ML103570206: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
(3 intermediate revisions by the same user not shown) | |||
Line 3: | Line 3: | ||
| issue date = 12/21/2010 | | issue date = 12/21/2010 | ||
| title = Technical Assistance Request - Review of Maine Yankee Response and Exemption Request to the Revised 10 CFR 73.55 Rule (TAC No. L24499) | | title = Technical Assistance Request - Review of Maine Yankee Response and Exemption Request to the Revised 10 CFR 73.55 Rule (TAC No. L24499) | ||
| author name = Johnson | | author name = Johnson R | ||
| author affiliation = NRC/NMSS/SFST | | author affiliation = NRC/NMSS/SFST | ||
| addressee name = Wastler S | | addressee name = Wastler S | ||
| addressee affiliation = NRC/NSIR/DSP | | addressee affiliation = NRC/NSIR/DSP | ||
| docket = 05000309, 07200030 | | docket = 05000309, 07200030 | ||
Line 14: | Line 14: | ||
| document type = Memoranda | | document type = Memoranda | ||
| page count = 3 | | page count = 3 | ||
| project = TAC:L24499 | |||
| stage = Approval | |||
}} | }} | ||
=Text= | =Text= | ||
{{#Wiki_filter:December 21, 2010 | {{#Wiki_filter:December 21, 2010 MEMORANDUM TO: Sandra Wastler, Chief Materials, Waste and International Security Branch Division of Security Policy Office of Nuclear Security and Incident Response FROM: Robert Johnson, Acting Chief /RA/ | ||
Licensing Branch Division of Spent Fuel Storage and Transportation Office of Nuclear Material Safety and Safeguards | |||
MEMORANDUM TO: | |||
FROM: | |||
==SUBJECT:== | ==SUBJECT:== | ||
TECHNICAL ASSISTANCE REQUEST - REVIEW OF MAINE YANKEE RESPONSE AND EXEMPTION REQUEST TO THE REVISED | TECHNICAL ASSISTANCE REQUEST - REVIEW OF MAINE YANKEE RESPONSE AND EXEMPTION REQUEST TO THE REVISED 10 CFR 73.55 RULE (TAC NO. L24499) | ||
The Division of Spent Fuel Storage and Transportation (SFST), Office of Nuclear Material Safety and Safeguards (NMSS), requests technical assistance from the Division of Security Policy (DSP), Nuclear Security and Incident Response (NSIR), for the completion of the following project: | |||
The Division of Spent Fuel Storage and Transportation (SFST), Office of Nuclear Material Safety and Safeguards (NMSS), requests technical assistance from the Division of Security Policy (DSP), Nuclear Security and Incident Response (NSIR), for the completion of the following project: | PROJECT: Security Evaluation of Maine Yankees response and exemption request to the revised 10 CFR 73.55 rule. | ||
DOCKET NOS: 50-309, 72-30 TAC NO: L24499 LICENSE NO: DPR-36 REQUESTED ACTION: NMSS/SFST requests that NSIR/DSP review Maine Yankees response and exemption request to the revised 10 CFR 73.55 rule. (November 29, 2010, cover letter enclosed; the SUNSI attachments are referenced in ADAMS, (ML103410498)). Based on the results of your review, prepare a Security Evaluation documenting the staffs reasons for approving or denying the proposed changes. | |||
To facilitate this request, we ask that you respond by June 30, 2011. Should any additional information be needed from the applicant to support your review, we ask that you transmit a draft Request for Additional Information to us by May 1, 2011. The applicant will normally be allowed two months to provide a response. The SFST project manager will keep your staff informed of any schedule changes. | |||
S. Wastler Please provide the information requested below and return a completed copy to the SFST Project Manager designated below. | |||
Name of NSIR/DSP assigned Reviewer: _________________________________ | |||
NSIR/DSP Project Completion Date: _________________________________ | |||
Please provide the information requested below and return a completed copy to the SFST Project Manager designated below. | NSIR/DSP Branch Chief Signature: _________________________________ | ||
Name of NSIR/DSP assigned Reviewer: | |||
==Contact:== | |||
John Goshen (301) 492-3325 The above TAC No. should be referenced in future correspondence related to this request and in the Human Resources Management System for recording staff time expended on this effort. | |||
==Enclosure:== | ==Enclosure:== | ||
As stated | As stated | ||
Please provide the information requested below and return a completed copy to the SFST Project Manager designated below. | S. Wastler Please provide the information requested below and return a completed copy to the SFST Project Manager designated below. | ||
