ML17303A786: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 16: | Line 16: | ||
=Text= | =Text= | ||
{{#Wiki_filter:~~PCCELEMTZD DISCI'RIBUTJON | {{#Wiki_filter:~ ~ | ||
'MONSTRATION SYSTEM REGULATORY INFORMATION D STRIBUTION SYSTEM (RIDS)ACCESSION NBR:8803030229 DOC.DATE: 8//12/'3 NOTARIZED: | PCCELEMTZD DISCI'RIBUTJON 'MONSTRATION SYSTEM REGULATORY INFORMATION D STRIBUTION SYSTEM (RIDS) | ||
NO DOCKET FACIL:STN-50-528 Palo Verde Nuclear Station, Unit 1, Arizona Publi 05000528 STN-50-529 Palo Verde Nuclear Station, Unit 2, Arizona Publi 05000529 STN-50-530 Palo Verde Nuclear Station, Unit 3, Arizona Publi 05000530 AUTH.NAME AUTHOR AFFILIATION VA BRUNT,E.E. | ACCESSION NBR:8803030229 DOC.DATE: 8 //12/'3 NOTARIZED: NO DOCKET FACIL:STN-50-528 Palo Verde Nuclear Station, Unit 1, Arizona Publi 05000528 STN-50-529 Palo Verde Nuclear Station, Unit 2, Arizona Publi 05000529 STN-50-530 Palo Verde Nuclear Station, Unit 3, Arizona Publi 05000530 AUTH. NAME AUTHOR AFFILIATION VA BRUNT,E.E. Arizona Nuclear Power Project (formerly Arizona Public Serv RECIP.NAME RECIPIENT AFFILIATION "Statistical Rept of Personnel Monitoring 1987." | ||
Arizona Nuclear Power Project (formerly Arizona Public Serv RECIP.NAME RECIPIENT AFFILIATION | |||
==SUBJECT:== | ==SUBJECT:== | ||
W/880226 ltr. Summary DISTRIBUTION CODE: IE56D COPIES RECEIVED:LTR ENCL SIZE: | |||
~'RIZONA NULCEAR POWER PROJECT Palo Verde Nuclear Generating Station STATISTICAL | TITLE: Annual Radiation Exposure Report By Functions Per Tech Spec ) | ||
NOTES:Standardized plant. 05000528 g Standardized plant. 05000529 Standardized plant. 05000530 RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD5 LA 1 0 PD5 PD 5 5 LICITRA,E 1 0 DAVIS,M 1 0 INTERNAL: ACRS 11 10 10 AEOD/DOA 1 1 AEOD/DS P/TPAB 1 1 NMSS/IQSB 6H3 1 1 NRR/DOEA/EAB11E 1 1 RR/DRE~PB10A 2 2 NRR/PMAS/ILRB12 1 1 - =LP 02 1 1 RES BROOKS,B 2 2 RGN5 01 1 1 EXTERNAL: LPDR 1 1 NRC PDR 1 1 NSIC 1 1 NOTES: 1 1 S | |||
j A | |||
TOTAL NUMBER OF COPIES REQUIRED: LTTR 33 ENCL 30 | |||
~ | |||
'RIZONA NULCEAR POWER PROJECT Palo Verde Nuclear Generating Station STATISTICAL | |||
==SUMMARY== | ==SUMMARY== | ||
REPORT of PERSONNEL MONITORING as specified by 10CFR20.407 Paragraph (a)(2)1987 ESTIMATED WHOLE BODY EXPOSURE RANGE (Rems) | REPORT of PERSONNEL MONITORING as specified by 10CFR20.407 Paragraph (a) (2) 1987 ESTIMATED WHOLE BODY EXPOSURE NUMBER OF INDIVIDUALS IN RANGE (Rems) EACH CATEGORY No measurable exposure 2587 (*) | ||
The work took 2.5 days and 3.183 Man-Rem.Defects in the RCP shafts were discovered during the outage, leading to the disassembly of the pumps and replacement of all 4 shafts.Actual work covered 70 days and expended 100.360 Man-Rem. | Less than O.l 794 (**) | ||
0.1 to 0.25 363 0.25 to 0.50 227 0.50 to 0.75 140 0.75 to 1.0 72 1 to 2 133 2 to 3 48 3 to 4 15 4to5 5 to 6 6 to 7 7 to 8 8 to 9 9 to 10 10 to ll 11 to 12 12 + | |||
