ML18033A239: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:ENCLOSURE 1 PROPOSED TECHNICAL SPECIFICATIONS REVISIONS BRONNS FERRY NUCLEAR PLANT UNITS 1, 2, AND 3 (TVA BFN TS 24S-T)8806070126 880601 PDR ADOCK 05000259 P.DCD  
{{#Wiki_filter:ENCLOSURE 1 PROPOSED TECHNICAL SPECIFICATIONS REVISIONS BRONNS FERRY NUCLEAR PLANT UNITS 1, 2, AND 3 (TVA BFN TS 24S-T) 8806070126 880601 PDR ADOCK 05000259 P.             DCD
~~~~~3.714.7 CONTAINMENT SY TEMS LIMITING CONDITIONS FOR OPERATION 3.7.B.Standb Gas Treatment S stem SURVEILLANCE REQUIREMENTS 4.7.B.Standb Gas Treatment S stem*1 a.Except as specified in Specification 3.7.B.3 below, all three trains of the standby gas treatment system shall be OPERABLE at all times when secondary containment integrity is required.lb.Hith no fuel in any reactor vessel, only two (2)of the three (3)standby gas treat-ment trains are required to be OPERABLE at all times when secondary containment integrity is required.If either of the two (2)standby gas treatment system trains become inoperable at any time when operability is required, suspend handling of irradiated fuel until two (2)trains of standby gas treatment are OPERABLE.1.At least once per year, the following conditions shall be demonstrated.
a.Pressure drop across the combined HEPA filters and charcoal adsorber banks is, less than 6 inches of w'ater at a flow of 9000 cfm (+101.).b.The inlet heaters on~each circuit are tested in accordance with ANSI N510-1975, and are capable of an output of at least 40 kN.c.Air distribution is uniform within 20%across HEPA filters and charcoal adsorbers.
*Hith no fuel in any reactor vessel, Specification 3.7.8.l.b is applicable.
BFN Unit 1 3.7/4.7-13 3.7/4.7 CONTAINMENT SYSTEMS LIMITING CONDITIONS FOR OPERATION 3.7.B.Standb.Gas Treatment S stem SURVEILLANCE REQUIREMENTS 4.7.8.Standb Gas Treatment S stem*la.Except as'specified in Specification 3.7.B.3 below, all'three trains of the standby gas treatment system shall be OPERABLE at all times when secondary containment integrity is required." lb.Hith no fuel in any reactor vessel, only two (2)of the three (3)standby gas treat-ment trains are required to be OPERABLE at all times when secondary containment integrity is required.If either of the two (2)standby gas treatment system trains become inoperable at any time when operability is required, suspend handling of irradiated fuel until two (2)trains of standby gas treatment are OPERABLE.1.At least once per year, the following conditions shall be demonstrated.
a.Pressure drop across the combined HEPA filters and charcoal adsorber banks is less than 6 inches of water at a flow of 9000 cfm (+10/).b.The inlet heaters on each circuit are tested in accordance with ANSI N510-1975, and are capable of an output of at least 40 kH.c.Air distribution is..uniform within 20%across HEPA filters and charcoal adsorbers.
'ith no fuel in any reactor vessel, Specification 3.7.B.l.b is applicable,-
BFN Unit 2 3.7/4.7-13 3.7/4.7 CONTAINMENT SY TEMS LIMITING CONDITIONS FOR OPERATION 3.7.8.Standb Gas Treatment S stem SURVEILLANCE REQUIREMENTS 4.7.B.Standb Gas Treatment S stem*la.Except as specified in Specification F 7.B.3 below, all three trains of the standby gas treatment system shall be OPERABLE at all times when secondary containment integrity is required.lb.Hith no fuel in any reactor vessel, only two (2)of the three (3)standby gas treat-.ment trains are required to be OPERABLE at all times when secondary containment integrity is required.If either of the two (2)standby gas treatment system trains become inoperable at any time when operability is required, suspend handling of irradiated fuel until two (2)trains of standby gas treatment are OPERABLE.l.At least once per year, the following conditions shall be demonstrated.
a.Pressure drop across the combined HEPA filters and charcoal , adsorber banks is less than 6 inches of water at a flow of 9000 cfm (+10/.).b.The inlet heaters on each circuit are tested in accordance with ANSI N510-1975, and are capable of an output of at least 40 kH.c.Air distribution is uniform within 20%across HEPA filters and charcoal adsorbers.
*Hith no fuel in any reactor vessel, Specification 3.7.B.l.b is applicable.
BFN Unit 3 3.7/4.7-13
.3.7/4.7 CONTAINMENT SYSTEMS.LIMITING.'CONDITIONS FOR OPERATION 3.7.8.:Standb Gas Treatment S stem SURVEILLANCE REQUIREMENTS 4.7.8.Standb Gas Treatment S stem 4.7.8.2 (Cont'd)'d.e.Each train shall be operated a total of at least 10 hours every month.Test seal]ng of gaskets for housing doors shall be performed utilizing chemical smoke generators during each test performed for compliance wi th Specification 4.7.8.2,a and Specification 3.7.8.2.a.
*3.From and af ter the date that one train of the standby gas treatment system is made or found to be INOPERABLE for any reason, reactor operation and fuel handling is permissible only during the succeedin'g 7 days unless such circuit is sooner made OPERABLE, provided that during such 7 days all active components of the other two standby gas treatment trains shall be OPERABLE.3.a.b.*Once per operating cycle automatic initiation of each branch of the standby gas treatment system shall be demonstrated from each unit's controls.At least once per year manua.l operability of the bypass valve for filter cooling shall be demonstrated.
I Hhen one train of the standby gas treatment system becomes INOPERABLE the other two trains shall be demonstrated to be OPERABLE within 2 hours and daily thereafter.
'ot applicable with no fuel in any reactor vessel.BFN Unit 1 3.7/4.7-15 3.7/4.7 CONTAINMENT SYSTEMS LIMITING CONDITIONS FOR OPERATION 3.7.B.Standb Gas Treatment S stem SURVEILLANCE REQUIREMENTS 4.7.8.Standb Gas Treatment S stem'.7.8.2 (Cont'd)d.Each train shall be operated a total of at least 10 hours every month.'.From and after the date that one train of the standby gas treatment system is made or found to be INOPERABLE for any reason, reactor operation and fuel handling is permissible only during the succeeding 7 days unless such circuit is sooner made OPERABLE, provided that during such 7 days all active components of the other two standby gas treatment trains shall be OPERABLE, e.3.a.b.'.Test sealing of gaskets for housing doors shall be performed utilizing chemical smoke generators during each test performed for compliance with Specification 4.7.B.2.a and Specification 3.7.B.2.a.
Once per operating cycle automatic initiation of each branch of the standby gas treatment system shall be demonstrated from each unit's controls.At least once per year manual operability of the bypass valve for filter cooling shall be demonstrated.
Nhen one train of the standby gas treatment system becomes INOPERABLE the other two trains shall be demonstrated to be OPERABLE within 2 hours and daily thereafter.
*Not applicable with no fuel in any reactor vessel.BFN Unit 2 3.7/4.7-15 3.7/4.7 CONTAINMENT SYSTEMS LIMITING CONDITIONS FOR OPERATION 3.7.'B.Standb Gas Treatment S stem SURVEILLANCE REQUIREMENTS 4.7.8.Standb Gas Treatment S stem 4.7.B.2 (Cont'd)d.Each train shall be operated a total of at least 10 hours every month.e.Test sealing of gaskets for housing doors shall be performed utilizing chemical smoke generators during each test performed for compliance with Specification 4.7.B.2.a and Specification 3.7.B.2.a.
'*3.From and after the date that one train of the standby gas treatment system is made or found to be INOPERABLE for any reason, reactor operation and fuel handling is permissible only during the succeeding 7 days unless such circuit is sooner m~de OPERABLE, provided that during such 7 days all active components of the other two standby gas treatment trains shall be OPERABLE.3e a~b.c Once per operating cycle automatic initiation of each branch of the standby gas treatment system shall be demonstrated from each unit's controls.At least once per year manual operability of the bypass valve for filter cooling shall be demonstrated.
When one train of the standby gas treatment system becomes INOPERABLE the other two trains shall be demonstrated to be OPERABLE within 2 hours and daily thereafter.
*Not applicable with no fuel in any reactor vessel.BFN-Unit 3 3.7/4.7-15 3.7/4.7 CONTAINMENT SYSTEMS LIMITING CONDITIONS FOR OPERATION 3.7.8.Standb Gas Treatment S stem 3.7.8.3 (Cont'd)4.If these conditions cannot be met, the reactor shall be placed in a condition for which the standby gas treatment system is not required.SURVEILLANCE REQUIREMENTS 4.7.8.Standb Gas Treatment S stem BFN Unit 1 3.7/4.7-15a


3.7/4.7 CONTAINMENT S STEMS LIMITING CONDITIONS FOR OPERATION 3.7.8.Standb Gas Treatment S stem 3.7.8.3 (Cont'd)4.If these conditions cannot be met, the reactor shall be placed in a condition for which the standby gas treatment system is not required., SURVEILLANCE REQUIREMENTS 4.7.8.Standb Gas Treatment S stem BFN Unit 2 3.7/4.7-15a 3.7/4.7 CONTAINHENT SYSTEHS LIHITING CONDITIONS FOR OPERATION 3.7.8.Standb Gas Treatment S stem 3.7.B.3 (Cont'd)4.If these conditions cannot be met, the reactor shall be placed in a condition for which the standby gas treatment system is not required.SURVEILLANCE REQUIREHENTS 4.7.B.Standb Gas Treatment S stem BFN-Unit 3 3.7/4.7-isa 3.7/4.7 CONTAINMENT SYSTEMS LIMITING CONDITIONS FOR OPERATION 3.7.E.Control,;Room Emer enc Ventilation SURVEILLANCE REQUIREMENTS 4.7.E.'.Control-Room Emer enc Ventilation 3.From and after the date that one of the control room emergency pressurization systems is made or found to be INOPERABLE for any reason, reactor operation or refueling.operations is permissible only during the succeeding 7 days unless such circuit is sooner made OPERABLE.*
~ ~  ~ ~
3.At least once per operating cycle not to exceed 18 months, automatic initiation of the control room emergency pressurization system shall be demonstrated.