Name of NSIR/DSP assigned Reviewer: | Name of NSIR/DSP assigned Reviewer: _________________________________ | ||
NSIR/DSP Project Completion Date: _________________________________ | |||
NSIR/DSP Branch Chief Signature: _________________________________ | |||
==Contact:== | |||
John Goshen (301) 492-3325 The above TAC No. should be referenced in future correspondence related to this request and in the Human Resources Management System for recording staff time expended on this effort. | |||
==Enclosure:== | ==Enclosure:== | ||
As stated | As stated Distribution: (w/o attachment) SFST r/f BWhite, RWharton ADAMS Package: | ||
File Location : G:\SFST\Maine Yankee\MY TAR 73.55 eval_.docx OFC SFST SFST SFST NAME WWheatley JGoshen RJohnson DATE 12/20/2010 12/16/2010 12/21/2010 OFFICIAL RECORD COPY}} | |||
Distribution: | |||
File Location : | |||
G:\SFST\Maine Yankee\MY TAR 73.55 eval_. |
Latest revision as of 11:38, 6 December 2019
ML103570206 | |
Person / Time | |
---|---|
Site: | Maine Yankee |
Issue date: | 12/21/2010 |
From: | Rachel Johnson NRC/NMSS/SFST |
To: | Wastler S Division of Security Policy |
Goshen, JM, NNSS/SFST, 492-3325 | |
Shared Package | |
ML103570195 | List: |
References | |
TAC L24499 | |
Download: ML103570206 (3) | |
Text
December 21, 2010 MEMORANDUM TO: Sandra Wastler, Chief Materials, Waste and International Security Branch Division of Security Policy Office of Nuclear Security and Incident Response FROM: Robert Johnson, Acting Chief /RA/
Licensing Branch Division of Spent Fuel Storage and Transportation Office of Nuclear Material Safety and Safeguards
SUBJECT:
TECHNICAL ASSISTANCE REQUEST - REVIEW OF MAINE YANKEE RESPONSE AND EXEMPTION REQUEST TO THE REVISED 10 CFR 73.55 RULE (TAC NO. L24499)
The Division of Spent Fuel Storage and Transportation (SFST), Office of Nuclear Material Safety and Safeguards (NMSS), requests technical assistance from the Division of Security Policy (DSP), Nuclear Security and Incident Response (NSIR), for the completion of the following project:
PROJECT: Security Evaluation of Maine Yankees response and exemption request to the revised 10 CFR 73.55 rule.
DOCKET NOS: 50-309, 72-30 TAC NO: L24499 LICENSE NO: DPR-36 REQUESTED ACTION: NMSS/SFST requests that NSIR/DSP review Maine Yankees response and exemption request to the revised 10 CFR 73.55 rule. (November 29, 2010, cover letter enclosed; the SUNSI attachments are referenced in ADAMS, (ML103410498)). Based on the results of your review, prepare a Security Evaluation documenting the staffs reasons for approving or denying the proposed changes.
To facilitate this request, we ask that you respond by June 30, 2011. Should any additional information be needed from the applicant to support your review, we ask that you transmit a draft Request for Additional Information to us by May 1, 2011. The applicant will normally be allowed two months to provide a response. The SFST project manager will keep your staff informed of any schedule changes.
S. Wastler Please provide the information requested below and return a completed copy to the SFST Project Manager designated below.
Name of NSIR/DSP assigned Reviewer: _________________________________
NSIR/DSP Project Completion Date: _________________________________
NSIR/DSP Branch Chief Signature: _________________________________
Contact:
John Goshen (301) 492-3325 The above TAC No. should be referenced in future correspondence related to this request and in the Human Resources Management System for recording staff time expended on this effort.
Enclosure:
As stated
S. Wastler Please provide the information requested below and return a completed copy to the SFST Project Manager designated below.
Name of NSIR/DSP assigned Reviewer: _________________________________
NSIR/DSP Project Completion Date: _________________________________
NSIR/DSP Branch Chief Signature: _________________________________
Contact:
John Goshen (301) 492-3325 The above TAC No. should be referenced in future correspondence related to this request and in the Human Resources Management System for recording staff time expended on this effort.
Enclosure:
As stated Distribution: (w/o attachment) SFST r/f BWhite, RWharton ADAMS Package:
File Location : G:\SFST\Maine Yankee\MY TAR 73.55 eval_.docx OFC SFST SFST SFST NAME WWheatley JGoshen RJohnson DATE 12/20/2010 12/16/2010 12/21/2010 OFFICIAL RECORD COPY