| issue date = 01/21/2009
| issue date = 01/21/2009
| title = Notification of Edwin I. Hatch Nuclear Plant - Component Design Bases Inspection - NRC Inspection Report 05000321-09-006 and 05000366-09-006
| title = Notification of Edwin I. Hatch Nuclear Plant - Component Design Bases Inspection - NRC Inspection Report 05000321-09-006 and 05000366-09-006
| author name = Desai B B
| author name = Desai B
| author affiliation = NRC/RGN-II/DRS/EB1
| author affiliation = NRC/RGN-II/DRS/EB1
| addressee name = Madison D R
| addressee name = Madison D
| addressee affiliation = Southern Nuclear Operating Co, Inc
| addressee affiliation = Southern Nuclear Operating Co, Inc
| docket = 05000321, 05000366
| docket = 05000321, 05000366
Line 14: Line 14:
| page count = 6
| page count = 6
}}
}}
See also: [[followed by::IR 05000321/2009006]]
See also: [[see also::IR 05000321/2009006]]


=Text=
=Text=
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II SAM NUNN ATLANTA FEDERAL CENTER 61 FORSYTH STREET, SW, SUITE 23T85 ATLANTA, GEORGIA 30303-8931
{{#Wiki_filter:UNITED STATES
  January 21, 2009
                                NUCLEAR REGULATORY COMMISSION
Mr. Dennis R. Madison  
                                              REGION II
Vice President - Hatch
                                  SAM NUNN ATLANTA FEDERAL CENTER
Southern Nuclear Operating Company, Inc.  
                                  61 FORSYTH STREET, SW, SUITE 23T85
Edwin I. Hatch Nuclear Plant  
                                      ATLANTA, GEORGIA 30303-8931
11028 Hatch Parkway North  
                                          January 21, 2009
Baxley, GA 31513  
Mr. Dennis R. Madison
Vice President - Hatch
Southern Nuclear Operating Company, Inc.
Edwin I. Hatch Nuclear Plant
11028 Hatch Parkway North
Baxley, GA 31513
SUBJECT:        NOTIFICATION OF EDWIN I. HATCH NUCLEAR PLANT - COMPONENT
                DESIGN BASES INSPECTION - NRC INSPECTION REPORT
                05000321/2009006 AND 05000366/2009006
Dear Mr. Madison:
The purpose of this letter is to notify you that the U.S. Nuclear Regulatory Commission (NRC)
Region II staff will conduct a component design bases inspection at your Edwin I. Hatch Nuclear
Plant during the weeks of May 4 - 8, May 18 - 22, and June 1 - 5, 2009. The inspection team
will be led by D. Jones, a Senior Reactor Inspector from the NRC's Region II Office. This
inspection will be conducted in accordance with the baseline inspection procedure, Procedure
71111.21, Component Design Bases Inspection, issued August 19, 2008.
The inspection will evaluate the capability of risk significant / low margin components to function
as designed and to support proper system operation. The inspection will also include a review
of selected operator actions, operating experience, and modifications.
During a telephone conversation on January 7, 2009, Mr. Jones confirmed with Mr. S. Tipps of
your staff, arrangements for an information gathering site visit and the three-week onsite
inspection. The schedule is as follows:
    *  Information gathering visit: Week of April 13 - 17, 2009
    *  Onsite weeks: May 4 - 8, May 18 - 22, and June 1 - 5, 2009
The purpose of the information gathering visit is to meet with members of your staff to identify
risk-significant components and operator actions. Information and documentation needed to
support the inspection will also be identified. Mr. R. Bernhard, a Region II Senior Reactor
Analyst, may accompany Mr. Jones during the information gathering visit to review probabilistic
risk assessment data and identify risk significant components which will be examined during the
inspection.


