{{#Wiki_filter:Implementation of STAR Program and Replacement of the 2/3 Cycle MTC Measurement Pre-Submittal Presentation to the NRC Date: 07/11/2013
{{#Wiki_filter:Implementation of STAR Program and Replacement of the 2/3 Cycle MTC Measurement Pre-Submittal Presentation to the NRC Date: 07/11/2013


Purpose Present and discuss with the NRC planned licensing changes
Purpose
-Implementation of the Startup Testing Activity Reduction (STAR) Program at PVNGS
* Present and discuss with the NRC planned licensing changes
-Replacement of the 2/3 Cycle Moderator Temperature Coefficient (MTC) Measurement 2
    - Implementation of the Startup Testing Activity Reduction (STAR) Program at PVNGS
Topics STAR Replacement of the 2/3 Cycle MTC Measurement Licensing Approach Conclusion and Discussion 3
    - Replacement of the 2/3 Cycle Moderator Temperature Coefficient (MTC) Measurement 2
STAR Objectives
 
-Alternate method to validate core design
Topics
-Minimize the time the plant is in an abnormal configuration 4
* STAR
STAR Overview -Approved by NRC in WCAP
* Replacement of the 2/3 Cycle MTC Measurement
-16011-P-A Participating plants only Successfully implemented at 8 CE units
* Licensing Approach
-Incorporated into Improved Standard TS NUREG-1432, Rev 4 TSTF 486   5 STAR Overview -Adds Credits Pre
* Conclusion and Discussion 3
-Operational Checks New Beginning of Cycle (BOC) Hot Zero Power (HZP) MTC surveillance methodology Applicability Requirements  
 
-Replaces BOC HZP Isothermal Temperature Coefficient (ITC) Measurement CEA Worth Measurement 6
STAR
STAR Current Methodology
* Objectives
-CEA worth measurement Require operation outside the normal TS LCOs Presents operational challenges
    - Alternate method to validate core design
-Unit 3 LER 2012
    - Minimize the time the plant is in an abnormal configuration 4
-001 -Unit 1 LER 2011
 
-005 -Measure ITC at HZP with use of reactivity computer   7 STAR Proposed Methodology
STAR
-Replacement of CEA Worth Measurements Use applicability requirements Replacement will reduce the occurrence of problems associated with testing and minimize time in abnormal operating configuration 8
* Overview
STAR Proposed Methodology (cont.)
    - Approved by NRC in WCAP-16011-P-A
-Alternate MTC verification Adjust predicted HZP MTC based on measured Critical Boron Increase availability of the control channels Align PVNGS with Improved Standard TS 9
* Participating plants only
STAR Applicability Requirements
* Successfully implemented at 8 CE units
-Found in Table 3
    - Incorporated into Improved Standard TS
-4 of WCAP-16011-P-A -Compliance evaluated on a reload cycle
* NUREG-1432, Rev 4
-specific basis
* TSTF 486 5
-STAR only applied to cycles when compliance verified -Maintain the effectiveness of the STAR Program in problem identification 10 STAR Applicability Requirements (cont.)
 
-Core design methods have a defined set of uncertainties based on a benchmark of predictions to actual plant measurements
STAR
-Core, fuel, CEA design are similar to that of a benchmarked core
* Overview
-Cycle specific predictions independently verified by Comparison of 2 independent neutronics codes   11 STAR Applicability Requirements (cont.)
    - Adds
-Implementation of CEA Lifetime Program Limit CEA life within operation experience base
* Credits Pre-Operational Checks
-Pre-operational checks verify core and CEA loading are consistent with design
* New Beginning of Cycle (BOC) Hot Zero Power (HZP) MTC surveillance methodology
-CEA Coupling checks performed during reactor restack Many favorable PVNGS unique design feature 12 STAR Benefits -Minimize the time the plant is in an abnormal operating configuration
* Applicability Requirements
-Increase the availability of the control channels
    - Replaces
-Operationally focused improvement 13 STAR WCAP 16011
* BOC HZP Isothermal Temperature Coefficient (ITC) Measurement 6
-P-A approach
* CEA Worth Measurement
-Compare STAR Program to Generic Program Generic Program based on ANSI/ANS 19.6.1
 
