| | issue date = 03/09/2010 | | | issue date = 03/09/2010 |
| | title = Yankee Atomic, Decommissioning Funding Assurance Status Report - 1OCFR 50.75 | | | title = Yankee Atomic, Decommissioning Funding Assurance Status Report - 1OCFR 50.75 |
| | author name = Pizzella C M | | | author name = Pizzella C |
| | author affiliation = Yankee Atomic Electric Co | | | author affiliation = Yankee Atomic Electric Co |
| | addressee name = | | | addressee name = |
Line 16: |
Line 16: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:COAX4K9 )YANKEE ATOMIC ELECTRIC COMPANY 49 Yankee Road, Rowe, Massachusetts 01367 March 9, 2010 BYR-2010-003 Docket No. 50-029 Re: 10 CFR 50.75 U. S. Nuclear Regulatory Commission Attention: | | {{#Wiki_filter:COAX4K9 ) YANKEE ATOMIC ELECTRIC COMPANY 49 Yankee Road, Rowe, Massachusetts 01367 March 9, 2010 BYR-2010-003 Docket No. 50-029 Re: 10 CFR 50.75 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555 |
| Document Control Desk Washington, DC 20555 | |
|
| |
|
| ==Reference:== | | ==Reference:== |
| | (a) License No. DPR-3 (Docket No. 50-029) |
| | (b) Letter: A. C. Kadak to USNRC; Permanent Cessation of Power Operations at the Yankee Nuclear Power Station, BYR-92-024, dated February 26, 1992 (c) Letter: USNRC to Yankee Atomic Power Company; Yankee Nuclear Power Station - Release of Land from Part 50 License, dated August 10, 2007 (d) USNRC Regulatory Issue Summary (RIS) 2001-07, REV 1 |
|
| |
|
| ==Subject:== | | ==Subject:== |
| Gentlemen: (a) License No. DPR-3 (Docket No. 50-029)(b) Letter: A. C. Kadak to USNRC; Permanent Cessation of Power Operations at the Yankee Nuclear Power Station, BYR-92-024, dated February 26, 1992 (c) Letter: USNRC to Yankee Atomic Power Company; Yankee Nuclear Power Station -Release of Land from Part 50 License, dated August 10, 2007 (d) USNRC Regulatory Issue Summary (RIS) 2001-07, REV 1 Decommissioning Funding Assurance Status Report -1OCFR 50.75 In reference (b) Yankee Atomic Electric Company (YAEC) informed the USNRC that the Board of Directors of YAEC had decided to permanently cease operations at the Yankee Rowe Plant and that fuel had been permanently removed from the reactor. In accordance with 1 OCFR 50.82 the certifications in the letter modified the YAEC license to permanently withdraw YAEC's authority to operate the reactor. In 1993, YAEC commenced decommissioning the power plant. In Reference (c), the NRC amended the YAEC license, releasing most of the formerly licensed land for unrestricted use, shrinking the licensed land to the ISFSI only.In accordance with the requirements of 10 CFR 50.75, direction provided by the NRC staff on March 5, 2008 and recent RIS 2001-07, Rev 1 regulatory clarification, YEAC hereby, submits its report on the status of decommissioning funding for the year ending December 31, 2009. Attachment I provides the requested information.
| | Decommissioning Funding Assurance Status Report - 10CFR 50.75 Gentlemen: |
| If you should have any questions, please contact me at (860) 267-6426 x304.Sincerely, Carla M. l .,. , ,.Date USNRC.BYR-2010-003/Page 2 Attachment 1 -"NRC Decommissioning Funding Status Report" cc: J. Joustra, Chief, Decommissioning Branch, Region I S. J. Collins, NRC Regional Administrator, Region 1 J. Goshen, NRC Project Manager, Haddam Neck Plant BYR-2010-003 Attachment 1 NRC Decommissioning Funding Status Report March 2010 USNRC BYR-2010-003/Attachment 1/Page 1 Attachment I NRC Decommissioning Funding Status Report Yankee Atomic -Yankee Rowe Plant (Status as of 12131109)1. The amount of decommissioning funds estimated to be required pursuant to 10 CFR 50.75 (b) and (c)2. The amount accumulated at the end of the calendar year preceding the date of the report for items included in 10 CFR 50.75 (b) and (c)3. Schedule of the annual amounts remaining to be collected including amounts beyond those required in 10 CFR 50.75 (e)(1)(i)# Years to collect$101.7 million(1)$38.9 million(2) | | In reference (b) Yankee Atomic Electric Company (YAEC) informed the USNRC that the Board of Directors of YAEC had decided to permanently cease operations at the Yankee Rowe Plant and that fuel had been permanently removed from the reactor. In accordance with 10CFR 50.82 the certifications in the letter modified the YAEC license to permanently withdraw YAEC's authority to operate the reactor. In 1993, YAEC commenced decommissioning the power plant. In Reference (c), the NRC amended the YAEC license, releasing most of the formerly licensed land for unrestricted use, shrinking the licensed land to the ISFSI only. |
| $11.8 million(3) 5 years 4. The assumptions used regarding escalation of the decommissioning cost estimate, rates of earnings on decommissioning funds, and rates of other factors used in funding projections are: Annual escalation rate 2.5%(1) Since the original power plant has been decommissioned and the license amended, the only remaining decommissioning as defined by the NRC in 10 CFR 50.75 is decontamination and dismantlement of the ISFSI once the fuel is removed. The Site-Specific Cost Estimate for future costs beyond 2009 is $101.7 million (in 2009 dollars) and includes the current estimate for spent fuel management costs, i.e. Long-term ISFSI operations through 2022 ($91.9 million) and D&D of the ISFSI ($9.8 million).(2) This accrued market value balance includes amounts in the Decommissioning Trust for all decommissioning costs including site restoration and long-term spent fuel storage as well as decommissioning as defined in 10 CFR 50.75. Since the original power plant has been decommissioned and the license amended, the only remaining decommissioning is decontamination and dismantlement of the ISFSI (currently estimated at $9.8.million of the current market value balance) once the fuel is removed.(3) YAEC revised its annual decommissioning collections rates effective February 1, 2006 continuing through 2014, based on the Settlement Agreement filed at FERC on May 1, 2006 and accepted on July 31, 2006.
