ML11201A158: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:DWIGHT LOOK COLLEGE OF ENGINEERING Department of Nuclear Engineering-U TXS &July 13, 2011 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
{{#Wiki_filter:DWIGHT LOOK COLLEGE OF ENGINEERING Department of Nuclear Engineering
                                                                                            -UTXS &
July 13, 2011 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001


==Subject:==
==Subject:==
2010 Annual Report Facility License R-23 To Whom It May Concern: Enclosed please find the 2010 Annual Report for the Texas A&M AGN-201M, College Station, TX 77843. If you have any questions, please do not hesitate to contact me at: (979) 845-4161, or e-mail at riuzaitisgtamu.edu. 29 Zachry Engineering Center 3133 TAMU College Station, TX 77843-3133 Tel. 979.845.4161 Fax. 979.845.6443 http://nuclear.tamu.edu bD C)0 94L ANNUAL OPERATING REPORT of the TEXAS A&M UNIVERSITY AGN-201M TRAINING REACTOR NRC LICENSE R-23 JUNE 1, 2010 -MAY 31, 2011 DEPARTMENT OF NUCLEAR ENGINEERING TEXAS A&M UNIVERSITY College Station, Texas 77843 -3133 27/,1 Rayr id J. Juzaitis, hD. ate Depati llent Head
2010 Annual Report Facility License R-23 To Whom It May Concern:
Enclosed please find the 2010 Annual Report for the Texas A&M AGN-201M, College Station, TX 77843. If you have any questions, please do not hesitate to contact me at: (979) 845-4161, or e-mail at riuzaitisgtamu.edu.
Enclosure 129 Zachry Engineering Center 3133 TAMU College Station, TX 77843-3133 bD C)
Tel. 979.845.4161 Fax. 979.845.6443 http://nuclear.tamu.edu 0 94L
 
ANNUAL OPERATING REPORT of the TEXAS A&M UNIVERSITY AGN-201M TRAINING REACTOR NRC LICENSE R-23 JUNE 1, 2010 -MAY 31, 2011 DEPARTMENT OF NUCLEAR ENGINEERING TEXAS A&M UNIVERSITY College Station, Texas 77843 - 3133 27/,1 Rayr   id J. Juzaitis, hD.                     ate Depatillent Head
: 1.  
: 1.  


==SUMMARY==
==SUMMARY==
This report is intended to detail the pertinent activities related to the Texas A&M University AGN-201M training facility operated by the Department of Nuclear Engineering during the period of 1 June 2010 until 31 May 2011. The contents of this report are intended to comply with the requirements of IOCFR50 section 50.59 and Section 6.9.1 of the Technical Specifications for this facility under license R-23.The main function of this facility is to provide an operating nuclear system to be used in support of the requirements of Nuclear Engineering courses, as a research tool, and for operator training as well as preventive maintenance.
 
During this reporting period, the AGN-20 1 M reactor was started up for the first time in over 10 years after the completion of all required maintenance.
This report is intended to detail the pertinent activities related to the Texas A&M University AGN-201M training facility operated by the Department of Nuclear Engineering during the period of 1 June 2010 until 31 May 2011. The contents of this report are intended to comply with the requirements of IOCFR50 section 50.59 and Section 6.9.1 of the Technical Specifications for this facility under license R-23.
Mr. Christopher Crouch was appointed Reactor Supervisor in November 2009 and after examination he received a SRO license from the NRC. With this license he oversaw the maintenance and re-startup of the AGN-201M reactor. Since August 2010 the AGN-201M has been performing its main function with the addition of student workers who have received SRO and/or RO licenses.2. OPERATIONAL  
The main function of this facility is to provide an operating nuclear system to be used in support of the requirements of Nuclear Engineering courses, as a research tool, and for operator training as well as preventive maintenance. During this reporting period, the AGN-20 1M reactor was started up for the first time in over 10 years after the completion of all required maintenance. Mr. Christopher Crouch was appointed Reactor Supervisor in November 2009 and after examination he received a SRO license from the NRC. With this license he oversaw the maintenance and re-startup of the AGN-201M reactor. Since August 2010 the AGN-201M has been performing its main function with the addition of student workers who have received SRO and/or RO licenses.
: 2.     OPERATIONAL  


==SUMMARY==
==SUMMARY==
Total Hours Critical:
 
