AREA:_
PRESSURIZER SYSTEM_______________________________________________
TASK:_EQUALIZE BORON CONCENTRATIONS BETWEEN RCS AND PRESSURIZER
____________________
JTA#:__10105150101__________________________
JTA#:__10105150101__________________________
KA VALUE RO:___
KA VALUE RO:___3.6____ SRO:___3.4____ KA  
3.6____ SRO:___
3.4____ KA  


==REFERENCE:==
==REFERENCE:==
__
__010 A4.02_________________
010 A4.02_________________
APPROVED FOR ADMINISTRATION TO:   RO:____X___ SRO:___ X ___
APPROVED FOR ADMINISTRATION TO: RO:____
TASK LOCATION:  INSIDE CR:____X____ OUTSIDE CR:_________ BOTH:________
X___ SRO:___
X ___TASK LOCATION:  INSIDE CR:____
X____ OUTSIDE CR:_________ BOTH:________
SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):
SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):
PLANT SITE:_______________ SIMULATOR:___
PLANT SITE:_______________ SIMULATOR:___PERFORM_______ LAB:__________________
PERFORM_______ LAB:__________________
POSITION EVALUATED:  RO:__________   SRO:___________
POSITION EVALUATED:  RO:__________
SRO:___________
ACTUAL TESTING ENVIRONMENT: SIMULATOR:__________ PLANT SITE:__________ LAB:________
ACTUAL TESTING ENVIRONMENT: SIMULATOR:__________ PLANT SITE:__________ LAB:________
TESTING METHOD: SIMULATE:_________
TESTING METHOD: SIMULATE:_________   PERFORM:___________
PERFORM:___________
APPROXIMATE COMPLETION TIME IN MINUTES:___ 10 MINUTES______________________________
APPROXIMATE COMPLETION TIME IN MINUTES
REFERENCE(S):__1103.005 REV 029-03-0_______________________________________________
:___ 10 MINUTES
__1203.015 REV 010-01-0_______________________________________________
______________________________
EXAMINEE'S NAME:________________________________       SSN ______-_____-____________
REFERENCE(S):__
1103.005 REV 029-03-0_______________________________________________
__1203.015 REV 010-01-0
_______________________________________________
EXAMINEE'S NAME:________________________________
SSN ______-_____-____________
EVALUATOR'S NAME:__________________________________________________________________
EVALUATOR'S NAME:__________________________________________________________________
THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:
THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:
SATISFACTORY:________________
SATISFACTORY:________________         UNSATISFACTORY:_________________
UNSATISFACTORY:_________________
PERFORMANCE CHECKLIST COMMENTS:
PERFORMANCE CHECKLIST COMMENTS:
___________________________________________________________________________________
___________________________________________________________________________________
___________________________________________________________________________________
___________________________________________________________________________________
___________________________________________________________________________________
____________ Start Time          ____________ Stop Time      ____________ Total Time


___________________________________________________________________________________
Page 2 of 7 SIGNED ________________________________ DATE: _______________________
____________ Start Time
SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.
____________ Stop Time
____________ Total Time Page 2 of 7 SIGNED ________________________________ DATE: _______________________
SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A


QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.
Page 3 of 7 JPM INITIAL TASK CONDITIONS:
Page 3 of 7 JPM INITIAL TASK CONDITIONS
* The plant is at 100% power, steady state conditions.
:* The plant is at 100% power, steady state conditions.
* Chemistry reports Pressurizer Boron sample 70 ppm higher than RCS Boron.
* Chemistry reports Pressurizer Boron sample 70 ppm higher than RCS Boron.INITIATING CUE:
INITIATING CUE:
The SM/CRS directs you to equalize pressurizer and RCS boron concentrations per 1103.005 Method 1 - Spray and heaters in manual.
The SM/CRS directs you to equalize pressurizer and RCS boron concentrations per 1103.005 Method 1 - Spray and heaters in manual.
Page 4 of 7 TUOI NUMBER:_
 
ANO-1-JPM-RO-PZR02_
Page 4 of 7 TUOI NUMBER:_ANO-1-JPM-RO-PZR02_
THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:
THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:
The examiner shall review the "Briefing Checklist - System Walkthrough" portion of OP 1064.023 Attachment 6 with the examinee.
The examiner shall review the "Briefing Checklist - System Walkthrough" portion of OP 1064.023 Attachment 6 with the examinee.
JPM INITIAL TASK CONDITIONS:
JPM INITIAL TASK CONDITIONS: The plant is at 100% power, steady state conditions.___
The plant is at 100% power, steady state conditions.___
_Chemistry reports a Pressurizer Boron sample 70 ppm higher than RCS Boron._________
_Chemistry reports a Pressurizer Boron sample 70 ppm higher than RCS Boron._________
_State to examinee: You are responsible for panel C04 and related alarms.___________
_State to examinee: You are responsible for panel C04 and related alarms.___________
TASK STANDARD:
TASK STANDARD: Note: this is an Alternate Success Path JPM.       Pressurizer boron__
Note: this is an Alternate Success Path JPM.
equalization started, then must close CV-1009 (Pressurizer Spray Isolation Valve) due to CV-1008 failure.       ___________________________________________________
Pressurizer boron__
equalization started, then must close CV-1009 (Pressurizer Spray Isolation Valve) due to CV-1008 failure.
___________________________________________________
____________________________________________________________________________________
____________________________________________________________________________________
____________________________________________________________________________________
____________________________________________________________________________________
TASK PERFORMANCE AIDS:_
TASK PERFORMANCE AIDS:_1103.005 Section 8.0 and 1203.015 Section 6__________________
1103.005 Section 8.0 and 1203.015 Section 6__________________
____________________________________________________________________________________
____________________________________________________________________________________
____________________________________________________________________________________
____________________________________________________________________________________
____________________________________________________________________________________
____________________________________________________________________________________
Instructor Note:
Instructor Note:
Close RCRC4 Pressurizer spray minimum flow prior to start of JPM.
Close RCRC4 Pressurizer spray minimum flow prior to start of JPM.
Note: This JPM is an Alternate Success Path JPM intended to be performed on the simulator, not simulated. Therefore, no cues are provided.
Note: This JPM is an Alternate Success Path JPM intended to be performed on the simulator, not simulated. Therefore, no cues are provided.
Note to IA Operator and Examiner:
Note to IA Operator and Examiner:
When CV-1008 is cracked open, insert Component Malfunction to fail Pressurizer Spray Valve CV-1008 full open.
When CV-1008 is cracked open, insert Component Malfunction to fail Pressurizer Spray Valve CV-1008 full open.
Page 5 of 7 TUOI NUMBER:_
 
ANO-1-JPM-RO-PZR02_
Page 5 of 7 TUOI NUMBER:_ANO-1-JPM-RO-PZR02_
INITIATING CUE:
INITIATING CUE:
The SM/CRS directs you to equalize pressurizer and RCS boron concentrations per 1103.005 Method 1 - Spray and heaters in manual.
The SM/CRS directs you to equalize pressurizer and RCS boron concentrations per 1103.005 Method 1 - Spray and heaters in manual.
CRITICAL ELEMENTS (C):_
CRITICAL ELEMENTS (C):_1, 2, 6_
1, 2, 6_(C)PERFORMANCE CHECKLIST STANDARD N/A SAT UNSAT (C)1.Place Pressurizer Spray Valve (CV-1008) in manual (HAND).POSITIVE CUE
(C)       PERFORMANCE CHECKLIST               STANDARD               N/A     SAT UNSAT (C) 1. Place Pressurizer Spray     Placed HS-1003 in Manual Valve (CV-1008) in manual   position.                      ____    ____  ____
: CV-1008 is in hand.
(HAND).
Placed HS-1003 in Manual position.____________(C)2.Partially open Pressurizer Spray Valve (CV-1008) as
POSITIVE CUE:
CV-1008 is in hand.
(C)  2. Partially open Pressurizer  Placed CV-1008 in throttled Spray Valve (CV-1008) as    open position.                 ____    ____  ____
required.
POSITIVE CUE:
CV-1008 is throttled open.
: 3. Place some (as per          Placed some PZR heaters in 1103.005) of the PZR        manual (SAT if examinee        ____    ____  ____
heaters in manual.          places any of the heaters in manual).
POSITIVE CUE:
Pzr heater banks are in manual IA Operator: Fail CV-1008  100% open (wait until steps 1-3 above have been done.
: 4. Monitor RCS pressure        Monitored RCS pressure, closely.                    noticed RCS pressure            ____    ____  ____
dropping and/or Pressurizer ALTERNATE PATH CUE:            Spray Valve CV-1008 full RCS pressure is dropping and    open.
CV-1008 is full open.
: 5. Attempt to close CV-1008    Attempted to close by taking Pressurizer        Pressurizer Spray Valve CV-    ____    ____  ____
Control switch to HAND and  1008.
taking CV-1008 handswitch to close.
POSITIVE CUE:
CV-1008 will not close (red light on).
(C)  6. Close Pressurizer Spray      Closed Pressurizer Spray Isolation Valve CV-1009. Isolation Valve CV-1009.        ____    ____  ____
POSITIVE CUE:
CV-1009 is closed (green light indication on).
NEGATIVE CUE:


required.POSITIVE CUE
Page 6 of 7 RCS pressure is 2000 psig and going down.
: CV-1008 is throttled open.
Placed CV-1008 in throttled open position.
____________3.Place some (as per 1103.005) of the PZR


heaters in manual.
Page 7 of 7 TUOI NUMBER:_ANO-1-JPM-RO-PZR02_
POSITIVE CUE
(C)      PERFORMANCE CHECKLIST              STANDARD              N/A    SAT UNSAT
: Pzr heater banks are in manual Placed some PZR heaters in manual (SAT if examinee
: 7. Return pressurizer heaters Returned pressurizer heaters to auto.                  to automatic.                   ____    ____  ____
POSITIVE CUE:
Pressurizer heaters are in automatic.
END


places any of the heaters in
Page 1 of 6 JOB PERFORMANCE MEASURE UNIT: ______1_______    REV # ______1________    DATE: ______________________________
 
TUOI NUMBER:_ANO-1-JPM-RO-RCP04______________
manual).____________IA Operator: Fail CV-1008  100% open (wait until steps 1-3 above have been done.
SYSTEM/DUTY AREA:_REACTOR COOLANT PUMP SYSTEM______________________________________
4.Monitor RCS pressure closely.ALTERNATE PATH CUE
TASK:__SHUTDOWN RCP P-32A AT POWER_________________________________________________
: RCS pressure is dropping and CV-1008 is full open.
JTA#:__10035260101__________________________
Monitored RCS pressure, noticed RCS pressure
KA VALUE RO:__3.7_____ SRO:_3.9______ KA  
 
dropping and/or Pressurizer
 
Spray Valve CV-1008 full
 
open.____________5.Attempt to close CV-1008 by taking Pressurizer
 
Control switch to HAND and
 
taking CV-1008 handswitch
 
to close.POSITIVE CUE:
CV-1008 will not close (red
 
light on).
Attempted to close Pressurizer Spray Valve CV-
 
1008.____________(C)6.Close Pressurizer Spray Isolation Valve CV-1009.
POSITIVE CUE
: CV-1009 is closed (green light indication on).
NEGATIVE CUE
: Closed Pressurizer Spray Isolation Valve CV-1009.
____________
Page  6 of 7 RCS pressure is 2000 psig and going down.
Page  7 of 7 TUOI NUMBER:_
ANO-1-JPM-RO-PZR02_(C)PERFORMANCE CHECKLIST STANDARD N/A SAT UNSAT 7.Return pressurizer heaters to auto.POSITIVE CUE
: Pressurizer heaters are in automatic.
Returned pressurizer heaters to automatic.
____________END Page 1 of 6 JOB PERFORMANCE MEASURE UNIT: ______
1_______REV # ______
1________DATE: ______________________________
TUOI NUMBER:_
ANO-1-JPM-RO-RCP04______________
SYSTEM/DUTY AREA:_
REACTOR COOLANT PUMP SYSTEM
______________________________________
TASK:__SHUTDOWN RCP P-32A AT POWER
_________________________________________________
JTA#:__10035260101
__________________________
KA VALUE RO:__
3.7_____ SRO:_
3.9______ KA  


==REFERENCE:==
==REFERENCE:==
___
___003 A2.02________________
003 A2.02________________
APPROVED FOR ADMINISTRATION TO:   RO:____X___ SRO:___X_____
APPROVED FOR ADMINISTRATION TO: RO:____
TASK LOCATION:  INSIDE CR:____X____ OUTSIDE CR:_________ BOTH:________
X___ SRO:___
X_____TASK LOCATION:  INSIDE CR:____
X____ OUTSIDE CR:_________ BOTH:________
SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):
SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):
PLANT SITE:_______________ SIMULATOR:___
PLANT SITE:_______________ SIMULATOR:___PERFORM_______ LAB:__________________
PERFORM_______ LAB:__________________
POSITION EVALUATED:  RO:__________   SRO:___________
POSITION EVALUATED:  RO:__________
SRO:___________
ACTUAL TESTING ENVIRONMENT: SIMULATOR:__________ PLANT SITE:__________ LAB:________
ACTUAL TESTING ENVIRONMENT: SIMULATOR:__________ PLANT SITE:__________ LAB:________
TESTING METHOD: SIMULATE:_________
TESTING METHOD: SIMULATE:_________   PERFORM:___________
PERFORM:___________
APPROXIMATE COMPLETION TIME IN MINUTES:___5 MINUTES________________________________
APPROXIMATE COMPLETION TIME IN MINUTES:___
REFERENCE(S):__1103.006 REV. 023-02-0______________________________________________
5 MINUTES________________________________
REFERENCE(S):__
1103.006 REV. 023-02-0
______________________________________________
______________________________________________________________________
______________________________________________________________________
EXAMINEE'S NAME:________________________________
EXAMINEE'S NAME:________________________________       SSN ______-_____-____________
SSN ______-_____-____________
EVALUATOR'S NAME:__________________________________________________________________
EVALUATOR'S NAME:__________________________________________________________________
THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:
THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:
SATISFACTORY:________________
SATISFACTORY:________________         UNSATISFACTORY:_________________
UNSATISFACTORY:_________________
PERFORMANCE CHECKLIST COMMENTS:
PERFORMANCE CHECKLIST COMMENTS:
___________________________________________________________________________________
___________________________________________________________________________________
___________________________________________________________________________________
___________________________________________________________________________________
___________________________________________________________________________________
____________ Start Time          ____________ Stop Time      ____________ Total Time


___________________________________________________________________________________
Page 2 of 6 SIGNED ________________________________ DATE: _______________________
____________ Start Time
____________ Stop Time
____________ Total Time Page 2 of 6 SIGNED ________________________________ DATE: _______________________
SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.
SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.
Page 3 of 6 JPM INITIAL TASK CONDITIONS
 
:* Reactor power is  
Page 3 of 6 JPM INITIAL TASK CONDITIONS:
£60% steady state with 4 RCPs on.
* Reactor power is 60% steady state with 4 RCPs on.
* System Engineering monitoring abnormal vibration on Reactor Coolant Pump P-32A.
* System Engineering monitoring abnormal vibration           on Reactor Coolant Pump P-32A.
* Backup indication of zero speed is not installed.
* Backup indication of zero speed is not installed.
System and Maintenance Engineering along with the approval of Operations have requested that RCP P-32A be secured due to abnormal
System and Maintenance Engineering along with the approval of Operations have requested that RCP P-32A be secured due to abnormal vibrations on the pump.
 
vibrations on the pump.
INITIATING CUE:
INITIATING CUE:
The SM/CRS directs you to stop RCP P-32A per 1103.006 section 9 RCP Stop.
The SM/CRS directs you to stop RCP P-32A per 1103.006 section 9 RCP Stop.
Page 4 of 6 TUOI NUMBER:_
 
ANO-1-JPM-RO-RCP04
Page 4 of 6 TUOI NUMBER:_ANO-1-JPM-RO-RCP04_
_THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:
THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:
The examiner shall review the "Briefing Checklist - System Walkthrough" portion of OP 1064.023 Attachment 6 with the examinee.
The examiner shall review the "Briefing Checklist - System Walkthrough" portion of OP 1064.023 Attachment 6 with the examinee.
JPM INITIAL TASK CONDITIONS:
JPM INITIAL TASK CONDITIONS: Reactor power is 60% steady state with 4 RCPs on._____
Reactor power is  
£60% steady state with 4 RCPs on._____
System Engineering monitoring abnormal vibration on Reactor Coolant Pump P-32A._____
System Engineering monitoring abnormal vibration on Reactor Coolant Pump P-32A._____
Backup indication of zero speed is not installed. System and Maintenance___________
Backup indication of zero speed is not installed. System and Maintenance___________
Engineering along with the approval of Operations have requested that RCP P-32A be__
Engineering along with the approval of Operations have requested that RCP P-32A be__
secured due to abnormal vibrations on the pump.___                                _
secured due to abnormal vibrations on the pump.___                                _
TASK STANDARD:
TASK STANDARD: Reactor Coolant Pump A secured , all RCPs tripped, reactor tripped.
Reactor Coolant Pump "A" secured , all RCPs tripped, reactor tripped.
_This is an alternate success path JPM._____________________________________________
_This is an alternate success path JPM.
_____________________________________________
____________________________________________________________________________________
____________________________________________________________________________________
____________________________________________________________________________________
____________________________________________________________________________________
____________________________________________________________________________________
____________________________________________________________________________________
TASK PERFORMANCE AIDS:__
TASK PERFORMANCE AIDS:__1103.006 Section 9.0________________________________________
1103.006 Section 9.0________________________________________
____________________________________________________________________________________
____________________________________________________________________________________
____________________________________________________________________________________
____________________________________________________________________________________
____________________________________________________________________________________
____________________________________________________________________________________
Simulator Instructor The following overrides are necessary for the performance of the JPM:
Simulator Instructor The following overrides are necessary for the performance of the JPM:
: 1. Override DO HS1022_B;false (prevents zero speed lamp for P-32A from coming on).
: 1. Override DO HS1022_B;false (prevents zero speed lamp for P-32A from coming on).
As soon as P-32A is stopped:
As soon as P-32A is stopped:
Insert IMF RC466, Wait 15 seconds and input:
Insert IMF RC466, Wait 15 seconds and input:
: 1. IOR-DO K08B6 True RCP VIB HI alarm
: 1. IOR-DO K08B6 True RCP VIB HI alarm
: 2. IOR-DORCPA_R01 True RCP VIB Hi red light Page 5 of 6 TUOI NUMBER:_
: 2. IOR-DORCPA_R01 True RCP VIB Hi red light
ANO-1-JPM-RO-RCP04
 
_INITIATING CUE:
Page 5 of 6 TUOI NUMBER:_ANO-1-JPM-RO-RCP04_
INITIATING CUE:
The SM/CRS directs you to stop RCP P-32A per 1103.006.
The SM/CRS directs you to stop RCP P-32A per 1103.006.
 
CRITICAL ELEMENTS (C): 2, 5, 6__
CRITICAL ELEMENTS (C):
(C)       PERFORMANCE CHECKLIST                 STANDARD             N/A     SAT UNSAT
2, 5, 6__(C)PERFORMANCE CHECKLIST STANDARD N/A SAT UNSAT 1.Start HP Oil Lift Pump (P-63A), Emergency HP
: 1. Start HP Oil Lift Pump   Started P-63A, P-80A and (P-63A), Emergency HP     P-82A Lube oil pumps.
 
Lift Oil Pump (P-80A) and Backup Lube oil Pump                                 ____    ____  ____
Lift Oil Pump (P-80A)
(P-82A) for RCP P-32A.
 
POSITIVE CUE:
and Backup Lube oil Pump (P-82A) for RCP P-32A.
Red light ON, green light OFF for each oil pump.
POSITIVE CUE
: 2. Stop RCP P-32A.          On panel C13, stopped RCP P-32A.
: Red light ON, green light OFF for each oil pump.
POSITIVE CUE:
Started P-63A, P-80A and P-82A Lube oil pumps.
(C)  Green light ON, red light OFF                                   ____    ____  ____
____________(C)2.Stop RCP P-32A.
for P-32A, RCS flow lowering in the B RCS loop.
POSITIVE CUE
NEGATIVE CUE:
: Green light ON, red light OFF for P-32A, RCS flow lowering
Red light ON, green light OFF for P-32A, RCS loop flows are matched.
 
: 3. Verify HP Oil Lift Pump  Verified HP Oil Lift Pump and Backstop Lube Oil     and Backstop Lube Oil Pumps Pumps remain on during   remain on during RCP RCP coastdown.           coastdown.                      ____    ____  ____
in the "B" RCS loop.
POSITIVE CUE:
NEGATIVE CUE
Red lights ON for oil pumps.
: Red light ON, green light OFF for P-32A, RCS loop flows are
Note to IA operator:
 
matched.On panel C13, stopped RCP P-32A.
____________3.Verify HP Oil Lift Pump and Backstop Lube Oil
 
Pumps remain on during
 
RCP coastdown.
POSITIVE CUE
: Red lights ON for oil pumps.
Verified HP Oil Lift Pump and Backstop Lube Oil Pumps
 
remain on during RCP
 
coastdown.
____________Note to IA operator:
: 1. Override DO HS1022_B;false (prevents zero speed lamp for P-32A from coming on).
: 1. Override DO HS1022_B;false (prevents zero speed lamp for P-32A from coming on).
As soon as P-32A is stopped:
As soon as P-32A is stopped:
Insert IMF RC466, Wait 15 seconds and input:
Insert IMF RC466, Wait 15 seconds and input:
: 1. IOR-DO K08B6 True RCP VIB HI alarm
: 1. IOR-DO K08B6 True RCP VIB HI alarm
: 2. IOR-DORCPA_R01 True RCP VIB Hi red light Page  6 of 6 TUOI NUMBER:_
: 2. IOR-DORCPA_R01 True RCP VIB Hi red light
ANO-1-JPM-RO-RCP04
_(C)PERFORMANCE CHECKLIST STANDARD N/A SAT UNSAT 4.Verify shaft stops, without reverse


rotation.NEGATIVE(FAULTED) CUES
Page 6 of 6 TUOI NUMBER:_ANO-1-JPM-RO-RCP04_
: A. Blue zero speed light OFF for P-32A.
(C)      PERFORMANCE CHECKLIST                STANDARD              N/A      SAT UNSAT
B. Plant computer alarm "RCP P32-A REVERSE ROTATION" (P3188) is in alarm.
: 4. Verify shaft stops,      Verified shaft stops by without reverse          observing blue zero speed rotation.                 indicator on , RCS flow indication stabilizes, and NEGATIVE(FAULTED) CUES:         plant computer reverse A. Blue zero speed light OFF   rotation alarm clear.          ____    ____  ____
for P-32A.                 Determined that P-32A is rotating in the reverse B. Plant computer alarm RCP   direction.
P32-A REVERSE ROTATION (P3188) is in alarm.
C. P-32A has high vibration.
C. P-32A has high vibration.
C. P-32A motor bearing temperature is high.
C. P-32A motor bearing temperature is high.
Verified shaft stops by observing blue zero speed
: 5. Trip reactor.            Depressed the reactor trip pushbutton on panel C03.
 
(C)  POSITIVE CUE:                                                  _____    _____ _____
indicator on , RCS flow
Rod bottom lights all ON for groups 1-7, reactor power dropping in the intermediate range.
 
: 6. Trip running RCPs.        On panel C13, tripped RCPs P-32B/P-32C/P-32D.
indication stabilizes, and
 
plant computer reverse
 
rotation alarm clear.
 
Determined that P-32A is
 
rotating in the reverse
 
direction.
____________(C)5.Trip reactor.
POSITIVE CUE:
POSITIVE CUE:
Rod bottom lights all ON for
(C)  Green lights ON, red lights                                    _____    _____ _____
OFF for tripped RCPs.
NEGATIVE CUE: P-32A vibration is high Reactor Coolant Pump Operation procedure now has the operator to Refer to Reactor Trip (1202.001). Tell examinee that his crew will perform the remainder of the Reactor Trip immediate actions.
END


groups 1-7, reactor power
ADMINISTRATIVE JOB PERFORMANCE MEASURE                Page 1 of 5 UNIT: ______1_______    REV # _____0_________    DATE: ______________________________
TUOI NUMBER:_ANO-1-JPM-RO-RAD1__________________
SYSTEM/DUTY AREA:_ADMINISTRATIVE TOPIC-RADIATION CONTROL_________________________
TASK:_ABILITY TO CONTROL RADIATION RELEASES.________________________________________
JTA#:_106854901W4________________
KA VALUE RO:___2.7   SRO:__3.2_____ KA


dropping in the intermediate
==REFERENCE:==
 
__2.3.11_________________
range.Depressed the reactor trip pushbutton on panel C03.
APPROVED FOR ADMINISTRATION TO:   RO:____X___ SRO:________
_______________(C)6.Trip run ning RCPs.
TASK LOCATION:  INSIDE CR:____X____ OUTSIDE CR:_________ BOTH:________
POSITIVE CUE
: Green lights ON, red lights OFF for tripped RCPs.
NEGATIVE CUE: P-32A vibration is high On panel C13, tripped RCP's P-32B/P-32C/P-32D.
_______________Reactor Coolant Pump Operation procedure now has the operator to "Refer to Reactor Trip (1202.001). Tell examinee that his crew will perform the remainder of the Reactor Trip immediate actions.
END ADMINISTRATIVE JOB PERFORMANCE MEASURE Page  1 of 5 UNIT: ______
1_______REV # _____
0_________
DATE: ______________________________
TUOI NUMBER:_
ANO-1-JPM-RO-RAD1__________________
SYSTEM/DUTY AREA:_
ADMINISTRATIVE TOPIC-RADIATION CONTROL
_________________________
TASK:_ABILITY TO CONTROL RADIATION RELEASES.
________________________________________
JTA#:_106854901W4________________
KA VALUE RO:___
2.7  SRO:__3.2_____ KA REFERENCE
:__2.3.11_________________
APPROVED FOR ADMINISTRATION TO: RO:____
X___ SRO:________
TASK LOCATION:  INSIDE CR:____
X____ OUTSIDE CR:_________ BOTH:________
SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):
SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):
PLANT SITE:_______________ SIMULATOR:___
PLANT SITE:_______________ SIMULATOR:___PERFORM_______ LAB:__________________
PERFORM_______ LAB:__________________
POSITION EVALUATED:   RO:_____X_____ SRO:____N/A_______
POSITION EVALUATED: RO:_____
ACTUAL TESTING ENVIRONMENT: SIMULATOR:____X_____ PLANT SITE:__________ LAB:________
X_____SRO:____N/A_______ACTUAL TESTING ENVIRONMENT: SIMULATOR:____
TESTING METHOD: SIMULATE:____X____    PERFORM:___________
X_____ PLANT SITE:__________ LAB:________
APPROXIMATE COMPLETION TIME IN MINUTES:__15 MINUTES________________________________
TESTING METHOD: SIMULATE:____
REFERENCE(S):__ 1104.020 039-04-0 ATT B2, Offsite Dose Calculation Manual (ODCM) and P-47B Pump Differential Pressure versus Flow Rate graph EXAMINEE'S NAME:________________________________         SSN ______-_____-____________
X____PERFORM:___________
APPROXIMATE COMPLETION TIME IN MINUTES
:__15 MINUTES
________________________________
REFERENCE(S):__
1104.020 039-04-0 ATT "B2", Offsite Dose Calculation Manual (ODCM) and P-47B Pump Differential Pressure versus Flow Rate graph EXAMINEE'S NAME:________________________________
SSN ______-_____-____________
EVALUATOR'S NAME:__________________________________________________________________
EVALUATOR'S NAME:__________________________________________________________________
THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:
THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:
SATISFACTORY:________________
SATISFACTORY:________________           UNSATISFACTORY:_________________
UNSATISFACTORY:_________________
PERFORMANCE CHECKLIST COMMENTS:
PERFORMANCE CHECKLIST COMMENTS:
___________________________________________________________________________________
___________________________________________________________________________________
___________________________________________________________________________________
___________________________________________________________________________________
___________________________________________________________________________________
___________________________________________________________________________________
____________ Start Time
____________ Start Time           ____________ Stop Time        ____________ Total Time SIGNED ________________________________ DATE: _______________________
____________ Sto p Time____________ Total Time SIGNED ________________________________ DATE: _______________________
SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.
SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A


QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.
ADMINISTRATIVE JOB PERFORMANCE MEASURE           Page 2 of 5 JPM INITIAL TASK CONDITIONS:
ADMINISTRATIVE JOB PERFORMANCE MEASURE Page 2 of 5 JPM INITIAL TASK CONDITIONS
* Plant is shutdown for a Refueling Outage.
:* Plant is shutdown for a Refueling Outage.
* Circulating Water Pump     P-3A in service.         ALL other Circ Water Pumps are OOS for maintenance.
* Circulating Water Pump P-3A in service. ALL other Circ Water Pumps are OOS for maintenance.
* Discharge flow to flume indicator (FI-4642) is INOPERABLE and OOS.
* Discharge flow to flume indicator (FI-4642) is INOPERABLE and OOS.* T-16B TWMT release is in progress.
* T-16B TWMT release is in progress.
* Maximum allowable flow rate for the release from Preliminary Report is 90 gpm.
* Maximum allowable flow rate for the release from Preliminary Report is 90 gpm.
* WCO reports CV-4642, CZ Discharge to Flume Flow Control Valve, is throttled open.
* WCO reports CV-4642, CZ Discharge to Flume Flow Control Valve, is throttled open.
* WCO reports that P-47B, Treated Waste Monitoring Pump, parameters after establishing flow through CV-4642:
* WCO reports that P-47B, Treated Waste Monitoring Pump, parameters after establishing flow through CV-4642:
  § Suction Pressure = 10 psig
  § Discharge Pressure = 38 psig INITIATING CUE:
The CRS directs you to perform step 4.15.1 of 1104.020 ATT B2 Treated Waste Monitor Tank (TWMT) T-16B Liquid Release Permit and report if the release flow rate is within the allowable limit.


§ Suction Pressure = 10 psig
ADMINISTRATIVE JOB PERFORMANCE MEASURE               Page 3 of 5 TUOI NUMBER:_ANO-1-JPM-RO-RAD1______
§ Discharge Pressure = 38 psig INITIATING CUE:
The CRS directs you to perform step 4.15.1 of 1104.020 ATT "B2" Treated Waste Monitor Tank (TWMT) T-16B Liquid Release Permit and
 
report if the release flow rate is within the allowable limit.
ADMINISTRATIVE JOB PERFORMANCE MEASURE Page 3 of 5 TUOI NUMBER:_
ANO-1-JPM-RO-RAD1______
THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:
THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:
The examiner shall review the "Briefing Checklist - System Walkthrough" portion of 1064.023 Attachment 6 with the examinee.
The examiner shall review the "Briefing Checklist - System Walkthrough" portion of 1064.023 Attachment 6 with the examinee.
JPM INITIAL TASK CONDITIONS:
JPM INITIAL TASK CONDITIONS: Plant is shutdown for a Refueling Outage. Circulating Water Pump  P-3A in service. ALL other Circ Water Pumps are OOS for maintenance.
Plant is shutdown for a Refueling Outage. Circulating Water Pump  P-3A in service. ALL other Circ Water Pumps are OOS for maintenance.
Discharge flow to flume indicator (FI-4642) is INOPERABLE and OOS. T-16B TWMT release is in progress. Maximum allowable flow rate for the release from Preliminary Report is 90 gpm. WCO reports CV-4642, CZ Discharge to Flume Flow Control Valve, is throttled open. WCO reports that P-47B, Treated Waste Monitoring Pump, parameters after establishing flow through CV-4642:   Suction Pressure = 10 psig, Discharge Pressure = 38 psig.
Discharge flow to flume indicator (FI-4642) is INOPERABLE and OOS. T-16B TWMT release is in progress. Maximum allowable flow rate for the release from Preliminary Report is 90 gpm. WCO reports CV-4642, CZ Discharge to Flume Flow Control Valve, is throttled open. WCO reports that P-47B, Treated Waste Monitoring Pump, parameters after establishing flow through CV-4642: Suction Pressure = 10 psig, Discharge Pressure = 38 psig.
TASK STANDARD: Candidate estimates release flow rate between 75 to 85 gpm and is within the allowable flow rate specified in the Preliminary Report.
TASK STANDARD:
Candidate estimates release flow rate between 75 to 85 gpm and is within the allowable flow rate specified in the Preliminary Report.
____________________________________________________________________________________
____________________________________________________________________________________
TASK PERFORMANCE AIDS:
TASK PERFORMANCE AIDS: 1104.020 039-04-0 ATT B2, Offsite Dose Calculation Manual (ODCM) and P-47B Pump Differential Pressure versus Flow Rate graph.
1104.020 039-04-0 ATT "B2", Offsite Dose Calculation Manual (ODCM) and P-47B Pump Differential Pressure versus Flow Rate graph.
___________________________________________________________________________
___________________________________________________________________________
____________________________________________________________________________________
____________________________________________________________________________________
____________________________________________________________________________________
____________________________________________________________________________________
ADMINISTRATIVE JOB PERFORMANCE MEASURE Page 4 of 5 TUOI NUMBER:_
 
ANO-1-JPM-RO-RAD1______
ADMINISTRATIVE JOB PERFORMANCE MEASURE               Page 4 of 5 TUOI NUMBER:_ANO-1-JPM-RO-RAD1______
INITIATING CUE:
INITIATING CUE:
The CRS directs you to perform step 4.15.1 of 1104.020 ATT "B2" Treated Waste Monitor Tank (TWMT) T-16B Liquid Release Permit and report if the release flow rate
The CRS directs you to perform step 4.15.1 of 1104.020 ATT B2 Treated Waste Monitor Tank (TWMT) T-16B Liquid Release Permit and report if the release flow rate is within the allowable limit.
 
CRITICAL ELEMENTS (C):___3, 5_______
is within the allowable limit.
(c)       PERFORMANCE CHECKLIST                   STANDARD           N/A   SAT   UNSAT Examiner Cue: Provide Candidate with copy of partially completed 1104.020, ATT B2.
CRITICAL ELEMENTS (C):
: 1. Candidate performs a         Performed review of T-16B review of ATT B TWMT       Liquid Release Permit.
___3, 5_______(c)PERFORMANCE CHECKLIST STANDARD N/A SAT UNSAT Examiner Cue: Provide Candidate with copy of partially completed 1104.020, ATT "B2".
_____  _____  _____
: 1. Candidate performs a review of ATT "B" TWMT
 
Release Permit.
Release Permit.
Performed review of T-16B Liquid Release Permit.
: 2. Perform step 4.15.1.A         Recognize actions for FI-4642 inoperable           inoperable flow indicator
_______________2. Perform step 4.15.1.A FI-4642 inoperable
_____  _____  _____
 
actions.                      contained in ODCM App. 1 Table 2.1-1.
actions.Recognize actions for inoperable flow indicator
: 3. Determine required actions   Utilizing ODCM App. 1 Table for conducting release        2.1-1 Action 2. Determines C                                                                    _____  _____  _____
 
with FI-4642 inoperable.      release flow rate required to be estimated at least once every four hours utilizing pump curves.
contained in ODCM App. 1
Note: Candidate should discuss options available to obtain pump curve data which may include any of the following: 1) Contacting System Engineer     2) Reference Pump Technical Manual.
 