| | In accordance with the requirements of 10 CFR 50.75, direction provided by the NRC staff on March 5, 2008 and recent RIS 2001-07, Rev 1 regulatory clarification, YEAC hereby, submits its report on the status of decommissioning funding for the year ending December 31, 2009. Attachment I provides the requested information. |
| USNRC BYR-2010-003/Attachment 1/Page 2 Attachment 1 NRC Decommissioning Funding Status Report Yankee Atomic -Yankee Rowe Plant (Status as of 12/31109)Annual after-tax earnings rate on decommissioning trust funds: Pre-tax (taxable) 4.0 -6.0%Pre-tax (tax-exempt) 5.0%Pre-tax equity 10.0%State tax rate (non-qualified trust) 6.5%Federal tax rate (qualified trust) 20.0%Federal tax rate (non-qualified trust) 34.0%Other factors assumed None 5. Any contracts upon which the licensee is relying pursuant to 10 CFR 50.75(e)(1)(ii)(A) | | If you should have any questions, please contact me at (860) 267-6426 x304. |
| YAEC is currently collecting funds through its power contracts and amendatory agreements under FERC regulation. | | Sincerely, Carla M. l .,. , ,.Date |
| The power contracts and the amendatory agreements specify the obligations of the purchasers for the costs of YAEC, including decommissioning costs. Such contracts have been filed with FERC.6. Any modifications to a licensee's current method of providing None financial assurance occurring since the last submitted report.7. Any material changes to trust agreements. | | |
| | USNRC |
| | . BYR-2010-003/Page 2 Attachment 1 - "NRC Decommissioning Funding Status Report" cc: J. Joustra, Chief, Decommissioning Branch, Region I S. J. Collins, NRC Regional Administrator, Region 1 J. Goshen, NRC Project Manager, Haddam Neck Plant |
| | |
| | BYR-2010-003 Attachment 1 NRC Decommissioning Funding Status Report March 2010 |
| | |
| | USNRC BYR-2010-003/Attachment 1/Page 1 Attachment I NRC Decommissioning Funding Status Report Yankee Atomic - Yankee Rowe Plant (Status as of 12131109) |
| | : 1. The amount of decommissioningfunds estimated to be required pursuantto 10 CFR 50.75 (b) and (c) $101.7 million(1 ) |
| | : 2. The amount accumulatedat the end of the calendaryear $38.9 million(2) preceding the date of the report for items included in 10 CFR 50.75 (b) and (c) |
| | : 3. Schedule of the annual amounts remainingto be collected $11.8 million(3) including amounts beyond those requiredin 10 CFR 50.75 (e)(1)(i) |
| | # Years to collect 5 years |
| | : 4. The assumptions used regardingescalationof the decommissioning cost estimate, rates of earnings on decommissioning funds, and rates of other factors used in funding projectionsare: |
| | Annual escalation rate 2.5% |
| | (1)Since the original power plant has been decommissioned and the license amended, the only remaining decommissioning as defined by the NRC in 10 CFR 50.75 is decontamination and dismantlement of the ISFSI once the fuel is removed. The Site-Specific Cost Estimate for future costs beyond 2009 is $101.7 million (in 2009 dollars) and includes the current estimate for spent fuel management costs, i.e. Long-term ISFSI operations through 2022 |
| | ($91.9 million) and D&D of the ISFSI ($9.8 million). |
| | (2) This accrued market value balance includes amounts in the Decommissioning Trust for all decommissioning costs including site restoration and long-term spent fuel storage as well as decommissioning as defined in 10 CFR 50.75. Since the original power plant has been decommissioned and the license amended, the only remaining decommissioning is decontamination and dismantlement of the ISFSI (currently estimated at $9.8.million of the current market value balance) once the fuel is removed. |
| | (3) YAEC revised its annual decommissioning collections rates effective February 1, 2006 continuing through 2014, based on the Settlement Agreement filed at FERC on May 1, 2006 and accepted on July 31, 2006. |
| | |
| | USNRC BYR-2010-003/Attachment 1/Page 2 Attachment 1 NRC Decommissioning Funding Status Report Yankee Atomic - Yankee Rowe Plant (Status as of 12/31109) |
| | Annual after-tax earnings rate on decommissioningtrust funds: |
| | Pre-tax (taxable) 4.0 - 6.0% |
| | Pre-tax (tax-exempt) 5.0% |
| | Pre-tax equity 10.0% |
| | State tax rate (non-qualified trust) 6.5% |
| | Federal tax rate (qualified trust) 20.0% |
| | Federal tax rate (non-qualified trust) 34.0% |
| | Other factors assumed None |
| | : 5. Any contracts upon which the licensee is relying pursuant to 10 CFR 50.75(e)(1)(ii)(A) |
| | YAEC is currently collecting funds through its power contracts and amendatory agreements under FERC regulation. The power contracts and the amendatory agreements specify the obligations of the purchasers for the costs of YAEC, including decommissioning costs. Such contracts have been filed with FERC. |
| | : 6. Any modifications to a licensee's current method of providing None financial assuranceoccurring since the last submitted report. |
| | : 7. Any materialchanges to trust agreements. |
| Effective January 1, 2010, YAEC has changed its Nuclear Decommissioning Fund Trustee from Bank of New York Mellon to Bank of America. Although the Trustee has changed, there were no material changes to the trust agreements.}} | | Effective January 1, 2010, YAEC has changed its Nuclear Decommissioning Fund Trustee from Bank of New York Mellon to Bank of America. Although the Trustee has changed, there were no material changes to the trust agreements.}} |
|
---|
Category:Decommissioning Funding Plan DKTs 30