-1997 Identify set of core problems
STAR
-Design Predictions
* Current Methodology
-As-Built Core
    - CEA worth measurement
-Test Performance 14 STAR WCAP 16011
* Require operation outside the normal TS LCOs
-P-A approach (cont.)
* Presents operational challenges
-Concluded STAR Program is as effective in detecting the Problems as the Generic Program
          - Unit 3 LER 2012-001
-STAR is an NRC approved and implemented alternative to current testing methodology.
          - Unit 1 LER 2011-005
15 STAR PVNGS Application
    - Measure ITC at HZP with use of reactivity computer 7
-Compared Design differences between PVNGS and original participating plants Differences in current PVNGS startup program and Generic Program Operating Experience since original STAR
 
-NRC and INPO
STAR
-PVNGS -Implementing plants 16 STAR Results of Evaluations
* Proposed Methodology
-Contained in plant specific justification
    - Replacement of CEA Worth Measurements
-CASMO/SIMULATE as applied at PVNGS is acceptable for STAR
* Use applicability requirements
-The PVNGS STAR Program is as effective as the approved STAR Program and is an acceptable alternative to the current PVNGS startup testing program.
* Replacement will reduce the occurrence of problems associated with testing and minimize time in abnormal operating configuration 8
17 Replacement of 2/3 Cycle MTC Measurement Objective -To replace the 2/3 cycle MTC measurement with alternate verification Overview -Approved for all CE plants in CE NPSD
 
-911-A and Amendment 1
STAR
-A (TSTF 406)
* Proposed Methodology (cont.)
-No measurement at 2/3 cycle if 40 EFPD measurement is within acceptance criteria
    - Alternate MTC verification
-Already implemented at many PWRs 18 Replacement of 2/3 Cycle MTC Measurement Current Topical only applicable for ROCS & ANC PVNGS will demonstrate applicability of SIMULATE Conclusions
* Adjust predicted HZP MTC based on measured Critical Boron
-SIMULATE is acceptable for use
* Increase availability of the control channels
-Replacement of the 2/3 cycle MTC measurement is acceptable at PVNGS including STAR Cycles 19 Licensing Approach Submit one LAR
* Align PVNGS with Improved Standard TS 9
-Application of STAR to PVNGS
 
-Replacement of 2/3 cycle MTC Measurement 20 Licensing Approach Technical Specification 3.1.4 MTC
STAR
-SR 3.1.4.1 (HZP verification)
* Applicability Requirements
Add note allowing use of alternate BOC HZP MTC surveillance method (TSTF 486)
    - Found in Table 3-4 of WCAP-16011-P-A
-SR 3.1.4.2 (At power verifications)
    - Compliance evaluated on a reload cycle-specific basis
Add note allowing replacement of 2/3 cycle at power MTC Measurement (CE
    - STAR only applied to cycles when compliance verified
-NPSD-911 & TSTF 406) 21 Licensing Approach Proposed Schedule
    - Maintain the effectiveness of the STAR Program in problem identification 10
-Submit November 2013
 
-Requesting NRC Approval in November 2014
STAR
-First use in Spring of 2015 22 Conclusion and Discussion Acceptable to implement the STAR Program at PVNGS Acceptable to replace the 2/3 cycle at power MTC measurement Submit both under a single LAR November 2013 Requesting NRC approval November 2014 23}}
* Applicability Requirements (cont.)
    - Core design methods have a defined set of uncertainties based on a benchmark of predictions to actual plant measurements
    - Core, fuel, CEA design are similar to that of a benchmarked core
    - Cycle specific predictions independently verified by
* Comparison of 2 independent neutronics codes 11
 
STAR
* Applicability Requirements (cont.)
    - Implementation of CEA Lifetime Program
* Limit CEA life within operation experience base
    - Pre-operational checks verify core and CEA loading are consistent with design
    - CEA Coupling checks performed during reactor restack
* Many favorable PVNGS unique design feature 12
 
STAR
* Benefits
    - Minimize the time the plant is in an abnormal operating configuration
    - Increase the availability of the control channels
    - Operationally focused improvement 13
 