Total number of personnel for whom monitoring was provided 4379 | |||
(*) Includes 108 visitors | |||
(**) Includes 3 visitors Reviewed By / Date 8803030229 87i23i PDP. ADOCK 05000528 s.c5 | |||
1987 MRC 1. rt STAT ION UT I LITY CONT RAO'ION TOTALS cRea CRAB N sRca N aR eel OPERATIONS/SURVEILLANCE Hafntenance Personnel 178 13,239 280 203 8,964 385 22,483 Operat lone Personnel 208 24,958 205 91 7,66$ 302 32,828 Health Physics Personnel 68 17,886 0 170 25,2$ 6 238 43,1C2 Supervisory Personnel 125 0 7 1,1C? 10 1,272 Engfneer fns Pcrsorr>>I 22 2,416 45 10 35$ 34 2,816 SUSTOTALS 4?9 58,624 9 530 481 C3,387 969 102,5CI ROUTINE MAINTENANCE Hafntenance Personnel 197 22,508 6 337 C33 90,865 636 11$ ,710 Operatfcns Pcrsorv>>I 60 1,972 2 134 Cb 2,2Cb 10& 4,352 Health Physfcs Personnel 33 1,558 0 0 110 6,360 IC3 7,918 Supcrvfsory Personnel 35 0 0 7 168 8 203 Engfncerfns Pcrsonr>>l 14 809 0 0 10 1,316 ~ 24 2,125 SUSTOTALS 30$ 26,882 8 471 606 100,955 919 128,308 IN SERVICE INSPECTION Hafntenance Personnel 115 16,993 4 239 253 72,?35 3?2 89,967 Operations Personnel 2C 1,5?7 0 0 34 9,060 58 10,637 Health Physfss Personnel 29 3, 179 0 0 d9 11,38$ 118 1C,562 Supervfsory Personnel I 271 0 0 2 110 3 381 Ensfneerlns Personnel 9 2,583 I 70 4 628 1C 3,281 SUBTOTALS 178 24,603 5 309 382 93,916 56$ 118,828 SPECIAL MAINTENANCE Hafntenance Personnel 138 73,?85 6 2,SIC 333 131, 345 477 207,944 Operations Personne'I 42 2,690 2 535 61 C, 607 105 7,832 Health Phyafea PerSOnne'I 28 3,722 0 0 103 16,997 131 20,7'lp Supervisory Personnel 2 20 0 0 5 1,'372 7 1,392 EnSlnecrfnS Personnel 9 1,534 0 0 14 1,577 23 3,111 SU&TOTALS 219 81,?$ 1 d 3,349 516 155, 898 74$ 240,99& | |||
RADVASIE PROCESSING Hafntenanoe Pcrsonr>>I 89 7,518 3 350 104 5,2?C 196 13, 142 Operatfcns Personnel 56 14,996 0 0 103 19,852 159 3C,&48 Health Physics Personnel 26 1, 216 0 0 59 5,061 85 6,277 Supervisory Personnel 0 0 0 0 0 0 0 0 Enslneerlns Personnel *2 32 0 0 I 5 3 37 I | |||
SUBTOTALS 173 23,762 3$ 0 267 30,192 CC3 5C,304 I | |||
RKTUKLIMS 72 13,017 115 87 9,594 162 22, 726 Hafntenanse Personnel 24 800 30 2d C,302 53 5, 132 Operat Iona Personnel 0 38 5,409 42 5,549 Health Phys Isa Personnel C 1CO 30 0 0 0 1 30 1 Supervisory Personnel 1,104 0 8 216 11 1,320 Enoineerfn9 Personnel 5 C 145 269 34,7$ 7 SUSTOTALS 103 15,061 SIATIOM TOTALS 4,135 685 318,777 958 C69,972 Hafntenanoe Personnel Operations Personnel 265 269 147,060 46,993 8 | |||
C '0C 207 47,732 70,466 480 261 95,629 98,167 27,70'I 0 0 188 Health Physics Personnel 73 0 0 12 2,827 15 3,278 Sqxrvlsory Personnel 3 C51 86 12,690 8, C?8 5 115 35 C,097 Engfnecrfnd Personnel Cb 17 5,154 1127 44'5,899 1800 6?9,736 PVMfiS STATION IOTALS 656 230,683 | |||
1987 SPECIAL MAINTENANCE PVNGS had four (4) jobs classified as Special Maintenance in 1987. | |||
All four (4) were in Unit I and cost 247.912 Man-Rem. | |||