MONTHYEARML24085A2192024-03-11011 March 2024 Yankee Nuclear Power Station Independent Spent Fuel Storage Installation - Decommissioning Funding Assurance Status Report ML23080A1072023-03-0606 March 2023 Yankee Nuclear Power Station Independent Spent Fuel Storage Installation, Decommissioning Funding Assurance Status Report ML22237A0632022-08-0303 August 2022 Yankee Atomic Electric Company - Supplemental Information for the Three-Year Update to the Independent Spent Fuel Storage Installation Decommissioning Funding Plan ML22082A1232022-03-14014 March 2022 Yankee Nuclear Power Station Independent Spent Fuel Storage Installation, Decommissioning Funding Assurance Status Report ML22010A0122022-01-10010 January 2022 Yankee Atomic Electric Company - Three-Year Update to the Independent Spent Fuel Storage Installation Decommissioning Funding Plan ML21105A7382021-03-0202 March 2021 Yankee Nuclear Power Station Independent Sperit Fuel Storage Installation - Decommissioning Funding Assurance Status Report ML19116A0502019-03-12012 March 2019 Yankee Nuclear Power Station Independent Spent Fuel Storage Installation Decommissioning Funding Assurance Status Report ML18354A7382018-12-10010 December 2018 Yankee Nuclear Power Station Independent Spent Fuel Storage Installation - Three-Year Update to the Decommissioning Funding Plan ML18075A3252018-03-0505 March 2018 Yankee Nuclear Power Station Independent Spent Fuel Storage Installation - Decommissioning Funding Assurance Status Report ML16076A2742016-03-0909 March 2016 Yankee Nuclear Power Station Independent Spent Fuel Storage Installation - Decommissioning Funding Assurance Status Report ML16020A0162015-12-14014 December 2015 Yankee ISFSI - Three-Year Update to the Decommissioning Funding Plan ML15131A0252015-03-0303 March 2015 Yankee and Independent Spent Fuel Storage Installation (ISFSI) - Decommissioning Funding Assurance Status Report ML13094A1162013-03-25025 March 2013 Yankee Nuclear Power Station Independent Spent Fuel Storage Installation, Decommissioning Funding Assurance Status Report ML12363A1062012-12-17017 December 2012 Independent Spent Fuel Storage Installation Decommissioning Funding Plan ML1210706332012-03-27027 March 2012 Redacted - Yankee, Decommissioning Funding Assurance Status Report - 10CFR 50.75 ML1007504532010-03-0909 March 2010 Yankee Atomic, Decommissioning Funding Assurance Status Report - 1OCFR 50.75 ML0409704532004-03-31031 March 2004 Yankee, Decommissioning Funding Assurance - 10CFR50.75(f) ML0210200492002-03-29029 March 2002 Submittal of Decommissioning Funding Assurance for the Yankee Nuclear Power Station 2024-03-11
[Table view] Category:40
MONTHYEARML24085A2192024-03-11011 March 2024 Yankee Nuclear Power Station Independent Spent Fuel Storage Installation - Decommissioning Funding Assurance Status Report ML23080A1072023-03-0606 March 2023 Yankee Nuclear Power Station Independent Spent Fuel Storage Installation, Decommissioning Funding Assurance Status Report ML22237A0632022-08-0303 August 2022 Yankee Atomic Electric Company - Supplemental Information for the Three-Year Update to the Independent Spent Fuel Storage Installation Decommissioning Funding Plan ML22082A1232022-03-14014 March 2022 Yankee Nuclear Power Station Independent Spent Fuel Storage Installation, Decommissioning Funding Assurance Status Report ML22010A0122022-01-10010 January 2022 Yankee Atomic Electric Company - Three-Year Update to the Independent Spent Fuel Storage Installation Decommissioning Funding Plan ML21287A1012021-10-0404 October 2021 Yankee Atomic Electric Company - Yankee Nuclear Power Station Independent Spent Fuel Storage Installation, Biennial Update to the Yankee Nuclear Power Station License Termination Plan ML21105A7382021-03-0202 March 2021 Yankee Nuclear Power Station Independent Sperit Fuel Storage Installation - Decommissioning Funding Assurance Status Report ML20108F5362020-03-12012 March 2020 Yankee Nuclear Power Station Independent Spent Fuel Storage Installation - Decommissioning Funding Assurance Status Report ML19116A0502019-03-12012 March 2019 Yankee Nuclear Power Station Independent Spent Fuel Storage Installation Decommissioning Funding Assurance Status Report ML18354A7382018-12-10010 December 2018 Yankee Nuclear Power Station Independent Spent Fuel Storage Installation - Three-Year Update to the Decommissioning Funding Plan ML18075A3252018-03-0505 March 2018 Yankee Nuclear Power Station Independent Spent Fuel Storage Installation - Decommissioning Funding Assurance Status Report ML17054C4592017-01-26026 January 2017 Yankee Atomic Electric Company - Yankee Rowe Independent Spent Fuel Storage Installation - Notification of Changes in Accordance with 10 CFR 50.82(a)(7) ML16076A2742016-03-0909 March 2016 Yankee Nuclear Power Station Independent Spent Fuel Storage Installation - Decommissioning Funding Assurance Status Report ML16020A0162015-12-14014 December 2015 Yankee ISFSI - Three-Year Update to the Decommissioning Funding Plan ML15131A0252015-03-0303 March 2015 Yankee and Independent Spent Fuel Storage Installation (ISFSI) - Decommissioning Funding Assurance Status Report ML13094A1162013-03-25025 March 2013 Yankee Nuclear Power Station Independent Spent Fuel Storage Installation, Decommissioning Funding Assurance Status Report ML12363A1072012-12-31031 December 2012 Independent Spent Fuel Storage Installation Decommissioning Study Plan ML12363A1062012-12-17017 December 2012 Independent Spent Fuel Storage Installation Decommissioning Funding Plan ML1210706332012-03-27027 March 2012 Redacted - Yankee, Decommissioning Funding Assurance Status Report - 10CFR 50.75 ML1007504532010-03-0909 March 2010 Yankee Atomic, Decommissioning Funding Assurance Status Report - 1OCFR 50.75 ML0504703012005-02-0707 February 2005 Supplement to the Request for Proposed Procedures in Accordance with 1OCFR20.2002 ML0436305462004-12-22022 December 2004 Yankee Nuclear Power Station - Request for Approval of Proposed Procedures in Accordance with 10 CFR 20.2002 ML0409704532004-03-31031 March 2004 Yankee, Decommissioning Funding Assurance - 10CFR50.75(f) ML0411006392004-02-10010 February 2004 Yankee Atomic Electric Company (Rowe) License Termination Plan Update - Section 6 Appendices (A-N) ML0426701072003-11-24024 November 2003 License Termination Plan for the Yankee Nuclear Power Station - Section 4 ML0426701292003-11-24024 November 2003 License Termination Plan for the Yankee Nuclear Power Station - Section 8 ML0426701272003-11-24024 November 2003 License Termination Plan for the Yankee Nuclear Power Station - Section 7 ML0426701262003-11-24024 November 2003 License Termination Plan for the Yankee Nuclear Power Station - Section 6 ML0426701242003-11-24024 November 2003 License Termination Plan for the Yankee Nuclear Power Station - Section 5 ML0426700702003-11-24024 November 2003 License Termination Plan for the Yankee Nuclear Power Station - Table of Contents ML0426700722003-11-24024 November 2003 License Termination Plan for the Yankee Nuclear Power Station - Section 1 ML0426700782003-11-24024 November 2003 License Termination Plan for the Yankee Nuclear Power Station - Section 2 ML0426700812003-11-24024 November 2003 License Termination Plan for the Yankee Nuclear Power Station - Appendix 2A: Summaries of the Significant Events Leading to Long-Term Contamination of the Ynps Site (Presented in Ltp Table 2-3.) ML0426700842003-11-24024 November 2003 License Termination Plan for the Yankee Nuclear Power Station - Appendix 2B: Impacted Area Assessments Buildings, Structures and Open Land Areas Inside of the RCA ML0426700862003-11-24024 November 2003 License Termination Plan for the Yankee Nuclear Power Station - Appendix 2C: Impacted Area Assessments Buildings, Structures and Open Land Areas Outside of the RCA ML0426700912003-11-24024 November 2003 License Termination Plan for the Yankee Nuclear Power Station - Section 3 ML0426701152003-11-24024 November 2003 License Termination Plan for the Yankee Nuclear Power Station - Appendix 4A: ALARA Evaluations ML0409600532003-10-28028 October 2003 Decommissioning Project Status, Goals and Challenges with Handwritten Notes ML0704301762003-10-20020 October 2003 Yankee Nuclear Power Station Site Closure Project Plan, Revision 1 ML0309805862003-03-31031 March 2003 Decommissioning Funding Assurance - 10CFR50.75 ML0210200492002-03-29029 March 2002 Submittal of Decommissioning Funding Assurance for the Yankee Nuclear Power Station ML0716700101993-12-20020 December 1993 Yankee Nuclear Power Station Decommissioning Plan Revision 0.0, Dated December 20, 1993 2024-03-11
[Table view] Category:50
MONTHYEARML24085A2192024-03-11011 March 2024 Yankee Nuclear Power Station Independent Spent Fuel Storage Installation - Decommissioning Funding Assurance Status Report ML23080A1072023-03-0606 March 2023 Yankee Nuclear Power Station Independent Spent Fuel Storage Installation, Decommissioning Funding Assurance Status Report ML22237A0632022-08-0303 August 2022 Yankee Atomic Electric Company - Supplemental Information for the Three-Year Update to the Independent Spent Fuel Storage Installation Decommissioning Funding Plan ML22082A1232022-03-14014 March 2022 Yankee Nuclear Power Station Independent Spent Fuel Storage Installation, Decommissioning Funding Assurance Status Report ML22010A0122022-01-10010 January 2022 Yankee Atomic Electric Company - Three-Year Update to the Independent Spent Fuel Storage Installation Decommissioning Funding Plan ML21287A1012021-10-0404 October 2021 Yankee Atomic Electric Company - Yankee Nuclear Power Station Independent Spent Fuel Storage Installation, Biennial Update to the Yankee Nuclear Power Station License Termination Plan ML21105A7382021-03-0202 March 2021 Yankee Nuclear Power Station Independent Sperit Fuel Storage Installation - Decommissioning Funding Assurance Status Report ML20108F5362020-03-12012 March 2020 Yankee Nuclear Power Station Independent Spent Fuel Storage Installation - Decommissioning Funding Assurance Status Report ML19116A0502019-03-12012 March 2019 Yankee Nuclear Power Station Independent Spent Fuel Storage Installation Decommissioning Funding Assurance Status Report ML18354A7382018-12-10010 December 2018 Yankee Nuclear Power Station Independent Spent Fuel Storage Installation - Three-Year Update to the Decommissioning Funding Plan ML18075A3252018-03-0505 March 2018 Yankee Nuclear Power Station Independent Spent Fuel Storage Installation - Decommissioning Funding Assurance Status Report ML17054C4592017-01-26026 January 2017 Yankee Atomic Electric Company - Yankee Rowe Independent Spent Fuel Storage Installation - Notification of Changes in Accordance with 10 CFR 50.82(a)(7) ML16076A2742016-03-0909 March 2016 Yankee Nuclear Power Station Independent Spent Fuel Storage Installation - Decommissioning Funding Assurance Status Report ML16020A0162015-12-14014 December 2015 Yankee ISFSI - Three-Year Update to the Decommissioning Funding Plan ML15131A0252015-03-0303 March 2015 Yankee and Independent Spent Fuel Storage Installation (ISFSI) - Decommissioning Funding Assurance Status Report ML13094A1162013-03-25025 March 2013 Yankee Nuclear Power Station Independent Spent Fuel Storage Installation, Decommissioning Funding Assurance Status Report ML12363A1072012-12-31031 December 2012 Independent Spent Fuel Storage Installation Decommissioning Study Plan ML12363A1062012-12-17017 December 2012 Independent Spent Fuel Storage Installation Decommissioning Funding Plan ML1210706332012-03-27027 March 2012 Redacted - Yankee, Decommissioning Funding Assurance Status Report - 10CFR 50.75 ML1007504532010-03-0909 March 2010 Yankee Atomic, Decommissioning Funding Assurance Status Report - 1OCFR 50.75 ML0504703012005-02-0707 February 2005 Supplement to the Request for Proposed Procedures in Accordance with 1OCFR20.2002 ML0436305462004-12-22022 December 2004 Yankee Nuclear Power Station - Request for Approval of Proposed Procedures in Accordance with 10 CFR 20.2002 ML0409704532004-03-31031 March 2004 Yankee, Decommissioning Funding Assurance - 10CFR50.75(f) ML0411006392004-02-10010 February 2004 Yankee Atomic