39.35 Total Watt Hours of Operation:
Total Hours Critical:                                       39.35 Total Watt Hours of Operation:                               41:59:00 Average Power Level of Operations (Watts):                   4.45E-02 Number of Reactor Startups:                                 88
41:59:00 Average Power Level of Operations (Watts): 4.45E-02 Number of Reactor Startups:
: 3. UNSCHEDULED SHUTDOWNS 10 June 2010: Reactor SCRAM at 5E-03 W due to "High Power Linear Channel".
88
SCRAM was spurious, suspected problem with self-scaling function of linear channel. Troubleshooting IAW startup plan.
: 3. UNSCHEDULED SHUTDOWNS 10 June 2010: Reactor SCRAM at 5E-03 W due to "High Power Linear Channel".SCRAM was spurious, suspected problem with self-scaling function of linear channel. Troubleshooting IAW startup plan.11 June 2010: Reactor SCRAM at 1.4E-02 W due to "High Power Linear Channel".Suspected problem with scaling of linear channel. Troubleshooting JAW startup plan.14 June 2010: Reactor SCRAM at 3.3E-02 W due to "Low Power Log Channel".Troubleshooting JAW startup plan.30 Sept. 2010: Period SCRAM due to operator error. Operator drove the in during low power operations too quickly. No corrective action required.30 Sept. 2010: Reactor SCRAM due to operator error. Operator inadvertently closed AGN program. No corrective action required.3 Dec. 2010: Earthquake SCRAM due to bumping reactor tank. No corrective action required.4. MAJOR SAFETY RELATED CORRECTIVE MAINTENANCE 13 June 2010: Replaced channel 3 meter with Kiethley Model 6487 Picoammeter.
11 June 2010: Reactor SCRAM at 1.4E-02 W due to "High Power Linear Channel".
Meter was replaced due to suspected problems with meter scaling.18 June 2010: Replaced channel 1 detector with smaller BF3 tube. Replacement was required due to size and sensitivity of channel 1 detector.5. (a) FACILITY CHANGES Additional shielding was erected on the east side of the AGN-20 I M reactor. This concrete wall stands 6.7 feet high, 6.5 feet wide and 1.9 feet deep. The wall was put into place in order to lower general radiation levels to operators and students participating in laboratory experiments.(b) CHANGES TO PLANS AND PROCEDURES The emergency plan has been changed to alleviate a discrepancy between standard facility and NRC emergency terminology for reactor emergencies.(c) NEW EXPERIMENTS OR TESTS No new experiments or test were performed during this reporting period.6.  
Suspected problem with scaling of linear channel. Troubleshooting JAW startup plan.
14 June 2010: Reactor SCRAM at 3.3E-02 W due to "Low Power Log Channel".
Troubleshooting JAW startup plan.
30 Sept. 2010: Period SCRAM due to operator error. Operator drove the sou*ce in during low power operations too quickly. No corrective action required.
30 Sept. 2010: Reactor SCRAM due to operator error. Operator inadvertently closed AGN program. No corrective action required.
3 Dec. 2010: Earthquake SCRAM due to bumping reactor tank. No corrective action required.
: 4. MAJOR SAFETY RELATED CORRECTIVE MAINTENANCE 13 June 2010: Replaced channel 3 meter with Kiethley Model 6487 Picoammeter.
Meter was replaced due to suspected problems with meter scaling.
18 June 2010: Replaced channel 1 detector with smaller BF3 tube. Replacement was required due to size and sensitivity of channel 1 detector.
: 5. (a) FACILITY CHANGES Additional shielding was erected on the east side of the AGN-20 I M reactor. This concrete wall stands 6.7 feet high, 6.5 feet wide and 1.9 feet deep. The wall was put
 
into place in order to lower general radiation levels to operators and students participating in laboratory experiments.
(b) CHANGES TO PLANS AND PROCEDURES The emergency plan has been changed to alleviate a discrepancy between standard facility and NRC emergency terminology for reactor emergencies.
(c) NEW EXPERIMENTS OR TESTS No new experiments or test were performed during this reporting period.
: 6.  


==SUMMARY==
==SUMMARY==
OF SAFETY EVALUATIONS No changes, test or experiments were performed during this reporting period, which meet the criteria of I OCFR50 paragraph 50.59 requiring a safety evaluation.
OF SAFETY EVALUATIONS No changes, test or experiments were performed during this reporting period, which meet the criteria of IOCFR50 paragraph 50.59 requiring a safety evaluation.
: 7.  
: 7.  


==SUMMARY==
==SUMMARY==
OF RADIOACTIVE EFFLUENTS RELEASED No liquid or solid radioactive were released during this reporting period.8. ENVIRONMENTAL RADIOLOGICAL SURVEYS No environmental radiological surveys were performed outside this facility during this reporting period.9. RADIATION EXPOSURE During calendar year 2010 all of the exposures were reported to be less than 0.100 rem or no measurable dose.}}
OF RADIOACTIVE EFFLUENTS RELEASED No liquid or solid radioactive were released during this reporting period.
: 8. ENVIRONMENTAL RADIOLOGICAL SURVEYS No environmental radiological surveys were performed outside this facility during this reporting period.
: 9. RADIATION EXPOSURE During calendar year 2010 all of the exposures were reported to be less than 0.100 rem or no measurable dose.}}

Latest revision as of 17:14, 12 November 2019

Texas A&M University 2010 Annual Report Facility License R-023
ML11201A158
Person / Time
Site: Texas A&M University
Issue date: 07/13/2011
From: Juzaitis R
Texas A&M Univ
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML11201A158 (5)


Text

DWIGHT LOOK COLLEGE OF ENGINEERING Department of Nuclear Engineering

-UTXS &

July 13, 2011 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001

Subject:

2010 Annual Report Facility License R-23 To Whom It May Concern:

Enclosed please find the 2010 Annual Report for the Texas A&M AGN-201M, College Station, TX 77843. If you have any questions, please do not hesitate to contact me at: (979) 845-4161, or e-mail at riuzaitisgtamu.edu.