Table 2.1-1.
_______________C 3. Determine required actions for conducting release
 
with FI-4642 inoperable.
Utilizing ODCM App. 1 Table 2.1-1 Action 2. Determines
 
release flow rate required
 
to be estimated at least
 
once every four hours
 
utilizing pump curves.
_______________Note: Candidate should discuss options available to obtain pump curve data which may include any of the following: 1) Contacting System Engineer   2) Reference Pump
 
Technical Manual.
Examiner Cue: Provide Candidate with copy of P-47B Pump Curve upon request.
Examiner Cue: Provide Candidate with copy of P-47B Pump Curve upon request.
: 4. Obtain pump curve data. To estimate release flow
: 4. Obtain pump curve data. To   Candidate obtains pump curve estimate release flow         data.
_____  _____  _____
rate.
Note:  Pump Suction and Discharge pressure are given in Initial Task Conditions.
: 5. Determine pump flow rate      Candidate calculates pump based on pump differential    differential pressure and C                                                                    _____  _____  _____
pressure.                    estimates flow rate of 75 to 85 gpm using pump curve.
: 6. Report that flow is within    Candidate reports to CRS allowable limit.              that flow is within
_____  _____  _____
allowable limit.
END


rate.Candidate obtains pump curve data._______________Note:  Pump Suction and Discharge pressure are given in Initial Task Conditions.
Treated Waste Monitor Pump P-47B 60 Pump Differential Pressure (PSID) 55 50 45 40 35 30 25 20 15 10 5
C 5. Determine pump flow rate based on pump differential
0 0    20    40    60    80  100  120    140  160 Flow - GPM (5 GPM increments)


pressure.Candidate calculates pump differential pressure and
PROC./WORK PLAN NO. PROCEDURE/WORK PLAN TITLE:                            PAGE:      1 of 113 1104.020                    CLEAN WASTE SYSTEM OPERATION CHANGE:    039-04-0 ATTACHMENT B2 Page 1 of 8 TREATED WASTE MONITOR TANK (TWMT)
T-16B LIQUID RELEASE PERMIT PERMIT #__1-LR-2001-0100__(Assigned by Nuclear Chemistry)                ___02/13/2001 Date INITIALS 1.0    REQUEST (Operations) 1.1        T-16B taken out of service and placed on recirc for sampling and release:
Date 02/12/2001 Time 0010                                            SRP NOTE Tag contains information to remind personnel that tank is isolated for chemistry sample.
1.2        Verify Treated Waste Monitor T-16B Inlet (CZ-47B) is closed          SRP and tag is installed on handwheel or chain operator.
1.3        Initial T-16B level ______92_________%.      Record local or          SRP remote level indication. (Circle one) 1.4        Check Liquid Radwaste Process Monitor (RI-4642) available            SRP by one of the following methods:
1.4.1      If monitor count rate is  1000 cpm perform the following:
A. Verify no Liquid Release in progress using FI-4642.
B. Select "Check Source" on RI-4642 and verify that the monitor responds to check source with a count rate rise >100 cpm.
1.4.2      If monitor count rate >1000 cpm, then verify that count rate is <4.22E6.
1.5        Verify that RI-4642 is not inoperable for any other reason.          SRP 1.6        If RI-4642 is operable, Then record Rad Monitor RI-4642 background counts.      __1.0 E4______________                        SRP 1.7        Record the following:
SRP 1.7.1      # of CW pumps running __1___
and CW pump Disch Press _1.1 PSIG__
1.8        If adjustments are made to CW flow, terminate release.
1.9        Submitted to Nuclear Chemistry for Analysis, Section 2.0.            SRP Date _02/12/2001____      Time _0120__________
Section 1.0 Performed By __Steve R. Pullin_                  _


estimates flow rate of 75 to
PROC./WORK PLAN NO. PROCEDURE/WORK PLAN TITLE:                          PAGE:      2 of 113 1104.020                    CLEAN WASTE SYSTEM OPERATION CHANGE:    039-04-0 ATTACHMENT B2 Page 2 of 8 2.0    Analysis (Nuclear Chemistry) 2.l        Tank T-16B sample obtained for release analysis.                      JB Date/Time _02/12/2001__/_0200___
Performed by    John Brown_____.
N/A 2.2        If required for weekly sample for oil and grease, Tank T-16B sample obtained. Otherwise N/A.
Performed by ________N/A__________________
JB 2.3        T-16B pH analysis performed by _John Brown_____
2.3.1      T-16B pH __7.0____
2.4        If pH is not between 6.0 and 9.0, adjust per Sampling the          N/A Treated Waste Monitor Tanks (T-16A/B) (1607.009).
Otherwise N/A.
2.4.1      Tank T-16B post neutralization pH sample,                N/A Obtained by _____N/A_________________
2.4.2      T-16B post neutralization pH sample,                    N/A Analysis performed by ____N/A_______________
2.4.3      T-16B post neutralization pH _N/A___
2.4.4      If pH is not between 6.0 and 9.0, re-perform            N/A adjustment and analysis sequence until pH is between 6.0 and 9.0. Otherwise N/A.
2.5        Gamma spectroscopy performed by ___John Brown____    ________
2.6        Gamma spectroscopy report reviewed by _Jim Smith          ____
2.7        Tritium analysis performed by __John Brown    ___________


85 gpm using pump curve.
PROC./WORK PLAN NO. PROCEDURE/WORK PLAN TITLE:                           PAGE:     3 of 113 1104.020                   CLEAN WASTE SYSTEM OPERATION CHANGE:    039-04-0 ATTACHMENT B2 Page 3 of 8 2.8       If Liquid Radwaste Process Monitor (RI-4642) is inoperable             N/A or unavailable as identified in "Request" or "Verification of Pre-Release Requirements" sections of this permit, the following ODCM App. 1, Table 2.1-1 requirements shall be met. Otherwise N/A.
_______________6. Report that flow is within allowable limit.
2.8.1     An independent sample of the tank contents shall be obtained and analyzed.
Candidate reports to CRS that flow is within
Performed by ______N/A__________________
 
2.8.2     Computer input data shall be independently verified correct.
allowable limit.
Performed by _____N/A___________________
_______________END Treated Waste Monitor Pump P-47B 0 5 10 15 20 25 30 35 40 45 50 55 60 0 20 40 60 80 100 120 140 160 Flow - GPM (5 GPM increments)
2.9       Sample results indicate release of total tank contents will             JB not violate ANO radioactive effluent discharge limit.
Pump Differential Pressure (PSID)
2.10       Preliminary release report prepared by ___John Brown________
PROC./WORK PLAN NO.
1104.020 PROCEDURE/WORK PLAN TITLE:
CLEAN WASTE SYSTEM OPERATION PAGE: 1 of 113 CHANGE: 039-04-0 ATTACHMENT B2 Page 1 of 8 TREATED WASTE MONITOR TANK (TWMT)
T-16B LIQUID RELEASE PERMIT PERMIT #__
1-LR-2001-0100
__(Assigned by Nuclear Chemistry)
___02/13/2001 Date    INITIALS 1.0 REQUEST (Operations) 1.1 T-16B taken out of service and placed on re circ for sampling and release:
Date 02/12/2001 Time 0010 NOTE Tag contains information to remind personnel that tank is isolated for chemistry sample.
1.2 Verify Treated Waste Monitor T
-16B Inlet (CZ
-47B) is closed and tag is installed on handwheel or chain operator.
1.3 Initial T-16B level
______92_________%. Record local or remote level indication. (Circle one) 1.4 Check Liquid Radwaste Process Monitor (RI
-4642) available by one of the following methods:
1.4.1 If monitor count rate is
&#xa3; 1000 cpm perform the following:
A.Verify no Liquid Release in progress using FI-4642.B.Select "Check Source" on RI
-4642 and verify that the monitor responds to check source with a count rate rise >100 cpm.
1.4.2 If monitor count rate >1000 cpm, then verify that count rate is <4.22E6.
1.5 Verify that RI
-4642 is not inoperable for any other reason.
1.6 If RI-4642 is operable, Then record Rad Monitor RI
-4642 background counts.
__1.0 E4______________
1.7 Record the following:
1.7.1# of CW pumps running
__1___and CW pump Disch Press
_1.1 PSIG__1.8 If adjustments are made to CW flow, terminate release.
1.9 Submitted to Nuclear Chemistry for Analysis, Section 2.0.
Date _02/12/2001
____  Time _
0120__________
Section 1.0 Performed By __
Steve R. Pullin_
_SRP    SRP  SRP  SRP  SRP  SRP  SRP  SRP PROC./WORK PLAN NO.
1104.020 PROCEDURE/WORK PLAN TITLE:
CLEAN WASTE SYSTEM OPERATION PAGE: 2 of 113 CHANGE: 039-04-0 ATTACHMENT B2 Page 2 of 8 2.0 Analysis (Nuclear Chemistry) 2.l Tank T-16B sample obtained for release analysis.
Date/Time _
02/12/2001__/_0200___
Performed by John Brown_____.
2.2 If required for weekly sample for oil and grease, Tank T-16B samp le obtained. Otherwise N/A.
Performed by ________
N/A__________________
2.3 T-16B pH analysis performed by _
John Brown
_____2.3.1 T-16B pH __
7.0____2.4 If pH is not between 6.0 and 9.0, adjust per Sampling the Treated Waste Monitor Tanks (T
-16A/B) (1607.009).
Otherwise N/A.
2.4.1 Tank T-16B post neutralization pH sample, Obtained by
_____N/A_________________
2.4.2 T-16B post neutralization pH sample, Analysis performed by ____
N/A_______________
2.4.3 T-16B post neutralization pH
_N/A___2.4.4 If pH is not between 6.0 and 9.0, re-perform adjustment and analysis sequence until pH is between 6.0 and 9.0. Otherwise N/A.
2.5 Gamma spectroscopy performed by ___
John Brown____   ________
2.6 Gamma spectroscopy report reviewed by _
Jim Smith        ____2.7 Tritium analysis performed by __
John Brown
___________
JB          N/A          N/A          JB          N/A          N/A          N/A PROC./WORK PLAN NO.
1104.020 PROCEDURE/WORK PLAN TITLE:
CLEAN WASTE SYSTEM OPERATION PAGE: 3 of 113 CHANGE: 039-04-0 ATTACHMENT B2 Page 3 of 8 2.8 If Liquid Radwaste Process Monitor (RI
-4642) is inoperable or unavailable as identified in "Request" or "Verification of Pre-Release Requirements" sections of this permit, the following ODCM App. 1, Table 2.1
-1 requirements shall be met. Otherwise N/A.2.8.1 An independent sample of the tank contents shall be obtained and analyzed.
Performed by
______N/A__________________
2.8.2 Computer input data shall be independently verified correct.
Performed by
_____N/A___________________
2.9 Sample results indicate release of total tank contents will not violate ANO radioactive effluent discharge limit.
2.10 Preliminary release report prepared by ___
John Brown________
If not radioactive N/A.
If not radioactive N/A.
2.11 Preliminary release report and/or permit returned to Control Room.
2.11       Preliminary release report and/or permit returned to Control Room.
By _John Brown_______ Date _02/13/2001_ Time      0900 3.0    Verification of Pre-Release Requirements (Operations) 3.1        Verify CW flow/configuration recorded in initial release            JG submittal data is still valid.
3.2        Verify appropriate signatures on preliminary report.                JG 3.3        CRS/SM approval to proceed with release.
CRS/SM ___Abel Leader__________________
3.4        Provide copy of Setpoints section from Preliminary Report            JG to Control Room Operators.
3.5        Verify F560 in service by performing the following:
3.5.1      Verify open:
* CZ-74 (LRW Disch Filter F-560 Inlet)                  JG
* CZ-77 (LRW Disch Filter F-560 Outlet)                JG 3.5.2      Verify closed CZ-83 (LRW Disch Filter F-560              JG Bypass)


By _John Brown
PROC./WORK PLAN NO. PROCEDURE/WORK PLAN TITLE:                           PAGE:     4 of 113 1104.020                    CLEAN WASTE SYSTEM OPERATION CHANGE:   039-04-0 ATTACHMENT B2 Page 4 of 8 3.6       If Liquid Radwaste Process Monitor (RI-4642) is operable and available, verify proper operation of radiation monitor and interlocks as follows. Otherwise N/A.
_______ Date _
3.6.1     Check Liquid Radwaste Process Monitor (RI-4642)           JG available by one of the following methods:
02/13/2001
* If monitor count rate is 1000 cpm, select CHECK SOURCE on RI-4642 and verify that the monitor responds to check source with a count rate rise >100 cpm.
_ Time    0900    3.0 Verification of Pre-Release Requirements (Operations) 3.1 Verify CW flow/configuration r ecorded in initial release submittal data is still valid.
3.2 Verify appropriate signatures on preliminary report.
3.3 CRS/SM approval to proceed with release.
CRS/SM ___
Abel Leader
__________________
3.4 Provide copy of Setpoints section from Prelimi nary Report to Control Room Operators.
3.5 Verify F560 in service by performing the following:
3.5.1 Verify open:
* CZ-74 (LRW Disch Filter F
-560 Inlet)
* CZ-77 (LRW Disch Filter F
-560 Outlet) 3.5.2 Verify closed CZ
-83 (LRW Disch Filter F
-560 Bypass)  N/A          JB          JG          JG          JG          JG          JG          JG PROC./WORK PLAN NO.
1104.020 PROCEDURE/WORK PLAN TITLE:
CLEAN WASTE SYSTEM OPERATION PAGE: 4 of 113 CHANGE: 039-04-0 ATTACHMENT B2 Page 4 of 8 3.6 If Liquid Radwaste Process Monitor (RI
-4642) is operable and available, verify proper operation of radiation monitor and interlocks as follows. Otherwise N/A.
3.6.1 Check Liquid Radwaste Process Monitor (RI
-4642)available by one of the following methods:
* If monitor count rate is  
&#xa3; 1000 cpm, select CHECK SOURCE on RI
-4642 and verify that the monitor responds to check source with a count rate rise >100 cpm.
* If monitor count rate >1000 cpm, then verify that count rate is <4.22E6.
* If monitor count rate >1000 cpm, then verify that count rate is <4.22E6.
3.6.2 Verify the following valves closed:
3.6.2     Verify the following valves closed:
* FWMT Disch to CW Flumes (DZ
* FWMT Disch to CW Flumes (DZ-25)                       JG
-25)* LZ Drain Pump P
* LZ Drain Pump P-45 Discharge to Flume (LZ-5)         JG
-45 Discharge to Flume (LZ
* Treated Waste Discharge to Circ Water Flume           JG (CZ-58) 3.6.3     Place CZ Disch to Flume Flow Control Valve               JG (CV-4642) hand switch to OPEN.
-5)* Treated Waste Discharge to Circ Water Flume (CZ-58)3.6.3 Place CZ Disch to Flume Flow Control Valve (CV-4642) hand switch to OPEN
A. Verify FIC-4642 in Manual and fully open           JG CV-4642 using the Manual Adjustment Knob.
.A.Verify FIC
3.6.4     Lower RI-4642 alarm setpoint until HIGH RAD               JG alarm actuates.
-4642 in Manual and fully open CV-4642 using the Manual Adjustment Knob.
3.6.5     Verify from CV-4642 indicating lights that               JG CV-4642 trips closed.
3.6.4 Lower RI-4642 alarm setpoint until HIGH RAD alarm actuates.
3.6.6     Place CV-4642 HS to CLOSED position.                     JG A. Turn Man. Adj. Knob to fully Closed                 JG Position (fully counterclockwise).
3.6.5 Verify from CV
JG 3.6.7     Adjust RI-4642 setpoint to the value listed in the Preliminary Report for total Circ Water flow.
-4642 indicating lights that CV-4642 trips closed.
3.6.8       Verify a Licensed Operator, other than                   JG individual who initially set RI-4642 setpoint, has independently verified that RI-4642 setpoint is correct for total circ water flow.
3.6.6 Place CV-4642 HS to CL OSED position.
3.6.9       Reset RI-4642 HIGH RAD alarm.                           JG 3.7       If RI-4642 is inoperable or unavailable, verify                     N/A requirements specified in "Analysis" section of this permit for RI-4642 inoperable or unavailable have been performed.
A.Turn Man. Adj. Knob to fully Closed Position (fully counterclockwise).
3.6.7 Adjust RI-4642 setpoint to the value listed in the Preliminary Report for total Circ Water flow.3.6.8 Verify a Licensed Operator, other than individual who initially set RI
-4642 setpoint, has independently verified that RI
-4642 setpoint is correct for total circ water flow.
3.6.9 Reset RI-4642 HIGH RAD alarm.
3.7 If RI-4642 is inoperable or unavailable, verify requirements specified in "Analysis" section of this permit for RI-4642 inoperable or unavailable have been performed.
Otherwise N/A.
Otherwise N/A.
Section 3.0 Performed By __
Section 3.0 Performed By __Joe Gogetter____________________________
Joe Gogetter____________________________
 
JG          JG          JG          JG          JG          JG          JG          JG          JG          JG          JG          JG          JG          N/A PROC./WORK PLAN NO.
PROC./WORK PLAN NO. PROCEDURE/WORK PLAN TITLE:                         PAGE:     5 of 113 1104.020                  CLEAN WASTE SYSTEM OPERATION CHANGE:   039-04-0 ATTACHMENT B2 Page 5 of 8 4.0   Release (Operations)
1104.020 PROCEDURE/WORK PLAN TITLE:
CLEAN WASTE SYSTEM OPERATION PAGE: 5 of 113 CHANGE: 039-04-0 ATTACHMENT B2 Page 5 of 8 4.0 Release (Operations)
CAUTION Unauthorized discharge to Lake Dardanelle via the flume shall be avoided.
CAUTION Unauthorized discharge to Lake Dardanelle via the flume shall be avoided.
4.1 Verify CZ Disch to Flume Flow (CV
4.1       Verify CZ Disch to Flume Flow (CV-4642) closed.                         JG 4.2       Verify T-16B X-FER PP (P-47B) stopped.                                   JG JG 4.2.1     If T-16B neutralization was required, verify VCT-9 is isolated per Sampling TWMT (T-16A or T-16B) Section of this procedure.
-4642) closed.
4.2 Verify T-16B X-FER PP (P
-47B) stopped.
4.2.1 If T-16B neutralization was required, verify VCT-9 is isolated per Sampling TWMT (T-16A or T-16B) Section of thi s procedure.
NOTE Tag contains information to remind personnel that tank is isolated for chemistry sample.
NOTE Tag contains information to remind personnel that tank is isolated for chemistry sample.
4.3 Verify Treated Waste Monitor Tank T
JG 4.3       Verify Treated Waste Monitor Tank T-16B Inlet (CZ-47B) closed and tagged.
-16B Inlet (CZ
4.3.1     If tag is missing or has been removed since tank was last sampled, perform the following.
-47B)closed and tagged.4.3.1 If tag is missing or has been removed since tank was last sampled, perform the following.
Otherwise N/A.
Otherwise N/A.
A.Terminate this release.
N/A A. Terminate this release.
B.Install tag on CZ
N/A B. Install tag on CZ-47B.
-47B.C.Submit new release permit to Nuclear Chemistry.
C. Submit new release permit to Nuclear                   N/A Chemistry.
4.4 Verify Treated Waste Monitor Tank T
4.4       Verify Treated Waste Monitor Tank T-16B Outlet (CZ-48B)               JG open.
-16B Outlet (CZ
4.5       Verify Treated Waste Discharge Valve to Header from P-47A             JG (CZ-55A) closed.
-48B)open.4.5 Verify Treated Waste Disc harge Valve to Header from P
JG 4.6       Verify Treated Waste Monitor Tank T-16B Recirc Inlet (CZ-54B) closed.
-47A (CZ-55A) closed.
JG 4.7       Open Treated Waste Discharge Valve to Header from P-47B (CZ-55B).
4.6 Verify Treated Waste Monitor Tank T
4.8       Open Treated Waste Discharge to Circ. Water Flume (CZ-58).           JG 4.9       Verify Treated Waste Monitor Pump Discharge to Clean Waste           JG Tanks (CZ-57) closed.
-16B Recirc Inlet (CZ-54B) closed.
4.7 Open Treated Waste Discharge Valve to Header from P
-47B (CZ-55B).4.8 Open Treated Waste Discharge to Circ. Water Flume (C Z-58).4.9 Verify Treated Waste Monitor Pump Discharge to Clean Waste Tanks (CZ-57) closed.
JG          JG          JG          JG          N/A          N/A          N/A          JG          JG          JG          JG          JG          JG PROC./WORK PLAN NO.
1104.020 PROCEDURE/WORK PLAN TITLE:
CLEAN WASTE SYSTEM OPERATION PAGE: 6 of 113 CHANGE: 039-04-0 ATTACHMENT B2 Page 6 of 8 4.10 Verify Unit 1/Unit 2 Liquid Radwaste Manifold Isol (CZ
-87)closed..11 Verify Suction Crossover on Treated Waste Monitor Pump s (CZ-50) closed.
4.12 If Liquid Radwaste Process Monitor (RI
-4642) is inoperable or unavailable, perform the following. Otherwise N/A (ODCM App.1, L2.1.1).
4.12.1 Verify FWMT Disch to CW Flumes (DZ
-25) closed.
4.12.2 Verify LZ Drain Pump P
-45 Disch arge to Flume (LZ-5) closed.
4.12.3 Person qualified as Waste Control Operator, independently verify release path valve


alignment prior to release (ODCM App.1, Table 2.1-1).4.13 Notify control room of intent to begin release.
PROC./WORK PLAN NO. PROCEDURE/WORK PLAN TITLE:                          PAGE:      6 of 113 1104.020                  CLEAN WASTE SYSTEM OPERATION CHANGE:    039-04-0 ATTACHMENT B2 Page 6 of 8 4.10      Verify Unit 1/Unit 2 Liquid Radwaste Manifold Isol (CZ-87)            JG closed.
4.14 Commence T
JG
-16B rele ase as follows:
          .11      Verify Suction Crossover on Treated Waste Monitor Pumps (CZ-50) closed.
4.14.1 Start P-47B.4.14.2 Place CZ Disch to Flume Flow (CV
4.12      If Liquid Radwaste Process Monitor (RI-4642) is inoperable or unavailable, perform the following. Otherwise N/A (ODCM App.1, L2.1.1).
-4642) hand switch to OPEN.
JG 4.12.1    Verify FWMT Disch to CW Flumes (DZ-25) closed.
JG 4.12.2    Verify LZ Drain Pump P-45 Discharge to Flume (LZ-5) closed.
4.12.3    Person qualified as Waste Control Operator,                JG independently verify release path valve alignment prior to release (ODCM App.1, Table 2.1-1).
4.13     Notify control room of intent to begin release.                       JG 4.14     Commence T-16B release as follows:
JG 4.14.1     Start P-47B.
4.14.2     Place CZ Disch to Flume Flow (CV-4642) hand               JG switch to OPEN.
NOTE Allowable Release Flow Rate is Listed in the "Max Waste (GPM)" Column of the Preliminary Report.
NOTE Allowable Release Flow Rate is Listed in the "Max Waste (GPM)" Column of the Preliminary Report.
{4.3.1}CAUTION Use of flow rate greater than allowable by the release permit may violate ODCM limits for release and may be NRC reportable.
{4.3.1}
{4.3.1}4.14.3 Use CZ Disch to Flume (FIC
CAUTION Use of flow rate greater than allowable by the release permit may violate ODCM limits for release and may be NRC reportable.
-4642) to obtain flow rate < allowable release flow rate for total circ water flow.
{4.3.1}
Max Flow Rate from Preliminary Report ( 90_ gpm) JG          JG          JG          JG          JG          JG          JG          JG          JG PROC./WORK PLAN NO.
4.14.3     Use CZ Disch to Flume (FIC-4642) to obtain flow             JG rate < allowable release flow rate for total circ water flow.
1104.020 PROCEDURE/WORK PLAN TITLE:
Max Flow Rate from Preliminary Report ( 90_ gpm)
CLEAN WASTE SYSTEM OPERATION PAGE: 7 of 113 CHANGE: 039-04-0 ATTACHMENT B2 Page 7 of 8 4.15 When release has started, perform the following:
 
{4.3.1}4.15.1 Control Room Personnel shall observe Discharge Flow to Flume (FI
PROC./WORK PLAN NO. PROCEDURE/WORK PLAN TITLE:                         PAGE:     7 of 113 1104.020                  CLEAN WASTE SYSTEM OPERATION CHANGE:   039-04-0 ATTACHMENT B2 Page 7 of 8 4.15       When release has started, perform the following:
-4642). Verify release flow rate is < allowable release flow rate for total circ water flow.
{4.3.1}
A.If FI-4642 is inoperable, estimate flow rate at least once every four hours during release (ODCM App.1, Table 2.1
4.15.1     Control Room Personnel shall observe Discharge Flow to Flume (FI-4642). Verify release flow rate is < allowable release flow rate for total circ water flow.
-1).Otherwise N/A.
A. If FI-4642 is inoperable, estimate flow rate at least once every four hours during release (ODCM App.1, Table 2.1-1).
NOTE If a Plant Computer tabular Log (DUMP) is used instead of Process Radiation Monitoring Effluent Recorder (RR
Otherwise N/A.
-4830), the tabular log shall contain at least points R4642, R3618 and be set at  
NOTE If a Plant Computer tabular Log (DUMP) is used instead of Process Radiation Monitoring Effluent Recorder (RR-4830), the tabular log shall contain at least points R4642, R3618 and be set at 5 minute intervals and cover the duration of the release.
&#xa3; 5 minute intervals and cover the duration of the release.
4.15.2     Record the following data on RR-4830. If RR-4830 not available, verify Plant Computer tabular log is activated and record data on it.
4.15.2 Record the following data on RR
A. Release start time __________ Date _________
-4830. If RR-4830 not available, verify Plant Computer tabular log is activated and record data on it.
B. Release permit number _____________________
A.Release start time __________ Date _________
C. Name and number of tank being released:
B.Release permit number _____________________
                                    "TWMT (T-16B)"
C.Name and number of tank being released: "TWMT (T-16B)" 4.15.3 Notify HP that T
4.15.3     Notify HP that T-16B release has started and LRW disch filter F-560 should be periodically monitored for Rad levels.
-16B release has started and LRW disch filter F-560 should be periodically monitored for Rad levels.
4.15.4     Notify Chemistry that T-16B release has started.
4.15.4 Notify Chemistry that T
-16B release has started.
CAUTION Pumping radioactive liquid tanks empty can cause sediment in bottom of tank to be deposited in discharge piping. This can produce higher radiation areas in the vicinity of the discharge piping that previously existed.
CAUTION Pumping radioactive liquid tanks empty can cause sediment in bottom of tank to be deposited in discharge piping. This can produce higher radiation areas in the vicinity of the discharge piping that previously existed.
4.16 Verify by tank level observation that only T
4.16       Verify by tank level observation that only T-16B is being released.
-16B is being released.NOTE Liquid Radwaste Disch Filter (F
NOTE Liquid Radwaste Disch Filter (F-560) inlet press should not exceed 25 psig.
-560) inlet press should not exceed 25 psig
4.16.1     Monitor F-560 during release for a rise in d/p.
.4.16.1 Monitor F-560 during release for a rise in d/p.
4.16.2     If LRW Disch Filter (F-560) inlet press on PI-4606 exceeds 25 psig, then stop release, and perform "Backflushing Liquid Radwaste Discharge Filter (F-560)" section of this procedure.
4.16.2 If LRW Disch Filter (F
 
-560) inlet press on PI-4606 exceeds 25 psig, then stop release, and perform "Backflushing Liquid Radwaste Discharge Filter (F-560)" section of this procedure.
PROC./WORK PLAN NO. PROCEDURE/WORK PLAN TITLE:                         PAGE:     8 of 113 1104.020                    CLEAN WASTE SYSTEM OPERATION CHANGE:   039-04-0 ATTACHMENT B2 Page 8 of 8 4.17       When release is complete, perform the following.
PROC./WORK PLAN NO.
4.17.1       Verify P-47B is off and hand switch is "Green Flagged".
1104.020 PROCEDURE/WORK PLAN TITLE:
4.17.2     Verify discharge flow zero gpm.
CLEAN WASTE SYSTEM OPERATION PAGE: 8 of 113 CHANGE: 039-04-0 ATTACHMENT B2 Page 8 of 8 4.17 When release is complete, perform the following.
4.17.3       Notify HP that T-16B release is complete and that F-560 should be surveyed for Rad levels to determine the need to back flush F-560.
4.17.1 Verify P-47B is off and hand switch is"Green Flagged".
4.17.4     Back flush F-560 as necessary per HP survey.
4.17.2 Verify discharge flow  
4.18       Notify control room that release is complete.
~zero gpm.4.17.3 Notify HP that T
4.19       Record the following data on RR-4830. If RR-4830 was not available, record on Plant Computer tabular logsheets.
-16B release is complete and that F-560 should be s urveyed for Rad levels to determine the need to back flush F
A. Release stop time ____________ Date _____________
-560.4.17.4 Back flush F
B. Release permit number _____________
-560 as necessary per HP survey.
4.20       Flush clean waste to discharge flume piping as follows:
4.18 Notify control room that release is complete.
4.20.1     Close Treated Waste Discharge Valve to Header from P-47B (CZ-55B) 4.20.2     Close CZ-58.
4.19 Record the following data on RR
4.20.3     Align demineralized water to discharge piping by opening Condensate Flush Disch Hdr (CS-256).
-4830. If RR-4830 was not available, record on Plant Computer tabular logsheets.
4.20.4     After flushing piping for ~ 5 minutes, Close CS-256.
A.Release stop time ____________ Date _____________
4.21       Place CV-4642 hand switch to CLOSE and verify indicating lights show valve closed.
B.Release permit number _____________
4.21.1     Verify FIC-4642 in manual and turn Man. Adj.
4.20 Flush clean waste to discharge flume piping as follows:
Knob to CLOSED position (fully counterclockwise) 4.22       Record final T-16B level ________%
4.20.1 Close Treated Waste Discharge Valve to Header from P-47B (CZ-55B)4.20.2 Close CZ-58.4.20.3 Align demineralized water to discharge piping by opening Condensate Flush Disch Hdr (CS
4.23       Remove tag from Treated Waste Monitor T-16B Inlet (CZ-47B).
-256).4.20.4 After flushing piping for ~ 5 minutes, Close CS-256.4.21 Place CV-4642 hand switch to CLOSE and verify indicating lights show valve closed.
4.24       Return release permit with all attachments to CRS/SM.
4.21.1 Verify FIC
Performed by __Joe Gogetter /___________________________       Date _____________
-4642 in manual and turn Man. Adj.
Approved by CRS/SM _____________________________________       Date _____________
Knob to CLOSED position (fully counterclockwise) 4.22 Record final T
4.25       Return the following to Nuclear Chemistry:
-16B level ________%
4.23 Remove tag from Treated Waste Monitor T
-16B Inlet (CZ
-47B).4.24 Return rel ease permit with all attachments to CRS/SM.
Performed by __
Joe Gogetter /
___________________________ Date _____________
Approved by CRS/SM _____________________________________ Date _____________
4.25 Return the following to Nuclear Chemistry:
* This attachment
* This attachment
* Release permit
* Release permit
* Tabular logsheets, if used.
* Tabular logsheets, if used.
Reactor Building Spray Pump P-35A  OP-1104.005  Supp 3 Date Pump Pump Diff Pump Diff Pump Diff Pump Diff O.B. Motor I.B. Motor I.B. Pump I.B. Pump I.B. Pump I.B. Pump I.B. Pump Differential Pressure Pressure Pressure Pressure Bearing Bearing Vertical Vertical Vertical Horizontal Horzontal P-35A Lo Hi Lo Hi Vibration Vibration Brg ANR LCO Brg ANR RBS Pressure ANR ANR LCO LCO Vibration Vibration Vibration Vibration Vibration Pump PSID PSID PSID PSID PSID IN/SEC IN/SEC IN/SEC IN/SEC IN/SEC IN/SEC IN/SEC 05/04/95 194.9 185 199 181 201 0.057 0.104 0.155 0.325 0.7 0.250 0.325 06/14/95 194.8 185 199 181 201 0.050 0.111 0.178 0.325 0.7 0.279 0.325 07/27/95 196.4 185 199 181 201 0.058 0.102 0.139 0.325 0.7 0.238 0.325 08/09/95 196.6 185 199 181 201 0.060 0.115 0.134 0.325 0.7 0.256 0.325 10/19/95 195.4 185 199 181 201 0.073 0.112 0.149 0.325 0.7 0.289 0.325 11/30/95 195 185 199 181 201 0.059 0.113 0.135 0.325 0.7 0.260 0.325 01/11/96 195.7 185 199 181 201 0.065 0.111 0.139 0.325 0.7 0.263 0.325 04/04/96 196.4 185 199 181 201 0.060 0.113 0.128 0.325 0.7 0.241 0.325 05/16/96 197.7 185 199 181 201 0.069 0.105 0.140 0.325 0.7 0.247 0.325 06/28/96 197 185 199 181 201 0.057 0.105 0.138 0.325 0.7 0.234 0.325 09/20/96 196.3 185 199 181 201 0.061 0.113 0.141 0.325 0.7 0.266 0.325 12/12/96 195.9 185 199 181 201 0.057 0.095 0.147 0.325 0.7 0.215 0.325 03/06/97 196.6 185 199 181 201 0.056 0.095 0.137 0.325 0.7 0.217 0.325 05/29/97 196.1 185 199 181 201 0.063 0.092 0.125 0.325 0.7 0.197 0.325 06/19/97 197 185 199 181 201 0.046 0.097 0.112 0.325 0.7 0.216 0.325 08/21/97 195 185 199 181 201 0.075 0.097 0.126 0.325 0.7 0.247 0.325 11/13/97 196.7 185 199 181 201 0.049 0.100 0.130 0.325 0.7 0.215 0.325 02/06/98 195.5 185 199 181 201 0.067 0.114 0.132 0.325 0.7 0.218 0.325 05/01/98 196.9 185 199 181 201 0.067 0.102 0.122 0.325 0.7 0.177 0.325 07/23/98 196.6 185 199 181 214.5 0.064 0.127 0.142 0.325 0.7 0.221 0.325 09/30/98 195.9 185 199 181 214.5 0.049 0.099 0.120 0.325 0.7 0.212 0.325 10/15/98 195.5 185 199 181 214.5 0.056 0.115 0.124 0.325 0.7 0.239 0.325 12/03/98 196.1 185 199 181 214.5 0.052 0.082 0.113 0.325 0.7 0.225 0.325 01/07/99 194.5 185 199 181 214.5 0.085 0.109 0.125 0.325 0.7 0.268 0.325 04/01/99 193 185 199 181 214.5 0.045 0.097 0.116 0.325 0.7 0.241 0.325 06/25/99 192 185 199 181 214.5 0.045 0.104 0.127 0.325 0.7 0.233 0.325 09/06/99 191 185 199 181 214.5 0.061 0.098 0.120 0.325 0.7 0.215 0.325 12/05/99 190 185 199 181 214.5 0.089 0.110 0.119 0.325 0.7 0.203 0.325 Arkansas Nuclear One Unit 1 Page 1 1/16/01  4:06 PM Reactor Building Spray Pump P-35A  OP-1104.005  Supp 3 Date P-35A RBS Pump 05/04/95 06/14/95 07/27/95 08/09/95 10/19/95 11/30/95 01/11/96 04/04/96 05/16/96 06/28/96 09/20/96 12/12/96 03/06/97 05/29/97 06/19/97 08/21/97 11/13/97 02/06/98 05/01/98 07/23/98 09/30/98 10/15/98 12/03/98 01/07/99 04/01/99 06/25/99 09/06/99 12/05/99 I.B. Pump O.B. Pump O.B. Pump O.B. Pump Horizontal Vertical Vertical Vertical LCO Brg ANR LCO Vibration Vibration Vibration Vibration IN/SEC IN/SEC IN/SEC IN/SEC 0.7 0.114 0.293 0.7 0.7 0.129 0.293 0.7 0.7 0.118 0.293 0.7 0.7 0.114 0.293 0.7 0.7 0.117 0.293 0.7 0.7 0.073 0.293 0.7 0.7 0.107 0.293 0.7 0.7 0.115 0.293 0.7 0.7 0.118 0.293 0.7 0.7 0.105 0.293 0.7 0.7 0.113 0.293 0.7 0.7 0.123 0.293 0.7 0.7 0.118 0.293 0.7 0.7 0.133 0.293 0.7 0.7 0.094 0.293 0.7 0.7 0.092 0.293 0.7 0.7 0.095 0.293 0.7 0.7 0.101 0.293 0.7 0.7 0.111 0.293 0.7 0.7 0.105 0.293 0.7 0.7 0.090 0.293 0.7 0.7 0.104 0.293 0.7 0.7 0.111 0.293 0.7 0.7 0.101 0.293 0.7 0.7 0.102 0.293 0.7 0.7 0.085 0.293 0.7 0.7 0.090 0.293 0.7 0.7 0.093 0.293 0.7 Arkansas Nuclear One Unit 1 Page 2 1/16/01  4:06 PM Reactor Building Spray Pump P-35A  OP-1104.005  Supp 3 Date P-35A RBS Pump 05/04/95 06/14/95 07/27/95 08/09/95 10/19/95 11/30/95 01/11/96 04/04/96 05/16/96 06/28/96 09/20/96 12/12/96 03/06/97 05/29/97 06/19/97 08/21/97 11/13/97 02/06/98 05/01/98 07/23/98 09/30/98 10/15/98 12/03/98 01/07/99 04/01/99 06/25/99 09/06/99 12/05/99 O.B. Pump O.B. Pump O.B. Pump O.B. Pump O.B. Pump O.B. Pump Comments Horizontal Horizontal Horizontal Axial Axial Axial Brg ANR LCO Brg ANR LCO Vibration Vibration Vibration Vibration Vibration Vibration IN/SEC IN/SEC IN/SEC IN/SEC IN/SEC IN/SEC 0.194 0.325 0.7 0.124 0.295 0.7 0.201 0.325 0.7 0.150 0.295 0.7 1R12 OPERABILITY TEST 0.183 0.325 0.7 0.120 0.295 0.7 0.199 0.325 0.7 0.119 0.295 0.7 0.195 0.325 0.7 0.127 0.295 0.7 Contacted PDM about I.B. Horz. Vibes 0.141 0.325 0.7 0.118 0.295 0.7 P35A run for P35B mntc 0.181 0.325 0.7 0.127 0.295 0.7 Quarterly/Annual 0.173 0.325 0.7 0.114 0.295 0.7 0.187 0.325 0.7 0.132 0.295 0.7 Quarterly 0.177 0.325 0.7 0.115 0.295 0.7 0.184 0.325 0.7 0.119 0.295 0.7 0.173 0.325 0.7 0.125 0.295 0.7 Quarterly 0.181 0.325 0.7 0.149 0.295 0.7 Quarterly 0.154 0.325 0.7 0.114 0.295 0.7 quarterly 0.164 0.325 0.7 0.117 0.295 0.7 0.176 0.325 0.7 0.105 0.295 0.7 0.189 0.325 0.7 0.116 0.295 0.7 0.177 0.325 0.7 0.133 0.295 0.7 Quarterly/Annual/Oper following Maint.
0.179 0.325 0.7 0.117 0.295 0.7 Quarterly 0.155 0.325 0.7 0.133 0.295 0.7 Quarterly 0.176 0.325 0.7 0.129 0.295 0.7 Quarterly 0.202 0.325 0.7 0.110 0.295 0.7 Quarterly 0.199 0.325 0.7 0.111 0.295 0.7 P-35A run for P-35B Maintenance 0.187 0.325 0.7 0.112 0.295 0.7 Quarterly 0.190 0.325 0.7 0.112 0.295 0.7 Normal Scheduled PMs 0.194 0.325 0.7 0.115 0.295 0.7 Quarterly and 18 Month 0.171 0.325 0.7 0.104 0.295 0.7 Quarterly 0.162 0.325 0.7 0.115 0.295 0.7 Quarterly Arkansas Nuclear One Unit 1 Page 3 1/16/01  4:06 PM OP-1104.005  Supp  3 Arkansas Nuclear One Unit 1 Page 4 1/16/01  4:06 PM Reactor Building Spray Pump P-35A  Differential Pressure 170 175 180 185 190 195 200 205 210 215 04/07/91 06/11/91 09/26/91 04/02/92 08/27/92 02/11/93 05/06/93 10/22/93 01/27/94 06/03/94 08/25/94 12/29/94 03/19/95 06/14/95 08/09/95 11/30/95 04/04/96 06/28/96 12/12/96 05/29/97 08/21/97 02/06/98 07/23/98 10/15/98 01/07/99 06/25/99 12/05/99 P S I D DP Lo ANR DP Hi ANR DP Lo LCO DP Hi LCO DP OP-1104.005 Supp 3 Arkansas Nuclear One Unit 1 Page 5 1/16/01  4:06 PM Reactor Building Spray Pump P-35A Motor Brg Vibration 0.000 0.020 0.040 0.060 0.080 0.100 0.120 0.140 03/23/93 07/29/93 12/16/93 03/10/94 07/14/94 11/18/94 02/09/95 05/04/95 07/27/95 10/19/95 01/11/96 05/16/96 09/20/96 03/06/97 06/19/97 11/13/97 05/01/98 09/30/98 12/03/98 04/01/99 09/06/99 I n/S e c OB Mtr IB Mtr OP-1104.005  Supp  3 Arkansas Nuclear One Unit 1 Page 6 1/16/01  4:06 PM Reactor Building Spray Pump P-35A  I.B. Brg Vib Vertical 0.000 0.100 0.200 0.300 0.400 0.500 0.600 0.700 0.800 03/23/93 07/29/93 12/16/93 03/10/94 07/14/94 11/18/94 02/09/95 05/04/95 07/27/95 10/19/95 01/11/96 05/16/96 09/20/96 03/06/97 06/19/97 11/13/97 05/01/98 09/30/98 12/03/98 04/01/99 09/06/99 I n/S e c IB Vert Vib IB Vert ANR IB Vert LCO OP-1104.005  Supp  3 Arkansas Nuclear One Unit 1 Page 7 1/16/01  4:06 PM Reactor Building Spray Pump P-35A  I.B. Brg Vib Horizontal 0.000 0.100 0.200 0.300 0.400 0.500 0.600 0.700 0.800 03/23/93 07/29/93 12/16/93 03/10/94 07/14/94 11/18/94 02/09/95 05/04/95 07/27/95 10/19/95 01/11/96 05/16/96 09/20/96 03/06/97 06/19/97 11/13/97 05/01/98 09/30/98 12/03/98 04/01/99 09/06/99 I n/S e c IB Horiz Vib IB Horiz ANR IB Horiz LCO OP-1104.005  Supp 3 Arkansas Nuclear One Unit 1 Page 8 1/16/01  4:06 PM Reactor Building Spray Pump P-35A  O.B. Brg Vib Vertical 0.000 0.100 0.200 0.300 0.400 0.500 0.600 0.700 0.800 03/23/93 07/29/93 12/16/93 03/10/94 07/14/94 11/18/94 02/09/95 05/04/95 07/27/95 10/19/95 01/11/96 05/16/96 09/20/96 03/06/97 06/19/97 11/13/97 05/01/98 09/30/98 12/03/98 04/01/99 09/06/99 I n/S e c OB Vert Vib OB Vert ANR OB Vert LCO OP-1104.005  Supp 3 Arkansas Nuclear One Unit 1 Page 9 1/16/01  4:06 PM Reactor Building Spray Pump P-35A  O.B. Brg Vib Horizontal 0.000 0.100 0.200 0.300 0.400 0.500 0.600 0.700 0.800 03/23/93 07/29/93 12/16/93 03/10/94 07/14/94 11/18/94 02/09/95 05/04/95 07/27/95 10/19/95 01/11/96 05/16/96 09/20/96 03/06/97 06/19/97 11/13/97 05/01/98 09/30/98 12/03/98 04/01/99 09/06/99 I n/S e c OB Horiz Vib OB Horiz ANR OB Horiz LCO OP-1104.005  Supp 3 Arkansas Nuclear One Unit 1 Page 10 1/16/01  4:06 PM Reactor Building Spray Pump P-35A  O.B. Brg Vib  Axial 0.000 0.100 0.200 0.300 0.400 0.500 0.600 0.700 0.800 03/23/93 07/29/93 12/16/93 03/10/94 07/14/94 11/18/94 02/09/95 05/04/95 07/27/95 10/19/95 01/11/96 05/16/96 09/20/96 03/06/97 06/19/97 11/13/97 05/01/98 09/30/98 12/03/98 04/01/99 09/06/99 I n/S e c OB Axial Vib OB Axial ANR OB Axial LCO Rx. % _100___________________
Date __02/10/2001
____________
Time ___0000:00______________
Dose Rate Inst.
_HP-DR-170____
Cal Due Date __
12/31/2001
____Dose Rate Inst. #2
_RM-065____Cal Due Date __
12/31/2001_
Count Inst. ____
RO-705____Cal Due Date _
12/31/2001
______Bkg. _80__ cpm  D/C ___10_____Count Inst. #2 _________________
Cal Due Date __
12/31/2001
_____Bkg. __90_ cpm  D/C ___10______Survey Frequency:
_____ Daily
_____ Bi-Weekly__X_ Monthly_____ Quarterly
_____ Job Coverage
_____ Other_____________________________
RWP # _4005/1_Surveyor:_John Public_____
___1234_                                        Badge RP Supervisor Review:
_Imma N. Charge
_____________
DANI # __011256______________
Page 1 of __
1____All Radiation values are in mrem/hour unless otherwise noted.
12.5    denotes gamma general area dose rates.
Smear contamination values are in DPM/100 Sqcm unless otherwise noted.
H. S. Denotes Hot Spot Readings
*12/13 Denotes Gamma Contact/Far reading (30 cm)            O Denotes smear location (100 sqcm.)* 12 Denotes contact dose rate (gamma)          *12 B Denotes Beta Contact Dose Rate        Denotes large area smear location Form to be retained for records DPM/ _100cm2 No.          Activity
_1___    _20,000__
_2____30,000___
_3____60,000___
_4____10,000___
_______________
_______________
_______________
_______________
_______________
_______________
_______________
_______________
_______________
_______________
_______________
_______________
_______________
_______________
_______________
_______________
_______________
_______________
_______________
_______________
_______________
_______________
_____MAP NUMBER
:    1A2-16        LOCATION:    U1 AUX 335' EL. P36C PUMP ROOM, ROOM NUMBER 54 1 2 400.0/150.0 HS Aux building posted: RM,RWPR 335 posted RA 0.4 1.0 110.0 105.0 4 3 115.0 Arkansas Nuclear One - Unit One 2001 License Examination Administrative Topics OPERATING TEST ONE Candidate:


Examination Level (Circle One)
Reactor Building Spray Pump P-35A OP-1104.005 Supp 3 Date        Pump      Pump Diff Pump Diff Pump Diff Pump Diff O.B. Motor I.B. Motor I.B. Pump I.B. Pump I.B. Pump I.B. Pump I.B. Pump Differential Pressure Pressure Pressure Pressure      Bearing    Bearing    Vertical  Vertical Vertical  Horizontal Horzontal P-35A                    Lo        Hi        Lo        Hi    Vibration  Vibration    Brg      ANR      LCO      Brg        ANR RBS      Pressure      ANR      ANR      LCO      LCO                            Vibration Vibration Vibration Vibration Vibration Pump        PSID        PSID      PSID      PSID      PSID    IN/SEC      IN/SEC    IN/SEC    IN/SEC    IN/SEC    IN/SEC      IN/SEC 05/04/95      194.9      185      199      181      201      0.057      0.104      0.155    0.325      0.7    0.250      0.325 06/14/95      194.8      185      199      181      201      0.050      0.111      0.178    0.325      0.7    0.279      0.325 07/27/95      196.4      185      199      181      201      0.058      0.102      0.139    0.325      0.7    0.238      0.325 08/09/95      196.6      185      199      181      201      0.060      0.115      0.134    0.325      0.7    0.256      0.325 10/19/95      195.4      185      199      181      201      0.073      0.112      0.149    0.325      0.7    0.289      0.325 11/30/95        195        185      199      181      201      0.059      0.113      0.135    0.325      0.7    0.260      0.325 01/11/96      195.7      185      199      181      201      0.065      0.111      0.139    0.325      0.7    0.263      0.325 04/04/96      196.4      185      199      181      201      0.060      0.113      0.128    0.325      0.7    0.241      0.325 05/16/96      197.7      185      199      181      201      0.069      0.105      0.140    0.325      0.7    0.247      0.325 06/28/96        197        185      199      181      201      0.057      0.105      0.138    0.325      0.7    0.234      0.325 09/20/96      196.3      185      199      181      201      0.061      0.113      0.141    0.325      0.7    0.266      0.325 12/12/96      195.9      185      199      181      201      0.057      0.095      0.147    0.325      0.7    0.215      0.325 03/06/97      196.6      185      199      181      201      0.056      0.095      0.137    0.325      0.7    0.217      0.325 05/29/97      196.1      185      199      181      201      0.063      0.092      0.125    0.325      0.7    0.197      0.325 06/19/97        197        185      199      181      201      0.046      0.097      0.112    0.325      0.7    0.216      0.325 08/21/97        195        185      199      181      201      0.075      0.097      0.126    0.325      0.7    0.247      0.325 11/13/97      196.7      185      199      181      201      0.049      0.100      0.130    0.325      0.7    0.215      0.325 02/06/98      195.5      185      199      181      201      0.067      0.114      0.132    0.325      0.7    0.218      0.325 05/01/98      196.9      185      199      181      201      0.067      0.102      0.122    0.325      0.7    0.177      0.325 07/23/98      196.6      185      199      181      214.5      0.064      0.127      0.142    0.325      0.7    0.221      0.325 09/30/98      195.9      185      199      181      214.5      0.049      0.099      0.120    0.325      0.7    0.212      0.325 10/15/98      195.5      185      199      181      214.5      0.056      0.115      0.124    0.325      0.7    0.239      0.325 12/03/98      196.1      185      199      181      214.5      0.052      0.082      0.113    0.325      0.7    0.225      0.325 01/07/99      194.5      185      199      181      214.5      0.085      0.109      0.125    0.325      0.7    0.268      0.325 04/01/99        193        185      199      181      214.5      0.045      0.097      0.116    0.325      0.7    0.241      0.325 06/25/99        192        185      199      181      214.5      0.045      0.104      0.127    0.325      0.7    0.233      0.325 09/06/99        191        185      199      181      214.5      0.061      0.098      0.120    0.325      0.7    0.215      0.325 12/05/99        190        185      199      181      214.5      0.089      0.110      0.119    0.325      0.7    0.203      0.325 Arkansas Nuclear One Unit 1                                            Page 1                                                          1/16/01 4:06 PM
:  RO / SRO Examiner:  


Topic Area (Circle One)
Reactor Building Spray Pump P-35A OP-1104.005 Supp 3 Date    I.B. Pump O.B. Pump O.B. Pump O.B. Pump Horizontal Vertical  Vertical  Vertical P-35A        LCO      Brg      ANR      LCO RBS      Vibration Vibration Vibration Vibration Pump        IN/SEC   IN/SEC    IN/SEC    IN/SEC 05/04/95        0.7    0.114    0.293      0.7 06/14/95        0.7    0.129    0.293      0.7 07/27/95        0.7    0.118    0.293      0.7 08/09/95        0.7    0.114    0.293      0.7 10/19/95        0.7    0.117    0.293      0.7 11/30/95        0.7    0.073    0.293      0.7 01/11/96        0.7    0.107    0.293      0.7 04/04/96        0.7    0.115    0.293      0.7 05/16/96        0.7    0.118    0.293      0.7 06/28/96        0.7    0.105    0.293      0.7 09/20/96        0.7    0.113    0.293      0.7 12/12/96        0.7    0.123    0.293      0.7 03/06/97        0.7    0.118    0.293      0.7 05/29/97        0.7    0.133    0.293      0.7 06/19/97        0.7    0.094    0.293      0.7 08/21/97        0.7    0.092    0.293      0.7 11/13/97        0.7    0.095    0.293      0.7 02/06/98        0.7    0.101    0.293      0.7 05/01/98        0.7    0.111    0.293      0.7 07/23/98        0.7    0.105    0.293      0.7 09/30/98        0.7    0.090    0.293      0.7 10/15/98        0.7    0.104    0.293      0.7 12/03/98        0.7    0.111    0.293      0.7 01/07/99        0.7    0.101    0.293      0.7 04/01/99        0.7    0.102    0.293      0.7 06/25/99        0.7    0.085    0.293      0.7 09/06/99        0.7    0.090    0.293      0.7 12/05/99        0.7    0.093    0.293      0.7 Arkansas Nuclear One Unit 1                          Page 2                        1/16/01 4:06 PM
Question A1-JPM-1 Expected Response and Reference source A.1   A.2 A.3  A.4 SEE ATTACHED JPM ANO-1-JPM-SRO-TURN Candidate Response:
Arkansas Nuclear One - Unit One 2001 License Examination Administrative Topics OPERATING TEST ONE Candidate:  


Examination Level (Circle One)
Reactor Building Spray Pump P-35A OP-1104.005 Supp 3 Date      O.B. Pump O.B. Pump O.B. Pump O.B. Pump O.B. Pump O.B. Pump                      Comments Horizontal Horizontal Horizontal  Axial      Axial    Axial P-35A        Brg      ANR        LCO        Brg        ANR      LCO RBS        Vibration Vibration  Vibration  Vibration  Vibration Vibration Pump      IN/SEC    IN/SEC    IN/SEC    IN/SEC      IN/SEC  IN/SEC 05/04/95      0.194      0.325      0.7      0.124        0.295      0.7 06/14/95      0.201      0.325      0.7      0.150        0.295      0.7    1R12 OPERABILITY TEST 07/27/95      0.183      0.325      0.7      0.120        0.295      0.7 08/09/95      0.199      0.325      0.7      0.119        0.295      0.7 10/19/95      0.195      0.325      0.7      0.127        0.295      0.7    Contacted PDM about I.B. Horz. Vibes 11/30/95      0.141      0.325      0.7      0.118        0.295      0.7    P35A run for P35B mntc 01/11/96      0.181      0.325      0.7      0.127        0.295      0.7    Quarterly/Annual 04/04/96      0.173      0.325      0.7      0.114        0.295      0.7 05/16/96      0.187      0.325      0.7      0.132        0.295      0.7    Quarterly 06/28/96      0.177      0.325      0.7      0.115        0.295      0.7 09/20/96      0.184      0.325      0.7      0.119        0.295      0.7 12/12/96      0.173      0.325      0.7      0.125        0.295      0.7    Quarterly 03/06/97      0.181      0.325      0.7      0.149        0.295      0.7    Quarterly 05/29/97      0.154      0.325      0.7      0.114        0.295      0.7    quarterly 06/19/97      0.164      0.325      0.7      0.117        0.295      0.7 08/21/97      0.176      0.325      0.7      0.105        0.295      0.7 11/13/97      0.189      0.325      0.7      0.116        0.295      0.7 02/06/98      0.177      0.325      0.7      0.133        0.295      0.7    Quarterly/Annual/Oper following Maint.
:  RO / SRO Examiner:  
05/01/98      0.179      0.325      0.7      0.117        0.295      0.7    Quarterly 07/23/98      0.155      0.325      0.7      0.133        0.295      0.7    Quarterly 09/30/98      0.176      0.325      0.7      0.129        0.295      0.7    Quarterly 10/15/98      0.202      0.325      0.7      0.110        0.295      0.7    Quarterly 12/03/98      0.199      0.325      0.7      0.111        0.295      0.7    P-35A run for P-35B Maintenance 01/07/99      0.187      0.325      0.7      0.112        0.295      0.7    Quarterly 04/01/99      0.190      0.325      0.7      0.112        0.295      0.7    Normal Scheduled PMs 06/25/99      0.194      0.325      0.7      0.115        0.295      0.7    Quarterly and 18 Month 09/06/99      0.171      0.325      0.7      0.104        0.295      0.7    Quarterly 12/05/99      0.162      0.325      0.7      0.115        0.295      0.7    Quarterly Arkansas Nuclear One Unit 1                                            Page 3                                                      1/16/01 4:06 PM


Topic Area (Circle One)
P 195 S
Question A1-JPM-2 Expected Response and Reference source A.1  A.2 A.3  A.4 SEE ATTACHED JPM ANO-1-JPM-SRO-TREND Candidate Response:
I 170  175  180  185  D 190  200  205  210  215 04/07/91 06/11/91 09/26/91 Arkansas Nuclear One Unit 1 04/02/92 08/27/92 02/11/93 05/06/93 DP 10/22/93 01/27/94 06/03/94 Lo ANR DP 08/25/94 12/29/94 03/19/95 06/14/95 Hi ANR DP Page 4 08/09/95 OP-1104.005 Supp 3 11/30/95 Lo LCO DP   04/04/96 06/28/96 12/12/96 05/29/97 Reactor Building Spray Pump P-35A Differential Pressure Hi LCO DP 08/21/97 02/06/98 07/23/98 10/15/98 01/07/99 06/25/99 12/05/99 1/16/01 4:06 PM
Arkansas Nuclear One - Unit One 2001 License Examination Administrative Topics OPERATING TEST ONE Candidate:  


Examination Level (Circle One)
OP-1104.005 Supp 3 Reactor Building Spray Pump P-35A Motor Brg Vibration 0.140 0.120 0.100 I
:  RO / SRO Examiner:  
n 0.080
    /
S e 0.060 c
0.040 0.020 0.000 03/23      07/29      12/16      03/10      07/14      11/18      02/09      05/04      07/27      10/19      01/11      05/16      09/20      03/06      06/19      11/13      05/01      09/30      12/03      04/01      09/06
            /93        /93        /93        /94        /94        /94        /95        /95        /95        /95        /96        /96        /96        /97        /97        /97        /98        /98        /98        /99        /99 OB Mtr                IB Mtr Arkansas Nuclear One Unit 1                                                                                          Page 5                                                                                                1/16/01 4:06 PM


Topic Area (Circle One)
OP-1104.005 Supp 3 Reactor Building Spray Pump P-35A I.B. Brg Vib Vertical 0.800 0.700 0.600 0.500 I
Question A2-JPM-1 Expected Response and Reference source A.1  A.2  A.3  A.4  SEE ATTACHED JPM ANO-1-JPM-SRO-HCRD3 Candidate Response:
n
Arkansas Nuclear One - Unit One 2001 License Examination Administrative Topics OPERATING TEST ONE Candidate:  
    /
0.400 S
e c
0.300 0.200 0.100 0.000 03/23      07/29      12/16      03/10      07/14      11/18      02/09      05/04      07/27      10/19      01/11      05/16      09/20      03/06      06/19      11/13      05/01      09/30      12/03      04/01      09/06
            /93        /93        /93        /94        /94        /94        /95        /95        /95        /95        /96        /96        /96        /97        /97        /97        /98        /98        /98        /99        /99 IB Vert Vib                IB Vert ANR                    IB Vert LCO Arkansas Nuclear One Unit 1                                                                                          Page 6                                                                                                1/16/01 4:06 PM


Examination Level (Circle One)
OP-1104.005 Supp 3 Reactor Building Spray Pump P-35A I.B. Brg Vib Horizontal 0.800 0.700 0.600 0.500 I
:  RO / SRO Examiner:  
n
    /
0.400 S
e c
0.300 0.200 0.100 0.000 03/23      07/29      12/16      03/10      07/14      11/18      02/09      05/04      07/27      10/19      01/11      05/16      09/20      03/06      06/19      11/13      05/01      09/30      12/03      04/01      09/06
            /93        /93        /93        /94        /94        /94        /95        /95        /95        /95        /96        /96        /96        /97        /97        /97        /98        /98        /98        /99        /99 IB Horiz Vib                  IB Horiz ANR                    IB Horiz LCO Arkansas Nuclear One Unit 1                                                                                          Page 7                                                                                                1/16/01 4:06 PM


Topic Area (Circle One)
OP-1104.005 Supp 3 Reactor Building Spray Pump P-35A O.B. Brg Vib Vertical 0.800 0.700 0.600 0.500 I
Question A3-Q1 Expected Response and Reference source A.1  A.2  A.3  A.4 The following radiological postings are present in the P-36C HPI pump room:
n
* The access boundary to the room has a single posting as a RADIATION AREA.
    /
* There is one HOT SPOT posted on the piping in the southeast corner of the
0.400 S
e c
0.300 0.200 0.100 0.000 03/23      07/29      12/16      03/10      07/14      11/18      02/09      05/04      07/27      10/19      01/11      05/16      09/20      03/06      06/19      11/13      05/01      09/30      12/03      04/01      09/06
            /93        /93        /93        /94        /94        /94        /95        /95        /95        /95        /96        /96        /96        /97        /97        /97        /98        /98        /98        /99        /99 OB Vert Vib                      OB Vert ANR                  OB Vert LCO Arkansas Nuclear One Unit 1                                                                                          Page 8                                                                                                1/16/01 4:06 PM


room. You are preparing to conduct a pre-job briefing with your WCO. His job is to
OP-1104.005 Supp 3 Reactor Building Spray Pump P-35A O.B. Brg Vib Horizontal 0.800 0.700 0.600 0.500 I
n
    /
0.400 S
e c
0.300 0.200 0.100 0.000 03/23      07/29      12/16      03/10      07/14      11/18      02/09      05/04      07/27      10/19      01/11      05/16      09/20      03/06      06/19      11/13      05/01      09/30      12/03      04/01      09/06
            /93        /93        /93        /94        /94        /94        /95        /95        /95        /95        /96        /96        /96        /97        /97        /97        /98        /98        /98        /99        /99 OB Horiz Vib                    OB Horiz ANR                      OB Horiz LCO Arkansas Nuclear One Unit 1                                                                                          Page 9                                                                                                  1/16/01 4:06 PM


perform a special test on P-36C, HPI
OP-1104.005 Supp 3 Reactor Building Spray Pump P-35A O.B. Brg Vib Axial 0.800 0.700 0.600 0.500 I
n
    /
0.400 S
e c
0.300 0.200 0.100 0.000 03/23      07/29      12/16      03/10      07/14      11/18      02/09      05/04      07/27      10/19      01/11      05/16      09/20      03/06      06/19      11/13      05/01      09/30      12/03      04/01      09/06
            /93        /93        /93        /94        /94        /94        /95        /95        /95        /95        /96        /96        /96        /97        /97        /97        /98        /98        /98        /99        /99 OB Axial Vib                  OB Axial ANR                      OB Axial LCO Arkansas Nuclear One Unit 1                                                                                          Page 10                                                                                              1/16/01 4:06 PM


pump, with the System Engineer following
MAP NUMBER: 1A2-16                  LOCATION:      U1 AUX 335 EL. P36C PUMP ROOM, ROOM NUMBER 54                                Rx. % _100___________________
 
DPM/ _100cm2    Date __02/10/2001____________
completion of pump maintenance.
No. Activity Time ___0000:00______________
Based on your review of the given survey map, state what changes to the room
_1___ _20,000__
 
Aux building                                                                                              _2___
postings you would recommend to
Dose Rate Inst. _HP-DR-170____
 
posted: RM,RWPR                                                                                            _30,000___
Radiation Protection and why.
_3___
 
_60,000___      Cal Due Date __12/31/2001____
Answer: Candidate should identify at least two of the following three errors for successful
_4___
 
335 posted RA                                                                                              _10,000___      Dose Rate Inst. #2 _RM-065____
completion:
_____
* The room access boundary should be posted as a HIGH RADIATION AREA
__________
 
_____            Cal Due Date __12/31/2001_
since the general area readings
__________
_____            Count Inst. ____RO-705____
400.0/150.0 HS                  __________
_____            Cal Due Date _12/31/2001______
__________
_____
Bkg. _80__ cpm D/C ___10_____
__________
_____
__________      Count Inst. #2 _________________
110.0                                                                      _____
115.0                                          __________      Cal Due Date __12/31/2001_____
1                                                                _____
__________      Bkg. __90_ cpm D/C ___10______
_____
1.0
__________
Survey Frequency:
4                                  _____
__________      _____ Daily 2                                                                            _____            _____ Bi-Weekly
__________      __X_ Monthly 3
_____            _____ Quarterly 0.4                                                                                                __________      _____ Job Coverage 105.0                                                                    _____
_____ Other
__________
_____
__________      _____________________________
_____
__________      RWP # _4005/1_
_____
__________      Surveyor:
_____
_John Public_____ ___1234_
__________
_____                                  Badge All Radiation values are in mrem/hour unless otherwise noted.                                                              __________
12.5 denotes gamma general area dose rates.                                                                                _____            RP Supervisor Review:
Smear contamination values are in DPM/100 Sqcm unless otherwise noted.                H. S. Denotes Hot Spot Readings      __________
*12/13 Denotes Gamma Contact/Far reading (30 cm)                                      Denotes smear location (100 sqcm.) _____            _Imma N. Charge_____________
* 12 Denotes contact dose rate (gamma)        *12 B Denotes Beta Contact Dose Rate    Denotes large area smear location  __________
Form to be retained for records                                                                                            _____
DANI # __011256______________
__________
_____
__________              Page 1 of __1____
_____


(115.0 , 110.0 and 105.0 mr/hr) are greater than the 100 mR/hr threshold for a High Radiation area.
Arkansas Nuclear One - Unit One 2001 License Examination Administrative Topics OPERATING TEST ONE Candidate:                              Examination Level (Circle One): RO / SRO Examiner:
* In addition, the access should also be posted as a CONTAMINATION
Topic Area              Question                                Expected Response (Circle One)            A1-JPM-1                                and Reference source A.1 A.2          SEE ATTACHED JPM ANO-1-JPM-SRO-TURN A.3 A.4 Candidate Response:


AREA, since smear data indicates
Arkansas Nuclear One - Unit One 2001 License Examination Administrative Topics OPERATING TEST ONE Candidate:                              Examination Level (Circle One): RO / SRO Examiner:
Topic Area                Question                                Expected Response (Circle One)            A1-JPM-2                                and Reference source A.1 A.2          SEE ATTACHED JPM ANO-1-JPM-SRO-TREND A.3 A.4 Candidate Response:


loose surface contamination of greater
Arkansas Nuclear One - Unit One 2001 License Examination Administrative Topics OPERATING TEST ONE Candidate:                              Examination Level (Circle One): RO / SRO Examiner:
Topic Area              Question                                Expected Response (Circle One)            A2-JPM-1                                and Reference source A.1 A.2          SEE ATTACHED JPM ANO-1-JPM-SRO-HCRD3 A.3 A.4 Candidate Response:


than 1000 dpm/cm 2 but less than 100,000 dpm/cm 2.* The hot spot posting is not valid since the contact reading is not greater than
Arkansas Nuclear One - Unit One 2001 License Examination Administrative Topics OPERATING TEST ONE Candidate:                                      Examination Level (Circle One): RO / SRO Examiner:
 
Topic Area                      Question                                Expected Response (Circle One)                    A3-Q1                                  and Reference source The following radiological postings are      Answer:
or equal to four times the 30 cm reading.
A.1 A.2    present in the P-36C HPI pump room:
Candidate should identify at least two of A.3 A.4
* The access boundary to the room has a    the following three errors for successful single posting as a RADIATION AREA.      completion:
* The room access boundary should be
* There is one HOT SPOT posted on the            posted as a HIGH RADIATION AREA piping in the southeast corner of the          since the general area readings room.                                          (115.0, 110.0 and 105.0 mr/hr) are greater than the 100 mR/hr threshold You are preparing to conduct a pre-job            for a High Radiation area.
briefing with your WCO. His job is to
* In addition, the access should also be perform a special test on P-36C, HPI              posted as a CONTAMINATION pump, with the System Engineer following          AREA, since smear data indicates completion of pump maintenance.                    loose surface contamination of greater than 1000 dpm/cm2 but less than Based on your review of the given survey          100,000 dpm/cm2.
map, state what changes to the room postings you would recommend to
* The hot spot posting is not valid since Radiation Protection and why.                      the contact reading is not greater than or equal to four times the 30 cm reading.


==Reference:==
==Reference:==


1012.017 Rev. 006-02-0 K/A: 2.3.1 RO 2.6 / SRO 3.0 Candidate Response:
1012.017 Rev. 006-02-0 K/A:
Arkansas Nuclear One - Unit One 2001 License Examination Administrative Topics OPERATING TEST ONE Candidate:  
2.3.1 RO 2.6 / SRO 3.0 Candidate Response:


Examination Level (Circle One)
Arkansas Nuclear One - Unit One 2001 License Examination Administrative Topics OPERATING TEST ONE Candidate:                                        Examination Level (Circle One): RO / SRO Examiner:
: RO / SRO Examiner:  
Topic Area                     Question                                  Expected Response (Circle One)                     A3-Q2                                   and Reference source Given:                                          Answer:
 
A.1 A.2
Topic Area (Circle One)
* The plant is in a refueling outage.         One person performing the job without A.3 A.4
Question A3-Q2 Expected Response and Reference source A.1   A.2 A.3  A.4  Given:
* An ALARA planning meeting between           shielding will receive a dose of 37.5 mR.
* The plant is in a refueling outage.
maintenance personnel and radiation Two technicians installing the shielding protection personnel is being and subsequent removal of the shielding conducted prior to emergent work on will receive a total man-Rem dose of 100 CV-1050, Decay Heat Suction valve.
* An ALARA planning meeting between maintenance personnel and radiation
mRem.
 
* The maintenance job is expected to take one person 15 minutes to               The person performing the job with complete.                                   shielding will receive a dose of 3.75
protection personnel is being
* The dose rate at CV-1050 is 150             mRem.
 
mR/hr.
conducted prior to emergent work on
Using shielding, will produce a total man-During the briefing the Radiation               Rem dose of 103.75 mRem.
 
Protection Technician states that dose         Using ALARA principles, the job should rates around CV-1050 could be reduced           be performed without the shielding for a by using shielding. It will take two (2)       lower total dose.
CV-1050, Decay Heat Suction valve.
workers, 10 minutes to install and 10 minutes to remove the shielding. The shielding will reduce the dose rate at CV-    
* The maintenance job is expected to take one person 15 minutes to
 
complete.* The dose rate at CV-1050 is 150 mR/hr. During the briefing the Radiation Protection Technician states that dose
 
rates around CV-1050 could be reduced
 
by using shielding. It will take two (2)
 
workers, 10 minutes to install and 10
 
minutes to remove the shielding. The
 
shielding will reduce the dose rate at CV-
 
1050 to 15 mR/hr. Apply the principles of ANO's ALARA program to this situation and determine whether this job should be done with or
 
without shielding.
Answer: One person performing the job without shielding will receive a dose of 37.5 mR.Two technicians installing the shielding and subsequent removal of the shielding
 
will receive a total man-Rem dose of 100
 
mRem.The person performing the job with shielding will receive a dose of 3.75
 
mRem.Using shielding, will produce a total man-Rem dose of 103.75 mRem.
Using ALARA principles, the job should be performed without the shielding for a
 
lower total dose.


==Reference:==
==Reference:==


1012.027 Rev. 003-01-0 K/A: 2.3.2 RO 2.5 / SRO 2.9 Candidate Response:
1050 to 15 mR/hr.                              1012.027 Rev. 003-01-0 Apply the principles of ANO's ALARA K/A:
Arkansas Nuclear One - Unit One 2001 License Examination Administrative Topics OPERATING TEST ONE Candidate:  
program to this situation and determine whether this job should be done with or        2.3.2 without shielding.                              RO 2.5 / SRO 2.9 Candidate Response:


Examination Level (Circle One)
Arkansas Nuclear One - Unit One 2001 License Examination Administrative Topics OPERATING TEST ONE Candidate:                                Examination Level (Circle One): RO / SRO Examiner:
: RO / SRO Examiner:  
Topic Area                Question                                  Expected Response (Circle One)            A4-JPM-1                                  and Reference source A.1 A.2          SEE ATTACHED JPM ANO-1-JPM-SRO-EAL4, EAL5, and EAL6 A.3 A.4 Candidate Response:


Topic Area (Circle One)
ADMINISTRATIVE JOB PERFORMANCE MEASURE TUOI:  ANO-1-JPM-SRO-EAL4 Page  1 of 4 UNIT:      1           REV #         0           DATE: ______________________________
Question A4-JPM-1 Expected Response and Reference source A.1  A.2  A.3  A.4  SEE ATTACHED JPM ANO-1-JPM-SRO-EAL4, EAL5, and EAL6 Candidate Response:
TUOI NUMBER: ANO-1-JPM-SRO-EAL4 SYSTEM/DUTY AREA: ADMINISTRATIVE TOPIC - EMERGENCY PROCEDURES/PLAN TASK: CLASSIFY AN EMERGENCY EVENT JTA#: 13445110303 KA VALUE RO:   2.3      SRO:  4.1     KA  
ADMINISTRATIVE JOB PERFORMANCE MEASURE TUOI:  ANO-1-JPM-SRO-EAL4 Page  1 of 4 UNIT:      1     REV #       0     DATE: ______________________________
TUOI NUMBER:
ANO-1-JPM-SRO-EAL4 SYSTEM/DUTY AREA:
ADMINISTRATIVE TOPIC - EMERGENCY PROCEDURES/PLAN TASK: CLASSIFY AN EMERGENCY EVENT JTA#: 13445110303 KA VALUE RO:
2.3      SRO:  4.1   KA  


==REFERENCE:==
==REFERENCE:==
 
2.4.41 APPROVED FOR ADMINISTRATION TO:   RO:             SRO:   X TASK LOCATION:  INSIDE CR:     X         OUTSIDE CR:_________ BOTH:________
2.4.41 APPROVED FOR ADMINISTRATION TO: RO:
SRO:   X   TASK LOCATION:  INSIDE CR:
X       OUTSIDE CR:_________ BOTH:________
SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):
SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):
PLANT SITE:_______________ SIMULATOR:
PLANT SITE:_______________ SIMULATOR:       PERFORM        LAB:__________________
P ERFORM      LAB:__________________
POSITION EVALUATED:  RO:____N/A___    SRO:_____X_____
POSITION EVALUATED:  RO:____
ACTUAL TESTING ENVIRONMENT: SIMULATOR:       X    PLANT SITE:__________ LAB:________
N/A___SRO:_____X_____ACTUAL TESTING ENVIRONMENT: SIMULATOR:
TESTING METHOD: SIMULATE:_________     PERFORM:___________
X    PLANT SITE:__________ LAB:________
APPROXIMATE COMPLETION TIME IN MINUTES:         5 MINUTES REFERENCE(S): 1903.010 REV. 036-02-0, 1903.011 REV. 025-04-0
TESTING METHOD: SIMULATE:_________
PERFORM:___________
APPROXIMATE COMPLETION TIME IN MINUTES:
5 MINUTES REFERENCE(S):
1903.010 REV. 036-02-0, 1903.011 REV. 025-04-0
______________________________________________________________________
______________________________________________________________________
EXAMINEE'S NAME:________________________________
EXAMINEE'S NAME:________________________________           SSN ______-_____-____________
SSN ______-_____-____________
EVALUATOR'S NAME:__________________________________________________________________
EVALUATOR'S NAME:__________________________________________________________________
THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:
THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:
SATISFACTORY:________________
SATISFACTORY:________________           UNSATISFACTORY:_________________
UNSATISFACTORY:_________________
PERFORMANCE CHECKLIST COMMENTS:
PERFORMANCE CHECKLIST COMMENTS:
___________________________________________________________________________________
___________________________________________________________________________________
___________________________________________________________________________________
___________________________________________________________________________________
____________ Start Time          ____________ Stop Time        ____________ Total Time SIGNED ________________________________ DATE: _______________________
SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A


___________________________________________________________________________________
ADMINISTRATIVE JOB PERFORMANCE MEASURE TUOI:  ANO-1-JPM-SRO-EAL4 Page 2 of 4 QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.


___________________________________________________________________________________
ADMINISTRATIVE JOB PERFORMANCE MEASURE TUOI: ANO-1-JPM-SRO-EAL4 Page 3 of 4 EXAMINEES COPY JPM INITIAL TASK CONDITIONS:
____________ Start Time
* Unit One has experienced a Loss of Coolant Accident.
____________ Stop Time
____________ Total Time SIGNED ________________________________ DATE: _______________________
SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A ADMINISTRATIVE JOB PERFORMANCE MEASURE TUOI: ANO-1-JPM-SRO-EAL4 Page 2 of 4 QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.
ADMINISTRATIVE JOB PERFORMANCE MEASURE TUOI:  ANO-1-JPM-SRO-EAL4 Page  3 of 4 EXAMINEE'S COPY JPM INITIAL TASK CONDITIONS
:* Unit One has experienced a Loss of Coolant Accident.
* Reactor has tripped.
* Reactor has tripped.
* ESAS Channels 1-6 have actuated, RT-10 successfully performed.
* ESAS Channels 1-6 have actuated, RT-10 successfully performed.
Line 1,539: Line 979:
* No radiological release is in progress.
* No radiological release is in progress.
INITIATING CUE:
INITIATING CUE:
For the given plant conditions, determine the applicable EAL classification and initiate notifications per the applicable Shift
For the given plant conditions, determine the applicable EAL classification and initiate notifications per the applicable Shift Manager Emergency Direction and Control Checklist in 1903.011.


Manager Emergency Direction and Control Checklist in 1903.011.
ADMINISTRATIVE JOB PERFORMANCE MEASURE TUOI:  ANO-1-JPM-SRO-EAL4 Page  4 of 4 THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:
ADMINISTRATIVE JOB PERFORMANCE MEASURE TUOI:  ANO-1-JPM-SRO-EAL4 Page  4 of 4 THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:
The examiner shall review the "Briefing Checklist - System Walkthrough" portion of OP 1064.023 Attachment 6 with the examinee.
The examiner shall review the "Briefing Checklist - System Walkthrough" portion of OP 1064.023 Attachment 6 with the examinee.
JPM INITIAL TASK CONDITIONS
JPM INITIAL TASK CONDITIONS:  The following conditions existed at the end of Operating test 1 Scenario 1. Unit One has experienced a Loss of Coolant Accident.
:  The following conditions existed at the end of Operating test 1 Scenario 1. Unit One has experienced a Loss of Coolant Accident.
Reactor has tripped. ESAS Channels 1-6 have actuated, RT-10 successfully performed.
Reactor has tripped. ESAS Channels 1-6 have actuated, RT-10 successfully performed.
RCS pressure and PZR level continue to drop. No radiological release is in progress.
RCS pressure and PZR level continue to drop. No radiological release is in progress.
TASK STANDARD
TASK STANDARD: __Examinee correctly classifies this event as a SAE per EAL 2.4 and makes notifications to plant personnel per 1903.011P.
: __Examinee correctly classifies this event as a SAE per EAL 2.4 and makes notifications to plant personnel per 1903.011P.
___________________________________________________________________________________
___________________________________________________________________________________
TASK PERFORMANCE AIDS
TASK PERFORMANCE AIDS: 1903.010 Attachments 1 and 3, 1903.011 Attachment 3, and 1903.011P_______________________________________________________________________
: 1903.010 Attachments 1 and 3, 1903.011 Attachment 3,         and 1903.011P
_______________________________________________________________________
ADMINISTRATIVE JOB PERFORMANCE MEASURE TUOI:  ANO-1-JPM-SRO-EAL4 Page  5 of 4 INITIATING CUE:
For the given plant conditions, determine the applicable EAL classification and initiate notifications per the applicable Shift Manager Emergency Direction and


Control Checklist in 1903.011.
ADMINISTRATIVE JOB PERFORMANCE MEASURE TUOI:  ANO-1-JPM-SRO-EAL4 Page  5 of 4 INITIATING CUE:
CRITICAL ELEMENTS (C)         3, 6       (C)PERFORMANCE CHECKLIST STANDARD N/A SAT UNSAT 1. Compare event conditions with the Index of EALs, Attachment 1 of 1903.010, Emergency Action Level
For the given plant conditions, determine the applicable EAL classification and initiate notifications per the applicable Shift Manager Emergency Direction and Control Checklist in 1903.011.
 