Electric Company (Rowe) License Termination Plan Update - Section 6 Appendices (A-N) ML0426701072003-11-24024 November 2003 License Termination Plan for the Yankee Nuclear Power Station - Section 4 ML0426701292003-11-24024 November 2003 License Termination Plan for the Yankee Nuclear Power Station - Section 8 ML0426701272003-11-24024 November 2003 License Termination Plan for the Yankee Nuclear Power Station - Section 7 ML0426701262003-11-24024 November 2003 License Termination Plan for the Yankee Nuclear Power Station - Section 6 ML0426701242003-11-24024 November 2003 License Termination Plan for the Yankee Nuclear Power Station - Section 5 ML0426700702003-11-24024 November 2003 License Termination Plan for the Yankee Nuclear Power Station - Table of Contents ML0426700722003-11-24024 November 2003 License Termination Plan for the Yankee Nuclear Power Station - Section 1 ML0426700782003-11-24024 November 2003 License Termination Plan for the Yankee Nuclear Power Station - Section 2 ML0426700812003-11-24024 November 2003 License Termination Plan for the Yankee Nuclear Power Station - Appendix 2A: Summaries of the Significant Events Leading to Long-Term Contamination of the Ynps Site (Presented in Ltp Table 2-3.) ML0426700842003-11-24024 November 2003 License Termination Plan for the Yankee Nuclear Power Station - Appendix 2B: Impacted Area Assessments Buildings, Structures and Open Land Areas Inside of the RCA ML0426700862003-11-24024 November 2003 License Termination Plan for the Yankee Nuclear Power Station - Appendix 2C: Impacted Area Assessments Buildings, Structures and Open Land Areas Outside of the RCA ML0426700912003-11-24024 November 2003 License Termination Plan for the Yankee Nuclear Power Station - Section 3 ML0426701152003-11-24024 November 2003 License Termination Plan for the Yankee Nuclear Power Station - Appendix 4A: ALARA Evaluations ML0409600532003-10-28028 October 2003 Decommissioning Project Status, Goals and Challenges with Handwritten Notes ML0704301762003-10-20020 October 2003 Yankee Nuclear Power Station Site Closure Project Plan, Revision 1 ML0309805862003-03-31031 March 2003 Decommissioning Funding Assurance - 10CFR50.75 ML0210200492002-03-29029 March 2002 Submittal of Decommissioning Funding Assurance for the Yankee Nuclear Power Station ML0716700101993-12-20020 December 1993 Yankee Nuclear Power Station Decommissioning Plan Revision 0.0, Dated December 20, 1993 2024-03-11
[Table view] Category:70
MONTHYEARML24085A2192024-03-11011 March 2024 Yankee Nuclear Power Station Independent Spent Fuel Storage Installation - Decommissioning Funding Assurance Status Report ML23080A1072023-03-0606 March 2023 Yankee Nuclear Power Station Independent Spent Fuel Storage Installation, Decommissioning Funding Assurance Status Report ML22237A0632022-08-0303 August 2022 Yankee Atomic Electric Company - Supplemental Information for the Three-Year Update to the Independent Spent Fuel Storage Installation Decommissioning Funding Plan ML22082A1232022-03-14014 March 2022 Yankee Nuclear Power Station Independent Spent Fuel Storage Installation, Decommissioning Funding Assurance Status Report ML22010A0122022-01-10010 January 2022 Yankee Atomic Electric Company - Three-Year Update to the Independent Spent Fuel Storage Installation Decommissioning Funding Plan ML21287A1012021-10-0404 October 2021 Yankee Atomic Electric Company - Yankee Nuclear Power Station Independent Spent Fuel Storage Installation, Biennial Update to the Yankee Nuclear Power Station License Termination Plan ML21105A7382021-03-0202 March 2021 Yankee Nuclear Power Station Independent Sperit Fuel Storage Installation - Decommissioning Funding Assurance Status Report ML20108F5362020-03-12012 March 2020 Yankee Nuclear Power Station Independent Spent Fuel Storage Installation - Decommissioning Funding Assurance Status Report ML19116A0502019-03-12012 March 2019 Yankee Nuclear Power Station Independent Spent Fuel Storage Installation Decommissioning Funding Assurance Status Report ML18354A7382018-12-10010 December 2018 Yankee Nuclear Power Station Independent Spent Fuel Storage Installation - Three-Year Update to the Decommissioning Funding Plan ML18075A3252018-03-0505 March 2018 Yankee Nuclear Power Station Independent Spent Fuel Storage Installation - Decommissioning Funding Assurance Status Report ML17054C4592017-01-26026 January 2017 Yankee Atomic Electric Company - Yankee Rowe Independent Spent Fuel Storage Installation - Notification of Changes in Accordance with 10 CFR 50.82(a)(7) ML16076A2742016-03-0909 March 2016 Yankee Nuclear Power Station Independent Spent Fuel Storage Installation - Decommissioning Funding Assurance Status Report ML16020A0162015-12-14014 December 2015 Yankee ISFSI - Three-Year Update to the Decommissioning Funding Plan ML15131A0252015-03-0303 March 2015 Yankee and Independent Spent Fuel Storage Installation (ISFSI) - Decommissioning Funding Assurance Status Report ML13094A1162013-03-25025 March 2013 Yankee Nuclear Power Station Independent Spent Fuel Storage Installation, Decommissioning Funding Assurance Status Report ML12363A1072012-12-31031 December 2012 Independent Spent Fuel Storage Installation Decommissioning Study Plan ML12363A1062012-12-17017 December 2012 Independent Spent Fuel Storage Installation Decommissioning Funding Plan ML1210706332012-03-27027 March 2012 Redacted - Yankee, Decommissioning Funding Assurance Status Report - 10CFR 50.75 ML1007504532010-03-0909 March 2010 Yankee Atomic, Decommissioning Funding Assurance Status Report - 1OCFR 50.75 ML0504703012005-02-0707 February 2005 Supplement to the Request for Proposed Procedures in Accordance with 1OCFR20.2002 ML0436305462004-12-22022 December 2004 Yankee Nuclear Power Station - Request for Approval of Proposed Procedures in Accordance with 10 CFR 20.2002 ML0409704532004-03-31031 March 2004 Yankee, Decommissioning