Enclosure 129 Zachry Engineering Center 3133 TAMU College Station, TX 77843-3133 bD C)

Tel. 979.845.4161 Fax. 979.845.6443 http://nuclear.tamu.edu 0 94L

ANNUAL OPERATING REPORT of the TEXAS A&M UNIVERSITY AGN-201M TRAINING REACTOR NRC LICENSE R-23 JUNE 1, 2010 -MAY 31, 2011 DEPARTMENT OF NUCLEAR ENGINEERING TEXAS A&M UNIVERSITY College Station, Texas 77843 - 3133 27/,1 Rayr id J. Juzaitis, hD. ate Depatillent Head

1.

SUMMARY

This report is intended to detail the pertinent activities related to the Texas A&M University AGN-201M training facility operated by the Department of Nuclear Engineering during the period of 1 June 2010 until 31 May 2011. The contents of this report are intended to comply with the requirements of IOCFR50 section 50.59 and Section 6.9.1 of the Technical Specifications for this facility under license R-23.

The main function of this facility is to provide an operating nuclear system to be used in support of the requirements of Nuclear Engineering courses, as a research tool, and for operator training as well as preventive maintenance. During this reporting period, the AGN-20 1M reactor was started up for the first time in over 10 years after the completion of all required maintenance. Mr. Christopher Crouch was appointed Reactor Supervisor in November 2009 and after examination he received a SRO license from the NRC. With this license he oversaw the maintenance and re-startup of the AGN-201M reactor. Since August 2010 the AGN-201M has been performing its main function with the addition of student workers who have received SRO and/or RO licenses.

2. OPERATIONAL

SUMMARY

Total Hours Critical: 39.35 Total Watt Hours of Operation: 41:59:00 Average Power Level of Operations (Watts): 4.45E-02 Number of Reactor Startups: 88

3. UNSCHEDULED SHUTDOWNS 10 June 2010: Reactor SCRAM at 5E-03 W due to "High Power Linear Channel".

SCRAM was spurious, suspected problem with self-scaling function of linear channel. Troubleshooting IAW startup plan.

11 June 2010: Reactor SCRAM at 1.4E-02 W due to "High Power Linear Channel".

Suspected problem with scaling of linear channel. Troubleshooting JAW startup plan.

14 June 2010: Reactor SCRAM at 3.3E-02 W due to "Low Power Log Channel".

Troubleshooting JAW startup plan.

30 Sept. 2010: Period SCRAM due to operator error. Operator drove the sou*ce in during low power operations too quickly. No corrective action required.

30 Sept. 2010: Reactor SCRAM due to operator error. Operator inadvertently closed AGN program. No corrective action required.

3 Dec. 2010: Earthquake SCRAM due to bumping reactor tank. No corrective action required.

4. MAJOR SAFETY RELATED CORRECTIVE MAINTENANCE 13 June 2010: Replaced channel 3 meter with Kiethley Model 6487 Picoammeter.

Meter was replaced due to suspected problems with meter scaling.

18 June 2010: Replaced channel 1 detector with smaller BF3 tube. Replacement was required due to size and sensitivity of channel 1 detector.

5. (a) FACILITY CHANGES Additional shielding was erected on the east side of the AGN-20 I M reactor. This concrete wall stands 6.7 feet high, 6.5 feet wide and 1.9 feet deep. The wall was put

into place in order to lower general radiation levels to operators and students participating in laboratory experiments.

(b) CHANGES TO PLANS AND PROCEDURES The emergency plan has been changed to alleviate a discrepancy between standard facility and NRC emergency terminology for reactor emergencies.

(c) NEW EXPERIMENTS OR TESTS No new experiments or test were performed during this reporting period.

6.

SUMMARY

OF SAFETY EVALUATIONS No changes, test or experiments were performed during this reporting period, which meet the criteria of IOCFR50 paragraph 50.59 requiring a safety evaluation.

7.

SUMMARY

OF RADIOACTIVE EFFLUENTS RELEASED No liquid or solid radioactive were released during this reporting period.

8. ENVIRONMENTAL RADIOLOGICAL SURVEYS No environmental radiological surveys were performed outside this facility during this reporting period.
9. RADIATION EXPOSURE During calendar year 2010 all of the exposures were reported to be less than 0.100 rem or no measurable dose.