Annual Operating Report of the Texas A&M University AGN-201M Training Reactor NRC License R-23, June 1, 2019-May 31, 2020
ML20325A145
Person / Time
Site: Texas A&M University
Issue date: 11/20/2020
From: Mcdeavitt S
Texas A&M Univ
To:
Office of Nuclear Material Safety and Safeguards, Office of Nuclear Reactor Regulation
References
Download: ML20325A145 (3)


Text

ANNUAL OPERATING REPORT of the TEXAS A&M UNIVERSITY AGN-201M TRAINING REACTOR NRC LICENSE R-23 JUNE 1, 2019-MAY 31, 2020 DEPARTMENT OF NUCLEAR ENGINEERING TEXAS A&M UNIVERSITY College Station, Texas 77843-3133

  • Sean M. McDeavitt, Ph.D Director, TEES Nuclear Engineering and Science Center

1.

SUMMARY

This report is intended to detail the pertinent activities related to the Texas A&M University AGN-201M training facility operated by the Department of Nuclear Engineering during the period of June 1, 2019-May 31, 2020. The contents of this report are intended to comply with the requirements of 10 CPR 50 section 50.59 and Section 6.9.1 of the Technical specifications for the facility under license R-23.

This facility is in storage pending installaµon in its final location and resuming operations. When operations resume the main function of this facility will be to provide an operating nuclear system to be used in support of the requirements of nuclear engineering courses, as a research tool, and for operator training. During the reporting period, the AGN-201M reactor was maintained in a storage condition and did not operate.

2. OPERATIONAL

SUMMARY

Total Hours Critical 0 Total Watt Hours of Operation 0 Average Power Level of Operations (Watts)

Number of Reactor Startups

3. UNSCHEDULED SHUTDOWNS 0

0 None.

4. MAJOR SAFETY RELATED CORRECTIVE MAINENANCE No safety related corrective maintenance was performed during this reporting period.
5. FACil,ITY CHANGES, CHANGES TO PLANS AND PROCEDURES, NEW EXPERIMENTS OR TESTS No changes were made the facility, plans or procedures, and no new experiments or tests were performed during this reporting period.
6.

SUMMARY

OF SAFETY EVALUATIONS No changes, tests, or experiments were performed during this reporting period which meet the criteria of

  • 10 CPR 50.59 requiring a safety evaluation.
7.

SUMMARY

OF RADIOACTIVE EFFLUENTS RELEASED No radioactive effluents were released during this reporting period.

8. ENVIRONMENTAL RADIOLOGICAL SURVEYS No special environmental surveys were conducted for this specific license. The Storage of the AGN places it in the boundary of license R-83 that has required quarterly state TLD monitoring as well as a monthly site survey to check for radiation levels at all fence lines.
9. RADIATION EXPOSURE Radiation exposure was not higher than background levels during this reporting period.
  • J