| {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555*0001 February 8, 2011 Ms. Carol Sachs U. S. Environmental Protection Agency, Region 9 Mail Code: CED-2 75 Hawthorne Street San Francisco, CA 94105 FINAL PLANT-SPECIFIC SUPPLEMENT 43 TO THE GENERIC ENVIRONMENTAL IMPACT STATEMENT FOR LICENSE RENEWAL OF NUCLEAR PLANTS REGARDING PALO VERDE NUCLEAR GENERATING STATION | | {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555*0001 February 8, 2011 Ms. Carol Sachs U. S. Environmental Protection Agency, Region 9 Mail Code: CED-2 75 Hawthorne Street San Francisco, CA 94105 |
| | |
| | ==SUBJECT:== |
| | FINAL PLANT-SPECIFIC SUPPLEMENT 43 TO THE GENERIC ENVIRONMENTAL IMPACT STATEMENT FOR LICENSE RENEWAL OF NUCLEAR PLANTS REGARDING PALO VERDE NUCLEAR GENERATING STATION |
|
| |
|
| ==Dear Ms. Sachs:== | | ==Dear Ms. Sachs:== |
| The U.S. Nuclear Regulatory Commission (NRC) staff has completed the final plant-specific Supplement 43 to NUREG-1437, "Generic Environmental Impact Statement for License Renewal of Nuclear Plants" (GElS), regarding the renewal of Operating Licenses NPF-41, NPF-51 and NPF-74 for an additional 20 years of operation for the Palo Verde Nuclear Generating Station. Enclosed is a copy of the final supplement and the associated Federal Register Notice of Availability. | | |
| The notice advises the public that the final supplement is publicly available at the NRC Public Document Room or from the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC website at http://www.nrc.gov/reading-rm/adams/html. The accession number for the final Supplement 43 to the GElS is ML103560149. | | The U.S. Nuclear Regulatory Commission (NRC) staff has completed the final plant-specific Supplement 43 to NUREG-1437, "Generic Environmental Impact Statement for License Renewal of Nuclear Plants" (GElS), regarding the renewal of Operating Licenses NPF-41, NPF-51 and NPF-74 for an additional 20 years of operation for the Palo Verde Nuclear Generating Station. Enclosed is a copy of the final supplement and the associated Federal Register Notice of Availability. The notice advises the public that the final supplement is publicly available at the NRC Public Document Room or from the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC website at http://www.nrc.gov/reading-rm/adams/html. The accession number for the final Supplement 43 to the GElS is ML103560149. |
| As discussed in Section 9.4 of the final supplement, the NRC's recommendation is that the adverse environmental impacts of license renewal for PVNGS are not great enough to deny the option of license renewal for energy-planning decision makers. This recommendation is based on (1) the analysis and findings in the GElS; (2) the Environmental Report submitted by Arizona Public Service Company (APS); (3) consultation with Federal, State and local agencies; (4) the NRC staff's own independent review; and (5) the NRC staff's consideration of public comments received during the scoping process and on the draft supplement. | | As discussed in Section 9.4 of the final supplement, the NRC's recommendation is that the adverse environmental impacts of license renewal for PVNGS are not great enough to deny the option of license renewal for energy-planning decision makers. This recommendation is based on (1) the analysis and findings in the GElS; (2) the Environmental Report submitted by Arizona Public Service Company (APS); (3) consultation with Federal, State and local agencies; (4) the NRC staff's own independent review; and (5) the NRC staff's consideration of public comments received during the scoping process and on the draft supplement. |
| Region 9 of the U. S. Environmental Protection Agency provided comments on the draft Supplement 43 in a letter dated October 29, 2010. Responses to those comments are provided at pages A-50 through A-55 of the final Supplement | | Region 9 of the U. S. Environmental Protection Agency provided comments on the draft Supplement 43 in a letter dated October 29, 2010. Responses to those comments are provided at pages A-50 through A-55 of the final Supplement 43. |
| : 43.