    ~    3.714.7 CONTAINMENT SY TEMS LIMITING CONDITIONS   FOR OPERATION                 SURVEILLANCE REQUIREMENTS 3.7.B. Standb   Gas Treatment   S stem         4.7.B. Standb       Gas Treatment S   stem
4.If these conditions cannot be met, reactor shutdown shall be initiated and all reactors shall be in Cold Shutdown within 24 hours for reactor operations and refueling operations shall be terminated within 2 hours.'.During the simulated automatic actuation test of this system (see Table 4.2.G), it shall be verified that the following dampers operate as indicated:
              *1 a. Except as specified in                        1. At  least once per year, Specification 3.7.B.3 below,                      the following conditions all three trains of the                             shall be demonstrated.
Close: FCO-150 8, D, E, and F Open: FCO-151 FCO-152'CO not applicable with no fuel in any reactor vessel.BFN Unit 1 3.7.4.7-20
standby gas treatment system shall  be OPERABLE  at all                        a. Pressure drop across times when secondary                                    the combined HEPA containment integrity is                               filters and charcoal required.                                               adsorber banks is,less than 6 inches of w'ater lb. Hith  no fuel in any reactor                            at  a  flow of 9000 cfm vessel, only two (2) of the                             (+ 101.).
three (3) standby gas treat-ment trains are required                          b. The  inlet heaters  on to be OPERABLE at all times                      ~
each  circuit are when secondary    containment                          tested in accordance integrity is required.      If                          with ANSI N510-1975, either of the two (2) standby                          and are capable    of  an gas treatment system trains                            output of at least become inoperable at any time                          40 kN.
when operability is required, suspend  handling of irradiated                  c. Air distribution is fuel until two (2) trains of                            uniform within    20%
standby gas treatment are                              across HEPA filters OPERABLE.                                              and charcoal adsorbers.
* Hith  no fuel in any reactor vessel, Specification 3.7.8.l.b is applicable.
BFN                                         3.7/4.7-13 Unit 1


3.7/4.7 CONTAINMENT SYSTEMS LIMITING CONDITIONS FOR OPERATION 3.7.E.Control Room Emer enc Vent/lation SURVEILLANCE REQUIREMENTS 4.7.E.Control Room Emer enc Ventilation 3.From and after the date that one of the control room emergency pressurization systems is made or found to be INOPERABLE for any reason, reactor operation or refueling.
3.7/4.7   CONTAINMENT SYSTEMS LIMITING CONDITIONS     FOR OPERATION               SURVEILLANCE REQUIREMENTS 3.7.B. Standb  .Gas  Treatment  S  stem          4.7.8. Standb    Gas Treatment  S  stem
    *la. Except as'specified in                        1. At least once per year, Specification 3.7.B.3 below,                      the following conditions all'three trains of the                          shall be demonstrated.
standby gas treatment system shall  be OPERABLE    at all                      a. Pressure drop across times when secondary                                  the combined HEPA containment integrity is                              filters and charcoal required."                                            adsorber banks is less than 6 inches of water lb. Hith  no fuel in any reactor                          at  a  flow of 9000 cfm vessel, only two (2) of the                            (+  10/).
three (3) standby gas treat-ment trains are required                          b. The    inlet heaters  on to be OPERABLE at all times                            each  circuit are when secondary    containment                          tested in accordance integrity is required.      If                      with ANSI N510-1975, either of the two (2)    standby                      and are capable    of  an gas treatment system trains                          output of at least become inoperable at any time                          40 kH.
when  operability is required, suspend handling of irradiated                    c. Air distribution is ..
fuel until two (2) trains of                          uniform within 20%
standby gas treatment are                              across HEPA filters OPERABLE.                                              and charcoal adsorbers.
'ith    no  fuel in  any  reactor vessel, Specification 3.7.B.l.b is applicable,-
BFN                                          3.7/4.7-13 Unit  2
 
3.7/4.7  CONTAINMENT SY TEMS LIMITING CONDITIONS      FOR OPERATION                SURVEILLANCE REQUIREMENTS 3.7.8. Standb    Gas  Treatment  S stem            4.7.B. Standb    Gas  Treatment  S  stem
    *la. Except as specified in                          l. At least once per year, Specification F 7.B.3 below,                      the following conditions all three trains of the                            shall be demonstrated.
standby gas treatment system shall  be OPERABLE  at all                        a. Pressure drop across times when secondary                                    the combined HEPA containment integrity is                                filters and charcoal required.                                            , adsorber banks is less than 6 inches of water lb. Hith    no fuel in any reactor                          at  a  flow of  9000 cfm vessel, only two (2) of the                            (+ 10/.)  .
three (3) standby gas treat-    .
ment trains are required                          b. The  inlet heaters  on to be OPERABLE at all times                            each  circuit are when secondary    containment                          tested in accordance integrity is required.      If                          with ANSI N510-1975, either of the    two (2) standby                        and are capable    of  an gas  treatment system trains                            output of at least become inoperable at any time                          40 kH.
when  operability is required, suspend handling of irradiated                    c. Air distribution is fuel until two (2) trains of                            uniform within 20%
standby gas treatment are                              across HEPA filters OPERABLE.                                              and charcoal adsorbers.
* Hith no fuel in any reactor vessel, Specification 3.7.B.l.b is applicable.
BFN                                          3.7/4.7-13 Unit  3
 
.3.7/4.7    CONTAINMENT SYSTEMS
. LIMITING.'CONDITIONS FOR OPERATION                      SURVEILLANCE REQUIREMENTS 3.7.8.    :Standb    Gas  Treatment  S stem            4.7.8. Standb    Gas  Treatment  S  stem 4.7.8.2    (Cont'd)
                                                                  'd. Each  train shall be operated    a total of at least  10 hours    every month.
: e. Test seal] ng of gaskets for housing doors shall be performed utilizing chemical smoke generators during each test performed    for  compliance wi th Specification 4.7.8.2,a and Specification 3.7.8.2.a.
* 3. From and af ter the date                  3. a. Once per    operating cycle that one train of the                              automatic    initiation of standby gas treatment                              each branch of the system is made or found                            standby gas treatment to  be INOPERABLE  for  any                      system shall be reason,  reactor operation                        demonstrated    from each and fuel handling is                              unit's controls.
permissible only during the succeedin'g 7 days unless                      b. At least once per year such circuit is sooner made                        manua.l  operability of OPERABLE,    provided that                        the bypass valve      for during such    7 days all active                  filter cooling      shall  be components of the other two                        demonstrated.
standby gas treatment trains I
shall  be OPERABLE.
* Hhen one    train of the standby gas treatment system becomes INOPERABLE the other two trains shall be demonstrated to be OPERABLE    within 2  hours and    daily thereafter.
  'ot applicable any with reactor vessel.
no  fuel in BFN                                            3.7/4.7-15 Unit  1
 
3.7/4.7    CONTAINMENT SYSTEMS LIMITING CONDITIONS        FOR OPERATION                  SURVEILLANCE REQUIREMENTS 3.7.B. Standb    Gas  Treatment    S  stem            4.7.8. Standb    Gas  Treatment  S stem'.7.8.2 (Cont'd)
: d. Each  train shall be operated    a total of at least  10 hours  every month.
: e. Test sealing of gaskets for housing    doors shall be performed utilizing chemical smoke generators during each test performed  for  compliance with Specification 4.7.B.2.a and Specification
          '.      From and that  one after the date train of the
: 3. a.
3.7.B.2.a.
Once  per operating cycle automatic initiation of standby gas treatment                              each branch of the system is made or found                              standby gas treatment to  be INOPERABLE      for any                      system shall be reason,    reactor operation                        demonstrated    from each and fuel handling is                                unit's controls.
permissible only during the succeeding    7  days unless                  b. At least once per year such  circuit is    sooner made                  manual    operability of OPERABLE,    provided that                          the bypass valve    for during such      7 days all active                  filter cooling    shall            be components of the other two standby gas treatment trains shall  be OPERABLE,                          '. demonstrated.
Nhen one    train of the standby gas treatment system becomes INOPERABLE the other two trains shall be demonstrated to be OPERABLE  within 2 hours and    daily thereafter.
* Not  applicable with      no  fuel in any  reactor vessel.
BFN                                              3.7/4.7-15 Unit  2
 
3.7/4.7  CONTAINMENT SYSTEMS LIMITING CONDITIONS      FOR OPERATION                SURVEILLANCE REQUIREMENTS 3.7.'B. Standb    Gas  Treatment  S  stem          4.7.8. Standb    Gas  Treatment  S  stem 4.7.B.2 (Cont'd)
: d. Each  train shall be operated    a total of at least  10  hours every month.
: e. Test sealing of gaskets for  housing doors shall be performed utilizing chemical smoke generators during each test performed    for  compliance with Specification 4.7.B.2.a and Specification 3.7.B.2.a.