CRITICAL ELEMENTS (C)         3, 6 (C)       PERFORMANCE CHECKLIST               STANDARD           N/A     SAT   UNSAT
Classification.
: 1. Compare event conditions   Turned to Attachment 1 of with the Index of EALs,     1903.010, Index of EALs.
Turned to Attachment 1 of 1903.010, Index of EALs.
Attachment 1 of 1903.010,                                 _____  _____  _____
_______________2. Turn to appropriate EAL and compare EAL criteria with event conditions.
Emergency Action Level Classification.
Turned to a specific EAL in Safety System Function, Attachment 3 of 1903.010.
: 2. Turn to appropriate EAL     Turned to a specific EAL in and compare EAL criteria    Safety System Function,       _____  _____  _____
_______________(C)3. Declare the emergency classification.
with event conditions.      Attachment 3 of 1903.010.
Declared or stated the event is a Site Area Emergency (based on LOCA greater than
: 3. Declare the emergency       Declared or stated the event (C)      classification.            is a Site Area Emergency (based on LOCA greater than   _____  _____  _____
 
HPI capacity) in accordance with EAL 2.4.
HPI capacity) in accordance
: 4. Initiate immediate         Referred to 1903.011 and     _____  _____  _____
 
notifications.              turned to Attachment 3.
with EAL 2.4.
NOTE: Cue the examinee that the Unit 2 Shift Engineer is performing the initial notifications per 1903.011 after the examinee has stated that Unit 2 Shift Engineer (or control room communicator) has been requested.
_______________4. Initiate immediate notifications.
: 5. Begin completion of form    Began completion of form 1903.011P, SAE Emergency    1903.011P SAE Emergency Direction and Control       Direction and Control Checklist for Shift        Checklist for Shift Manager.
Referred to 1903.011 and turned to Attachment 3.
Manager.
_______________NOTE: Cue the examinee that the Unit 2 Shift Engineer is performing the initial notifications per 1903.011 after the examinee has stated that Unit 2 Shift Engineer (or control room communicator) has been requested.
Examinee should fill in the  _____  _____  _____
: 5. Begin completion of form 1903.011P, SAE Emergency Direction and Control
data on items 1 and 2.
 
Examinee should simulate (or state) direction of the SE to complete the initial notification.
Checklist for Shift
: 6. (Simulate) Announce        Used plant-paging system to (C)      emergency on plant paging  (simulate) make announcement system.                     per step 9 of form           _____  _____  _____
 
1903.011P.
Manager.Began completion of form 1903.011P SAE Emergency


Direction and Control
ADMINISTRATIVE JOB PERFORMANCE MEASURE TUOI: ANO-1-JPM-SRO-EAL4 Page 6 of 4 END


Checklist for Shift Manager.
ADMINISTRATIVE JOB PERFORMANCE MEASURE TUOI:  ANO-1-JPM-SRO-EAL5 Page  1 of 4 UNIT:      1           REV #         0           DATE: ______________________________
Examinee should fill in the data on items 1 and 2.
TUOI NUMBER: ANO-1-JPM-SRO-EAL5 SYSTEM/DUTY AREA: ADMINISTRATIVE TOPIC - EMERGENCY PROCEDURES/PLAN TASK: CLASSIFY AN EMERGENCY EVENT JTA#: 13445110303 KA VALUE RO:   2.3      SRO:  4.1     KA  
Examinee should simulate (or state) direction of the SE
 
to complete the initial
 
notification.
_______________(C)6. (Simulate) Announce emergency on plant paging system.Used plant-paging system to (simulate) make announcement per step 9 of form
 
1903.011P.
_______________
ADMINISTRATIVE JOB PERFORMANCE MEASURE TUOI:  ANO-1-JPM-SRO-EAL4 Page  6 of 4 END ADMINISTRATIVE JOB PERFORMANCE MEASURE TUOI:  ANO-1-JPM-SRO-EAL5 Page  1 of 4 UNIT:      1     REV #       0     DATE: ______________________________
TUOI NUMBER:
ANO-1-JPM-SRO-EAL5 SYSTEM/DUTY AREA:
ADMINISTRATIVE TOPIC - EMERGENCY PROCEDURES/PLAN TASK: CLASSIFY AN EMERGENCY EVENT JTA#: 13445110303 KA VALUE RO:
2.3      SRO:  4.1   KA  


==REFERENCE:==
==REFERENCE:==
 
2.4.41 APPROVED FOR ADMINISTRATION TO:   RO:             SRO:   X TASK LOCATION:  INSIDE CR:     X         OUTSIDE CR:_________ BOTH:________
2.4.41 APPROVED FOR ADMINISTRATION TO: RO:
SRO:   X   TASK LOCATION:  INSIDE CR:
X       OUTSIDE CR:_________ BOTH:________
SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):
SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):
PLANT SITE:_______________ SIMULATOR:
PLANT SITE:_______________ SIMULATOR:       PERFORM        LAB:__________________
P ERFORM      LAB:__________________
POSITION EVALUATED:  RO:____N/A___    SRO:_____X_____
POSITION EVALUATED:  RO:____
ACTUAL TESTING ENVIRONMENT: SIMULATOR:       X    PLANT SITE:__________ LAB:________
N/A___SRO:_____X_____ACTUAL TESTING ENVIRONMENT: SIMULATOR:
TESTING METHOD: SIMULATE:_________     PERFORM:___________
X    PLANT SITE:__________ LAB:________
APPROXIMATE COMPLETION TIME IN MINUTES:         5 MINUTES REFERENCE(S): 1903.010 REV. 036-02-0, 1903.011 REV. 025-04-0
TESTING METHOD: SIMULATE:_________
PERFORM:___________
APPROXIMATE COMPLETION TIME IN MINUTES:
5 MINUTES REFERENCE(S):
1903.010 REV. 036-02-0, 1903.011 REV. 025-04-0
______________________________________________________________________
______________________________________________________________________
EXAMINEE'S NAME:________________________________
EXAMINEE'S NAME:________________________________           SSN ______-_____-____________
SSN ______-_____-____________
EVALUATOR'S NAME:__________________________________________________________________
EVALUATOR'S NAME:__________________________________________________________________
THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:
THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:
SATISFACTORY:________________
SATISFACTORY:________________           UNSATISFACTORY:_________________
UNSATISFACTORY:_________________
PERFORMANCE CHECKLIST COMMENTS:
PERFORMANCE CHECKLIST COMMENTS:
___________________________________________________________________________________
___________________________________________________________________________________
___________________________________________________________________________________
___________________________________________________________________________________
___________________________________________________________________________________
____________ Start Time          ____________ Stop Time        ____________ Total Time SIGNED ________________________________ DATE: _______________________
SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A


___________________________________________________________________________________
ADMINISTRATIVE JOB PERFORMANCE MEASURE TUOI:  ANO-1-JPM-SRO-EAL5 Page 2 of 4 QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.
____________ Start Time
____________ Stop Time
____________ Total Time SIGNED ________________________________ DATE: _______________________
SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A ADMINISTRATIVE JOB PERFORMANCE MEASURE TUOI:  ANO-1-JPM-SRO-EAL5 Page 2 of 4 QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.
ADMINISTRATIVE JOB PERFORMANCE MEASURE TUOI:  ANO-1-JPM-SRO-EAL5 Page  3 of 4 EXAMINEE'S COPY JPM INITIAL TASK CONDITIONS
:* Unit One has experienced a Main Turbine trip above 43% power.
* Reactor Protection System failed to actuate an automatic reactor trip. The reactor was successfully tripped from the Control


Room.* A Degraded Power condition subsequently occurred.
ADMINISTRATIVE JOB PERFORMANCE MEASURE TUOI: ANO-1-JPM-SRO-EAL5 Page 3 of 4 EXAMINEES COPY JPM INITIAL TASK CONDITIONS:
* Unit One has experienced a Main Turbine trip above 43% power.
* Reactor Protection System failed to actuate an automatic reactor trip. The reactor was successfully tripped from the Control Room.
* A Degraded Power condition subsequently occurred.
INITIATING CUE:
INITIATING CUE:
For the given plant conditions, determine the applicable EAL classification and initiate notifications per the applicable Shift
For the given plant conditions, determine the applicable EAL classification and initiate notifications per the applicable Shift Manager Emergency Direction and Control Checklist in 1903.011.


Manager Emergency Direction and Control Checklist in 1903.011.
ADMINISTRATIVE JOB PERFORMANCE MEASURE TUOI:   ANO-1-JPM-SRO-EAL5 Page  4 of 4 THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:
ADMINISTRATIVE JOB PERFORMANCE MEASURE TUOI: ANO-1-JPM-SRO-EAL5 Page  4 of 4 THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:
The examiner shall review the "Briefing Checklist - System Walkthrough" portion of OP 1064.023 Attachment 6 with the examinee.
The examiner shall review the "Briefing Checklist - System Walkthrough" portion of OP 1064.023 Attachment 6 with the examinee.
JPM INITIAL TASK CONDITIONS
JPM INITIAL TASK CONDITIONS:   The following conditions existed at the end of Operating test 1 Scenario 2. Unit One has experienced a Main Turbine trip above 43%
: The following conditions existed at the end of Operating test 1 Scenario 2. Unit One has experienced a Main Turbine trip above 43%
power. Reactor Protection System failed to actuate an automatic reactor trip. The reactor was successfully tripped from the Control Room. A Degraded Power condition subsequently occurred.
power. Reactor Protection System failed to actuate an automatic reactor trip. The reactor was successfully tripped from the Control Room. A Degraded Power condition subsequently occurred.
TASK STANDARD
TASK STANDARD: __Examinee correctly classifies this event as an Alert per EAL 6.2 and makes notifications to plant personnel per 1903.011M.
: __Examinee correctly classifies this event as an Alert per EAL 6.2 and makes notifications to plant personnel per 1903.011M.
___________________________________________________________________________________
___________________________________________________________________________________
TASK PERFORMANCE AIDS
TASK PERFORMANCE AIDS: 1903.010 Attachments 1 and 3, 1903.011 Attachment 2, and 1903.011M_______________________________________________________________________
: 1903.010 Attachments 1 and 3, 1903.011 Attachment 2,         and 1903.011M
_______________________________________________________________________
ADMINISTRATIVE JOB PERFORMANCE MEASURE TUOI:  ANO-1-JPM-SRO-EAL5 Page  5 of 4 INITIATING CUE:
For the given plant conditions, determine the applicable EAL classification and initiate notifications per the applicable Shift Manager Emergency Direction and


Control Checklist in 1903.011.
ADMINISTRATIVE JOB PERFORMANCE MEASURE TUOI:  ANO-1-JPM-SRO-EAL5 Page  5 of 4 INITIATING CUE:
CRITICAL ELEMENTS (C)         3, 6       (C)PERFORMANCE CHECKLIST STANDARD N/A SAT UNSAT 1. Compare event conditions with the Index of EALs, Attachment 1 of 1903.010, Emergency Action Level
For the given plant conditions, determine the applicable EAL classification and initiate notifications per the applicable Shift Manager Emergency Direction and Control Checklist in 1903.011.
CRITICAL ELEMENTS (C)         3, 6 (C)       PERFORMANCE CHECKLIST               STANDARD             N/A     SAT   UNSAT
: 1. Compare event conditions   Turned to Attachment 1 of with the Index of EALs,     1903.010, Index of EALs.
Attachment 1 of 1903.010,                                 _____  _____  _____
Emergency Action Level Classification.
: 2. Turn to appropriate EAL    Turned to a specific EAL in and compare EAL criteria    Safety System Function,      _____  _____  _____
with event conditions.      Attachment 3 of 1903.010.
: 3. Declare the emergency      Declared or stated the event (C)      classification.            is an Alert (based on failure of RPS to complete    _____  _____  _____
an automatic trip and subsequent efforts to trip reactor from the Control Room were successful - not required to be stated) in accordance with EAL 6.2.
: 4. Initiate immediate          Referred to 1903.011 and      _____  _____  _____
notifications.              turned to Attachment 2.
NOTE: Cue the examinee that the Unit 2 Shift Engineer is performing the initial notifications per 1903.011 after the examinee has stated that Unit 2 Shift Engineer (or control room communicator) has been requested.
: 5. Begin completion of form    Began completion of form 1903.011M, Alert Emergency  1903.011M Alert Emergency Direction and Control      Direction and Control Checklist for Shift        Checklist for Shift Manager.
Manager.
Examinee should fill in the  _____  _____  _____
data on items 1 and 2.
Examinee should simulate (or state) direction of the SE to complete the initial notification.
: 6. (Simulate) Announce        Used plant-paging system to (C)      emergency on plant paging  (simulate) make announcement


Classification.
ADMINISTRATIVE JOB PERFORMANCE MEASURE TUOI: ANO-1-JPM-SRO-EAL5 Page 6 of 4 system.                   per step 4 of form     _____  _____ _____
Turned to Attachment 1 of 1903.010, Index of EALs.
1903.011M.
_______________2. Turn to appropriate EAL and compare EAL criteria with event conditions.
END
Turned to a specific EAL in Safety System Function, Attachment 3 of 1903.010.
_______________(C)3. Declare the emergency classification.
Declared or stated the event is an Alert (based on
 
failure of RPS to complete
 
an automatic trip and
 
subsequent efforts to trip
 
reactor from the Control
 
Room were successful - not
 
required to be stated) in
 
accordance with EAL 6.2.
_______________4. Initiate immediate notifications.
Referred to 1903.011 and turned to Attachment 2.
_______________NOTE: Cue the examinee that the Unit 2 Shift Engineer is performing the initial notifications per 1903.011 after the examinee has stated that Unit 2 Shift Engineer (or control room communicator) has been requested.
: 5. Begin completion of form 1903.011M, Alert Emergency Direction and Control
 
Checklist for Shift
 
Manager.Began completion of form 1903.011M Alert Emergency
 
Direction and Control
 
Checklist for Shift Manager.
Examinee should fill in the data on items 1 and 2.
Examinee should simulate (or state) direction of the SE
 
to complete the initial


notification.
ADMINISTRATIVE JOB PERFORMANCE MEASURE TUOI:  ANO-1-JPM-SRO-EAL6 Page  1 of 4 UNIT:      1           REV #         0           DATE: ______________________________
_______________(C)6. (Simulate) Announce emergency on plant paging Used plant-paging system to (simulate) make announcement ADMINISTRATIVE JOB PERFORMANCE MEASURE TUOI:  ANO-1-JPM-SRO-EAL5 Page  6 of 4 system.per step 4 of form 1903.011M.
TUOI NUMBER: ANO-1-JPM-SRO-EAL6 SYSTEM/DUTY AREA: ADMINISTRATIVE TOPIC - EMERGENCY PROCEDURES/PLAN TASK: CLASSIFY AN EMERGENCY EVENT JTA#: 13445110303 KA VALUE RO:   2.3      SRO:  4.1     KA  
_______________END ADMINISTRATIVE JOB PERFORMANCE MEASURE TUOI:  ANO-1-JPM-SRO-EAL6 Page  1 of 4 UNIT:      1     REV #       0     DATE: ______________________________
TUOI NUMBER:
ANO-1-JPM-SRO-EAL6 SYSTEM/DUTY AREA:
ADMINISTRATIVE TOPIC - EMERGENCY PROCEDURES/PLAN TASK: CLASSIFY AN EMERGENCY EVENT JTA#: 13445110303 KA VALUE RO:
2.3      SRO:  4.1   KA  


==REFERENCE:==
==REFERENCE:==
 
2.4.41 APPROVED FOR ADMINISTRATION TO:   RO:             SRO:   X TASK LOCATION:  INSIDE CR:     X         OUTSIDE CR:_________ BOTH:________
2.4.41 APPROVED FOR ADMINISTRATION TO: RO:
SRO:   X   TASK LOCATION:  INSIDE CR:
X       OUTSIDE CR:_________ BOTH:________
SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):
SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):
PLANT SITE:_______________ SIMULATOR:
PLANT SITE:_______________ SIMULATOR:       PERFORM        LAB:__________________
P ERFORM      LAB:__________________
POSITION EVALUATED:  RO:____N/A___    SRO:_____X_____
POSITION EVALUATED:  RO:____
ACTUAL TESTING ENVIRONMENT: SIMULATOR:       X    PLANT SITE:__________ LAB:________
N/A___SRO:_____X_____ACTUAL TESTING ENVIRONMENT: SIMULATOR:
TESTING METHOD: SIMULATE:_________     PERFORM:___________
X    PLANT SITE:__________ LAB:________
APPROXIMATE COMPLETION TIME IN MINUTES:         5 MINUTES REFERENCE(S): 1903.010 REV. 036-02-0, 1903.011 REV. 025-04-0
TESTING METHOD: SIMULATE:_________
PERFORM:___________
APPROXIMATE COMPLETION TIME IN MINUTES:
5 MINUTES REFERENCE(S):
1903.010 REV. 036-02-0, 1903.011 REV. 025-04-0
______________________________________________________________________
______________________________________________________________________
EXAMINEE'S NAME:________________________________
EXAMINEE'S NAME:________________________________           SSN ______-_____-____________
SSN ______-_____-____________
EVALUATOR'S NAME:__________________________________________________________________
EVALUATOR'S NAME:__________________________________________________________________
THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:
THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:
SATISFACTORY:________________
SATISFACTORY:________________           UNSATISFACTORY:_________________
UNSATISFACTORY:_________________
PERFORMANCE CHECKLIST COMMENTS:
PERFORMANCE CHECKLIST COMMENTS:
___________________________________________________________________________________
___________________________________________________________________________________
___________________________________________________________________________________
___________________________________________________________________________________
____________ Start Time          ____________ Stop Time        ____________ Total Time SIGNED ________________________________ DATE: _______________________
SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A


___________________________________________________________________________________
ADMINISTRATIVE JOB PERFORMANCE MEASURE TUOI:  ANO-1-JPM-SRO-EAL6 Page 2 of 4 QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.


___________________________________________________________________________________
ADMINISTRATIVE JOB PERFORMANCE MEASURE TUOI: ANO-1-JPM-SRO-EAL6 Page 3 of 4 EXAMINEES COPY JPM INITIAL TASK CONDITIONS:
____________ Start Time
* While shutting down due to a tube leak in B OTSG, the Unit One reactor was manually tripped due to two dropped rods.
____________ Stop Time
* Post trip, the RCS leak rate to B OTSG has been estimated at approximately 100 gpm.
____________ Total Time SIGNED ________________________________ DATE: _______________________
SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A ADMINISTRATIVE JOB PERFORMANCE MEASURE TUOI:  ANO-1-JPM-SRO-EAL6 Page  2 of 4 QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.
ADMINISTRATIVE JOB PERFORMANCE MEASURE TUOI: ANO-1-JPM-SRO-EAL6 Page 3 of 4 EXAMINEE'S COPY JPM INITIAL TASK CONDITIONS
:* While shutting down due to a tube leak in "B" OTSG, the Unit One reactor was manually tripped due to two dropped rods.
* Post trip, the RCS leak rate to "B" OTSG has been estimated at approximately 100 gpm.
* SPDS indicates that NO Main Steam Safety Valves (MSSVs) lifted following the trip.
* SPDS indicates that NO Main Steam Safety Valves (MSSVs) lifted following the trip.
INITIATING CUE:
INITIATING CUE:
For the given plant conditions, determine the applicable EAL classification and initiate notifications per the applicable Shift
For the given plant conditions, determine the applicable EAL classification and initiate notifications per the applicable Shift Manager Emergency Direction and Control Checklist in 1903.011.


Manager Emergency Direction and Control Checklist in 1903.011.
ADMINISTRATIVE JOB PERFORMANCE MEASURE TUOI:  ANO-1-JPM-SRO-EAL6 Page  4 of 4 THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:
ADMINISTRATIVE JOB PERFORMANCE MEASURE TUOI:  ANO-1-JPM-SRO-EAL6 Page  4 of 4 THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:
The examiner shall review the "Briefing Checklist - System Walkthrough" portion of OP 1064.023 Attachment 6 with the examinee.
The examiner shall review the "Briefing Checklist - System Walkthrough" portion of OP 1064.023 Attachment 6 with the examinee.
JPM INITIAL TASK CONDITIONS
JPM INITIAL TASK CONDITIONS:  The following conditions existed at the end of Operating test 1 Scenario 3. While shutting down due to a tube leak in B OTSG, the Unit One reactor was manually tripped due to two dropped rods. Post trip, the RCS leak rate to B OTSG has been estimated at approximately 100 gpm. SPDS indicates that NO Main Steam Safety Valves (MSSVs) lifted following the trip.
:  The following conditions existed at the end of Operating test 1 Scenario 3. While shutting down due to a tube leak in "B" OTSG, the Unit One reactor was manually tripped due to two dropped rods. Post trip, the RCS leak rate to "B" OTSG has been estimated at approximately 100 gpm. SPDS indicates that NO Main Steam Safety Valves (MSSVs) lifted following the trip.
TASK STANDARD: __Examinee correctly classifies this event as an Alert per EAL 2.2 and makes notifications to plant personnel per 1903.011M.
TASK STANDARD
: __Examinee correctly classifies this event as an Alert per EAL 2.2 and makes notifications to plant personnel per 1903.011M.
___________________________________________________________________________________
___________________________________________________________________________________
TASK PERFORMANCE AIDS
TASK PERFORMANCE AIDS: 1903.010 Attachments 1 and 3, 1903.011 Attachment 2, and 1903.011M_______________________________________________________________________
: 1903.010 Attachments 1 and 3, 1903.011 Attachment 2,         and 1903.011M
_______________________________________________________________________
ADMINISTRATIVE JOB PERFORMANCE MEASURE TUOI:  ANO-1-JPM-SRO-EAL6 Page  5 of 4 INITIATING CUE:
For the given plant conditions, determine the applicable EAL classification and initiate notifications per the applicable Shift Manager Emergency Direction and
 
Control Checklist in 1903.011.
CRITICAL ELEMENTS (C)        3, 6        (C)PERFORMANCE CHECKLIST STANDARD N/A SAT UNSAT 1. Compare event conditions with the Index of EALs, Attachment 1 of 1903.010, Emergency Action Level
 
Classification.
Turned to Attachment 1 of 1903.010, Index of EALs.
_______________2. Turn to appropriate EAL and compare EAL criteria with event conditions.
Turned to a specific EAL in Safety System Function, Attachment 3 of 1903.010.
_______________(C)3. Declare the emergency classification.
Declared or stated the event is an Alert (based on RCS
 
leakage greater than normal


ADMINISTRATIVE JOB PERFORMANCE MEASURE TUOI:  ANO-1-JPM-SRO-EAL6 Page  5 of 4 INITIATING CUE:
For the given plant conditions, determine the applicable EAL classification and initiate notifications per the applicable Shift Manager Emergency Direction and Control Checklist in 1903.011.
CRITICAL ELEMENTS (C)          3, 6 (C)        PERFORMANCE CHECKLIST                STANDARD            N/A    SAT    UNSAT
: 1. Compare event conditions    Turned to Attachment 1 of with the Index of EALs,    1903.010, Index of EALs.
Attachment 1 of 1903.010,                                _____  _____  _____
Emergency Action Level Classification.
: 2. Turn to appropriate EAL    Turned to a specific EAL in and compare EAL criteria    Safety System Function,      _____  _____  _____
with event conditions.      Attachment 3 of 1903.010.
: 3. Declare the emergency      Declared or stated the event (C)      classification.            is an Alert (based on RCS leakage greater than normal  _____  _____  _____
makeup capacity [50 gpm] -
makeup capacity [50 gpm] -
not required to be stated) in accordance with EAL 2.2.
not required to be stated) in accordance with EAL 2.2.
_______________4. Initiate immediate notifications.
: 4. Initiate immediate         Referred to 1903.011 and     _____  _____  _____
Referred to 1903.011 and turned to Attachment 2.
notifications.              turned to Attachment 2.
_______________NOTE: Cue the examinee that the Unit 2 Shift Engineer is performing the initial notifications per 1903.011 after the examinee has stated that Unit 2 Shift Engineer (or control room communicator) has been requested.
NOTE: Cue the examinee that the Unit 2 Shift Engineer is performing the initial notifications per 1903.011 after the examinee has stated that Unit 2 Shift Engineer (or control room communicator) has been requested.
: 5. Begin completion of form 1903.011M, Alert Emergency Direction and Control
: 5. Begin completion of form    Began completion of form 1903.011M, Alert Emergency  1903.011M Alert Emergency Direction and Control       Direction and Control Checklist for Shift        Checklist for Shift Manager.
Manager.
Examinee should fill in the  _____  _____  _____
data on items 1 and 2.
Examinee should simulate (or state) direction of the SE to complete the initial notification.
: 6. (Simulate) Announce        Used plant-paging system to (C)      emergency on plant paging  (simulate) make announcement system.                    per step 4 of form            _____  _____  _____
1903.011M.


Checklist for Shift
ADMINISTRATIVE JOB PERFORMANCE MEASURE TUOI: ANO-1-JPM-SRO-EAL6 Page 6 of 4 END


Manager.Began completion of form 1903.011M Alert Emergency
Page 1 of 7 JOB PERFORMANCE MEASURE UNIT: ______1_______    REV # _____3_________  DATE: ______________________________
 
TUOI NUMBER:_ANO-1-JPM-RO-EOP07__________________
Direction and Control
SYSTEM/DUTY AREA:_ABNORMAL AND EMERGENCY OPERATIONS________________________________
 
TASK:_PERFORM REACTOR TRIP IMMEDIATE ACTION________________________________________
Checklist for Shift Manager.
Examinee should fill in the data on items 1 and 2.
Examinee should simulate (or state) direction of the SE
 
to complete the initial
 
notification.
_______________(C)6. (Simulate) Announce emergency on plant paging system.Used plant-paging system to (simulate) make announcement per step 4 of form
 
1903.011M.
_______________
ADMINISTRATIVE JOB PERFORMANCE MEASURE TUOI:  ANO-1-JPM-SRO-EAL6 Page 6 of 4 END Page  1 of 7 JOB PERFORMANCE MEASURE UNIT: ______
1_______REV # _____
3_________
DATE: ______________________________
TUOI NUMBER:_
ANO-1-JPM-RO-EOP07__________________
SYSTEM/DUTY AREA:_
ABNORMAL AND EMERGENCY OPERATIONS
________________________________
TASK:_PERFORM REACTOR TRIP IMMEDIATE ACTION
________________________________________
JTA#:_13035010601___________________________
JTA#:_13035010601___________________________
KA VALUE RO:___
KA VALUE RO:___4.0____ SRO:__4.6_____ KA  
4.0____ SRO:__4.6_____ KA  


==REFERENCE:==
==REFERENCE:==
__
__007 EK3.01_________________
007 EK3.01
APPROVED FOR ADMINISTRATION TO:   RO:____X___ SRO:___X_____
_________________
TASK LOCATION:  INSIDE CR:____X____ OUTSIDE CR:_________ BOTH:________
APPROVED FOR ADMINISTRATION TO: RO:____
X___ SRO:___
X_____TASK LOCATION:  INSIDE CR:____
X____ OUTSIDE CR:_________ BOTH:________
SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):
SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):
PLANT SITE:_______________ SIMULATOR:___
PLANT SITE:_______________ SIMULATOR:___PERFORM_______ LAB:__________________
PERFORM_______ LAB:__________________
POSITION EVALUATED:  RO:__________   SRO:___________
POSITION EVALUATED:  RO:__________
SRO:___________
ACTUAL TESTING ENVIRONMENT: SIMULATOR:__________ PLANT SITE:__________ LAB:________
ACTUAL TESTING ENVIRONMENT: SIMULATOR:__________ PLANT SITE:__________ LAB:________
TESTING METHOD: SIMULATE:_________
TESTING METHOD: SIMULATE:_________   PERFORM:___________
PERFORM:___________
APPROXIMATE COMPLETION TIME IN MINUTES:___5 MINUTES________________________________
APPROXIMATE COMPLETION TIME IN MINUTES:___
REFERENCE(S):__1202.001 REV. 27, 1202.012 REV. 004-01-0     _________________________
5 MINUTES________________________________
REFERENCE(S):__
1202.001 REV. 27, 1202.012 REV. 004-01-0
_________________________
______________________________________________________________________
______________________________________________________________________
EXAMINEE'S NAME:________________________________
EXAMINEE'S NAME:________________________________       SSN ______-_____-____________
SSN ______-_____-____________
EVALUATOR'S NAME:__________________________________________________________________
EVALUATOR'S NAME:__________________________________________________________________
THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:
THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:
SATISFACTORY:________________
SATISFACTORY:________________       UNSATISFACTORY:_________________
UNSATISFACTORY:_________________
PERFORMANCE CHECKLIST COMMENTS:
PERFORMANCE CHECKLIST COMMENTS:
___________________________________________________________________________________
___________________________________________________________________________________
___________________________________________________________________________________
___________________________________________________________________________________
___________________________________________________________________________________
____________ Start Time          ____________ Stop Time      ____________ Total Time


___________________________________________________________________________________
Page 2 of 7 SIGNED ________________________________ DATE: _______________________
____________ Start Time
SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.
____________ Stop Time
____________ Total Time Page 2 of 7 SIGNED ________________________________ DATE: _______________________
SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A


QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.
Page 3 of 7 JPM INITIAL TASK CONDITIONS:
Page 3 of 7 JPM INITIAL TASK CONDITIONS
* Plant is operating at 100% power.
:* Plant is operating at 100% power.
* CBOT is out of the control room.
* CBOT is out of the control room.
* Generator hydrogen pressure is dropping rapidly.
* Generator hydrogen pressure is dropping rapidly.
INITIATING CUE:
INITIATING CUE:
The CRS directs you to manually trip the reactor and perform reactor trip actions through step 6 per 1202.001 Reactor Trip.
The CRS directs you to manually trip the reactor and perform reactor trip actions through step 6 per 1202.001 Reactor Trip.
Page 4 of 7 TUOI NUMBER:_
 
ANO-1-JPM-RO-EOP07______
Page 4 of 7 TUOI NUMBER:_ANO-1-JPM-RO-EOP07______
THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:
THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:
The examiner shall review the "Briefing Checklist - System Walkthrough" portion of 1064.023 Attachment 6 with the examinee.
The examiner shall review the "Briefing Checklist - System Walkthrough" portion of 1064.023 Attachment 6 with the examinee.
JPM INITIAL TASK CONDITIONS:
JPM INITIAL TASK CONDITIONS: Plant is operating at 100% power. CBOT is out of the Control room. Generator hydrogen pressure is dropping rapidly.                   ___
Plant is operating at 100% power. CBOT is out of the Control room. Generator hydrogen pressure is dropping rapidly.                   ___
____________________________________________________________________________________
____________________________________________________________________________________
TASK STANDARD:
TASK STANDARD: Immediate action for Reactor Trip completed and Emergency Boration in progress. Actions for failure of all control rods to insert have been completed.___
Immediate action for Reactor Trip completed and Emergency Boration in progress. Actions for failure of all control rods to insert have been completed.___(Alternate success path JPM)._______________________________________________________
(Alternate success path JPM)._______________________________________________________
____________________________________________________________________________________
____________________________________________________________________________________
TASK PERFORMANCE AIDS:
TASK PERFORMANCE AIDS: Rx Trip 1202.001, RT 1202.012, Emergency Boration.
Rx Trip 1202.001, RT 1202.012, Emergency Boration.
___________________________________________________________________________
___________________________________________________________________________
____________________________________________________________________________________
____________________________________________________________________________________
____________________________________________________________________________________
____________________________________________________________________________________
NOTE: This is an alternate success path JPM and is intended to be performed on the simulator, not simulated. Therefore, no positive or negative cues are provided.
NOTE: This is an alternate success path JPM and is intended to be performed on the simulator, not simulated. Therefore, no positive or negative cues are provided.
Notes to IA Operator and Examiner:
Notes to IA Operator and Examiner:
: 1. Prior to starting this JPM, insert the following malfunctions to stick 2 rods out:
RD363, RD370
: 2. RT-12 is allowed for performance for emergency boration.
: 3. The only immediate action is tripping the Reactor. Trainee may perform follow up steps but are not required.


1.Prior to starting this JPM, insert the following malfunctions to stick 2 rod s out: RD363, RD370 2.RT-12 is allowed for performance for emergency boration.
Page 5 of 7 TUOI NUMBER:_ANO-1-JPM-RO-EOP07______
3.The only immediate action is tripping the Reactor. Trainee may perform follow up steps but are not required.
Page 5 of 7 TUOI NUMBER:_
ANO-1-JPM-RO-EOP07______
INITIATING CUE:
INITIATING CUE:
The CRS directs you to manually trip the reactor and perform reactor trip actions through step 6 per 1202.001 Reactor Trip.
The CRS directs you to manually trip the reactor and perform reactor trip actions through step 6 per 1202.001 Reactor Trip.
NOTE TO EXAMINER: THIS IS AN ALTERNATE SUCCESS PATH JPM THAT INCLUDES A FAULT WHEN THE REACTOR IS TRIPPED.
NOTE TO EXAMINER: THIS IS AN ALTERNATE SUCCESS PATH JPM THAT INCLUDES A FAULT WHEN THE REACTOR IS TRIPPED.
CRITICAL ELEMENTS (C):_
CRITICAL ELEMENTS (C):_1, 5, 6, 7, 8, 9 (C)       PERFORMANCE CHECKLIST               STANDARD               N/A     SAT UNSAT
1, 5, 6, 7, 8, 9 (C)PERFORMANCE CHECKLIST STANDARD N/A SAT UNSAT (C)1.Depress the reactor trip pushbutton.
: 1. Depress the reactor trip    On C03, depressed the (C)     pushbutton.                 reactor trip pushbutton.       _____    _____ _____
POSITIVE CUE
POSITIVE CUE:
: Reactor trip pushbutton depressed.
Reactor trip pushbutton depressed.
On C03, depressed the reactor trip pushbutton.
: 2. Identify that 2 rods have   On C13, observed 2 rods have failed to insert.          failed to trip.               _____    _____ _____
_______________2.Identify that 2 ro ds have failed to insert.
INSTRUCTOR NOTE:
On C13, observed 2 rods have failed to trip.
_______________INSTRUCTOR NOTE:
The following step is optional at the trainees discretion.
The following step is optional at the trainees discretion.
3.Depress CRD Power Supply Breaker Trip Push buttons
: 3. Depress CRD Power Supply     On C03 depressed CRD Power Breaker Trip Push buttons   Supply Push buttons.          _____    _____ _____
 
on C03 (A501 and B631).    (A501 and B631).
on C03 (A501 and B631).
POSITIVE CUE:
POSITIVE CUE
Breakers A501 and B631 open (Green light on)
: Breakers A501 and B631 open (Green light on)
: 4. Verify all rods inserted   On C13, observed rod bottom and power dropping.        lights for all control rods   _____    _____ _____
On C03 depressed CRD Power Supply Push buttons.
(A501 and B631).
_______________4.Verify all rods inserted and power dropping.
On C13, observed rod bottom lights for all control rods
 
except 2 have come on.
except 2 have come on.
_______________NOTE TO EXAMINER:
NOTE TO EXAMINER:
Give examinee a copy of RT12, Emergency Boration, if examinee requests it.(C)5.Open BWST outlet to OP HPI Pump (CV-1407 or CV-1408).
Give examinee a copy of RT12, Emergency Boration, if examinee requests it.
POSITIVE CUE
(C) 5. Open BWST outlet to OP HPI On C16 or C18, CV-1407 or Pump (CV-1407 or CV-1408). CV-1408 opened (associated     _____ _____    _____
: CV-1408 red light on green light off On C16 or C18, CV-1407 or CV-1408 opened (associated
valve for the running HPI POSITIVE CUE:                  pump).
 
CV-1408 red light on green light off (C) 6. Set Batch Controller for     Batch set key depressed, maximum batch size.        999999 gallons batch size set by depressing             _____ _____    _____
valve for the running HPI
POSITIVE CUE:                  appropriate keys. Depressed Batch size indicates 999999    enter and lower display keys on upper display.              in sequence (red LED next to display key should be on).
 
NEGATIVE CUE:
pump)._______________(C)6.Set Batch Controller for maximum batch size.
Batch size indicates 500 (or whatever is on upper display).
POSITIVE CUE
: Batch size indicates 999999 on upper display.
NEGATIVE CUE
: Batch size indicates 500 (or whatever is on upper
 
display).Batch set key depressed, 999999 gallons batch size
 
set by depressing
 
appropriate keys. Depressed
 
enter and lower display keys
 
in sequence (red LED next to
 
display key should be on).
_______________
Page  6 of 7 TUOI NUMBER:_
ANO-1-JPM-RO-EOP07______(C)PERFORMANCE CHECKLIST STANDARD N/A SAT UNSAT (C)7.Open CV-1250.
POSITIVE CUE
: CV-1250 is open (red light on green light off)
On C04, handswitch for CV-1250 is placed in the open
 
position and CV-1250
 
opened._______________(C)8.P39A, P39B or both started.POSITIVE CUE
: P39A and /or P39B red lights on green lights off.
Started 1 or 2 boric acid pumps on C04.
_______________(C)9.Start the Batch Controller.
POSITIVE CUE
: Lower display digital reading is increasing.
NEGATIVE CUE
: Lower display digital reading is staying at 0.
Batch controller started by depressing run pushbutton.
_______________10.Set pressurizer level control setpoint to 220
 
inches.POSITIVE CUE
: Pressurizer level control setpoint at 220".
Verified pressurizer level setpoint on CV-1235
 
controller is set to 220
 
inches. (If not at 220", set
 
it to 220").
_______________NOTE TO EXAMINER:
Inform examinee "consider that emergency boration started and an additional operator
 
has taken over the duties for finishing RT12."  The following actions are follow-up
 
actions and are not required to satisfy JPM Task.
11.Depress the turbine trip pushbutton.
POSITIVE CUE
: Turbine trip pushbutton depressed.
On C01, depressed the turbine trip pushbutton.
_______________12.Verify turbine throttle and governor valves are
 
closed.POSITIVE CUE
: Turbine governor and throttle valves indicate zero.
On C01, verified by observation that all
 
throttle and governor valves


Page 6 of 7 TUOI NUMBER:_ANO-1-JPM-RO-EOP07______
(C)      PERFORMANCE CHECKLIST                STANDARD              N/A    SAT  UNSAT
: 7. Open CV-1250.              On C04, handswitch for CV-1250 is placed in the open    _____    _____ _____
(C)  POSITIVE CUE:                  position and CV-1250 CV-1250 is open (red light on  opened.
green light off)
: 8. P39A, P39B or both          Started 1 or 2 boric acid started.                    pumps on C04.
(C)                                                                _____    _____ _____
POSITIVE CUE:
P39A and /or P39B red lights on green lights off.
: 9. Start the Batch              Batch controller started by Controller.                depressing run pushbutton.
(C)                                                                _____    _____ _____
POSITIVE CUE:
Lower display digital reading is increasing.
NEGATIVE CUE:
Lower display digital reading is staying at 0.
: 10. Set pressurizer level      Verified pressurizer level control setpoint to 220    setpoint on CV-1235 inches.                    controller is set to 220 inches. (If not at 220, set  _____ _____ _____
POSITIVE CUE:                  it to 220).
Pressurizer level control setpoint at 220.
NOTE TO EXAMINER:
Inform examinee consider that emergency boration started and an additional operator has taken over the duties for finishing RT12. The following actions are follow-up actions and are not required to satisfy JPM Task.
: 11. Depress the turbine trip    On C01, depressed the pushbutton.                turbine trip pushbutton.
_____ _____ _____
POSITIVE CUE:
Turbine trip pushbutton depressed.
: 12. Verify turbine throttle    On C01, verified by and governor valves are    observation that all closed.                    throttle and governor valves _____ _____ _____
are closed.
are closed.
_______________13.Check SCM adequate.
POSITIVE CUE:
POSITIVE CUE
Turbine governor and throttle valves indicate zero.
: SCM indicates 59  
: 13. Check SCM adequate.         On ICC display on C19 or panel C04, verified by POSITIVE CUE:                  observation that SCM is        _____ _____ _____
&deg;F.NOTE: Adequate SCM is  
SCM indicates 59 &deg;F.           adequate.
&#xb3; 30&deg;F.On ICC display on C19 or panel C04, verified by
NOTE: Adequate SCM is 30&deg;F.
 