| | |
| C. Sachs -A separate notice of filing of the final supplemental environmental impact statement was placed in the Federal Register through the U.S. Environmental Protection Agency on January 21,2011. If you have any questions regarding this matter, please contact me at 301-415-6223, or by e-mail at David.Drucker@nrc.gov. | | C. Sachs - 2 A separate notice of filing of the final supplemental environmental impact statement was placed in the Federal Register through the U.S. Environmental Protection Agency on January 21,2011. |
| Sincerely, David Drucker, Project Manager Program Operations Branch Division of License Renewal Office of Nuclear Reactor Regulation Docket Nos. 50-528, 50-529 and 50-530 | | If you have any questions regarding this matter, please contact me at 301-415-6223, or by e-mail at David.Drucker@nrc.gov. |
| | Sincerely, |
| | ;i)~?tG~ |
| | David Drucker, Project Manager Program Operations Branch Division of License Renewal Office of Nuclear Reactor Regulation Docket Nos. 50-528, 50-529 and 50-530 |
|
| |
|
| ==Enclosures:== | | ==Enclosures:== |
|
| |
|
| As stated cc w/encls: Distribution via Listserv | | As stated cc w/encls: Distribution via Listserv |
| | |
| | [7590-01-P] |
| | NUCLEAR REGULATORY COMMISSION ARIZONA PUBLIC SERVICE COMPANY PALO VERDE NUCLEAR GENERATING STATION DOCKET NOS. 50-528, 50-529, 50-530 NOTICE OF AVAILABILITY OF THE FINAL SUPPLEMENT 43 TO THE GENERIC ENVIRONMENTAL IMPACT STATEMENT FOR LICENSE RENEWAL OF NUCLEAR PLANTS |
| | [NRC-2009-00 121 Notice is hereby given that the U.S. Nuclear Regulatory Commission (NRC) has published a final plant-specific supplement to the Generic Environmental Impact Statement for License Renewal of Nuclear Plants (GElS), NUREG-1437, regarding the renewal of operating licenses NPF-41, NPF-51 and NPF-74 for an additional 20 years of operation for the Palo Verde Nuclear Generating Station (PVNGS). Possible alternatives to the proposed action (license renewal) include no action and reasonable alternative energy sources. |
| | As discussed in Section 9.4 of the final supplement, the staff determined that the adverse environmental impacts of license renewal for PVNGS are not so great that preserving the option of license renewal for energy planning decision makers would be unreasonable. This recommendation is based on: (1) the analysis and findings in the GElS; (2) information provided in the environmental report (ER) submitted by Arizona Public Service Company; (3) consultation with Federal, State, and local agencies; (4) a review of pertinent documents and reports; and (5) consideration of public comments received during scoping and on the draft SEIS. |
| | |
| | - 2 The final Supplement 43 to the GElS is publicly available at the NRC Public Document Room (PDR), located at One White Flint North, 11555 Rockville Pike, Rockville, Maryland 20852, or from the NRC's Agencywide Documents Access and Management System (ADAMS). |
| | The ADAMS Public Electronic Reading Room is accessible at http://www.nrc,gov/reading rm/adams.html. The accession number for the final Supplement 43 to the GElS is ML103560149. Persons who do not have access to ADAMS or who encounter problems in accessing the documents located in ADAMS, should contact the NRC's PDR reference staff by telephone at (800) 397-4209 or (301) 415-4737, or bye-mail at pdr@nrc.gov. In addition, the Litchfield Park Branch Library, 101 West Wigwam Boulevard, Litchfield Park, AZ 85340, has agreed to make the final supplement available for public inspection. |
| | FOR FURTHER INFORMATION, CONTACT: Mr. David Drucker, Program Operations Branch, Division of License Renewal, Office of Nuclear Reactor Regulation, U.S. Nuclear Regulatory Commission, Mail Stop 0-11 F1, Washington, DC 20555-0001. Mr. Drucker may be contacted by telephone at (800) 368-5642, extension 6223, or via e-mail at david.drucker@nrc.gov. |
| | rd Dated at Rockville, Maryland, this 3 day of January, 2011. |
| | FOR THE NUCLEAR REGULATORY COMMISSION IRAI Trent Wertz, Chief Program Operations Branch Division of License Renewal Office of Nuclear Reactor Regulation |
|
| |
|
| NUCLEAR REGULATORY ARIZONA PUBLIC SERVICE PALO VERDE NUCLEAR GENERATING DOCKET NOS. 50-528, 50-529, NOTICE OF AVAILABILITY OF THE FINAL SUPPLEMENT 43 TO THE ENVIRONMENTAL IMPACT STATEMENT FOR LICENSE RENEWAL OF NUCLEAR [NRC-2009-00 Notice is hereby given that the U.S. Nuclear Regulatory Commission (NRC) has published a final plant-specific supplement to the Generic Environmental Impact Statement for License Renewal of Nuclear Plants (GElS), NUREG-1437, regarding the renewal of operating licenses NPF-41, NPF-51 and NPF-74 for an additional 20 years of operation for the Palo Verde Nuclear Generating Station (PVNGS). Possible alternatives to the proposed action (license renewal) include no action and reasonable alternative energy sources. As discussed in Section 9.4 of the final supplement, the staff determined that the adverse environmental impacts of license renewal for PVNGS are not so great that preserving the option of license renewal for energy planning decision makers would be unreasonable.
