ANNUAL OPERATING REPORT of the TEXAS A&M UNIVERSITY AGN-201M TRAINING REACTOR NRC LICENSE R-23 JUNE 1, 2017 - MAY 31, 2018 DEPARTMENT OF NUCLEAR ENGINEERING TEXAS A&M UNIVERSITY College Station, Texas 77843-3133 Sean M. McDeavitt, Ph.D Date Director, TEES Nuclear Engineering and Science Center
- 1.
SUMMARY
This report is intended to detail the eprtinnet activities related to the Texas A&m University AGN-201M training facility operated by the Department of Nuclear Engineering during the period of June 1, 2017 - May 31, 2018. The contents of this report are intended to comply with the requirements of 10 CFR 50 section 50.59 and Section 6.9.1 of the Technical specifications for the facility under license R-23.
This facility is in storage pending installation in its final location and resuming operations. When operations resume the main function of this facility will be to provide an operating nuclear system to be used in support of the requirements of nuclear engineering courses, as a research tool, and for operator training. During the reporting period, the AGN-201M reactor was maintained in a storage condition and did not operate.
- 2. OPERATIONAL
SUMMARY
Total Hours Critical 0 Total Watt Hours of Operation 0 Average Power Level of Operations (Watts) 0 Number of Reactor Startups 0
- 3. UNSCHEDULED SHUTDOWNS None.
- 4. MAJOR SAFETY RELATED CORRECTIVE MAINENANCE No safety related corrective maintenance was performed during this reporting period.
- 5. FACILITY CHANGES, CHANGES TO PLANS AND PROCEDURES, NEW EXPERIMENTS OR TESTS No changes were made the facility, plans or procedures, and no new experiments or tests were performed during this reporting period.
- 6.
SUMMARY
OF SAFETY EVALUATIONS No changes, tests, or experiments were performed during this reporting period which meet the criteria of 10 CFR 50.59 requiring a safety evaluation.
- 7.
SUMMARY
OF RADIOACTIVE EFFLUENTS RELEASED No radioactive effluents were released during this reporting period.
- 8. ENVIRONMENTAL RADIOLOGICAL SURVEYS No environmental radiological surveys were performed outside this facility during this reporting period.
- 9. RADIATION EXPOSURE Radiation exposure was not higher than background levels during this reporting period.