          '*  3. From and    after the date              3e  a ~ Once  per operating cycle that  one  train of the                        automatic initiation of standby gas treatment                            each branch of the system is made or found                          standby gas treatment to be INOPERABLE for any                        system shall be reason, reactor operation                        demonstrated    from each and fuel handling is                            unit's controls.
permissible only during the succeeding 7 days unless                    b. At least once per year such  circuit is    sooner m~de                manual    operability of OPERABLE,    provided that                      the bypass valve      for during such    7 days all active                filter cooling      shall  be components of the other two                      demonstrated.
standby gas treatment trains shall  be OPERABLE.                        c  When  one train of the standby gas treatment system becomes      INOPERABLE the other two trains shall be demonstrated      to be OPERABLE    within 2  hours and    daily thereafter.
* Not  applicable with      no  fuel in any  reactor vessel.
BFN-Unit    3                                  3.7/4.7-15
 
3.7/4.7  CONTAINMENT SYSTEMS LIMITING CONDITIONS    FOR OPERATION              SURVEILLANCE REQUIREMENTS 3.7.8. Standb    Gas  Treatment  S stem            4.7.8. Standb  Gas Treatment S stem 3.7.8.3 (Cont'd)
: 4. If these  conditions cannot be met,  the reactor shall  be placed in a condition for which the standby gas treatment system is not required.
BFN                                        3.7/4.7-15a Unit 1
 
3.7/4.7  CONTAINMENT S STEMS LIMITING CONDITIONS  FOR OPERATION              SURVEILLANCE REQUIREMENTS 3.7.8. Standb    Gas Treatment S stem            4.7.8. Standb  Gas Treatment S stem 3.7.8.3 (Cont'd)
: 4. If these  conditions cannot be  met, the reactor shall be placed in a condition for which the standby gas treatment system is not required.,
BFN                                      3.7/4.7-15a Unit  2
 
3.7/4.7  CONTAINHENT SYSTEHS LIHITING CONDITIONS    FOR OPERATION            SURVEILLANCE REQUIREHENTS 3.7.8. Standb    Gas  Treatment S stem          4.7.B. Standb  Gas Treatment S stem 3.7.B.3 (Cont'd)
: 4. If these  conditions cannot be met,  the reactor shall be placed in a condition for which the standby gas treatment system is not required.
BFN-Unit 3                                3.7/4.7-isa
 
3.7/4.7    CONTAINMENT SYSTEMS LIMITING CONDITIONS      FOR OPERATION            SURVEILLANCE REQUIREMENTS 3.7.E. Control,;Room     Emer enc                 4.7.E.    '.Control-Room Emer enc Ventilation                                           Ventilation
: 3. From and after the date that             3. At least once per operating one of the control room                       cycle not to exceed 18 months, emergency pressurization                     automatic initiation of the systems is made or found to                   control room emergency be INOPERABLE for any reason,                 pressurization system shall  be reactor operation or refueling   .            demonstrated.
operations is permissible only during the succeeding 7 days unless such circuit is sooner made OPERABLE.*
operations is permissible only during the succeeding 7 days unless such circuit is sooner made OPERABLE.*
4.If these conditions cannot be met, reactor shutdown shall be initiated and all reactors shall be in Cold Shutdown within 24 hours for reactor operations and refueling operations shall be terminated within 2 hours.*3.At least once per operating cycle not to exceed 18 months,-automatic initiation of the control room emergency pressurization system shall be demonstrated.
: 4. If these conditions cannot be               During the simulated automatic met, reactor shutdown shall be               actuation test of this system initiated shall and all reactors be in Cold Shutdown (see Table 4.2.G),   it shall be verified that the following within  2 hours.'.
4.During the simulated automatic actuation test of this system (see Table 4.2.G), it shall be verified that the following dampers operate as indicated:
within 24 hours for reactor operations and refueling operations shall be terminated dampers operate as indicated:
Close: FCO-150 B, D, E, and F Open: FCO-151 FCO-152*LCO not applicable with no fuel in any reactor vessel.BFN Unit 2 3.7.4.7-20 3.7/4.7 CONTAINMENT SYSTEMS.LIMITING CONDITIONS FOR OPERATION 3.7.E.Control Room Emer enc'Ventilation'URVEILLANCE REQUIREMENTS 4.7.E.Control Room Emer enc Ventilation 3.From and after the date that one of the control room emergency pressurization systems is made or found to be INOPERABLE for any reason, reactor operation or refueling.
Close: FCO-150 8, D, E, and Open:   FCO-151 FCO-152 F
    'CO    not applicable with no fuel in any reactor vessel.
BFN                                       3.7.4.7-20 Unit  1
 
3.7/4.7   CONTAINMENT SYSTEMS LIMITING CONDITIONS     FOR OPERATION             SURVEILLANCE REQUIREMENTS 3.7.E. Control     Room Emer enc                 4.7.E. Control Room Emer enc Vent/lation                                        Ventilation
: 3. From and after the date that             3. At least once per operating one of the control room                     cycle not to exceed 18 months,-
emergency pressurization                     automatic initiation of the systems is made or found to                 control room emergency be INOPERABLE for any reason,               pressurization system shall  be reactor operation or refueling.              demonstrated.
operations is permissible only during the succeeding 7 days unless such circuit is sooner made OPERABLE.*
operations is permissible only during the succeeding 7 days unless such circuit is sooner made OPERABLE.*
3.At least once per operating cycle not to exceed 18 months, automatic initiation of the control room emergency pressurization system shall be demonstrated.
: 4. If these conditions cannot be           4. During the simulated automatic met, reactor shutdown shall be               actuation test of this system initiated and all reactors                   (see Table 4.2.G),  it shall be shall be in Cold Shutdown                   verified that the following within 24 hours for reactor                 dampers operate as indicated:
4.If these conditions cannot be met, reactor shutdown shall be initiated and all reactors shall be in Cold Shutdown within 24 hours for reactor operations and refueling operations shall be terminated within 2 hours.*4.During the simulated automatic actuation test of this system (see Table 4.2.G), it shall be verified that the following dampers operate as indicated:
operations and refueling operations shall be terminated               Close: FCO-150 B, D, E, and  F within 2 hours.*                             Open:  FCO-151 FCO-152
Close: FCO-150 B, D, E, and F Open: FCO-151 FCO-152*LCO not applicable with no fuel in any reactor vessel.BFN-Unit 3 3.7.4.7-20 ENCLOSURE 2 Descri tion of Chan e DESCRIPTION AND JUSTIFICATION BRONNS FERRY NUCLEAR PLANT UNITS 1, 2, AND 3 The Browns Ferry Nuclear (BFN)Plant Technical Specifications require specific safety-related systems to be operable during handling of spent fuel and all operations over the spent fuel pools.BFN is proposing the attached temporary changes to units 1, 2, and 3 technical specifications for the Standby Gas Treatment System (SGTS)and Control Room.Emergency Ventilation System (CREVS).Reason for Chan e The proposed temporary changes to the technical specifications as shown in attachment 1 are to provide system operability requirements for the SGTS and CREVS Systems to support the BFN fuel inspection and reconstitution program and plant activities before unit 2 fuel load.'The current BFN technical specifications provide operability requirements for the handling of spent fuel and operations over the spent fuel pools.Specification 3.7.C.3 requires refueling zone secondary containment integrity to be maintained.
* LCO not applicable with no fuel in any reactor vessel.
For handling of spent fuel and all operations over the spent fuel pools, BFN Technical Specification 3.7.8.1 requires all three trains of SGTS to be operable whenever secondary containment integrity is required.Technical specification 3.7.8.3 will allow fuel handling for a maximum of seven days with one train of SGTS inoperable.
BFN                                      3.7.4.7-20 Unit  2
However, the remaining two trains must be demonstrated operable within two hours and daily thereafter.
 
A conservative reading of technical specification 3.7.E.1 would also require both control room emergency ventilation systems to be operable.The actual specification requires operability at all times when any reactor vessel contains irradiated fuel.All three units at BFN are currently defueled.Technical Specification 3.7.E.3 and 4 limit"refueling operations" if one or both CREVS is inoperable.
3.7/4.7    CONTAINMENT SYSTEMS
A conservative definition of refueling operations would encompass any movement of fuel in and around the fuel pools.Fuel inspection and reconstitution will improve the reliability of the fuel by identifying and replacing fuel rods which fail to meet acceptable corrosion criteria for continued operation.
.LIMITING CONDITIONS      FOR OPERATION                            REQUIREMENTS
This will reduce the number of fuel pins leaking, in future cycles, which will reduce plant radiation levels and thus increase plant safety.TVA requests a temporary change to the technical specifications which will relax these system requirements.
        'Ventilation'URVEILLANCE 3.7.E. Control      Room Emer enc                  4.7.E. Control Room Emer  enc Ventilation
This will allow the system modifications and maintenance needed for restart to proceed in parallel with the fuel inspections and reconstitution program without reducing the margin of safet:y.  
: 3. From and after the date that              3. At least once per operating one of the control room                        cycle not to exceed 18 months, emergency pressurization                      automatic initiation of the systems is made or found to                  control room emergency be INOPERABLE for any reason,                 pressurization system shall  be reactor operation or refueling.              demonstrated.