14 Reduce letdown by closing    On C04, rotated the pot on CV-1223.                    CV-1223 controller to zero and verified letdown flow on _____ _____ _____
observation that SCM is


adequate._______________14 Reduce letdown by closin g CV-1223.On C04, rotated the pot on CV-1223 controller to zero
Page 7 of 7 POSITIVE CUE:          C04 lowers.
Letdown flow indicator decreased to ~40 gpm.
END


and verified letdown flow on
Page 1 of 6 JOB PERFORMANCE MEASURE UNIT: ______1_______    REV # _____2________    DATE: ______________________________
_______________
TUOI NUMBER:_ANO-1-JPM-RO-ED008_____________
Page 7 of 7 POSITIVE CUE
SYSTEM/DUTY AREA:_ELECTRICAL DISTRIBUTION__________________________________________
: Letdown flow indicator decreased to ~40 gpm.
TASK:_SHIFT BUSES (A1, A2, H1, H2) FROM STARTUP ONE TO UNIT AUX TRANSFORMER________
C04 lowers.
JTA#:_10625110101___________________________
END Page  1 of 6 JOB PERFORMANCE MEASURE UNIT: ______
KA VALUE RO:__3.1_____ SRO:__3.1_____ KA  
1_______REV # _____
2________DATE: ______________________________
TUOI NUMBER:_
ANO-1-JPM-RO-ED008_____________
SYSTEM/DUTY AREA:_
ELECTRICAL DISTRIBUTION__________________________________________
TASK:_SHIFT BUSES (A1, A2, H1, H2) FROM STARTUP ONE TO UNIT AUX TRANSFORMER
________JTA#:_10625110101
___________________________
KA VALUE RO:__
3.1_____ SRO:__
3.1_____ KA  


==REFERENCE:==
==REFERENCE:==
__
__062 000 A4.07_________________
062 000 A4.07
APPROVED FOR ADMINISTRATION TO:   RO:____X___ SRO:___ X ___
_________________
TASK LOCATION:  INSIDE CR:____X____ OUTSIDE CR:_________ BOTH:________
APPROVED FOR ADMINISTRATION TO: RO:____
X___ SRO:___
X ___TASK LOCATION:  INSIDE CR:____
X____ OUTSIDE CR:_________ BOTH:________
SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):
SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):
PLANT SITE:_______________ SIMULATOR:___
PLANT SITE:_______________ SIMULATOR:___PERFORM_______ LAB:__________________
PERFORM_______ LAB:__________________
POSITION EVALUATED:  RO:__________   SRO:___________
POSITION EVALUATED:  RO:__________
SR O:___________
ACTUAL TESTING ENVIRONMENT: SIMULATOR:__________ PLANT SITE:__________ LAB:________
ACTUAL TESTING ENVIRONMENT: SIMULATOR:__________ PLANT SITE:__________ LAB:________
TESTING METHOD: SIMULATE:_________
TESTING METHOD: SIMULATE:_________   PERFORM:___________
PERFORM:___________
APPROXIMATE COMPLETION TIME IN MINUTES:___10   MINUTES______________________________
APPROXIMATE COMPLETION TIME IN MINUTES
REFERENCE(S):__1107.001 REV. 057-02-0______________________________________________
:___10 MINUTES
______________________________
REFERENCE(S):__
1107.001 REV. 057-02-0
______________________________________________
______________________________________________________________________
______________________________________________________________________
EXAMINEE'S NAME:________________________________
EXAMINEE'S NAME:________________________________       SSN ______-_____-____________
SSN ______-_____-____________
EVALUATOR'S NAME:__________________________________________________________________
EVALUATOR'S NAME:__________________________________________________________________
THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:
THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:
SATISFACTORY:________________
SATISFACTORY:________________         UNSATISFACTORY:_________________
UNSATISFACTORY:_________________
PERFORMANCE CHECKLIST COMMENTS:
PERFORMANCE CHECKLIST COMMENTS:
___________________________________________________________________________________
___________________________________________________________________________________
___________________________________________________________________________________
___________________________________________________________________________________
___________________________________________________________________________________
____________ Start Time          ____________ Stop Time      ____________ Total Time


___________________________________________________________________________________
Page 2 of 6 SIGNED ________________________________ DATE: _______________________
____________ Start Time
SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.
____________ Stop Time
____________ Total Time Page 2 of 6 SIGNED ________________________________ DATE: _______________________
SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A


QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.
Page 3 of 6 JPM INITIAL TASK CONDITIONS:
Page 3 of 6 JPM INITIAL TASK CONDITIONS
* Plant Startup in progress.
:* Plant Startup in progress.
* Reactor Power at 20-40% and ready to transfer plant auxiliaries to the Unit Aux Transformer.
* Reactor Power at 20-40% and ready to transfer plant auxiliaries to the Unit Aux Transformer.
* The Unit Auxiliary Transformer is available and all breaker controls are in "Remote."
* The Unit Auxiliary Transformer is available and all breaker controls are in Remote.
INITIATING CUE:
INITIATING CUE:
The SM/CRS directs you to transfer plant auxiliaries from Startup One Transformer to the Unit Auxiliary Transformer per 1107.001 Step
The SM/CRS directs you to transfer plant auxiliaries from Startup One Transformer to the Unit Auxiliary Transformer per 1107.001 Step 8.2 Transferring Buses from SU 1 to Unit Aux.


8.2 Transferring Buses from SU 1 to Unit Aux.
Page 4 of 6 TUOI NUMBER:_ANO-1-JPM-RO-ED008_
Page 4 of 6 TUOI NUMBER:_
ANO-1-JPM-RO-ED008_
THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:
THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:
The examiner shall review the "Briefing Checklist - System Walkthrough" portion of OP 1064.023 Attachment 6 with the examinee.
The examiner shall review the "Briefing Checklist - System Walkthrough" portion of OP 1064.023 Attachment 6 with the examinee.
JPM INITIAL TASK CONDITIONS:
JPM INITIAL TASK CONDITIONS: Plant is at 20-40% power and ready to transfer plant___
Plant is at 20-40% power and ready to transfer plant___
_auxiliaries to the Unit Aux Transformer. The Unit Auxiliary Transformer is avail-__
_auxiliaries to the Unit Aux Transformer. The Unit Auxiliary Transformer is avail-__
_able and all breaker controls in "Remote."_
_able and all breaker controls in Remote._ SEE SETUP BELOW.____________________
SEE SETUP BELOW.____________________
TASK STANDARD: Plant auxiliaries (A1, A2, H1, H2)_are being powered from the Unit___
TASK STANDARD:
_Auxiliary Transformer. This is a faulted JPM, the operator must manually trip one of the power supplies to A1 bus._____________________________
Plant auxiliaries (A1, A2, H1, H2)_are being powered from the Unit___
TASK PERFORMANCE AIDS: Synch-switch handle, 1107.001 Step 8.2_______________________
_Auxiliary Transformer.
This is a faulted JPM, the operator must manually trip one of the power supplies to A1 bus._____________________________
TASK PERFORMANCE AIDS:
Synch-switch handle, 1107.001 Step 8.2_______________________
____________________________________________________________________________________
____________________________________________________________________________________
____________________________________________________________________________________
____________________________________________________________________________________
____________________________________________________________________________________
____________________________________________________________________________________
Simulator setup:
Simulator setup:
The faulted breaker for this JPM will be implemented by use of an override. Prior to providing the initial conditions for this JPM insert the following:
The faulted breaker for this JPM will be implemented by use of an override. Prior to providing the initial conditions for this JPM insert the following:
Override DI 152-112/CS-G01;F
Override DI 152-112/CS-G01;F This will cause the SU1 feeder breaker to bus A1 to fail to open when the Unit Aux feeder handswitch is released after being closed (the override defeats the return-to-normal for breaker A-112, Unit Aux to A1).
 
This will cause the SU1 feeder breaker to bus A1 to fail to open when the Unit Aux feeder handswitch is released after being closed (the override defeats the return-


to-normal for breaker A-112, Unit Aux to A1).
Page 5 of 6 TUOI NUMBER:_ANO-1-JPM-RO-ED008_
Page 5 of 6 TUOI NUMBER:_
ANO-1-JPM-RO-ED008_
INITIATING CUE:
INITIATING CUE:
The SM/CRS directs you to transfer plant auxiliaries from Startup One Transformer to the Unit Auxiliary Transformer per 1107.001 Step 8.2 Transferring Buses from SU 1 to Unit Aux.CRITICAL ELEMENTS (C):_
The SM/CRS directs you to transfer plant auxiliaries from Startup One Transformer to the Unit Auxiliary Transformer per 1107.001 Step 8.2 Transferring Buses from SU 1 to Unit Aux.
1, 3, 4, 6_______
CRITICAL ELEMENTS (C):_1, 3, 4, 6_______
Note: Steps 1 through 7 should be repeated until all buses are shifted.(C)PERFORMANCE CHECKLIST STANDARD N/A SAT UNSAT This is a faulted JPM, the Startup One to A1 breaker will not automatically open after the Unit Aux to A1 breaker is closed, the operator must manually trip one of the feeder breakers to A1.(C)1. On C10, place Synchronize switch to ON for the Unit Aux Feeder Breaker that is
Note: Steps 1 through 7 should be repeated until all buses are shifted.
 
(C)       PERFORMANCE CHECKLIST                 STANDARD             N/A     SAT UNSAT This is a faulted JPM, the Startup One to A1 breaker will not automatically open after the Unit Aux to A1 breaker is closed, the operator must manually trip one of the feeder breakers to A1.
: 1. On C10, place Synchronize    Turned ON Synchronize switch  A1___    A1___ A1___
switch to ON for the Unit   for correct breaker.
(C)    Aux Feeder Breaker that is                                 A2___    A2___ A2___
to be closed.
to be closed.
H1___    H1___ H1___
POSITIVE CUE:
POSITIVE CUE:
Synchronize switch ON.
Synchronize switch ON.                                         H2___    H2___ H2___
Turned ON Synchronize switch for correct breaker.
: 2. Verify synchroscope         Verified synchroscope          A1___    A1___ A1___
A1___A2___
between 11 and 1 oclock. between 11 and 1 oclock position.                     A2___    A2___ A2___
H1___
H1___   H1___ H1___
H2___A1___A2___
H2___   H2___ H2___
H1___
: 3. On C10, close Unit Aux      Closed Unit Aux Feeder        A1___    A1___ A1___
H2___A1___A2___
Feeder breaker. Allow       Breaker and allowed control (C)    control switch to return    switch to return to normal-    A2___    A2___ A2___
H1___
to normal-after-close       after-close position.
H2___2. Verify synchroscope between 11 and 1 o'clock.
position.                                                  H1___    H1___ H1___
Verified synchroscope between 11 and 1 o'clock
POSITIVE CUE:                                                  H2___    H2___ H2___
 
Unit Aux Feeder Breaker closed.
position.A1___A2___
: 4. On C10, turn Synchronize    Turned Synchronize switch      A1___    A1___ A1___
H1___
switch OFF.                  OFF.
H2___A1___A2___
(C)                                                                A2___    A2___ A2___
H1___
H2___A1___A2___
H1___
H2___(C)3. On C10, close Unit Aux Feeder breaker. Allow control switch to return
 
to normal-after-close
 
position.
POSITIVE CUE:
POSITIVE CUE:
Unit Aux Feeder Breaker
Synchronize switch OFF.                                        H1___    H1___ H1___
H2___    H2___ H2___


closed.Closed Unit Aux Feeder Breaker and allowed control
Page 6 of 6 TUOI NUMBER:_ANO-1-JPM-RO-ED008_
 
(C)       PERFORMANCE CHECKLIST             STANDARD               N/A     SAT UNSAT
switch to return to normal-
: 5. On C10, verify that the   Verified that the SU1 Feeder SU1 Feeder Breaker opens. Breaker Opened.
 
A2___    A2___ A2___
after-close position.
A1___A2___
H1___
H2___A1___A2___
H1___
H2___A1___A2___
H1___
H2___(C)4. On C10, turn Synchronize switch OFF.
POSITIVE CUE:
Synchronize switch OFF.
Turned Synchronize switch OFF.A1___A2___
H1___
H2___A1___A2___
H1___
H2___A1___A2___
H1___
H2___
Page 6 of 6 TUOI NUMBER:_
ANO-1-JPM-RO-ED008_(C)PERFORMANCE CHECKLIST STANDARD N/A SAT UNSAT 5. On C10, verify that the SU1 Feeder Breaker opens.
POSITIVE CUE (for A2, H1, H2)
POSITIVE CUE (for A2, H1, H2)
SU1 feeder breaker opened.
SU1 feeder breaker opened.                                   H1___    H1___ H1___
NEGATIVE CUE (for A1):
NEGATIVE CUE (for A1):                                       H2___    H2___ H2___
SU1 breaker did not open, Unit Aux and SU1 feeder
SU1 breaker did not open, Unit Aux and SU1 feeder breakers to A1 are closed.
 
: 6. If the SU1 breaker does   Tripped (to open) the SU1 not immediately open, trip feeder breaker to A1 bus (A-it.                        113). Also acceptable if operator tripped Unit Aux (C)  POSITIVE CUE:                Feeder to A1 instead of the   A1___    A1___ A1___
breakers to A1 are closed.
SU1 to A1 breaker is open. SU1 to A1 breaker, the limit and precaution states: when transferring auxiliaries, high circulating currents may cause bus lockout relay trip if both feeder breakers remain closed.
Verified that the SU1 Feeder Breaker Opened.
: 7. Place the open breakers  Placed the open breakers      A1___    A1___ A1___
A2___H1___
control switch in normal- control switch in the after-open.               normal-after-open position. A2___    A2___ A2___
H2___A2___H1___
H1___   H1___ H1___
H2___A2___H1___
H2___    H2___ H2___
H2___(C)6. If the SU1 breaker does not immediately open, trip it.POSITIVE CUE:
: 8. Verify Startup XFMRS Pref Verified Startup XFMRS Pref Transfer selector switch   Transfer selector switch is    ____    ____  ____
SU1 to A1 breaker is open.
is in the desired         in the desired position (to position.                  SU1).
Tripped (to open) the SU1 feeder breaker to A1 bus (A-
: 9. Verify 4160V buses remain Verified proper voltages on above 3640V and 6900V     A1, A2, H1 and H2.
 
buses remain above 6010V.                                 ____    ____  ____
113). Also acceptable if
 
operator tripped Unit Aux
 
Feeder to A1 instead of the
 
SU1 to A1 breaker, the limit
 
and precaution states: when
 
transferring auxiliaries, high circulating currents
 
may cause bus lockout relay
 
trip if both feeder breakers
 
remain closed.
A1___A1___A1___7. Place the open breaker's control switch in normal-after-open.
Placed the open breaker's control switch in the
 
normal-after-open position.
A1___A2___
H1___
H2___A1___A2___
H1___
H2___A1___A2___
H1___
H2___8. Verify Startup XFMRS Pref  Transfer selector switch is in the desired
 
position.
Verified Startup XFMRS Pref Transfer selector switch is in the desired position (to
 
SU1).____________9. Verify 4160V buses remain above 3640V and 6900V buses remain above 6010V.
POSITIVE CUE:
POSITIVE CUE:
Voltages at 4160V and 6900V.
Voltages at 4160V and 6900V.
Verified proper voltages on A1, A2, H1 and H2.
END
____________END JOB PERFORMANCE MEASURE Page 1 of 5 UNIT:    1      REV #:    8      DATE:
TUOI NUMBER:
ANO-1-JPM-RO-ED010 SYSTEM:  DC Electrical Distribution System TASK:    Place battery charger DO3A in service.                 


JTA: 10635070101 KA VALUE RO:
JOB PERFORMANCE MEASURE Page 1 of 5 UNIT:    1        REV #:    8        DATE:
2.9    SRO:  3.5     KA  
TUOI NUMBER:  ANO-1-JPM-RO-ED010 SYSTEM:  DC Electrical Distribution System TASK:    Place battery charger DO3A in service.
JTA: 10635070101 KA VALUE RO:   2.9    SRO:  3.5         KA  


==REFERENCE:==
==REFERENCE:==
 
063 K1.03 APPROVED FOR ADMINISTRATION TO: RO:     X         SRO:    X TASK LOCATION: INSIDE CR:           OUTSIDE CR:         X   BOTH:
063 K1.03 APPROVED FOR ADMINISTRATION TO: RO:
SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):
X       SRO:    X   TASK LOCATION: INSIDE CR:
PLANT SITE:   Simulate        SIMULATOR:                     LAB:
OUTSIDE CR:
POSITION EVALUATED: RO:           SRO:
X     BOTH:       SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):
ACTUAL TESTING ENVIRONMENT: SIMULATOR:               PLANT SITE:     LAB:
PLANT SITE:
TESTING METHOD: SIMULATE:             PERFORM:
Simulate        SIMULATOR:
APPROXIMATE COMPLETION TIME IN MINUTES:         10 Minutes REFERENCE (S):   OP 1107.004, Rev.011-04-0 EXAMINEE'S NAME:                                       SSN:       -   -
LAB:             POSITION EVALUATED: RO:
EVALUATOR'S NAME:
SRO:       ACTUAL TESTING ENVIRONMENT: SIMULATOR:
PLANT SITE:
LAB:     TESTING METHOD: SIMULATE:
PERFORM:
APPROXIMATE COMPLETION TIME IN MINUTES:
10 Minutes REFERENCE (S):
OP 1107.004, Rev.011-04-0 EXAMINEE'S NAME:
SSN:       -     -     EVALUATOR'S NAME:
THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:
THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:
SATISFACTORY:
SATISFACTORY:                         UNSATISFACTORY:
UNSATISFACTORY:
PERFORMANCE CHECKLIST COMMENTS:
PERFORMANCE CHECKLIST COMMENTS:
Start Time                 Stop Time                     Total Time SIGNED DATE:
Start Time                     Stop Time                 Total Time SIGNED                                                     DATE:
SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.
SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.
JOB PERFORMANCE MEASURE Page 2 of 5 JPM INITIAL TASK CONDITIONS:
JOB PERFORMANCE MEASURE Page 2 of 5 JPM INITIAL TASK CONDITIONS:
* Bus D01 is being supplied by battery charger D03B.
* Bus D01 is being supplied by battery charger D03B.
INITIATING CUE:
INITIATING CUE:
The SM/CRS directs placing battery charger D03A on bus D01 and securing battery charger D03B per 1107.004 Attachment "A" Placing Battery Charger
The SM/CRS directs placing battery charger D03A on bus D01 and securing battery charger D03B per 1107.004 Attachment A Placing Battery Charger D-03A In Service.


D-03A In Service.
JOB PERFORMANCE MEASURE Page 3 of 5 THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:
JOB PERFORMANCE MEASURE Page 3 of 5 THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:
The examiner shall review the "Briefing Checklist - System Walkthrough" portion of 1064.023 Attachment 6 with the examinee.
The examiner shall review the Briefing Checklist - System Walkthrough portion of 1064.023 Attachment 6 with the examinee.
JPM INITIAL TASK CONDITIONS:
JPM INITIAL TASK CONDITIONS: Bus D01 is being supplied by battery charger D03B.
Bus D01 is being supplied by battery charger D03B.
TASK STANDARD: Battery charger D03A supplying power to bus D01.
 
TASK STANDARD:
Battery charger D03A supplying power to bus D01.                
 
___
___
TASK PERFORMANCE AIDS:
TASK PERFORMANCE AIDS: 1107.004, Attachment A "Placing Battery Charger D03A in___
1107.004, Attachment A "Placing Battery Charger D03A in___
Service".                                                                ________
Service".                                                                ________
JUSTIFICATION FOR RO:
JUSTIFICATION FOR RO:
Correct operation of the battery chargers is vital to maintain the DC batteries charged.
Correct operation of the battery chargers is vital to maintain the DC batteries charged.
DC power provides the control power for ES associated equipment.
DC power provides the control power for ES associated equipment.
JOB PERFORMANCE MEASURE Page 4 of 5 INITIATING CUE:
JOB PERFORMANCE MEASURE Page 4 of 5 INITIATING CUE:
The SM/CRS directs placing battery charger D03A on bus D01 and securing battery charger D03B per 1107.004 Attachment "A" Placing Battery Charger D-03A In Service.
The SM/CRS directs placing battery charger D03A on bus D01 and securing battery charger D03B per 1107.004 Attachment A Placing Battery Charger D-03A In Service.
CRITICAL ELEMENTS (C):
CRITICAL ELEMENTS (C): 4, 5, 7, 8, 10, 11, 12 C     PERFORMANCE CHECKLIST       STANDARDS                 N/A       SAT       UNSAT
4, 5, 7, 8, 10, 11, 12 C PERFORMANCE CHECKLIST STANDARDS N/A SAT UNSAT 1.Open or verify open the following breakers on charger
: 1. Open or verify open the following breakers on charger D03A.
A. AC Input Bkr    D03A AC input bkr on open.            charger cabinet        ______    ______    ______
verified open by indicator on switch.
B. DC Output Bkr    D03B DC Output bkr on open.            charger cabinet        ______    _______    ______
verified open by POSITIVE CUE:                indicator on the Both breakers are            switch.
open.
NOTE:
Inform examinee that Breaker B-5145 is closed to prevent trip to & from B51 Switchgear.
: 2. Close or verify close the following breakers A. AC Feed bkr      Bkr 5145 verified in      N/A        N/A        N/A 5145 closed      closed position.
B. Supply from      Opened Bkr D01-41 Battery Charger cabinet door and D01-41          verified Bkr D01-41A    ______    ______      _____
closed.
POSITIVE CUE:
Both breakers are closed.
: 3. Verify manual          D-07 manual disconnect D-13        disconnect D-13        ______    _______    ______
closed.                verified closed.
POSITIVE CUE:
Manual disconnect closed.
NEGATIVE CUE:
Manual disconnect open.
(C)  4. Close charger D03A    D03A AC input bkr AC input bkr.          located on the front of the cabinet placed  ______    ______    ______
POSITIVE CUE:              in a closed position.
Bkr is closed.
(C)  5. Close charger D03A    D03A DC output bkr DC output bkr.        located on the front of the cabinet placed  ______    ______    ______
POSITIVE CUE:              in a closed position.
Bkr is closed.


D03A.A.AC Input Bkr open.D03A AC input bkr on charger cabinet verified open by
JOB PERFORMANCE MEASURE Page 5 of 5 C     PERFORMANCE CHECKLIST         STANDARDS         N/A   SAT     UNSAT 6     Verify automatic load Waited ~ 1 minute and sharing between D-03A observed load on D-and D-03B.           03B dropped and load  ______ ______  ______
 
on D-03A raised and POSITIVE CUE:                became stable.
indicator on switch.
Load indicated on both D-03A and D-03B and stable.
__________________B.DC Output Bkr open.POSITIVE CUE:
(C) 7. Open charger D-03B DC Charger D-03B DC output bkr.          output bkr placed in open position as     ______ ______  ______
Both breakers are open.D03B DC Output bkr on charger cabinet
POSITIVE CUE:                shown by the switch Bkr is open.                indicator.
 
(C) 8. Open charger D-03B AC Charger D-03B input input breaker        bkr placed in open position as shown by ______ ______  ______
verified open by
POSITIVE CUE:              bkr switch indicator.
 
Bkr is open
indicator on the
: 9. Verify charger D-03A Charger verified to maintains proper     be maintaining ~ 130V DC bus voltage.       by reading voltmeter indication.          ______ ______  ______
 
POSITIVE CUE:
switch.___________________NOTE: Inform examinee that Breaker B-5145 is closed to prevent trip to & from B51 Switchgear.
D01 bus voltage at
2.Close or verify close the following breakers A.AC Feed bkr 5145 closed Bkr 5145 verified in closed position.
      ~ 130 VDC.
N/A N/A N/A B.Supply from Battery Charger D01-41 POSITIVE CUE
NEGATIVE CUE:
: Both breakers are closed.
D01 voltage is LOW.
Opened Bkr D01-41 cabinet door and
(C) 10. Reset local alarm    Reset local alarm panel for D-03A.     panel for D-03A by depressing the reset POSITIVE CUE:                button.              ______ ______  ______
 
Alarm panel reset.
verified Bkr D01-41A closed._________________3.Verify manual disconnect D-13 closed. POSITIVE CUE
NEGATIVE CUE:
: Manual disconnect closed.
D01 low voltage alarm will not reset.
NEGATIVE CUE
(C) 11. Place D-03A alarm to Placed the alarm control room toggle   toggle switch for switch ON.           D-03A to the ON       ______ ______  ______
: Manual disconnect open.
position.
D-07 manual disconnect D-13
(C) 12. Place D-03B alarm to Placed the alarm control room toggle   toggle switch for switch OFF.           D-03B to the OFF     ______ ______  ______
 
position.
verified closed.
13    Verify Annunciator    Called the control K01-E7 clear.        room and verified alarm K01-E7 clear. ______ ______  ______
___________________(C)4.Close charger D03A AC input bkr.
POSITIVE CUE:
POSITIVE CUE
K01-E7 cleared.
: Bkr is closed.
NEGATIVE CUE:
D03A AC input bkr located on the front
K01-E7 is in alarm.
 
END
of the cabinet placed
 
in a closed position.
__________________(C)5.Close charger D03A DC output bkr.
POSITIVE CUE
: Bkr is closed.
D03A DC output bkr located on the front of the cabinet placed
 
in a closed position.
__________________
JOB PERFORMANCE MEASURE Page 5 of 5 C PERFORMANCE CHECKLIST STANDARDS N/A SAT UNSAT 6 Verify automatic load sharing between D-03A and D-03B.
POSITIVE CUE
: Load indicated on both D-03A and D-03B and stable.
Waited ~ 1 minute and observed load on D-03B dropped and load on D-03A raised and
 
became stable.
__________________(C)7.Open charger D-03B DC output bkr.
POSITIVE CUE
: Bkr is open.
Charger D-03B DC output bkr placed in
 
open position as
 
shown by the switch
 
indicator.
__________________(C)8.Open charg er D-03B AC input breaker POSITIVE CUE
: Bkr is open Charger D-03B input bkr placed in open
 
position as shown by
 
bkr switch indicator.
__________________9.Verify charger D-03A maintains proper
 
DC bus voltage.
POSITIVE CUE
: D01 bus voltage at
~ 130 VDC.
NEGATIVE CUE
: D01 voltage is LOW.
Charger verified to be maintaining ~ 130V
 
by reading voltmeter
 
indication.
__________________(C)10.Reset local alarm panel for D-03A.
POSITIVE CUE
: Alarm panel reset.
NEGATIVE CUE
: D01 low voltage alarm will not reset.
Reset local alarm panel for D-03A by
 
depressing the reset
 
button.__________________(C)11.Place D-03A alarm to control room toggle
 
switch ON.
Placed the alarm toggle switch for
 
D-03A to the ON
 
position.__________________(C)12.Place D-03B alarm to control room toggle switch OFF.
Placed the alarm toggle switch for D-03B to the OFF


position.__________________13 Verify Annunciator K01-E7 clear.
JOB PERFORMANCE MEASURE Page 1 of 5 UNIT:     1           REV #:     1         DATE:
POSITIVE CUE
TUOI NUMBER:       ANO-1-JPM-RO-AOP28 SYSTEM:   Emergency and Abnormal Operations TASK:   Respond to Lo-Lo Instrument Air Pressure._________________________
: K01-E7 cleared.
JTA   140150101A4 KA VALUE RO:   3.7     SRO:   3.9       KA  
NEGATIVE CUE
: K01-E7 is in alarm.
Called the control room and verified
 
alarm K01-E7 clear.
__________________END JOB PERFORMANCE MEASURE Page 1 of 5 UNIT:   1       REV #:
1       DATE:                   TUOI NUMBER:
ANO-1-JPM-RO-AOP28 SYSTEM: Emergency and Abnormal Operations TASK: Respond to Lo-Lo Instrument Air Pressure._________________________
 
JTA   140150101A4 KA VALUE RO:
3.7     SRO:   3.9     KA  


==REFERENCE:==
==REFERENCE:==
 
065 AK3.08 APPROVED FOR ADMINISTRATION TO:     RO:   X      SRO:    X TASK LOCATION:   INSIDE CR:     X       OUTSIDE CR:           BOTH:
065 AK3.08 APPROVED FOR ADMINISTRATION TO: RO:
SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):
X      SRO:    X   TASK LOCATION: INSIDE CR:
PLANT SITE:                 SIMULATOR:         X        LAB:
X     OUTSIDE CR:
POSITION EVALUATED:   RO:           SRO:
BOTH:       SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):
ACTUAL TESTING ENVIRONMENT:     SIMULATOR:           PLANT SITE:       LAB:
PLANT SITE:
TESTING METHOD:   SIMULATE:               PERFORM:
SIMULATOR:
APPROXIMATE COMPLETION TIME IN MINUTES:       15 minutes REFERENCE(S):   1203.024, Rev. 010-02-0 EXAMINEE'S NAME:                                                       SSN:     -     -
X        LAB:             POSITION EVALUATED: RO:
EVALUATOR'S NAME:
SRO:       ACTUAL TESTING ENVIRONMENT: SIMULATOR:
PLANT SITE:
LAB:     TESTING METHOD: SIMULATE:
PERFORM:
APPROXIMATE COMPLETION TIME IN MINUTES:
15 minutes REFERENCE(S):
1203.024, Rev. 010-02-0                        
 
EXAMINEE'S NAME:  
 
SSN:       -   -     EVALUATOR'S NAME:
THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:
THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:
SATISFACTORY:
SATISFACTORY:                         UNSATISFACTORY:
UNSATISFACTORY:
PERFORMANCE CHECKLIST COMMENTS:
PERFORMANCE CHECKLIST COMMENTS:
Start Time Stop Time  
Start Time                 Stop Time                 Total Time ______________
SIGNED                                              DATE:______________________


Total Time ______________
SIGNED DATE:______________________
JOB PERFORMANCE MEASURE Page 2 of 5 SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.
JOB PERFORMANCE MEASURE Page 2 of 5 SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.
JOB PERFORMANCE MEASURE Page 3 of 5 JPM INITIAL TASK CONDITIONS:
JOB PERFORMANCE MEASURE Page 3 of 5 JPM INITIAL TASK CONDITIONS:
* Instrument Air pressure dropping due to unisolable leak on IA main line.* ICW RB isolation valves inadvertently closed and will not reopen.
* Instrument Air pressure dropping due to unisolable leak on IA main line.
* Plant Shutdown commenced at >10% per minute per Rapid Plant Shutdown 1203.045.* PZR Level 290" and trending up.
* ICW RB isolation valves inadvertently closed and will not reopen.
* Plant Shutdown commenced at >10% per minute per Rapid Plant Shutdown 1203.045.
* PZR Level 290 and trending up.
INITATING CUE:
INITATING CUE:
The SM/CRS directs you to perform 1203.024 Section 2 Lo-Lo Instrument Air Pressure step 3.6 through step 3.6.6.
The SM/CRS directs you to perform 1203.024 Section 2 Lo-Lo Instrument Air Pressure step 3.6 through step 3.6.6.
JOB PERFORMANCE MEASURE Page 4 of 5 THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:
JOB PERFORMANCE MEASURE Page 4 of 5 THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:
The examiner shall review the "Briefing Checklist - System Walkthrough" portion of 1064.023 Attachment 6 with the examinee.
The examiner shall review the Briefing Checklist - System Walkthrough portion of 1064.023 Attachment 6 with the examinee.
JPM INITIAL TASK CONDITIONS
JPM INITIAL TASK CONDITIONS:  Instrument Air pressure dropping due to unisolable leak on IA main line. ICW RB isolation valves inadvertently closed and will not reopen. Plant_
:  Instrument Air pressure dropping due to unisolable leak on IA main line. ICW RB isolation valves inadvertently closed and will not reopen. Plant_
Shutdown commenced at >10% per minute per Rapid Plant Shutdown 1203.045. PZR Level 290 and trending up.          _____________________________________________________________
Shutdown commenced at >10% per minute per Rapid Plant Shutdown 1203.045. PZR Level 290" and trending up.          _____________________________________________________________
TASK STANDARD: Rx Tripped, EFW in service, Seal Injection isolated, and RCPs secured with normal and alternate seal bleedoff flowpaths isolated.__________
TASK STANDARD:
TASK PERFORMANCE AIDS:   1203.024 Section 2.__________
Rx Tripped, EFW in service, Seal Injection isolated, and RCP's secured with normal and alternate seal bleedoff flowpaths isolated.__________
________________________________________________________________________
TASK PERFORMANCE AIDS:
 
1203.024 Section 2.__________
__________________________________________
______________________________
JOB PERFORMANCE MEASURE Page 5 of 5 INITIATING CUE:
JOB PERFORMANCE MEASURE Page 5 of 5 INITIATING CUE:
The SM/CRS directs you to perform 1203.024 Section 2 Lo-Lo Instrument Air Pressure step 3.6 through step 3.6.6.
The SM/CRS directs you to perform 1203.024 Section 2 Lo-Lo Instrument Air Pressure step 3.6 through step 3.6.6.
CRITICAL ELEMENTS (C):
CRITICAL ELEMENTS (C): 1, 3, 4, 5, 6, 7 (C)   PERFORMANCE CHECKLIST         STANDARDS               N/A   SAT       UNSAT
1, 3, 4, 5, 6, 7 (C)PERFORMANCE CHECKLIST STANDARDS N/A SAT UNSAT (C)1. Perform Reactor Trip Immediate Action.
: 1. Perform Reactor Trip Immediate Action.
* Depress Rx Trip pushbutton.
(C)
On C03, depressed the Rx Trip pushbutton.
* Depress Rx Trip       On C03, depressed the pushbutton.          Rx Trip pushbutton. ______ ______    ______
__________________2.Verify All rods inserted and power
: 2. Verify All rods         On C13, observed all inserted and power      rod bottom lights have dropping.              come on. On C03 observed power         ______ ______    ______
 
dropping.
dropping.On C13, observed all rod bottom lights have
(C)   3. Actuate EFW for both   On C09, All 4 EFW push OTSGs.                buttons pushed on EFIC remote matrix.         ______ ______    ______
 
(C)   4. Isolate Seal           On C04, placed HS-1206 Injection.              in close position. ______ ______    ______
come on. On C03
(C)   5. Trip All running       On C13 tripped All RCPs.                  running RCPs.
 
P-32A/P-32B/P-32C/P-   ______ ______    ______
observed power
32D.
 
(C)   6. Isolate Alternate Seal On C13, placed SV-1270 Bleedoff flowpath to    thru SV-1273 the Quench Tank.        handswitch in close   ______ ______    ______
dropping.__________________(C)3.Actuate EFW for both OTSG's.On C09, All 4 EFW push buttons pushed on EFIC
position.
 
(C)   7. Isolate Normal Seal     On C16, close CV-1274 Bleedoff flowpath.      or on C18 close       ______ ______    ______
remote matrix.
__________________(C)4.Isolate Seal Injection.
On C04, placed HS-1206 in close position.
__________________(C)5.Trip All running RCP's.On C13 tripped All running RCP's.
 
P-32A/P-32B/P-32C/P-
 
32D.__________________(C)6.Isolate Alternate Seal Bleedoff flowpath to
 
the Quench Tank.
On C13, placed SV-1270 thru SV-1273
 
handswitch in close
 
position.__________________(C)7. Isolate Normal Seal Bleedoff flowpath.
On C16, close CV-1274 or on C18 close
 
CV-1270 thru CV-1273.
CV-1270 thru CV-1273.
__________________END}}
END}}

Revision as of 05:57, 24 November 2019

ANO-Init Exam-2-2001-Final Operating Exam
ML010720210
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 02/15/2001
From:
NRC Region 4
To:
References
-RFPFR
Download: ML010720210 (109)


Text

JOB PERFORMANCE MEASURE Page 1 of 6 UNIT: 1 REV #: 8 DATE:

TUOI NUMBER: ANO-1-JPM-RO-EFW01 SYSTEM: Emergency Feedwater and EFIC TASK: Reset the Steam Driven Emergency Feedwater pump after an overspeed trip.