| | C. Sachs - 2 A separate notice of filing of the final supplemental environmental impact statement was placed in the Federal Register through the U.S. Environmental Protection Agency on January 21, 2011. |
| This recommendation is based on: (1) the analysis and findings in the GElS; (2) information provided in the environmental report (ER) submitted by Arizona Public Service Company; (3) consultation with Federal, State, and local agencies; (4) a review of pertinent documents and reports; and (5) consideration of public comments received during scoping and on the draft SEIS.
| | If you have any questions regarding this matter, please contact me at 301-415-6223, or by e-mail at David.Drucker@nrc.gov. |
| -The final Supplement 43 to the GElS is publicly available at the NRC Public Document Room (PDR), located at One White Flint North, 11555 Rockville Pike, Rockville, Maryland 20852, or from the NRC's Agencywide Documents Access and Management System (ADAMS). The ADAMS Public Electronic Reading Room is accessible at rm/adams.html.
| | Sincerely, IRA! |
| The accession number for the final Supplement 43 to the GElS is ML103560149.
| | David Drucker, Project Manager Program Operations Branch Division of License Renewal Office of Nuclear Reactor Regulation Docket Nos. 50-528, 50-529 and 50-530 |
| Persons who do not have access to ADAMS or who encounter problems in accessing the documents located in ADAMS, should contact the NRC's PDR reference staff by telephone at (800) 397-4209 or (301) 415-4737, or bye-mail at pdr@nrc.gov.
| |
| In addition, the Litchfield Park Branch Library, 101 West Wigwam Boulevard, Litchfield Park, AZ 85340, has agreed to make the final supplement available for public inspection.
| |
| FOR FURTHER INFORMATION, CONTACT: Mr. David Drucker, Program Operations Branch, Division of License Renewal, Office of Nuclear Reactor Regulation, U.S. Nuclear Regulatory Commission, Mail Stop 0-11 F1, Washington, DC 20555-0001.
| |
| Mr. Drucker may be contacted by telephone at (800) 368-5642, extension 6223, or via e-mail at david.drucker@nrc.gov. Dated at Rockville, Maryland, this 3 rd day of January, 2011. FOR THE NUCLEAR REGULATORY COMMISSION IRAI Trent Wertz, Chief Program Operations Branch Division of License Renewal Office of Nuclear Reactor Regulation C. Sachs -A separate notice of filing of the final supplemental environmental impact statement was placed in the Federal Register through the U.S. Environmental Protection Agency on January 21, 2011. If you have any questions regarding this matter, please contact me at 301-415-6223, or by e-mail at David.Drucker@nrc.gov.
| |
| Docket Nos. 50-528, 50-529 and 50-530 | |
|
| |
|
| ==Enclosures:== | | ==Enclosures:== |
|
| |
|
| As stated cc w/encls: Distribution via Listserv DISTRIBUTION: | | As stated cc w/encls: Distribution via Listserv DISTRIBUTION: |
| HARDCOPY:
| | : l. Regner HARDCOPY: A. Imboden DlR RF R. Hall B. Mizuno, OGC E-MAil: R. Treadway, RIV PUBLIC J. Bashore, RIV RidsNrrDlr Resource V. Dricks, RIV RidsNrrDIrRerb Resource R. lantz, RIV RidsNrrDlrRpob Resource N. O'Keefe, RIV RidsOpaMail Resource ADAMS Accession Nos.: Ml110190661 (Package), Ml11 0190528 (letter), |
| DlR RF E-MAil: PUBLIC RidsNrrDlr Resource RidsNrrDIrRerb Resource RidsNrrDlrRpob Resource RidsOpaMail Resource Sincerely, IRA! David Drucker, Project Manager Program Operations Branch Division of License Renewal Office of Nuclear Reactor Regulation
| | Ml103510478 (FRN), Ml103560149 (Final Supplement 43) |
| : l. Regner A. Imboden R. Hall B. Mizuno, OGC R. Treadway, RIV J. Bashore, RIV V. Dricks, RIV R. lantz, RIV N. O'Keefe, RIV ADAMS Accession Nos.: Ml110190661 (Package), Ml11 0190528 (letter), Ml103510478 (FRN), Ml103560149 (Final Supplement | | IOFFICE PM:RPOB:DlR LA:DlR BC:RPOB:DlR PM:RPOB:DlR NAME DDrucker IKing TWertz DDrucker DATE 02/08/2011 02/03/2011 02/812011 011 OFFICIAL RECORD COpy}} |
| : 43) IOFFICE PM:RPOB:DlR NAME DDrucker DATE 02/08/2011 LA:DlR IKing 02/03/2011 BC:RPOB:DlR TWertz 02/812011 PM:RPOB:DlR DDrucker 011 OFFICIAL RECORD COpy}}
| |
|
---|
Category:Letter