STAR
* WCAP 16011-P-A approach
    - Compare STAR Program to Generic Program
* Generic Program based on ANSI/ANS 19.6.1-1997
* Identify set of core problems
            - Design Predictions
            - As-Built Core
            - Test Performance 14
 
STAR
* WCAP 16011-P-A approach (cont.)
    - Concluded STAR Program is as effective in detecting the Problems as the Generic Program
    - STAR is an NRC approved and implemented alternative to current testing methodology.
15
 
STAR
* PVNGS Application
      - Compared
* Design differences between PVNGS and original participating plants
* Differences in current PVNGS startup program and Generic Program
* Operating Experience since original STAR
            - NRC and INPO
            - PVNGS
            - Implementing plants 16
 
STAR
* Results of Evaluations
    - Contained in plant specific justification
    - CASMO/SIMULATE as applied at PVNGS is acceptable for STAR
    - The PVNGS STAR Program is as effective as the approved STAR Program and is an acceptable alternative to the current PVNGS startup testing program.
17
 
Replacement of 2/3 Cycle MTC Measurement
* Objective
    - To replace the 2/3 cycle MTC measurement with alternate verification
* Overview
    - Approved for all CE plants in CE NPSD-911-A and Amendment 1-A (TSTF 406)
    - No measurement at 2/3 cycle if 40 EFPD measurement is within acceptance criteria 18  - Already implemented at many PWRs
 
Replacement of 2/3 Cycle MTC Measurement
* Current Topical only applicable for ROCS
    & ANC
* PVNGS will demonstrate applicability of SIMULATE
* Conclusions
      - SIMULATE is acceptable for use
      - Replacement of the 2/3 cycle MTC measurement is acceptable at PVNGS including 19      STAR Cycles
 
Licensing Approach
* Submit one LAR
      - Application of STAR to PVNGS
      - Replacement of 2/3 cycle MTC Measurement 20
 
Licensing Approach
* Technical Specification 3.1.4 MTC
    - SR 3.1.4.1 (HZP verification)
* Add note allowing use of alternate BOC HZP MTC surveillance method (TSTF 486)
    - SR 3.1.4.2 (At power verifications)
* Add note allowing replacement of 2/3 cycle at power MTC Measurement (CE-NPSD-911 & TSTF 406) 21
 
Licensing Approach
* Proposed Schedule
      - Submit November 2013
      - Requesting NRC Approval in November 2014
      - First use in Spring of 2015 22
 
Conclusion and Discussion
* Acceptable to implement the STAR Program at PVNGS
* Acceptable to replace the 2/3 cycle at power MTC measurement
* Submit both under a single LAR November 2013
* Requesting NRC approval November 2014 23}}

Latest revision as of 16:58, 4 November 2019

7/11/13 Meeting Slides - Implementation of STAR Program and Replacement of the 2/3 Cycle Mtc Measurement
ML13197A095
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 07/11/2013
From:
Arizona Public Service Co
To:
Division of Operating Reactor Licensing
Rankin J
References
TAC MF1932, TAC MF1933, TAC MF1934
Download: ML13197A095 (23)


Text

Implementation of STAR Program and Replacement of the 2/3 Cycle MTC Measurement Pre-Submittal Presentation to the NRC Date: 07/11/2013

Purpose

  • Present and discuss with the NRC planned licensing changes

- Implementation of the Startup Testing Activity Reduction (STAR) Program at PVNGS

- Replacement of the 2/3 Cycle Moderator Temperature Coefficient (MTC) Measurement 2

Topics

  • Replacement of the 2/3 Cycle MTC Measurement
  • Licensing Approach
  • Conclusion and Discussion 3

STAR

  • Objectives

- Alternate method to validate core design

- Minimize the time the plant is in an abnormal configuration 4

STAR

  • Overview

- Approved by NRC in WCAP-16011-P-A

  • Participating plants only
  • Successfully implemented at 8 CE units

- Incorporated into Improved Standard TS

STAR

  • Overview

- Adds

  • Credits Pre-Operational Checks
  • New Beginning of Cycle (BOC) Hot Zero Power (HZP) MTC surveillance methodology
  • Applicability Requirements

- Replaces

  • BOC HZP Isothermal Temperature Coefficient (ITC) Measurement 6
  • CEA Worth Measurement

STAR

  • Current Methodology

- CEA worth measurement

  • Require operation outside the normal TS LCOs
  • Presents operational challenges

- Unit 3 LER 2012-001

- Unit 1 LER 2011-005

- Measure ITC at HZP with use of reactivity computer 7

STAR

  • Proposed Methodology

- Replacement of CEA Worth Measurements

  • Use applicability requirements
  • Replacement will reduce the occurrence of problems associated with testing and minimize time in abnormal operating configuration 8

STAR

  • Proposed Methodology (cont.)

