05000302/FIN-2011501-01: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by Mark Hawes)
 
(Created page by program invented by StriderTol)
 
Line 12: Line 12:
| identified by = Licensee
| identified by = Licensee
| Inspection procedure = IP 71114.04
| Inspection procedure = IP 71114.04
| Inspector = B Bonser, M Specks, Coker B, Bonser C, Evans D, Rich J, Munday L, Casey L, Wert M, Speckb Bonser, D Rich, M Speck
| Inspector = B Bonser, M Specks, Cokerb Bonser, C Evans, D Rich, J Munday, L Casey, L Wert, M Speckb, Bonserd Rich, M Speck
| CCA = H.13
| CCA = H.13
| INPO aspect = DM.1
| INPO aspect = DM.1
| description = An AV was identified for failure to follow and maintain in effect emergency plans which use a standard emergency classification and action level scheme. Specifically, the licensee's emergency plan emergency action level (EAL) 1.4, General Emergency - Gaseous Effluent, specified instrument values that were beyond the limits of the effluent radiation monitors capabilities to accurately measure. This finding was considered more than minor because the licensee is required to be capable of implementing adequate measures to protect public health and safety in the event of a radiological emergency. Regulations require a standard emergency classification and action level scheme, the bases which include facility system and effluent parameters, in use by the licensee and State and local response plans call for reliance on information provided by the licensee for determination of minimum initial offsite response measures. As a result of having General Emergency EAL threshold values that were beyond the range of the associated effluent radiation monitors, Crystal River Unit 3 personnel may not have been able to perform timely and accurate classification of an emergency based upon an effluent radioactive material release. Emergency response actions directed by the State and local emergency response plans, which rely on information provided by the licensee, could have potentially been delayed. The cause of the finding is related to the human performance cross-cutting element of Decision-making (H.1(a)) for ensuring that risk-significant decisions are made using a systematic process and obtaining interdisciplinary input and reviews. - THIS FINDING WAS LICENSEE IDENTIFIED
| description = An AV was identified for failure to follow and maintain in effect emergency plans which use a standard emergency classification and action level scheme. Specifically, the licensee's emergency plan emergency action level (EAL) 1.4, General Emergency - Gaseous Effluent, specified instrument values that were beyond the limits of the effluent radiation monitors capabilities to accurately measure. This finding was considered more than minor because the licensee is required to be capable of implementing adequate measures to protect public health and safety in the event of a radiological emergency. Regulations require a standard emergency classification and action level scheme, the bases which include facility system and effluent parameters, in use by the licensee and State and local response plans call for reliance on information provided by the licensee for determination of minimum initial offsite response measures. As a result of having General Emergency EAL threshold values that were beyond the range of the associated effluent radiation monitors, Crystal River Unit 3 personnel may not have been able to perform timely and accurate classification of an emergency based upon an effluent radioactive material release. Emergency response actions directed by the State and local emergency response plans, which rely on information provided by the licensee, could have potentially been delayed. The cause of the finding is related to the human performance cross-cutting element of Decision-making (H.1(a)) for ensuring that risk-significant decisions are made using a systematic process and obtaining interdisciplinary input and reviews. - THIS FINDING WAS LICENSEE IDENTIFIED
}}
}}

Latest revision as of 19:44, 20 February 2018

01
Site: Crystal River Duke Energy icon.png
Report IR 05000302/2011501 Section 1EP4
Date counted Sep 30, 2011 (2011Q3)
Type: Violation: White
cornerstone Emergency Prep
Identified by: Licensee-identified
Inspection Procedure: IP 71114.04
Inspectors (proximate) B Bonser
M Specks
Cokerb Bonser
C Evans
D Rich
J Munday
L Casey
L Wert
M Speckb
Bonserd Rich
M Speck
CCA H.13, Consistent Process
INPO aspect DM.1
'