MONTHYEARML24295A0362024-10-23023 October 2024 Regulatory Audit Plan in Support of Relief Request No. 71; Resubmittal of Relief Request-30 ML24296B2152024-10-22022 October 2024 Transmittal of Valve Relief Request (VRR) - 03: Alternative Request Allowing Removal of the Lower Acceptance Criteria Threshold from Solenoid-Operated Valves ML24296B2142024-10-22022 October 2024 Transmittal of Valve Relief Request (VRR) - 02: Alternative Request Allowing Normally Closed Valves with a Safety Function to Close to Be Exercise Tested Once Per Refueling Cycle IR 05000528/20244022024-10-22022 October 2024 Security Baseline Inspection Report 05000528/2024402 and 05000529/2024402 and 05000530/2024402 ML24296B2172024-10-18018 October 2024 Submittal of Unit 1 Core Operating Limits Report, Revision 34, Unit 2 Core Operating Limits Report, Revision 26, and Unit 3 Core Operating Limits Report, Revision 3 ML24292A2192024-10-18018 October 2024 Core Operating Limits Report Revision 34, 26 and 33 ML24292A0322024-10-17017 October 2024 Th Refueling Outage Steam Generator Tube Inspection Report ML24285A2562024-10-11011 October 2024 License Renewal - Alloy 600 Management Program Plan Response to Request for Additional Information IR 07200044/20244012024-10-0808 October 2024 Independent Spent Fuel Storage Installation Security Inspection Report 07200044/2024401 ML24269A1542024-09-27027 September 2024 Summary of Presubmittal Meeting with Arizona Public Service Company to Discuss Proposed Life-of-Plant Alternatives for a Pressurizer Thermowell Nozzle Repair at Palo Verde Nuclear Generating Station, Unit 1 ML24262A0972024-09-23023 September 2024 Notification of Post-Approval Site Inspection for License Renewal and Request for Information Inspection (05000529/2024011) ML24241A2542024-08-28028 August 2024 Inservice Inspection Request for Information ML24241A2782024-08-28028 August 2024 License Amendment Request to Revise the Technical Specifications 3.5.1 and 3.5.2 Safety Injection Tank Pressure Bands, and to Use GOTHIC Code ML24240A2682024-08-27027 August 2024 Transmittal of Technical Specification Bases Revision 79 IR 05000528/20240052024-08-22022 August 2024 Updated Inspection Plan for Palo Verde Nuclear Generating Station - Units 1, 2, and 3 (Report 05000528/2024005, 05000529/2024005, 05000530/2024005) 05000530/LER-2024-001-01, Inoperable Boron Dilution Alarm System(Bdas) with Technical Specification Violation2024-08-21021 August 2024 Inoperable Boron Dilution Alarm System(Bdas) with Technical Specification Violation ML24208A0612024-08-20020 August 2024 Issuance of Amendment Nos. 224, 224, and 224 Regarding Revision to Technical Specifications 3.5.1, 3.5.2 and 3.6.5 IR 05000528/20244042024-08-0808 August 2024 Cybersecurity Inspection Report 05000528/2024404, 05000529/2024404 and 05000530/2024404 ML24213A3232024-07-31031 July 2024 Transmittal of Relief Request (RR) No. 71: Re-Submittal of RR-30 ML24213A3292024-07-31031 July 2024 Transmittal of Relief Request (RR) No. 72: Re-Submittal of RR-39 IR 05000528/20240022024-07-29029 July 2024 Integrated Inspection Report 05000528/2024002 and 05000529/2024002 and 05000530/2024002 ML24173A3302024-07-24024 July 2024 Pressurizer Surge Line Inspection Program ML24159A4702024-07-17017 July 2024 Issuance of Amendment Nos. 223, 223, and 223 Revision to Technical Specifications 3.5.1 and 3.5.2 Using Risk Informed Process for Evaluations ML24198A0662024-07-16016 July 2024 Program Review - Simulator Testing Methodology ML24193A3442024-07-11011 July 2024 Fourth 10-Year Interval, Second Period Owner’S Activity Report Number 3R24 ML24129A0522024-07-0303 July 2024 Review of the Spring 2023 Steam Generator Tube Inspection Report ML24177A3212024-06-25025 June 2024 Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Transportable Storage Canisters Identification Numbers AMZDFX180, AMZDFX181, AMZDFX182 Vertical Concrete Cask Identification Nu 05000530/LER-2024-002, Invalid Specified System Actuation of Train B Emergency Diesel Generator2024-06-25025 June 2024 Invalid Specified System Actuation of Train B Emergency Diesel Generator IR 05000528/20240042024-06-25025 June 2024 Notification of Inspection (NRC Inspection Report 05000528/2024004, 05000529/2024004, 05000530/2024004) ML24177A3222024-06-25025 June 2024 Invalid Specified System Actuation of Train B Emergency Diesel Generator ML24170A9962024-06-18018 June 2024 Response to Second Request for Additional Information to Revise Technical Specifications (TS) 3.5.1, Safety Injection Tanks (Sits) – Operating, TS 3.5.2, Safety Injection Tanks (Sits) – Shutdown a IR 05000528/20243012024-06-17017 June 2024 NRC Examination Report 05000528/2024301; 05000529/2024301; 05000530/2024301 ML24129A2062024-06-14014 June 2024 Issuance of Amendment Nos. 222, 222, and 222 Revision to Technical Specifications to Adopt TSTF-266-A 05000530/LER-2024-001, Inoperable Boron Dilution Alarm System(Bdas) with