Funding Assurance - 10CFR50.75(f) ML0411006392004-02-10010 February 2004 Yankee Atomic Electric Company (Rowe) License Termination Plan Update - Section 6 Appendices (A-N) ML0426701072003-11-24024 November 2003 License Termination Plan for the Yankee Nuclear Power Station - Section 4 ML0426701292003-11-24024 November 2003 License Termination Plan for the Yankee Nuclear Power Station - Section 8 ML0426701272003-11-24024 November 2003 License Termination Plan for the Yankee Nuclear Power Station - Section 7 ML0426701262003-11-24024 November 2003 License Termination Plan for the Yankee Nuclear Power Station - Section 6 ML0426701242003-11-24024 November 2003 License Termination Plan for the Yankee Nuclear Power Station - Section 5 ML0426700702003-11-24024 November 2003 License Termination Plan for the Yankee Nuclear Power Station - Table of Contents ML0426700722003-11-24024 November 2003 License Termination Plan for the Yankee Nuclear Power Station - Section 1 ML0426700782003-11-24024 November 2003 License Termination Plan for the Yankee Nuclear Power Station - Section 2 ML0426700812003-11-24024 November 2003 License Termination Plan for the Yankee Nuclear Power Station - Appendix 2A: Summaries of the Significant Events Leading to Long-Term Contamination of the Ynps Site (Presented in Ltp Table 2-3.) ML0426700842003-11-24024 November 2003 License Termination Plan for the Yankee Nuclear Power Station - Appendix 2B: Impacted Area Assessments Buildings, Structures and Open Land Areas Inside of the RCA ML0426700862003-11-24024 November 2003 License Termination Plan for the Yankee Nuclear Power Station - Appendix 2C: Impacted Area Assessments Buildings, Structures and Open Land Areas Outside of the RCA ML0426700912003-11-24024 November 2003 License Termination Plan for the Yankee Nuclear Power Station - Section 3 ML0426701152003-11-24024 November 2003 License Termination Plan for the Yankee Nuclear Power Station - Appendix 4A: ALARA Evaluations ML0409600532003-10-28028 October 2003 Decommissioning Project Status, Goals and Challenges with Handwritten Notes ML0704301762003-10-20020 October 2003 Yankee Nuclear Power Station Site Closure Project Plan, Revision 1 ML0309805862003-03-31031 March 2003 Decommissioning Funding Assurance - 10CFR50.75 ML0210200492002-03-29029 March 2002 Submittal of Decommissioning Funding Assurance for the Yankee Nuclear Power Station ML0716700101993-12-20020 December 1993 Yankee Nuclear Power Station Decommissioning Plan Revision 0.0, Dated December 20, 1993 2024-03-11
[Table view] Category:Financial Assurance Document
MONTHYEARML23080A1112023-03-0606 March 2023 Yankee Nuclear Power Plant Independent Spent Fuel Storage Installation, Funding Status Report for Managing Irradiated Fuel and GTCC Waste ML16074A1432016-03-0202 March 2016 Yankee Nuclear Power Station Independent Spent Fuel Storage Installation - Submittal of Nuclear Liability Insurance Coverage ML16042A2042016-01-19019 January 2016 Certificate of Liability Insurance ML15043A0172015-02-0202 February 2015 Yankee Atomic Independent Spent Fuel Storage Installation, Notification of Property Insurance Coverage ML13094A1162013-03-25025 March 2013 Yankee Nuclear Power Station Independent Spent Fuel Storage Installation, Decommissioning Funding Assurance Status Report ML13092A1432013-03-19019 March 2013 Yankee Nuclear Power Station Independent Spent Fuel Storage Installation, Funding Status Report for Managing Irradiated Fuel and GTCC Waste ML1210706332012-03-27027 March 2012 Redacted - Yankee, Decommissioning Funding Assurance Status Report - 10CFR 50.75 ML1108101152011-03-15015 March 2011 Yankee, Decommissioning Funding Assurance Status Report ML1108101052011-03-14014 March 2011 Liability Insurance Coverage, Regarding Letter to Provide the NRC with Proof of Financial Protection in the Form of Nuclear Liability Insurance for Yankee Rowe Plant ML1107600522011-03-14014 March 2011 Property Insurance Coverage ML1013000672010-04-29029 April 2010 Nuclear Liability Insurance Coverage ML1007504532010-03-0909 March 2010 Yankee Atomic, Decommissioning Funding Assurance Status Report - 1OCFR 50.75 ML1005506662010-02-18018 February 2010 Property Insurance Coverage ML0908902692009-03-0404 March 2009 Property Insurance Coverage for 2009 2023-03-06
[Table view] Category:Letter
MONTHYEARML24085A2192024-03-11011 March 2024 Yankee Nuclear Power Station Independent Spent Fuel Storage Installation - Decommissioning Funding Assurance Status Report ML24085A2222024-03-11011 March 2024 Yankee Nuclear Power Plant Independent Spent Fuel Storage Installation - Funding Status Report for Managing Irradiated Fuel and GTCC Waste ML24047A0552024-01-15015 January 2024 Independent Spent Fuel Storage Installation, Formal Announcement of Change in ISFSI Manager ML24057A0212024-01-12012 January 2024 Yankee Nuclear Power Station Independent Spent Fuel Storage Installation - Nuclear Liability Insurance Coverage IR 07200031/20234012023-10-0404 October 2023 Yankee Atomic Electric Company - Independent Spent Fuel Storage Security Inspection Report 07200031/2023401 ML23157A1012023-05-0404 May 2023 Request for Exemption from 10 CFR 50.82(a)(8)(i)(A) and 10 CFR 50.75(h)(2) for the Yankee Nuclear Power Station Independent Spent Fuel Storage Installation ML23130A1562023-04-24024 April 2023 Yankee Nuclear Power Station Independent Spent Fuel Storage Installation, Annual Radioactive Effluent Release Report, Annual Radiological Environmental Operating Report, and Changes to the Off-Site Dose Calculation Manual for 2022 ML23080A1072023-03-0606 March 2023 Yankee Nuclear Power Station Independent Spent Fuel Storage Installation, Decommissioning Funding Assurance Status Report ML23080A1112023-03-0606 March 2023 Yankee Nuclear Power Plant Independent Spent Fuel Storage Installation, Funding Status Report for Managing Irradiated Fuel and GTCC Waste