In late January, Unit I developed a primary to secondary tube leak in Steam Generator I. The outage for identification and repair lasted 47 days and cost 97.412 Man-Rem. | |||
In July, the Low Pressure Safety In)ection Pump A & B seals were replaced, along with the LPSI B motor. This required 23 days and 46.959 Man-Rem. | |||
During the Refueling Outage, starting in September, an Antimony removal process to remove antimony from the RCS coolant and piping was performed. The work took 2.5 days and 3.183 Man-Rem. | |||
Defects in the RCP shafts were discovered during the outage, leading to the disassembly of the pumps and replacement of all 4 shafts. | |||
Actual work covered 70 days and expended 100.360 Man-Rem. | |||
Arizona Nuclear Power Project P.O.BOX 52034~PHOENIX, | Arizona Nuclear Power Project P.O. BOX 52034 ~ PHOENIX, ARIZONA85072-2034 161-00829-EEVB/PGN February 26, 1988 Docket Nos. STN 50-528/529/530 Director of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D. C. 20555 | ||
==Dear Sirs:== | ==Dear Sirs:== | ||
==Subject:== | ==Subject:== | ||
Palo Verde Nuclear Generating Station (PVNGS)Units 1, 2 and 3 Personnel Monitoring Report for 1987 File: 88-019-026 Pursuant to 10CFR20.407(a)(2) and as supplemented by PVNGS Technical Specification 6.9.1.5, attached please find the Personnel Monitoring Report for 1987.If you have any questions, please call Mr.A.C.Rogers at (602)371-4041.Very truly yours | Palo Verde Nuclear Generating Station (PVNGS) | ||
Units 1, 2 and 3 Personnel Monitoring Report for 1987 File: 88-019-026 Pursuant to 10CFR20.407(a)(2) and as supplemented by PVNGS Technical Specification 6.9.1.5, attached please find the Personnel Monitoring Report for 1987. | |||
If you have any questions, please call Mr. A. C. Rogers at (602) 371-4041. | |||
Very truly yours E. E. Van Brunt, Jr. | |||
Executive Vice President Prospect Director EEVB/PGN/cal Attachments cc: 0. M. De Michele (all w/o) | |||
G. W. Knighton J. B. Martin T. J. Polich}} |
Latest revision as of 10:02, 29 October 2019
ML17303A786 | |
Person / Time | |
---|---|
Site: | Palo Verde |
Issue date: | 12/31/1987 |
From: | Van Brunt E ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR |
To: | Office of Nuclear Reactor Regulation |
References | |
161-00829-EEVB, 161-829-EEVB, NUDOCS 8803030229 | |
Download: ML17303A786 (6) | |
Text
~ ~
PCCELEMTZD DISCI'RIBUTJON 'MONSTRATION SYSTEM REGULATORY INFORMATION D STRIBUTION SYSTEM (RIDS)
ACCESSION NBR:8803030229 DOC.DATE: 8 //12/'3 NOTARIZED: NO DOCKET FACIL:STN-50-528 Palo Verde Nuclear Station, Unit 1, Arizona Publi 05000528 STN-50-529 Palo Verde Nuclear Station, Unit 2, Arizona Publi 05000529 STN-50-530 Palo Verde Nuclear Station, Unit 3, Arizona Publi 05000530 AUTH. NAME AUTHOR AFFILIATION VA BRUNT,E.E. Arizona Nuclear Power Project (formerly Arizona Public Serv RECIP.NAME RECIPIENT AFFILIATION "Statistical Rept of Personnel Monitoring 1987."