Technical Specification Violation2024-06-0505 June 2024 Inoperable Boron Dilution Alarm System(Bdas) with Technical Specification Violation ML24159A0262024-06-0303 June 2024 Annual Report of Guarantee of Payment of Deferred Premium 05000529/LER-2024-001, Valid Specified System Actuations of Unit 2 Train B Emergency Diesel Generator and Train B Auxiliary Feedwater2024-05-23023 May 2024 Valid Specified System Actuations of Unit 2 Train B Emergency Diesel Generator and Train B Auxiliary Feedwater ML24135A2482024-05-14014 May 2024 Response to Second Request for Additional Information to Proposed Method to Manage Environmentally Assisted Fatigue for the Pressurizer Surge Line ML24164A2582024-05-0909 May 2024 10-PV-2024-04 Post-Exam Comments ML24128A2702024-05-0707 May 2024 Docket Nos. Stn 50-528/529/530 - Response to NRC Regulatory Issue Summary (RIS) 2024-01, Preparation and Scheduling of Operator Licensing Examinations ML24129A1482024-05-0707 May 2024 And Independent Spent Fuel Storage Installation Registration of Dry Spent Fuel Storage Casks with Applied Changes IR 05000528/20240012024-05-0202 May 2024 Independent Spent Fuel Storage Installation, Integrated Inspection Report 05000528/2024001, 05000529/2024001, 05000530/2024001, 07200044/2024001, and Exercise of Enforcement Discretion ML24119A0022024-04-26026 April 2024 2023 Annual Environmental Operating Report ML24116A2082024-04-24024 April 2024 Independent Spent Fuel Storage Installation, Annual Radioactive Effluent Release Report 2023 IR 05000528/20244012024-04-22022 April 2024 Security Baseline Inspection Report 05000528/2024401 and 05000529/2024401 and 05000530/2024401 (Cover Letter) ML24109A0712024-04-22022 April 2024 NRC Initial Operator Licensing Examination Approval 05000528/2024301, 05000529/2024301, and 05000530/2024301 ML24112A0012024-04-19019 April 2024 Core Operating Limits Report, Revision 32 ML24108A1982024-04-16016 April 2024 Independent Spent Fuel Storage Installation - Registration of Dry Spent Fuel Storage Casks with Applied Changes Authorized by an Amended Certificate of Compliance ML24103A2482024-04-12012 April 2024 Emergency Core Cooling System Performance Evaluation Models, 10 CFR 50.46(a)(3)(ii) Annual Report for 2023 ML24131A0972024-04-10010 April 2024 Annual Radiological Environmental Operating Report 2023 ML24096A2202024-04-0505 April 2024 Transmittal of Technical Specification Bases Revision 78 2024-09-27
[Table view] Category:Federal Register Notice
MONTHYEARML24130A0012024-05-16016 May 2024 April 2024, Issuance of Multiple Exemptions Regarding Security Notifications, Reports, and Recording Keeping ML24114A3102024-05-0303 May 2024 Monthly (28-Day) Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: May 14, 2024 ML23166B0852023-07-0606 July 2023 FRN: for Issuance of Exemption ML23045A3112023-03-15015 March 2023 Order Extending the Effectiveness of the Approval of the Indirect Transfer of the Co-Owner Licenses from Public Service Company of New Mexico to Avangrid, Inc. (EPID L-2022-LLO-0000) (FRN) ML22146A1872022-06-0101 June 2022 FRN for Issuance of Exemption ML22101A2572022-05-11011 May 2022 Order Extending the Effectiveness of the Approval of the Indirect Transfer of the Co-Owner Licenses from Public Service Company of New Mexico to Avangrid, Inc. (EPID L-2022-LLO-0000) (FRN) ML22054A0072022-03-24024 March 2022 Exemption from the Requirements of 10 CFR 50.62 to Delete Diverse Auxiliary Feedwater Actuation System Using Risk-Informed Process for Evaluations (EPID L 2022 Lle 0004) FRN ML22034A9832022-02-15015 February 2022 FRN - Notice of Issuance of COVID-19 Exemptions Issued in January 2022 ML22003A1042022-01-26026 January 2022 the Independent Spent Fuel Storage Installation - Order Approving Indirect Transfer of Control of Licenses (EPID L 2021 LLM 0002) (FRN) ML21307A1332021-11-17017 November 2021 the Independent Spent Fuel Storage Installation - Order Approving Transfers of Control of Licenses for Minority Interests Subject to Expiring Leases (Superseding Order of October 21, 2021) (FRN) ML21307A1312021-11-17017 November 2021 the Independent Spent Fuel Storage Installation - Order Approving Transfers of Control of Licenses for Minority Interests Subject to Expiring Leases (EPID L-2021-LLM-0003) (Letter) ML21245A0662021-10-21021 October 2021 the Independent Spent Fuel Storage Installation - Order Approving Transfers of Control of Licenses for Minority Interests Subject to Expiring Leases (EPID L-2021-LLM-0003) (FRN) ML21245A0642021-10-21021 