SUBJECT: NOTIFICATION OF EDWIN I. HATCH NUCLEAR PLANT - COMPONENT DESIGN BASES INSPECTION - NRC INSPECTION REPORT 
SNC                                               2
05000321/2009006 AND 05000366/2009006
Please provide the information requested in the enclosure to the Region II office by March 30,
2009. The enclosure lists documents that will be needed prior to the information gathering visit.
Dear Mr. Madison:
The inspectors will try to minimize your administrative burden by specifically identifying only
The purpose of this letter is to notify you that the U.S. Nuclear Regulatory Commission (NRC) Region II staff will conduct a component design bases inspection at your Edwin I. Hatch Nuclear Plant during the weeks of May 4 - 8, May 18 - 22, and June 1 - 5, 2009.  The inspection team will be led by D. Jones, a Senior Reactor Inspector from the NRC's Region II Office.  This inspection will be conducted in accordance with the baseline inspection procedure, Procedure 71111.21, Component Design Bases Inspection, issued August 19, 2008.
those documents required for the inspection preparation. Contact Mr. Jones with any questions
related to the information request. During the information gathering visit, the team leader will
The inspection will evaluate the capability of risk significant / low margin components to function as designed and to support proper system operation.  The inspection will also include a review of selected operator actions, operating experience, and modifications. 
also discuss the following inspection support administrative details: request for supplemental
During a telephone conversation on January 7, 2009, Mr. Jones confirmed with Mr. S. Tipps of
documents to be made available to the inspection team in the Region II office prior to the team
your staff, arrangements for an information gathering site visit and the three-week onsite inspection. The schedule is as follows:
preparation week of April 27 - May 1, 2009; office space; arrangements for site access; and the
* Information gathering visit:  Week of April 13 - 17, 2009
availability of knowledgeable plant engineering and licensing personnel to serve as points of
* Onsite weeks:  May 4 - 8, May 18 - 22, and June 1 - 5, 2009 
contact during the inspection.
The purpose of the information gathering visit is to meet with members of your staff to identify risk-significant components and operator actions.  Information and documentation needed to support the inspection will also be identified.  Mr. R. Bernhard, a Region II Senior Reactor
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its
Analyst, may accompany Mr. Jones during the information gathering visit to review probabilistic risk assessment data and identify risk significant components which will be examined during the inspection. 
enclosure will be available electronically for public inspection in the NRC Public Document
SNC 2 Please provide the information requested in the enclosure to the Region II office by March 30, 2009. The enclosure lists documents that will be needed prior to the information gathering visit. The inspectors will try to minimize your administrative burden by specifically identifying only those documents required for the inspection preparation. Contact Mr. Jones with any questions related to the information request. During the information gathering visit, the team leader will also discuss the following inspection support administrative details: request for supplemental  
Room or from the Publicly Available Records (PARS) component of NRC's document system
documents to be made available to the inspection team in the Region II office prior to the team preparation week of April 27 - May 1, 2009; office space; arrangements for site access; and the availability of knowledgeable plant engineering and licensing personnel to serve as points of contact during the inspection.  
(ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-
rm/adams.html (the Public Electronic Reading Room).
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).  
Thank you for your cooperation in this matter. If you have any questions regarding the
Thank you for your cooperation in this matter. If you have any questions regarding the  
information requested or the inspection, please contact Mr. Jones at (404) 562-4631 or me at
information requested or the inspection, please contact Mr. Jones at (404) 562-4631 or me at (404) 562-4519.  
(404) 562-4519.
                                              Sincerely,
                                              /RA/
                                              Binoy Desai, Chief
                                              Engineering Branch 1
                                              Division of Reactor Safety
Docket Nos.: 50-321, 50-366,
License Nos.: DPR-57, NPF-5
Enclosure: Information Request for Hatch Component Design Bases Inspection
cc w/encl.: (See page 3)