ML22340A4752023-02-24024 February 2023 Closeout Letter to Yankee Atomic Electric Company Regarding 2018 and 2021 Updated DFPs for Yankee Nuclear Power Station ISFSI ML23041A1132023-01-0505 January 2023 Yankee Atomic Electric Company - Report of 10 CFR 72.48 Changes, Tests, and Experiments ML23041A1122023-01-0505 January 2023 Independent Spent Fuel Storage Installation, 10 CFR 50.59 Changes, Tests, and Experiments Report ML22347A2802022-12-21021 December 2022 Yankee Atomic Electric Company - Independent Spent Fuel Storage Installation Security Inspection Plan Dated December 21, 2022 ML22237A0632022-08-0303 August 2022 Yankee Atomic Electric Company - Supplemental Information for the Three-Year Update to the Independent Spent Fuel Storage Installation Decommissioning Funding Plan ML22136A1562022-04-28028 April 2022 Yankee Nuclear Power Station Independent Spent Fuel Storage Installation, Annual Radioactive Effluent Release Report, Annual Radiological Environmental Operating Report, and Changes to the Off-Site Dose Calculation Manual for 2021 ML22119A2112022-04-18018 April 2022 Independent Spent Fuel Storage Installation - Yankee Atomic Electric Company Adoption of NAC-MPC System, Amendment 8 Certificate of Compliance and Canister Registration ML22089A1002022-03-14014 March 2022 Yankee Nuclear Power Plant Independent Spent Fuel Storage Installation - Funding Status Report for Managing Irradiated Fuel and GTCC Waste ML22082A1232022-03-14014 March 2022 Yankee Nuclear Power Station Independent Spent Fuel Storage Installation, Decommissioning Funding Assurance Status Report ML22011A1292022-01-31031 January 2022 Yankee Atomic Electric Company- Independent Spent Fuel Storage Installation Security Inspection Plan ML22038A2062022-01-20020 January 2022 Yankee Nuclear Power Station Independent Spent Fuel Storage Installation - Nuclear Liability Insurance Coverage ML22038A1982022-01-20020 January 2022 Yankee Nuclear Power Station Independent Spent Fuel Storage Installation - Property Insurance Coverage ML22010A0122022-01-10010 January 2022 Yankee Atomic Electric Company - Three-Year Update to the Independent Spent Fuel Storage Installation Decommissioning Funding Plan IR 05000029/20210012021-10-29029 October 2021 Yankee Atomic Electric Company - NRC Independent Spent Fuel Storage Installation Inspection Report 07200031/2021001 and 0500029/2021001 ML21287A0362021-10-0404 October 2021 Biennial Update to the Yankee Nuclear Power Station Final Safety Analysis Report ML21291A1602021-10-0404 October 2021 Yankee Nuclear Power Station Independent Spent Fuel Storage Installation, Biennial Update of the Yaec Quality Assurance Program ML21287A1012021-10-0404 October 2021 Yankee Atomic Electric Company - Yankee Nuclear Power Station Independent Spent Fuel Storage Installation, Biennial Update to the Yankee Nuclear Power Station License Termination Plan ML21189A0502021-06-0101 June 2021 Independent Spent Fuel Storage Installation, Formal Announcement of Change in ISFSI Manager ML21062A2472021-04-0707 April 2021 Close-out Letter - Yankee Rowe ISFSI DFP ML21105A7382021-03-0202 March 2021 Yankee Nuclear Power Station Independent Sperit Fuel Storage Installation - Decommissioning Funding Assurance Status Report ML21077A1682021-03-0202 March 2021 Yankee Nuclear Power Plant Independent Spent Fuel Storage Installation - Funding Status Report for Managing Irradiated Fuel and GTCC Waste ML21042A1452021-01-27027 January 2021 Yankee Nuclear Power Station Independent Spent Fuel Storage Installation - Property Insurance Coverage ML21042A9812021-01-27027 January 2021 Yankee Nuclear Power Station Independent Spent Fuel Storage Installation - Nuclear Liability Insurance Coverage ML21028A0632021-01-26026 January 2021 M210211: Welcome Letter to W. Norton ML20167A3032020-07-10010 July 2020 Letter - Ynps Exemption 190502, Rev 0 ML20167A3022020-07-0202 July 2020 FRN - Ynps Exemption 190502, Rev 0 ML20162A1282020-06-23023 June 2020 Issuance of Temporary Exemption from 10 CFR Part 73, Appendix B, for Yankee Rowe ISFSI (COVID-19) ML20160A0402020-05-20020 May 2020 BYR 2020-014 - Yaec Letter BYR 2020-014 Temporary Exemption - Annual Physical Requirement ML20087J6642020-03-16016 March 2020 Yankee Nuclear Power Independent Spent Fuel Storage Installation - Funding Status Report for Managing Irradiated Fuel and GTCC Waste ML20108F5362020-03-12012 March 2020 Yankee Nuclear Power Station Independent Spent Fuel Storage Installation - Decommissioning Funding Assurance Status Report ML20054B6392020-02-0606 February 2020 Independent Spent Fuel Storage Installation - Formal Announcement of Change in ISFSI Manager ML20015A4942020-01-15015 January 2020 Yankee Atomic Power Company - Independent Spent Fuel Storage Installation Security Inspection Plan ML20013F6882019-12-17017 December 2019 Independent Spent Fuel Storage Installation - Formal Announcement of Change in Isfsj Manager ML19295E1062019-10-0202 October 2019 Biennial Update of the Yankee Atomic Electric Company Quality Assurance Program (Rev. 39) for the Yankee Rowe ISFSI ML19165A0262019-06-0505 June 2019 Independent Spent Fuel Storage Installation - Formal Announcement of Change in ISFSI Manager ML19176A0752019-05-0202 May 2019 Independent Spent Fuel Storage Installation - Request for Exemption from Certain Requirements of 10 CFR 72.212 and 10 CFR 72.214 ML19121A4202019-04-23023 April 2019 Yankee Nuclear Power Station Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report, Annual Radiological Environmental Operating Report, and Changes to the Off-Site Dose Calculation Manual for 2018 ML18354A7382018-12-10010 December 2018 Yankee Nuclear Power Station Independent Spent Fuel Storage Installation - Three-Year Update to the Decommissioning Funding Plan IR 05000029/20180012018-05-30030 May 2018 Yankee Atomic Electric Company, Rowe, Massachusetts Site - NRC Independent Spent Fuel Storage Installation Report Nos. 07200031/2018001 and 05000029/2018001 IR 07200031/20184012018-05-17017 May 2018 Inspection Report 07200031/2018401, on May 17, 2018, Yankee Atomic Electric Company - ISFSI Security Inspection Report 07200031/2018401 - (Cover Letter Only) ML18136A5552018-04-10010 April 2018 Yankee Nuclear Power Station, and Independent Spent Fuel Storage Installation - Annual Radioactive Effluent Release Report, Annual Radiological Environmental Operating Report, and Changes to the Off-Site Dose Calculation Manual for 2017 2024-03-11
