| number = ML11257A049
| number = ML11257A049
| issue date = 09/01/2011
| issue date = 09/01/2011
| title = Attachment 3, Calculation, WNA-CN-00157-WBT-NP, Revision 0, Watts Bar 2 Incore Instrument System (Iis) Signal Processing System (Sps) Isolation Requirements
| title = Attachment 3, Calculation, WNA-CN-00157-WBT-NP, Revision 0, Watts Bar 2 Incore Instrument System (Iis) Signal Processing System (SPS) Isolation Requirements
| author name = Shakun M A
| author name = Shakun M
| author affiliation = Westinghouse Electric Co, LLC
| author affiliation = Westinghouse Electric Co, LLC
| addressee name =  
| addressee name =  
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:Attachment 3 Westinghouse Electric Company WNA-CN-001 57-WBT-NP, Revision 0,"Watts Bar 2 Incore Instrument System (IIS) Signal Processing System (SPS)Isolation Requirements," (Non-Proprietary)
{{#Wiki_filter:Attachment 3 Westinghouse Electric Company WNA-CN-001 57-WBT-NP, Revision 0, "Watts Bar 2 Incore Instrument System (IIS) Signal Processing System (SPS)
Westinghouse Non-Proprietary Class 3 WESTINGHOUSE ELECTRIC COMPANY LLC Calculation Note Number Revision Shop Order Number Network/Activity Page WNA-CN-00157-WBT-NP 0 N/A 1602247/0010 1 Project Releasable (Y/N) Open Items (Y/N) Files Attached (Y/N) Total No. Pages WB2 WINCISE IIS SPS Y Y N 35 Title: Watts Bar 2 Incore Instrument System (IIS) Signal Processing System (SPS) Isolation Requirements Author Name(s)Matthew A. Shakun Signature
Isolation Requirements," (Non-Proprietary)
/ Date Electronically Approved*Scope All Scope All Verifier Name(s)See WNA-CN-001 57-WBT RevO Signature
 
/ Date Electronically Approved*Reviewer Name(s)Kenneth I. Sundstrom Manager Name Shawn P. Kelly Signature
Westinghouse Non-Proprietary Class 3 WESTINGHOUSE ELECTRIC COMPANY LLC Calculation Note Number                 Revision         Shop Order Number   Network/Activity       Page WNA-CN-00157-WBT-NP                         0                   N/A       1602247/0010                 1 Project                             Releasable (Y/N)     Open Items (Y/N) Files Attached (Y/N) Total No. Pages WB2 WINCISE IIS SPS                         Y                     Y                   N                 35
/ Date Electronically Approved*Signature
 
/ Date Electronically Approved**Electronically approved records are authenticated in the electronic document management system.© 2011 Westinghouse Electric Company LLC All Rights Reserved O Westinghouse Word Version 6.1 Westinghouse Non-Proprietary Class 3 WESTINGHOUSE ELECTRIC COMPANY LLC Calculation Note Number Revision Page WNA-CN-00157-WBT-NP 0 2 Record of Revisions Rev Date Revision Description 0 See Initial Issue.EDMS 4- 4 4- 4 4- 4 4 4. 4 Word Version 6.1 Westinghouse Non-Proprietary Class 3 WESTINGHOUSE ELECTRIC COMPANY LLC Calculation Note Number Revision Page WNA-CN-00157-WBT-NP 0 3 Table of Contents 1.0 Background and Purpose .....................................................................................  
==Title:==
.....................
Watts Bar 2 Incore Instrument System (IIS) Signal Processing System (SPS) Isolation Requirements Author Name(s)                       Signature / Date                                    Scope Matthew A. Shakun                   ElectronicallyApproved*                             All Verifier Name(s)                     Signature / Date                                    Scope See WNA-CN-001 57-WBT RevO           ElectronicallyApproved*                             All Reviewer Name(s)                     Signature / Date Kenneth I. Sundstrom                 ElectronicallyApproved*
5 1 .1 P u rp o s e .......................................................................................................  
Manager Name                         Signature / Date Shawn P. Kelly                       ElectronicallyApproved*
.....................
  *Electronicallyapprovedrecords are authenticatedin the electronic document managementsystem.
5 1.2 Background  
                                  © 2011 Westinghouse Electric Company LLC All Rights Reserved O         Westinghouse Word Version 6.1
.................................................................................................  
 
.....................
Westinghouse Non-Proprietary Class 3 WESTINGHOUSE ELECTRIC COMPANY LLC Calculation Note Number                                                       Revision Page WNA-CN-00157-WBT-NP                                                                   0     2 Record of Revisions Rev         Date                                       Revision Description 0         See         Initial Issue.
5 1.3 Requirem ents for 1E/non 1E Independence  
EDMS 4-           4 4-           4 4-           4-1-          4
................................................  
: 4.           4 Word Version 6.1
...............
 
10 2.0 Sum m ary of Results and Conclusions  
Westinghouse Non-Proprietary Class 3 WESTINGHOUSE ELECTRIC COMPANY LLC Calculation Note Number                                                                                                         Revision                   Page WNA-CN-00157-WBT-NP                                                                                                                       0                         3 Table of Contents 1.0     Background and Purpose .....................................................................................                                 ..................... 5 1 .1   P u rp o s e .......................................................................................................                 ..................... 5 1.2   Background .................................................................................................                           ..................... 5 1.3   Requirem ents for 1E/non 1E Independence ................................................                                             ............... 10 2.0     Sum m ary of Results and Conclusions ..................................................................                                       ............... 14 2.1   Assum ptions and Interface Requirem ents ...................................................                                           ..............       15 3.0     References ...............................................................................................................................                         16 4 .0   Ca lc u la tio n s ...............................................................................................................................                 18 4.1   Lim its of Applicability ...................................................................................................                               18 4.2   O pen Item s .......................................................................................................................                       18 4.3   Method Discussion .......................................................................................................                                   18 4.4   Discussion of Significant Assum ptions .........................................................................                                           19 4.5   Acceptance Criteria .....................................................................................................                                   20 4 .6   Inp u t ..................................................................................................................................                 20 5.0     Evaluations, Analysis, Detailed Calculations and Results .....................................................                                                     21 5.1   Faults under Norm al O perating Conditions ................................................................                                                 21 5.1.1       AC Power Surges ............................................................................................                                   21 5.1.2       Surges on the Ethernet ...................................................................................                                     22 5.1.3       [           ]ac Power Supply Failure .......................................................................                                   22 5.2   Faults under LOCA Conditions .....................................................................................                                         23 5.3   Incore Cable Charge-up issue ....................................................................................                                           24 5.4   Defense In Depth ........................................................................................................                                   25 Disconnection of the IITA at power with Connector Failure .........................................                                                         25 Checklist A: Proprietary Class Statem ent Checklist .....................................................................                                                 27 Checklist B: Calculation Note Methodology Checklist ...................................................................                                                   28 Checklist D: 3-Pass Verification Methodology Checklist ..............................................................                                                     30 Additional Verifier's Com m ents .....................................................................................................                                     31 Appendix A :               Supporting Docum entation ..............................................................................                                       32 A.1   [           ]ac Power Supply Fault Voltage Assessment Letter (Reference 6) ...................                                                             32 A.2   [                                                                                           ]a,c ................................................... 33 A.3 [a,c                                                                                                 ..................................................       34 Word Version 6.1
..................................................................  
 
...............
Westinghouse Non-Proprietary Class 3 WESTINGHOUSE ELECTRIC COMPANY LLC Calculation Note Number                                               Revision         Page WNA-CN-00157-WBT-NP                                                           0             4 A.4 Vendor Letter on [                                             ]a,c (Reference 13).. 35 Word Version 6.1
14 2.1 Assum ptions and Interface Requirem ents ...................................................  
 
..............
Westinghouse Non-Proprietary Class 3 WESTINGHOUSE ELECTRIC COMPANY LLC Calculation Note Number                                                         Revision     Page WNA-CN-00157-WBT-NP                                                                   0           5 1.0       Background and Purpose 1.1       Purpose This document is a copy of WNA-CN-001 57-WBT, Rev. 0, "Watts Bar 2 Incore Instrument System (IIS) Signal Processing System (SPS) Isolation Requirements." It was created to submit to the Nuclear Regulatory Commission for the Watts Bar Nuclear Unit 2 NSSS Completion Project.
15 3.0 References  
This evaluation addresses the immunity of the Watts bar 2 Class 1 E Core Exit Thermocouple (CET) system from faults originating in, or by means of, the non-IE Incore Instrumentation System (IIS) Signal Processing System Cabinets (SPS).
...............................................................................................................................
This evaluation also addresses incore detector signal conductor charge-up issues caused by disconnection of the incore detector signal cable from its normal termination at the SPS cabinet.
16 4 .0 C a lc u la tio n s ...............................................................................................................................
This evaluation is necessary to ensure compliance with the isolation requirements of IEEE 384 for independence of Class 1 E equipment and circuits. Though compliance with IEEE 384-1981 is required, the latest revisions of this standard, IEEE 384-1992 and IEEE 384-2008, include additional clarification on the requirements established in the 1981 revision, without relaxing any applicable requirements. For this reason, this document quotes the 2008 revision to IEEE 384, with the understanding that the requirements of the 1981 and 1992 revision are also met.
1 8 4.1 Lim its of Applicability  
This calculation note was prepared according to Westinghouse Procedure NSNP 3.2.6.
...................................................................................................
1.2       Background Watts Bar 2 includes 58 Incore Instrumentation Thimble Assemblies (IITAs) each of which contains five axial levels of Vanadium Incore Self Powered Neutron Detectors (SPNDs) used for power distribution monitoring (a non 1 E function), and a single Core Exit Thermocouple used in the Post Accident Monitoring System (a 1E function). These separate functions share the same IITA to minimize the number of reactor vessel penetrations and routing complexities that would be required if they were installed in separate assemblies. Other than sharing the same IITA, the CETs and SPNDs are completely separate physically and electrically. The SPND signals are processed in two separate Incore Instrumentation System (IIS) Signal Processing System (SPS) cabinets (29 IITAs Incore detector assemblies per SPS cabinet).
18 4.2 O pen Item s .......................................................................................................................
The CETs are also processed in two separate PAMS cabinets (29 CETs per cabinet). The CETs and SPNDs are routed such that all of the CETs associated with a single PAMS train will have its associated IITA SPNDs routed to one SPS cabinet. Those CETs associated with the other PAMS train will have the IITA SPND signals in their respective IITAs routed to the other SPS cabinet, (Reference 1). This arrangement complies with IEEE 384-2008 Section Word Version 6.1
18 4.3 M ethod Discussion  
 
.......................................................................................................
Westinghouse Non-Proprietary Class 3 WESTINGHOUSE ELECTRIC COMPANY LLC Calculation Note Number                                                               Revision     Page WNA-CN-00157-WBT-NP                                                                         0           6 4.6 d), as addressed in Section 1.3 of this evaluation.
18 4.4 Discussion of Significant Assum ptions .........................................................................
[
19 4.5 Acceptance Criteria .....................................................................................................
Iac
20 4 .6 In p u t ..................................................................................................................................
                                                                        ]a.c Note that the Watts Bar 2 IITA enters the reactor vessel through the Reactor Vessel bottom, via guide tubes which serve as the RCS pressure boundary. The guide tubes entering the reactor vessel bottom and enclosing the IITA assembly are terminated at the far end at a seal table assembly, where the IITA connector mates with a mineral insulated cable assembly, and where IITA disconnection during refueling may be effected.
2 0 5.0 Evaluations, Analysis, Detailed Calculations and Results .....................................................
a,c The Watts Bar IITA Engineering Specification, 418E28 (Reference 10), provides additional detail on dimensions and composition of the IITA.
21 5.1 Faults under Norm al O perating Conditions  
aW                                                               s Word Version 6.1
................................................................
 
21 5.1.1 AC Power Surges ............................................................................................
Westinghouse Non-Proprietary Class 3 WESTINGHOUSE ELECTRIC COMPANY LLC Calculation Note Number                                           Revision Page WNA-CN-00157-WBT-NP                                                       0     7 a,c Figure 1. [                                 Iaxc Word Version 6.1
21 5.1.2 Surges on the Ethernet ...................................................................................
 
22 5.1.3 [ ]ac Power Supply Failure .......................................................................
Westinghouse Non-Proprietary Class 3 WESTINGHOUSE ELECTRIC COMPANY LLC Calculation Note Number                                             Revision Page WNA-CN-00157-WBT-NP                                                       0       8 a,c Figure 2. [                                 Sa,c Word Version 6.1
22 5.2 Faults under LOCA Conditions  
 
.....................................................................................
Westinghouse Non-Proprietary Class 3 WESTINGHOUSE ELECTRIC COMPANY LLC Calculation Note Number                                                             Revision     Page WNA-CN-00157-WBT-NP                                                                         0           9
23 5.3 Incore Cable Charge-up issue ....................................................................................
[
24 5.4 Defense In Depth ........................................................................................................
                                                                  ]a,c It should be noted that because of the compact nature of the IITA assembly the physical separation between the SPNDs and CETs within the IITA assembly and seal table connector does not meet the preferred minimum 1 inch separation requirement between the Class 1E CETs and non 1 E Incore detectors as defined in IEEE-384.
25 Disconnection of the IITA at power with Connector Failure .........................................
                                                                            ]a,c This evaluation therefore addresses the following two issues:
25 Checklist A: Proprietary Class Statem ent Checklist  
: 1)     Ensure that no fault originating either within the Incore signal processing system (SPS) cabinet or electrical surges on the input power lines or output [               ]a,c communications link can result in fault voltages at the Seal Table connector of greater than [       ],c between the connector pins.
.....................................................................
Word Version 6.1
27 Checklist B: Calculation Note M ethodology Checklist  
 
...................................................................
Westinghouse Non-Proprietary Class 3 WESTINGHOUSE ELECTRIC COMPANY LLC Calculation Note Number                                                           Revision       Page WNA-CN-00157-WBT-NP                                                                       0           10
28 Checklist D: 3-Pass Verification M ethodology Checklist  
: 2)       Ensure that inadvertent disconnection or failures of any IITA emitter wire or wires either at the SPS cabinet, or anywhere in the cabling between the IITA seal table connector and the SPS cabinet will not cause voltage charge-up on the emitter wire exceeding [           ]ac during worst case (full power) plant operation, thus preventing the fault voltage from affecting the associated CET.
..............................................................
1.3       Requirements for I E/non 1 E Independence Reference 5, "IEEE Standard 384-2008, IEEE Standard Criteria for Independence of Class 1E Equipment and Circuits", addresses issues associated with separation between 1E and non 1 E systems.
30 Additional Verifier's Com m ents .....................................................................................................
Note that the italicized text in subsections sections c. and d. of IEEE 384 Section 4.6, quoted below, represent additions to the IEEE 384-1992 text in the 2008 issue of this standard.
31 Appendix A : Supporting Docum entation ..............................................................................
Though the section numbers between revisions are changed, the technical changes are restricted to those in the italicized text. These do not change the fundamental requirements, but clarify that consideration of the energy available during faulting must be made, and that non 1 E cabling may not be run with the associated cabling from a redundant division.
32 A.1 [ ]ac Power Supply Fault Voltage Assessment Letter (Reference  
Section 4.5.1 of IEEE-384 (Reference 5) states the following:
: 6) ...................
          "4.5.1 General Non-Class 1E power, control, and instrumentation circuits become associated in one or more of the following ways, except as noted in items c), d), and e) in 4.6:
32 A.2 [ ]a,c ...................................................
: 1) Electrical connection to a Class 1 E power supply without the use of an isolation device.
33 A.3 [a,c ..................................................
: 2) Electrical connection to an associated power supply without the use of an isolation device.
34 Word Version 6.1 Westinghouse Non-Proprietary Class 3 WESTINGHOUSE ELECTRIC COMPANY LLC Calculation Note Number Revision Page WNA-CN-00157-WBT-NP 0 4 A.4 Vendor Letter on []a,c (Reference 13).. 35 Word Version 6.1 Westinghouse Non-Proprietary Class 3 WESTINGHOUSE ELECTRIC COMPANY LLC Calculation Note Number Revision Page WNA-CN-00157-WBT-NP 0 5 1.0 Background and Purpose 1.1 Purpose This document is a copy of WNA-CN-001 57-WBT, Rev. 0, "Watts Bar 2 Incore Instrument System (IIS) Signal Processing System (SPS) Isolation Requirements." It was created to submit to the Nuclear Regulatory Commission for the Watts Bar Nuclear Unit 2 NSSS Completion Project.This evaluation addresses the immunity of the Watts bar 2 Class 1 E Core Exit Thermocouple (CET) system from faults originating in, or by means of, the non-IE Incore Instrumentation System (IIS) Signal Processing System Cabinets (SPS).This evaluation also addresses incore detector signal conductor charge-up issues caused by disconnection of the incore detector signal cable from its normal termination at the SPS cabinet.This evaluation is necessary to ensure compliance with the isolation requirements of IEEE 384 for independence of Class 1 E equipment and circuits.
: 3) Proximity to Class 1 E circuits and equipment without the required physical separation or barriers.
Though compliance with IEEE 384-1981 is required, the latest revisions of this standard, IEEE 384-1992 and IEEE 384-2008, include additional clarification on the requirements established in the 1981 revision, without relaxing any applicable requirements.
: 4) Proximity to associated circuits and equipment without the required physical separation or barriers.
For this reason, this document quotes the 2008 revision to IEEE 384, with the understanding that the requirements of the 1981 and 1992 revision are also met.This calculation note was prepared according to Westinghouse Procedure NSNP 3.2.6.1.2 Background Watts Bar 2 includes 58 Incore Instrumentation Thimble Assemblies (IITAs) each of which contains five axial levels of Vanadium Incore Self Powered Neutron Detectors (SPNDs) used for power distribution monitoring (a non 1 E function), and a single Core Exit Thermocouple used in the Post Accident Monitoring System (a 1 E function).
: 5) Sharing a Class 1E or associated signal source without the use of an isolation device."
These separate functions share the same IITA to minimize the number of reactor vessel penetrations and routing complexities that would be required if they were installed in separate assemblies.
In accordance with the criteria set forth in Item 3 listed above, the Incore cables and their attached connectors are treated as Associated Circuits.
Other than sharing the same IITA, the CETs and SPNDs are completely separate physically and electrically.
Section 4.5.2 of IEEE-384 (Reference 5) states the following:
The SPND signals are processed in two separate Incore Instrumentation System (IIS) Signal Processing System (SPS) cabinets (29 IITAs Incore detector assemblies per SPS cabinet).The CETs are also processed in two separate PAMS cabinets (29 CETs per cabinet).
          "4.5.2 Criteria Associated circuits shall comply with one of the following requirements:
The CETs and SPNDs are routed such that all of the CETs associated with a single PAMS train will have its associated IITA SPNDs routed to one SPS cabinet. Those CETs associated with the other PAMS train will have the IITA SPND signals in their respective IITAs routed to the other SPS cabinet, (Reference 1). This arrangement complies with IEEE 384-2008 Section Word Version 6.1 Westinghouse Non-Proprietary Class 3 WESTINGHOUSE ELECTRIC COMPANY LLC Calculation Note Number Revision Page WNA-CN-00157-WBT-NP 0 6 4.6 d), as addressed in Section 1.3 of this evaluation.
Word Version 6.1
[I ac]a.c Note that the Watts Bar 2 IITA enters the reactor vessel through the Reactor Vessel bottom, via guide tubes which serve as the RCS pressure boundary.
 