~)j Justification for Chan e Standb Gas Treatment (SGTS)The SGTS has three trains that automatically start upon receipt of a high radiation signal.The SGTS minimizes the release of radioactive material from the secondar'y containment to the environs.The SGTS performs two safety functions:
operations is permissible only during the succeeding 7 days unless such circuit is sooner made OPERABLE.*
(1)filter iodine particulate and exhaust the Reactor Building atmosphere to the plant stack during secondary containment isolation conditions, and (2)when isolated, maintain the secondary containment at one-quarter inch of water negative pressure relative to the building exterior, thus assuring only inleakage into the secondary containment.
: 4. If  these conditions cannot be            4. During the simulated automatic met, reactor shutdown shall be                actuation test of this system initiated and all reactors                    (see Table 4.2.G),  it shall be shall be in Cold Shutdown                    verified that the following within 24 hours for reactor                  dampers  operate as indicated:
The fuel for all three units has decayed for approximately three years.The only significant.
operations and refueling operations shall be terminated                Close: FCO-150 B, D, E, and   F within 2 hours.*                              Open:  FCO-151 FCO-152
radioisotope remaining is Kr-85.There is essentially no iodine present.-Should a fuel handling accident occur, SGTS filtering of iodine would therefore not be required.Filtering has no effect on Kr-85 since, it is an inert gas.The only safety function that would be performed by the SGTS in the event of a fuel handling accident would be to maintain the required one-quarter inch of water negative pressure when secondary containment integrity is required.-It is verified through periodic surveillance testing that only two SGTS trains are required to maintain the one-quarter inch of water negative pressure.The average measured inleakage is approximately 10,100 CFM with the secondary containment at one-quarter inch negative pressure.This is less than the technical specification limit of 12,000 CFM.Each train of SGTS is rated at 9,000 CFM.The total design flow for two trains is 15,000 CFM.Thus, two trains will provide adequate flow to maintain the necessary vacuum.The proposed temporary amendment will require only two of the three trains of SGTS to be operable when secondary containment integrity is required.Hith less than two operable trains of SGTS, handling of irradiated fuel will be suspended until two trains are operable.If fuel handling is suspended, the fuel assemblies being moved, inspected, or reconstituted will be placed in a secure position until fuel handling activities resume.As fuel handling will be suspended if less than two trains are operable, limiting condition for operation (LCO)3.7.B.3 and its associated required surveillance requirement (SR)4.7.B.3.c will not be entered.To'revent ambiguity, this LCO and SR will be marked to clarify that it is not applicable with no fuel in any reactor vessel.Control Room Emer enc Ventilation S stem (CREVS)The CREVS is designed to protect the control room operators by pressurizing the main control room (MCR)with filtered air during a fuel handling accident condition.
* LCO  not applicable with no fuel in    any reactor vessel.
The CREVS uses charcoal adsorbers to assure the removal of radioactive iodine from the air and high efficiency particulate absolute (HEPA)filters for removing particulate matter.These filters and adsorbers will keep the resulting doses, in the event of a design basis fuel handling accident, less than the allowable levels stated in criterion 19 of General Design Criteria for Nuclear Power Plants Appendix A to 10 CFR 50.r
BFN-Unit  3                              3.7.4.7-20
 
ENCLOSURE 2 DESCRIPTION AND JUSTIFICATION BRONNS FERRY NUCLEAR PLANT UNITS 1, 2, AND 3 Descri tion    of  Chan e The Browns    Ferry Nuclear (BFN) Plant Technical Specifications require specific safety-related systems to     be operable during handling of spent fuel and all operations over the spent fuel pools. BFN is proposing the attached temporary changes to units 1, 2, and 3 technical specifications for the Standby Gas Treatment System (SGTS) and Control Room. Emergency Ventilation System (CREVS).
Reason  for Chan e The proposed    temporary changes to the technical specifications as shown in attachment    1  are to provide system operability requirements for the SGTS and CREVS  Systems to support the BFN fuel inspection and reconstitution program and  plant activities before unit      2  fuel load.
'The  current    BFN  technical specifications provide operability requirements for the handling    of spent fuel  and operations over the spent fuel pools.
Specification 3.7.C.3 requires refueling zone secondary containment integrity to be maintained. For handling of spent fuel and all operations over the spent fuel pools, BFN Technical Specification 3.7.8.1 requires all three trains of SGTS to be operable whenever secondary containment integrity is required. Technical specification 3.7.8.3 will allow fuel handling for a maximum of seven days with one train of SGTS inoperable.           However, the remaining two trains must      be  demonstrated  operable within two hours and daily thereafter.
A  conservative reading of technical specification 3.7.E.1 would also require both control room emergency        ventilation systems to be operable. The actual specification requires operability at all times when any reactor vessel contains irradiated fuel. All three units at BFN are currently defueled.
Technical Specification 3.7.E.3 and 4 limit "refueling operations" both CREVS is inoperable. A conservative definition of refueling operations if  one or would encompass any movement of fuel in and around the fuel pools.
Fuel inspection and      reconstitution will improve the reliability of the fuel by identifying and replacing fuel rods which fail to meet acceptable corrosion criteria for continued operation. This will reduce the number of fuel pins leaking, in future cycles, which will reduce plant radiation levels and thus increase plant safety.
TVA  requests    a temporary change to the technical specifications which will relax these system requirements.         This will allow the system modifications and maintenance needed for restart to proceed in parallel with the fuel inspections and reconstitution program without reducing the margin of safet:y.
 
  ~ )
j
 
Justification for    Chan e Standb  Gas  Treatment (SGTS)
The SGTS has    three trains that automatically start upon receipt of a high radiation signal.     The SGTS minimizes the release of radioactive material from the secondar'y containment to the environs. The SGTS performs two safety functions: (1) filter iodine particulate and exhaust the Reactor Building atmosphere to the plant stack during secondary containment isolation conditions, and (2) when isolated, maintain the secondary containment at one-quarter inch of water negative pressure relative to the building exterior, thus assuring only inleakage into the secondary containment.
The fuel for all three units has decayed for approximately three years.        The only significant. radioisotope remaining is Kr-85. There is essentially no iodine present. Should a fuel handling accident occur, SGTS filtering of
 
iodine would therefore not be required. Filtering has no effect on Kr-85 since, it is an inert gas. The only safety function that would be performed by the SGTS in the event of a fuel handling accident would be to maintain the required one-quarter inch of water negative pressure when secondary containment integrity is required. -It is verified through periodic surveillance testing that only two SGTS trains are required to maintain the one-quarter inch of water negative pressure.       The average measured inleakage is approximately 10,100 CFM with the secondary containment at one-quarter inch negative pressure.      This is less than the technical specification limit of 12,000 CFM. Each train of SGTS is rated at 9,000 CFM. The total design flow for two trains is 15,000 CFM. Thus, two trains will provide adequate flow to maintain the necessary vacuum.
The proposed temporary amendment will require only two of the three trains of SGTS to be operable when secondary containment integrity is required.       Hith less than two operable trains of SGTS, handling of irradiated fuel will be suspended until two trains are operable.      If fuel handling is suspended, the fuel assemblies being moved, inspected, or reconstituted will be placed in a secure position until fuel handling activities resume.       As fuel handling will be suspended if less than two trains are operable, limiting condition for operation (LCO) 3.7.B.3 and its associated required surveillance requirement (SR) 4.7.B.3.c will not be entered.      To'revent ambiguity, this LCO and SR will be marked to clarify that it is not applicable with no fuel in any reactor vessel.
Control  Room Emer enc    Ventilation  S stem (CREVS)
The CREVS    is designed to protect the control room operators by pressurizing the main control room (MCR) with filtered air during a fuel handling accident condition. The CREVS uses charcoal adsorbers to assure the removal of radioactive iodine from the air and high efficiency particulate absolute (HEPA) filters for removing particulate matter.        These filters and adsorbers will keep the resulting doses, in the event of a design basis fuel handling accident, less than the allowable levels stated in criterion 19 of General Design Criteria for Nuclear Power Plants Appendix A to 10 CFR 50.
r
 
Justification for  Chan e (Cont'd)
TVA  is proposing to delete the operability requirements of the CREVS until just  before fuel load. This change will enable work to be performed on the CREVS and the associated  control room HVAC ducting, as necessary. This consists of a one time change to the technical specifications. LCO's 3.7.E.3 and 3.7.E.4 will be returned to applicability before commencing fuel load.
The  filtration function that  the CREVS provides would not be needed in the event of  a fuel handling accident. 10 CFR 50 Appendix A (GDC 19) requires that in the event of an accident the radiation dosage to the occupants of the control room not exceed 5 REM whole body or its equivalent to any part of the body for the duration of the accident. This same radiation dose limit is endorsed in section 6.2.4 of NUREG 0800. TVA has evaluated the potential consequences to the control room operators in the event of a fuel handling accident before fuel load. Currently all three units are defueled with the irradiated fuel stored in the spent fuel pool. The irradiated fuel has decayed for approximately three years and the only remaining volatile fission product of any significance is Kr-85. Essentially no .iodine is present in the decayed fuels Due to the "scrubbing" effect of the fuel pool water and since Kr-85 is the only radioisotope of any significance, virtually no radioactive particulates would enter the CREVS intake ductwork. Since essentially no iodine is present in the fuel, the inhalation dose is negligible, and therefore, assuming the failure of two assemblies (i.e., 124 fuel pins), the main control room doses would be 0.001 REM whole body gamma, 0 '00 REM beta, and 0.0 REM inhalation. These calculated doses are far below the level acceptable in the event of an accident. In order to reach the dose limit of 10 CFR 50 Appendix A, a roximatel      300 assemblies currently stored in the BFN fuel pool would have to fail.