Sincerely,  /RA/  Binoy Desai, Chief Engineering Branch 1 Division of Reactor Safety
SNC                                      3
Docket Nos.: 50-321, 50-366,  License Nos.: DPR-57, NPF-5
cc w/encl:                                 Bob Masse
Enclosure: Information Request for Hatch Component Design Bases Inspection 
Angela Thornhill                           Resident Manager
cc w/encl.: (See page 3)
Managing Attorney and Compliance Officer   Vogtle Electric Generating Plant
SNC 3  cc w/encl: Angela Thornhill Managing Attorney and Compliance Officer Southern Nuclear Operating Company, Inc. Electronic Mail Distribution  
Southern Nuclear Operating Company, Inc.   Oglethorpe Power Corporation
Jeffrey T. Gasser  
Electronic Mail Distribution              Electronic Mail Distribution
Executive Vice President Southern Nuclear Operating Company, Inc. Electronic Mail Distribution  
Jeffrey T. Gasser                         Senior Resident Inspector
Raymond D. Baker  
Executive Vice President                   Southern Nuclear Operating Company, Inc.
Licensing Manager Licensing-Hatch Southern Nuclear Operating Company, Inc. Electronic Mail Distribution  
Southern Nuclear Operating Company, Inc.  Edwin I. Hatch Nuclear Plant
Electronic Mail Distribution               U.S. NRC
L. Mike Stinson Vice President Fleet Operations Support Southern Nuclear Operating Company, Inc. Electronic Mail Distribution  
                                          11030 Hatch Parkway N
Raymond D. Baker                           Baxley, GA 30334
Licensing Manager
Licensing-Hatch                           Arthur H. Domby, Esq.
Southern Nuclear Operating Company, Inc.   Troutman Sanders
Electronic Mail Distribution              Electronic Mail Distribution
L. Mike Stinson                           Dr. Carol Couch
Vice President                             Director
Fleet Operations Support                   Environmental Protection
Southern Nuclear Operating Company, Inc.  Department of Natural Resources
Electronic Mail Distribution              Electronic Mail Distribution
David H. Jones                            Cynthia Sanders
Vice President                            Program Manager
Engineering                                Radioactive Materials Program
Southern Nuclear Operating Company, Inc.   Department of Natural Resources
Electronic Mail Distribution               Electronic Mail Distribution
Moanica Caston                            Jim Sommerville
Vice President and General Counsel        (Acting) Chief
Southern Nuclear Operating Company, Inc.  Environmental Protection Division
Electronic Mail Distribution              Department of Natural Resources
                                          Electronic Mail Distribution
Steven B. Tipps
Hatch Principal Engineer - Licensing      Mr. Steven M. Jackson
Edwin I. Hatch Nuclear Plant              Senior Engineer - Power Supply
Electronic Mail Distribution              Municipal Electric Authority of Georgia
                                          Electronic Mail Distribution
Mr. K. Rosanski
Resident Manager                          Mr. Reece McAlister
Oglethorpe Power Corporation              Executive Secretary
Electronic Mail Distribution              Georgia Public Service Commission
                                          Electronic Mail Distribution
Laurence Bergen
Oglethorpe Power Corporation              Chairman
Electronic Mail Distribution              Appling County Commissioners
                                          County Courthouse
                                          69 Tippins Street, Suite 201
                                          Baxley, GA 31513


David H. Jones Vice President Engineering Southern Nuclear Operating Company, Inc. Electronic Mail Distribution
Moanica Caston Vice President and General Counsel Southern Nuclear Operating Company, Inc. Electronic Mail Distribution
Steven B. Tipps Hatch Principal Engineer - Licensing Edwin I. Hatch Nuclear Plant Electronic Mail Distribution
Mr. K. Rosanski Resident Manager Oglethorpe Power Corporation Electronic Mail Distribution
Laurence Bergen Oglethorpe Power Corporation Electronic Mail Distribution
 