The guide tubes entering the reactor vessel bottom and enclosing the IITA assembly are terminated at the far end at a seal table assembly, where the IITA connector mates with a mineral insulated cable assembly, and where IITA disconnection during refueling may be effected.a,c The Watts Bar IITA Engineering Specification, 418E28 (Reference 10), provides additional detail on dimensions and composition of the IITA.aW s Word Version 6.1 Westinghouse Non-Proprietary Class 3 WESTINGHOUSE ELECTRIC COMPANY LLC Calculation Note Number Revision Page WNA-CN-00157-WBT-NP 0 7 a,c Figure 1. [Iaxc Word Version 6.1 Westinghouse Non-Proprietary Class 3 WESTINGHOUSE ELECTRIC COMPANY LLC Calculation Note Number Revision Page WNA-CN-00157-WBT-NP 0 8 a,c Figure 2. [Sa,c Word Version 6.1 Westinghouse Non-Proprietary Class 3 WESTINGHOUSE ELECTRIC COMPANY LLC Calculation Note Number Revision Page WNA-CN-00157-WBT-NP 0 9[]a,c It should be noted that because of the compact nature of the IITA assembly the physical separation between the SPNDs and CETs within the IITA assembly and seal table connector does not meet the preferred minimum 1 inch separation requirement between the Class 1 E CETs and non 1 E Incore detectors as defined in IEEE-384.]a,c This evaluation therefore addresses the following two issues: 1) Ensure that no fault originating either within the Incore signal processing system (SPS)cabinet or electrical surges on the input power lines or output [ ]a,c communications link can result in fault voltages at the Seal Table connector of greater than [ ],c between the connector pins.Word Version 6.1 Westinghouse Non-Proprietary Class 3 WESTINGHOUSE ELECTRIC COMPANY LLC Calculation Note Number Revision Page WNA-CN-00157-WBT-NP 0 10 2) Ensure that inadvertent disconnection or failures of any IITA emitter wire or wires either at the SPS cabinet, or anywhere in the cabling between the IITA seal table connector and the SPS cabinet will not cause voltage charge-up on the emitter wire exceeding  
Westinghouse Non-Proprietary Class 3 WESTINGHOUSE ELECTRIC COMPANY LLC Calculation Note Number                                                             Revision     Page WNA-CN-00157-WBT-NP                                                                       0           11 c) They shall be analyzed or tested to demonstrate that Class 1 E circuits are not degraded below an acceptable level. These associated circuits can then be considered non Class 1 E circuits per the requirements in c), d), and e) in 4.6."
[ ]ac during worst case (full power) plant operation, thus preventing the fault voltage from affecting the associated CET.1.3 Requirements for I E/non 1 E Independence Reference 5, "IEEE Standard 384-2008, IEEE Standard Criteria for Independence of Class 1E Equipment and Circuits", addresses issues associated with separation between 1 E and non 1 E systems.Note that the italicized text in subsections sections c. and d. of IEEE 384 Section 4.6, quoted below, represent additions to the IEEE 384-1992 text in the 2008 issue of this standard.Though the section numbers between revisions are changed, the technical changes are restricted to those in the italicized text. These do not change the fundamental requirements, but clarify that consideration of the energy available during faulting must be made, and that non 1 E cabling may not be run with the associated cabling from a redundant division.Section 4.5.1 of IEEE-384 (Reference  
Section 4.6 of IEEE-384 addresses the independence of non-Class 1E circuits from Class 1E circuits as follows:
: 5) states the following:
          "4.6     Non-Class 1E Circuits; General Criteria The independence of non-class 1 E circuits from Class 1 E circuits or associated circuits shall be achieved by complying with the following requirements:
"4.5.1 General Non-Class 1 E power, control, and instrumentation circuits become associated in one or more of the following ways, except as noted in items c), d), and e) in 4.6: 1) Electrical connection to a Class 1 E power supply without the use of an isolation device.2) Electrical connection to an associated power supply without the use of an isolation device.3) Proximity to Class 1 E circuits and equipment without the required physical separation or barriers.4) Proximity to associated circuits and equipment without the required physical separation or barriers.5) Sharing a Class 1 E or associated signal source without the use of an isolation device." In accordance with the criteria set forth in Item 3 listed above, the Incore cables and their attached connectors are treated as Associated Circuits.Section 4.5.2 of IEEE-384 (Reference  
c) The effects of less than minimum separation or the absence of electrical isolation between the non Class 1E circuits and the Class 1 E circuits or associated circuits shall be analyzed to demonstrate that that Class 1 E circuits are not degraded below an acceptable level or the non Class 1E circuits shall be associated circuits. As part of the analysis, considerationshall be given to potentialenergy and identification of the circuits involved. Also, the non Class IE circuits shall not be routed with associated cables from a redundantdivision.
: 5) states the following:
d) Non-Class 1 E instrumentation signal and control circuits (see IEEE Std 690) are not required to be physically separated or electrically isolated from associated circuits provided that (1) the non-Class 1 E circuits are not routed with associated cables of a redundant division and (2) the non-Class 1E circuits are analyzed to demonstrate that Class 1E circuits are not degraded below an acceptable level. As part of the analysis, considerationshall be given to potential energy and identification of the circuits involved.
"4.5.2 Criteria Associated circuits shall comply with one of the following requirements:
e) Non Class 1E fiber optic circuits are not required to be physically separated from Class 1E and associated circuits. Electrical isolation is an inherent characteristic of fiber-optic circuits. Since fiber-optic circuits have no potential to degrade Class 1E circuits, they can be considered non Class 1 E circuits versus associated circuits".
Word Version 6.1 Westinghouse Non-Proprietary Class 3 WESTINGHOUSE ELECTRIC COMPANY LLC Calculation Note Number Revision Page WNA-CN-00157-WBT-NP 0 11 c) They shall be analyzed or tested to demonstrate that Class 1 E circuits are not degraded below an acceptable level. These associated circuits can then be considered non Class 1 E circuits per the requirements in c), d), and e) in 4.6." Section 4.6 of IEEE-384 addresses the independence of non-Class 1 E circuits from Class 1 E circuits as follows: "4.6 Non-Class 1 E Circuits; General Criteria The independence of non-class 1 E circuits from Class 1 E circuits or associated circuits shall be achieved by complying with the following requirements:
The Incore cable design does not meet the required minimum separation distance between the non-Class 1E SPNDs and Class 1E CETs. Based upon the above statements from IEEE-384, the purpose of this evaluation is to provide assurances that no credible fault within or by means of the non-Class 1E Incore SPS cabinet can adversely impact the Class 1 E CETs by way of fault propagation over the Associated Incore cables.
c) The effects of less than minimum separation or the absence of electrical isolation between the non Class 1 E circuits and the Class 1 E circuits or associated circuits shall be analyzed to demonstrate that that Class 1 E circuits are not degraded below an acceptable level or the non Class 1 E circuits shall be associated circuits.
Figure 3 is a block diagram defining the 1E/Associated/non 1 E interface between the Class 1 E Core Exit Thermocouples and the non 1 E Incore SPS cabinets.
As part of the analysis, consideration shall be given to potential energy and identification of the circuits involved.
Note that:
Also, the non Class IE circuits shall not be routed with associated cables from a redundant division.d) Non-Class 1 E instrumentation signal and control circuits (see IEEE Std 690) are not required to be physically separated or electrically isolated from associated circuits provided that (1) the non-Class 1 E circuits are not routed with associated cables of a redundant division and (2) the non-Class 1 E circuits are analyzed to demonstrate that Class 1 E circuits are not degraded below an acceptable level. As part of the analysis, consideration shall be given to potential energy and identification of the circuits involved.e) Non Class 1 E fiber optic circuits are not required to be physically separated from Class 1 E and associated circuits.
Word Version 6.1
Electrical isolation is an inherent characteristic of fiber-optic circuits.
 
Since fiber-optic circuits have no potential to degrade Class 1 E circuits, they can be considered non Class 1 E circuits versus associated circuits".
Westinghouse Non-Proprietary Class 3 WESTINGHOUSE ELECTRIC COMPANY LLC Calculation Note Number                                                           Revision   Page WNA-CN-00157-WBT-NP                                                                     0         12
The Incore cable design does not meet the required minimum separation distance between the non-Class 1 E SPNDs and Class 1 E CETs. Based upon the above statements from IEEE-384, the purpose of this evaluation is to provide assurances that no credible fault within or by means of the non-Class 1 E Incore SPS cabinet can adversely impact the Class 1 E CETs by way of fault propagation over the Associated Incore cables.Figure 3 is a block diagram defining the 1 E/Associated/non 1 E interface between the Class 1 E Core Exit Thermocouples and the non 1 E Incore SPS cabinets.Note that: Word Version 6.1 Westinghouse Non-Proprietary Class 3 WESTINGHOUSE ELECTRIC COMPANY LLC Calculation Note Number Revision Page WNA-CN-00157-WBT-NP 0 12" The 1E portion of the circuitry includes the IITA and connecting MI cabling housing the CET wiring." Interconnecting cabling from the Seal Table to the SPS cabinet does not perform a 1 E function, but is not isolated from the 1E CETs per IEEE 384. Therefore, it is Associated.
              " The 1E portion of the circuitry includes the IITA and connecting MI cabling housing the CET wiring.
* The Associated to non 1E interface is at the Incore SPS connector panel at the IIS SPS cabinet.* The only electrical interfaces with the SPS are the Incore SPND output signals, the two] a,c input power feeds, and the two output [ ]ac links.a]x' links are fiber optic.Word Version 6.1 Westinghouse Non-Proprietary Class 3 WESTINGHOUSE ELECTRIC COMPANY LLC Calculation Note Number Revision Page WNA-CN-00157-WBT-NP 0 13 a,c Figure 3: [I a,c Word Version 6.1 Westinghouse Non-Proprietary Class 3 WESTINGHOUSE ELECTRIC COMPANY LLC Calculation Note Number Revision Page WNA-CN-00157-WBT-NP 0 14 2.0 Summary of Results and Conclusions Conclusions No credible source of faulting within the SPS, the IITA, or the interconnecting cabling can negatively impact either PAMS train. Thus, both trains will remain operable.For large input over-voltage conditions on the [ ]',c input instrument bus used in both the SPS cabinet and associated PAMS train, the SPS will not cause any failure within the PAMS train that would not otherwise occur as a direct result of the over-voltage condition within the PAMS power supply.SPS Fault Evaluation For the normal situation in which the 1E power input is maintained below [ ]a~c there are three possible sources of faulting within or by means of the non-iE Incore SPS. Each of these was evaluated for fault potential against the acceptance criteria of a [- ]aC limit on potential faulting.The conclusion is that there is no credible fault originating within the non-I E Incore SPS that can exceed this limit The three faults evaluated are" Electrical surges (up to 4 kV) on the [ ]ac communications link" Electrical surges (up to 4 kV) on the [ ] ,c input power feed* [ 1]ax Power Supply failure during normal or harsh environmental conditions Additionally, it was assumed that the input [ ]a'° power feed could bypass (or short through)the [ ]ac power supply unattenuated directly to the SPND input signal leads.The worst case fault is [ ]*a assuming complete power supply failure and a dead short through the SPS cabinet to the signal input cables. The incore instrument input cables are tested to a voltage of greater than [ ]a,c, The lowest permissible cable insulation resistance is that of the IITA due to its elevated temperature during operation.
              "   Interconnecting cabling from the Seal Table to the SPS cabinet does not perform a 1 E function, but is not isolated from the 1E CETs per IEEE 384. Therefore, it is Associated.
This is [ I,. Therefore, conservatively assuming this minimum leakage resistance (maximum leakage current) is concentrated at a single point in the IITA, the energy available to cause further damage during the worst case power supply fault is restricted to I ],c which is negligible.
* The Associated to non 1E interface is at the Incore SPS connector panel at the IIS SPS cabinet.
1 E bus Faults above r Iac Word Version 6.1 Westinghouse Non-Proprietary Class 3 WESTINGHOUSE ELECTRIC COMPANY LLC Calculation Note Number Revision Page WNA-CN-00157-WBT-NP 0 15 ac Failure of a single PAMS train is acceptable under such circumstances, and leaves the other train operable.Cable Voltage Build Up Evaluation The worst case voltage buildup due to disconnection or opening of the emitter wire at the Seal Table connector or any of the downstream signal processing will be less than the []ac for which the connectors will be qualified.
* The only electrical interfaces with the SPS are the Incore SPND output signals, the two
]a,c The design maximum emitter current of [ ac is sufficiently low that any short within the IITA will so restrict the energy available that further damage is precluded.
                                        ] a,c input power feeds, and the two output [           ]ac links.
2.1 Assumptions and Interface Requirements This evaluation is based on the interfaces to the SPS meeting the following requirements:
a]x' links are fiber optic.
: 1. The maximum normal voltage on the AC input power to the SPS is limited to a,c 2. The IITA and interfacing mineral insulated cabling up to the SPS cabinet interface shall have a dielectric voltage rating of at least [ I,.3. The IITA and interfacing mineral insulated cabling shall be tested to confirm the ability to withstand a [ ]ax application on the emitter wire without a reduction in insulation resistance such that the fault voltage could propagate to the IITA sheath, the interfacing MI cable sheath or adjacent connector pins. Results of testing shall be documented to successfully demonstrate that the requirements are met.4. The AC power cable to the SPS cabinet shall be routed in metal conduit such that the normal maximum voltage that can be impressed upon the AC power input is restricted to the [ ]'C assumed in this evaluation.
Word Version 6.1
: 5. Watts Bar must confirm that the [ ] ,c input power to the SPS cabinets are from isolated 1 E sources, and are channelized such that the same source used in PAMS train A is used in SPS cabinet 1, and the same AC source used in PAMS train B is used in SPS cabinet 2.Word Version 6.1 Westinghouse Non-Proprietary Class 3 WESTINGHOUSE ELECTRIC COMPANY LLC Calculation Note Number Revision Page WNA-CN-00157-WBT-NP 0 16 3.0 References
 
Westinghouse Non-Proprietary Class 3 WESTINGHOUSE ELECTRIC COMPANY LLC Calculation Note Number                                               Revision       Page WNA-CN-00157-WBT-NP                                                           0             13 a,c Figure 3: [                                             I a,c Word Version 6.1
 
Westinghouse Non-Proprietary Class 3 WESTINGHOUSE ELECTRIC COMPANY LLC Calculation Note Number                                                               Revision     Page WNA-CN-00157-WBT-NP                                                                         0           14 2.0       Summary of Results and Conclusions Conclusions No credible source of faulting within the SPS, the IITA, or the interconnecting cabling can negatively impact either PAMS train. Thus, both trains will remain operable.
For large input over-voltage conditions on the [             ]',c input instrument bus used in both the SPS cabinet and associated PAMS train, the SPS will not cause any failure within the PAMS train that would not otherwise occur as a direct result of the over-voltage condition within the PAMS power supply.
SPS Fault Evaluation For the normal situation in which the 1E power input is maintained below [                   ]a~c there are three possible sources of faulting within or by means of the non-iE Incore SPS. Each of these was evaluated for fault potential against the acceptance criteria of a [-           ]aC limit on potential faulting.
The conclusion is that there is no credible fault originating within the non-I E Incore SPS that can exceed this limit The three faults evaluated are
                "   Electrical surges (up to 4 kV) on the [               ]ac communications link
                "   Electrical surges (up to 4 kV) on the [               ] ,c input power feed
                *   [             ]ax Power Supply failure during normal or harsh environmental conditions Additionally, it was assumed that the input [ ]a'° power feed could bypass (or short through) the [         ]ac power supply unattenuated directly to the SPND input signal leads.
The worst case fault is [                               ]*a assuming complete power supply failure and a dead short through the SPS cabinet to the signal input cables. The incore instrument input cables are tested to a voltage of greater than [             ]a,c, The lowest permissible cable insulation resistance is that of the IITA due to its elevated temperature during operation. This is [               I,. Therefore, conservatively assuming this minimum leakage resistance (maximum leakage current) is concentrated at a single point in the IITA, the energy available to cause further damage during the worst case power supply fault is restricted to I           ],c which is negligible.
1E bus Faults above r             Iac Word Version 6.1
 
Westinghouse Non-Proprietary Class 3 WESTINGHOUSE ELECTRIC COMPANY LLC Calculation Note Number                                                               Revision     Page WNA-CN-00157-WBT-NP                                                                         0         15 ac Failure of a single PAMS train is acceptable under such circumstances, and leaves the other train operable.
Cable Voltage Build Up Evaluation The worst case voltage buildup due to disconnection or opening of the emitter wire at the Seal Table connector or any of the downstream signal processing will be less than the []ac for which the connectors will be qualified.
                                                                            ]a,c The design maximum emitter current of [                 ac is sufficiently low that any short within the IITA will so restrict the energy available that further damage is precluded.
2.1       Assumptions and Interface Requirements This evaluation is based on the interfaces to the SPS meeting the following requirements:
: 1. The maximum normal voltage on the AC input power to the SPS is limited to a,c
: 2. The IITA and interfacing mineral insulated cabling up to the SPS cabinet interface shall have a dielectric voltage rating of at least [           I,.
: 3. The IITA and interfacing mineral insulated cabling shall be tested to confirm the ability to withstand a [         ]ax application on the emitter wire without a reduction in insulation resistance such that the fault voltage could propagate to the IITA sheath, the interfacing MI cable sheath or adjacent connector pins. Results of testing shall be documented to successfully demonstrate that the requirements are met.
: 4. The AC power cable to the SPS cabinet shall be routed in metal conduit such that the normal maximum voltage that can be impressed upon the AC power input is restricted to the [         ]'C assumed in this evaluation.
: 5. Watts Bar must confirm that the [             ] ,c input power to the SPS cabinets are from isolated 1 E sources, and are channelized such that the same source used in PAMS train A is used in SPS cabinet 1, and the same AC source used in PAMS train B is used in SPS cabinet 2.
Word Version 6.1
 