October 2021 the Independent Spent Fuel Storage Installation - Order Approving Transfers of Control of Licenses for Minority Interests Subject to Expiring Leases (EPID L-2021-LLM-0003) (Letter) ML21245A0652021-10-21021 October 2021 the Independent Spent Fuel Storage Installation - Order Approving Transfers of Control of Licenses for Minority Interests Subject to Expiring Leases (EPID L-2021-LLM-0003) (Order) ML21165A0542021-06-23023 June 2021 Letter, Notice of Consideration of Approval of Application Proposed Transfer of Control of Licenses and Opportunity to Request a Hearing ML21165A0562021-06-23023 June 2021 FRN - Notice of Consideration of Approval of Application Proposed Transfer of Control of Licenses and Opportunity to Request a Hearing ML21118B0292021-05-25025 May 2021 Order Approving Indirect Transfer of Licenses for Units 1, 2, and 3, and the Independent Spent Fuel Storage Installation (EPID L-2020-LLM-0002) (Order) ML21118B0312021-05-25025 May 2021 FRN - Order Approving Indirect Transfer of Licenses for Units 1, 2, and 3, and the Independent Spent Fuel Storage Installation ML21106A1502021-04-28028 April 2021 ISFSI - FRN - Notice of Consideration of Approval of Application Regarding Proposed Indirect License Transfer and Opportunity to Request a Hearing ML21106A1482021-04-28028 April 2021 ISFSI - Letter - Notice of Consideration of Approval of Application Regarding Proposed Indirect License Transfer and Opportunity to Request a Hearing ML21028A0122021-02-18018 February 2021 FRN - Notice of Issuance of Multiple Exemptions Regarding Various Parts of 10 CFR Due to COVID-19 Impacts for January 2021 ML21011A2492021-01-21021 January 2021 ISFSI, Letter - Notice of Consideration of Approval of Application Regarding Proposed Indirect License Transfer and Opportunity for a Hearing ML21011A2592021-01-21021 January 2021 ISFSI, FRN - Notice of Consideration of Approval of Application Regarding Proposed Indirect License Transfer and Opportunity for a Hearing ML20335A0902020-12-21021 December 2020 Federal Register Notice - November 2020 COVID-19 Exemptions ML20119A5242020-05-0707 May 2020 FRN: Notice of Issuance of Multiple Exemptions Regarding 10 CFR Part 26 (COVID-19) ML20035C4082020-02-18018 February 2020 Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: 02/25/2020 ML19213A0342019-08-23023 August 2019 Federal Register Notice: Palo Verde Nuclear Generating Station Independent Spent Fuel Storage Installation - Issuance of Exemption ML19205A2742019-08-19019 August 2019 Federal Register Notice: Palo Verde Nuclear Generating Station ISFSI - Environmental Assessment and Finding of No Significant Impact; Issuance ML19122A2102019-05-15015 May 2019 Federal Register Notice: Palo Verde Independent Spent Fuel Storage Installation - Environmental Assessment and Finding of No Significant Impact; Issuance NRC-2018-0277, Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving Proposed No Significant Hazards Consideration and Containing SUNSI and Order Imposing Procedures for Access to SUNSI - Publication Date: January2018-12-13013 December 2018 Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving Proposed No Significant Hazards Consideration and Containing SUNSI and Order Imposing Procedures for Access to SUNSI - Publication Date: January 8, 2 ML18334A2202018-12-13013 December 2018 Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving Proposed No Significant Hazards Consideration and Containing SUNSI and Order Imposing Procedures for Access to SUNSI - Publication Date: January 8, 2 ML18295A7442018-10-25025 October 2018 Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: 11/06/18 NRC-2017-0175, Biweekly Sholly Report - Federal Register Notice Fr Publication Date: August 15, 20172017-08-0404 August 2017 Biweekly Sholly Report - Federal Register Notice Fr Publication Date: August 15, 2017 ML17213A1842017-08-0404 August 2017 Biweekly Sholly Report - Federal Register Notice Fr Publication Date: August 15, 2017 NRC-2016-0202, Biweekly FRN - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: September 27, 20162016-09-19019 September 2016 Biweekly FRN - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: September 27, 2016 ML16257A5172016-09-19019 September 2016 Biweekly FRN - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: September 27, 2016 NRC-2016-0161, Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: August 16, 20162016-08-0303 August 2016 Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: August 16, 2016 ML16215A2272016-08-0303 August 2016 Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: August 16, 2016 NRC-2016-0100, Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: May 24, 20162016-05-13013 May 2016 Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: May 24, 2016 ML16131A7952016-05-13013 May 2016 Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: May 24, 2016 ML16061A3012016-03-0202 March 2016 Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: March 15, 2016 NRC-2015-0269, Biweekly FRN - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: December 8, 20152015-11-27027 November 2015 Biweekly FRN - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: December 8, 2015 ML15328A5502015-11-27027 November 2015 Biweekly FRN - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: December 8, 2015 ML15252A1102015-09-11011 September 2015 Letter, Newspaper Notice, Exigent License Amendment Request to Amend Technical Specification Surveillance Requirement 3.1.5.3 for Control Element Assembly 88 for the Remainder of Cycle 19 ML13018A2392015-04-0808 April 2015 G20110171 - Letter to Petitioner Saporito on Proposed Director'S Decision Regarding 2.206 Petition Dated: March 12, 2011 ML14177A6452014-06-27027 June 2014 Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations ML14059A1812014-03-0707 March 2014 FRN - Withdrawal of License Amendment Request to Revise Technical Specifications; Eliminate Use of the Term Core Alteration Consistent w/TSTF-471 and NUREG-1432, Rev 3 ML13225A5572013-08-12012 August 2013 Rescission of Certain Security Orders Concerning Spent Nuclear Fuel in Transit ML13228A3992013-08-12012 August 2013 Letter to Holders of Independent Spent Fuel Storage Installation (ISFSI) Licenses Re Rescission of Certain Security Orders Concerning Spent Nuclear Fuel in Transit - Rin 3150-AI64 (NRC-2009-0163) EA-02-109 NRC-2012-0067, Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Effective Immediately) - to All Power Reactor Licensees and Holders of Construction Permits in Active or Deferred Status2012-03-12012 March 2012 Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Effective Immediately) - to All Power Reactor Licensees and Holders of Construction Permits in Active or Deferred Status 2024-05-03
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555*0001 February 8, 2011 Ms. Carol Sachs U. S. Environmental Protection Agency, Region 9 Mail Code: CED-2 75 Hawthorne Street San Francisco, CA 94105
SUBJECT:
FINAL PLANT-SPECIFIC SUPPLEMENT 43 TO THE GENERIC ENVIRONMENTAL IMPACT STATEMENT FOR LICENSE RENEWAL OF NUCLEAR PLANTS REGARDING PALO VERDE NUCLEAR GENERATING STATION
Dear Ms. Sachs:
The U.S. Nuclear Regulatory Commission (NRC) staff has completed the final plant-specific Supplement 43 to NUREG-1437, "Generic Environmental Impact Statement for License Renewal of Nuclear Plants" (GElS), regarding the renewal of Operating Licenses NPF-41, NPF-51 and NPF-74 for an additional 20 years of operation for the Palo Verde Nuclear Generating Station. Enclosed is a copy of the final supplement and the associated Federal Register Notice of Availability. The notice advises the public that the final supplement is publicly available at the NRC Public Document Room or from the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC website at http://www.nrc.gov/reading-rm/adams/html. The accession number for the final Supplement 43 to the GElS is ML103560149.
As discussed in Section 9.4 of the final supplement, the NRC's recommendation is that the adverse environmental impacts of license renewal for PVNGS are not great enough to deny the option of license renewal for energy-planning decision makers. This recommendation is based on (1) the analysis and findings in the GElS; (2) the Environmental Report submitted by Arizona Public Service Company (APS); (3) consultation with Federal, State and local agencies; (4) the NRC staff's own independent review; and (5) the NRC staff's consideration of public comments received during the scoping process and on the draft supplement.
Region 9 of the U. S. Environmental Protection Agency provided comments on the draft Supplement 43 in a letter dated October 29, 2010. Responses to those comments are provided at pages A-50 through A-55 of the final Supplement 43.
C. Sachs - 2 A separate notice of filing of the final supplemental environmental impact statement was placed in the Federal Register through the U.S. Environmental Protection Agency on January 21,2011.