  Bob Masse Resident Manager Vogtle Electric Generating Plant Oglethorpe Power Corporation Electronic Mail Distribution
Senior Resident Inspector Southern Nuclear Operating Company, Inc. Edwin I. Hatch Nuclear Plant U.S. NRC 11030 Hatch Parkway N
Baxley, GA  30334
Arthur H. Domby, Esq. Troutman Sanders Electronic Mail Distribution
Dr. Carol Couch
Director Environmental Protection Department of Natural Resources Electronic Mail Distribution
Cynthia Sanders Program Manager Radioactive Materials Program Department of Natural Resources Electronic Mail Distribution


  Jim Sommerville (Acting) Chief Environmental Protection Division Department of Natural Resources
_________________________
Electronic Mail Distribution
OFFICE            RII:DRS        RII:DRP        RII:DRS
  Mr. Steven M. Jackson Senior Engineer - Power Supply Municipal Electric Authority of Georgia
SIGNATURE
Electronic Mail Distribution
NAME              DJONES          SSHAEFFER      RBERNHARD
  Mr. Reece McAlister Executive Secretary Georgia Public Service Commission Electronic Mail Distribution
DATE                  01/  /2009      01/  /2009      01/  /2009
   
E-MAIL COPY?        YES        NO  YES        NO  YES        NO YES    NO  YES      NO YES  NO YES N
Chairman Appling County Commissioners County Courthouse 69 Tippins Street, Suite 201 Baxley, GA  31513
       
            Information Request for Hatch Component Design Bases Inspection
Please provide the information electronically in .pdf files, Excel, or other searchable format on
CDROM. The CDROM should be indexed and hyperlinked to facilitate ease of use.
1.  From your most-recent probabilistic safety analysis (PSA) excluding external events and
    fires:
    a. Two risk rankings of components from your site-specific probabilistic safety analysis
          (PSA): one sorted by Risk Achievement Worth (RAW), and the other sorted by
          Birnbaum Importance.
    b. A list of the top 500 cutsets.
2. From your most-recent probabilistic safety analysis (PSA) including external events and
    fires:
    a. Two risk rankings of components from your site-specific probabilistic safety analysis
          (PSA): one sorted by Risk Achievement Worth (RAW), and the other sorted by
          Birnbaum Importance.
    b. A list of the top 500 cutsets.
3.  Risk ranking of operator actions from your site specific PSA sorted by RAW. Provide
    human reliability worksheets for these items.
4.  List of time critical operator actions with a brief description of each action.
5.  List of Emergency and Abnormal Operating Procedures revised since January 1, 2006 with
    a brief description of each revision.
6. List of components with low design margins (i.e., pumps closest to the design limit for flow
    or pressure, diesel generator close to design required output, heat exchangers close to
    rated design heat removal, MOV risk-margin rankings, etc.) and associated evaluations or
    calculations.
7. List of station operating experience evaluations/reviews performed and documented in the
    stations corrective action program for industry events and safety related equipment
    failures/vulnerabilities [as communicated by NRC generic communications, industry
    communications, 10 CFR part 21 notifications, etc.] since January 1, 2006.
8. List and brief description of safety related SSC design modifications implemented since
    January 1, 2006.
9. List and brief description of common-cause component failures that have occurred since
    January 1, 2004.
10. List and brief description of operability evaluations completed since January 1, 2006.
11. List of equipment on the sites Station Equipment Reliability Issues List, including a
    description of the reason(s) why each component is on that list and summaries (if available)
    of your plans to address the issue(s).
                                            Page 1 of 2
                                                                                          Enclosure


 
12. List and brief description of equipment currently in degraded or nonconforming status as
 
    described in RIS 05-020.
_________________________    OFFICE RII:DRS RII:DRP RII:DRS    SIGNATURE        NAME DJONES SSHAEFFER RBERNHARD    DATE 01/    /2009 01/    /2009 01/    /2009    E-MAIL COPY?    YES NO  YES NO  YES NO  YES NO  YES NO  YES NO  YES
13. List and reason for equipment classified in maintenance rule (a)(1) status since January 1,
N
    2006 to present.
  Page 1 of 2
14. Copies of System Descriptions (or the like) for Safety-Related Systems
  Enclosure Information Request for Hatch Component Design Bases Inspection 
15. Copy of UFSAR(s)
16. List and brief description of Root Cause Evaluations that have been performed since
Please provide the information electronically in ".pdf" files, Excel, or other searchable format on CDROM.  The CDROM should be indexed and hyperlinked to facilitate ease of use. 
    January 1, 2006.
 