Westinghouse Non-Proprietary Class 3 WESTINGHOUSE ELECTRIC COMPANY LLC Calculation Note Number                                                             Revision Page WNA-CN-00157-WBT-NP                                                                       0       16 3.0       References
: 1. WINCISE System Wiring Diagram, E-WBN2-155-006.
: 1. WINCISE System Wiring Diagram, E-WBN2-155-006.
: 2. Standard Safety Line Filter Panel Assembly, Drawing 10042D05, sheets 1 through 4.3. Standard Safety Power Supply Panels Assembly, Drawing 10043D28, sheets 1 through 23.4.ac 5. IEEE Standard Criteria for Independence of Class 1E Equipment and Circuits, IEEE Std 384-1992, IEEE 384-1981, and IEEE 384-2008.6.a,c 7. Watts Bar Unit 2 WINCISE Signal Processing System Design Requirements, WNA-DS-01811-WBT.
: 2. Standard Safety Line Filter Panel Assembly, Drawing 10042D05, sheets 1 through 4.
8.a,c 9. Drawing 6657E27, OPARSSEL Incore Instrumentation Thimble Assembly.10. Engineering Specification for Incore Instrumentation Thimble Assembly, Specification number 418E28.11. Design Specification 00000-FEA-6102 Design and Fabrication Specification or Mineral Insulated Cable Assemblies Without Integral Reference Junctions.
: 3. Standard Safety Power Supply Panels Assembly, Drawing 10043D28, sheets 1 through 23.
4.
ac
: 5. IEEE Standard Criteria for Independence of Class 1E Equipment and Circuits, IEEE Std 384-1992, IEEE 384-1981, and IEEE 384-2008.
6.
a,c
: 7. Watts Bar Unit 2 WINCISE Signal Processing System Design Requirements, WNA-DS-01811-WBT.
: 8.                                                                   a,c
: 9. Drawing 6657E27, OPARSSEL Incore Instrumentation Thimble Assembly.
: 10. Engineering Specification for Incore Instrumentation Thimble Assembly, Specification number 418E28.
: 11. Design Specification 00000-FEA-6102 Design and Fabrication Specification or Mineral Insulated Cable Assemblies Without Integral Reference Junctions.
: 12. WINCISE 1 to 2 Transition Cable Assemblies, E-WBN2-155-002.
: 12. WINCISE 1 to 2 Transition Cable Assemblies, E-WBN2-155-002.
13.a,c 14. International Standard IEC 61000-4-5, Edition 1.1. 2001-04, Electromagnetic Compatibility (EMC)-Part 4-5, Testing and measurement techniques-Surge immunity test.15. Standard Specification for Thermocouples, Sheathed, Type K and Type N, for Nuclear or for Other High Reliability Applications, ASTM Standard E 235-06.16.[ja~c 17. WINCISE 6 to 1 Transition Cable Assemblies, drawing E-WBN2-155-003.
13.
18.[]a,C Word Version 6.1 Westinghouse Non-Proprietary Class 3 WESTINGHOUSE ELECTRIC COMPANY LLC Calculation Note Number Revision Page WNA-C N-00157-WBT-N P 0 17 19. Repair, Replacement, and Automation Services (RRAS) Common Q Power Supply Technical Manual, 00000-ICE-3453.
a,c
: 20. Watts Bar Unit 2 WINCISE Power Supply Panel Assembly, 10004D05, sheets 1 through 3.Word Version 6.1 Westinghouse Non-Proprietary Class 3 WESTINGHOUSE ELECTRIC COMPANY LLC Calculation Note Number Revision Page WNA-CN-00157-WBT-NP 0 18 4.0 Calculations 4.1 Limits of Applicability This analysis is applicable to the Watts Bar 2 Incore Nuclear Instrumentation system. The analysis is applicable for either [ ]a,c input power feeds to the Incore SPS.Though Watts Bar employs [ ]axc from an isolated 1E source, this analysis conservatively assumes a [ ]ac input power feed, with a maximum input fault voltage of[ ]ac 4.2 Open Items There are 4 open items in this calculation note.(1) This Calc Note requires that the Incore detector assembly (IITA) and interfacing
: 14. International Standard IEC 61000-4-5, Edition 1.1. 2001-04, Electromagnetic Compatibility (EMC)-Part 4-5, Testing and measurement techniques-Surge immunity test.
]a~c to the SPS cabinet interface have a dielectric voltage rating of at least [ ]ac, and that testing be performed to verify this value.]a,c (2) The [ ]a,c power supply must undergo successful EMC surge qualification testing to 4kV to validate the assumptions regarding potential faults during normal operation.
: 15. Standard Specification for Thermocouples, Sheathed, Type K and Type N, for Nuclear or for Other High Reliability Applications, ASTM Standard E 235-06.
(3) The AC power cabling and voltage source external to the SPS cabinet shall be routed and the power source limited such that the maximum normal AC input voltage is [ ]a,c (4) The maximum IITA cable leakage resistance at the minimum temperature for criticality (551 degrees F) is limited to [ ]ac. Since cable leakage resistance decreases with increased temperature, and normal reactor operating temperature is above this value, this is a conservative reference temperature.
16.[
Cable leakage resistance must be verified by test or a combination of test (at one reference temperature) and analysis providing extrapolation to the performance at 551 degrees. This specification is required to minimize cable voltage charge-up during at-power IITA disconnection.
ja~c
4.3 Method Discussion This evaluation treats the non 1E Incore cabinet assembly in containment as an envelope.There are two points of electrical connection to the rest of the plant. These are the I I a,c communications connection and the AC power feed to the cabinet. The effects of electrical surges on both of these interfaces were evaluated, and suitable isolation devices to prevent unacceptable fault propagation were specified.
: 17. WINCISE 6 to 1 Transition Cable Assemblies, drawing E-WBN2-155-003.
This evaluation of surges was restricted to normal (non harsh) operating environment.
18.[
Since the CET may be required during a LOCA, the cabinet is analyzed to determine what potential faults could be injected on the Incore cables from the SPS cabinets during such an event.Word Version 6.1 Westinghouse Non-Proprietary Class 3 WESTINGHOUSE ELECTRIC COMPANY LLC Calculation Note Number Revision Page WNA-CN-00157-WBT-NP 0 19 The cable charge build up issue evaluates the maximum possible voltage build up on an unterminated IITA detector at the seal table connector, which is the only point of vulnerability on the IITA assembly due to the double barrier design of the SPND and CET within the IITA.Maximum expected leakage resistance at elevated temperatures is assumed, and resulting voltage is calculated per Ohm's Law using the maximum permissible full power input current of [ ]a,c.4.4 Discussion of Significant Assumptions
                                                                                                  ]a,C Word Version 6.1
[1 a,c Surges are not assumed to occur during a harsh environment condition, when the Incore system will be experiencing environmental conditions well beyond the qualified ratings of the equipment.
 
Reference 7 requires that Power Supplies shall be equipped with a loss of voltage detection circuit, integral current limiting, and over-voltage protection circuit. Though this circuitry will provide protection during normal operation, during harsh conditions it must be assumed that the protective circuitry does not function.The maximum normal AC voltage on the [ a,c input is limited to [ ]a,c. This is consistent with References 4, and 8, the [ ]ac DC Power Supply data sheets, and is greater than the specified  
Westinghouse Non-Proprietary Class 3 WESTINGHOUSE ELECTRIC COMPANY LLC Calculation Note Number                                                   Revision   Page WNA-C N-00157-WBT-N P                                                           0         17
[ ]',c Power interface Requirements specified for the SPS in Reference  
: 19. Repair, Replacement, and Automation Services (RRAS) Common Q Power Supply Technical Manual, 00000-ICE-3453.
: 7. All input power cabling between the isolated AC power input and SPS cabinet is routed in metal conduit.It should be noted that the AC power input feed to the SPS is an isolated (per IEEE 384) 1 E power source, and that this power source is the same source used to supply the CET circuitry in the associated Post Accident Monitoring System (PAMS) train. Thus, any extreme over voltage condition on the 1 E input bus beyond the [ ]a,c required in this analysis that may compromise the SPS will also independently compromise the associated PAMS channel used to monitor the affected CETs regardless of the status of the SPS.By assigning each SPS cabinet and its corresponding PAMS division to the same Class 1 E power bus, it is ensured that extreme fault voltages on a single 1 E bus that [I ac can only disable one of the two PAMS trains. This single failure of the 1E bus will still leave the other PAMS train intact and operable.
: 20. Watts Bar Unit 2 WINCISE Power Supply Panel Assembly, 10004D05, sheets 1 through 3.
The [ ]a,c Power Supply used in the PAMS (Reference  
Word Version 6.1
: 19) has a maximum input voltage rating of [ ] , which is lower than that of the SPS [ I power supply. It can therefore be assumed that the PAMS power supply will be inoperable for input fault voltages approaching  
 
[ ]aC and that the associated PAMS train will become inoperable.
Westinghouse Non-Proprietary Class 3 WESTINGHOUSE ELECTRIC COMPANY LLC Calculation Note Number                                                               Revision     Page WNA-CN-00157-WBT-NP                                                                           0           18 4.0       Calculations 4.1       Limits of Applicability This analysis is applicable to the Watts Bar 2 Incore Nuclear Instrumentation system. The analysis is applicable for either [                         ]a,c input power feeds to the Incore SPS.
Word Version 6.1 Westinghouse Non-Proprietary Class 3 WESTINGHOUSE ELECTRIC COMPANY LLC Calculation Note Number Revision Page WNA-CN-00157-WBT-NP  
Though Watts Bar employs [                         ]axc from an isolated 1E source, this analysis conservatively assumes a [                 ]ac input power feed, with a maximum input fault voltage of
.0 20 Detailed cable routing of the SPS signal input cabling is not addressed in this evaluation.
[         ]ac 4.2       Open Items There are 4 open items in this calculation note.
That is, IEEE 384 Section 4.6, item d, addressed in Section 1 of this Calc Note, (this is section 5.6 item 4 in the 1992 revision of IEEE 384) requires that there be no compromising of the class 1 E cable routing by misrouting of the associated Incore cabling to the improper SPS cabinet.Reference 1 depicts the PAMS train/SPS signal routing assignments in accordance with IEEE 384 compliance.
(1) This Calc Note requires that the Incore detector assembly (IITA) and interfacing
However, physical details of this routing are within customer scope, and are beyond the scope of this evaluation.
                                                ]a~c to the SPS cabinet interface have a dielectric voltage rating of at least [           ]ac, and that testing be performed to verify this value.
4.5 Acceptance Criteria Faults originating in or by means of the normal electrical interfaces,]a,c cannot result in a voltage on the Incore input cables of]a,c or more. Similarly, maximum cable charge-up voltage at the IITA connector shall not exceed [ ]a,c in the event of IITA disconnection while at power. Under these conditions, there is no failure in the SPS, IITA, or 1 to 2 transition cabling, either during normal or harsh environmental conditions, that can negatively impact wither PAMS train.4.6 Input I ]a'c Word Version 6.1 Westinghouse Non-Proprietary Class 3 WESTINGHOUSE ELECTRIC COMPANY LLC Calculation Note Number Revision Page WNA-CN-00157-WBT-NP 0 21 5.0 Evaluations, Analysis, Detailed Calculations and Results The Class 1 E core exit thermocouples are most likely to be required during accident conditions:
                                                                                ]a,c (2) The [         ]a,c power supply must undergo successful EMC surge qualification testing to 4kV to validate the assumptions regarding potential faults during normal operation.
that is, during those events that could lead to a harsh containment environment (e.g. LOCA). The non-I E Incore Processing System Signal Processing System (SPS)cabinets used to mount the Incore system SPS are mounted in containment.
(3) The AC power cabling and voltage source external to the SPS cabinet shall be routed and the power source limited such that the maximum normal AC input voltage is [                         ]a,c (4) The maximum IITA cable leakage resistance at the minimum temperature for criticality (551 degrees F) is limited to [                   ]ac. Since cable leakage resistance decreases with increased temperature, and normal reactor operating temperature is above this value, this is a conservative reference temperature. Cable leakage resistance must be verified by test or a combination of test (at one reference temperature) and analysis providing extrapolation to the performance at 551 degrees. This specification is required to minimize cable voltage charge-up during at-power IITA disconnection.
As such, it may be expected that the SPS cabinets will experience a harsh environment well beyond the design capabilities of the system at the precise moment when the 1 E thermocouples are most likely needed. It must be assumed that such an environment will lead to the failure of the Incore signal processing electronics.
4.3       Method Discussion This evaluation treats the non 1E Incore cabinet assembly in containment as an envelope.
The signal processing electronics are not post accident qualified; therefore it is not possible to perform a detailed circuit analysis of the SPS to assure that the maximum acceptable voltage on the IITA and its associated connectors is not exceeded.
There are two points of electrical connection to the rest of the plant. These are the I             Ia,c communications connection and the AC power feed to the cabinet. The effects of electrical surges on both of these interfaces were evaluated, and suitable isolation devices to prevent unacceptable fault propagation were specified. This evaluation of surges was restricted to normal (non harsh) operating environment.
Note that there are numerous internal design features that limit the possibility of faulting during normal operation.
Since the CET may be required during a LOCA, the cabinet is analyzed to determine what potential faults could be injected on the Incore cables from the SPS cabinets during such an event.
These are not credited during harsh conditions.
Word Version 6.1
However, the Incore SPS cabinets may be regarded as an envelope, and the sources of credible voltage transients evaluated individually, without the need for detailed analysis.5.1 Faults under Normal Operating Conditions The normal operating environment for the SPS is [ ]a,c The Incore SPS cabinets have three external interfaces  
 
-AC input power, Ethernet communications to the Non 1 E system, and Incore SPND input signals. For normal operating conditions, there are three faults that have the potential to provide faults to the SPND cables -surges on the AC power, surges on the ETHERNET, and a power supply failure. These faults are analyzed herein.5.1.1 AC Power Surges a,c Word Version 6.1 Westinghouse Non-Proprietary Class 3 WESTINGHOUSE ELECTRIC COMPANY LLC Calculation Note Number Revision Page WNA-CN-00157-WBT-NP 0 22[]"'c The]a.,c power supply and associated protection devices will either be 4kV surge tested to IEC 61000-4-5, (Reference  
Westinghouse Non-Proprietary Class 3 WESTINGHOUSE ELECTRIC COMPANY LLC Calculation Note Number                                                                 Revision       Page WNA-CN-00157-WBT-NP                                                                           0             19 The cable charge build up issue evaluates the maximum possible voltage build up on an unterminated IITA detector at the seal table connector, which is the only point of vulnerability on the IITA assembly due to the double barrier design of the SPND and CET within the IITA.
: 14) or credit will be taken for previous testing if such testing has been performed.
Maximum expected leakage resistance at elevated temperatures is assumed, and resulting voltage is calculated per Ohm's Law using the maximum permissible full power input current of [                 ]a,c.
Thus, 4kV input surges shall not result in unacceptable voltages on the I I a,c incore power distribution.
4.4       Discussion of Significant Assumptions
[
1a,c Surges are not assumed to occur during a harsh environment condition, when the Incore system will be experiencing environmental conditions well beyond the qualified ratings of the equipment.
Reference 7 requires that Power Supplies shall be equipped with a loss of voltage detection circuit, integral current limiting, and over-voltage protection circuit. Though this circuitry will provide protection during normal operation, during harsh conditions it must be assumed that the protective circuitry does not function.
The maximum normal AC voltage on the [                     a,c input is limited to [           ]a,c. This is consistent with References 4, and 8, the [               ]ac DC Power Supply data sheets, and is greater than the specified [                     ]',c Power interface Requirements specified for the SPS in Reference 7. All input power cabling between the isolated AC power input and SPS cabinet is routed in metal conduit.
It should be noted that the AC power input feed to the SPS is an isolated (per IEEE 384) 1 E power source, and that this power source is the same source used to supply the CET circuitry in the associated Post Accident Monitoring System (PAMS) train. Thus, any extreme over voltage condition on the 1 E input bus beyond the [                   ]a,c required in this analysis that may compromise the SPS will also independently compromise the associated PAMS channel used to monitor the affected CETs regardless of the status of the SPS.
By assigning each SPS cabinet and its corresponding PAMS division to the same Class 1 E power bus, it is ensured that extreme fault voltages on a single 1 E bus that [
Iac can only disable one of the two PAMS trains. This single failure of the 1E bus will still leave the other PAMS train intact and operable. The [                 ]a,c Power Supply used in the PAMS (Reference 19) has a maximum input voltage rating of [             ] , which is lower than that of the SPS [             I power supply. It can therefore be assumed that the PAMS power supply will be inoperable for input fault voltages approaching [         ]aC and that the associated PAMS train will become inoperable.
Word Version 6.1
 
Westinghouse Non-Proprietary Class 3 WESTINGHOUSE ELECTRIC COMPANY LLC Calculation Note Number                                                           Revision       Page WNA-CN-00157-WBT-NP                                                                     .0             20 Detailed cable routing of the SPS signal input cabling is not addressed in this evaluation. That is, IEEE 384 Section 4.6, item d, addressed in Section 1 of this Calc Note, (this is section 5.6 item 4 in the 1992 revision of IEEE 384) requires that there be no compromising of the class 1E cable routing by misrouting of the associated Incore cabling to the improper SPS cabinet.
Reference 1 depicts the PAMS train/SPS signal routing assignments in accordance with IEEE 384 compliance. However, physical details of this routing are within customer scope, and are beyond the scope of this evaluation.
4.5       Acceptance Criteria Faults originating in or by means of the normal electrical interfaces,
                                              ]a,c cannot result in a voltage on the Incore input cables of
                    ]a,c or more. Similarly, maximum cable charge-up voltage at the IITA connector shall not exceed [           ]a,c in the event of IITA disconnection while at power. Under these conditions, there is no failure in the SPS, IITA, or 1 to 2 transition cabling, either during normal or harsh environmental conditions, that can negatively impact wither PAMS train.
4.6       Input
                                                                          ]a'c I
Word Version 6.1
 
