ML033320093: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 17: | Line 17: | ||
=Text= | =Text= | ||
{{#Wiki_filter:SAFEGUARDS | {{#Wiki_filter:SAFEGUARDS INFORMATION November 28, 2003 Mrs. Franchone Oshinowo Vice President, Spent Fuel Program Edlow International Company 1666 Connecticut Ave., N.W., Suite 201 Washington, D.C. 20009 | ||
==SUBJECT:== | ==SUBJECT:== | ||
APPROVAL OF HIGHWAY ROUTE TO TRANSPORT SPENT NUCLEAR | APPROVAL OF HIGHWAY ROUTE TO TRANSPORT SPENT NUCLEAR FUEL FROM ATHENS, AL, TO PLEASANTON, CA (NRC ROUTE NO. 209) | ||
==Dear Mrs. Oshinowo:== | ==Dear Mrs. Oshinowo:== | ||
On behalf of the U. S. Nuclear Regulatory Commission (NRC), I am responding to | On behalf of the U. S. Nuclear Regulatory Commission (NRC), I am responding to your submittal of July 17, 2003, which requested the NRC approve a route for transporting spent nuclear fuel (SNF) from Browns Ferry Nuclear Plant, Athens, AL, to GE Vallecitos Nuclear Center, Pleasanton, CA (NRC Route No. 209). | ||
Approval of Route No. 209 will expire two years from the date of this letter. The NRC issued additional security measures for the transportation of SNF for NRC | The NRC has reviewed Edlow International Companys submittal and concluded that the information satisfies the requirements of 10 CFR 73.37. Specific details of Route No. 209 are enclosed [Enclosure 1]. Specific details of Route No. 209 combined with additional Safeguards Information (SGI) are also enclosed [Enclosure 2]. Enclosure 2 will not be released to the public and you should protect it in accordance with the requirements of 10 CFR 73.21. | ||
Approval of Route No. 209 will expire two years from the date of this letter. | |||
The NRC issued additional security measures for the transportation of SNF for NRC licensees who ship greater than 100 grams of SNF. Licensees are required to comply with the requirements of 10 CFR 73.37 and these measures when shipping SNF. Licensees are also required to comply with the U.S. Departments of Transportation and Homeland Security regulations on the shipment of hazardous materials. | |||
In addition, the NRC also issued Regulatory Issue Summary (RIS) 2002-12I, Rev. 1, on October 3, 2002, Transportation of Spent Nuclear Fuel Greater than 100 Grams - NRC Threat Advisory and Protective Measures System. The RIS advised licensees shipping SNF to consider various recommendations to be taken in conjunction with changes to the national or transportation-sector threat levels. | |||
WARNING: Violation of Section 147 of the Atomic Energy Act, "Safeguards Information" is subject to Civil and When separated from Enclosure 2 Criminal Penalties this document is DECONTROLLED SAFEGUARDS INFORMATION | |||
SAFEGUARDS INFORMATION F. Oshinowo If you are requested by State officials to deviate from a portion of the approved route (due to highway construction activities or other exigent conditions), please provide details of the deviation to Mrs. Gloria Bennington of my staff as soon as possible. If you have questions on this route approval or require additional information please contact Mrs. Bennington at (301) 415-8183 or via e-mail at GMB@nrc.gov for non-SGI information or via secure e-mail at GMB@nrc.sgov.gov. | |||
Sincerely, | |||
/RA/ | |||
Joseph W. Shea, Project Director Nuclear Security Policy Project Directorate Division of Nuclear Security Office of Nuclear Security and Incident Response Docket No. 70-1252 | |||
==Enclosures:== | ==Enclosures:== | ||
(Note: Enclosure 2 contains Safeguards Information)1. Route No. 209 - Mileage Summary | (Note: Enclosure 2 contains Safeguards Information) | ||
: 1. Route No. 209 - Mileage Summary | |||
: 2. Route No. 209 - Detailed Highway Route Plan (U) | : 2. Route No. 209 - Detailed Highway Route Plan (U) | ||
SAFEGUARDS | SAFEGUARDS INFORMATION | ||
