ACCELERATED DISTRIBUTION DEMONSTRATION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS) 9(*9 tO'0 ACCESSION NBR:9405050279 DOC.DATE: 93/12/31 NOTARIZED: NO DOCKET FACIL:STN-50-528 Palo Verde Nuclear Station, Unit. 1, Arizona Publi 05000528 STN-50-529 Palo Verde Nuclear Station, Unit 2, Arizona Publi 05000529 STN-50-530 Palo Verde Nuclear Station, Unit 3, Arizona Publi 05000530 AUTH. NAME AUTHOR AFFILIATION CONWAY,W.F. Arizona Public Service Co. (formerly Arizona Nuclear Power RECIP.NAME RECIPIENT AFFILIATION I

SUBJECT:

"Palo Verde Nuclear Gemerating Station Units 1,2 & 3 D Annual Environ Operating Rept for 1993."

DISTRIBUTION CODE: IE25D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: Environmental Monitoring Rept (per Tech Specs)

NOTES STANDARDIZED PLANT 05000528 ~

Standardized plant. 05000529 Standardized plant. 05000530 ~

RECIPIENT COPIES RECIPIENT COPIES D ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PDIV-3 LA 3 3 PDIV-3 PD 1 1 HOLIAN, B 1 1 TRAN, L 1 1 INTERNAL:.-

REG S~ 01 1

1 1

1 NRR/DRSS/PRPB11 RGN4 DRSS/RPB 2

1 2

1 RGN4 F E 02 1 1 EXTERNAL: EG&G AKERS, D 1 1 NRC PDR 1 1 D

D D

NOTE TO ALL "RIDS" RECIPIEN'fS:

PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED: LTTR 14 ENCL 14 peal

0 I 9405050279 93i23i PDR ADOCK 05000528 R pDFL, Arizona Public Service Company P,O. BOX 53999 ~ PHOENIX. ARIZONA 85072-3999 WILLIAMF. CONWAY 102-02926-WFC/JRP EXECUTIVEVICE PRESIOENT NUCLEAR April 24, 1994 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Station P1-37 Washington, DC 20555

Dear Sirs:

Subject:

Palo Verde Nuclear Generating Station (PVNGS)

Units 1, 2, and 3 Docket Nos. STN 50-528/529/530 Annual Environmental Operating Report for 1993 File: 94-005-41 9.05 94-056-026 Enclosed is the PVNGS Annual Environmental Operating Report for 1993. This report covers the operation of PVNGS Units 1, 2, and 3 during 1993 and is being submitted pursuant to Section 5.4.1 of Appendix B to the operating license.

Should you have any questions, please call Mr. Richard A. Bernier at (602) 393-5882.

Sincerely, WFC/JRP/did Enclosure cc: K. E. Perkins L. J. Callan K. E. Johnston B. E. Holian

E 4

(

l I

V~

ARIZONA PUBLIC SERVICE COMPANY PALO VERDE NUCLEAR GENERATING STATION ANNUAL ENVIRONMENTALOPERATING REPORT FOR 1993 APRIL 1994

PVNGS 1993 Annual Environmental Operating Report Page 1 I~ INTRODUCTION The Palo Verde Nuclear Generating Station (PVNGS) is located in Maricopa County, Arizona, approximately 50 miles west of the Phoenix metropolitan area. The PVNGS site comprises approximately 4050 acres. Site elevations range from 890 feet above mean sea level at the southern boundary to 1030 feet above mean sea level at the northern boundary. The station consists of three pressurized water reactor electrical generating units with a nominal generating capacity of 1270 MWe per unit.

PVNGS was issued low power operating licenses NPF-34, NPF-46 and NPF-65 for Units 1, 2 and 3 by the United States Nuclear Regulatory Commission (NRC) on December 31, 1984, December 9, 1985, and March 25, 1987, respectively. The Unit 1 full power operating license NPF-41 was issued June 1, 1985. The Unit 2 full power operating license NPF-51 was issued April 24, 1986. The Unit 3 full power operating license NPF-74 was issued November 25, 1987. Appendix B to these operating licenses is entitled the "Environmental Protection Plan (Non-Radiological)".