Westinghouse Non-Proprietary Class 3 WESTINGHOUSE ELECTRIC COMPANY LLC Calculation Note Number                                                             Revision     Page WNA-CN-00157-WBT-NP                                                                       0           21 5.0       Evaluations, Analysis, Detailed Calculations and Results The Class 1E core exit thermocouples are most likely to be required during accident conditions: that is, during those events that could lead to a harsh containment environment (e.g. LOCA). The non-I E Incore Processing System Signal Processing System (SPS) cabinets used to mount the Incore system SPS are mounted in containment. As such, it may be expected that the SPS cabinets will experience a harsh environment well beyond the design capabilities of the system at the precise moment when the 1E thermocouples are most likely needed. It must be assumed that such an environment will lead to the failure of the Incore signal processing electronics.
The signal processing electronics are not post accident qualified; therefore it is not possible to perform a detailed circuit analysis of the SPS to assure that the maximum acceptable voltage on the IITA and its associated connectors is not exceeded. Note that there are numerous internal design features that limit the possibility of faulting during normal operation. These are not credited during harsh conditions.
However, the Incore SPS cabinets may be regarded as an envelope, and the sources of credible voltage transients evaluated individually, without the need for detailed analysis.
5.1       Faults under Normal Operating Conditions The normal operating environment for the SPS is [                                               ]a,c The Incore SPS cabinets have three external interfaces - AC input power, Ethernet communications to the Non 1E system, and Incore SPND input signals. For normal operating conditions, there are three faults that have the potential to provide faults to the SPND cables -
surges on the AC power, surges on the ETHERNET, and a power supply failure. These faults are analyzed herein.
5.1.1     AC Power Surges a,c Word Version 6.1
 
Westinghouse Non-Proprietary Class 3 WESTINGHOUSE ELECTRIC COMPANY LLC Calculation Note Number                                                                 Revision       Page WNA-CN-00157-WBT-NP                                                                           0               22
[
                                                                                                          ]"'c The
                  ]a.,c power supply and associated protection devices will either be 4kV surge tested to IEC 61000-4-5, (Reference 14) or credit will be taken for previous testing if such testing has been performed. Thus, 4kV input surges shall not result in unacceptable voltages on the I           Ia,c incore power distribution.
Surges must be assumed possible at any time during normal operation.
Surges must be assumed possible at any time during normal operation.
If, due to obsolescence or other concerns, other suppression devices are employed rather than those specified above, these devices will be evaluated to the same criteria described in this evaluation.
If, due to obsolescence or other concerns, other suppression devices are employed rather than those specified above, these devices will be evaluated to the same criteria described in this evaluation.
Based on the successful completion of the surge testing, the 4kV surge on the AC input shall not result in the output of the [ ]a'c power supply exceeding the maximum dielectric rating of the Incore cabling and connectors.
Based on the successful completion of the surge testing, the 4kV surge on the AC input shall not result in the output of the [           ]a'c power supply exceeding the maximum dielectric rating of the Incore cabling and connectors.
5.1.2 Surges on the Ethernet Surges on the [ ] ,c output communications cable are not a credible threat. The SPS communicates with remote equipment by means of redundant  
5.1.2     Surges on the Ethernet Surges on the [                     ] ,c output communications cable are not a credible threat. The SPS communicates with remote equipment by means of redundant [                               ]'a links.
[ ]'a links.These will be fiber optic. Therefore, there is no credible surge that can be injected into the SPS cabinet from this interface.
These will be fiber optic. Therefore, there is no credible surge that can be injected into the SPS cabinet from this interface.
5.1.3 [ ],,c Power Supply Failure]a,c However the concern with the [ a power supply is that it could fail in such a manner as to produce a voltage greater than the dielectric rating of the Incore cables and connectors.
5.1.3     [       ],,c Power Supply Failure
The most limiting internal source of unacceptable faulting was evaluated:  
                                                                                                      ]a,c   However the concern with the [             a power supply is that it could fail in such a manner as to produce a voltage greater than the dielectric rating of the Incore cables and connectors.
[].,c The power supply manufacturer  
The most limiting internal source of unacceptable faulting was evaluated: [
[ ,c was asked to provide an assessment of the maximum credible voltage that could be produced under such conditions (Reference 6). The manufacturer responded that the power supply includes independent over-voltage protection that limits output voltage [],c will significantly limit the possible fault. However, the maximum voltage at the Word Version 6.1 Westinghouse Non-Proprietary Class 3 WESTINGHOUSE ELECTRIC COMPANY LLC Calculation Note Number Revision Page WNA-CN-00157-WBT-NP 0 23 power supply input capacitors can be as high as the input RMS voltage X 1.414. Assuming a maximum input voltage of [ ]ac on the nominal [ ]a,c input, this can result in a maximum voltage of: I ]ac.This is less than the required dielectric rating of the Incore cabling and connectors.
                                                                                      ].,c     The power supply manufacturer [                 ,c was asked to provide an assessment of the maximum credible voltage that could be produced under such conditions (Reference 6). The manufacturer responded that the power supply includes independent over-voltage protection that limits output voltage [
5.2 Faults under LOCA Conditions The environmental conditions seen during a LOCA could exceed the values for which the equipment is qualified.
                      ],c will significantly limit the possible fault. However, the maximum voltage at the Word Version 6.1
Under these conditions, the electronics would be damaged beyond repair and any protection devices could not be credited for protection.
 
The most limiting internal source of unacceptable faulting was evaluated:
Westinghouse Non-Proprietary Class 3 WESTINGHOUSE ELECTRIC COMPANY LLC Calculation Note Number                                                               Revision       Page WNA-CN-00157-WBT-NP                                                                           0             23 power supply input capacitors can be as high as the input RMS voltage X 1.414. Assuming a maximum input voltage of [               ]ac on the nominal [             ]a,c input, this can result in a maximum voltage of:
this is faulting in the]a,c power supplies.  
I                                     ]ac.
[]ac The worst case fault voltage that could be generated is the peak voltage value at the power supply input capacitors, as evaluated in Section 5.1.2, above. [ ]axc This is considerably less than the required dielectric rating of the Incore cabling and connectors.
This is less than the required dielectric rating of the Incore cabling and connectors.
There is no physical mechanism by which the power supply can generate more voltage than the input voltage multiplied by the ratio of peak to average for a sinusoidal input voltage (Vrms X SQRT(2)).
5.2       Faults under LOCA Conditions The environmental conditions seen during a LOCA could exceed the values for which the equipment is qualified. Under these conditions, the electronics would be damaged beyond repair and any protection devices could not be credited for protection.
This fault is the same limiting condition that will exist should the AC power input leads become shorted directly to the incore input cables.It is assumed that this is the maximum credible voltage that can propagate to the Incore SPND MI cabling input. The [ ] a° output over voltage maximum in normal operation is not credited, since during a harsh environment, it is assumed that over voltage protection will not function.The only other possible sources of fault voltages in the Incore signal processing electronics are the many point-of-load low voltage DC power supply ICs mounted on the individual circuit cards. These are all small, low voltage [ ]a,c low wattage, solid state ICs, and their fault potential is restricted by design. Their failure in a mode capable of creating fault voltages of several hundred volts is not considered credible.The minimum rated and tested dielectric strength of the incore cables shall be [Since the maximum input fault voltage is limited to much less than this voltage, the current leakage across any of the connector pins will be negligible, and the fault voltage can not generate sufficient energy to degrade the CET signals as required for IEEE-384 compliance.
The most limiting internal source of unacceptable faulting was evaluated: this is faulting in the
With the minimum permissible cable leakage resistance of [ ]ac assumed to be located at a single point in the IITA, the maximum power that could be generated in the event of a [ ]ac power supply fault would be: Word Version 6.1 Westinghouse Non-Proprietary Class 3 WESTINGHOUSE ELECTRIC COMPANY LLC Calculation Note Number Revision Page WNA-CN-00157-WBT-NP 0 24[ Iac. I related damage to the incore cabling or IITA.rhis is negligible, and will not cause any energy-5.3 Incore Cable Charge-up issue This section addresses disconnection of the SPND detector signal cable while at power, and the resulting voltage build-up on the signal lead. The purpose is to demonstrate that the maximum voltage is always less than the [ ]a c dielectric rating of the IITA seal table connector.
                                          ]a,c power supplies. [
Note that this is only an issue while at power, since detector current is negligible when shut down.a,c The maximum detector current for which the SPS is designed is [ a,c. Actual current will be less [ ]a~c, and will be even lower for the progressively shorter SPNDs in each IITA. However, for conservatism it is assumed that all detectors are sourcing the design maximum current of [ I .It is also conservatively assumed that the cable is disconnected at the seal table, so that any parallel resistance paths to Common in downstream MI cabling or the SPS are excluded.These would further reduce the voltage build up, since V = I X R, where V is the voltage build up on the emitter wire, I is the detector current (assumed to be [ ]ac), and R is the maximum cable leakage resistance.
                                                              ]ac The worst case fault voltage that could be generated is the peak voltage value at the power supply input capacitors, as evaluated in Section 5.1.2, above. [                   ]axc This is considerably less than the required dielectric rating of the Incore cabling and connectors.
]a,c Using the IST maximum measured leakage resistance of [ ] the maximum cable voltage build up assuming head area cable disconnection with a [ ]ac input current would be:[]ac This is significantly below the [ xac rating of the reactor head area connectors and is negligible.
There is no physical mechanism by which the power supply can generate more voltage than the input voltage multiplied by the ratio of peak to average for a sinusoidal input voltage (Vrms X SQRT(2)). This fault is the same limiting condition that will exist should the AC power input leads become shorted directly to the incore input cables.
However, the IR 400 readings defined above are taken at a temperature of].c, which is significantly higher than the Watts Bar reactor operating temperature.
It is assumed that this is the maximum credible voltage that can propagate to the Incore SPND MI cabling input. The [               ]a° output over voltage maximum in normal operation is not credited, since during a harsh environment, it is assumed that over voltage protection will not function.
In addition, cable leakage resistance decreases as temperature increases in a non linear fashion. For these reasons, cable leakage resistance at the minimum expected temperature for criticality must be derived. For Watts Bar the minimum temperature for criticality is 551 degrees F.Word Version 6.1 Westinghouse Non-Proprietary Class 3 WESTINGHOUSE ELECTRIC COMPANY LLC Calculation Note Number Revision Page WNA-CN-00157-WBT-NP 0 25 Therefore it will be necessary to conservatively specify a maximum permissible cable leakage resistance at a temperature of 551 degrees F so as not to exceed the connector rating of]a,c when detector current is at its maximum of [ ]a,c This is calculated as: I.]a,c This must be verified by test or a combination of test and analysis.
The only other possible sources of fault voltages in the Incore signal processing electronics are the many point-of-load low voltage DC power supply ICs mounted on the individual circuit cards. These are all small, low voltage [                   ]a,c low wattage, solid state ICs, and their fault potential is restricted by design. Their failure in a mode capable of creating fault voltages of several hundred volts is not considered credible.
For example, it may be possible to use an empirical correlation to calculate the cable resistance at 551 degrees F based upon actual production testing at 752 degrees F (the temperature at which the IR400 readings are taken).. However this correlation must be sufficiently robust to provide a high confidence of successful extrapolation.
The minimum rated and tested dielectric strength of the incore cables shall be [
]apc This issue is listed as an open item in Section 4.2 5.4 Defense In Depth Disconnection of the IITA at power with Connector Failure This section addresses the hypothetical case in which, for whatever reason, the barrier between CET and SPND is breached during normal operation.
Since the maximum input fault voltage is limited to much less than this voltage, the current leakage across any of the connector pins will be negligible, and the fault voltage can not generate sufficient energy to degrade the CET signals as required for IEEE-384 compliance.
This could be due to excessively high IITA cable resistance when the IITA is disconnected, producing a voltage high enough to force a current through the connector pins to the CET.[I aC Word Version 6.1 Westinghouse Non-Proprietary Class 3 WESTINGHOUSE ELECTRIC COMPANY LLC Calculation Note Number Revision Page WNA-CN-00157-WBT-NP 0 26[a'c If the fault occurs at this point, it is possible to calculate the resulting voltage on the Thermocouple leads.]a,c This represents approximately a worst case [ ]axc error in temperature reading and will not cause any equipment damage. For most of the SPND detectors in the IITA, the current will be much lower, perhaps, on average, [ ]ac. This will produce a proportionally smaller error [ ]a,c. This error could be detected both as an anomalous reading in the PAMS channel and would be immediately flagged to the SPS by the loss of normal SPND signal, so it is a detectable error. Loss of one CET while at power would not affect the PAMS function, which only requires two CETs per core quadrant per train to be operable.
With the minimum permissible cable leakage resistance of [                           ]ac assumed to be located at a single point in the IITA, the maximum power that could be generated in the event of a [         ]ac power supply fault would be:
In addition, in a post accident environment, power (and SPND current), would be negligible, so the CET would be completely unaffected.
Word Version 6.1
ac Finally, if it is assumed that, for whatever reason, the grounded junction connection of the CET is disconnected, simultaneous with a shorting of the SPND current to the CET lead to the PAMS, then the [ ]a,c worst case fault current will be processed by the PAMS CET-reading analog input modules. These have an input impedance of approximately  
 
[ ] ,c. This impedance with a [ ]a,c input current would produce only [ ]a,c at the CET temperature measurement circuitry, which is within the acceptable range of inputs to the input module.Therefore, this portion of the evaluation demonstrates that even if the CET/SPND barrier at the Seal Table connector were to be breached for any reason, while the normally available SPND signal path to the SPS was open circuited while at power, the resulting temperature error during any post-trip situation would be negligible, and that even at power and assuming a direct short to the CET temperature processing circuitry, there will be no equipment damage.Word Version 6.1 Westinghouse Non-Proprietary Class 3 WESTINGHOUSE ELECTRIC COMPANY LLC Calculation Note Number Revision Page WNA-CN-00157-WBT-NP 0 27 Checklist A: Proprietary Class Statement Checklist Directions (this section is to be completed by authors):
Westinghouse Non-Proprietary Class 3 WESTINGHOUSE ELECTRIC COMPANY LLC Calculation Note Number                                                                 Revision           Page WNA-CN-00157-WBT-NP                                                                             0               24
Authors are to determine the appropriate proprietary classification of their document.
[                                           Iac. Irhis is negligible, and will not cause any energy-related damage to the incore cabling or IITA.
Start with the Westinghouse Proprietary Class 1 category and review for applicability, proceeding to Westinghouse Proprietary Class 2 -Non-Releasable and finally to Westinghouse Proprietary Class 2 -Releasable.
5.3       Incore Cable Charge-up issue This section addresses disconnection of the SPND detector signal cable while at power, and the resulting voltage build-up on the signal lead. The purpose is to demonstrate that the maximum voltage is always less than the [                 ]a c dielectric rating of the IITA seal table connector. Note that this is only an issue while at power, since detector current is negligible when shut down.
The proprietary classification is established when the first criterion is satisfied.
a,c The maximum detector current for which the SPS is designed is [                     a,c. Actual current will be less [                                                           ]a~c, and will be even lower for the progressively shorter SPNDs in each IITA. However, for conservatism it is assumed that all detectors are sourcing the design maximum current of [                               I .
Westinghouse Proprietary Class I FD If the document contains highly sensitive information such as commercial documents, pricing information, legal privilege, strategic documents, including business strategic and financial plans and certain documents of the utmost strategic importance, it is Proprietary Class 1. Check the box to the left and see Appendix B of Procedure 1.0 in WCAP-7211, Revision 5, for guidance on the use of Form 36 and the distribution of this document.
It is also conservatively assumed that the cable is disconnected at the seal table, so that any parallel resistance paths to Common in downstream MI cabling or the SPS are excluded.
This document can be found at http://worldwide.westincqhouse.com/pdf/e3 wcap-7211.pdf.
These would further reduce the voltage build up, since V = I X R, where V is the voltage build up on the emitter wire, I is the detector current (assumed to be [             ]ac), and R is the maximum cable leakage resistance.
Westinghouse Proprietary Class 2 -Non-Releasable Review the questions below for applicability to this calculation, checking the box to the left of each question that is applicable.
                                                                                                                      ]a,c Using the IST maximum measured leakage resistance of [                           ]     the maximum cable voltage build up assuming head area cable disconnection with a [                               ]ac input current would be:
If one or more boxes are checked, the calculation is considered a Westinghouse Proprietary Class 2 -Non-Releasable document.
[]ac This is significantly below the [             xac rating of the reactor head area connectors and is negligible.
See Appendix B of Procedure 1.0 in WCAP-721 1, Revision 5, for guidance on the use of Form 36 and the distribution of this document.LI Does the document contain one or more of the following:
However, the IR 400 readings defined above are taken at a temperature of
detailed manufacturing information or technology, computer source codes, design manuals, priced procurement documents or design reviews?[] Does the document contain sufficient detail of explanation of computer codes to allow their recreation?
                              ].c, which is significantly higher than the Watts Bar reactor operating temperature. In addition, cable leakage resistance decreases as temperature increases in a non linear fashion. For these reasons, cable leakage resistance at the minimum expected temperature for criticality must be derived. For Watts Bar the minimum temperature for criticality is 551 degrees F.
LI Does the document contain special methodology or calculation techniques developed by or for Westinghouse using a knowledge base that is not available in the open literature?
Word Version 6.1
0I Does the document contain any cost information or commercially or legally sensitive data?0 Does the document contain negotiating strategy or commercial position justification?
 
LI Does the document contain Westinghouse management business direction or commercial strategic directions?
Westinghouse Non-Proprietary Class 3 WESTINGHOUSE ELECTRIC COMPANY LLC Calculation Note Number                                                         Revision     Page WNA-CN-00157-WBT-NP                                                                     0         25 Therefore it will be necessary to conservatively specify a maximum permissible cable leakage resistance at a temperature of 551 degrees F so as not to exceed the connector rating of
LI Does the document contain third party proprietary information?
              ]a,c when detector current is at its maximum of [       ]a,c This is calculated as:
LI Does the document contain information that supports Westinghouse patented technologies, including specialized test data?LI Does the document contain patentable ideas for which patent protection may be desirable?
I.                                     ]a,c This must be verified by test or a combination of test and analysis. For example, it may be possible to use an empirical correlation to calculate the cable resistance at 551 degrees F based upon actual production testing at 752 degrees F (the temperature at which the IR400 readings are taken).. However this correlation must be sufficiently robust to provide a high confidence of successful extrapolation.
Westinghouse Proprietary Class 2 -Releasable
                                                      ]apc This issue is listed as an open item in Section 4.2 5.4       Defense In Depth Disconnection of the IITA at power with Connector Failure This section addresses the hypothetical case in which, for whatever reason, the barrier between CET and SPND is breached during normal operation. This could be due to excessively high IITA cable resistance when the IITA is disconnected, producing a voltage high enough to force a current through the connector pins to the CET.
[] If the calculation note is determined to be neither Westinghouse Proprietary Class 1 nor Westinghouse Proprietary Class 2 -Non-Releasable, it is considered Westinghouse Proprietary Class 2 -Releasable.
[
Check the box to the left and refer to Appendix B of Procedure 1.0 in WCAP-721 1, Revision 5, for guidance on use of Form 36 and the distribution of the document.Word Version 6.1 Westinghouse Non-Proprietary Class 3 WESTINGHOUSE ELECTRIC COMPANY LLC Calculation Note Number Revision Page WNA-CN-00157-WBT-NP 0 28 Checklist B: Calculation Note Methodology Checklist (Completed By Author)No. Self Review Topic Yes No N/A 1 Was the latest version of the calculation note template used? X 2 Is all information in the cover page header block provided appropriately?
I aC Word Version 6.1
X 3 Are all the pages sequentially numbered, and are the calculation note number, revision X number, and appropriate proprietary classification listed on each page? Are the page numbers in the Table of Contents provided and correct?4 Does this calculation note fulfill the customer requirements?
 
