ML16147A178: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 2: Line 2:
| number = ML16147A178
| number = ML16147A178
| issue date = 04/29/2016
| issue date = 04/29/2016
| title = Seabrook Station, Revision 17 to Updated Final Safety Analysis Report, Chapter 2, Appendix 2L, Geologic Investigation of Soils and the Bedrock Surface at Unit 2 Containment Site. Seabrook Station through Appendix 2R, Short-Term (Accident) Diffusion ....
| title = Seabrook Station, Revision 17 to Updated Final Safety Analysis Report, Chapter 2, Appendix 2L, Geologic Investigation of Soils and the Bedrock Surface at Unit 2 Containment Site. Seabrook Station Through Appendix 2R, Short-Term (Accident) D
| author name =  
| author name =  
| author affiliation = NextEra Energy Seabrook, LLC
| author affiliation = NextEra Energy Seabrook, LLC
Line 14: Line 14:
| document type = Updated Final Safety Analysis Report (UFSAR)
| document type = Updated Final Safety Analysis Report (UFSAR)
| page count = 218
| page count = 218
| revision = 0
}}
}}

Revision as of 19:12, 25 February 2018

Seabrook Station, Revision 17 to Updated Final Safety Analysis Report, Chapter 2, Appendix 2L, Geologic Investigation of Soils and the Bedrock Surface at Unit 2 Containment Site. Seabrook Station Through Appendix 2R, Short-Term (Accident) D
ML16147A178
Person / Time
Site: Seabrook NextEra Energy icon.png
Issue date: 04/29/2016
Revision: 0
From:
NextEra Energy Seabrook
To:
Office of Nuclear Reactor Regulation
Shared Package
ML16260A369 List:
References
SBK-L-16048
Download: ML16147A178 (218)