17. Contact information for a person to discuss PRA information prior to the information
    gathering trip: name, title, phone number, and e-mail address.
1. From your most-recent probabilistic safety analysis (PSA) excluding external events and fires: a. Two risk rankings of components from your site-specific probabilistic safety analysis (PSA):  one sorted by Risk Achievement Worth (RAW), and the other sorted by
                                            Page 2 of 2
Birnbaum Importance. b. A list of the top 500 cutsets.
                                                                                      Enclosure
2. From your most-recent probabilistic safety analysis (PSA) including external events and fires:
a. Two risk rankings of components from your site-specific probabilistic safety analysis (PSA):  one sorted by Risk Achievement Worth (RAW), and the other sorted by
Birnbaum Importance. b. A list of the top 500 cutsets. 
3. Risk ranking of operator actions from your site specific PSA sorted by RAW.  Provide human reliability worksheets for these items.
4. List of time critical operator actions with a brief description of each action.
 
5. List of Emergency and Abnormal Operating Procedures revised since January 1, 2006 with a brief description of each revision.
6. List of components with low design margins (i.e., pumps closest to the design limit for flow or pressure, diesel generator close to design required output, heat exchangers close to
rated design heat removal, MOV risk-margin rankings, etc.) and associated evaluations or calculations.
7.  List of station operating experience evaluations/reviews performed and documented in the station's corrective action program for industry events and safety related equipment
failures/vulnerabilities [as communicated by NRC generic communications, industry
communications, 10 CFR part 21 notifications, etc.] since January 1, 2006. 
8. List and brief description of safety related SSC design modifications implemented since January 1, 2006. 
9. List and brief description of common-cause component failures that have occurred since January 1, 2004. 
10. List and brief description of operability evaluations completed since January 1, 2006. 
11. List of equipment on the site's Station Equipment Reliability Issues List, including a description of the reason(s) why each component is on that list and summaries (if available)
of your plans to address the issue(s).
 
Page 2 of 2
  Enclosure
   
12. List and brief description of equipment currently in degraded or nonconforming status as described in RIS 05-020.  
13. List and reason for equipment classified in maintenance rule (a)(1) status since January 1, 2006 to present. 14. Copies of System Descriptions (or the like) for Safety-Related Systems 15. Copy of UFSAR(s) 16. List and brief description of Root Cause Evaluations that have been performed since January 1, 2006. 17. Contact information for a person to discuss PRA information prior to the information gathering trip: name, title, phone number, and e-mail address.
}}
}}

Latest revision as of 10:46, 14 November 2019

Notification of Edwin I. Hatch Nuclear Plant - Component Design Bases Inspection - NRC Inspection Report 05000321-09-006 and 05000366-09-006
ML090220347
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 01/21/2009
From: Binoy Desai
NRC/RGN-II/DRS/EB1
To: Madison D
Southern Nuclear Operating Co
References
IR-09-006
Download: ML090220347 (6)


See also: IR 05000321/2009006

Text

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION II

SAM NUNN ATLANTA FEDERAL CENTER

61 FORSYTH STREET, SW, SUITE 23T85

ATLANTA, GEORGIA 30303-8931

January 21, 2009

Mr. Dennis R. Madison

Vice President - Hatch

Southern Nuclear Operating Company, Inc.