X 5 Is the Summary of Results and Conclusions provided in Section 2.0 consistent with the X purpose stated in Section 1.0 and calculations contained in Section 5.0?6 Is sufficient information provided for all References in Section 3.0 to facilitate their retrieval X (e.g., from EDMS, SAP, CAPs, NRC's ADAMS system, open literature, etc.), or has a copy been provided in Appendix A?7 Are Section 4.2 and the open items box on the calculation note cover sheet consistent?
Westinghouse Non-Proprietary Class 3 WESTINGHOUSE ELECTRIC COMPANY LLC Calculation Note Number                                                                 Revision         Page WNA-CN-00157-WBT-NP                                                                             0             26
X 8 Are all computer outputs documented in Table 6-2 and consistent with Table 6-1? X 9 Are all computer codes used under Configuration Control and released for use? X 10 Are the computer codes used applicable for modeling the physical and/or computational X problem contained in this calculation note?11 Have the latest and/or most appropriate versions of all computer codes been used? X 12 Have all open computer code errors identified in Software Error Reports been addressed?
[
X 13 Are the units of measure clearly identified?
a'c If the fault occurs at this point, it is possible to calculate the resulting voltage on the Thermocouple leads.
X 14 Are approved design control practices (e.g., Level 3 procedures, guidebooks, etc.) followed X without exception?
                                                                                ]a,c This represents approximately a worst case [                 ]axc error in temperature reading and will not cause any equipment damage. For most of the SPND detectors in the IITA, the current will be much lower, perhaps, on average, [                                   ]ac. This will produce a proportionally smaller error [                                                             ]a,c. This error could be detected both as an anomalous reading in the PAMS channel and would be immediately flagged to the SPS by the loss of normal SPND signal, so it is a detectable error. Loss of one CET while at power would not affect the PAMS function, which only requires two CETs per core quadrant per train to be operable. In addition, in a post accident environment, power (and SPND current), would be negligible, so the CET would be completely unaffected.
If Level 3 procedures are used, please list those used, either in the body of the calculation note or here: 15 Are all hand-annotated changes to the calculation note initialed and dated by author and X verifier?
ac Finally, if it is assumed that, for whatever reason, the grounded junction connection of the CET is disconnected, simultaneous with a shorting of the SPND current to the CET lead to the PAMS, then the [       ]a,c worst case fault current will be processed by the PAMS CET-reading analog input modules. These have an input impedance of approximately [                             ] ,c. This impedance with a [         ]a,c input current would produce only [             ]a,c at the CET temperature measurement circuitry, which is within the acceptable range of inputs to the input module.
Has a single line been drawn through any changes with the original information remaining legible?16 Was a Pre-Job Brief held prior to beginning the analysis?
Therefore, this portion of the evaluation demonstrates that even if the CET/SPND barrier at the Seal Table connector were to be breached for any reason, while the normally available SPND signal path to the SPS was open circuited while at power, the resulting temperature error during any post-trip situation would be negligible, and that even at power and assuming a direct short to the CET temperature processing circuitry, there will be no equipment damage.
X 17 Was a Self Check performed prior to submitting the analysis for Peer Checks and/or final X verification?
Word Version 6.1
18 Was a Peer Check performed to review inputs documented in Section 4.6 prior to performing X analyses?19 Was a Peer Check performed to review results before documenting them in Section 5.0? X 20 If required, have computer files been transferred to archive storage? Provide page number for X list of files if not included in Table 6-2. Page 21 If applicable, have the results of any previous assessments on the analysis of record been X incorporated in this calculation note?22 If this calculation note requires a change to a safety analysis database (e.g., SAIK), has the X change been submitted such that the database will be updated?23 If this calculation note used FEA methods, were the guidelines discussed in WCAP-16904-P X used?If 'NO' to any of the above, provide page number of justification or provide additional explanation here or on subsequent pages.Word Version 6.1 Westinghouse Non-Proprietary Class 3 WESTINGHOUSE ELECTRIC COMPANY LLC Calculation Note Number Revision Page WNA-CN-00157-WBT-NP 0 29 Checklist C: Verification Method Checklist (Completed By Verifier(s))
 
Initial If Verification Method (One or more must be completed by each verifier)
Westinghouse Non-Proprietary Class 3 WESTINGHOUSE ELECTRIC COMPANY LLC Calculation Note Number                                                             Revision         Page WNA-CN-00157-WBT-NP                                                                         0             27 Checklist A: Proprietary Class Statement Checklist Directions (this section is to be completed by authors): Authors are to determine the appropriate proprietary classification of their document. Start with the Westinghouse Proprietary Class 1 category and review for applicability, proceeding to Westinghouse Proprietary Class 2 - Non-Releasable and finally to Westinghouse Proprietary Class 2 - Releasable. The proprietary classification is established when the first criterion is satisfied.
Performed 1 Independent review of document. (Briefly explain method of review below or attach.) ACD 2 Verification performed by alternative calculations as indicated below.1)a. Comparison to a sufficient number of simplified calculations which give persuasive support to the original analysis.b. Comparison to an analysis by an alternate verified method.c. Comparison to a similar verified design or calculation.
Westinghouse Proprietary Class I FD         Ifthe document contains highly sensitive information such as commercial documents, pricing information, legal privilege, strategic documents, including business strategic and financial plans and certain documents of the utmost strategic importance, it is Proprietary Class 1. Check the box to the left and see Appendix B of Procedure 1.0 in WCAP-7211, Revision 5, for guidance on the use of Form 36 and the distribution of this document. This document can be found at http://worldwide.westincqhouse.com/pdf/e3 wcap-7211.pdf.
: d. Comparison to test results.e. Comparison to measured and documented plant data for a comparable design.f. Comparison to published data and correlations confirmed by experience in the industry.3 Completed Group-Specific Verification Checklist. (Optional, attach if used.)4 Other (Describe)
Westinghouse Proprietary Class 2 - Non-Releasable Review the questions below for applicability to this calculation, checking the box to the left of each question that is applicable. If one or more boxes are checked, the calculation is considered a Westinghouse Proprietary Class 2 - Non-Releasable document. See Appendix B of Procedure 1.0 in WCAP-721 1, Revision 5, for guidance on the use of Form 36 and the distribution of this document.
LI         Does the document contain one or more of the following: detailed manufacturing information or technology, computer source codes, design manuals, priced procurement documents or design reviews?
[]         Does the document contain sufficient detail of explanation of computer codes to allow their recreation?
LI         Does the document contain special methodology or calculation techniques developed by or for Westinghouse using a knowledge base that is not available in the open literature?
0I         Does the document contain any cost information or commercially or legally sensitive data?
0         Does the document contain negotiating strategy or commercial position justification?
LI         Does the document contain Westinghouse management business direction or commercial strategic directions?
LI         Does the document contain third party proprietary information?
LI         Does the document contain information that supports Westinghouse patented technologies, including specialized test data?
LI         Does the document contain patentable ideas for which patent protection may be desirable?
Westinghouse Proprietary Class 2 - Releasable
[]         If the calculation note is determined to be neither Westinghouse Proprietary Class 1 nor Westinghouse Proprietary Class 2 - Non-Releasable, it is considered Westinghouse Proprietary Class 2 - Releasable.
Check the box to the left and refer to Appendix B of Procedure 1.0 in WCAP-721 1, Revision 5, for guidance on use of Form 36 and the distribution of the document.
Word Version 6.1
 
Westinghouse Non-Proprietary Class 3 WESTINGHOUSE ELECTRIC COMPANY LLC Calculation Note Number                                                                                 Revision           Page WNA-CN-00157-WBT-NP                                                                                             0               28 Checklist B: Calculation Note Methodology Checklist (Completed By Author)
No.                                               Self Review Topic                                                   Yes     No     N/A 1     Was the latest version of the calculation note template used?                                                   X 2     Is all information in the cover page header block provided appropriately?                                       X 3     Are all the pages sequentially numbered, and are the calculation note number, revision                         X number, and appropriate proprietary classification listed on each page? Are the page numbers in the Table of Contents provided and correct?
4     Does this calculation note fulfill the customer requirements?                                                   X 5     Is the Summary of Results and Conclusions provided in Section 2.0 consistent with the                           X purpose stated in Section 1.0 and calculations contained in Section 5.0?
6     Is sufficient information provided for all References in Section 3.0 to facilitate their retrieval             X (e.g., from EDMS, SAP, CAPs, NRC's ADAMS system, open literature, etc.), or has a copy been provided in Appendix A?
7     Are Section 4.2 and the open items box on the calculation note cover sheet consistent?                           X 8     Are all computer outputs documented in Table 6-2 and consistent with Table 6-1?                                                   X 9     Are all computer codes used under Configuration Control and released for use?                                                     X 10     Are the computer codes used applicable for modeling the physical and/or computational                                             X problem contained in this calculation note?
11     Have the latest and/or most appropriate versions of all computer codes been used?                                                 X 12     Have all open computer code errors identified in Software Error Reports been addressed?                                           X 13     Are the units of measure clearly identified?                                                                   X 14     Are approved design control practices (e.g., Level 3 procedures, guidebooks, etc.) followed                     X without exception? If Level 3 procedures are used, please list those used, either in the body of the calculation note or here:
15     Are all hand-annotated changes to the calculation note initialed and dated by author and                                         X verifier? Has a single line been drawn through any changes with the original information remaining legible?
16     Was a Pre-Job Brief held prior to beginning the analysis?                                                       X 17     Was a Self Check performed prior to submitting the analysis for Peer Checks and/or final                       X verification?
18     Was a Peer Check performed to review inputs documented in Section 4.6 prior to performing                       X analyses?
19     Was a Peer Check performed to review results before documenting them in Section 5.0?                           X 20     If required, have computer files been transferred to archive storage? Provide page number for                                   X list of files if not included in Table 6-2. Page 21     If applicable, have the results of any previous assessments on the analysis of record been                                       X incorporated in this calculation note?
22     If this calculation note requires a change to a safety analysis database (e.g., SAIK), has the                                   X change been submitted such that the database will be updated?
23     If this calculation note used FEA methods, were the guidelines discussed in WCAP-16904-P                                         X used?
If'NO' to any of the above, provide page number of justification or provide additional explanation here or on subsequent pages.
Word Version 6.1
 
Westinghouse Non-Proprietary Class 3 WESTINGHOUSE ELECTRIC COMPANY LLC Calculation Note Number                                                           Revision       Page WNA-CN-00157-WBT-NP                                                                       0             29 Checklist C: Verification Method Checklist (Completed By Verifier(s))
Initial If Verification Method (One or more must be completed by each verifier)                               Performed 1     Independent review of document. (Briefly explain method of review below or attach.)             ACD 1
2     Verification performed by alternative calculations as indicated below. )
: a. Comparison to a sufficient number of simplified calculations which give persuasive support to the original analysis.
: b. Comparison to an analysis by an alternate verified method.
: c. Comparison to a similar verified design or calculation.
: d. Comparison to test results.
: e. Comparison to measured and documented plant data for a comparable design.
: f. Comparison to published data and correlations confirmed by experience in the industry.
3     Completed Group-Specific Verification Checklist. (Optional, attach ifused.)
4     Other (Describe)
(1) For independent verification accomplished by comparisons with results of one or more alternate calculations or processes, the comparison should be referenced, shown below, or attached to the checklist.
(1) For independent verification accomplished by comparisons with results of one or more alternate calculations or processes, the comparison should be referenced, shown below, or attached to the checklist.
Verification:
Verification: The verifier's signature (or Electronic Approval) on the cover sheet indicates that all comments or necessary corrections identified during the review of this document have been incorporated as required and that this document has been verified using the method(s) described above. For multiple verifiers, appropriate methods are indicated by initials. If necessary, technical comments and responses (if required) have been made on the "Additional Verifier's Comments" page.
The verifier's signature (or Electronic Approval) on the cover sheet indicates that all comments or necessary corrections identified during the review of this document have been incorporated as required and that this document has been verified using the method(s) described above. For multiple verifiers, appropriate methods are indicated by initials.
Additional Details of Verifier's Review Reviewed design input. Reviewed IEEE-384, and IEEE-603 to determine if approach was acceptable.
If necessary, technical comments and responses (if required) have been made on the "Additional Verifier's Comments" page.Additional Details of Verifier's Review Reviewed design input. Reviewed IEEE-384, and IEEE-603 to determine if approach was acceptable.
Reviewed calculations for accuracy and checked with cable and probe designers to verify accurate information is presented herein. Reviewed the content of the analysis and its conclusions and agreed with results.
Reviewed calculations for accuracy and checked with cable and probe designers to verify accurate information is presented herein. Reviewed the content of the analysis and its conclusions and agreed with results.Word Version 6.1 Westinghouse Non-Proprietary Class 3 WESTINGHOUSE ELECTRIC COMPANY LLC Calculation Note Number Revision Page WNA-CN-00157-WBT-NP 0 30 Checklist D: 3-Pass Verification Methodology Checklist (Completed by Verifier(s))
Word Version 6.1
No. 3-Pass Verification Review Topic Yes No N/A First Pass I Were the general theme, scope of document, and scope of review clear? X Second Pass 2 Do the references appear to be documented correctly?
 
Is there enough information X present to ensure the referenced document is retrievable?
Westinghouse Non-Proprietary Class 3 WESTINGHOUSE ELECTRIC COMPANY LLC Calculation Note Number                                                                                 Revision         Page WNA-CN-00157-WBT-NP                                                                                             0               30 Checklist D: 3-Pass Verification Methodology Checklist (Completed by Verifier(s))
3 Do the acceptance criteria seem appropriate?
No.                                 3-Pass Verification Review Topic                                             Yes     No       N/A First Pass I Were the general theme, scope of document, and scope of review clear?                                     X Second Pass 2     Do the references appear to be documented correctly? Is there enough information                         X present to ensure the referenced document is retrievable?
X 4 Does the technical content of the calculation note make sense from a qualitative X standpoint and are appropriate methods used?Third Pass 5 Do the results and conclusions meet the acceptance criteria?
3     Do the acceptance criteria seem appropriate?                                                             X 4     Does the technical content of the calculation note make sense from a qualitative                         X standpoint and are appropriate methods used?
Do the results and X conclusions make sense and support the purpose of the calculation note?6 Has the technical content of the document been verified in adequate detail? Examples X of technical content include inputs, models, techniques, output, hand calculations, results, tables, plots, units of measure, etc.7 Does the calculation note provide sufficient detail in a concise manner? Note that X sufficient detail is enough information such that a qualified person could understand the analysis and replicate the results without consultation with the author.8 Is the calculation note acceptable with respect to spelling, punctuation, and grammar? X 9 Are the references accurate?
Third Pass 5     Do the results and conclusions meet the acceptance criteria? Do the results and                         X conclusions make sense and support the purpose of the calculation note?
Do the references to other documents point to the latest X revision?
6     Has the technical content of the document been verified in adequate detail? Examples                     X of technical content include inputs, models, techniques, output, hand calculations, results, tables, plots, units of measure, etc.
If not, are the reasons documented?
7     Does the calculation note provide sufficient detail in a concise manner? Note that                       X sufficient detail is enough information such that a qualified person could understand the analysis and replicate the results without consultation with the author.
Are the references retrievable?
8     Is the calculation note acceptable with respect to spelling, punctuation, and grammar?                   X 9     Are the references accurate? Do the references to other documents point to the latest                   X revision? Ifnot, are the reasons documented? Are the references retrievable?
10 Are computer code names spelled correctly?
10     Are computer code names spelled correctly? If applicable, are numerals included in                                         X the official code name as appropriate?
If applicable, are numerals included in X the official code name as appropriate?
11     Has the calculation note been read word-for-word, cover-to-cover?                                       X If 'NO' to any of the above, provide page number of justification or provide additional explanation here or on subsequent pages.
11 Has the calculation note been read word-for-word, cover-to-cover?
Word Version 6.1
X If 'NO' to any of the above, provide page number of justification or provide additional explanation here or on subsequent pages.Word Version 6.1 Westinghouse Non-Proprietary Class 3 WESTINGHOUSE ELECTRIC COMPANY LLC Calculation Note Number Revision Page WNA-CN-00157-WBT-NP 0 31 Additional Verifier's Comments The signatures of the Author(s) and Verifier(s) on the cover page (or Electronic Approval) indicate acceptance of the comments and responses.
 