 
ENCLOSURE 3 DETERMINATION OF NO SIGNIFICANT HAZARDS CONSIDERATION BROHNS FERRY NUCLEAR PLANT UNITS 1, 2, AND 3 F
Descri  tion of  Amendment Re uest The proposed    amendment  would change the Browns Ferry Nuclear Plant (BFN)
Technical Specifications. for units 1, 2, and 3 by relaxing technical .
specification    operability requirements for the SGTS and CREVS Systems to support plant activities before fuel load.
Basis  for Pro osed No    Si'ificant  Hazards Consideration Determination NRC  has provided standards for determining whether a significant hazards consideration exists as stated in 10 CFR 50.92(c). A proposed amendment to an operating license involves no significant hazards considerations of the facility in accordance with the proposed amendment would not (1) if operation involve a significant increase in the probability or consequences of an accident previously evaluated, or (2) create the possibility of a new or different kind of accident from an accident previously evaluated, or (3) involve a significant reduction in a margin of safety.
(1)  The proposed    amendments  do not involve a  significant increase in the probability or    consequences of an accident previously evaluated. The
    .proposed temporary changes to the technical specifications involve relaxations to system operability requirements for the SGTS and CREVS Systems during the fuel inspection and reconstitution program in addition to supporting plant activities before fuel load. The fuel being moved in a  spent fuel pool has decayed for approximately three years, thus reducing the need for systems required by the technical specifications for postaccident iodine removal.
The  fuel handling accident evaluated in the FSAR (section 14.6.4) represents    the most severe event in terms of radioactive release and dose consequences that should be considered applicable to the fuel inspection and reconstitution program or any other plant activity before fuel load.
Since movement of irradiated fuel in the spent fuel pool area for a typical refueling operation is the same for the fuel inspection and reconstitution process, the current FSAR analysis is still valid. The current condition of the fuel .is well within the bounds of the FSAR, analysis. The FSAR calculations used freshly irradiated fuel (unloaded from the core 24 hours after shutdown) which would contain large amounts of fission products, specifically iodine. The irradiated fuel being inspected and reconstituted has decayed for approximately three years and the only remaining volatile fission product of any significance is Kr-85, which is an inert gas. Due to this decay time, there is essentially no iodine present and therefore no need for operability of systems with iodine removal capability.
 
Basis  for  Pro osed No Si  nificant  Hazards Consideration Determination (Cont'd)
The proposed    temporary changes to the technical specifications do not affect the precursors for any accident analysis and therefore do not involve a significant increase in the probability of an accident previously evaluated. The present required availability of systems in the technical specifications is based on FSAR accident analysis assumptions and limitations. The present condition of the fuel in the spent fuel pool is such that over 300 assemblies would have to fail before the FSAR limiting assumptions for releases and dose consequences could be reached, thus allowing a reduction in the number of systems required to mitigate such a limiting event. The requested reduction in system operability for the SGTS and CREVS Systems has been evaluated and a determination reached that with the proposed temporary technical specification changes present FSAR assumptions and limitations will be maintained. Therefore, the proposed temporary changes do not involve a significant increase in the consequences of an accident previously evaluated.
(2)  The proposed  change does not create  the possibility of a new or different kind of accident from    an accident previously evaluated. The proposed temporary changes will reduce present system operability requirements; however, no new modes of plant operation are introduced which could contribute to the possibility of a new or different kind of accident.
The fuel inspection and reconstitution program involves handling irradiated fuel which is bounded by present FSAR fuel handling accident assumptions. This is the most severe event that could occur before fuel load therefore any plant activities conducted until. then wi 11 be also bounded by the FSAR fuel handling accident.
(3)  The proposed amendment does not involve a significant reduction in a margin of safety. The proposed temporary technical specification changes will reduce the operability requirements for the SGTS and CREVS during the fuel inspection and reconstitution program and those plant activities conducted before fuel load for BFN Unit 2. The proposed temporary changes as they relate to the margin of safety are discussed below:
: a. SGTS  Based on the current unit 2 fuel fission inventory (essentially no  iodine) the SGTS would not be required to mitigate a fuel handling accident during the fuel inspection and reconstitution program. The most severe accident applicable before fuel load is the fuel handling accident previously evaluated in FSAR section 14.6.4.      The SGTS is still required to maintain the one-quarter-inch of water negative pressure when secondary containment integrity is required (technical specification 4.7.C). Approximately 10,100 CFM are required to-draw the one quarter inch of water negative pressure and each SGTS is rated at 9000 CFM. Therefore, two trains of the SGTS are more than adequate.
 
Basis  for    Pro osed No Si    nificant  Hazards Consideration  Determination (Cont'd) b.,  CREVS : The  irradiated fuel has decayed for approximately three years and the  only remaining volatile fission product of any significance is Kr-85. Essentially no iodine is present in the decayed fuel. Due to
          , the "scrubbing" effect of,the fuel pool water and since Kr-85 is the
      ., only radioisotope of any significance, should a fuel handling accident occur virtually no radioactive particulates would be present in the CREVS, intake ductwork. Therefore, the filtration function that the CREVS provides would not be needed during the fuel inspection and reconstitution program or any other plant activities before fuel load.
The proposed      temporary changes  will  ensure that the appropriate safety-related systems      needed  to mitigate  a fuel handling accident are operable and    will  be  able to perform their intended safety function called upon. Therefore, the proposed changes do not represent a if significant reduction in a margin of safety.
Determination of Basis      for  Pro osed No Si  nificant Hazards Since the application for amendment involves a proposed change that is encompassed by the criteria for which no significant hazards consideration exists, TVA has made a proposed determination that the application involves no significant hazards consideration.


Justification for Chan e (Cont'd)TVA is proposing to delete the operability requirements of the CREVS until just before fuel load.This change will enable work to be performed on the CREVS and the associated control room HVAC ducting, as necessary.
V ~ "-
This consists of a one time change to the technical specifications.
k}}
LCO's 3.7.E.3 and 3.7.E.4 will be returned to applicability before commencing fuel load.The filtration function that the CREVS provides would not be needed in the event of a fuel handling accident.10 CFR 50 Appendix A (GDC 19)requires that in the event of an accident the radiation dosage to the occupants of the control room not exceed 5 REM whole body or its equivalent to any part of the body for the duration of the accident.This same radiation dose limit is endorsed in section 6.2.4 of NUREG 0800.TVA has evaluated the potential consequences to the control room operators in the event of a fuel handling accident before fuel load.Currently all three units are defueled with the irradiated fuel stored in the spent fuel pool.The irradiated fuel has decayed for approximately three years and the only remaining volatile fission product of any significance is Kr-85.Essentially no.iodine is present in the decayed fuels Due to the"scrubbing" effect of the fuel pool water and since Kr-85 is the only radioisotope of any significance, virtually no radioactive particulates would enter the CREVS intake ductwork.Since essentially no iodine is present in the fuel, the inhalation dose is negligible, and therefore, assuming the failure of two assemblies (i.e., 124 fuel pins), the main control room doses would be 0.001 REM whole body gamma, 0'00 REM beta, and 0.0 REM inhalation.
These calculated doses are far below the level acceptable in the event of an accident.In order to reach the dose limit of 10 CFR 50 Appendix A, a roximatel 300 assemblies currently stored in the BFN fuel pool would have to fail.
ENCLOSURE 3 DETERMINATION OF NO SIGNIFICANT HAZARDS CONSIDERATION BROHNS FERRY NUCLEAR PLANT UNITS 1, 2, AND 3 F Descri tion of Amendment Re uest The proposed amendment would change the Browns Ferry Nuclear Plant (BFN)Technical Specifications.
for units 1, 2, and 3 by relaxing technical.specification operability requirements for the SGTS and CREVS Systems to support plant activities before fuel load.Basis for Pro osed No Si'ificant Hazards Consideration Determination NRC has provided standards for determining whether a significant hazards consideration exists as stated in 10 CFR 50.92(c).A proposed amendment to an operating license involves no significant hazards considerations if operation of the facility in accordance with the proposed amendment would not (1)involve a significant increase in the probability or consequences of an accident previously evaluated, or (2)create the possibility of a new or different kind of accident from an accident previously evaluated, or (3)involve a significant reduction in a margin of safety.(1)The proposed amendments do not involve a significant increase in the probability or consequences of an accident previously evaluated.
The.proposed temporary changes to the technical specifications involve relaxations to system operability requirements for the SGTS and CREVS Systems during the fuel inspection and reconstitution program in addition to supporting plant activities before fuel load.The fuel being moved in a spent fuel pool has decayed for approximately three years, thus reducing the need for systems required by the technical specifications for postaccident iodine removal.The fuel handling accident evaluated in the FSAR (section 14.6.4)represents the most severe event in terms of radioactive release and dose consequences that should be considered applicable to the fuel inspection and reconstitution program or any other plant activity before fuel load.Since movement of irradiated fuel in the spent fuel pool area for a typical refueling operation is the same for the fuel inspection and reconstitution process, the current FSAR analysis is still valid.The current condition of the fuel.is well within the bounds of the FSAR, analysis.The FSAR calculations used freshly irradiated fuel (unloaded from the core 24 hours after shutdown)which would contain large amounts of fission products, specifically iodine.The irradiated fuel being inspected and reconstituted has decayed for approximately three years and the only remaining volatile fission product of any significance is Kr-85, which is an inert gas.Due to this decay time, there is essentially no iodine present and therefore no need for operability of systems with iodine removal capability.
Basis for Pro osed No Si nificant Hazards Consideration Determination (Cont'd)The proposed temporary changes to the technical specifications do not affect the precursors for any accident analysis and therefore do not involve a significant increase in the probability of an accident previously evaluated.