SUBJECT:
W/880226 ltr. Summary DISTRIBUTION CODE: IE56D COPIES RECEIVED:LTR ENCL SIZE:
TITLE: Annual Radiation Exposure Report By Functions Per Tech Spec )
NOTES:Standardized plant. 05000528 g Standardized plant. 05000529 Standardized plant. 05000530 RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD5 LA 1 0 PD5 PD 5 5 LICITRA,E 1 0 DAVIS,M 1 0 INTERNAL: ACRS 11 10 10 AEOD/DOA 1 1 AEOD/DS P/TPAB 1 1 NMSS/IQSB 6H3 1 1 NRR/DOEA/EAB11E 1 1 RR/DRE~PB10A 2 2 NRR/PMAS/ILRB12 1 1 - =LP 02 1 1 RES BROOKS,B 2 2 RGN5 01 1 1 EXTERNAL: LPDR 1 1 NRC PDR 1 1 NSIC 1 1 NOTES: 1 1 S
j A
TOTAL NUMBER OF COPIES REQUIRED: LTTR 33 ENCL 30
~
'RIZONA NULCEAR POWER PROJECT Palo Verde Nuclear Generating Station STATISTICAL
SUMMARY
REPORT of PERSONNEL MONITORING as specified by 10CFR20.407 Paragraph (a) (2) 1987 ESTIMATED WHOLE BODY EXPOSURE NUMBER OF INDIVIDUALS IN RANGE (Rems) EACH CATEGORY No measurable exposure 2587 (*)
Less than O.l 794 (**)
0.1 to 0.25 363 0.25 to 0.50 227 0.50 to 0.75 140 0.75 to 1.0 72 1 to 2 133 2 to 3 48 3 to 4 15 4to5 5 to 6 6 to 7 7 to 8 8 to 9 9 to 10 10 to ll 11 to 12 12 +
Total number of personnel for whom monitoring was provided 4379
(*) Includes 108 visitors
(**) Includes 3 visitors Reviewed By / Date 8803030229 87i23i PDP. ADOCK 05000528 s.c5
1987 MRC 1. rt STAT ION UT I LITY CONT RAO'ION TOTALS cRea CRAB N sRca N aR eel OPERATIONS/SURVEILLANCE Hafntenance Personnel 178 13,239 280 203 8,964 385 22,483 Operat lone Personnel 208 24,958 205 91 7,66$ 302 32,828 Health Physics Personnel 68 17,886 0 170 25,2$ 6 238 43,1C2 Supervisory Personnel 125 0 7 1,1C? 10 1,272 Engfneer fns Pcrsorr>>I 22 2,416 45 10 35$ 34 2,816 SUSTOTALS 4?9 58,624 9 530 481 C3,387 969 102,5CI ROUTINE MAINTENANCE Hafntenance Personnel 197 22,508 6 337 C33 90,865 636 11$ ,710 Operatfcns Pcrsorv>>I 60 1,972 2 134 Cb 2,2Cb 10& 4,352 Health Physfcs Personnel 33 1,558 0 0 110 6,360 IC3 7,918 Supcrvfsory Personnel 35 0 0 7 168 8 203 Engfncerfns Pcrsonr>>l 14 809 0 0 10 1,316 ~ 24 2,125 SUSTOTALS 30$ 26,882 8 471 606 100,955 919 128,308 IN SERVICE INSPECTION Hafntenance Personnel 115 16,993 4 239 253 72,?35 3?2 89,967 Operations Personnel 2C 1,5?7 0 0 34 9,060 58 10,637 Health Physfss Personnel 29 3, 179 0 0 d9 11,38$ 118 1C,562 Supervfsory Personnel I 271 0 0 2 110 3 381 Ensfneerlns Personnel 9 2,583 I 70 4 628 1C 3,281 SUBTOTALS 178 24,603 5 309 382 93,916 56$ 118,828 SPECIAL MAINTENANCE Hafntenance Personnel 138 73,?85 6 2,SIC 333 131, 345 477 207,944 Operations Personne'I 42 2,690 2 535 61 C, 607 105 7,832 Health Phyafea PerSOnne'I 28 3,722 0 0 103 16,997 131 20,7'lp Supervisory Personnel 2 20 0 0 5 1,'372 7 1,392 EnSlnecrfnS Personnel 9 1,534 0 0 14 1,577 23 3,111 SU&TOTALS 219 81,?$ 1 d 3,349 516 155, 898 74$ 240,99&