JTA: (10615100401)

KA VALUE RO: 3.4 SRO: 3.8 KA

REFERENCE:

061 A2.04 APPROVED FOR ADMINISTRATION TO: RO: X SRO: X TASK LOCATION: INSIDE CR: OUTSIDE CR: X BOTH:

SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):

PLANT SITE: Perform/Simulate SIMULATOR: LAB:

POSITION EVALUATED: RO: SRO:

ACTUAL TESTING ENVIRONMENT: SIMULATOR: PLANT SITE: LAB:

TESTING METHOD: SIMULATE: PERFORM:

APPROXIMATE COMPLETION TIME IN MINUTES: 10 Minutes REFERENCE(S): 1106.006 Rev. 060-00-0 EXAMINEE'S NAME: SSN: - -

EVALUATOR'S NAME:

THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:

SATISFACTORY: UNSATISFACTORY:

PERFORMANCE CHECKLIST COMMENTS:

Start Time Stop Time Total Time SIGNED DATE:

JOB PERFORMANCE MEASURE Page 2 of 6 SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.

JOB PERFORMANCE MEASURE Page 3 of 6 JPM INITIAL TASK CONDITIONS:

P7A tripped on overspeed during an EFIC actuation.

INITIATING CUE:

The SM/CRS directs you to manually reset P7A turbine per 1106.006 Exhibit A.

JOB PERFORMANCE MEASURE Page 4 of 6 THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:

The examiner shall review the Briefing Checklist - System Walkthrough portion of 1064.023 Attachment 6 with the examinee.

JPM INITIAL TASK CONDITIONS: P7A tripped on overspeed during an EFIC actuation.

TASK STANDARD: P7A turbine has been reset.

TASK PERFORMANCE AIDS: 1106.006, Exhibit A or section 12.0

_____________________________________________________________________________________

JOB PERFORMANCE MEASURE Page 5 of 6 INITIATING CUE:

The SM/CRS directs you to manually reset P7A turbine per 1106.006 Exhibit A.

CRITICAL ELEMENTS (C): _2, 3, 8 _

PERFORMANCE CHECKLIST STANDARDS N/A SAT UNSAT

1. Verify steam supply Called control room to valves(SV-2613, SV- verify SV-2613, SV-2663 AND CV-2613, 2663, CV-2613, CV-2663 ______ _______ ______

CV-2663) closed. are closed.

POSITIVE CUE:

Control Room confirms SV-2613, SV-2663, CV-2613 and CV-2663 are closed.

(C) 2. Position the Turned K3 Trip/

trip/throttle valve Throttle valve to allow reset. handwheel clockwise _______ _______ _______

until sliding nut is POSITIVE CUE: in a position to allow The latch lever will engagement with trip engage the trip hook. hook (C) 3. Pull spring-loaded Pulled connecting rod connecting rod to move head lever against spring away from tappet and _______ _______ _______

force to move head tappet nut.

lever away from tappet and tappet nut.

POSITIVE CUE:

Head lever is away from tappet/tappet nut.

4. Lift and release Lifted and released tappet assembly. tappet assembly. _______ _______ ______

POSITIVE CUE:

Tappet lifted and released.

5. Verify tappet nut Verified tapped nut locates in the located in the trip-trip-reset position reset position on the _______ _______ _____

on head bracket. head bracket.

POSITIVE CUE:

Tappet nut located in the trip-reset position.

JOB PERFORMANCE MEASURE Page 6 of 6 PERFORMANCE CHECKLIST STANDARDS N/A SAT UNSAT

6. Verify tappet nut Observed Tappet nut to in the proper verify flat side position. aligned with long axis _______ _______ ______

of pump (parallel to POSITIVE CUE: shaft).

Flat sides aligned.

7. Verify spring Verified spring tension holds tension holding spring-loaded connecting rod in _______ _______ ______

connecting rod in position (holding head position. lever against tappet nut.

POSITIVE CUE:

Spring tension is holding connecting rod in position.

(C) 8. Fully open the Turned the trip/throttle valve trip/throttle handwheel until valve _______ _______ _______

POSITIVE CUE: CV-6601A is fully Handwheel in full open open.

position.

NEGATIVE CUE:

Handwheel will not open the trip/throttle valve.

9. Close trip Rotated CV6601A throttle/valve handwheel 3/4 turn in (CV6601A) handwheel close direction. _______ ________ _______

3/4 turn in close direction.

POSITIVE CUE:

Handwheel 3/4 turn from open.

10. Verify P7A trip Verified K12-B5 clear alarm clear. by calling control ______ _______ ______

room.

POSITIVE CUE:

K12-B5 is clear.

NEGATIVE CUE:

K12-B5 is in Alarm.

11. Notify Control Room Notified CR.

P-7A is ready for (May have been _______ _______ ______

restart. performed in the previous step)

END

JOB PERFORMANCE MEASURE Page 1 of 5 UNIT: 1 REV #: 1 DATE:

TUOI NUMBER: ANO-1-JPM-RO-MUP05 SYSTEM: Makeup and Purification System TASK: Restoring Seal Injection Flow JTA: 13035030601 KA VALUE RO: 3.3 SRO: 3.2 KA

REFERENCE:

003 A4.01 APPROVED FOR ADMINISTRATION TO: RO: X SRO: X TASK LOCATION: INSIDE CR: OUTSIDE CR: X BOTH:

SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):

PLANT SITE: Simulate SIMULATOR: LAB:

POSITION EVALUATED: RO: SRO:

ACTUAL TESTING ENVIRONMENT: SIMULATOR: PLANT SITE: LAB:

TESTING METHOD: SIMULATE: PERFORM:

APPROXIMATE COMPLETION TIME IN MINUTES: 10 minutes REFERENCE(S): 1202.007 Rev. 005-01-0 EXAMINEE'S NAME: SSN: - -

EVALUATOR'S NAME:

THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:

SATISFACTORY: UNSATISFACTORY:

PERFORMANCE CHECKLIST COMMENTS:

Start Time Stop Time Total Time SIGNED DATE:

JOB PERFORMANCE MEASURE Page 2 of 5 SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.

JOB PERFORMANCE MEASURE Page 3 of 5 JPM INITIAL TASK CONDITIONS:

  • Plant has been in a Degraded Power condition for ~5 minutes.
  • Examinee is extra Control Room Operator.
  • EOP 1202.007 completed through step 12.

INITIATING CUE:

The Control Room Supervisor dispatches you to restore total Seal Injection flow to 8 to 12 GPM per 1202.007 step 13.

JOB PERFORMANCE MEASURE Page 4 of 5 THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:

The examiner shall review the Briefing Checklist - System Walkthrough portion of 1064.023 Attachment 6 with the examinee.

JPM INITIAL TASK CONDITIONS: Plant has been in a Degraded Power condition for

~5 minutes. Examinee is extra Control Room Operator. EOP 1202.007 completed through step 12.

TASK STANDARD: Seal Injection Flow of 8 to 12 GPM established.

TASK PERFORMANCE AIDS: Hand held radio (actual performance only)

Copy of 1202.007 Degraded Power (applicable steps)

JOB PERFORMANCE MEASURE Page 5 of 5 INITIATING CUE:

The Control Room Supervisor dispatches you to restore total Seal Injection flow to 8 to 12 GPM per 1202.007 step 13.

CRITICAL ELEMENTS (C): 1, 2, 3 (C) PERFORMANCE CHECKLIST STANDARDS N/A SAT UNSAT (C) 1. Close MU-1207-1. Turned valve handwheel in the clockwise POSITIVE CUE: direction until MU-MU-1207-1 will not turn any 1207-1 was closed.

further in the clockwise direction.

(C) 2. Contact Control Room Control Room was by Telephone or Radio. Contacted by Telephone or Radio POSITIVE CUE:

The Control Room directs that MU-1207-3 be opened 1 full turn.

(C) 3. Operator opens MU- Turned handwheel for 1207-3 one turn. MU-1207-3 counter-POSITIVE CUE: clockwise one turn.

Control Room reports total Seal Injection flow is 10 GPM.

NEGATIVE CUE:

Control Room reports total Seal Injection flow is zero.

END

Page 1 of 8 JOB PERFORMANCE MEASURE UNIT: ______1_______ REV # _____0_________ DATE: ______________________________

TUOI NUMBER:_ANO-1-JPM-RO-MFW03_____________

SYSTEM/DUTY AREA:_Main Feedwater System _________________________________

TASK:_Shutdown of last MFWP and place Auxiliary Feedwater Pump in Service.__________

JTA#:__100__________________________

KA VALUE RO:__2.9_____ SRO:__2.9_____ KA

REFERENCE:

__059 A4.04 __________________

APPROVED FOR ADMINISTRATION TO: RO:____X___ SRO:___X_____

TASK LOCATION: INSIDE CR:____X____ OUTSIDE CR:_________ BOTH:________

SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):

PLANT SITE:_______________ SIMULATOR:___PERFORM_______ LAB:__________________

POSITION EVALUATED: RO:__________ SRO:___________

ACTUAL TESTING ENVIRONMENT: SIMULATOR:__________ PLANT SITE:__________ LAB:________

TESTING METHOD: SIMULATE:_________ PERFORM:___________

APPROXIMATE COMPLETION TIME IN MINUTES:__10 MINUTES________________________________

REFERENCE(S):___1106.016 REV. 039-00-0 ______________________________

______________________________________________________________________

EXAMINEE'S NAME:________________________________ SSN ______-_____-____________

EVALUATOR'S NAME:__________________________________________________________________

THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:

SATISFACTORY:________________ UNSATISFACTORY:_________________

PERFORMANCE CHECKLIST COMMENTS:

___________________________________________________________________________________

___________________________________________________________________________________

___________________________________________________________________________________

____________ Start Time ____________ Stop Time ____________ Total Time

Page 2 of 8 SIGNED ________________________________ DATE: _______________________

SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.

Page 3 of 8 JPM INITIAL TASK CONDITIONS:

  • Plant Shutdown in progress.
  • Reactor Power ~1%.
  • A Main Feed Pump (P-1A) in service providing flow to both OTSGs.
  • No planned maintenance activities.

INITIATING CUE:

The SM/CRS directs you to start P-75 Auxiliary Feedwater Pump and shutdown P-1A A Main Feedwater Pump per 1106.016 Section 21 Shutting Down Last MFWP and Placing Aux Feedwater Pump (P-75) into Service.

Page 4 of 8 TUOI NUMBER:_ANO-1-JPM-RO-MFW03______

THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:

The examiner shall review the "Briefing Checklist - System Walkthrough" portion of OP 1064.023 Attachment 6 with the examinee.

JPM INITIAL TASK CONDITIONS: Plant shutdown in progress. Reactor Power ~1%._______

A Main Feed Pump (P-1A) in service providing flow to both OTSGs._________________

No planned maintenance activities. __________________________________

TASK STANDARD: A Main Feedwater pump is shutdown and the Auxiliary Feedwater Pump_

___is supplying feedwater to the OTSGs. __________________________________________

____________________________________________________________________________________

____________________________________________________________________________________

____________________________________________________________________________________

TASK PERFORMANCE AIDS:__1106.016 Section 21.0 ____________________________________

____________________________________________________________________________________

____________________________________________________________________________________

____________________________________________________________________________________

Page 5 of 8 TUOI NUMBER:_ANO-1-JPM-RO-MFW03______

INITIATING CUE:

The SM/CRS directs you to start P-75 Auxiliary Feedwater Pump and shutdown P-1A A Main Feedwater Pump per 1106.016 Section 21 Shutting Down Last MFWP and Placing Aux Feedwater Pump (P-75) into Service.

CRITICAL ELEMENTS (C): 1, 2, 3, 7, 9 (C) PERFORMANCE CHECKLIST STANDARD N/A SAT UNSAT

1. Verify TRIP ON LOSS OF Verified K08-F4 TRIP ON LOSS (C) MFP BYPASSED (KO8-F4) OF MFP BYPASSED alarm in alarm. solid or fast flashing.

_____ _____ _____

POSITIVE CUE:

TRIP ON LOSS OF MFP BYPASSED is in alarm.

2 Verify Aux FW Pump Recirc Called and requested the to E-11A (FW-1) open. auxiliary operator to verify (C) the Aux FW Pump Recirc to E-POSITIVE CUE: 11A (FW-1) open. _____ _____ _____

The auxiliary operator reports that the Aux FW Pump Recirc is open.

(C) 3. Start the Aux Feedwater Placed the control switch, Pump (P-75). located on C-11, to the start position.

POSITIVE CUE: _____ _____ _____

P-75 breaker red light is on, green light is off

4. Verify MFW Pump H/A Verified A MFW Pump H/A station in Hand. station in Hand by verifying white manual light on.

POSITIVE CUE: _____ _____ _____

Manual white light ON.

5. Open FW Pump Recirc Contacted the Auxiliary Condenser Sprays (CV-2856 Operator and directed the and CV-2857). Auxiliary Operator to open CV-2856 and CV-2857. _____ _____ _____

POSITIVE CUE:

Auxiliary Operator reports that CV-2856 and CV-2857 open.

6. Slowly decelerate A Decelerated A MFWP using MFWP while monitoring toggle switch on A MFW Pump feed valve P. H/A station.

_____ _____ _____

POSITIVE CUE:

A MFWP speed is going down.

Page 6 of 8 Page 7 of 8 TUOI NUMBER:_ANO-1-JPM-RO-MFW03______

(C) PERFORMANCE CHECKLIST STANDARD N/A SAT UNSAT (C) 7. Verify P-75 maintains 70 Selected Measured Variable psid. on MFW Pump H/A stations and monitored feed valve P. _____ _____ _____

POSIITIVE CUE:

A feed valve P is 80 psid, B feed valve P is 75 psid.

8. Verify Startup Valves Monitored A and B (CV2623 and CV-2673) Startup level indicators and maintain low level limits verified level maintained at _____ _____ _____

on both SGs. ~31 inches.

POSITIVE CUE:

A and B Startup levels are at 31 inches.

(C) 9. Trip A MFWP. Placed A MFWP Trip/Reset switch in the trip position.

POSITIVE CUE: _____ _____ _____

Green pump tripped light on, red latched light out

10. Close MFWP P-1A Feedpump Placed MFWP P-1A Feedpump Recirc (CV2874). Recirc Controller in manual and lowered demand to zero. _____ _____ _____

POSITIVE CUE:

MFWP P-1A Feedpump Recirc valve is closed.

11 Close FW Pump Recirc Contacted the Auxiliary Condenser Sprays (CV-2856 Operator and directed the and CV-2857). Auxiliary Operator to close _____ _____ _____

CV-2856 and CV-2857.

POSITIVE CUE:

Auxiliary Operator reports that CV-2856 and CV-2857 closed.

12 When pump coasts down When pump coasted down, verify turning gear observed red and amber engages. lights for turning gear on to verify turning gear _____ _____ _____

POSITIVE CUE: engaged.

Turning gear amber and red lights are on.

13 Open A MFWP steam Directed the Auxiliary leakoff and Seat drain Operator to open MS-85, RS-valves: 92, and RS-93.

MS-85 _____ _____ _____

RS-92 RS-93 POSITIVE CUE:

Auxiliary Operator reports MS-85, RS-92, and RS-93 are open.

Page 8 of 8 END

Page 1 of 6 JOB PERFORMANCE MEASURE UNIT: ______1_______ REV # ______3_______ DATE: ______________________________

TUOI NUMBER:_ANO-1-JPM-RO-HYD01_____________

SYSTEM/DUTY AREA:_HYDROGEN RECOMBINER AND PURGE CONTROL SYSTEM_____________________

TASK:_PLACE HYDROGEN RECOMBINER M55A IN OPERATION__________________________________

JTA#:_10285120101___________________________

KA VALUE RO:__4.0_____ SRO:__4.0_____ KA

REFERENCE:

__028 A4.01_________________

APPROVED FOR ADMINISTRATION TO: RO:____X___ SRO:___X_____

TASK LOCATION: INSIDE CR:____X____ OUTSIDE CR:_________ BOTH:________

SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):

PLANT SITE:_______________ SIMULATOR:___PERFORM_______ LAB:__________________

POSITION EVALUATED: RO:__________ SRO:___________

ACTUAL TESTING ENVIRONMENT: SIMULATOR:__________ PLANT SITE:__________ LAB:________

TESTING METHOD: SIMULATE:_________ PERFORM:___________

APPROXIMATE COMPLETION TIME IN MINUTES:__15 MINUTES________________________________

REFERENCE(S):__1104.031 REV. 012-01-0 _____________________________________________

______________________________________________________________________

EXAMINEE'S NAME:________________________________ SSN ______-_____-____________

EVALUATOR'S NAME:__________________________________________________________________

THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:

SATISFACTORY:________________ UNSATISFACTORY:_________________

PERFORMANCE CHECKLIST COMMENTS:

___________________________________________________________________________________

___________________________________________________________________________________

___________________________________________________________________________________

____________ Start Time ____________ Stop Time ____________ Total Time

Page 2 of 6 SIGNED ________________________________ DATE: _______________________

SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.

Page 3 of 6 JPM INITIAL TASK CONDITIONS:

  • A Loss of Coolant Accident (LOCA) has occurred.
  • Containment hydrogen concentration is 2.0%.
  • Containment pressure is 20.4 psia.
  • Pre-LOCA containment temperature was 120°F.

INITIATING CUE:

The SM/CRS directs you to place both Hydrogen Recombiners (M55A/B) in standby and then place M55A in operation at the power required for containment pressure and pre-loca containment temperature per 1104.031 Section 8.0 Placing Hydrogen Recombiner (M55A or M55B) in Operation.

Page 4 of 6 TUOI NUMBER:_ANO-1-JPM-RO-HYD01______

THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:

The examiner shall review the "Briefing Checklist - System Walkthrough" portion of OP 1064.023 Attachment 6 with the examinee.

JPM INITIAL TASK CONDITIONS: A Loss of Coolant Accident (LOCA) has occurred.________

Containment hydrogen Concentration is 2.0%. Both hydrogen recombiners are shutdown.

Containment pressure is 20.4 psia. Pre-LOCA containment temperature was 120°F.____

TASK STANDARD: Hydrogen recombiner M55A in operation at power setting of 52.5 KW to 54 KW on JI-1000. ________________________________________________________

____________________________________________________________________________________

____________________________________________________________________________________

____________________________________________________________________________________

TASK PERFORMANCE AIDS:___1104.031_Section 8.0______________________________________

____________________________________________________________________________________

____________________________________________________________________________________

____________________________________________________________________________________

Page 5 of 6 TUOI NUMBER:_ANO-1-JPM-RO-HYD01_

INITIATING CUE:

The SM/CRS directs you to place both Hydrogen Recombiners (M55A/B) in standby and then place M55A in operation at the power required for containment pressure and pre-loca containment temperature per 1104.031 Section 8.0 Placing Hydrogen Recombiner (M55A or M55B) in Operation.

CRITICAL ELEMENTS (C):_2, 9, 10_

(C) PERFORMANCE CHECKLIST STANDARD N/A SAT UNSAT

1. Verify power adjust Verified power adjust potentiometers are set at potentiometers set to zero zero. on C26 (if not already at zero used knurled knob on ____ ____ ____

POSITIVE CUE: power adjust potentiometers Power adjust potentiometers on C26 and turned to the for M55A/B are set at zero on left and set at zero using C26. HS-7472 and HS-7473).

2. Turn hydrogen recombiners Turned on hydrogen M55A and M55B on. recombiners M55A and M55B (C) using HS-7470 and HS-7471 on POSITIVE CUE: C26. ____ ____ ____

M55A/B red lights ON.

NEGATIVE CUE:

M55A/B green lights ON.

3. Select thermocouple #1, 2 Thermocouple #1, 2 or 3 or 3 to input to selected to input to TI-2300 recombiner temperature and TI-2301 using indicators TI-2300 and handswitches HS-7474 and HS- ____ ____ ____

TI-2301. 7475 on C26.

POSITIVE CUE: thermocouple

  1. 1, 2 or 3 selected as desired to input to TI-2300 and TI-2301.
4. Increase power to ~5 KW Slowly adjusted and then hold for ten potentiometers clockwise minutes. until power on JI-1000 and JI-1001 on C26 indicated ~5 ____ ____ ____

POSITIVE CUE: KW.

Power on JI-1000 and JI-1001 indicates 5KW.

NOTE: evaluator inform examinee that ten minutes have elapsed after one minute at 5 KW.

Page 6 of 6 TUOI NUMBER:_ANO-1-JPM-RO-HYD01______

(C) PERFORMANCE CHECKLIST STANDARD N/A SAT UNSAT

5. Slowly increase power to Increased power to ~10 KW 10 KW. using power adjust potentiometers on C26.

POSITIVE CUE:

Power is at 10 KW on JI-1000 ____ ____ ____

and JI-1001.

7. Hold power at 10 KW for Waited 10 minutes with power 10 minutes. constant at 10 KW.

POSITIVE CUE:

Inform examinee that ten minutes have elapsed after one minute at 10 KW.

NOTE:

Evaluator inform examinee to disregard taking data every 30 minutes on Attachment D.

8. Slowly increase power to Increased power on M55A to 20 KW on M55A and hold ~20 KW using power adjust for 5 minutes. potentiometer on C26.

POSITIVE CUE: ____ ____ ____

Power at 20 KW on JI-1000.

NOTE: inform examinee that five minutes have elapsed after 1 minute at 20 KW.

9. Determine power required Determined recombiner power (C) from Attachment B based using Attachment B to be on containment pressure. between 52.5 and 54.0 KW. ____ ____ ____
10. Slowly increase power to Power increased to 52.5 to 52.5 - 54.0 KW range. 54 range using power adjust potentiometer on C26.

POSITIVE CUE:

(C) Hydrogen concentration ____ ____ ____

decreasing on QI-7457 and M55A maintaining power at determined value.

NEGATIVE CUE:

Hydrogen concentration increasing on QI-7457.

END

Page 1 of 7 JOB PERFORMANCE MEASURE UNIT: ______1_______ REV # ______1________ DATE: ______________________________

TUOI NUMBER:_ANO-1-JPM-RO-PZR02_____________

SYSTEM/DUTY AREA:_PRESSURIZER SYSTEM_______________________________________________

TASK:_EQUALIZE BORON CONCENTRATIONS BETWEEN RCS AND PRESSURIZER____________________

JTA#:__10105150101__________________________

KA VALUE RO:___3.6____ SRO:___3.4____ KA

REFERENCE:

__010 A4.02_________________

APPROVED FOR ADMINISTRATION TO: RO:____X___ SRO:___ X ___

TASK LOCATION: INSIDE CR:____X____ OUTSIDE CR:_________ BOTH:________

SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):

PLANT SITE:_______________ SIMULATOR:___PERFORM_______ LAB:__________________

POSITION EVALUATED: RO:__________ SRO:___________

ACTUAL TESTING ENVIRONMENT: SIMULATOR:__________ PLANT SITE:__________ LAB:________

TESTING METHOD: SIMULATE:_________ PERFORM:___________

APPROXIMATE COMPLETION TIME IN MINUTES:___ 10 MINUTES______________________________

REFERENCE(S):__1103.005 REV 029-03-0_______________________________________________

__1203.015 REV 010-01-0_______________________________________________

EXAMINEE'S NAME:________________________________ SSN ______-_____-____________

EVALUATOR'S NAME:__________________________________________________________________

THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:

SATISFACTORY:________________ UNSATISFACTORY:_________________

PERFORMANCE CHECKLIST COMMENTS:

___________________________________________________________________________________

___________________________________________________________________________________

___________________________________________________________________________________

____________ Start Time ____________ Stop Time ____________ Total Time

Page 2 of 7 SIGNED ________________________________ DATE: _______________________

SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.

Page 3 of 7 JPM INITIAL TASK CONDITIONS:

  • The plant is at 100% power, steady state conditions.
  • Chemistry reports Pressurizer Boron sample 70 ppm higher than RCS Boron.

INITIATING CUE:

The SM/CRS directs you to equalize pressurizer and RCS boron concentrations per 1103.005 Method 1 - Spray and heaters in manual.

Page 4 of 7 TUOI NUMBER:_ANO-1-JPM-RO-PZR02_

THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:

The examiner shall review the "Briefing Checklist - System Walkthrough" portion of OP 1064.023 Attachment 6 with the examinee.

JPM INITIAL TASK CONDITIONS: The plant is at 100% power, steady state conditions.___

_Chemistry reports a Pressurizer Boron sample 70 ppm higher than RCS Boron._________

_State to examinee: You are responsible for panel C04 and related alarms.___________

TASK STANDARD: Note: this is an Alternate Success Path JPM. Pressurizer boron__

equalization started, then must close CV-1009 (Pressurizer Spray Isolation Valve) due to CV-1008 failure. ___________________________________________________

____________________________________________________________________________________

____________________________________________________________________________________

TASK PERFORMANCE AIDS:_1103.005 Section 8.0 and 1203.015 Section 6__________________

____________________________________________________________________________________

____________________________________________________________________________________

____________________________________________________________________________________

Instructor Note:

Close RCRC4 Pressurizer spray minimum flow prior to start of JPM.

Note: This JPM is an Alternate Success Path JPM intended to be performed on the simulator, not simulated. Therefore, no cues are provided.

Note to IA Operator and Examiner:

When CV-1008 is cracked open, insert Component Malfunction to fail Pressurizer Spray Valve CV-1008 full open.

Page 5 of 7 TUOI NUMBER:_ANO-1-JPM-RO-PZR02_

INITIATING CUE:

The SM/CRS directs you to equalize pressurizer and RCS boron concentrations per 1103.005 Method 1 - Spray and heaters in manual.

CRITICAL ELEMENTS (C):_1, 2, 6_

(C) PERFORMANCE CHECKLIST STANDARD N/A SAT UNSAT (C) 1. Place Pressurizer Spray Placed HS-1003 in Manual Valve (CV-1008) in manual position. ____ ____ ____

(HAND).

POSITIVE CUE:

CV-1008 is in hand.

(C) 2. Partially open Pressurizer Placed CV-1008 in throttled Spray Valve (CV-1008) as open position. ____ ____ ____

required.

POSITIVE CUE:

CV-1008 is throttled open.

3. Place some (as per Placed some PZR heaters in 1103.005) of the PZR manual (SAT if examinee ____ ____ ____

heaters in manual. places any of the heaters in manual).

POSITIVE CUE:

Pzr heater banks are in manual IA Operator: Fail CV-1008 100% open (wait until steps 1-3 above have been done.

4. Monitor RCS pressure Monitored RCS pressure, closely. noticed RCS pressure ____ ____ ____

dropping and/or Pressurizer ALTERNATE PATH CUE: Spray Valve CV-1008 full RCS pressure is dropping and open.

CV-1008 is full open.

5. Attempt to close CV-1008 Attempted to close by taking Pressurizer Pressurizer Spray Valve CV- ____ ____ ____

Control switch to HAND and 1008.

taking CV-1008 handswitch to close.

POSITIVE CUE:

CV-1008 will not close (red light on).

(C) 6. Close Pressurizer Spray Closed Pressurizer Spray Isolation Valve CV-1009. Isolation Valve CV-1009. ____ ____ ____

POSITIVE CUE:

CV-1009 is closed (green light indication on).

NEGATIVE CUE:

Page 6 of 7 RCS pressure is 2000 psig and going down.

Page 7 of 7 TUOI NUMBER:_ANO-1-JPM-RO-PZR02_

(C) PERFORMANCE CHECKLIST STANDARD N/A SAT UNSAT

7. Return pressurizer heaters Returned pressurizer heaters to auto. to automatic. ____ ____ ____

POSITIVE CUE:

Pressurizer heaters are in automatic.

END

Page 1 of 6 JOB PERFORMANCE MEASURE UNIT: ______1_______ REV # ______1________ DATE: ______________________________

TUOI NUMBER:_ANO-1-JPM-RO-RCP04______________

SYSTEM/DUTY AREA:_REACTOR COOLANT PUMP SYSTEM______________________________________

TASK:__SHUTDOWN RCP P-32A AT POWER_________________________________________________

JTA#:__10035260101__________________________

KA VALUE RO:__3.7_____ SRO:_3.9______ KA

REFERENCE:

___003 A2.02________________

APPROVED FOR ADMINISTRATION TO: RO:____X___ SRO:___X_____

TASK LOCATION: INSIDE CR:____X____ OUTSIDE CR:_________ BOTH:________

SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):

PLANT SITE:_______________ SIMULATOR:___PERFORM_______ LAB:__________________

POSITION EVALUATED: RO:__________ SRO:___________

ACTUAL TESTING ENVIRONMENT: SIMULATOR:__________ PLANT SITE:__________ LAB:________

TESTING METHOD: SIMULATE:_________ PERFORM:___________

APPROXIMATE COMPLETION TIME IN MINUTES:___5 MINUTES________________________________

REFERENCE(S):__1103.006 REV. 023-02-0______________________________________________

______________________________________________________________________

EXAMINEE'S NAME:________________________________ SSN ______-_____-____________

EVALUATOR'S NAME:__________________________________________________________________

THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:

SATISFACTORY:________________ UNSATISFACTORY:_________________

PERFORMANCE CHECKLIST COMMENTS:

___________________________________________________________________________________

___________________________________________________________________________________

___________________________________________________________________________________

____________ Start Time ____________ Stop Time ____________ Total Time

Page 2 of 6 SIGNED ________________________________ DATE: _______________________

SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.

Page 3 of 6 JPM INITIAL TASK CONDITIONS:

  • Reactor power is 60% steady state with 4 RCPs on.
  • System Engineering monitoring abnormal vibration on Reactor Coolant Pump P-32A.
  • Backup indication of zero speed is not installed.

System and Maintenance Engineering along with the approval of Operations have requested that RCP P-32A be secured due to abnormal vibrations on the pump.

INITIATING CUE:

The SM/CRS directs you to stop RCP P-32A per 1103.006 section 9 RCP Stop.

Page 4 of 6 TUOI NUMBER:_ANO-1-JPM-RO-RCP04_

THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:

The examiner shall review the "Briefing Checklist - System Walkthrough" portion of OP 1064.023 Attachment 6 with the examinee.

JPM INITIAL TASK CONDITIONS: Reactor power is 60% steady state with 4 RCPs on._____

System Engineering monitoring abnormal vibration on Reactor Coolant Pump P-32A._____

Backup indication of zero speed is not installed. System and Maintenance___________

Engineering along with the approval of Operations have requested that RCP P-32A be__

secured due to abnormal vibrations on the pump.___ _

TASK STANDARD: Reactor Coolant Pump A secured , all RCPs tripped, reactor tripped.

_This is an alternate success path JPM._____________________________________________

____________________________________________________________________________________

____________________________________________________________________________________

____________________________________________________________________________________

TASK PERFORMANCE AIDS:__1103.006 Section 9.0________________________________________

____________________________________________________________________________________

____________________________________________________________________________________

____________________________________________________________________________________

Simulator Instructor The following overrides are necessary for the performance of the JPM:

1. Override DO HS1022_B;false (prevents zero speed lamp for P-32A from coming on).

As soon as P-32A is stopped:

Insert IMF RC466, Wait 15 seconds and input:

1. IOR-DO K08B6 True RCP VIB HI alarm
2. IOR-DORCPA_R01 True RCP VIB Hi red light

Page 5 of 6 TUOI NUMBER:_ANO-1-JPM-RO-RCP04_

INITIATING CUE:

The SM/CRS directs you to stop RCP P-32A per 1103.006.

CRITICAL ELEMENTS (C): 2, 5, 6__

(C) PERFORMANCE CHECKLIST STANDARD N/A SAT UNSAT

1. Start HP Oil Lift Pump Started P-63A, P-80A and (P-63A), Emergency HP P-82A Lube oil pumps.

Lift Oil Pump (P-80A) and Backup Lube oil Pump ____ ____ ____

(P-82A) for RCP P-32A.

POSITIVE CUE:

Red light ON, green light OFF for each oil pump.

2. Stop RCP P-32A. On panel C13, stopped RCP P-32A.

POSITIVE CUE:

(C) Green light ON, red light OFF ____ ____ ____

for P-32A, RCS flow lowering in the B RCS loop.

NEGATIVE CUE:

Red light ON, green light OFF for P-32A, RCS loop flows are matched.

3. Verify HP Oil Lift Pump Verified HP Oil Lift Pump and Backstop Lube Oil and Backstop Lube Oil Pumps Pumps remain on during remain on during RCP RCP coastdown. coastdown. ____ ____ ____

POSITIVE CUE:

Red lights ON for oil pumps.

Note to IA operator:

1. Override DO HS1022_B;false (prevents zero speed lamp for P-32A from coming on).

As soon as P-32A is stopped:

Insert IMF RC466, Wait 15 seconds and input:

1. IOR-DO K08B6 True RCP VIB HI alarm
2. IOR-DORCPA_R01 True RCP VIB Hi red light

Page 6 of 6 TUOI NUMBER:_ANO-1-JPM-RO-RCP04_

(C) PERFORMANCE CHECKLIST STANDARD N/A SAT UNSAT

4. Verify shaft stops, Verified shaft stops by without reverse observing blue zero speed rotation. indicator on , RCS flow indication stabilizes, and NEGATIVE(FAULTED) CUES: plant computer reverse A. Blue zero speed light OFF rotation alarm clear. ____ ____ ____

for P-32A. Determined that P-32A is rotating in the reverse B. Plant computer alarm RCP direction.

P32-A REVERSE ROTATION (P3188) is in alarm.

C. P-32A has high vibration.

C. P-32A motor bearing temperature is high.

5. Trip reactor. Depressed the reactor trip pushbutton on panel C03.

(C) POSITIVE CUE: _____ _____ _____

Rod bottom lights all ON for groups 1-7, reactor power dropping in the intermediate range.

6. Trip running RCPs. On panel C13, tripped RCPs P-32B/P-32C/P-32D.

POSITIVE CUE:

(C) Green lights ON, red lights _____ _____ _____

OFF for tripped RCPs.

NEGATIVE CUE: P-32A vibration is high Reactor Coolant Pump Operation procedure now has the operator to Refer to Reactor Trip (1202.001). Tell examinee that his crew will perform the remainder of the Reactor Trip immediate actions.

END

ADMINISTRATIVE JOB PERFORMANCE MEASURE Page 1 of 5 UNIT: ______1_______ REV # _____0_________ DATE: ______________________________

TUOI NUMBER:_ANO-1-JPM-RO-RAD1__________________

SYSTEM/DUTY AREA:_ADMINISTRATIVE TOPIC-RADIATION CONTROL_________________________

TASK:_ABILITY TO CONTROL RADIATION RELEASES.________________________________________

JTA#:_106854901W4________________

KA VALUE RO:___2.7 SRO:__3.2_____ KA

REFERENCE:

__2.3.11_________________

APPROVED FOR ADMINISTRATION TO: RO:____X___ SRO:________

TASK LOCATION: INSIDE CR:____X____ OUTSIDE CR:_________ BOTH:________

SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):

PLANT SITE:_______________ SIMULATOR:___PERFORM_______ LAB:__________________

POSITION EVALUATED: RO:_____X_____ SRO:____N/A_______

ACTUAL TESTING ENVIRONMENT: SIMULATOR:____X_____ PLANT SITE:__________ LAB:________

TESTING METHOD: SIMULATE:____X____ PERFORM:___________

APPROXIMATE COMPLETION TIME IN MINUTES:__15 MINUTES________________________________

REFERENCE(S):__ 1104.020 039-04-0 ATT B2, Offsite Dose Calculation Manual (ODCM) and P-47B Pump Differential Pressure versus Flow Rate graph EXAMINEE'S NAME:________________________________ SSN ______-_____-____________

EVALUATOR'S NAME:__________________________________________________________________

THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:

SATISFACTORY:________________ UNSATISFACTORY:_________________

PERFORMANCE CHECKLIST COMMENTS:

___________________________________________________________________________________

___________________________________________________________________________________

___________________________________________________________________________________

____________ Start Time ____________ Stop Time ____________ Total Time SIGNED ________________________________ DATE: _______________________

SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.

ADMINISTRATIVE JOB PERFORMANCE MEASURE Page 2 of 5 JPM INITIAL TASK CONDITIONS:

  • Plant is shutdown for a Refueling Outage.
  • Circulating Water Pump P-3A in service. ALL other Circ Water Pumps are OOS for maintenance.
  • Discharge flow to flume indicator (FI-4642) is INOPERABLE and OOS.
  • T-16B TWMT release is in progress.
  • Maximum allowable flow rate for the release from Preliminary Report is 90 gpm.
  • WCO reports CV-4642, CZ Discharge to Flume Flow Control Valve, is throttled open.
  • WCO reports that P-47B, Treated Waste Monitoring Pump, parameters after establishing flow through CV-4642:

§ Suction Pressure = 10 psig

§ Discharge Pressure = 38 psig INITIATING CUE:

The CRS directs you to perform step 4.15.1 of 1104.020 ATT B2 Treated Waste Monitor Tank (TWMT) T-16B Liquid Release Permit and report if the release flow rate is within the allowable limit.

ADMINISTRATIVE JOB PERFORMANCE MEASURE Page 3 of 5 TUOI NUMBER:_ANO-1-JPM-RO-RAD1______

THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:

The examiner shall review the "Briefing Checklist - System Walkthrough" portion of 1064.023 Attachment 6 with the examinee.

JPM INITIAL TASK CONDITIONS: Plant is shutdown for a Refueling Outage. Circulating Water Pump P-3A in service. ALL other Circ Water Pumps are OOS for maintenance.

Discharge flow to flume indicator (FI-4642) is INOPERABLE and OOS. T-16B TWMT release is in progress. Maximum allowable flow rate for the release from Preliminary Report is 90 gpm. WCO reports CV-4642, CZ Discharge to Flume Flow Control Valve, is throttled open. WCO reports that P-47B, Treated Waste Monitoring Pump, parameters after establishing flow through CV-4642: Suction Pressure = 10 psig, Discharge Pressure = 38 psig.

TASK STANDARD: Candidate estimates release flow rate between 75 to 85 gpm and is within the allowable flow rate specified in the Preliminary Report.

____________________________________________________________________________________

TASK PERFORMANCE AIDS: 1104.020 039-04-0 ATT B2, Offsite Dose Calculation Manual (ODCM) and P-47B Pump Differential Pressure versus Flow Rate graph.

___________________________________________________________________________

____________________________________________________________________________________

____________________________________________________________________________________

ADMINISTRATIVE JOB PERFORMANCE MEASURE Page 4 of 5 TUOI NUMBER:_ANO-1-JPM-RO-RAD1______

INITIATING CUE:

The CRS directs you to perform step 4.15.1 of 1104.020 ATT B2 Treated Waste Monitor Tank (TWMT) T-16B Liquid Release Permit and report if the release flow rate is within the allowable limit.