The present required availability of systems in the technical specifications is based on FSAR accident analysis assumptions and limitations.
The present condition of the fuel in the spent fuel pool is such that over 300 assemblies would have to fail before the FSAR limiting assumptions for releases and dose consequences could be reached, thus allowing a reduction in the number of systems required to mitigate such a limiting event.The requested reduction in system operability for the SGTS and CREVS Systems has been evaluated and a determination reached that with the proposed temporary technical specification changes present FSAR assumptions and limitations will be maintained.
Therefore, the proposed temporary changes do not involve a significant increase in the consequences of an accident previously evaluated.
(2)The proposed change does not create the possibility of a new or different kind of accident from an accident previously evaluated.
The proposed temporary changes will reduce present system operability requirements; however, no new modes of plant operation are introduced which could contribute to the possibility of a new or different kind of accident.The fuel inspection and reconstitution program involves handling irradiated fuel which is bounded by present FSAR fuel handling accident assumptions.
This is the most severe event that could occur before fuel load therefore any plant activities conducted until.then wi 11 be also bounded by the FSAR fuel handling accident.(3)The proposed amendment does not involve a significant reduction in a margin of safety.The proposed temporary technical specification changes will reduce the operability requirements for the SGTS and CREVS during the fuel inspection and reconstitution program and those plant activities conducted before fuel load for BFN Unit 2.The proposed temporary changes as they relate to the margin of safety are discussed below: a.SGTS-Based on the current unit 2 fuel fission inventory (essentially no iodine)the SGTS would not be required to mitigate a fuel handling accident during the fuel inspection and reconstitution program.The most severe accident applicable before fuel load is the fuel handling accident previously evaluated in FSAR section 14.6.4.The SGTS is still required to maintain the one-quarter-inch of water negative pressure when secondary containment integrity is required (technical specification 4.7.C).Approximately 10,100 CFM are required to-draw the one quarter inch of water negative pressure and each SGTS is rated at 9000 CFM.Therefore, two trains of the SGTS are more than adequate.
Basis for Pro osed No Si nificant Hazards Consideration Determination (Cont'd)b., CREVS-: The irradiated fuel has decayed for approximately three years and the only remaining volatile fission product of any significance is Kr-85.Essentially no iodine is present in the decayed fuel.Due to , the"scrubbing" effect of, the fuel pool water and since Kr-85 is the., only radioisotope of any significance, should a fuel handling accident occur virtually no radioactive particulates would be present in the CREVS, intake ductwork.Therefore, the filtration function that the CREVS provides would not be needed during the fuel inspection and reconstitution program or any other plant activities before fuel load.The proposed temporary changes will ensure that the appropriate safety-related systems needed to mitigate a fuel handling accident are operable and will be able to perform their intended safety function if called upon.Therefore, the proposed changes do not represent a significant reduction in a margin of safety.Determination of Basis for Pro osed No Si nificant Hazards Since the application for amendment involves a proposed change that is encompassed by the criteria for which no significant hazards consideration exists, TVA has made a proposed determination that the application involves no significant hazards consideration.
V~"-k}}

Revision as of 23:57, 21 October 2019

Proposed Tech Specs,Changing Operability Requirements for Standby Gas Treatment Sys & Control Room Emergency Ventilation Sys in Order to Proceed W/Fuel Insp & Reconstitution Program
ML18033A239
Person / Time
Site: Browns Ferry  Tennessee Valley Authority icon.png
Issue date: 06/01/1988
From:
TENNESSEE VALLEY AUTHORITY
To:
Shared Package
ML18033A238 List:
References
NUDOCS 8806070126
Download: ML18033A239 (24)


Text

ENCLOSURE 1 PROPOSED TECHNICAL SPECIFICATIONS REVISIONS BRONNS FERRY NUCLEAR PLANT UNITS 1, 2, AND 3 (TVA BFN TS 24S-T) 8806070126 880601 PDR ADOCK 05000259 P. DCD

~ ~ ~ ~

~ 3.714.7 CONTAINMENT SY TEMS LIMITING CONDITIONS FOR OPERATION SURVEILLANCE REQUIREMENTS 3.7.B. Standb Gas Treatment S stem 4.7.B. Standb Gas Treatment S stem

  • 1 a. Except as specified in 1. At least once per year, Specification 3.7.B.3 below, the following conditions all three trains of the shall be demonstrated.

standby gas treatment system shall be OPERABLE at all a. Pressure drop across times when secondary the combined HEPA containment integrity is filters and charcoal required. adsorber banks is,less than 6 inches of w'ater lb. Hith no fuel in any reactor at a flow of 9000 cfm vessel, only two (2) of the (+ 101.).

three (3) standby gas treat-ment trains are required b. The inlet heaters on to be OPERABLE at all times ~

each circuit are when secondary containment tested in accordance integrity is required. If with ANSI N510-1975, either of the two (2) standby and are capable of an gas treatment system trains output of at least become inoperable at any time 40 kN.

when operability is required, suspend handling of irradiated c. Air distribution is fuel until two (2) trains of uniform within 20%

standby gas treatment are across HEPA filters OPERABLE. and charcoal adsorbers.

  • Hith no fuel in any reactor vessel, Specification 3.7.8.l.b is applicable.

BFN 3.7/4.7-13 Unit 1

3.7/4.7 CONTAINMENT SYSTEMS LIMITING CONDITIONS FOR OPERATION SURVEILLANCE REQUIREMENTS 3.7.B. Standb .Gas Treatment S stem 4.7.8. Standb Gas Treatment S stem

  • la. Except as'specified in 1. At least once per year, Specification 3.7.B.3 below, the following conditions all'three trains of the shall be demonstrated.

standby gas treatment system shall be OPERABLE at all a. Pressure drop across times when secondary the combined HEPA containment integrity is filters and charcoal required." adsorber banks is less than 6 inches of water lb. Hith no fuel in any reactor at a flow of 9000 cfm vessel, only two (2) of the (+ 10/).

three (3) standby gas treat-ment trains are required b. The inlet heaters on to be OPERABLE at all times each circuit are when secondary containment tested in accordance integrity is required. If with ANSI N510-1975, either of the two (2) standby and are capable of an gas treatment system trains output of at least become inoperable at any time 40 kH.

when operability is required, suspend handling of irradiated c. Air distribution is ..

fuel until two (2) trains of uniform within 20%

standby gas treatment are across HEPA filters OPERABLE. and charcoal adsorbers.

'ith no fuel in any reactor vessel, Specification 3.7.B.l.b is applicable,-

BFN 3.7/4.7-13 Unit 2

3.7/4.7 CONTAINMENT SY TEMS LIMITING CONDITIONS FOR OPERATION SURVEILLANCE REQUIREMENTS 3.7.8. Standb Gas Treatment S stem 4.7.B. Standb Gas Treatment S stem

  • la. Except as specified in l. At least once per year, Specification F 7.B.3 below, the following conditions all three trains of the shall be demonstrated.

standby gas treatment system shall be OPERABLE at all a. Pressure drop across times when secondary the combined HEPA containment integrity is filters and charcoal required. , adsorber banks is less than 6 inches of water lb. Hith no fuel in any reactor at a flow of 9000 cfm vessel, only two (2) of the (+ 10/.) .

three (3) standby gas treat- .

ment trains are required b. The inlet heaters on to be OPERABLE at all times each circuit are when secondary containment tested in accordance integrity is required. If with ANSI N510-1975, either of the two (2) standby and are capable of an gas treatment system trains output of at least become inoperable at any time 40 kH.

when operability is required, suspend handling of irradiated c. Air distribution is fuel until two (2) trains of uniform within 20%

standby gas treatment are across HEPA filters OPERABLE. and charcoal adsorbers.

  • Hith no fuel in any reactor vessel, Specification 3.7.B.l.b is applicable.

BFN 3.7/4.7-13 Unit 3

.3.7/4.7 CONTAINMENT SYSTEMS

. LIMITING.'CONDITIONS FOR OPERATION SURVEILLANCE REQUIREMENTS 3.7.8. :Standb Gas Treatment S stem 4.7.8. Standb Gas Treatment S stem 4.7.8.2 (Cont'd)

'd. Each train shall be operated a total of at least 10 hours1.157407e-4 days <br />0.00278 hours <br />1.653439e-5 weeks <br />3.805e-6 months <br /> every month.

e. Test seal] ng of gaskets for housing doors shall be performed utilizing chemical smoke generators during each test performed for compliance wi th Specification 4.7.8.2,a and Specification 3.7.8.2.a.
  • 3. From and af ter the date 3. a. Once per operating cycle that one train of the automatic initiation of standby gas treatment each branch of the system is made or found standby gas treatment to be INOPERABLE for any system shall be reason, reactor operation demonstrated from each and fuel handling is unit's controls.

permissible only during the succeedin'g 7 days unless b. At least once per year such circuit is sooner made manua.l operability of OPERABLE, provided that the bypass valve for during such 7 days all active filter cooling shall be components of the other two demonstrated.

standby gas treatment trains I

shall be OPERABLE.

'ot applicable any with reactor vessel.