No. Verifier's Comments Author's Response (If Required)+-4 .1.-4 4-4 4 4-4 4-~ 4-4 4-4 *1*-4 .1.-4 4-4 4-4 4-4 +-4 4 Word Version 6.1 Westinghouse Non-Proprietary Class 3 WESTINGHOUSE ELECTRIC COMPANY LLC Calculation Note Number Revision Page WNA-CN-00157-WBT-NP 0 32 Appendix A: Supporting Documentation A.1 [ ]a~c Power Supply Fault Voltage Assessment Letter (Reference 6)(The following page contains this letter.)Word Version 6.1 Westinghouse Non-Proprietary Class 3 WESTINGHOUSE ELECTRIC COMPANY LLC Calculation Note Number Revision Page WNA-CN-00157-WBT-NP 0 33 A.2 Iaa[Ia,c Word Version 6.1 Westinghouse Non-Proprietary Class 3 WESTINGHOUSE ELECTRIC COMPANY LLC Calculation Note Number Revision Page WNA-CN-00157-WBT-NP 0 34 A.3 [I a,[I a,c Word Version 6.1 Westinghouse Non-Proprietary Class 3 WESTINGHOUSE ELECTRIC COMPANY LLC Calculation Note Number WNA-CN-00157-WBT-NP A.4 Vendor Letter on [(The following page contains this letter)Revision Page 0 35]a~c (Reference 13)I Word Version 6.1 Attachment 4 Westinghouse Electric Company CAW-1 1-3215, Application for Withholding Proprietary Information from Public Disclosure, WNA-CN-00157-WBT-P, Revision 0,"Watts Bar 2 Incore Instrument System (IIS) Signal Processing System (SPS) Isolation Requirements," (Proprietary)
Westinghouse Non-Proprietary Class 3 WESTINGHOUSE ELECTRIC COMPANY LLC Calculation Note Number                                                         Revision         Page WNA-CN-00157-WBT-NP                                                                     0             31 Additional Verifier's Comments The signatures of the Author(s) and Verifier(s) on the cover page (or Electronic Approval) indicate acceptance of the comments and responses.
* Westinghouse Westinghouse Electric Company Nuclear Services 1000 Westinghouse Drive Cranberry Township, Pennsylvania 16066 USA U.S. Nuclear Regulatory Commission Document Control Desk 11555 Rockville Pike Rockville, MD 20852 Direct tel: Direct fax: e-mail: Proj letter: (412) 374-4643 (724) 720-0754 greshaja@westinghouse.com WBT-D-3328 CAW-1 1-3215 August 2, 2011 APPLICATION FOR WITHHOLDING PROPRIETARY INFORMATION FROM PUBLIC DISCLOSURE
No.                   Verifier's Comments                         Author's Response (If Required)
                                                          +
-4                                                         .1.
                  -4                                       4
-4                                                         4 4
-4                                                         4
-~                                                         4
-4                                                         4
-4                                                         *1*
-4                                                         .1.
-4                                                         4
-4                                                         4
-4                                                         4
-4                                                         +
-4                                                         4 Word Version 6.1
 
Westinghouse Non-Proprietary Class 3 WESTINGHOUSE ELECTRIC COMPANY LLC Calculation Note Number                                                   Revision Page WNA-CN-00157-WBT-NP                                                               0     32 Appendix A: Supporting Documentation A.1       [       ]a~c Power Supply Fault Voltage Assessment Letter (Reference 6)
(The following page contains this letter.)
Word Version 6.1
 
Westinghouse Non-Proprietary Class 3 WESTINGHOUSE ELECTRIC COMPANY LLC Calculation Note Number                                             Revision Page WNA-CN-00157-WBT-NP                                                       0     33 A.2                                                       Iaa
[
Ia,c Word Version 6.1
 
Westinghouse Non-Proprietary Class 3 WESTINGHOUSE ELECTRIC COMPANY LLC Calculation Note Number                                             Revision Page WNA-CN-00157-WBT-NP                                                       0     34 A.3       [                                               Ia,
[
Ia,c Word Version 6.1
 
Westinghouse Non-Proprietary Class 3 WESTINGHOUSE ELECTRIC COMPANY LLC Calculation Note Number                                                 Revision      Page WNA-CN-00157-WBT-NP                                                             0            35          I A.4       Vendor Letter on [                                             ]a~c (Reference 13)
(The following page contains this letter)
Word Version 6.1
 
Attachment 4 Westinghouse Electric Company CAW-1 1-3215, Application for Withholding Proprietary Information from Public Disclosure, WNA-CN-00157-WBT-P, Revision 0, "Watts Bar 2 Incore Instrument System (IIS) Signal Processing System (SPS) Isolation Requirements," (Proprietary)
* Westinghouse                                                             Westinghouse Electric Company Nuclear Services 1000 Westinghouse Drive Cranberry Township, Pennsylvania 16066 USA U.S. Nuclear Regulatory Commission                                 Direct tel: (412) 374-4643 Document Control Desk                                              Direct fax:  (724) 720-0754 11555 Rockville Pike                                                  e-mail:  greshaja@westinghouse.com Rockville, MD 20852                                                Proj letter: WBT-D-3328 CAW-1 1-3215 August 2, 2011 APPLICATION FOR WITHHOLDING PROPRIETARY INFORMATION FROM PUBLIC DISCLOSURE


==Subject:==
==Subject:==
Line 213: Line 349:
The proprietary information for which withholding is being requested in the above-referenced report is further identified in Affidavit CAW-1 1-3215 signed by the owner of the proprietary information, Westinghouse Electric Company LLC. The affidavit, which accompanies this letter, sets forth the basis on which the information may be withheld from public disclosure by the Commission and addresses with specificity the considerations listed in paragraph (b)(4) of 10 CFR Section 2.390 of the Commission's regulations.
The proprietary information for which withholding is being requested in the above-referenced report is further identified in Affidavit CAW-1 1-3215 signed by the owner of the proprietary information, Westinghouse Electric Company LLC. The affidavit, which accompanies this letter, sets forth the basis on which the information may be withheld from public disclosure by the Commission and addresses with specificity the considerations listed in paragraph (b)(4) of 10 CFR Section 2.390 of the Commission's regulations.
Accordingly, this letter authorizes the utilization of the accompanying affidavit by Tennessee Valley Authority.
Accordingly, this letter authorizes the utilization of the accompanying affidavit by Tennessee Valley Authority.
Correspondence with respect to the proprietary aspects of the application for withholding or the Westinghouse affidavit should reference this letter, CAW-1 1-3215, and should be addressed to J. A. Gresham, Manager, Regulatory Compliance, Westinghouse Electric Company LLC, Suite 428, 1000 Westinghouse Drive, Cranberry Township, Pennsylvania 16066.Very truly yours, J. A. Gresham, Manager Regulatory Compliance Enclosures CAW-1 1-3215 AFFIDAVIT COMMONWEALTH OF PENNSYLVANIA:
Correspondence with respect to the proprietary aspects of the application for withholding or the Westinghouse affidavit should reference this letter, CAW-1 1-3215, and should be addressed to J. A. Gresham, Manager, Regulatory Compliance, Westinghouse Electric Company LLC, Suite 428, 1000 Westinghouse Drive, Cranberry Township, Pennsylvania 16066.
ss COUNTY OF BUTLER: Before me, the undersigned authority, personally appeared B. F. Maurer, who, being by me duly sworn according to law, deposes and says that he is authorized to execute this Affidavit on behalf of Westinghouse Electric Company LLC (Westinghouse), and that the averments of fact set forth in this Affidavit are true and correct to the best of his knowledge, information, and belief: B. F. Maurer, Manager ABWR Licensing Sworn to and subscribed before me this 2nd day of August 2011 Notary Public COMMONWEALTH OF PENNSYLVANIA Notarial Seal Cynthia Olesky, Notary Public Manor Boro, Westmoreland County My Commission Expires July 16, 2014 Member. Pennsvlvania Association of Notaries 2 CAW-1 1-3215 (1) I am Manager, ABWR Licensing, in Nuclear Services, Westinghouse Electric Company LLC (Westinghouse), and as such, I have been specifically delegated the function of reviewing the proprietary information sought to be withheld from public disclosure in connection with nuclear power plant licensing and rule making proceedings, and am authorized to apply for its withholding on behalf of Westinghouse.
Very truly yours, J. A. Gresham, Manager Regulatory Compliance Enclosures
(2) I am making this Affidavit in conformance with the provisions of 10 CFR Section 2.390 of the Commission's regulations and in conjunction with the Westinghouse Application for Withholding Proprietary Information from Public Disclosure accompanying this Affidavit.
 
(3) I have personal knowledge of the criteria and procedures utilized by Westinghouse in designating information as a trade secret, privileged or as confidential commercial or financial information.
CAW-1 1-3215 AFFIDAVIT COMMONWEALTH OF PENNSYLVANIA:
(4) Pursuant to the provisions of paragraph (b)(4) of Section 2.390 of the Commission's regulations, the following is furnished for consideration by the Commission in determining whether the information sought to be withheld from public disclosure should be withheld.(i) The information sought to be withheld from public disclosure is owned and has been held in confidence by Westinghouse.(ii) The information is of a type customarily held in confidence by Westinghouse and not customarily disclosed to the public. Westinghouse has a rational basis for determining the types of information customarily held in confidence by it and, in that connection, utilizes a system to determine when and whether to hold certain types of information in confidence.
ss COUNTY OF BUTLER:
The application of that system and the substance of that system constitutes Westinghouse policy and provides the rational basis required.Under that system, information is held in confidence if it falls in one or more of several types, the release of which might result in the loss of an existing or potential competitive advantage, as follows: (a) The information reveals the distinguishing aspects of a process (or component, structure, tool, method, etc.) where prevention of its use by any of 3 CAW-11-3215 Westinghouse's competitors without license from Westinghouse constitutes a competitive economic advantage over other companies.(b) It consists of supporting data, including test data, relative to a process (or component, structure, tool, method, etc.), the application of which data secures a competitive economic advantage, e.g., by optimization or improved marketability.(c) Its use by a competitor would reduce his expenditure of resources or improve his competitive position in the design, manufacture, shipment, installation, assurance of quality, or licensing a similar product.(d) It reveals cost or price information, production capacities, budget levels, or commercial strategies of Westinghouse, its customers or suppliers.(e) It reveals aspects of past, present, or future Westinghouse or customer funded development plans and programs of potential commercial value to Westinghouse.(f) It contains patentable ideas, for which patent protection maybe desirable.
Before me, the undersigned authority, personally appeared B. F. Maurer, who, being by me duly sworn according to law, deposes and says that he is authorized to execute this Affidavit on behalf of Westinghouse Electric Company LLC (Westinghouse), and that the averments of fact set forth in this Affidavit are true and correct to the best of his knowledge, information, and belief:
There are sound policy reasons behind the Westinghouse system which include the following: (a) The use of such information by Westinghouse gives Westinghouse a competitive advantage over its competitors.
B. F. Maurer, Manager ABWR Licensing Sworn to and subscribed before me this 2nd day of August 2011 Notary Public COMMONWEALTH OF PENNSYLVANIA Notarial Seal Cynthia Olesky, Notary Public Manor Boro, Westmoreland County My Commission Expires July 16, 2014 Member. Pennsvlvania Association of Notaries
It is, therefore, withheld from disclosure to protect the Westinghouse competitive position.(b) It is information that is marketable in many ways. The extent to which such information is available to competitors diminishes the Westinghouse ability to sell products and services involving the use of the information.(c) Use by our competitor would put Westinghouse at a competitive disadvantage by reducing his expenditure of resources at our expense.
 
4 CAW- 11-3215 (d) Each component of proprietary information pertinent to a particular competitive advantage is potentially as valuable as the total competitive advantage.
2                                     CAW-1 1-3215 (1) I am Manager, ABWR Licensing, in Nuclear Services, Westinghouse Electric Company LLC (Westinghouse), and as such, I have been specifically delegated the function of reviewing the proprietary information sought to be withheld from public disclosure in connection with nuclear power plant licensing and rule making proceedings, and am authorized to apply for its withholding on behalf of Westinghouse.
If competitors acquire components of proprietary information, any one component may be the key to the entire puzzle, thereby depriving Westinghouse of a competitive advantage.(e) Unrestricted disclosure would jeopardize the position of prominence of Westinghouse in the world market, and thereby give a market advantage to the competition of those countries.(f) The Westinghouse capacity to invest corporate assets in research and development depends upon the success in obtaining and maintaining a competitive advantage.(iii) The information is being transmitted to the Commission in confidence and, under the provisions of 10 CFR Section 2.3 90; it is to be received in confidence by the Commission.(iv) The information sought to be protected is not available in public sources or available information has not been previously employed in the same original manner or method to the best of our knowledge and belief.(v) The proprietary information sought to be withheld in this submittal is that which is appropriately marked in WNA-CN-00 157-WBT-P, Revision 0, "Watts Bar 2 Incore Instrument System (IIS) Signal Processing System (SPS) Isolation Requirements" (Proprietary) for submittal to the Commission, being transmitted by Tennessee Valley Authority letter and Application for Withholding Proprietary Information from Public Disclosure, to the Document Control Desk. The proprietary information as submitted by Westinghouse is that associated with the Incore Instrument System (IIS) and may be used only for that purpose.
(2) I am making this Affidavit in conformance with the provisions of 10 CFR Section 2.390 of the Commission's regulations and in conjunction with the Westinghouse Application for Withholding Proprietary Information from Public Disclosure accompanying this Affidavit.
5 CAW-1 1-3215 This information is part of that which will enable Westinghouse to: (a) Assist the customer in providing technical licensing information to the NRC that is required for approval of the Watts Bar Nuclear Unit 2 IIS System.Further this information has substantial commercial value as follows: (a) Westinghouse plans to sell the use of similar information to its customers for the purpose of licensing in-core instrumentation systems.(b) Its use by a competitor would improve his competitive position in the development and licensing of a similar product.(c) The information requested to be withheld reveals the distinguishing aspects of a design developed by Westinghouse.
(3) I have personal knowledge of the criteria and procedures utilized by Westinghouse in designating information as a trade secret, privileged or as confidential commercial or financial information.
Public disclosure of this proprietary information is likely to cause substantial harm to the competitive position of Westinghouse because it would enhance the ability of competitors to provide similar calculations, analysis and licensing defense services for commercial power reactors without commensurate expenses.
(4) Pursuant to the provisions of paragraph (b)(4) of Section 2.390 of the Commission's regulations, the following is furnished for consideration by the Commission in determining whether the information sought to be withheld from public disclosure should be withheld.
Also, public disclosure of the information would enable others to use the information to meet NRC requirements for licensing documentation without purchasing the right to use the information.
(i)       The information sought to be withheld from public disclosure is owned and has been held in confidence by Westinghouse.
The development of the technology described in part by the information is the result of applying the results of many years of experience in an intensive Westinghouse effort and the expenditure of a considerable sum of money.In order for competitors of Westinghouse to duplicate this information, similar technical programs would have to be performed and a significant manpower effort, having the requisite talent and experience, would have to be expended.Further the deponent sayeth not.
(ii)     The information is of a type customarily held in confidence by Westinghouse and not customarily disclosed to the public. Westinghouse has a rational basis for determining the types of information customarily held in confidence by it and, in that connection, utilizes a system to determine when and whether to hold certain types of information in confidence. The application of that system and the substance of that system constitutes Westinghouse policy and provides the rational basis required.
PROPRIETARY INFORMATION NOTICE Transmitted herewith are proprietary and/or non-proprietary versions of documents furnished to the NRC in connection with requests for generic and/or plant-specific review and approval.In order to conform to the requirements of 10 CFR 2.390 of the Commission's regulations concerning the protection of proprietary information so submitted to the NRC, the information which is proprietary in the proprietary versions is contained within brackets, and where the proprietary information has been deleted in the non-proprietary versions, only the brackets remain (the information that was contained within the brackets in the proprietary versions having been deleted).
Under that system, information is held in confidence if it falls in one or more of several types, the release of which might result in the loss of an existing or potential competitive advantage, as follows:
The justification for claiming the information so designated as proprietary is indicated in both versions by means of lower case letters (a) through (f)located as a superscript immediately following the brackets enclosing each item of information being identified as proprietary or in the margin opposite such information.
(a)     The information reveals the distinguishing aspects of a process (or component, structure, tool, method, etc.) where prevention of its use by any of
These lower case letters refer to the types of information Westinghouse customarily holds in confidence identified in Sections (4)(ii)(a) through (4)(ii)(f) of the affidavit accompanying this transmittal pursuant to 10 CFR 2.390(b)(1).
 
COPYRIGHT NOTICE The reports transmitted herewith each bear a Westinghouse copyright notice. The NRC is permitted to make the number of copies of the information contained in these reports which are necessary for its internal use in connection with generic and plant-specific reviews and approvals as well as the issuance, denial, amendment, transfer, renewal, modification, suspension, revocation, or violation of a license, permit, order, or regulation subject to the requirements of 10 CFR 2.390 regarding restrictions on public disclosure to the extent such information has been identified as proprietary by Westinghouse, copyright protection notwithstanding.
3                                       CAW-11-3215 Westinghouse's competitors without license from Westinghouse constitutes a competitive economic advantage over other companies.
With respect to the non-proprietary versions of these reports, the NRC is permitted to make the number of copies beyond those necessary for its internal use which are necessary in order to have one copy available for public viewing in the appropriate docket files in the public document room in Washington, DC and in local public document rooms as may be required by NRC regulations if the number of copies submitted is insufficient for this purpose. Copies made by the NRC must include the copyright notice in all instances and the proprietary notice if the original was identified as proprietary.
(b)     It consists of supporting data, including test data, relative to a process (or component, structure, tool, method, etc.), the application of which data secures a competitive economic advantage, e.g., by optimization or improved marketability.
Tennessee Valley Authority Letter for Transmittal to the NRC The following paragraphs should be included in your letter to the NRC: Enclosed are: 1. _ copies of WNA-CN-00 1 57-WBT-P, Revision 0, "Watts Bar 2 Incore Instrument System (IIS)Signal Processing System (SPS) Isolation Requirements" (Proprietary)
(c)     Its use by a competitor would reduce his expenditure of resources or improve his competitive position in the design, manufacture, shipment, installation, assurance of quality, or licensing a similar product.
: 2. -copies of WNA-CN-00157-WBT-NP, Revision 0, "Watts Bar 2 Incore Instrument System (IIS)Signal Processing System (SPS) Isolation Requirements" (Non-Proprietary)
(d)     It reveals cost or price information, production capacities, budget levels, or commercial strategies of Westinghouse, its customers or suppliers.
Also enclosed is the Westinghouse Application for Withholding Proprietary Information from Public Disclosure CAW-1 1-3215, accompanying Affidavit, Proprietary Information Notice, and Copyright Notice.As Item 1 contains information proprietary to Westinghouse Electric Company LLC, it is supported by an affidavit signed by Westinghouse, the owner of the information.
(e)     It reveals aspects of past, present, or future Westinghouse or customer funded development plans and programs of potential commercial value to Westinghouse.
The affidavit sets forth the basis on which the information may be withheld from public disclosure by the Commission and addresses with specificity the considerations listed in paragraph (b)(4) of Section 2.390 of the Commission's regulations.
(f)     It contains patentable ideas, for which patent protection maybe desirable.
There are sound policy reasons behind the Westinghouse system which include the following:
(a)       The use of such information by Westinghouse gives Westinghouse a competitive advantage over its competitors. It is, therefore, withheld from disclosure to protect the Westinghouse competitive position.
(b)     It is information that is marketable in many ways. The extent to which such information is available to competitors diminishes the Westinghouse ability to sell products and services involving the use of the information.
(c)     Use by our competitor would put Westinghouse at a competitive disadvantage by reducing his expenditure of resources at our expense.
 
4                                     CAW- 11-3215 (d)     Each component of proprietary information pertinent to a particular competitive advantage is potentially as valuable as the total competitive advantage. If competitors acquire components of proprietary information, any one component may be the key to the entire puzzle, thereby depriving Westinghouse of a competitive advantage.
(e)     Unrestricted disclosure would jeopardize the position of prominence of Westinghouse in the world market, and thereby give a market advantage to the competition of those countries.
(f)     The Westinghouse capacity to invest corporate assets in research and development depends upon the success in obtaining and maintaining a competitive advantage.
(iii) The information is being transmitted to the Commission in confidence and, under the provisions of 10 CFR Section 2.3 90; it is to be received in confidence by the Commission.
(iv)   The information sought to be protected is not available in public sources or available information has not been previously employed in the same original manner or method to the best of our knowledge and belief.
(v)   The proprietary information sought to be withheld in this submittal is that which is appropriately marked in WNA-CN-00 157-WBT-P, Revision 0, "Watts Bar 2 Incore Instrument System (IIS) Signal Processing System (SPS) Isolation Requirements" (Proprietary) for submittal to the Commission, being transmitted by Tennessee Valley Authority letter and Application for Withholding Proprietary Information from Public Disclosure, to the Document Control Desk. The proprietary information as submitted by Westinghouse is that associated with the Incore Instrument System (IIS) and may be used only for that purpose.
 