If you have any questions regarding this matter, please contact me at 301-415-6223, or by e-mail at David.Drucker@nrc.gov.
Sincerely,
- i)~?tG~
David Drucker, Project Manager Program Operations Branch Division of License Renewal Office of Nuclear Reactor Regulation Docket Nos. 50-528, 50-529 and 50-530
Enclosures:
As stated cc w/encls: Distribution via Listserv
[7590-01-P]
NUCLEAR REGULATORY COMMISSION ARIZONA PUBLIC SERVICE COMPANY PALO VERDE NUCLEAR GENERATING STATION DOCKET NOS. 50-528, 50-529, 50-530 NOTICE OF AVAILABILITY OF THE FINAL SUPPLEMENT 43 TO THE GENERIC ENVIRONMENTAL IMPACT STATEMENT FOR LICENSE RENEWAL OF NUCLEAR PLANTS
[NRC-2009-00 121 Notice is hereby given that the U.S. Nuclear Regulatory Commission (NRC) has published a final plant-specific supplement to the Generic Environmental Impact Statement for License Renewal of Nuclear Plants (GElS), NUREG-1437, regarding the renewal of operating licenses NPF-41, NPF-51 and NPF-74 for an additional 20 years of operation for the Palo Verde Nuclear Generating Station (PVNGS). Possible alternatives to the proposed action (license renewal) include no action and reasonable alternative energy sources.
As discussed in Section 9.4 of the final supplement, the staff determined that the adverse environmental impacts of license renewal for PVNGS are not so great that preserving the option of license renewal for energy planning decision makers would be unreasonable. This recommendation is based on: (1) the analysis and findings in the GElS; (2) information provided in the environmental report (ER) submitted by Arizona Public Service Company; (3) consultation with Federal, State, and local agencies; (4) a review of pertinent documents and reports; and (5) consideration of public comments received during scoping and on the draft SEIS.
- 2 The final Supplement 43 to the GElS is publicly available at the NRC Public Document Room (PDR), located at One White Flint North, 11555 Rockville Pike, Rockville, Maryland 20852, or from the NRC's Agencywide Documents Access and Management System (ADAMS).
The ADAMS Public Electronic Reading Room is accessible at http://www.nrc,gov/reading rm/adams.html. The accession number for the final Supplement 43 to the GElS is ML103560149. Persons who do not have access to ADAMS or who encounter problems in accessing the documents located in ADAMS, should contact the NRC's PDR reference staff by telephone at (800) 397-4209 or (301) 415-4737, or bye-mail at pdr@nrc.gov. In addition, the Litchfield Park Branch Library, 101 West Wigwam Boulevard, Litchfield Park, AZ 85340, has agreed to make the final supplement available for public inspection.
FOR FURTHER INFORMATION, CONTACT: Mr. David Drucker, Program Operations Branch, Division of License Renewal, Office of Nuclear Reactor Regulation, U.S. Nuclear Regulatory Commission, Mail Stop 0-11 F1, Washington, DC 20555-0001. Mr. Drucker may be contacted by telephone at (800) 368-5642, extension 6223, or via e-mail at david.drucker@nrc.gov.
rd Dated at Rockville, Maryland, this 3 day of January, 2011.
FOR THE NUCLEAR REGULATORY COMMISSION IRAI Trent Wertz, Chief Program Operations Branch Division of License Renewal Office of Nuclear Reactor Regulation
C. Sachs - 2 A separate notice of filing of the final supplemental environmental impact statement was placed in the Federal Register through the U.S. Environmental Protection Agency on January 21, 2011.
If you have any questions regarding this matter, please contact me at 301-415-6223, or by e-mail at David.Drucker@nrc.gov.
Sincerely, IRA!
David Drucker, Project Manager Program Operations Branch Division of License Renewal Office of Nuclear Reactor Regulation Docket Nos. 50-528, 50-529 and 50-530
Enclosures:
As stated cc w/encls: Distribution via Listserv DISTRIBUTION:
- l. Regner HARDCOPY: A. Imboden DlR RF R. Hall B. Mizuno, OGC E-MAil: R. Treadway, RIV PUBLIC J. Bashore, RIV RidsNrrDlr Resource V. Dricks, RIV RidsNrrDIrRerb Resource R. lantz, RIV RidsNrrDlrRpob Resource N. O'Keefe, RIV RidsOpaMail Resource ADAMS Accession Nos.: Ml110190661 (Package), Ml11 0190528 (letter),
Ml103510478 (FRN), Ml103560149 (Final Supplement 43)
IOFFICE PM:RPOB:DlR LA:DlR BC:RPOB:DlR PM:RPOB:DlR NAME DDrucker IKing TWertz DDrucker DATE 02/08/2011 02/03/2011 02/812011 011 OFFICIAL RECORD COpy