The Environmental Protection Plans (EPP) of each of the current operating licenses are identical.

The EPP is to provide for protection of environmental values during construction and operation of the nuclear facility. The principal objectives of the EPP are as follows:

(1) Verify that the station is operated in an environmentally acceptable manner, as established by the FES (Final Environmental Statement) and other NRC environmental impact assessments.

(2) Coordinate NRC requirements and maintain consistency with other Federal, State and local requirements for environmental protection.

(3) Keep NRC informed of the environmental effects of facility construction and operation and of actions taken to control those effects.

This Annual Environmental Operating Report is required by Section 5.4.1 of the EPP.

This report describes the activities during the year 1993 related to the PVNGS EPP.

For purposes of this report, references to the EPP are considered to be the EPP of NPF-41, NPF-51 and NPF-74.

E l

I

PVNGS 1993 Annual Environmental Operating Report Page 2 II. ENVIRONMENTALMONITORING SUMMARIES AND ANALYSIS A. Cul ural Resources Section 4.2.1 of the EPP requires that an archaeological survey be performed when final alignment of the PVNGS-to-Saguaro transmission line is completed. As of the date of this report, plans for this transmission line have been placed on indefinite hold.

Therefore, there has been no further activity regarding this area of the EPP.

B. Terrestrial Ecolo Monitorin Section 4.2.2 of the EPP required that the provisions of the Salt Deposition and Impact Monitoring Plan (Revision 4, May 1985) be implemented by the onset of commercial operation of the first unit. The EPP further stipulated that the monitoring plan continue for a minimum of three full years after the onset of operation of all three units or until shown not to be necessary. Unit 3 (the last unit licensed at PVNGS) began commercial operation in November 1987. Therefore the minimum required monitoring period was satisfied as of November 1990. However, APS elected to continue the salt deposition monitoring program for an additional year. As communicated in a letter from William F. Conway, APS, to NRC, dated December 30, 1991, the salt deposition monitoring program was discontinued at the end of 1991 ~

III. PLANT DESIGN AND OPERATION CHANGES Section 3.1 of the EPP allows changes in station design or operation or the performance of tests or experiments affecting the environment provided that such changes, tests or experiments do not constitute an unreviewed environmental question and do not require a change to the EPP. Changes, tests or experiments in which all measurable non-radiological effects are confined to the on-site areas previously disturbed during site preparation and plant construction or in which the environment is not affected are exempt from the evaluation and reporting requirements of Section 3.1. Section 3.2 of the EPP also exempts changes, tests, or experiments which are required to comply with other Federal, State or local environmental regulations.

The following chan'ge in station design and operation was evaluated during 1993 and found not to involve any unreviewed environmental issues.

Two 4.5 MWe gas turbine generators were installed to provide an alternative

~ ~

PVNGS 1993 Annual Environmental Operating Report Page 3 alternating current power supply to allow safe plant shut down in the event of a loss of off-site power. Installation of these gas turbine generators was performed in order to satisfy the requirements of 10 CFR 50.63. These gas turbine generators were constructed in an area of the plant site which had previously been disturbed by other plant construction activities. Operation of these gas turbine generators was conservatively estimated to increase the maximum annual air emissions of carbon monoxide, oxides of nitrogen, oxides of sulfur, and total suspended particulates resulting from station operation by 2%, 5%, 5%, and 3%, respectively. These minor increases in air emissions were determined not to significantly affect the air quality impact analysis contained in the PVNGS Environmental Report - Operating License Stage and, therefore, did not involve an unreviewed environmental question or require modification of the EPP.

IV. EPP NONCOMPLIANCES There were no instances of noncompliance with the EPP identified during 1993.

V. NONROUTINE REPORTS There were no nonroutine reports required by Section 5.4.2 of the EPP submitted during 1993.