Edwin I. Hatch Nuclear Plant

11028 Hatch Parkway North

Baxley, GA 31513

SUBJECT: NOTIFICATION OF EDWIN I. HATCH NUCLEAR PLANT - COMPONENT

DESIGN BASES INSPECTION - NRC INSPECTION REPORT

05000321/2009006 AND 05000366/2009006

Dear Mr. Madison:

The purpose of this letter is to notify you that the U.S. Nuclear Regulatory Commission (NRC)

Region II staff will conduct a component design bases inspection at your Edwin I. Hatch Nuclear

Plant during the weeks of May 4 - 8, May 18 - 22, and June 1 - 5, 2009. The inspection team

will be led by D. Jones, a Senior Reactor Inspector from the NRC's Region II Office. This

inspection will be conducted in accordance with the baseline inspection procedure, Procedure

71111.21, Component Design Bases Inspection, issued August 19, 2008.

The inspection will evaluate the capability of risk significant / low margin components to function

as designed and to support proper system operation. The inspection will also include a review

of selected operator actions, operating experience, and modifications.

During a telephone conversation on January 7, 2009, Mr. Jones confirmed with Mr. S. Tipps of

your staff, arrangements for an information gathering site visit and the three-week onsite

inspection. The schedule is as follows:

  • Information gathering visit: Week of April 13 - 17, 2009
  • Onsite weeks: May 4 - 8, May 18 - 22, and June 1 - 5, 2009

The purpose of the information gathering visit is to meet with members of your staff to identify

risk-significant components and operator actions. Information and documentation needed to

support the inspection will also be identified. Mr. R. Bernhard, a Region II Senior Reactor

Analyst, may accompany Mr. Jones during the information gathering visit to review probabilistic

risk assessment data and identify risk significant components which will be examined during the

inspection.

SNC 2

Please provide the information requested in the enclosure to the Region II office by March 30,

2009. The enclosure lists documents that will be needed prior to the information gathering visit.

The inspectors will try to minimize your administrative burden by specifically identifying only

those documents required for the inspection preparation. Contact Mr. Jones with any questions

related to the information request. During the information gathering visit, the team leader will

also discuss the following inspection support administrative details: request for supplemental

documents to be made available to the inspection team in the Region II office prior to the team

preparation week of April 27 - May 1, 2009; office space; arrangements for site access; and the

availability of knowledgeable plant engineering and licensing personnel to serve as points of

contact during the inspection.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its

enclosure will be available electronically for public inspection in the NRC Public Document

Room or from the Publicly Available Records (PARS) component of NRC's document system

(ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-

rm/adams.html (the Public Electronic Reading Room).

Thank you for your cooperation in this matter. If you have any questions regarding the

information requested or the inspection, please contact Mr. Jones at (404) 562-4631 or me at

(404) 562-4519.

Sincerely,

/RA/

Binoy Desai, Chief

Engineering Branch 1

Division of Reactor Safety

Docket Nos.: 50-321, 50-366,

License Nos.: DPR-57, NPF-5

Enclosure: Information Request for Hatch Component Design Bases Inspection

cc w/encl.: (See page 3)

SNC 3

cc w/encl: Bob Masse

Angela Thornhill Resident Manager

Managing Attorney and Compliance Officer Vogtle Electric Generating Plant

Southern Nuclear Operating Company, Inc. Oglethorpe Power Corporation

Electronic Mail Distribution Electronic Mail Distribution

Jeffrey T. Gasser Senior Resident Inspector

Executive Vice President Southern Nuclear Operating Company, Inc.

Southern Nuclear Operating Company, Inc. Edwin I. Hatch Nuclear Plant

Electronic Mail Distribution U.S. NRC

11030 Hatch Parkway N

Raymond D. Baker Baxley, GA 30334

Licensing Manager

Licensing-Hatch Arthur H. Domby, Esq.