CRITICAL ELEMENTS (C):___3, 5_______

(c) PERFORMANCE CHECKLIST STANDARD N/A SAT UNSAT Examiner Cue: Provide Candidate with copy of partially completed 1104.020, ATT B2.

1. Candidate performs a Performed review of T-16B review of ATT B TWMT Liquid Release Permit.

_____ _____ _____

Release Permit.

2. Perform step 4.15.1.A Recognize actions for FI-4642 inoperable inoperable flow indicator

_____ _____ _____

actions. contained in ODCM App. 1 Table 2.1-1.

3. Determine required actions Utilizing ODCM App. 1 Table for conducting release 2.1-1 Action 2. Determines C _____ _____ _____

with FI-4642 inoperable. release flow rate required to be estimated at least once every four hours utilizing pump curves.

Note: Candidate should discuss options available to obtain pump curve data which may include any of the following: 1) Contacting System Engineer 2) Reference Pump Technical Manual.

Examiner Cue: Provide Candidate with copy of P-47B Pump Curve upon request.

4. Obtain pump curve data. To Candidate obtains pump curve estimate release flow data.

_____ _____ _____

rate.

Note: Pump Suction and Discharge pressure are given in Initial Task Conditions.

5. Determine pump flow rate Candidate calculates pump based on pump differential differential pressure and C _____ _____ _____

pressure. estimates flow rate of 75 to 85 gpm using pump curve.

6. Report that flow is within Candidate reports to CRS allowable limit. that flow is within

_____ _____ _____

allowable limit.

END

Treated Waste Monitor Pump P-47B 60 Pump Differential Pressure (PSID) 55 50 45 40 35 30 25 20 15 10 5

0 0 20 40 60 80 100 120 140 160 Flow - GPM (5 GPM increments)

PROC./WORK PLAN NO. PROCEDURE/WORK PLAN TITLE: PAGE: 1 of 113 1104.020 CLEAN WASTE SYSTEM OPERATION CHANGE: 039-04-0 ATTACHMENT B2 Page 1 of 8 TREATED WASTE MONITOR TANK (TWMT)

T-16B LIQUID RELEASE PERMIT PERMIT #__1-LR-2001-0100__(Assigned by Nuclear Chemistry) ___02/13/2001 Date INITIALS 1.0 REQUEST (Operations) 1.1 T-16B taken out of service and placed on recirc for sampling and release:

Date 02/12/2001 Time 0010 SRP NOTE Tag contains information to remind personnel that tank is isolated for chemistry sample.

1.2 Verify Treated Waste Monitor T-16B Inlet (CZ-47B) is closed SRP and tag is installed on handwheel or chain operator.

1.3 Initial T-16B level ______92_________%. Record local or SRP remote level indication. (Circle one) 1.4 Check Liquid Radwaste Process Monitor (RI-4642) available SRP by one of the following methods:

1.4.1 If monitor count rate is 1000 cpm perform the following:

A. Verify no Liquid Release in progress using FI-4642.

B. Select "Check Source" on RI-4642 and verify that the monitor responds to check source with a count rate rise >100 cpm.

1.4.2 If monitor count rate >1000 cpm, then verify that count rate is <4.22E6.

1.5 Verify that RI-4642 is not inoperable for any other reason. SRP 1.6 If RI-4642 is operable, Then record Rad Monitor RI-4642 background counts. __1.0 E4______________ SRP 1.7 Record the following:

SRP 1.7.1 # of CW pumps running __1___

and CW pump Disch Press _1.1 PSIG__

1.8 If adjustments are made to CW flow, terminate release.

1.9 Submitted to Nuclear Chemistry for Analysis, Section 2.0. SRP Date _02/12/2001____ Time _0120__________

Section 1.0 Performed By __Steve R. Pullin_ _

PROC./WORK PLAN NO. PROCEDURE/WORK PLAN TITLE: PAGE: 2 of 113 1104.020 CLEAN WASTE SYSTEM OPERATION CHANGE: 039-04-0 ATTACHMENT B2 Page 2 of 8 2.0 Analysis (Nuclear Chemistry) 2.l Tank T-16B sample obtained for release analysis. JB Date/Time _02/12/2001__/_0200___

Performed by John Brown_____.

N/A 2.2 If required for weekly sample for oil and grease, Tank T-16B sample obtained. Otherwise N/A.

Performed by ________N/A__________________

JB 2.3 T-16B pH analysis performed by _John Brown_____

2.3.1 T-16B pH __7.0____

2.4 If pH is not between 6.0 and 9.0, adjust per Sampling the N/A Treated Waste Monitor Tanks (T-16A/B) (1607.009).

Otherwise N/A.

2.4.1 Tank T-16B post neutralization pH sample, N/A Obtained by _____N/A_________________

2.4.2 T-16B post neutralization pH sample, N/A Analysis performed by ____N/A_______________

2.4.3 T-16B post neutralization pH _N/A___

2.4.4 If pH is not between 6.0 and 9.0, re-perform N/A adjustment and analysis sequence until pH is between 6.0 and 9.0. Otherwise N/A.

2.5 Gamma spectroscopy performed by ___John Brown____ ________

2.6 Gamma spectroscopy report reviewed by _Jim Smith ____

2.7 Tritium analysis performed by __John Brown ___________

PROC./WORK PLAN NO. PROCEDURE/WORK PLAN TITLE: PAGE: 3 of 113 1104.020 CLEAN WASTE SYSTEM OPERATION CHANGE: 039-04-0 ATTACHMENT B2 Page 3 of 8 2.8 If Liquid Radwaste Process Monitor (RI-4642) is inoperable N/A or unavailable as identified in "Request" or "Verification of Pre-Release Requirements" sections of this permit, the following ODCM App. 1, Table 2.1-1 requirements shall be met. Otherwise N/A.

2.8.1 An independent sample of the tank contents shall be obtained and analyzed.

Performed by ______N/A__________________

2.8.2 Computer input data shall be independently verified correct.

Performed by _____N/A___________________

2.9 Sample results indicate release of total tank contents will JB not violate ANO radioactive effluent discharge limit.

2.10 Preliminary release report prepared by ___John Brown________

If not radioactive N/A.

2.11 Preliminary release report and/or permit returned to Control Room.

By _John Brown_______ Date _02/13/2001_ Time 0900 3.0 Verification of Pre-Release Requirements (Operations) 3.1 Verify CW flow/configuration recorded in initial release JG submittal data is still valid.

3.2 Verify appropriate signatures on preliminary report. JG 3.3 CRS/SM approval to proceed with release.

CRS/SM ___Abel Leader__________________

3.4 Provide copy of Setpoints section from Preliminary Report JG to Control Room Operators.

3.5 Verify F560 in service by performing the following:

3.5.1 Verify open:

  • CZ-74 (LRW Disch Filter F-560 Inlet) JG
  • CZ-77 (LRW Disch Filter F-560 Outlet) JG 3.5.2 Verify closed CZ-83 (LRW Disch Filter F-560 JG Bypass)

PROC./WORK PLAN NO. PROCEDURE/WORK PLAN TITLE: PAGE: 4 of 113 1104.020 CLEAN WASTE SYSTEM OPERATION CHANGE: 039-04-0 ATTACHMENT B2 Page 4 of 8 3.6 If Liquid Radwaste Process Monitor (RI-4642) is operable and available, verify proper operation of radiation monitor and interlocks as follows. Otherwise N/A.

3.6.1 Check Liquid Radwaste Process Monitor (RI-4642) JG available by one of the following methods:

  • If monitor count rate is 1000 cpm, select CHECK SOURCE on RI-4642 and verify that the monitor responds to check source with a count rate rise >100 cpm.
  • If monitor count rate >1000 cpm, then verify that count rate is <4.22E6.

3.6.2 Verify the following valves closed:

  • FWMT Disch to CW Flumes (DZ-25) JG
  • LZ Drain Pump P-45 Discharge to Flume (LZ-5) JG
  • Treated Waste Discharge to Circ Water Flume JG (CZ-58) 3.6.3 Place CZ Disch to Flume Flow Control Valve JG (CV-4642) hand switch to OPEN.

A. Verify FIC-4642 in Manual and fully open JG CV-4642 using the Manual Adjustment Knob.

3.6.4 Lower RI-4642 alarm setpoint until HIGH RAD JG alarm actuates.

3.6.5 Verify from CV-4642 indicating lights that JG CV-4642 trips closed.

3.6.6 Place CV-4642 HS to CLOSED position. JG A. Turn Man. Adj. Knob to fully Closed JG Position (fully counterclockwise).

JG 3.6.7 Adjust RI-4642 setpoint to the value listed in the Preliminary Report for total Circ Water flow.

3.6.8 Verify a Licensed Operator, other than JG individual who initially set RI-4642 setpoint, has independently verified that RI-4642 setpoint is correct for total circ water flow.

3.6.9 Reset RI-4642 HIGH RAD alarm. JG 3.7 If RI-4642 is inoperable or unavailable, verify N/A requirements specified in "Analysis" section of this permit for RI-4642 inoperable or unavailable have been performed.

Otherwise N/A.

Section 3.0 Performed By __Joe Gogetter____________________________

PROC./WORK PLAN NO. PROCEDURE/WORK PLAN TITLE: PAGE: 5 of 113 1104.020 CLEAN WASTE SYSTEM OPERATION CHANGE: 039-04-0 ATTACHMENT B2 Page 5 of 8 4.0 Release (Operations)

CAUTION Unauthorized discharge to Lake Dardanelle via the flume shall be avoided.

4.1 Verify CZ Disch to Flume Flow (CV-4642) closed. JG 4.2 Verify T-16B X-FER PP (P-47B) stopped. JG JG 4.2.1 If T-16B neutralization was required, verify VCT-9 is isolated per Sampling TWMT (T-16A or T-16B) Section of this procedure.

NOTE Tag contains information to remind personnel that tank is isolated for chemistry sample.

JG 4.3 Verify Treated Waste Monitor Tank T-16B Inlet (CZ-47B) closed and tagged.

4.3.1 If tag is missing or has been removed since tank was last sampled, perform the following.

Otherwise N/A.

N/A A. Terminate this release.

N/A B. Install tag on CZ-47B.

C. Submit new release permit to Nuclear N/A Chemistry.

4.4 Verify Treated Waste Monitor Tank T-16B Outlet (CZ-48B) JG open.

4.5 Verify Treated Waste Discharge Valve to Header from P-47A JG (CZ-55A) closed.

JG 4.6 Verify Treated Waste Monitor Tank T-16B Recirc Inlet (CZ-54B) closed.

JG 4.7 Open Treated Waste Discharge Valve to Header from P-47B (CZ-55B).

4.8 Open Treated Waste Discharge to Circ. Water Flume (CZ-58). JG 4.9 Verify Treated Waste Monitor Pump Discharge to Clean Waste JG Tanks (CZ-57) closed.

PROC./WORK PLAN NO. PROCEDURE/WORK PLAN TITLE: PAGE: 6 of 113 1104.020 CLEAN WASTE SYSTEM OPERATION CHANGE: 039-04-0 ATTACHMENT B2 Page 6 of 8 4.10 Verify Unit 1/Unit 2 Liquid Radwaste Manifold Isol (CZ-87) JG closed.

JG

.11 Verify Suction Crossover on Treated Waste Monitor Pumps (CZ-50) closed.

4.12 If Liquid Radwaste Process Monitor (RI-4642) is inoperable or unavailable, perform the following. Otherwise N/A (ODCM App.1, L2.1.1).

JG 4.12.1 Verify FWMT Disch to CW Flumes (DZ-25) closed.

JG 4.12.2 Verify LZ Drain Pump P-45 Discharge to Flume (LZ-5) closed.

4.12.3 Person qualified as Waste Control Operator, JG independently verify release path valve alignment prior to release (ODCM App.1, Table 2.1-1).

4.13 Notify control room of intent to begin release. JG 4.14 Commence T-16B release as follows:

JG 4.14.1 Start P-47B.

4.14.2 Place CZ Disch to Flume Flow (CV-4642) hand JG switch to OPEN.

NOTE Allowable Release Flow Rate is Listed in the "Max Waste (GPM)" Column of the Preliminary Report.

{4.3.1}

CAUTION Use of flow rate greater than allowable by the release permit may violate ODCM limits for release and may be NRC reportable.

{4.3.1}

4.14.3 Use CZ Disch to Flume (FIC-4642) to obtain flow JG rate < allowable release flow rate for total circ water flow.

Max Flow Rate from Preliminary Report ( 90_ gpm)

PROC./WORK PLAN NO. PROCEDURE/WORK PLAN TITLE: PAGE: 7 of 113 1104.020 CLEAN WASTE SYSTEM OPERATION CHANGE: 039-04-0 ATTACHMENT B2 Page 7 of 8 4.15 When release has started, perform the following:

{4.3.1}

4.15.1 Control Room Personnel shall observe Discharge Flow to Flume (FI-4642). Verify release flow rate is < allowable release flow rate for total circ water flow.

A. If FI-4642 is inoperable, estimate flow rate at least once every four hours during release (ODCM App.1, Table 2.1-1).

Otherwise N/A.

NOTE If a Plant Computer tabular Log (DUMP) is used instead of Process Radiation Monitoring Effluent Recorder (RR-4830), the tabular log shall contain at least points R4642, R3618 and be set at 5 minute intervals and cover the duration of the release.

4.15.2 Record the following data on RR-4830. If RR-4830 not available, verify Plant Computer tabular log is activated and record data on it.

A. Release start time __________ Date _________

B. Release permit number _____________________

C. Name and number of tank being released:

"TWMT (T-16B)"

4.15.3 Notify HP that T-16B release has started and LRW disch filter F-560 should be periodically monitored for Rad levels.

4.15.4 Notify Chemistry that T-16B release has started.

CAUTION Pumping radioactive liquid tanks empty can cause sediment in bottom of tank to be deposited in discharge piping. This can produce higher radiation areas in the vicinity of the discharge piping that previously existed.

4.16 Verify by tank level observation that only T-16B is being released.

NOTE Liquid Radwaste Disch Filter (F-560) inlet press should not exceed 25 psig.

4.16.1 Monitor F-560 during release for a rise in d/p.

4.16.2 If LRW Disch Filter (F-560) inlet press on PI-4606 exceeds 25 psig, then stop release, and perform "Backflushing Liquid Radwaste Discharge Filter (F-560)" section of this procedure.

PROC./WORK PLAN NO. PROCEDURE/WORK PLAN TITLE: PAGE: 8 of 113 1104.020 CLEAN WASTE SYSTEM OPERATION CHANGE: 039-04-0 ATTACHMENT B2 Page 8 of 8 4.17 When release is complete, perform the following.

4.17.1 Verify P-47B is off and hand switch is "Green Flagged".

4.17.2 Verify discharge flow zero gpm.

4.17.3 Notify HP that T-16B release is complete and that F-560 should be surveyed for Rad levels to determine the need to back flush F-560.

4.17.4 Back flush F-560 as necessary per HP survey.

4.18 Notify control room that release is complete.

4.19 Record the following data on RR-4830. If RR-4830 was not available, record on Plant Computer tabular logsheets.

A. Release stop time ____________ Date _____________

B. Release permit number _____________

4.20 Flush clean waste to discharge flume piping as follows:

4.20.1 Close Treated Waste Discharge Valve to Header from P-47B (CZ-55B) 4.20.2 Close CZ-58.

4.20.3 Align demineralized water to discharge piping by opening Condensate Flush Disch Hdr (CS-256).

4.20.4 After flushing piping for ~ 5 minutes, Close CS-256.

4.21 Place CV-4642 hand switch to CLOSE and verify indicating lights show valve closed.

4.21.1 Verify FIC-4642 in manual and turn Man. Adj.

Knob to CLOSED position (fully counterclockwise) 4.22 Record final T-16B level ________%

4.23 Remove tag from Treated Waste Monitor T-16B Inlet (CZ-47B).

4.24 Return release permit with all attachments to CRS/SM.

Performed by __Joe Gogetter /___________________________ Date _____________

Approved by CRS/SM _____________________________________ Date _____________

4.25 Return the following to Nuclear Chemistry:

  • This attachment
  • Release permit
  • Tabular logsheets, if used.

Reactor Building Spray Pump P-35A OP-1104.005 Supp 3 Date Pump Pump Diff Pump Diff Pump Diff Pump Diff O.B. Motor I.B. Motor I.B. Pump I.B. Pump I.B. Pump I.B. Pump I.B. Pump Differential Pressure Pressure Pressure Pressure Bearing Bearing Vertical Vertical Vertical Horizontal Horzontal P-35A Lo Hi Lo Hi Vibration Vibration Brg ANR LCO Brg ANR RBS Pressure ANR ANR LCO LCO Vibration Vibration Vibration Vibration Vibration Pump PSID PSID PSID PSID PSID IN/SEC IN/SEC IN/SEC IN/SEC IN/SEC IN/SEC IN/SEC 05/04/95 194.9 185 199 181 201 0.057 0.104 0.155 0.325 0.7 0.250 0.325 06/14/95 194.8 185 199 181 201 0.050 0.111 0.178 0.325 0.7 0.279 0.325 07/27/95 196.4 185 199 181 201 0.058 0.102 0.139 0.325 0.7 0.238 0.325 08/09/95 196.6 185 199 181 201 0.060 0.115 0.134 0.325 0.7 0.256 0.325 10/19/95 195.4 185 199 181 201 0.073 0.112 0.149 0.325 0.7 0.289 0.325 11/30/95 195 185 199 181 201 0.059 0.113 0.135 0.325 0.7 0.260 0.325 01/11/96 195.7 185 199 181 201 0.065 0.111 0.139 0.325 0.7 0.263 0.325 04/04/96 196.4 185 199 181 201 0.060 0.113 0.128 0.325 0.7 0.241 0.325 05/16/96 197.7 185 199 181 201 0.069 0.105 0.140 0.325 0.7 0.247 0.325 06/28/96 197 185 199 181 201 0.057 0.105 0.138 0.325 0.7 0.234 0.325 09/20/96 196.3 185 199 181 201 0.061 0.113 0.141 0.325 0.7 0.266 0.325 12/12/96 195.9 185 199 181 201 0.057 0.095 0.147 0.325 0.7 0.215 0.325 03/06/97 196.6 185 199 181 201 0.056 0.095 0.137 0.325 0.7 0.217 0.325 05/29/97 196.1 185 199 181 201 0.063 0.092 0.125 0.325 0.7 0.197 0.325 06/19/97 197 185 199 181 201 0.046 0.097 0.112 0.325 0.7 0.216 0.325 08/21/97 195 185 199 181 201 0.075 0.097 0.126 0.325 0.7 0.247 0.325 11/13/97 196.7 185 199 181 201 0.049 0.100 0.130 0.325 0.7 0.215 0.325 02/06/98 195.5 185 199 181 201 0.067 0.114 0.132 0.325 0.7 0.218 0.325 05/01/98 196.9 185 199 181 201 0.067 0.102 0.122 0.325 0.7 0.177 0.325 07/23/98 196.6 185 199 181 214.5 0.064 0.127 0.142 0.325 0.7 0.221 0.325 09/30/98 195.9 185 199 181 214.5 0.049 0.099 0.120 0.325 0.7 0.212 0.325 10/15/98 195.5 185 199 181 214.5 0.056 0.115 0.124 0.325 0.7 0.239 0.325 12/03/98 196.1 185 199 181 214.5 0.052 0.082 0.113 0.325 0.7 0.225 0.325 01/07/99 194.5 185 199 181 214.5 0.085 0.109 0.125 0.325 0.7 0.268 0.325 04/01/99 193 185 199 181 214.5 0.045 0.097 0.116 0.325 0.7 0.241 0.325 06/25/99 192 185 199 181 214.5 0.045 0.104 0.127 0.325 0.7 0.233 0.325 09/06/99 191 185 199 181 214.5 0.061 0.098 0.120 0.325 0.7 0.215 0.325 12/05/99 190 185 199 181 214.5 0.089 0.110 0.119 0.325 0.7 0.203 0.325 Arkansas Nuclear One Unit 1 Page 1 1/16/01 4:06 PM

Reactor Building Spray Pump P-35A OP-1104.005 Supp 3 Date I.B. Pump O.B. Pump O.B. Pump O.B. Pump Horizontal Vertical Vertical Vertical P-35A LCO Brg ANR LCO RBS Vibration Vibration Vibration Vibration Pump IN/SEC IN/SEC IN/SEC IN/SEC 05/04/95 0.7 0.114 0.293 0.7 06/14/95 0.7 0.129 0.293 0.7 07/27/95 0.7 0.118 0.293 0.7 08/09/95 0.7 0.114 0.293 0.7 10/19/95 0.7 0.117 0.293 0.7 11/30/95 0.7 0.073 0.293 0.7 01/11/96 0.7 0.107 0.293 0.7 04/04/96 0.7 0.115 0.293 0.7 05/16/96 0.7 0.118 0.293 0.7 06/28/96 0.7 0.105 0.293 0.7 09/20/96 0.7 0.113 0.293 0.7 12/12/96 0.7 0.123 0.293 0.7 03/06/97 0.7 0.118 0.293 0.7 05/29/97 0.7 0.133 0.293 0.7 06/19/97 0.7 0.094 0.293 0.7 08/21/97 0.7 0.092 0.293 0.7 11/13/97 0.7 0.095 0.293 0.7 02/06/98 0.7 0.101 0.293 0.7 05/01/98 0.7 0.111 0.293 0.7 07/23/98 0.7 0.105 0.293 0.7 09/30/98 0.7 0.090 0.293 0.7 10/15/98 0.7 0.104 0.293 0.7 12/03/98 0.7 0.111 0.293 0.7 01/07/99 0.7 0.101 0.293 0.7 04/01/99 0.7 0.102 0.293 0.7 06/25/99 0.7 0.085 0.293 0.7 09/06/99 0.7 0.090 0.293 0.7 12/05/99 0.7 0.093 0.293 0.7 Arkansas Nuclear One Unit 1 Page 2 1/16/01 4:06 PM

Reactor Building Spray Pump P-35A OP-1104.005 Supp 3 Date O.B. Pump O.B. Pump O.B. Pump O.B. Pump O.B. Pump O.B. Pump Comments Horizontal Horizontal Horizontal Axial Axial Axial P-35A Brg ANR LCO Brg ANR LCO RBS Vibration Vibration Vibration Vibration Vibration Vibration Pump IN/SEC IN/SEC IN/SEC IN/SEC IN/SEC IN/SEC 05/04/95 0.194 0.325 0.7 0.124 0.295 0.7 06/14/95 0.201 0.325 0.7 0.150 0.295 0.7 1R12 OPERABILITY TEST 07/27/95 0.183 0.325 0.7 0.120 0.295 0.7 08/09/95 0.199 0.325 0.7 0.119 0.295 0.7 10/19/95 0.195 0.325 0.7 0.127 0.295 0.7 Contacted PDM about I.B. Horz. Vibes 11/30/95 0.141 0.325 0.7 0.118 0.295 0.7 P35A run for P35B mntc 01/11/96 0.181 0.325 0.7 0.127 0.295 0.7 Quarterly/Annual 04/04/96 0.173 0.325 0.7 0.114 0.295 0.7 05/16/96 0.187 0.325 0.7 0.132 0.295 0.7 Quarterly 06/28/96 0.177 0.325 0.7 0.115 0.295 0.7 09/20/96 0.184 0.325 0.7 0.119 0.295 0.7 12/12/96 0.173 0.325 0.7 0.125 0.295 0.7 Quarterly 03/06/97 0.181 0.325 0.7 0.149 0.295 0.7 Quarterly 05/29/97 0.154 0.325 0.7 0.114 0.295 0.7 quarterly 06/19/97 0.164 0.325 0.7 0.117 0.295 0.7 08/21/97 0.176 0.325 0.7 0.105 0.295 0.7 11/13/97 0.189 0.325 0.7 0.116 0.295 0.7 02/06/98 0.177 0.325 0.7 0.133 0.295 0.7 Quarterly/Annual/Oper following Maint.

05/01/98 0.179 0.325 0.7 0.117 0.295 0.7 Quarterly 07/23/98 0.155 0.325 0.7 0.133 0.295 0.7 Quarterly 09/30/98 0.176 0.325 0.7 0.129 0.295 0.7 Quarterly 10/15/98 0.202 0.325 0.7 0.110 0.295 0.7 Quarterly 12/03/98 0.199 0.325 0.7 0.111 0.295 0.7 P-35A run for P-35B Maintenance 01/07/99 0.187 0.325 0.7 0.112 0.295 0.7 Quarterly 04/01/99 0.190 0.325 0.7 0.112 0.295 0.7 Normal Scheduled PMs 06/25/99 0.194 0.325 0.7 0.115 0.295 0.7 Quarterly and 18 Month 09/06/99 0.171 0.325 0.7 0.104 0.295 0.7 Quarterly 12/05/99 0.162 0.325 0.7 0.115 0.295 0.7 Quarterly Arkansas Nuclear One Unit 1 Page 3 1/16/01 4:06 PM

P 195 S

I 170 175 180 185 D 190 200 205 210 215 04/07/91 06/11/91 09/26/91 Arkansas Nuclear One Unit 1 04/02/92 08/27/92 02/11/93 05/06/93 DP 10/22/93 01/27/94 06/03/94 Lo ANR DP 08/25/94 12/29/94 03/19/95 06/14/95 Hi ANR DP Page 4 08/09/95 OP-1104.005 Supp 3 11/30/95 Lo LCO DP 04/04/96 06/28/96 12/12/96 05/29/97 Reactor Building Spray Pump P-35A Differential Pressure Hi LCO DP 08/21/97 02/06/98 07/23/98 10/15/98 01/07/99 06/25/99 12/05/99 1/16/01 4:06 PM

OP-1104.005 Supp 3 Reactor Building Spray Pump P-35A Motor Brg Vibration 0.140 0.120 0.100 I

n 0.080

/

S e 0.060 c

0.040 0.020 0.000 03/23 07/29 12/16 03/10 07/14 11/18 02/09 05/04 07/27 10/19 01/11 05/16 09/20 03/06 06/19 11/13 05/01 09/30 12/03 04/01 09/06

/93 /93 /93 /94 /94 /94 /95 /95 /95 /95 /96 /96 /96 /97 /97 /97 /98 /98 /98 /99 /99 OB Mtr IB Mtr Arkansas Nuclear One Unit 1 Page 5 1/16/01 4:06 PM

OP-1104.005 Supp 3 Reactor Building Spray Pump P-35A I.B. Brg Vib Vertical 0.800 0.700 0.600 0.500 I

n

/

0.400 S

e c

0.300 0.200 0.100 0.000 03/23 07/29 12/16 03/10 07/14 11/18 02/09 05/04 07/27 10/19 01/11 05/16 09/20 03/06 06/19 11/13 05/01 09/30 12/03 04/01 09/06

/93 /93 /93 /94 /94 /94 /95 /95 /95 /95 /96 /96 /96 /97 /97 /97 /98 /98 /98 /99 /99 IB Vert Vib IB Vert ANR IB Vert LCO Arkansas Nuclear One Unit 1 Page 6 1/16/01 4:06 PM

OP-1104.005 Supp 3 Reactor Building Spray Pump P-35A I.B. Brg Vib Horizontal 0.800 0.700 0.600 0.500 I

n

/

0.400 S

e c

0.300 0.200 0.100 0.000 03/23 07/29 12/16 03/10 07/14 11/18 02/09 05/04 07/27 10/19 01/11 05/16 09/20 03/06 06/19 11/13 05/01 09/30 12/03 04/01 09/06

/93 /93 /93 /94 /94 /94 /95 /95 /95 /95 /96 /96 /96 /97 /97 /97 /98 /98 /98 /99 /99 IB Horiz Vib IB Horiz ANR IB Horiz LCO Arkansas Nuclear One Unit 1 Page 7 1/16/01 4:06 PM

OP-1104.005 Supp 3 Reactor Building Spray Pump P-35A O.B. Brg Vib Vertical 0.800 0.700 0.600 0.500 I

n

/

0.400 S

e c

0.300 0.200 0.100 0.000 03/23 07/29 12/16 03/10 07/14 11/18 02/09 05/04 07/27 10/19 01/11 05/16 09/20 03/06 06/19 11/13 05/01 09/30 12/03 04/01 09/06

/93 /93 /93 /94 /94 /94 /95 /95 /95 /95 /96 /96 /96 /97 /97 /97 /98 /98 /98 /99 /99 OB Vert Vib OB Vert ANR OB Vert LCO Arkansas Nuclear One Unit 1 Page 8 1/16/01 4:06 PM

OP-1104.005 Supp 3 Reactor Building Spray Pump P-35A O.B. Brg Vib Horizontal 0.800 0.700 0.600 0.500 I

n

/

0.400 S

e c

0.300 0.200 0.100 0.000 03/23 07/29 12/16 03/10 07/14 11/18 02/09 05/04 07/27 10/19 01/11 05/16 09/20 03/06 06/19 11/13 05/01 09/30 12/03 04/01 09/06

/93 /93 /93 /94 /94 /94 /95 /95 /95 /95 /96 /96 /96 /97 /97 /97 /98 /98 /98 /99 /99 OB Horiz Vib OB Horiz ANR OB Horiz LCO Arkansas Nuclear One Unit 1 Page 9 1/16/01 4:06 PM

OP-1104.005 Supp 3 Reactor Building Spray Pump P-35A O.B. Brg Vib Axial 0.800 0.700 0.600 0.500 I

n

/

0.400 S

e c

0.300 0.200 0.100 0.000 03/23 07/29 12/16 03/10 07/14 11/18 02/09 05/04 07/27 10/19 01/11 05/16 09/20 03/06 06/19 11/13 05/01 09/30 12/03 04/01 09/06

/93 /93 /93 /94 /94 /94 /95 /95 /95 /95 /96 /96 /96 /97 /97 /97 /98 /98 /98 /99 /99 OB Axial Vib OB Axial ANR OB Axial LCO Arkansas Nuclear One Unit 1 Page 10 1/16/01 4:06 PM

MAP NUMBER: 1A2-16 LOCATION: U1 AUX 335 EL. P36C PUMP ROOM, ROOM NUMBER 54 Rx. % _100___________________

DPM/ _100cm2 Date __02/10/2001____________

No. Activity Time ___0000:00______________

_1___ _20,000__

Aux building _2___

Dose Rate Inst. _HP-DR-170____

posted: RM,RWPR _30,000___

_3___

_60,000___ Cal Due Date __12/31/2001____

_4___

335 posted RA _10,000___ Dose Rate Inst. #2 _RM-065____

_____

__________

_____ Cal Due Date __12/31/2001_

__________

_____ Count Inst. ____RO-705____

400.0/150.0 HS __________

_____ Cal Due Date _12/31/2001______

__________

_____

Bkg. _80__ cpm D/C ___10_____

__________

_____

__________ Count Inst. #2 _________________

110.0 _____

115.0 __________ Cal Due Date __12/31/2001_____

1 _____

__________ Bkg. __90_ cpm D/C ___10______

_____

1.0

__________

Survey Frequency:

4 _____

__________ _____ Daily 2 _____ _____ Bi-Weekly

__________ __X_ Monthly 3

_____ _____ Quarterly 0.4 __________ _____ Job Coverage 105.0 _____

_____ Other

__________

_____

__________ _____________________________

_____

__________ RWP # _4005/1_

_____

__________ Surveyor:

_____

_John Public_____ ___1234_

__________

_____ Badge All Radiation values are in mrem/hour unless otherwise noted. __________

12.5 denotes gamma general area dose rates. _____ RP Supervisor Review:

Smear contamination values are in DPM/100 Sqcm unless otherwise noted. H. S. Denotes Hot Spot Readings __________

  • 12/13 Denotes Gamma Contact/Far reading (30 cm) Denotes smear location (100 sqcm.) _____ _Imma N. Charge_____________
  • 12 Denotes contact dose rate (gamma) *12 B Denotes Beta Contact Dose Rate Denotes large area smear location __________

Form to be retained for records _____

DANI # __011256______________

__________

_____

__________ Page 1 of __1____

_____

Arkansas Nuclear One - Unit One 2001 License Examination Administrative Topics OPERATING TEST ONE Candidate: Examination Level (Circle One): RO / SRO Examiner:

Topic Area Question Expected Response (Circle One) A1-JPM-1 and Reference source A.1 A.2 SEE ATTACHED JPM ANO-1-JPM-SRO-TURN A.3 A.4 Candidate Response:

Arkansas Nuclear One - Unit One 2001 License Examination Administrative Topics OPERATING TEST ONE Candidate: Examination Level (Circle One): RO / SRO Examiner:

Topic Area Question Expected Response (Circle One) A1-JPM-2 and Reference source A.1 A.2 SEE ATTACHED JPM ANO-1-JPM-SRO-TREND A.3 A.4 Candidate Response:

Arkansas Nuclear One - Unit One 2001 License Examination Administrative Topics OPERATING TEST ONE Candidate: Examination Level (Circle One): RO / SRO Examiner:

Topic Area Question Expected Response (Circle One) A2-JPM-1 and Reference source A.1 A.2 SEE ATTACHED JPM ANO-1-JPM-SRO-HCRD3 A.3 A.4 Candidate Response:

Arkansas Nuclear One - Unit One 2001 License Examination Administrative Topics OPERATING TEST ONE Candidate: Examination Level (Circle One): RO / SRO Examiner:

Topic Area Question Expected Response (Circle One) A3-Q1 and Reference source The following radiological postings are Answer:

A.1 A.2 present in the P-36C HPI pump room:

Candidate should identify at least two of A.3 A.4

  • The access boundary to the room has a the following three errors for successful single posting as a RADIATION AREA. completion:
  • The room access boundary should be
  • There is one HOT SPOT posted on the posted as a HIGH RADIATION AREA piping in the southeast corner of the since the general area readings room. (115.0, 110.0 and 105.0 mr/hr) are greater than the 100 mR/hr threshold You are preparing to conduct a pre-job for a High Radiation area.

briefing with your WCO. His job is to

  • In addition, the access should also be perform a special test on P-36C, HPI posted as a CONTAMINATION pump, with the System Engineer following AREA, since smear data indicates completion of pump maintenance. loose surface contamination of greater than 1000 dpm/cm2 but less than Based on your review of the given survey 100,000 dpm/cm2.

map, state what changes to the room postings you would recommend to

  • The hot spot posting is not valid since Radiation Protection and why. the contact reading is not greater than or equal to four times the 30 cm reading.

Reference:

1012.017 Rev. 006-02-0 K/A:

2.3.1 RO 2.6 / SRO 3.0 Candidate Response:

Arkansas Nuclear One - Unit One 2001 License Examination Administrative Topics OPERATING TEST ONE Candidate: Examination Level (Circle One): RO / SRO Examiner:

Topic Area Question Expected Response (Circle One) A3-Q2 and Reference source Given: Answer:

A.1 A.2

  • The plant is in a refueling outage. One person performing the job without A.3 A.4
  • An ALARA planning meeting between shielding will receive a dose of 37.5 mR.

maintenance personnel and radiation Two technicians installing the shielding protection personnel is being and subsequent removal of the shielding conducted prior to emergent work on will receive a total man-Rem dose of 100 CV-1050, Decay Heat Suction valve.

mRem.

  • The maintenance job is expected to take one person 15 minutes to The person performing the job with complete. shielding will receive a dose of 3.75
  • The dose rate at CV-1050 is 150 mRem.

mR/hr.

Using shielding, will produce a total man-During the briefing the Radiation Rem dose of 103.75 mRem.

Protection Technician states that dose Using ALARA principles, the job should rates around CV-1050 could be reduced be performed without the shielding for a by using shielding. It will take two (2) lower total dose.

workers, 10 minutes to install and 10 minutes to remove the shielding. The shielding will reduce the dose rate at CV-

Reference:

1050 to 15 mR/hr. 1012.027 Rev. 003-01-0 Apply the principles of ANO's ALARA K/A:

program to this situation and determine whether this job should be done with or 2.3.2 without shielding. RO 2.5 / SRO 2.9 Candidate Response:

Arkansas Nuclear One - Unit One 2001 License Examination Administrative Topics OPERATING TEST ONE Candidate: Examination Level (Circle One): RO / SRO Examiner:

Topic Area Question Expected Response (Circle One) A4-JPM-1 and Reference source A.1 A.2 SEE ATTACHED JPM ANO-1-JPM-SRO-EAL4, EAL5, and EAL6 A.3 A.4 Candidate Response:

ADMINISTRATIVE JOB PERFORMANCE MEASURE TUOI: ANO-1-JPM-SRO-EAL4 Page 1 of 4 UNIT: 1 REV # 0 DATE: ______________________________

TUOI NUMBER: ANO-1-JPM-SRO-EAL4 SYSTEM/DUTY AREA: ADMINISTRATIVE TOPIC - EMERGENCY PROCEDURES/PLAN TASK: CLASSIFY AN EMERGENCY EVENT JTA#: 13445110303 KA VALUE RO: 2.3 SRO: 4.1 KA

REFERENCE:

2.4.41 APPROVED FOR ADMINISTRATION TO: RO: SRO: X TASK LOCATION: INSIDE CR: X OUTSIDE CR:_________ BOTH:________

SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):

PLANT SITE:_______________ SIMULATOR: PERFORM LAB:__________________

POSITION EVALUATED: RO:____N/A___ SRO:_____X_____

ACTUAL TESTING ENVIRONMENT: SIMULATOR: X PLANT SITE:__________ LAB:________

TESTING METHOD: SIMULATE:_________ PERFORM:___________

APPROXIMATE COMPLETION TIME IN MINUTES: 5 MINUTES REFERENCE(S): 1903.010 REV. 036-02-0, 1903.011 REV. 025-04-0

______________________________________________________________________

EXAMINEE'S NAME:________________________________ SSN ______-_____-____________

EVALUATOR'S NAME:__________________________________________________________________

THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:

SATISFACTORY:________________ UNSATISFACTORY:_________________

PERFORMANCE CHECKLIST COMMENTS:

___________________________________________________________________________________

___________________________________________________________________________________

___________________________________________________________________________________

____________ Start Time ____________ Stop Time ____________ Total Time SIGNED ________________________________ DATE: _______________________

SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A

ADMINISTRATIVE JOB PERFORMANCE MEASURE TUOI: ANO-1-JPM-SRO-EAL4 Page 2 of 4 QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.

ADMINISTRATIVE JOB PERFORMANCE MEASURE TUOI: ANO-1-JPM-SRO-EAL4 Page 3 of 4 EXAMINEES COPY JPM INITIAL TASK CONDITIONS:

  • Unit One has experienced a Loss of Coolant Accident.
  • Reactor has tripped.
  • ESAS Channels 1-6 have actuated, RT-10 successfully performed.
  • RCS pressure and PZR level continue to drop.
  • No radiological release is in progress.