[Table view] |
Text
COAX4K9 ) YANKEE ATOMIC ELECTRIC COMPANY 49 Yankee Road, Rowe, Massachusetts 01367 March 9, 2010 BYR-2010-003 Docket No.50-029 Re: 10 CFR 50.75 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555
Reference:
(a) License No. DPR-3 (Docket No.50-029)
(b) Letter: A. C. Kadak to USNRC; Permanent Cessation of Power Operations at the Yankee Nuclear Power Station, BYR-92-024, dated February 26, 1992 (c) Letter: USNRC to Yankee Atomic Power Company; Yankee Nuclear Power Station - Release of Land from Part 50 License, dated August 10, 2007 (d) USNRC Regulatory Issue Summary (RIS) 2001-07, REV 1
Subject:
Decommissioning Funding Assurance Status Report - 10CFR 50.75 Gentlemen:
In reference (b) Yankee Atomic Electric Company (YAEC) informed the USNRC that the Board of Directors of YAEC had decided to permanently cease operations at the Yankee Rowe Plant and that fuel had been permanently removed from the reactor. In accordance with 10CFR 50.82 the certifications in the letter modified the YAEC license to permanently withdraw YAEC's authority to operate the reactor. In 1993, YAEC commenced decommissioning the power plant. In Reference (c), the NRC amended the YAEC license, releasing most of the formerly licensed land for unrestricted use, shrinking the licensed land to the ISFSI only.
In accordance with the requirements of 10 CFR 50.75, direction provided by the NRC staff on March 5, 2008 and recent RIS 2001-07, Rev 1 regulatory clarification, YEAC hereby, submits its report on the status of decommissioning funding for the year ending December 31, 2009. Attachment I provides the requested information.
If you should have any questions, please contact me at (860) 267-6426 x304.
Sincerely, Carla M. l .,. , ,.Date
USNRC
. BYR-2010-003/Page 2 Attachment 1 - "NRC Decommissioning Funding Status Report" cc: J. Joustra, Chief, Decommissioning Branch, Region I S. J. Collins, NRC Regional Administrator, Region 1 J. Goshen, NRC Project Manager, Haddam Neck Plant
BYR-2010-003 Attachment 1 NRC Decommissioning Funding Status Report March 2010
USNRC BYR-2010-003/Attachment 1/Page 1 Attachment I NRC Decommissioning Funding Status Report Yankee Atomic - Yankee Rowe Plant (Status as of 12131109)
- 1. The amount of decommissioningfunds estimated to be required pursuantto 10 CFR 50.75 (b) and (c) $101.7 million(1 )
- 2. The amount accumulatedat the end of the calendaryear $38.9 million(2) preceding the date of the report for items included in 10 CFR 50.75 (b) and (c)
- 3. Schedule of the annual amounts remainingto be collected $11.8 million(3) including amounts beyond those requiredin 10 CFR 50.75 (e)(1)(i)
- Years to collect 5 years
- 4. The assumptions used regardingescalationof the decommissioning cost estimate, rates of earnings on decommissioning funds, and rates of other factors used in funding projectionsare:
Annual escalation rate 2.5%
(1)Since the original power plant has been decommissioned and the license amended, the only remaining decommissioning as defined by the NRC in 10 CFR 50.75 is decontamination and dismantlement of the ISFSI once the fuel is removed. The Site-Specific Cost Estimate for future costs beyond 2009 is $101.7 million (in 2009 dollars) and includes the current estimate for spent fuel management costs, i.e. Long-term ISFSI operations through 2022
($91.9 million) and D&D of the ISFSI ($9.8 million).
(2) This accrued market value balance includes amounts in the Decommissioning Trust for all decommissioning costs including site restoration and long-term spent fuel storage as well as decommissioning as defined in 10 CFR 50.75. Since the original power plant has been decommissioned and the license amended, the only remaining decommissioning is decontamination and dismantlement of the ISFSI (currently estimated at $9.8.million of the current market value balance) once the fuel is removed.
(3) YAEC revised its annual decommissioning collections rates effective February 1, 2006 continuing through 2014, based on the Settlement Agreement filed at FERC on May 1, 2006 and accepted on July 31, 2006.
USNRC BYR-2010-003/Attachment 1/Page 2 Attachment 1 NRC Decommissioning Funding Status Report Yankee Atomic - Yankee Rowe Plant (Status as of 12/31109)
Annual after-tax earnings rate on decommissioningtrust funds:
Pre-tax (taxable) 4.0 - 6.0%
Pre-tax (tax-exempt) 5.0%
Pre-tax equity 10.0%
State tax rate (non-qualified trust) 6.5%
Federal tax rate (qualified trust) 20.0%
Federal tax rate (non-qualified trust) 34.0%
Other factors assumed None
- 5. Any contracts upon which the licensee is relying pursuant to 10 CFR 50.75(e)(1)(ii)(A)
YAEC is currently collecting funds through its power contracts and amendatory agreements under FERC regulation. The power contracts and the amendatory agreements specify the obligations of the purchasers for the costs of YAEC, including decommissioning costs. Such contracts have been filed with FERC.
- 6. Any modifications to a licensee's current method of providing None financial assuranceoccurring since the last submitted report.
- 7. Any materialchanges to trust agreements.
Effective January 1, 2010, YAEC has changed its Nuclear Decommissioning Fund Trustee from Bank of New York Mellon to Bank of America. Although the Trustee has changed, there were no material changes to the trust agreements.