RADVASIE PROCESSING Hafntenanoe Pcrsonr>>I 89 7,518 3 350 104 5,2?C 196 13, 142 Operatfcns Personnel 56 14,996 0 0 103 19,852 159 3C,&48 Health Physics Personnel 26 1, 216 0 0 59 5,061 85 6,277 Supervisory Personnel 0 0 0 0 0 0 0 0 Enslneerlns Personnel *2 32 0 0 I 5 3 37 I
SUBTOTALS 173 23,762 3$ 0 267 30,192 CC3 5C,304 I
RKTUKLIMS 72 13,017 115 87 9,594 162 22, 726 Hafntenanse Personnel 24 800 30 2d C,302 53 5, 132 Operat Iona Personnel 0 38 5,409 42 5,549 Health Phys Isa Personnel C 1CO 30 0 0 0 1 30 1 Supervisory Personnel 1,104 0 8 216 11 1,320 Enoineerfn9 Personnel 5 C 145 269 34,7$ 7 SUSTOTALS 103 15,061 SIATIOM TOTALS 4,135 685 318,777 958 C69,972 Hafntenanoe Personnel Operations Personnel 265 269 147,060 46,993 8
C '0C 207 47,732 70,466 480 261 95,629 98,167 27,70'I 0 0 188 Health Physics Personnel 73 0 0 12 2,827 15 3,278 Sqxrvlsory Personnel 3 C51 86 12,690 8, C?8 5 115 35 C,097 Engfnecrfnd Personnel Cb 17 5,154 1127 44'5,899 1800 6?9,736 PVMfiS STATION IOTALS 656 230,683
1987 SPECIAL MAINTENANCE PVNGS had four (4) jobs classified as Special Maintenance in 1987.
All four (4) were in Unit I and cost 247.912 Man-Rem.
In late January, Unit I developed a primary to secondary tube leak in Steam Generator I. The outage for identification and repair lasted 47 days and cost 97.412 Man-Rem.
In July, the Low Pressure Safety In)ection Pump A & B seals were replaced, along with the LPSI B motor. This required 23 days and 46.959 Man-Rem.
During the Refueling Outage, starting in September, an Antimony removal process to remove antimony from the RCS coolant and piping was performed. The work took 2.5 days and 3.183 Man-Rem.
Defects in the RCP shafts were discovered during the outage, leading to the disassembly of the pumps and replacement of all 4 shafts.
Actual work covered 70 days and expended 100.360 Man-Rem.
Arizona Nuclear Power Project P.O. BOX 52034 ~ PHOENIX, ARIZONA85072-2034 161-00829-EEVB/PGN February 26, 1988 Docket Nos. STN 50-528/529/530 Director of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D. C. 20555
Dear Sirs:
Subject:
Palo Verde Nuclear Generating Station (PVNGS)
Units 1, 2 and 3 Personnel Monitoring Report for 1987 File: 88-019-026 Pursuant to 10CFR20.407(a)(2) and as supplemented by PVNGS Technical Specification 6.9.1.5, attached please find the Personnel Monitoring Report for 1987.
If you have any questions, please call Mr. A. C. Rogers at (602) 371-4041.
Very truly yours E. E. Van Brunt, Jr.
Executive Vice President Prospect Director EEVB/PGN/cal Attachments cc: 0. M. De Michele (all w/o)
G. W. Knighton J. B. Martin T. J. Polich