INITIATING CUE:

For the given plant conditions, determine the applicable EAL classification and initiate notifications per the applicable Shift Manager Emergency Direction and Control Checklist in 1903.011.

ADMINISTRATIVE JOB PERFORMANCE MEASURE TUOI: ANO-1-JPM-SRO-EAL4 Page 4 of 4 THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:

The examiner shall review the "Briefing Checklist - System Walkthrough" portion of OP 1064.023 Attachment 6 with the examinee.

JPM INITIAL TASK CONDITIONS: The following conditions existed at the end of Operating test 1 Scenario 1. Unit One has experienced a Loss of Coolant Accident.

Reactor has tripped. ESAS Channels 1-6 have actuated, RT-10 successfully performed.

RCS pressure and PZR level continue to drop. No radiological release is in progress.

TASK STANDARD: __Examinee correctly classifies this event as a SAE per EAL 2.4 and makes notifications to plant personnel per 1903.011P.

___________________________________________________________________________________

TASK PERFORMANCE AIDS: 1903.010 Attachments 1 and 3, 1903.011 Attachment 3, and 1903.011P_______________________________________________________________________

ADMINISTRATIVE JOB PERFORMANCE MEASURE TUOI: ANO-1-JPM-SRO-EAL4 Page 5 of 4 INITIATING CUE:

For the given plant conditions, determine the applicable EAL classification and initiate notifications per the applicable Shift Manager Emergency Direction and Control Checklist in 1903.011.

CRITICAL ELEMENTS (C) 3, 6 (C) PERFORMANCE CHECKLIST STANDARD N/A SAT UNSAT

1. Compare event conditions Turned to Attachment 1 of with the Index of EALs, 1903.010, Index of EALs.

Attachment 1 of 1903.010, _____ _____ _____

Emergency Action Level Classification.

2. Turn to appropriate EAL Turned to a specific EAL in and compare EAL criteria Safety System Function, _____ _____ _____

with event conditions. Attachment 3 of 1903.010.

3. Declare the emergency Declared or stated the event (C) classification. is a Site Area Emergency (based on LOCA greater than _____ _____ _____

HPI capacity) in accordance with EAL 2.4.

4. Initiate immediate Referred to 1903.011 and _____ _____ _____

notifications. turned to Attachment 3.

NOTE: Cue the examinee that the Unit 2 Shift Engineer is performing the initial notifications per 1903.011 after the examinee has stated that Unit 2 Shift Engineer (or control room communicator) has been requested.

5. Begin completion of form Began completion of form 1903.011P, SAE Emergency 1903.011P SAE Emergency Direction and Control Direction and Control Checklist for Shift Checklist for Shift Manager.

Manager.

Examinee should fill in the _____ _____ _____

data on items 1 and 2.

Examinee should simulate (or state) direction of the SE to complete the initial notification.

6. (Simulate) Announce Used plant-paging system to (C) emergency on plant paging (simulate) make announcement system. per step 9 of form _____ _____ _____

1903.011P.

ADMINISTRATIVE JOB PERFORMANCE MEASURE TUOI: ANO-1-JPM-SRO-EAL4 Page 6 of 4 END

ADMINISTRATIVE JOB PERFORMANCE MEASURE TUOI: ANO-1-JPM-SRO-EAL5 Page 1 of 4 UNIT: 1 REV # 0 DATE: ______________________________

TUOI NUMBER: ANO-1-JPM-SRO-EAL5 SYSTEM/DUTY AREA: ADMINISTRATIVE TOPIC - EMERGENCY PROCEDURES/PLAN TASK: CLASSIFY AN EMERGENCY EVENT JTA#: 13445110303 KA VALUE RO: 2.3 SRO: 4.1 KA

REFERENCE:

2.4.41 APPROVED FOR ADMINISTRATION TO: RO: SRO: X TASK LOCATION: INSIDE CR: X OUTSIDE CR:_________ BOTH:________

SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):

PLANT SITE:_______________ SIMULATOR: PERFORM LAB:__________________

POSITION EVALUATED: RO:____N/A___ SRO:_____X_____

ACTUAL TESTING ENVIRONMENT: SIMULATOR: X PLANT SITE:__________ LAB:________

TESTING METHOD: SIMULATE:_________ PERFORM:___________

APPROXIMATE COMPLETION TIME IN MINUTES: 5 MINUTES REFERENCE(S): 1903.010 REV. 036-02-0, 1903.011 REV. 025-04-0

______________________________________________________________________

EXAMINEE'S NAME:________________________________ SSN ______-_____-____________

EVALUATOR'S NAME:__________________________________________________________________

THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:

SATISFACTORY:________________ UNSATISFACTORY:_________________

PERFORMANCE CHECKLIST COMMENTS:

___________________________________________________________________________________

___________________________________________________________________________________

___________________________________________________________________________________

____________ Start Time ____________ Stop Time ____________ Total Time SIGNED ________________________________ DATE: _______________________

SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A

ADMINISTRATIVE JOB PERFORMANCE MEASURE TUOI: ANO-1-JPM-SRO-EAL5 Page 2 of 4 QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.

ADMINISTRATIVE JOB PERFORMANCE MEASURE TUOI: ANO-1-JPM-SRO-EAL5 Page 3 of 4 EXAMINEES COPY JPM INITIAL TASK CONDITIONS:

  • Unit One has experienced a Main Turbine trip above 43% power.
  • A Degraded Power condition subsequently occurred.

INITIATING CUE:

For the given plant conditions, determine the applicable EAL classification and initiate notifications per the applicable Shift Manager Emergency Direction and Control Checklist in 1903.011.

ADMINISTRATIVE JOB PERFORMANCE MEASURE TUOI: ANO-1-JPM-SRO-EAL5 Page 4 of 4 THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:

The examiner shall review the "Briefing Checklist - System Walkthrough" portion of OP 1064.023 Attachment 6 with the examinee.

JPM INITIAL TASK CONDITIONS: The following conditions existed at the end of Operating test 1 Scenario 2. Unit One has experienced a Main Turbine trip above 43%

power. Reactor Protection System failed to actuate an automatic reactor trip. The reactor was successfully tripped from the Control Room. A Degraded Power condition subsequently occurred.

TASK STANDARD: __Examinee correctly classifies this event as an Alert per EAL 6.2 and makes notifications to plant personnel per 1903.011M.

___________________________________________________________________________________

TASK PERFORMANCE AIDS: 1903.010 Attachments 1 and 3, 1903.011 Attachment 2, and 1903.011M_______________________________________________________________________

ADMINISTRATIVE JOB PERFORMANCE MEASURE TUOI: ANO-1-JPM-SRO-EAL5 Page 5 of 4 INITIATING CUE:

For the given plant conditions, determine the applicable EAL classification and initiate notifications per the applicable Shift Manager Emergency Direction and Control Checklist in 1903.011.

CRITICAL ELEMENTS (C) 3, 6 (C) PERFORMANCE CHECKLIST STANDARD N/A SAT UNSAT

1. Compare event conditions Turned to Attachment 1 of with the Index of EALs, 1903.010, Index of EALs.

Attachment 1 of 1903.010, _____ _____ _____

Emergency Action Level Classification.

2. Turn to appropriate EAL Turned to a specific EAL in and compare EAL criteria Safety System Function, _____ _____ _____

with event conditions. Attachment 3 of 1903.010.

3. Declare the emergency Declared or stated the event (C) classification. is an Alert (based on failure of RPS to complete _____ _____ _____

an automatic trip and subsequent efforts to trip reactor from the Control Room were successful - not required to be stated) in accordance with EAL 6.2.

4. Initiate immediate Referred to 1903.011 and _____ _____ _____

notifications. turned to Attachment 2.

NOTE: Cue the examinee that the Unit 2 Shift Engineer is performing the initial notifications per 1903.011 after the examinee has stated that Unit 2 Shift Engineer (or control room communicator) has been requested.

5. Begin completion of form Began completion of form 1903.011M, Alert Emergency 1903.011M Alert Emergency Direction and Control Direction and Control Checklist for Shift Checklist for Shift Manager.

Manager.

Examinee should fill in the _____ _____ _____

data on items 1 and 2.

Examinee should simulate (or state) direction of the SE to complete the initial notification.

6. (Simulate) Announce Used plant-paging system to (C) emergency on plant paging (simulate) make announcement

ADMINISTRATIVE JOB PERFORMANCE MEASURE TUOI: ANO-1-JPM-SRO-EAL5 Page 6 of 4 system. per step 4 of form _____ _____ _____

1903.011M.

END

ADMINISTRATIVE JOB PERFORMANCE MEASURE TUOI: ANO-1-JPM-SRO-EAL6 Page 1 of 4 UNIT: 1 REV # 0 DATE: ______________________________

TUOI NUMBER: ANO-1-JPM-SRO-EAL6 SYSTEM/DUTY AREA: ADMINISTRATIVE TOPIC - EMERGENCY PROCEDURES/PLAN TASK: CLASSIFY AN EMERGENCY EVENT JTA#: 13445110303 KA VALUE RO: 2.3 SRO: 4.1 KA

REFERENCE:

2.4.41 APPROVED FOR ADMINISTRATION TO: RO: SRO: X TASK LOCATION: INSIDE CR: X OUTSIDE CR:_________ BOTH:________

SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):

PLANT SITE:_______________ SIMULATOR: PERFORM LAB:__________________

POSITION EVALUATED: RO:____N/A___ SRO:_____X_____

ACTUAL TESTING ENVIRONMENT: SIMULATOR: X PLANT SITE:__________ LAB:________

TESTING METHOD: SIMULATE:_________ PERFORM:___________

APPROXIMATE COMPLETION TIME IN MINUTES: 5 MINUTES REFERENCE(S): 1903.010 REV. 036-02-0, 1903.011 REV. 025-04-0

______________________________________________________________________

EXAMINEE'S NAME:________________________________ SSN ______-_____-____________

EVALUATOR'S NAME:__________________________________________________________________

THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:

SATISFACTORY:________________ UNSATISFACTORY:_________________

PERFORMANCE CHECKLIST COMMENTS:

___________________________________________________________________________________

___________________________________________________________________________________

___________________________________________________________________________________

____________ Start Time ____________ Stop Time ____________ Total Time SIGNED ________________________________ DATE: _______________________

SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A

ADMINISTRATIVE JOB PERFORMANCE MEASURE TUOI: ANO-1-JPM-SRO-EAL6 Page 2 of 4 QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.

ADMINISTRATIVE JOB PERFORMANCE MEASURE TUOI: ANO-1-JPM-SRO-EAL6 Page 3 of 4 EXAMINEES COPY JPM INITIAL TASK CONDITIONS:

  • While shutting down due to a tube leak in B OTSG, the Unit One reactor was manually tripped due to two dropped rods.
  • Post trip, the RCS leak rate to B OTSG has been estimated at approximately 100 gpm.

INITIATING CUE:

For the given plant conditions, determine the applicable EAL classification and initiate notifications per the applicable Shift Manager Emergency Direction and Control Checklist in 1903.011.

ADMINISTRATIVE JOB PERFORMANCE MEASURE TUOI: ANO-1-JPM-SRO-EAL6 Page 4 of 4 THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:

The examiner shall review the "Briefing Checklist - System Walkthrough" portion of OP 1064.023 Attachment 6 with the examinee.

JPM INITIAL TASK CONDITIONS: The following conditions existed at the end of Operating test 1 Scenario 3. While shutting down due to a tube leak in B OTSG, the Unit One reactor was manually tripped due to two dropped rods. Post trip, the RCS leak rate to B OTSG has been estimated at approximately 100 gpm. SPDS indicates that NO Main Steam Safety Valves (MSSVs) lifted following the trip.

TASK STANDARD: __Examinee correctly classifies this event as an Alert per EAL 2.2 and makes notifications to plant personnel per 1903.011M.

___________________________________________________________________________________

TASK PERFORMANCE AIDS: 1903.010 Attachments 1 and 3, 1903.011 Attachment 2, and 1903.011M_______________________________________________________________________

ADMINISTRATIVE JOB PERFORMANCE MEASURE TUOI: ANO-1-JPM-SRO-EAL6 Page 5 of 4 INITIATING CUE:

For the given plant conditions, determine the applicable EAL classification and initiate notifications per the applicable Shift Manager Emergency Direction and Control Checklist in 1903.011.

CRITICAL ELEMENTS (C) 3, 6 (C) PERFORMANCE CHECKLIST STANDARD N/A SAT UNSAT

1. Compare event conditions Turned to Attachment 1 of with the Index of EALs, 1903.010, Index of EALs.

Attachment 1 of 1903.010, _____ _____ _____

Emergency Action Level Classification.

2. Turn to appropriate EAL Turned to a specific EAL in and compare EAL criteria Safety System Function, _____ _____ _____

with event conditions. Attachment 3 of 1903.010.

3. Declare the emergency Declared or stated the event (C) classification. is an Alert (based on RCS leakage greater than normal _____ _____ _____

makeup capacity [50 gpm] -

not required to be stated) in accordance with EAL 2.2.

4. Initiate immediate Referred to 1903.011 and _____ _____ _____

notifications. turned to Attachment 2.

NOTE: Cue the examinee that the Unit 2 Shift Engineer is performing the initial notifications per 1903.011 after the examinee has stated that Unit 2 Shift Engineer (or control room communicator) has been requested.

5. Begin completion of form Began completion of form 1903.011M, Alert Emergency 1903.011M Alert Emergency Direction and Control Direction and Control Checklist for Shift Checklist for Shift Manager.

Manager.

Examinee should fill in the _____ _____ _____

data on items 1 and 2.

Examinee should simulate (or state) direction of the SE to complete the initial notification.

6. (Simulate) Announce Used plant-paging system to (C) emergency on plant paging (simulate) make announcement system. per step 4 of form _____ _____ _____

1903.011M.

ADMINISTRATIVE JOB PERFORMANCE MEASURE TUOI: ANO-1-JPM-SRO-EAL6 Page 6 of 4 END

Page 1 of 7 JOB PERFORMANCE MEASURE UNIT: ______1_______ REV # _____3_________ DATE: ______________________________

TUOI NUMBER:_ANO-1-JPM-RO-EOP07__________________

SYSTEM/DUTY AREA:_ABNORMAL AND EMERGENCY OPERATIONS________________________________

TASK:_PERFORM REACTOR TRIP IMMEDIATE ACTION________________________________________

JTA#:_13035010601___________________________

KA VALUE RO:___4.0____ SRO:__4.6_____ KA

REFERENCE:

__007 EK3.01_________________

APPROVED FOR ADMINISTRATION TO: RO:____X___ SRO:___X_____

TASK LOCATION: INSIDE CR:____X____ OUTSIDE CR:_________ BOTH:________

SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):

PLANT SITE:_______________ SIMULATOR:___PERFORM_______ LAB:__________________

POSITION EVALUATED: RO:__________ SRO:___________

ACTUAL TESTING ENVIRONMENT: SIMULATOR:__________ PLANT SITE:__________ LAB:________

TESTING METHOD: SIMULATE:_________ PERFORM:___________

APPROXIMATE COMPLETION TIME IN MINUTES:___5 MINUTES________________________________

REFERENCE(S):__1202.001 REV. 27, 1202.012 REV. 004-01-0 _________________________

______________________________________________________________________

EXAMINEE'S NAME:________________________________ SSN ______-_____-____________

EVALUATOR'S NAME:__________________________________________________________________

THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:

SATISFACTORY:________________ UNSATISFACTORY:_________________

PERFORMANCE CHECKLIST COMMENTS:

___________________________________________________________________________________

___________________________________________________________________________________

___________________________________________________________________________________

____________ Start Time ____________ Stop Time ____________ Total Time

Page 2 of 7 SIGNED ________________________________ DATE: _______________________

SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.

Page 3 of 7 JPM INITIAL TASK CONDITIONS:

  • Plant is operating at 100% power.
  • CBOT is out of the control room.
  • Generator hydrogen pressure is dropping rapidly.

INITIATING CUE:

The CRS directs you to manually trip the reactor and perform reactor trip actions through step 6 per 1202.001 Reactor Trip.

Page 4 of 7 TUOI NUMBER:_ANO-1-JPM-RO-EOP07______

THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:

The examiner shall review the "Briefing Checklist - System Walkthrough" portion of 1064.023 Attachment 6 with the examinee.

JPM INITIAL TASK CONDITIONS: Plant is operating at 100% power. CBOT is out of the Control room. Generator hydrogen pressure is dropping rapidly. ___

____________________________________________________________________________________

TASK STANDARD: Immediate action for Reactor Trip completed and Emergency Boration in progress. Actions for failure of all control rods to insert have been completed.___

(Alternate success path JPM)._______________________________________________________

____________________________________________________________________________________

TASK PERFORMANCE AIDS: Rx Trip 1202.001, RT 1202.012, Emergency Boration.

___________________________________________________________________________

____________________________________________________________________________________

____________________________________________________________________________________

NOTE: This is an alternate success path JPM and is intended to be performed on the simulator, not simulated. Therefore, no positive or negative cues are provided.

Notes to IA Operator and Examiner:

1. Prior to starting this JPM, insert the following malfunctions to stick 2 rods out:

RD363, RD370

2. RT-12 is allowed for performance for emergency boration.
3. The only immediate action is tripping the Reactor. Trainee may perform follow up steps but are not required.

Page 5 of 7 TUOI NUMBER:_ANO-1-JPM-RO-EOP07______

INITIATING CUE:

The CRS directs you to manually trip the reactor and perform reactor trip actions through step 6 per 1202.001 Reactor Trip.

NOTE TO EXAMINER: THIS IS AN ALTERNATE SUCCESS PATH JPM THAT INCLUDES A FAULT WHEN THE REACTOR IS TRIPPED.

CRITICAL ELEMENTS (C):_1, 5, 6, 7, 8, 9 (C) PERFORMANCE CHECKLIST STANDARD N/A SAT UNSAT

1. Depress the reactor trip On C03, depressed the (C) pushbutton. reactor trip pushbutton. _____ _____ _____

POSITIVE CUE:

Reactor trip pushbutton depressed.

2. Identify that 2 rods have On C13, observed 2 rods have failed to insert. failed to trip. _____ _____ _____

INSTRUCTOR NOTE:

The following step is optional at the trainees discretion.

3. Depress CRD Power Supply On C03 depressed CRD Power Breaker Trip Push buttons Supply Push buttons. _____ _____ _____

on C03 (A501 and B631). (A501 and B631).

POSITIVE CUE:

Breakers A501 and B631 open (Green light on)

4. Verify all rods inserted On C13, observed rod bottom and power dropping. lights for all control rods _____ _____ _____

except 2 have come on.

NOTE TO EXAMINER:

Give examinee a copy of RT12, Emergency Boration, if examinee requests it.

(C) 5. Open BWST outlet to OP HPI On C16 or C18, CV-1407 or Pump (CV-1407 or CV-1408). CV-1408 opened (associated _____ _____ _____

valve for the running HPI POSITIVE CUE: pump).

CV-1408 red light on green light off (C) 6. Set Batch Controller for Batch set key depressed, maximum batch size. 999999 gallons batch size set by depressing _____ _____ _____

POSITIVE CUE: appropriate keys. Depressed Batch size indicates 999999 enter and lower display keys on upper display. in sequence (red LED next to display key should be on).

NEGATIVE CUE:

Batch size indicates 500 (or whatever is on upper display).

Page 6 of 7 TUOI NUMBER:_ANO-1-JPM-RO-EOP07______

(C) PERFORMANCE CHECKLIST STANDARD N/A SAT UNSAT

7. Open CV-1250. On C04, handswitch for CV-1250 is placed in the open _____ _____ _____

(C) POSITIVE CUE: position and CV-1250 CV-1250 is open (red light on opened.

green light off)

8. P39A, P39B or both Started 1 or 2 boric acid started. pumps on C04.

(C) _____ _____ _____

POSITIVE CUE:

P39A and /or P39B red lights on green lights off.

9. Start the Batch Batch controller started by Controller. depressing run pushbutton.

(C) _____ _____ _____

POSITIVE CUE:

Lower display digital reading is increasing.

NEGATIVE CUE:

Lower display digital reading is staying at 0.

10. Set pressurizer level Verified pressurizer level control setpoint to 220 setpoint on CV-1235 inches. controller is set to 220 inches. (If not at 220, set _____ _____ _____

POSITIVE CUE: it to 220).

Pressurizer level control setpoint at 220.

NOTE TO EXAMINER:

Inform examinee consider that emergency boration started and an additional operator has taken over the duties for finishing RT12. The following actions are follow-up actions and are not required to satisfy JPM Task.

11. Depress the turbine trip On C01, depressed the pushbutton. turbine trip pushbutton.

_____ _____ _____

POSITIVE CUE:

Turbine trip pushbutton depressed.

12. Verify turbine throttle On C01, verified by and governor valves are observation that all closed. throttle and governor valves _____ _____ _____

are closed.

POSITIVE CUE:

Turbine governor and throttle valves indicate zero.

13. Check SCM adequate. On ICC display on C19 or panel C04, verified by POSITIVE CUE: observation that SCM is _____ _____ _____

SCM indicates 59 °F. adequate.

NOTE: Adequate SCM is 30°F.

14 Reduce letdown by closing On C04, rotated the pot on CV-1223. CV-1223 controller to zero and verified letdown flow on _____ _____ _____

Page 7 of 7 POSITIVE CUE: C04 lowers.

Letdown flow indicator decreased to ~40 gpm.

END

Page 1 of 6 JOB PERFORMANCE MEASURE UNIT: ______1_______ REV # _____2________ DATE: ______________________________

TUOI NUMBER:_ANO-1-JPM-RO-ED008_____________

SYSTEM/DUTY AREA:_ELECTRICAL DISTRIBUTION__________________________________________

TASK:_SHIFT BUSES (A1, A2, H1, H2) FROM STARTUP ONE TO UNIT AUX TRANSFORMER________

JTA#:_10625110101___________________________

KA VALUE RO:__3.1_____ SRO:__3.1_____ KA

REFERENCE:

__062 000 A4.07_________________

APPROVED FOR ADMINISTRATION TO: RO:____X___ SRO:___ X ___

TASK LOCATION: INSIDE CR:____X____ OUTSIDE CR:_________ BOTH:________

SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):

PLANT SITE:_______________ SIMULATOR:___PERFORM_______ LAB:__________________

POSITION EVALUATED: RO:__________ SRO:___________

ACTUAL TESTING ENVIRONMENT: SIMULATOR:__________ PLANT SITE:__________ LAB:________

TESTING METHOD: SIMULATE:_________ PERFORM:___________

APPROXIMATE COMPLETION TIME IN MINUTES:___10 MINUTES______________________________

REFERENCE(S):__1107.001 REV. 057-02-0______________________________________________

______________________________________________________________________

EXAMINEE'S NAME:________________________________ SSN ______-_____-____________

EVALUATOR'S NAME:__________________________________________________________________

THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:

SATISFACTORY:________________ UNSATISFACTORY:_________________

PERFORMANCE CHECKLIST COMMENTS:

___________________________________________________________________________________

___________________________________________________________________________________

___________________________________________________________________________________

____________ Start Time ____________ Stop Time ____________ Total Time

Page 2 of 6 SIGNED ________________________________ DATE: _______________________

SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.

Page 3 of 6 JPM INITIAL TASK CONDITIONS:

  • Plant Startup in progress.
  • Reactor Power at 20-40% and ready to transfer plant auxiliaries to the Unit Aux Transformer.
  • The Unit Auxiliary Transformer is available and all breaker controls are in Remote.

INITIATING CUE:

The SM/CRS directs you to transfer plant auxiliaries from Startup One Transformer to the Unit Auxiliary Transformer per 1107.001 Step 8.2 Transferring Buses from SU 1 to Unit Aux.

Page 4 of 6 TUOI NUMBER:_ANO-1-JPM-RO-ED008_

THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:

The examiner shall review the "Briefing Checklist - System Walkthrough" portion of OP 1064.023 Attachment 6 with the examinee.

JPM INITIAL TASK CONDITIONS: Plant is at 20-40% power and ready to transfer plant___

_auxiliaries to the Unit Aux Transformer. The Unit Auxiliary Transformer is avail-__

_able and all breaker controls in Remote._ SEE SETUP BELOW.____________________

TASK STANDARD: Plant auxiliaries (A1, A2, H1, H2)_are being powered from the Unit___

_Auxiliary Transformer. This is a faulted JPM, the operator must manually trip one of the power supplies to A1 bus._____________________________

TASK PERFORMANCE AIDS: Synch-switch handle, 1107.001 Step 8.2_______________________

____________________________________________________________________________________

____________________________________________________________________________________

____________________________________________________________________________________

Simulator setup:

The faulted breaker for this JPM will be implemented by use of an override. Prior to providing the initial conditions for this JPM insert the following:

Override DI 152-112/CS-G01;F This will cause the SU1 feeder breaker to bus A1 to fail to open when the Unit Aux feeder handswitch is released after being closed (the override defeats the return-to-normal for breaker A-112, Unit Aux to A1).

Page 5 of 6 TUOI NUMBER:_ANO-1-JPM-RO-ED008_

INITIATING CUE:

The SM/CRS directs you to transfer plant auxiliaries from Startup One Transformer to the Unit Auxiliary Transformer per 1107.001 Step 8.2 Transferring Buses from SU 1 to Unit Aux.

CRITICAL ELEMENTS (C):_1, 3, 4, 6_______

Note: Steps 1 through 7 should be repeated until all buses are shifted.

(C) PERFORMANCE CHECKLIST STANDARD N/A SAT UNSAT This is a faulted JPM, the Startup One to A1 breaker will not automatically open after the Unit Aux to A1 breaker is closed, the operator must manually trip one of the feeder breakers to A1.

1. On C10, place Synchronize Turned ON Synchronize switch A1___ A1___ A1___

switch to ON for the Unit for correct breaker.

(C) Aux Feeder Breaker that is A2___ A2___ A2___

to be closed.

H1___ H1___ H1___

POSITIVE CUE:

Synchronize switch ON. H2___ H2___ H2___

2. Verify synchroscope Verified synchroscope A1___ A1___ A1___

between 11 and 1 oclock. between 11 and 1 oclock position. A2___ A2___ A2___

H1___ H1___ H1___

H2___ H2___ H2___

3. On C10, close Unit Aux Closed Unit Aux Feeder A1___ A1___ A1___

Feeder breaker. Allow Breaker and allowed control (C) control switch to return switch to return to normal- A2___ A2___ A2___

to normal-after-close after-close position.

position. H1___ H1___ H1___

POSITIVE CUE: H2___ H2___ H2___

Unit Aux Feeder Breaker closed.

4. On C10, turn Synchronize Turned Synchronize switch A1___ A1___ A1___

switch OFF. OFF.

(C) A2___ A2___ A2___

POSITIVE CUE:

Synchronize switch OFF. H1___ H1___ H1___

H2___ H2___ H2___

Page 6 of 6 TUOI NUMBER:_ANO-1-JPM-RO-ED008_

(C) PERFORMANCE CHECKLIST STANDARD N/A SAT UNSAT

5. On C10, verify that the Verified that the SU1 Feeder SU1 Feeder Breaker opens. Breaker Opened.

A2___ A2___ A2___

POSITIVE CUE (for A2, H1, H2)

SU1 feeder breaker opened. H1___ H1___ H1___

NEGATIVE CUE (for A1): H2___ H2___ H2___

SU1 breaker did not open, Unit Aux and SU1 feeder breakers to A1 are closed.

6. If the SU1 breaker does Tripped (to open) the SU1 not immediately open, trip feeder breaker to A1 bus (A-it. 113). Also acceptable if operator tripped Unit Aux (C) POSITIVE CUE: Feeder to A1 instead of the A1___ A1___ A1___

SU1 to A1 breaker is open. SU1 to A1 breaker, the limit and precaution states: when transferring auxiliaries, high circulating currents may cause bus lockout relay trip if both feeder breakers remain closed.

7. Place the open breakers Placed the open breakers A1___ A1___ A1___

control switch in normal- control switch in the after-open. normal-after-open position. A2___ A2___ A2___

H1___ H1___ H1___

H2___ H2___ H2___

8. Verify Startup XFMRS Pref Verified Startup XFMRS Pref Transfer selector switch Transfer selector switch is ____ ____ ____

is in the desired in the desired position (to position. SU1).

9. Verify 4160V buses remain Verified proper voltages on above 3640V and 6900V A1, A2, H1 and H2.

buses remain above 6010V. ____ ____ ____

POSITIVE CUE:

Voltages at 4160V and 6900V.

END

JOB PERFORMANCE MEASURE Page 1 of 5 UNIT: 1 REV #: 8 DATE:

TUOI NUMBER: ANO-1-JPM-RO-ED010 SYSTEM: DC Electrical Distribution System TASK: Place battery charger DO3A in service.

JTA: 10635070101 KA VALUE RO: 2.9 SRO: 3.5 KA

REFERENCE:

063 K1.03 APPROVED FOR ADMINISTRATION TO: RO: X SRO: X TASK LOCATION: INSIDE CR: OUTSIDE CR: X BOTH:

SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):

PLANT SITE: Simulate SIMULATOR: LAB:

POSITION EVALUATED: RO: SRO:

ACTUAL TESTING ENVIRONMENT: SIMULATOR: PLANT SITE: LAB:

TESTING METHOD: SIMULATE: PERFORM:

APPROXIMATE COMPLETION TIME IN MINUTES: 10 Minutes REFERENCE (S): OP 1107.004, Rev.011-04-0 EXAMINEE'S NAME: SSN: - -

EVALUATOR'S NAME:

THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:

SATISFACTORY: UNSATISFACTORY:

PERFORMANCE CHECKLIST COMMENTS:

Start Time Stop Time Total Time SIGNED DATE:

SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.

JOB PERFORMANCE MEASURE Page 2 of 5 JPM INITIAL TASK CONDITIONS:

  • Bus D01 is being supplied by battery charger D03B.

INITIATING CUE:

The SM/CRS directs placing battery charger D03A on bus D01 and securing battery charger D03B per 1107.004 Attachment A Placing Battery Charger D-03A In Service.

JOB PERFORMANCE MEASURE Page 3 of 5 THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:

The examiner shall review the Briefing Checklist - System Walkthrough portion of 1064.023 Attachment 6 with the examinee.

JPM INITIAL TASK CONDITIONS: Bus D01 is being supplied by battery charger D03B.

TASK STANDARD: Battery charger D03A supplying power to bus D01.

___

TASK PERFORMANCE AIDS: 1107.004, Attachment A "Placing Battery Charger D03A in___

Service". ________

JUSTIFICATION FOR RO:

Correct operation of the battery chargers is vital to maintain the DC batteries charged.

DC power provides the control power for ES associated equipment.

JOB PERFORMANCE MEASURE Page 4 of 5 INITIATING CUE:

The SM/CRS directs placing battery charger D03A on bus D01 and securing battery charger D03B per 1107.004 Attachment A Placing Battery Charger D-03A In Service.

CRITICAL ELEMENTS (C): 4, 5, 7, 8, 10, 11, 12 C PERFORMANCE CHECKLIST STANDARDS N/A SAT UNSAT

1. Open or verify open the following breakers on charger D03A.

A. AC Input Bkr D03A AC input bkr on open. charger cabinet ______ ______ ______

verified open by indicator on switch.

B. DC Output Bkr D03B DC Output bkr on open. charger cabinet ______ _______ ______

verified open by POSITIVE CUE: indicator on the Both breakers are switch.

open.

NOTE:

Inform examinee that Breaker B-5145 is closed to prevent trip to & from B51 Switchgear.

2. Close or verify close the following breakers A. AC Feed bkr Bkr 5145 verified in N/A N/A N/A 5145 closed closed position.

B. Supply from Opened Bkr D01-41 Battery Charger cabinet door and D01-41 verified Bkr D01-41A ______ ______ _____

closed.

POSITIVE CUE:

Both breakers are closed.

3. Verify manual D-07 manual disconnect D-13 disconnect D-13 ______ _______ ______

closed. verified closed.

POSITIVE CUE:

Manual disconnect closed.

NEGATIVE CUE:

Manual disconnect open.

(C) 4. Close charger D03A D03A AC input bkr AC input bkr. located on the front of the cabinet placed ______ ______ ______

POSITIVE CUE: in a closed position.

Bkr is closed.

(C) 5. Close charger D03A D03A DC output bkr DC output bkr. located on the front of the cabinet placed ______ ______ ______

POSITIVE CUE: in a closed position.

Bkr is closed.

JOB PERFORMANCE MEASURE Page 5 of 5 C PERFORMANCE CHECKLIST STANDARDS N/A SAT UNSAT 6 Verify automatic load Waited ~ 1 minute and sharing between D-03A observed load on D-and D-03B. 03B dropped and load ______ ______ ______

on D-03A raised and POSITIVE CUE: became stable.

Load indicated on both D-03A and D-03B and stable.

(C) 7. Open charger D-03B DC Charger D-03B DC output bkr. output bkr placed in open position as ______ ______ ______

POSITIVE CUE: shown by the switch Bkr is open. indicator.

(C) 8. Open charger D-03B AC Charger D-03B input input breaker bkr placed in open position as shown by ______ ______ ______

POSITIVE CUE: bkr switch indicator.

Bkr is open

9. Verify charger D-03A Charger verified to maintains proper be maintaining ~ 130V DC bus voltage. by reading voltmeter indication. ______ ______ ______

POSITIVE CUE:

D01 bus voltage at

~ 130 VDC.

NEGATIVE CUE:

D01 voltage is LOW.

(C) 10. Reset local alarm Reset local alarm panel for D-03A. panel for D-03A by depressing the reset POSITIVE CUE: button. ______ ______ ______

Alarm panel reset.

NEGATIVE CUE:

D01 low voltage alarm will not reset.

(C) 11. Place D-03A alarm to Placed the alarm control room toggle toggle switch for switch ON. D-03A to the ON ______ ______ ______

position.

(C) 12. Place D-03B alarm to Placed the alarm control room toggle toggle switch for switch OFF. D-03B to the OFF ______ ______ ______

position.

13 Verify Annunciator Called the control K01-E7 clear. room and verified alarm K01-E7 clear. ______ ______ ______

POSITIVE CUE:

K01-E7 cleared.

NEGATIVE CUE:

K01-E7 is in alarm.

END

JOB PERFORMANCE MEASURE Page 1 of 5 UNIT: 1 REV #: 1 DATE:

TUOI NUMBER: ANO-1-JPM-RO-AOP28 SYSTEM: Emergency and Abnormal Operations TASK: Respond to Lo-Lo Instrument Air Pressure._________________________

JTA 140150101A4 KA VALUE RO: 3.7 SRO: 3.9 KA

REFERENCE:

065 AK3.08 APPROVED FOR ADMINISTRATION TO: RO: X SRO: X TASK LOCATION: INSIDE CR: X OUTSIDE CR: BOTH:

SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):

PLANT SITE: SIMULATOR: X LAB:

POSITION EVALUATED: RO: SRO:

ACTUAL TESTING ENVIRONMENT: SIMULATOR: PLANT SITE: LAB:

TESTING METHOD: SIMULATE: PERFORM:

APPROXIMATE COMPLETION TIME IN MINUTES: 15 minutes REFERENCE(S): 1203.024, Rev. 010-02-0 EXAMINEE'S NAME: SSN: - -

EVALUATOR'S NAME:

THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:

SATISFACTORY: UNSATISFACTORY:

PERFORMANCE CHECKLIST COMMENTS:

Start Time Stop Time Total Time ______________

SIGNED DATE:______________________

JOB PERFORMANCE MEASURE Page 2 of 5 SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.

JOB PERFORMANCE MEASURE Page 3 of 5 JPM INITIAL TASK CONDITIONS:

  • Instrument Air pressure dropping due to unisolable leak on IA main line.
  • ICW RB isolation valves inadvertently closed and will not reopen.
  • Plant Shutdown commenced at >10% per minute per Rapid Plant Shutdown 1203.045.
  • PZR Level 290 and trending up.

INITATING CUE:

The SM/CRS directs you to perform 1203.024 Section 2 Lo-Lo Instrument Air Pressure step 3.6 through step 3.6.6.

JOB PERFORMANCE MEASURE Page 4 of 5 THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:

The examiner shall review the Briefing Checklist - System Walkthrough portion of 1064.023 Attachment 6 with the examinee.

JPM INITIAL TASK CONDITIONS: Instrument Air pressure dropping due to unisolable leak on IA main line. ICW RB isolation valves inadvertently closed and will not reopen. Plant_

Shutdown commenced at >10% per minute per Rapid Plant Shutdown 1203.045. PZR Level 290 and trending up. _____________________________________________________________

TASK STANDARD: Rx Tripped, EFW in service, Seal Injection isolated, and RCPs secured with normal and alternate seal bleedoff flowpaths isolated.__________

TASK PERFORMANCE AIDS: 1203.024 Section 2.__________

________________________________________________________________________

JOB PERFORMANCE MEASURE Page 5 of 5 INITIATING CUE:

The SM/CRS directs you to perform 1203.024 Section 2 Lo-Lo Instrument Air Pressure step 3.6 through step 3.6.6.

CRITICAL ELEMENTS (C): 1, 3, 4, 5, 6, 7 (C) PERFORMANCE CHECKLIST STANDARDS N/A SAT UNSAT

1. Perform Reactor Trip Immediate Action.

(C)

  • Depress Rx Trip On C03, depressed the pushbutton. Rx Trip pushbutton. ______ ______ ______
2. Verify All rods On C13, observed all inserted and power rod bottom lights have dropping. come on. On C03 observed power ______ ______ ______

dropping.

(C) 3. Actuate EFW for both On C09, All 4 EFW push OTSGs. buttons pushed on EFIC remote matrix. ______ ______ ______

(C) 4. Isolate Seal On C04, placed HS-1206 Injection. in close position. ______ ______ ______

(C) 5. Trip All running On C13 tripped All RCPs. running RCPs.

P-32A/P-32B/P-32C/P- ______ ______ ______

32D.

(C) 6. Isolate Alternate Seal On C13, placed SV-1270 Bleedoff flowpath to thru SV-1273 the Quench Tank. handswitch in close ______ ______ ______

position.

(C) 7. Isolate Normal Seal On C16, close CV-1274 Bleedoff flowpath. or on C18 close ______ ______ ______

CV-1270 thru CV-1273.

END