- Alternate MTC verification

  • Adjust predicted HZP MTC based on measured Critical Boron
  • Increase availability of the control channels
  • Align PVNGS with Improved Standard TS 9

STAR

  • Applicability Requirements

- Found in Table 3-4 of WCAP-16011-P-A

- Compliance evaluated on a reload cycle-specific basis

- STAR only applied to cycles when compliance verified

- Maintain the effectiveness of the STAR Program in problem identification 10

STAR

  • Applicability Requirements (cont.)

- Core design methods have a defined set of uncertainties based on a benchmark of predictions to actual plant measurements

- Core, fuel, CEA design are similar to that of a benchmarked core

- Cycle specific predictions independently verified by

  • Comparison of 2 independent neutronics codes 11

STAR

  • Applicability Requirements (cont.)

- Implementation of CEA Lifetime Program

  • Limit CEA life within operation experience base

- Pre-operational checks verify core and CEA loading are consistent with design

- CEA Coupling checks performed during reactor restack

  • Many favorable PVNGS unique design feature 12

STAR

  • Benefits

- Minimize the time the plant is in an abnormal operating configuration

- Increase the availability of the control channels

- Operationally focused improvement 13

STAR

  • WCAP 16011-P-A approach

- Compare STAR Program to Generic Program

  • Identify set of core problems

- Design Predictions

- As-Built Core

- Test Performance 14

STAR

  • WCAP 16011-P-A approach (cont.)

- Concluded STAR Program is as effective in detecting the Problems as the Generic Program

- STAR is an NRC approved and implemented alternative to current testing methodology.

15

STAR

- Compared

  • Design differences between PVNGS and original participating plants
  • Differences in current PVNGS startup program and Generic Program
  • Operating Experience since original STAR

- NRC and INPO

- PVNGS

- Implementing plants 16

STAR

  • Results of Evaluations

- Contained in plant specific justification

- CASMO/SIMULATE as applied at PVNGS is acceptable for STAR

- The PVNGS STAR Program is as effective as the approved STAR Program and is an acceptable alternative to the current PVNGS startup testing program.

17

Replacement of 2/3 Cycle MTC Measurement

  • Objective

- To replace the 2/3 cycle MTC measurement with alternate verification

  • Overview

- Approved for all CE plants in CE NPSD-911-A and Amendment 1-A (TSTF 406)

- No measurement at 2/3 cycle if 40 EFPD measurement is within acceptance criteria 18 - Already implemented at many PWRs

Replacement of 2/3 Cycle MTC Measurement

  • Current Topical only applicable for ROCS

& ANC

  • PVNGS will demonstrate applicability of SIMULATE
  • Conclusions

- SIMULATE is acceptable for use

- Replacement of the 2/3 cycle MTC measurement is acceptable at PVNGS including 19 STAR Cycles

Licensing Approach

- Application of STAR to PVNGS

- Replacement of 2/3 cycle MTC Measurement 20

Licensing Approach

- SR 3.1.4.1 (HZP verification)

  • Add note allowing use of alternate BOC HZP MTC surveillance method (TSTF 486)

- SR 3.1.4.2 (At power verifications)

  • Add note allowing replacement of 2/3 cycle at power MTC Measurement (CE-NPSD-911 & TSTF 406) 21

Licensing Approach

  • Proposed Schedule

- Submit November 2013

- Requesting NRC Approval in November 2014

- First use in Spring of 2015 22

Conclusion and Discussion

  • Acceptable to implement the STAR Program at PVNGS
  • Acceptable to replace the 2/3 cycle at power MTC measurement
  • Submit both under a single LAR November 2013
  • Requesting NRC approval November 2014 23