no fuel in BFN 3.7/4.7-15 Unit 1

3.7/4.7 CONTAINMENT SYSTEMS LIMITING CONDITIONS FOR OPERATION SURVEILLANCE REQUIREMENTS 3.7.B. Standb Gas Treatment S stem 4.7.8. Standb Gas Treatment S stem'.7.8.2 (Cont'd)

d. Each train shall be operated a total of at least 10 hours1.157407e-4 days <br />0.00278 hours <br />1.653439e-5 weeks <br />3.805e-6 months <br /> every month.
e. Test sealing of gaskets for housing doors shall be performed utilizing chemical smoke generators during each test performed for compliance with Specification 4.7.B.2.a and Specification

'. From and that one after the date train of the

3. a.

3.7.B.2.a.

Once per operating cycle automatic initiation of standby gas treatment each branch of the system is made or found standby gas treatment to be INOPERABLE for any system shall be reason, reactor operation demonstrated from each and fuel handling is unit's controls.

permissible only during the succeeding 7 days unless b. At least once per year such circuit is sooner made manual operability of OPERABLE, provided that the bypass valve for during such 7 days all active filter cooling shall be components of the other two standby gas treatment trains shall be OPERABLE, '. demonstrated.

Nhen one train of the standby gas treatment system becomes INOPERABLE the other two trains shall be demonstrated to be OPERABLE within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> and daily thereafter.

  • Not applicable with no fuel in any reactor vessel.

BFN 3.7/4.7-15 Unit 2

3.7/4.7 CONTAINMENT SYSTEMS LIMITING CONDITIONS FOR OPERATION SURVEILLANCE REQUIREMENTS 3.7.'B. Standb Gas Treatment S stem 4.7.8. Standb Gas Treatment S stem 4.7.B.2 (Cont'd)

d. Each train shall be operated a total of at least 10 hours every month.
e. Test sealing of gaskets for housing doors shall be performed utilizing chemical smoke generators during each test performed for compliance with Specification 4.7.B.2.a and Specification 3.7.B.2.a.

'* 3. From and after the date 3e a ~ Once per operating cycle that one train of the automatic initiation of standby gas treatment each branch of the system is made or found standby gas treatment to be INOPERABLE for any system shall be reason, reactor operation demonstrated from each and fuel handling is unit's controls.

permissible only during the succeeding 7 days unless b. At least once per year such circuit is sooner m~de manual operability of OPERABLE, provided that the bypass valve for during such 7 days all active filter cooling shall be components of the other two demonstrated.

standby gas treatment trains shall be OPERABLE. c When one train of the standby gas treatment system becomes INOPERABLE the other two trains shall be demonstrated to be OPERABLE within 2 hours and daily thereafter.

  • Not applicable with no fuel in any reactor vessel.

BFN-Unit 3 3.7/4.7-15

3.7/4.7 CONTAINMENT SYSTEMS LIMITING CONDITIONS FOR OPERATION SURVEILLANCE REQUIREMENTS 3.7.8. Standb Gas Treatment S stem 4.7.8. Standb Gas Treatment S stem 3.7.8.3 (Cont'd)

4. If these conditions cannot be met, the reactor shall be placed in a condition for which the standby gas treatment system is not required.

BFN 3.7/4.7-15a Unit 1

3.7/4.7 CONTAINMENT S STEMS LIMITING CONDITIONS FOR OPERATION SURVEILLANCE REQUIREMENTS 3.7.8. Standb Gas Treatment S stem 4.7.8. Standb Gas Treatment S stem 3.7.8.3 (Cont'd)

4. If these conditions cannot be met, the reactor shall be placed in a condition for which the standby gas treatment system is not required.,

BFN 3.7/4.7-15a Unit 2

3.7/4.7 CONTAINHENT SYSTEHS LIHITING CONDITIONS FOR OPERATION SURVEILLANCE REQUIREHENTS 3.7.8. Standb Gas Treatment S stem 4.7.B. Standb Gas Treatment S stem 3.7.B.3 (Cont'd)

4. If these conditions cannot be met, the reactor shall be placed in a condition for which the standby gas treatment system is not required.

BFN-Unit 3 3.7/4.7-isa

3.7/4.7 CONTAINMENT SYSTEMS LIMITING CONDITIONS FOR OPERATION SURVEILLANCE REQUIREMENTS 3.7.E. Control,;Room Emer enc 4.7.E. '.Control-Room Emer enc Ventilation Ventilation

3. From and after the date that 3. At least once per operating one of the control room cycle not to exceed 18 months, emergency pressurization automatic initiation of the systems is made or found to control room emergency be INOPERABLE for any reason, pressurization system shall be reactor operation or refueling . demonstrated.

operations is permissible only during the succeeding 7 days unless such circuit is sooner made OPERABLE.*

4. If these conditions cannot be During the simulated automatic met, reactor shutdown shall be actuation test of this system initiated shall and all reactors be in Cold Shutdown (see Table 4.2.G), it shall be verified that the following within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />.'.

within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> for reactor operations and refueling operations shall be terminated dampers operate as indicated:

Close: FCO-150 8, D, E, and Open: FCO-151 FCO-152 F

'CO not applicable with no fuel in any reactor vessel.

BFN 3.7.4.7-20 Unit 1

3.7/4.7 CONTAINMENT SYSTEMS LIMITING CONDITIONS FOR OPERATION SURVEILLANCE REQUIREMENTS 3.7.E. Control Room Emer enc 4.7.E. Control Room Emer enc Vent/lation Ventilation

3. From and after the date that 3. At least once per operating one of the control room cycle not to exceed 18 months,-

emergency pressurization automatic initiation of the systems is made or found to control room emergency be INOPERABLE for any reason, pressurization system shall be reactor operation or refueling. demonstrated.

operations is permissible only during the succeeding 7 days unless such circuit is sooner made OPERABLE.*

4. If these conditions cannot be 4. During the simulated automatic met, reactor shutdown shall be actuation test of this system initiated and all reactors (see Table 4.2.G), it shall be shall be in Cold Shutdown verified that the following within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> for reactor dampers operate as indicated:

operations and refueling operations shall be terminated Close: FCO-150 B, D, E, and F within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />.* Open: FCO-151 FCO-152

  • LCO not applicable with no fuel in any reactor vessel.

BFN 3.7.4.7-20 Unit 2

3.7/4.7 CONTAINMENT SYSTEMS

.LIMITING CONDITIONS FOR OPERATION REQUIREMENTS

'Ventilation'URVEILLANCE 3.7.E. Control Room Emer enc 4.7.E. Control Room Emer enc Ventilation

3. From and after the date that 3. At least once per operating one of the control room cycle not to exceed 18 months, emergency pressurization automatic initiation of the systems is made or found to control room emergency be INOPERABLE for any reason, pressurization system shall be reactor operation or refueling. demonstrated.

operations is permissible only during the succeeding 7 days unless such circuit is sooner made OPERABLE.*

4. If these conditions cannot be 4. During the simulated automatic met, reactor shutdown shall be actuation test of this system initiated and all reactors (see Table 4.2.G), it shall be shall be in Cold Shutdown verified that the following within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> for reactor dampers operate as indicated:

operations and refueling operations shall be terminated Close: FCO-150 B, D, E, and F within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />.* Open: FCO-151 FCO-152

  • LCO not applicable with no fuel in any reactor vessel.

BFN-Unit 3 3.7.4.7-20

ENCLOSURE 2 DESCRIPTION AND JUSTIFICATION BRONNS FERRY NUCLEAR PLANT UNITS 1, 2, AND 3 Descri tion of Chan e The Browns Ferry Nuclear (BFN) Plant Technical Specifications require specific safety-related systems to be operable during handling of spent fuel and all operations over the spent fuel pools. BFN is proposing the attached temporary changes to units 1, 2, and 3 technical specifications for the Standby Gas Treatment System (SGTS) and Control Room. Emergency Ventilation System (CREVS).

Reason for Chan e The proposed temporary changes to the technical specifications as shown in attachment 1 are to provide system operability requirements for the SGTS and CREVS Systems to support the BFN fuel inspection and reconstitution program and plant activities before unit 2 fuel load.

'The current BFN technical specifications provide operability requirements for the handling of spent fuel and operations over the spent fuel pools.

Specification 3.7.C.3 requires refueling zone secondary containment integrity to be maintained. For handling of spent fuel and all operations over the spent fuel pools, BFN Technical Specification 3.7.8.1 requires all three trains of SGTS to be operable whenever secondary containment integrity is required. Technical specification 3.7.8.3 will allow fuel handling for a maximum of seven days with one train of SGTS inoperable. However, the remaining two trains must be demonstrated operable within two hours and daily thereafter.

A conservative reading of technical specification 3.7.E.1 would also require both control room emergency ventilation systems to be operable. The actual specification requires operability at all times when any reactor vessel contains irradiated fuel. All three units at BFN are currently defueled.

Technical Specification 3.7.E.3 and 4 limit "refueling operations" both CREVS is inoperable. A conservative definition of refueling operations if one or would encompass any movement of fuel in and around the fuel pools.

Fuel inspection and reconstitution will improve the reliability of the fuel by identifying and replacing fuel rods which fail to meet acceptable corrosion criteria for continued operation. This will reduce the number of fuel pins leaking, in future cycles, which will reduce plant radiation levels and thus increase plant safety.

TVA requests a temporary change to the technical specifications which will relax these system requirements. This will allow the system modifications and maintenance needed for restart to proceed in parallel with the fuel inspections and reconstitution program without reducing the margin of safet:y.

