ANNUAL OPERATING REPORT of the TEXAS A&M UNIVERSITY AGN-201M TRAINING REACTOR NRC LICENSE R-23 JUNE 1,2008 - MAY 31, 2009 DEPARTMENT OF NUCLEAR ENGINEERING TEXAS A&M UNIVERSITY College Station, Texas 77843 - 3133
- 1.
SUMMARY
This report is intended to detail the pertinent activities related to the Texas A&M University AGN-201 M training facility operated by the Department of Nuclear Engineering during the period of 1 June 2008 until 31 May 2009. The contents of this report are intended to comply with the requirements of 10CFR50 section 50.59(b) and Appendix A of the Technical Specifications for this facility under license R-23.
The main function of this facility is to provide an operating nuclear system to be used as a research too, to support the requirements of Nuclear Engineering courses and for operator training as well as preventive maintenance. During this reporting period, the AGN-201 reactor was not run by facility. The console was completed and all maintenance that could be done without coming to power was completed. Dr. W. D.
Reece was appointed Reactor Manager in January 2009 and after examination he received a SRO license from the NRC. With this license the rods were reloaded into the core.
- 2.
OPERATIONAL
SUMMARY
UTILIZATION BY CATEGORY HOURS (a)
Support of Nuclear Engineering Courses 0
(b)
Operator Training/Requalification 0
(c)
Preventive/Corrective Maintenance 0
Total Operating Hours:
0 Total Hours Critical:
0 Total Watt Hours of Operation:
0
Average Power L-evel of Operations (Watts);
0 Number of Reeaptor St~a up&
0
- 3. UNSCHEDULED SHUTDOWNS NONE
- 4. MAJOR SAFETY RELATED CORRECTIVE MAINTENANCE NONE
- 5. (a) FACILITY CHANGES None were madc during this reporting period, the new AGN-201 control console is complete and work continues to make all systems operable.
(b) CHANGES TO PLANS AND PROCEDURES The security and emergency plans are being prepared to reflect newly imposed requirements and new uses of areas / rooms associated with in the Nuclear Engineering Department.
(c) NEW EXPERIMENTS OR TESTS No new experiments or test were performed during this reporting period.
- 6.
SUMMARY
OF SAFETY EVALUATIONS No changes, test or experiments were performed during this reporting period, which meet the criteria of 1 OCFR50 paragraph 50.59 requiring a safety evaluation.
- 7.
SUMMARY
OF RADIOACTIVE EFFLUENTS RELEASED No liquid or solid radioactive were released during this reporting period,
- 8. ENVIRONMENTAL RADIOLOGICAL SURVEYS No environmental radiological surveys were performed outside this facility during this reporting period.
- 9. RADIATION EXPOSURE During calendar year 2008 all of the exposures were reported to be less than 0.100 rem or no measurable dose.
- 10. MISCELLANEOUS There were no changes to the security plan.