SAFEGUARDS INFORMATION F. Oshinowo If you are requested by State officials to deviate from a portion of the approved route (due to highway construction activities or other exigent conditions), please provide details of the deviation to Mrs. Gloria Bennington of my staff as soon as possible. If you have questions on this route approval or require additional information please contact Mrs. Bennington at (301) 415-8183 or via e-mail at GMB@nrc.gov for non-SGI information or via secure e-mail at GMB@nrc.sgov.gov. | |||
Sincerely, | |||
/RA/ | |||
Joseph W. Shea, Project Director Nuclear Security Policy Project Directorate Division of Nuclear Security Office of Nuclear Security and Incident Response Docket No. 70-1252 | |||
==Enclosures:== | ==Enclosures:== | ||
(Note: Enclosure 2 contains Safeguards Information)1. Route No. 209 - Mileage Summary | (Note: Enclosure 2 contains Safeguards Information) | ||
: 2. Route No. 209 - Detailed Highway Route Plan (U)DISTRIBUTION: | : 1. Route No. 209 - Mileage Summary | ||
: 2. Route No. 209 - Detailed Highway Route Plan (U) | |||
DISTRIBUTION: (07001252920R) (TAC # D91386) w/enclosures 1 and 2: | |||
DOCKET Case File 70-1252 OSmith, R-II MShannon, R-IV w/o Enclosure 2 RidsOgc RidsNsirDnsMtws RidsNsirDNS RidsNsirPmda1 NJensen, OGC EPoteat, OCIO KJabbour, NRR ADAMS Package Accession # ML033320079 ADAMS Document Accession # ML033320093 is SGI and is not entered into ADAMS g:dns staff\bennington\edlowltr.209.wpd | |||
* see previous concurrence MTWS E MTWS n MTWS n NSP-PD OFC GBennington/gb | |||
* PBrochman | |||
* MLayton | |||
* JShea NAME 11/26/03 11/28/03 11/28/03 11/28 /03 DATE OFFICIAL RECORD COPY C = COVER E = COVER & ENCLOSURE N = NO COPY SAFEGUARDS INFORMATION | |||
Mailing Labels MRS. FRANCHONE OSHINOWO VICE PRESIDENT, SPENT FUEL PROGRAM EDLOW INTERNATIONAL COMPANY 1666 CONNECTICUT AVE., N.W., SUITE 201 W ASHINGTON, D.C. 20009 MRS. FRANCHONE OSHINOWO VICE PRESIDENT, SPENT FUEL PROGRAM EDLOW INTERNATIONAL COMPANY 1666 CONNECTICUT AVE., N.W., SUITE 201 W ASHINGTON, D.C. 20009 MRS. FRANCHONE OSHINOWO VICE PRESIDENT, SPENT FUEL PROGRAM EDLOW INTERNATIONAL COMPANY 1666 CONNECTICUT AVE., N.W., SUITE 201 W ASHINGTON, D.C. 20009 MRS. FRANCHONE OSHINOWO VICE PRESIDENT, SPENT FUEL PROGRAM EDLOW INTERNATIONAL COMPANY 1666 CONNECTICUT AVE., N.W., SUITE 201 W ASHINGTON, D.C. 20009 MRS. FRANCHONE OSHINOWO VICE PRESIDENT, SPENT FUEL PROGRAM EDLOW INTERNATIONAL COMPANY 1666 CONNECTICUT AVE., N.W., SUITE 201 W ASHINGTON, D.C. 20009}} |
Revision as of 02:29, 24 November 2019
ML033320093 | |
Person / Time | |
---|---|
Site: | Browns Ferry, Zion, 07001252 ![]() |
Issue date: | 11/28/2003 |
From: | James Shea NRC/NSIR/DNS |
To: | Oshinowo F Edlow International Co |
Bennington G NSIR/DNS 301-415-8183 | |
Shared Package | |
ML033320079 | List: |
References | |
+kBR1SISP20060113, -RFPFR, 07001252920R | |
Download: ML033320093 (5) | |
Text
SAFEGUARDS INFORMATION November 28, 2003 Mrs. Franchone Oshinowo Vice President, Spent Fuel Program Edlow International Company 1666 Connecticut Ave., N.W., Suite 201 Washington, D.C. 20009
SUBJECT:
APPROVAL OF HIGHWAY ROUTE TO TRANSPORT SPENT NUCLEAR FUEL FROM ATHENS, AL, TO PLEASANTON, CA (NRC ROUTE NO. 209)
Dear Mrs. Oshinowo:
On behalf of the U. S. Nuclear Regulatory Commission (NRC), I am responding to your submittal of July 17, 2003, which requested the NRC approve a route for transporting spent nuclear fuel (SNF) from Browns Ferry Nuclear Plant, Athens, AL, to GE Vallecitos Nuclear Center, Pleasanton, CA (NRC Route No. 209).
The NRC has reviewed Edlow International Companys submittal and concluded that the information satisfies the requirements of 10 CFR 73.37. Specific details of Route No. 209 are enclosed [Enclosure 1]. Specific details of Route No. 209 combined with additional Safeguards Information (SGI) are also enclosed [Enclosure 2]. Enclosure 2 will not be released to the public and you should protect it in accordance with the requirements of 10 CFR 73.21.
Approval of Route No. 209 will expire two years from the date of this letter.