~ )

j

Justification for Chan e Standb Gas Treatment (SGTS)

The SGTS has three trains that automatically start upon receipt of a high radiation signal. The SGTS minimizes the release of radioactive material from the secondar'y containment to the environs. The SGTS performs two safety functions: (1) filter iodine particulate and exhaust the Reactor Building atmosphere to the plant stack during secondary containment isolation conditions, and (2) when isolated, maintain the secondary containment at one-quarter inch of water negative pressure relative to the building exterior, thus assuring only inleakage into the secondary containment.

The fuel for all three units has decayed for approximately three years. The only significant. radioisotope remaining is Kr-85. There is essentially no iodine present. Should a fuel handling accident occur, SGTS filtering of

iodine would therefore not be required. Filtering has no effect on Kr-85 since, it is an inert gas. The only safety function that would be performed by the SGTS in the event of a fuel handling accident would be to maintain the required one-quarter inch of water negative pressure when secondary containment integrity is required. -It is verified through periodic surveillance testing that only two SGTS trains are required to maintain the one-quarter inch of water negative pressure. The average measured inleakage is approximately 10,100 CFM with the secondary containment at one-quarter inch negative pressure. This is less than the technical specification limit of 12,000 CFM. Each train of SGTS is rated at 9,000 CFM. The total design flow for two trains is 15,000 CFM. Thus, two trains will provide adequate flow to maintain the necessary vacuum.

The proposed temporary amendment will require only two of the three trains of SGTS to be operable when secondary containment integrity is required. Hith less than two operable trains of SGTS, handling of irradiated fuel will be suspended until two trains are operable. If fuel handling is suspended, the fuel assemblies being moved, inspected, or reconstituted will be placed in a secure position until fuel handling activities resume. As fuel handling will be suspended if less than two trains are operable, limiting condition for operation (LCO) 3.7.B.3 and its associated required surveillance requirement (SR) 4.7.B.3.c will not be entered. To'revent ambiguity, this LCO and SR will be marked to clarify that it is not applicable with no fuel in any reactor vessel.

Control Room Emer enc Ventilation S stem (CREVS)

The CREVS is designed to protect the control room operators by pressurizing the main control room (MCR) with filtered air during a fuel handling accident condition. The CREVS uses charcoal adsorbers to assure the removal of radioactive iodine from the air and high efficiency particulate absolute (HEPA) filters for removing particulate matter. These filters and adsorbers will keep the resulting doses, in the event of a design basis fuel handling accident, less than the allowable levels stated in criterion 19 of General Design Criteria for Nuclear Power Plants Appendix A to 10 CFR 50.

r

Justification for Chan e (Cont'd)

TVA is proposing to delete the operability requirements of the CREVS until just before fuel load. This change will enable work to be performed on the CREVS and the associated control room HVAC ducting, as necessary. This consists of a one time change to the technical specifications. LCO's 3.7.E.3 and 3.7.E.4 will be returned to applicability before commencing fuel load.

The filtration function that the CREVS provides would not be needed in the event of a fuel handling accident. 10 CFR 50 Appendix A (GDC 19) requires that in the event of an accident the radiation dosage to the occupants of the control room not exceed 5 REM whole body or its equivalent to any part of the body for the duration of the accident. This same radiation dose limit is endorsed in section 6.2.4 of NUREG 0800. TVA has evaluated the potential consequences to the control room operators in the event of a fuel handling accident before fuel load. Currently all three units are defueled with the irradiated fuel stored in the spent fuel pool. The irradiated fuel has decayed for approximately three years and the only remaining volatile fission product of any significance is Kr-85. Essentially no .iodine is present in the decayed fuels Due to the "scrubbing" effect of the fuel pool water and since Kr-85 is the only radioisotope of any significance, virtually no radioactive particulates would enter the CREVS intake ductwork. Since essentially no iodine is present in the fuel, the inhalation dose is negligible, and therefore, assuming the failure of two assemblies (i.e., 124 fuel pins), the main control room doses would be 0.001 REM whole body gamma, 0 '00 REM beta, and 0.0 REM inhalation. These calculated doses are far below the level acceptable in the event of an accident. In order to reach the dose limit of 10 CFR 50 Appendix A, a roximatel 300 assemblies currently stored in the BFN fuel pool would have to fail.

ENCLOSURE 3 DETERMINATION OF NO SIGNIFICANT HAZARDS CONSIDERATION BROHNS FERRY NUCLEAR PLANT UNITS 1, 2, AND 3 F

Descri tion of Amendment Re uest The proposed amendment would change the Browns Ferry Nuclear Plant (BFN)

Technical Specifications. for units 1, 2, and 3 by relaxing technical .

specification operability requirements for the SGTS and CREVS Systems to support plant activities before fuel load.

Basis for Pro osed No Si'ificant Hazards Consideration Determination NRC has provided standards for determining whether a significant hazards consideration exists as stated in 10 CFR 50.92(c). A proposed amendment to an operating license involves no significant hazards considerations of the facility in accordance with the proposed amendment would not (1) if operation involve a significant increase in the probability or consequences of an accident previously evaluated, or (2) create the possibility of a new or different kind of accident from an accident previously evaluated, or (3) involve a significant reduction in a margin of safety.

(1) The proposed amendments do not involve a significant increase in the probability or consequences of an accident previously evaluated. The

.proposed temporary changes to the technical specifications involve relaxations to system operability requirements for the SGTS and CREVS Systems during the fuel inspection and reconstitution program in addition to supporting plant activities before fuel load. The fuel being moved in a spent fuel pool has decayed for approximately three years, thus reducing the need for systems required by the technical specifications for postaccident iodine removal.

The fuel handling accident evaluated in the FSAR (section 14.6.4) represents the most severe event in terms of radioactive release and dose consequences that should be considered applicable to the fuel inspection and reconstitution program or any other plant activity before fuel load.

Since movement of irradiated fuel in the spent fuel pool area for a typical refueling operation is the same for the fuel inspection and reconstitution process, the current FSAR analysis is still valid. The current condition of the fuel .is well within the bounds of the FSAR, analysis. The FSAR calculations used freshly irradiated fuel (unloaded from the core 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> after shutdown) which would contain large amounts of fission products, specifically iodine. The irradiated fuel being inspected and reconstituted has decayed for approximately three years and the only remaining volatile fission product of any significance is Kr-85, which is an inert gas. Due to this decay time, there is essentially no iodine present and therefore no need for operability of systems with iodine removal capability.

Basis for Pro osed No Si nificant Hazards Consideration Determination (Cont'd)

The proposed temporary changes to the technical specifications do not affect the precursors for any accident analysis and therefore do not involve a significant increase in the probability of an accident previously evaluated. The present required availability of systems in the technical specifications is based on FSAR accident analysis assumptions and limitations. The present condition of the fuel in the spent fuel pool is such that over 300 assemblies would have to fail before the FSAR limiting assumptions for releases and dose consequences could be reached, thus allowing a reduction in the number of systems required to mitigate such a limiting event. The requested reduction in system operability for the SGTS and CREVS Systems has been evaluated and a determination reached that with the proposed temporary technical specification changes present FSAR assumptions and limitations will be maintained. Therefore, the proposed temporary changes do not involve a significant increase in the consequences of an accident previously evaluated.

(2) The proposed change does not create the possibility of a new or different kind of accident from an accident previously evaluated. The proposed temporary changes will reduce present system operability requirements; however, no new modes of plant operation are introduced which could contribute to the possibility of a new or different kind of accident.

The fuel inspection and reconstitution program involves handling irradiated fuel which is bounded by present FSAR fuel handling accident assumptions. This is the most severe event that could occur before fuel load therefore any plant activities conducted until. then wi 11 be also bounded by the FSAR fuel handling accident.

(3) The proposed amendment does not involve a significant reduction in a margin of safety. The proposed temporary technical specification changes will reduce the operability requirements for the SGTS and CREVS during the fuel inspection and reconstitution program and those plant activities conducted before fuel load for BFN Unit 2. The proposed temporary changes as they relate to the margin of safety are discussed below:

a. SGTS Based on the current unit 2 fuel fission inventory (essentially no iodine) the SGTS would not be required to mitigate a fuel handling accident during the fuel inspection and reconstitution program. The most severe accident applicable before fuel load is the fuel handling accident previously evaluated in FSAR section 14.6.4. The SGTS is still required to maintain the one-quarter-inch of water negative pressure when secondary containment integrity is required (technical specification 4.7.C). Approximately 10,100 CFM are required to-draw the one quarter inch of water negative pressure and each SGTS is rated at 9000 CFM. Therefore, two trains of the SGTS are more than adequate.

Basis for Pro osed No Si nificant Hazards Consideration Determination (Cont'd) b., CREVS : The irradiated fuel has decayed for approximately three years and the only remaining volatile fission product of any significance is Kr-85. Essentially no iodine is present in the decayed fuel. Due to

, the "scrubbing" effect of,the fuel pool water and since Kr-85 is the

., only radioisotope of any significance, should a fuel handling accident occur virtually no radioactive particulates would be present in the CREVS, intake ductwork. Therefore, the filtration function that the CREVS provides would not be needed during the fuel inspection and reconstitution program or any other plant activities before fuel load.

The proposed temporary changes will ensure that the appropriate safety-related systems needed to mitigate a fuel handling accident are operable and will be able to perform their intended safety function called upon. Therefore, the proposed changes do not represent a if significant reduction in a margin of safety.

Determination of Basis for Pro osed No Si nificant Hazards Since the application for amendment involves a proposed change that is encompassed by the criteria for which no significant hazards consideration exists, TVA has made a proposed determination that the application involves no significant hazards consideration.

V ~ "-

k