05000313/FIN-2012004-02: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 1: | Line 1: | ||
{{finding | {{finding | ||
| title = Failure | | title = Failure to Implement Planning Procedure Results in Short Across Hand Switch in Control Room Control Panel | ||
| docket = 05000313, 05000368 | | docket = 05000313, 05000368 | ||
| inspection report = IR 05000313/2012004 | | inspection report = IR 05000313/2012004 |
Latest revision as of 20:46, 20 February 2018
Site: | Arkansas Nuclear |
---|---|
Report | IR 05000313/2012004 Section 4OA2 |
Date counted | Sep 30, 2012 (2012Q3) |
Type: | Finding: Green |
cornerstone | Mitigating Systems |
Identified by: | NRC identified |
Inspection Procedure: | IP 71152 |
Inspectors (proximate) | A Sanchez D Allen G Guerra J Laughlin J Rotton L Carson W Schaup |
CCA | H.5, Work Management |
INPO aspect | WP.1 |
' | |