The NRC issued additional security measures for the transportation of SNF for NRC licensees who ship greater than 100 grams of SNF. Licensees are required to comply with the requirements of 10 CFR 73.37 and these measures when shipping SNF. Licensees are also required to comply with the U.S. Departments of Transportation and Homeland Security regulations on the shipment of hazardous materials.
In addition, the NRC also issued Regulatory Issue Summary (RIS) 2002-12I, Rev. 1, on October 3, 2002, Transportation of Spent Nuclear Fuel Greater than 100 Grams - NRC Threat Advisory and Protective Measures System. The RIS advised licensees shipping SNF to consider various recommendations to be taken in conjunction with changes to the national or transportation-sector threat levels.
WARNING: Violation of Section 147 of the Atomic Energy Act, "Safeguards Information" is subject to Civil and When separated from Enclosure 2 Criminal Penalties this document is DECONTROLLED SAFEGUARDS INFORMATION
SAFEGUARDS INFORMATION F. Oshinowo If you are requested by State officials to deviate from a portion of the approved route (due to highway construction activities or other exigent conditions), please provide details of the deviation to Mrs. Gloria Bennington of my staff as soon as possible. If you have questions on this route approval or require additional information please contact Mrs. Bennington at (301) 415-8183 or via e-mail at GMB@nrc.gov for non-SGI information or via secure e-mail at GMB@nrc.sgov.gov.
Sincerely,
/RA/
Joseph W. Shea, Project Director Nuclear Security Policy Project Directorate Division of Nuclear Security Office of Nuclear Security and Incident Response Docket No. 70-1252
Enclosures:
(Note: Enclosure 2 contains Safeguards Information)
- 1. Route No. 209 - Mileage Summary
- 2. Route No. 209 - Detailed Highway Route Plan (U)
SAFEGUARDS INFORMATION
SAFEGUARDS INFORMATION F. Oshinowo If you are requested by State officials to deviate from a portion of the approved route (due to highway construction activities or other exigent conditions), please provide details of the deviation to Mrs. Gloria Bennington of my staff as soon as possible. If you have questions on this route approval or require additional information please contact Mrs. Bennington at (301) 415-8183 or via e-mail at GMB@nrc.gov for non-SGI information or via secure e-mail at GMB@nrc.sgov.gov.
Sincerely,
/RA/
Joseph W. Shea, Project Director Nuclear Security Policy Project Directorate Division of Nuclear Security Office of Nuclear Security and Incident Response Docket No. 70-1252
Enclosures:
(Note: Enclosure 2 contains Safeguards Information)
- 1. Route No. 209 - Mileage Summary
- 2. Route No. 209 - Detailed Highway Route Plan (U)
DISTRIBUTION: (07001252920R) (TAC # D91386) w/enclosures 1 and 2:
DOCKET Case File 70-1252 OSmith, R-II MShannon, R-IV w/o Enclosure 2 RidsOgc RidsNsirDnsMtws RidsNsirDNS RidsNsirPmda1 NJensen, OGC EPoteat, OCIO KJabbour, NRR ADAMS Package Accession # ML033320079 ADAMS Document Accession # ML033320093 is SGI and is not entered into ADAMS g:dns staff\bennington\edlowltr.209.wpd
- see previous concurrence MTWS E MTWS n MTWS n NSP-PD OFC GBennington/gb
- PBrochman
- MLayton
- JShea NAME 11/26/03 11/28/03 11/28/03 11/28 /03 DATE OFFICIAL RECORD COPY C = COVER E = COVER & ENCLOSURE N = NO COPY SAFEGUARDS INFORMATION
Mailing Labels MRS. FRANCHONE OSHINOWO VICE PRESIDENT, SPENT FUEL PROGRAM EDLOW INTERNATIONAL COMPANY 1666 CONNECTICUT AVE., N.W., SUITE 201 W ASHINGTON, D.C. 20009 MRS. FRANCHONE OSHINOWO VICE PRESIDENT, SPENT FUEL PROGRAM EDLOW INTERNATIONAL COMPANY 1666 CONNECTICUT AVE., N.W., SUITE 201 W ASHINGTON, D.C. 20009 MRS. FRANCHONE OSHINOWO VICE PRESIDENT, SPENT FUEL PROGRAM EDLOW INTERNATIONAL COMPANY 1666 CONNECTICUT AVE., N.W., SUITE 201 W ASHINGTON, D.C. 20009 MRS. FRANCHONE OSHINOWO VICE PRESIDENT, SPENT FUEL PROGRAM EDLOW INTERNATIONAL COMPANY 1666 CONNECTICUT AVE., N.W., SUITE 201 W ASHINGTON, D.C. 20009 MRS. FRANCHONE OSHINOWO VICE PRESIDENT, SPENT FUEL PROGRAM EDLOW INTERNATIONAL COMPANY 1666 CONNECTICUT AVE., N.W., SUITE 201 W ASHINGTON, D.C. 20009