Southern Nuclear Operating Company, Inc. Troutman Sanders

Electronic Mail Distribution Electronic Mail Distribution

L. Mike Stinson Dr. Carol Couch

Vice President Director

Fleet Operations Support Environmental Protection

Southern Nuclear Operating Company, Inc. Department of Natural Resources

Electronic Mail Distribution Electronic Mail Distribution

David H. Jones Cynthia Sanders

Vice President Program Manager

Engineering Radioactive Materials Program

Southern Nuclear Operating Company, Inc. Department of Natural Resources

Electronic Mail Distribution Electronic Mail Distribution

Moanica Caston Jim Sommerville

Vice President and General Counsel (Acting) Chief

Southern Nuclear Operating Company, Inc. Environmental Protection Division

Electronic Mail Distribution Department of Natural Resources

Electronic Mail Distribution

Steven B. Tipps

Hatch Principal Engineer - Licensing Mr. Steven M. Jackson

Edwin I. Hatch Nuclear Plant Senior Engineer - Power Supply

Electronic Mail Distribution Municipal Electric Authority of Georgia

Electronic Mail Distribution

Mr. K. Rosanski

Resident Manager Mr. Reece McAlister

Oglethorpe Power Corporation Executive Secretary

Electronic Mail Distribution Georgia Public Service Commission

Electronic Mail Distribution

Laurence Bergen

Oglethorpe Power Corporation Chairman

Electronic Mail Distribution Appling County Commissioners

County Courthouse

69 Tippins Street, Suite 201

Baxley, GA 31513

_________________________

OFFICE RII:DRS RII:DRP RII:DRS

SIGNATURE

NAME DJONES SSHAEFFER RBERNHARD

DATE 01/ /2009 01/ /2009 01/ /2009

E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES N

Information Request for Hatch Component Design Bases Inspection

Please provide the information electronically in .pdf files, Excel, or other searchable format on

CDROM. The CDROM should be indexed and hyperlinked to facilitate ease of use.

1. From your most-recent probabilistic safety analysis (PSA) excluding external events and

fires:

a. Two risk rankings of components from your site-specific probabilistic safety analysis

(PSA): one sorted by Risk Achievement Worth (RAW), and the other sorted by

Birnbaum Importance.

b. A list of the top 500 cutsets.

2. From your most-recent probabilistic safety analysis (PSA) including external events and

fires:

a. Two risk rankings of components from your site-specific probabilistic safety analysis

(PSA): one sorted by Risk Achievement Worth (RAW), and the other sorted by

Birnbaum Importance.

b. A list of the top 500 cutsets.

3. Risk ranking of operator actions from your site specific PSA sorted by RAW. Provide

human reliability worksheets for these items.

4. List of time critical operator actions with a brief description of each action.

5. List of Emergency and Abnormal Operating Procedures revised since January 1, 2006 with

a brief description of each revision.

6. List of components with low design margins (i.e., pumps closest to the design limit for flow

or pressure, diesel generator close to design required output, heat exchangers close to

rated design heat removal, MOV risk-margin rankings, etc.) and associated evaluations or

calculations.

7. List of station operating experience evaluations/reviews performed and documented in the

stations corrective action program for industry events and safety related equipment

failures/vulnerabilities [as communicated by NRC generic communications, industry

communications, 10 CFR part 21 notifications, etc.] since January 1, 2006.

8. List and brief description of safety related SSC design modifications implemented since

January 1, 2006.

9. List and brief description of common-cause component failures that have occurred since

January 1, 2004.

10. List and brief description of operability evaluations completed since January 1, 2006.

11. List of equipment on the sites Station Equipment Reliability Issues List, including a

description of the reason(s) why each component is on that list and summaries (if available)

of your plans to address the issue(s).

Page 1 of 2

Enclosure

12. List and brief description of equipment currently in degraded or nonconforming status as

described in RIS 05-020.

13. List and reason for equipment classified in maintenance rule (a)(1) status since January 1,

2006 to present.

14. Copies of System Descriptions (or the like) for Safety-Related Systems

15. Copy of UFSAR(s)

16. List and brief description of Root Cause Evaluations that have been performed since

January 1, 2006.

17. Contact information for a person to discuss PRA information prior to the information

gathering trip: name, title, phone number, and e-mail address.

Page 2 of 2