5                                     CAW-1 1-3215 This information is part of that which will enable Westinghouse to:
(a)     Assist the customer in providing technical licensing information to the NRC that is required for approval of the Watts Bar Nuclear Unit 2 IIS System.
Further this information has substantial commercial value as follows:
(a)     Westinghouse plans to sell the use of similar information to its customers for the purpose of licensing in-core instrumentation systems.
(b)     Its use by a competitor would improve his competitive position in the development and licensing of a similar product.
(c)     The information requested to be withheld reveals the distinguishing aspects of a design developed by Westinghouse.
Public disclosure of this proprietary information is likely to cause substantial harm to the competitive position of Westinghouse because it would enhance the ability of competitors to provide similar calculations, analysis and licensing defense services for commercial power reactors without commensurate expenses. Also, public disclosure of the information would enable others to use the information to meet NRC requirements for licensing documentation without purchasing the right to use the information.
The development of the technology described in part by the information is the result of applying the results of many years of experience in an intensive Westinghouse effort and the expenditure of a considerable sum of money.
In order for competitors of Westinghouse to duplicate this information, similar technical programs would have to be performed and a significant manpower effort, having the requisite talent and experience, would have to be expended.
Further the deponent sayeth not.
 
PROPRIETARY INFORMATION NOTICE Transmitted herewith are proprietary and/or non-proprietary versions of documents furnished to the NRC in connection with requests for generic and/or plant-specific review and approval.
In order to conform to the requirements of 10 CFR 2.390 of the Commission's regulations concerning the protection of proprietary information so submitted to the NRC, the information which is proprietary in the proprietary versions is contained within brackets, and where the proprietary information has been deleted in the non-proprietary versions, only the brackets remain (the information that was contained within the brackets in the proprietary versions having been deleted). The justification for claiming the information so designated as proprietary is indicated in both versions by means of lower case letters (a) through (f) located as a superscript immediately following the brackets enclosing each item of information being identified as proprietary or in the margin opposite such information. These lower case letters refer to the types of information Westinghouse customarily holds in confidence identified in Sections (4)(ii)(a) through (4)(ii)(f) of the affidavit accompanying this transmittal pursuant to 10 CFR 2.390(b)(1).
COPYRIGHT NOTICE The reports transmitted herewith each bear a Westinghouse copyright notice. The NRC is permitted to make the number of copies of the information contained in these reports which are necessary for its internal use in connection with generic and plant-specific reviews and approvals as well as the issuance, denial, amendment, transfer, renewal, modification, suspension, revocation, or violation of a license, permit, order, or regulation subject to the requirements of 10 CFR 2.390 regarding restrictions on public disclosure to the extent such information has been identified as proprietary by Westinghouse, copyright protection notwithstanding. With respect to the non-proprietary versions of these reports, the NRC is permitted to make the number of copies beyond those necessary for its internal use which are necessary in order to have one copy available for public viewing in the appropriate docket files in the public document room in Washington, DC and in local public document rooms as may be required by NRC regulations if the number of copies submitted is insufficient for this purpose. Copies made by the NRC must include the copyright notice in all instances and the proprietary notice if the original was identified as proprietary.
 
Tennessee Valley Authority Letter for Transmittal to the NRC The following paragraphs should be included in your letter to the NRC:
Enclosed are:
: 1. _ copies of WNA-CN-00 157-WBT-P, Revision 0, "Watts Bar 2 Incore Instrument System (IIS)
Signal Processing System (SPS) Isolation Requirements" (Proprietary)
: 2.   - copies of WNA-CN-00157-WBT-NP, Revision 0, "Watts Bar 2 Incore Instrument System (IIS)
Signal Processing System (SPS) Isolation Requirements" (Non-Proprietary)
Also enclosed is the Westinghouse Application for Withholding Proprietary Information from Public Disclosure CAW-1 1-3215, accompanying Affidavit, Proprietary Information Notice, and Copyright Notice.
As Item 1 contains information proprietary to Westinghouse Electric Company LLC, it is supported by an affidavit signed by Westinghouse, the owner of the information. The affidavit sets forth the basis on which the information may be withheld from public disclosure by the Commission and addresses with specificity the considerations listed in paragraph (b)(4) of Section 2.390 of the Commission's regulations.
Accordingly, it is respectfully requested that the information which is proprietary to Westinghouse be withheld from public disclosure in accordance with 10 CFR Section 2.390 of the Commission's regulations.
Accordingly, it is respectfully requested that the information which is proprietary to Westinghouse be withheld from public disclosure in accordance with 10 CFR Section 2.390 of the Commission's regulations.
Correspondence with respect to the copyright or proprietary aspects of the items listed above or the supporting Westinghouse affidavit should reference CAW- 11-3215 and should be addressed to J. A. Gresham, Manager, Regulatory Compliance, Westinghouse Electric Company LLC, Suite 428, 1000 Westinghouse Drive, Cranberry Township, Pennsylvania 16066.}}
Correspondence with respect to the copyright or proprietary aspects of the items listed above or the supporting Westinghouse affidavit should reference CAW- 11-3215 and should be addressed to J. A. Gresham, Manager, Regulatory Compliance, Westinghouse Electric Company LLC, Suite 428, 1000 Westinghouse Drive, Cranberry Township, Pennsylvania 16066.}}

Latest revision as of 02:43, 6 December 2019

Attachment 3, Calculation, WNA-CN-00157-WBT-NP, Revision 0, Watts Bar 2 Incore Instrument System (Iis) Signal Processing System (SPS) Isolation Requirements
ML11257A049
Person / Time
Site: Watts Bar Tennessee Valley Authority icon.png
Issue date: 09/01/2011
From: Shakun M
Westinghouse
To:
Office of Nuclear Reactor Regulation
References
CAW-11-3215 WNA-CN-00157-WBT-NP, Rev. 0
Download: ML11257A049 (45)


Text

Attachment 3 Westinghouse Electric Company WNA-CN-001 57-WBT-NP, Revision 0, "Watts Bar 2 Incore Instrument System (IIS) Signal Processing System (SPS)

Isolation Requirements," (Non-Proprietary)

Westinghouse Non-Proprietary Class 3 WESTINGHOUSE ELECTRIC COMPANY LLC Calculation Note Number Revision Shop Order Number Network/Activity Page WNA-CN-00157-WBT-NP 0 N/A 1602247/0010 1 Project Releasable (Y/N) Open Items (Y/N) Files Attached (Y/N) Total No. Pages WB2 WINCISE IIS SPS Y Y N 35

Title:

Watts Bar 2 Incore Instrument System (IIS) Signal Processing System (SPS) Isolation Requirements Author Name(s) Signature / Date Scope Matthew A. Shakun ElectronicallyApproved* All Verifier Name(s) Signature / Date Scope See WNA-CN-001 57-WBT RevO ElectronicallyApproved* All Reviewer Name(s) Signature / Date Kenneth I. Sundstrom ElectronicallyApproved*

Manager Name Signature / Date Shawn P. Kelly ElectronicallyApproved*

  • Electronicallyapprovedrecords are authenticatedin the electronic document managementsystem.

© 2011 Westinghouse Electric Company LLC All Rights Reserved O Westinghouse Word Version 6.1

Westinghouse Non-Proprietary Class 3 WESTINGHOUSE ELECTRIC COMPANY LLC Calculation Note Number Revision Page WNA-CN-00157-WBT-NP 0 2 Record of Revisions Rev Date Revision Description 0 See Initial Issue.

EDMS 4- 4 4- 4 4- 4-1- 4

4. 4 Word Version 6.1

Westinghouse Non-Proprietary Class 3 WESTINGHOUSE ELECTRIC COMPANY LLC Calculation Note Number Revision Page WNA-CN-00157-WBT-NP 0 3 Table of Contents 1.0 Background and Purpose ..................................................................................... ..................... 5 1 .1 P u rp o s e ....................................................................................................... ..................... 5 1.2 Background ................................................................................................. ..................... 5 1.3 Requirem ents for 1E/non 1E Independence ................................................ ............... 10 2.0 Sum m ary of Results and Conclusions .................................................................. ............... 14 2.1 Assum ptions and Interface Requirem ents ................................................... .............. 15 3.0 References ............................................................................................................................... 16 4 .0 Ca lc u la tio n s ............................................................................................................................... 18 4.1 Lim its of Applicability ................................................................................................... 18 4.2 O pen Item s ....................................................................................................................... 18 4.3 Method Discussion ....................................................................................................... 18 4.4 Discussion of Significant Assum ptions ......................................................................... 19 4.5 Acceptance Criteria ..................................................................................................... 20 4 .6 Inp u t .................................................................................................................................. 20 5.0 Evaluations, Analysis, Detailed Calculations and Results ..................................................... 21 5.1 Faults under Norm al O perating Conditions ................................................................ 21 5.1.1 AC Power Surges ............................................................................................ 21 5.1.2 Surges on the Ethernet ................................................................................... 22 5.1.3 [ ]ac Power Supply Failure ....................................................................... 22 5.2 Faults under LOCA Conditions ..................................................................................... 23 5.3 Incore Cable Charge-up issue .................................................................................... 24 5.4 Defense In Depth ........................................................................................................ 25 Disconnection of the IITA at power with Connector Failure ......................................... 25 Checklist A: Proprietary Class Statem ent Checklist ..................................................................... 27 Checklist B: Calculation Note Methodology Checklist ................................................................... 28 Checklist D: 3-Pass Verification Methodology Checklist .............................................................. 30 Additional Verifier's Com m ents ..................................................................................................... 31 Appendix A : Supporting Docum entation .............................................................................. 32 A.1 [ ]ac Power Supply Fault Voltage Assessment Letter (Reference 6) ................... 32 A.2 [ ]a,c ................................................... 33 A.3 [a,c .................................................. 34 Word Version 6.1

Westinghouse Non-Proprietary Class 3 WESTINGHOUSE ELECTRIC COMPANY LLC Calculation Note Number Revision Page WNA-CN-00157-WBT-NP 0 4 A.4 Vendor Letter on [ ]a,c (Reference 13).. 35 Word Version 6.1

Westinghouse Non-Proprietary Class 3 WESTINGHOUSE ELECTRIC COMPANY LLC Calculation Note Number Revision Page WNA-CN-00157-WBT-NP 0 5 1.0 Background and Purpose 1.1 Purpose This document is a copy of WNA-CN-001 57-WBT, Rev. 0, "Watts Bar 2 Incore Instrument System (IIS) Signal Processing System (SPS) Isolation Requirements." It was created to submit to the Nuclear Regulatory Commission for the Watts Bar Nuclear Unit 2 NSSS Completion Project.

This evaluation addresses the immunity of the Watts bar 2 Class 1 E Core Exit Thermocouple (CET) system from faults originating in, or by means of, the non-IE Incore Instrumentation System (IIS) Signal Processing System Cabinets (SPS).

This evaluation also addresses incore detector signal conductor charge-up issues caused by disconnection of the incore detector signal cable from its normal termination at the SPS cabinet.

This evaluation is necessary to ensure compliance with the isolation requirements of IEEE 384 for independence of Class 1 E equipment and circuits. Though compliance with IEEE 384-1981 is required, the latest revisions of this standard, IEEE 384-1992 and IEEE 384-2008, include additional clarification on the requirements established in the 1981 revision, without relaxing any applicable requirements. For this reason, this document quotes the 2008 revision to IEEE 384, with the understanding that the requirements of the 1981 and 1992 revision are also met.

This calculation note was prepared according to Westinghouse Procedure NSNP 3.2.6.

1.2 Background Watts Bar 2 includes 58 Incore Instrumentation Thimble Assemblies (IITAs) each of which contains five axial levels of Vanadium Incore Self Powered Neutron Detectors (SPNDs) used for power distribution monitoring (a non 1 E function), and a single Core Exit Thermocouple used in the Post Accident Monitoring System (a 1E function). These separate functions share the same IITA to minimize the number of reactor vessel penetrations and routing complexities that would be required if they were installed in separate assemblies. Other than sharing the same IITA, the CETs and SPNDs are completely separate physically and electrically. The SPND signals are processed in two separate Incore Instrumentation System (IIS) Signal Processing System (SPS) cabinets (29 IITAs Incore detector assemblies per SPS cabinet).

The CETs are also processed in two separate PAMS cabinets (29 CETs per cabinet). The CETs and SPNDs are routed such that all of the CETs associated with a single PAMS train will have its associated IITA SPNDs routed to one SPS cabinet. Those CETs associated with the other PAMS train will have the IITA SPND signals in their respective IITAs routed to the other SPS cabinet, (Reference 1). This arrangement complies with IEEE 384-2008 Section Word Version 6.1

Westinghouse Non-Proprietary Class 3 WESTINGHOUSE ELECTRIC COMPANY LLC Calculation Note Number Revision Page WNA-CN-00157-WBT-NP 0 6 4.6 d), as addressed in Section 1.3 of this evaluation.

[

Iac

]a.c Note that the Watts Bar 2 IITA enters the reactor vessel through the Reactor Vessel bottom, via guide tubes which serve as the RCS pressure boundary. The guide tubes entering the reactor vessel bottom and enclosing the IITA assembly are terminated at the far end at a seal table assembly, where the IITA connector mates with a mineral insulated cable assembly, and where IITA disconnection during refueling may be effected.

a,c The Watts Bar IITA Engineering Specification, 418E28 (Reference 10), provides additional detail on dimensions and composition of the IITA.

aW s Word Version 6.1

Westinghouse Non-Proprietary Class 3 WESTINGHOUSE ELECTRIC COMPANY LLC Calculation Note Number Revision Page WNA-CN-00157-WBT-NP 0 7 a,c Figure 1. [ Iaxc Word Version 6.1

Westinghouse Non-Proprietary Class 3 WESTINGHOUSE ELECTRIC COMPANY LLC Calculation Note Number Revision Page WNA-CN-00157-WBT-NP 0 8 a,c Figure 2. [ Sa,c Word Version 6.1

Westinghouse Non-Proprietary Class 3 WESTINGHOUSE ELECTRIC COMPANY LLC Calculation Note Number Revision Page WNA-CN-00157-WBT-NP 0 9

[

]a,c It should be noted that because of the compact nature of the IITA assembly the physical separation between the SPNDs and CETs within the IITA assembly and seal table connector does not meet the preferred minimum 1 inch separation requirement between the Class 1E CETs and non 1 E Incore detectors as defined in IEEE-384.

]a,c This evaluation therefore addresses the following two issues:

1) Ensure that no fault originating either within the Incore signal processing system (SPS) cabinet or electrical surges on the input power lines or output [ ]a,c communications link can result in fault voltages at the Seal Table connector of greater than [ ],c between the connector pins.

Word Version 6.1

Westinghouse Non-Proprietary Class 3 WESTINGHOUSE ELECTRIC COMPANY LLC Calculation Note Number Revision Page WNA-CN-00157-WBT-NP 0 10

2) Ensure that inadvertent disconnection or failures of any IITA emitter wire or wires either at the SPS cabinet, or anywhere in the cabling between the IITA seal table connector and the SPS cabinet will not cause voltage charge-up on the emitter wire exceeding [ ]ac during worst case (full power) plant operation, thus preventing the fault voltage from affecting the associated CET.

1.3 Requirements for I E/non 1 E Independence Reference 5, "IEEE Standard 384-2008, IEEE Standard Criteria for Independence of Class 1E Equipment and Circuits", addresses issues associated with separation between 1E and non 1 E systems.

Note that the italicized text in subsections sections c. and d. of IEEE 384 Section 4.6, quoted below, represent additions to the IEEE 384-1992 text in the 2008 issue of this standard.

Though the section numbers between revisions are changed, the technical changes are restricted to those in the italicized text. These do not change the fundamental requirements, but clarify that consideration of the energy available during faulting must be made, and that non 1 E cabling may not be run with the associated cabling from a redundant division.

Section 4.5.1 of IEEE-384 (Reference 5) states the following:

"4.5.1 General Non-Class 1E power, control, and instrumentation circuits become associated in one or more of the following ways, except as noted in items c), d), and e) in 4.6:

1) Electrical connection to a Class 1 E power supply without the use of an isolation device.
2) Electrical connection to an associated power supply without the use of an isolation device.
3) Proximity to Class 1 E circuits and equipment without the required physical separation or barriers.
4) Proximity to associated circuits and equipment without the required physical separation or barriers.
5) Sharing a Class 1E or associated signal source without the use of an isolation device."

In accordance with the criteria set forth in Item 3 listed above, the Incore cables and their attached connectors are treated as Associated Circuits.

Section 4.5.2 of IEEE-384 (Reference 5) states the following:

"4.5.2 Criteria Associated circuits shall comply with one of the following requirements:

Word Version 6.1

Westinghouse Non-Proprietary Class 3 WESTINGHOUSE ELECTRIC COMPANY LLC Calculation Note Number Revision Page WNA-CN-00157-WBT-NP 0 11 c) They shall be analyzed or tested to demonstrate that Class 1 E circuits are not degraded below an acceptable level. These associated circuits can then be considered non Class 1 E circuits per the requirements in c), d), and e) in 4.6."

Section 4.6 of IEEE-384 addresses the independence of non-Class 1E circuits from Class 1E circuits as follows:

"4.6 Non-Class 1E Circuits; General Criteria The independence of non-class 1 E circuits from Class 1 E circuits or associated circuits shall be achieved by complying with the following requirements:

c) The effects of less than minimum separation or the absence of electrical isolation between the non Class 1E circuits and the Class 1 E circuits or associated circuits shall be analyzed to demonstrate that that Class 1 E circuits are not degraded below an acceptable level or the non Class 1E circuits shall be associated circuits. As part of the analysis, considerationshall be given to potentialenergy and identification of the circuits involved. Also, the non Class IE circuits shall not be routed with associated cables from a redundantdivision.

d) Non-Class 1 E instrumentation signal and control circuits (see IEEE Std 690) are not required to be physically separated or electrically isolated from associated circuits provided that (1) the non-Class 1 E circuits are not routed with associated cables of a redundant division and (2) the non-Class 1E circuits are analyzed to demonstrate that Class 1E circuits are not degraded below an acceptable level. As part of the analysis, considerationshall be given to potential energy and identification of the circuits involved.

e) Non Class 1E fiber optic circuits are not required to be physically separated from Class 1E and associated circuits. Electrical isolation is an inherent characteristic of fiber-optic circuits. Since fiber-optic circuits have no potential to degrade Class 1E circuits, they can be considered non Class 1 E circuits versus associated circuits".

