ML17312A740

From kanterella
Jump to navigation Jump to search
Annual Environ Operating Rept for 1995. W/960430 Ltr
ML17312A740
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 12/31/1995
From: Stewart W
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
102-03686-WLS-S, 102-3686-WLS-S, NUDOCS 9605070088
Download: ML17312A740 (14)


Text

CATEGORY j.

REGULATO INFORMATION DISTRIBUTION STEM (RIDS)

ACCESSION NBR:9605070088 DOC.DATE:

FACIL:STN-50-528 Palo Verde Nuclear Station, Unit 1, Arizona Publi 05000528 STN-50-529 Palo Verde Nuclear Station, Unit 2, Arizona Publi 05000529 STN-50-530 Palo Verde Nuclear Station, Unit 3, Arizona Publi'5000530 AUTH. NAME AUTHOR AFFILIATION STEWART,W.L. Arizona Public Service Co. (formerly Arizona Nuclear Power RECIP.NAME RECIPIENT 'AFFILIATION

SUBJECT:

"Palo Verde Nuclear Generatin S tion Annual Environ Operating Rept for 1995." W 960430 ltr.

DISTRIBUTION CODE: IE25D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: Environmental Monitoring Rept (per Tech Specs)

E NOTES:STANDARDIZED PLANT 05000528 Standardiied plant. 05000529 Standardized plant. 05000530 0

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD4-2 LA 3 3 PD4-2 PD 1 1 THOMASiC 1 1 INTERNAL: ACRS 1 1 1 1 NRR/DRPM/PERB 1 1 RGN4 FILE 1 1 EXTERNAL L ITCO AKERS I D 1 1 NRC PDR 1 1 D

U NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM OWFN 5D<<5(EXT. 415-2083) TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED: LTTR 11 =ENCL 'l

~

4

)

0 Arizona Public Service PALO VERDE NUCLEAR GENERATING STATION P.O. BOX 52034 PHOENIX, ARIZONA 85072-2034 102-03686-WLS/SAB/PMB WILLIAML. STEWART April 30, 1996 EXECUTIVE VICE PRESIDENT NUCLEAR U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Station P1-37 Washington, DC 20555-0001

Dear Sirs:

Subject:

Palo Verde Nuclear Generating Station (PVNGS)

Units1,2, and 3 Docket Nos. STN 50-528/529/530 Annual Environmental Operating Report 1995 Enclosed is the PVNGS Annual Environmental Operating Report for 1995. This report covers the operation of'PVNGS Units 1, 2, and 3 during 1995, and is being submitted pursuant to Section 5.4.1 of Appendix B to Operating License Numbers NPF-41,. NPF-51, and NPF-74.

Should you have any questions, please call Scott A. Bauer at (602) 393-5978.

WLS/SAB/PMB/pb Enclosure cc: J. L. Callan (all with enclosure)

K. E. Johnston K. E. Perkins C. R. Thomas O~O13r.;

'P605070088 951231 5 PDR ADOCK 05000528' PDR

ENCLOSURE 1995 ANNUALENVIRONMENTALOPERATING REPORT FOR THE PALO VERDE NUCLEAR GENERATING STATION

I j I

l~

If, f I

ARIZONA PUBLIC SERVICE COMPANY PALO VERDE NUCLEAR GENERATING STATION ANNUALENVIRONMENTALOPERATING REPORT FOR 1995 APRIL 1996

0 1

PVNGS 1995 Annual Environmental Operating Report Page 1 I~ INTRODUCTION The Palo Verde Nuclear Generating Station (PVNGS) is located in Maricopa County,

, Arizona, approximately 50 miles west of the Phoenix metropolitan area. The PVNGS site comprises approximately 4050 acres. Site elevations range from 890 feet above mean sea level at the southern boundary to 1030 feet above mean sea level at the northern boundary. The station consists of three pressurized water reactor electrical generating units with a nominal generating capacity of 1270 MWe per unit.

PVNGS was issued low power operating licenses NPF-34, NPF-46 and NPF-65 for Units 1, 2 and 3 by the United States Nuclear Regulatory Commission (NRC) on December 31, 1984, December 9, 1985, and March 25, 1987, respectively. The Unit 1 full power operating license NPF-41 was issued June 1, 1985. The Unit 2 full power operating license NPF-51 was issued April 24, 1986. The Unit 3 full power operating license NPF-74 was issued November 25, 1987. Appendix B to these operating licenses is entitled the "Environmental Protection Plan (Non-Radiological)". The Environmental Protection Plans (EPP) of each of the current operating licenses are identical.,

The EPP is to provide for protection of environmental values during construction and operation of the nuclear facility. The principal objectives of the EPP are as follows:

(1) Verify that the station is operated in an environmentally acceptable manner, as established by the FES (Final Environmental Statement) and other NRC environmental impact assessments.

(2) Coordinate NRC requirements and maintain consistency with other Federal, State and local requirements for environmental protection.

(3) Keep NRC informed of the environmental effects of facility construction and operation and of actions taken to control those effects.

This Annual Environmental Operating Report is required by Section 5.4.1 of the EPP. This report describes the activities during the year 1995 related to the PVNGS EPP. For purposes of this report, references to the EPP are considered to be the EPP of NPF-41, NPF-51 and NPF-74.

0 1

i l

I I

l, 1

l

PVNGS 1995 Annual Environmental Operating Report Page 2 II~ ENVIRONMENTALMONITORING SUMMARIES AND ANALYSIS A. Cultural Resources Section 4.2.1 of the EPP requires that an archaeological survey be performed when final alignment of the PVNGS-to-Saguaro transmission line is completed. As of the date of this report, plans for this transmission line have been placed on indefinite hold. Therefore, there has been no further activity regarding this area of the EPP.

B. Terrestrial Ecolo Monitorin Section 4.2.2 of the EPP required that the provisions of the Salt Deposition and Impact Monitoring Plan (Revision 4, May 1985) be implemented by the onset of commercial operation of the first unit. The EPP further stipulated that the monitoring plan continue for a minimum of three full years after the onset of operation of all three units or until shown not to be necessary. Unit 3 (the last unit licensed at PVNGS) began commercial operation in November 1987. Therefore the minimum required monitoring period was satisfied as of November 1990. However, APS elected to continue the salt deposition monitoring program for an additional year. As communicated in a letter from William F.

Conway, APS, to NRC, dated December 30, 1991, the salt deposition monitoring program was discontinued at the end of 1991 ~

III. PLANT DESIGN AND OPERATION CHANGES I

Section 3.1 of the. EPP allows changes in station design or operation or the performance of tests or experiments affecting the environment provided that such changes, tests or experiments do not constitute an unreviewed environmental question and do not require a change to the EPP. Changes, tests or experiments in which all measurable non-radiological effects are confined to the on-site areas previously disturbed during site preparation and plant construction or in which the environment is not affected are exempt from the evaluation and reporting requirements of Section 3.1. Section 3.2 of the EPP also exempts changes, tests, or experiments which are required to comply with other Federal, State or local environmental regulations.

There were no changes in station design or operation which required environmental evaluations during 1995.

0 PVNGS 1995 Annual Environmental Operating Report Page 3 IV. EPP NONCOMPLIANCES There were no instances of noncompliance with the EPP identified during 1995.

V. NONROUTINE REPORTS There were no nonroutine reports required by Section 5.4.2 of the EPP submitted during 1995.

0 I