The Incore cable design does not meet the required minimum separation distance between the non-Class 1E SPNDs and Class 1E CETs. Based upon the above statements from IEEE-384, the purpose of this evaluation is to provide assurances that no credible fault within or by means of the non-Class 1E Incore SPS cabinet can adversely impact the Class 1 E CETs by way of fault propagation over the Associated Incore cables.

Figure 3 is a block diagram defining the 1E/Associated/non 1 E interface between the Class 1 E Core Exit Thermocouples and the non 1 E Incore SPS cabinets.

Note that:

Word Version 6.1

Westinghouse Non-Proprietary Class 3 WESTINGHOUSE ELECTRIC COMPANY LLC Calculation Note Number Revision Page WNA-CN-00157-WBT-NP 0 12

" The 1E portion of the circuitry includes the IITA and connecting MI cabling housing the CET wiring.

" Interconnecting cabling from the Seal Table to the SPS cabinet does not perform a 1 E function, but is not isolated from the 1E CETs per IEEE 384. Therefore, it is Associated.

  • The Associated to non 1E interface is at the Incore SPS connector panel at the IIS SPS cabinet.
  • The only electrical interfaces with the SPS are the Incore SPND output signals, the two

] a,c input power feeds, and the two output [ ]ac links.

a]x' links are fiber optic.

Word Version 6.1

Westinghouse Non-Proprietary Class 3 WESTINGHOUSE ELECTRIC COMPANY LLC Calculation Note Number Revision Page WNA-CN-00157-WBT-NP 0 13 a,c Figure 3: [ I a,c Word Version 6.1

Westinghouse Non-Proprietary Class 3 WESTINGHOUSE ELECTRIC COMPANY LLC Calculation Note Number Revision Page WNA-CN-00157-WBT-NP 0 14 2.0 Summary of Results and Conclusions Conclusions No credible source of faulting within the SPS, the IITA, or the interconnecting cabling can negatively impact either PAMS train. Thus, both trains will remain operable.

For large input over-voltage conditions on the [ ]',c input instrument bus used in both the SPS cabinet and associated PAMS train, the SPS will not cause any failure within the PAMS train that would not otherwise occur as a direct result of the over-voltage condition within the PAMS power supply.

SPS Fault Evaluation For the normal situation in which the 1E power input is maintained below [ ]a~c there are three possible sources of faulting within or by means of the non-iE Incore SPS. Each of these was evaluated for fault potential against the acceptance criteria of a [- ]aC limit on potential faulting.

The conclusion is that there is no credible fault originating within the non-I E Incore SPS that can exceed this limit The three faults evaluated are

" Electrical surges (up to 4 kV) on the [ ]ac communications link

" Electrical surges (up to 4 kV) on the [ ] ,c input power feed

  • [ ]ax 1 Power Supply failure during normal or harsh environmental conditions Additionally, it was assumed that the input [ ]a'° power feed could bypass (or short through) the [ ]ac power supply unattenuated directly to the SPND input signal leads.

The worst case fault is [ ]*a assuming complete power supply failure and a dead short through the SPS cabinet to the signal input cables. The incore instrument input cables are tested to a voltage of greater than [ ]a,c, The lowest permissible cable insulation resistance is that of the IITA due to its elevated temperature during operation. This is [ I,. Therefore, conservatively assuming this minimum leakage resistance (maximum leakage current) is concentrated at a single point in the IITA, the energy available to cause further damage during the worst case power supply fault is restricted to I ],c which is negligible.

1E bus Faults above r Iac Word Version 6.1

Westinghouse Non-Proprietary Class 3 WESTINGHOUSE ELECTRIC COMPANY LLC Calculation Note Number Revision Page WNA-CN-00157-WBT-NP 0 15 ac Failure of a single PAMS train is acceptable under such circumstances, and leaves the other train operable.

Cable Voltage Build Up Evaluation The worst case voltage buildup due to disconnection or opening of the emitter wire at the Seal Table connector or any of the downstream signal processing will be less than the []ac for which the connectors will be qualified.

]a,c The design maximum emitter current of [ ac is sufficiently low that any short within the IITA will so restrict the energy available that further damage is precluded.

2.1 Assumptions and Interface Requirements This evaluation is based on the interfaces to the SPS meeting the following requirements:

1. The maximum normal voltage on the AC input power to the SPS is limited to a,c
2. The IITA and interfacing mineral insulated cabling up to the SPS cabinet interface shall have a dielectric voltage rating of at least [ I,.
3. The IITA and interfacing mineral insulated cabling shall be tested to confirm the ability to withstand a [ ]ax application on the emitter wire without a reduction in insulation resistance such that the fault voltage could propagate to the IITA sheath, the interfacing MI cable sheath or adjacent connector pins. Results of testing shall be documented to successfully demonstrate that the requirements are met.
4. The AC power cable to the SPS cabinet shall be routed in metal conduit such that the normal maximum voltage that can be impressed upon the AC power input is restricted to the [ ]'C assumed in this evaluation.
5. Watts Bar must confirm that the [ ] ,c input power to the SPS cabinets are from isolated 1 E sources, and are channelized such that the same source used in PAMS train A is used in SPS cabinet 1, and the same AC source used in PAMS train B is used in SPS cabinet 2.

Word Version 6.1

Westinghouse Non-Proprietary Class 3 WESTINGHOUSE ELECTRIC COMPANY LLC Calculation Note Number Revision Page WNA-CN-00157-WBT-NP 0 16 3.0 References

1. WINCISE System Wiring Diagram, E-WBN2-155-006.
2. Standard Safety Line Filter Panel Assembly, Drawing 10042D05, sheets 1 through 4.
3. Standard Safety Power Supply Panels Assembly, Drawing 10043D28, sheets 1 through 23.

4.

ac

5. IEEE Standard Criteria for Independence of Class 1E Equipment and Circuits, IEEE Std 384-1992, IEEE 384-1981, and IEEE 384-2008.

6.

a,c

7. Watts Bar Unit 2 WINCISE Signal Processing System Design Requirements, WNA-DS-01811-WBT.
8. a,c
9. Drawing 6657E27, OPARSSEL Incore Instrumentation Thimble Assembly.
10. Engineering Specification for Incore Instrumentation Thimble Assembly, Specification number 418E28.
11. Design Specification 00000-FEA-6102 Design and Fabrication Specification or Mineral Insulated Cable Assemblies Without Integral Reference Junctions.
12. WINCISE 1 to 2 Transition Cable Assemblies, E-WBN2-155-002.

13.

a,c

14. International Standard IEC 61000-4-5, Edition 1.1. 2001-04, Electromagnetic Compatibility (EMC)-Part 4-5, Testing and measurement techniques-Surge immunity test.
15. Standard Specification for Thermocouples, Sheathed, Type K and Type N, for Nuclear or for Other High Reliability Applications, ASTM Standard E 235-06.

16.[

ja~c

17. WINCISE 6 to 1 Transition Cable Assemblies, drawing E-WBN2-155-003.

18.[

]a,C Word Version 6.1

Westinghouse Non-Proprietary Class 3 WESTINGHOUSE ELECTRIC COMPANY LLC Calculation Note Number Revision Page WNA-C N-00157-WBT-N P 0 17

19. Repair, Replacement, and Automation Services (RRAS) Common Q Power Supply Technical Manual, 00000-ICE-3453.
20. Watts Bar Unit 2 WINCISE Power Supply Panel Assembly, 10004D05, sheets 1 through 3.

Word Version 6.1

Westinghouse Non-Proprietary Class 3 WESTINGHOUSE ELECTRIC COMPANY LLC Calculation Note Number Revision Page WNA-CN-00157-WBT-NP 0 18 4.0 Calculations 4.1 Limits of Applicability This analysis is applicable to the Watts Bar 2 Incore Nuclear Instrumentation system. The analysis is applicable for either [ ]a,c input power feeds to the Incore SPS.

Though Watts Bar employs [ ]axc from an isolated 1E source, this analysis conservatively assumes a [ ]ac input power feed, with a maximum input fault voltage of

[ ]ac 4.2 Open Items There are 4 open items in this calculation note.

(1) This Calc Note requires that the Incore detector assembly (IITA) and interfacing

]a~c to the SPS cabinet interface have a dielectric voltage rating of at least [ ]ac, and that testing be performed to verify this value.

]a,c (2) The [ ]a,c power supply must undergo successful EMC surge qualification testing to 4kV to validate the assumptions regarding potential faults during normal operation.

(3) The AC power cabling and voltage source external to the SPS cabinet shall be routed and the power source limited such that the maximum normal AC input voltage is [ ]a,c (4) The maximum IITA cable leakage resistance at the minimum temperature for criticality (551 degrees F) is limited to [ ]ac. Since cable leakage resistance decreases with increased temperature, and normal reactor operating temperature is above this value, this is a conservative reference temperature. Cable leakage resistance must be verified by test or a combination of test (at one reference temperature) and analysis providing extrapolation to the performance at 551 degrees. This specification is required to minimize cable voltage charge-up during at-power IITA disconnection.

4.3 Method Discussion This evaluation treats the non 1E Incore cabinet assembly in containment as an envelope.

There are two points of electrical connection to the rest of the plant. These are the I Ia,c communications connection and the AC power feed to the cabinet. The effects of electrical surges on both of these interfaces were evaluated, and suitable isolation devices to prevent unacceptable fault propagation were specified. This evaluation of surges was restricted to normal (non harsh) operating environment.

Since the CET may be required during a LOCA, the cabinet is analyzed to determine what potential faults could be injected on the Incore cables from the SPS cabinets during such an event.

Word Version 6.1

Westinghouse Non-Proprietary Class 3 WESTINGHOUSE ELECTRIC COMPANY LLC Calculation Note Number Revision Page WNA-CN-00157-WBT-NP 0 19 The cable charge build up issue evaluates the maximum possible voltage build up on an unterminated IITA detector at the seal table connector, which is the only point of vulnerability on the IITA assembly due to the double barrier design of the SPND and CET within the IITA.

Maximum expected leakage resistance at elevated temperatures is assumed, and resulting voltage is calculated per Ohm's Law using the maximum permissible full power input current of [ ]a,c.

4.4 Discussion of Significant Assumptions

[

1a,c Surges are not assumed to occur during a harsh environment condition, when the Incore system will be experiencing environmental conditions well beyond the qualified ratings of the equipment.

Reference 7 requires that Power Supplies shall be equipped with a loss of voltage detection circuit, integral current limiting, and over-voltage protection circuit. Though this circuitry will provide protection during normal operation, during harsh conditions it must be assumed that the protective circuitry does not function.

The maximum normal AC voltage on the [ a,c input is limited to [ ]a,c. This is consistent with References 4, and 8, the [ ]ac DC Power Supply data sheets, and is greater than the specified [ ]',c Power interface Requirements specified for the SPS in Reference 7. All input power cabling between the isolated AC power input and SPS cabinet is routed in metal conduit.

It should be noted that the AC power input feed to the SPS is an isolated (per IEEE 384) 1 E power source, and that this power source is the same source used to supply the CET circuitry in the associated Post Accident Monitoring System (PAMS) train. Thus, any extreme over voltage condition on the 1 E input bus beyond the [ ]a,c required in this analysis that may compromise the SPS will also independently compromise the associated PAMS channel used to monitor the affected CETs regardless of the status of the SPS.

By assigning each SPS cabinet and its corresponding PAMS division to the same Class 1 E power bus, it is ensured that extreme fault voltages on a single 1 E bus that [

Iac can only disable one of the two PAMS trains. This single failure of the 1E bus will still leave the other PAMS train intact and operable. The [ ]a,c Power Supply used in the PAMS (Reference 19) has a maximum input voltage rating of [ ] , which is lower than that of the SPS [ I power supply. It can therefore be assumed that the PAMS power supply will be inoperable for input fault voltages approaching [ ]aC and that the associated PAMS train will become inoperable.

Word Version 6.1

Westinghouse Non-Proprietary Class 3 WESTINGHOUSE ELECTRIC COMPANY LLC Calculation Note Number Revision Page WNA-CN-00157-WBT-NP .0 20 Detailed cable routing of the SPS signal input cabling is not addressed in this evaluation. That is, IEEE 384 Section 4.6, item d, addressed in Section 1 of this Calc Note, (this is section 5.6 item 4 in the 1992 revision of IEEE 384) requires that there be no compromising of the class 1E cable routing by misrouting of the associated Incore cabling to the improper SPS cabinet.

Reference 1 depicts the PAMS train/SPS signal routing assignments in accordance with IEEE 384 compliance. However, physical details of this routing are within customer scope, and are beyond the scope of this evaluation.

4.5 Acceptance Criteria Faults originating in or by means of the normal electrical interfaces,

]a,c cannot result in a voltage on the Incore input cables of

]a,c or more. Similarly, maximum cable charge-up voltage at the IITA connector shall not exceed [ ]a,c in the event of IITA disconnection while at power. Under these conditions, there is no failure in the SPS, IITA, or 1 to 2 transition cabling, either during normal or harsh environmental conditions, that can negatively impact wither PAMS train.

4.6 Input

]a'c I

Word Version 6.1

Westinghouse Non-Proprietary Class 3 WESTINGHOUSE ELECTRIC COMPANY LLC Calculation Note Number Revision Page WNA-CN-00157-WBT-NP 0 21 5.0 Evaluations, Analysis, Detailed Calculations and Results The Class 1E core exit thermocouples are most likely to be required during accident conditions: that is, during those events that could lead to a harsh containment environment (e.g. LOCA). The non-I E Incore Processing System Signal Processing System (SPS) cabinets used to mount the Incore system SPS are mounted in containment. As such, it may be expected that the SPS cabinets will experience a harsh environment well beyond the design capabilities of the system at the precise moment when the 1E thermocouples are most likely needed. It must be assumed that such an environment will lead to the failure of the Incore signal processing electronics.

The signal processing electronics are not post accident qualified; therefore it is not possible to perform a detailed circuit analysis of the SPS to assure that the maximum acceptable voltage on the IITA and its associated connectors is not exceeded. Note that there are numerous internal design features that limit the possibility of faulting during normal operation. These are not credited during harsh conditions.

However, the Incore SPS cabinets may be regarded as an envelope, and the sources of credible voltage transients evaluated individually, without the need for detailed analysis.

5.1 Faults under Normal Operating Conditions The normal operating environment for the SPS is [ ]a,c The Incore SPS cabinets have three external interfaces - AC input power, Ethernet communications to the Non 1E system, and Incore SPND input signals. For normal operating conditions, there are three faults that have the potential to provide faults to the SPND cables -

surges on the AC power, surges on the ETHERNET, and a power supply failure. These faults are analyzed herein.

5.1.1 AC Power Surges a,c Word Version 6.1

Westinghouse Non-Proprietary Class 3 WESTINGHOUSE ELECTRIC COMPANY LLC Calculation Note Number Revision Page WNA-CN-00157-WBT-NP 0 22

[

]"'c The

]a.,c power supply and associated protection devices will either be 4kV surge tested to IEC 61000-4-5, (Reference 14) or credit will be taken for previous testing if such testing has been performed. Thus, 4kV input surges shall not result in unacceptable voltages on the I Ia,c incore power distribution.

Surges must be assumed possible at any time during normal operation.

If, due to obsolescence or other concerns, other suppression devices are employed rather than those specified above, these devices will be evaluated to the same criteria described in this evaluation.

Based on the successful completion of the surge testing, the 4kV surge on the AC input shall not result in the output of the [ ]a'c power supply exceeding the maximum dielectric rating of the Incore cabling and connectors.

5.1.2 Surges on the Ethernet Surges on the [ ] ,c output communications cable are not a credible threat. The SPS communicates with remote equipment by means of redundant [ ]'a links.

These will be fiber optic. Therefore, there is no credible surge that can be injected into the SPS cabinet from this interface.

5.1.3 [ ],,c Power Supply Failure

]a,c However the concern with the [ a power supply is that it could fail in such a manner as to produce a voltage greater than the dielectric rating of the Incore cables and connectors.

The most limiting internal source of unacceptable faulting was evaluated: [

].,c The power supply manufacturer [ ,c was asked to provide an assessment of the maximum credible voltage that could be produced under such conditions (Reference 6). The manufacturer responded that the power supply includes independent over-voltage protection that limits output voltage [

],c will significantly limit the possible fault. However, the maximum voltage at the Word Version 6.1

Westinghouse Non-Proprietary Class 3 WESTINGHOUSE ELECTRIC COMPANY LLC Calculation Note Number Revision Page WNA-CN-00157-WBT-NP 0 23 power supply input capacitors can be as high as the input RMS voltage X 1.414. Assuming a maximum input voltage of [ ]ac on the nominal [ ]a,c input, this can result in a maximum voltage of:

I ]ac.

This is less than the required dielectric rating of the Incore cabling and connectors.

5.2 Faults under LOCA Conditions The environmental conditions seen during a LOCA could exceed the values for which the equipment is qualified. Under these conditions, the electronics would be damaged beyond repair and any protection devices could not be credited for protection.

The most limiting internal source of unacceptable faulting was evaluated: this is faulting in the

]a,c power supplies. [

]ac The worst case fault voltage that could be generated is the peak voltage value at the power supply input capacitors, as evaluated in Section 5.1.2, above. [ ]axc This is considerably less than the required dielectric rating of the Incore cabling and connectors.

There is no physical mechanism by which the power supply can generate more voltage than the input voltage multiplied by the ratio of peak to average for a sinusoidal input voltage (Vrms X SQRT(2)). This fault is the same limiting condition that will exist should the AC power input leads become shorted directly to the incore input cables.

It is assumed that this is the maximum credible voltage that can propagate to the Incore SPND MI cabling input. The [ ]a° output over voltage maximum in normal operation is not credited, since during a harsh environment, it is assumed that over voltage protection will not function.

The only other possible sources of fault voltages in the Incore signal processing electronics are the many point-of-load low voltage DC power supply ICs mounted on the individual circuit cards. These are all small, low voltage [ ]a,c low wattage, solid state ICs, and their fault potential is restricted by design. Their failure in a mode capable of creating fault voltages of several hundred volts is not considered credible.

The minimum rated and tested dielectric strength of the incore cables shall be [

Since the maximum input fault voltage is limited to much less than this voltage, the current leakage across any of the connector pins will be negligible, and the fault voltage can not generate sufficient energy to degrade the CET signals as required for IEEE-384 compliance.

With the minimum permissible cable leakage resistance of [ ]ac assumed to be located at a single point in the IITA, the maximum power that could be generated in the event of a [ ]ac power supply fault would be:

Word Version 6.1

Westinghouse Non-Proprietary Class 3 WESTINGHOUSE ELECTRIC COMPANY LLC Calculation Note Number Revision Page WNA-CN-00157-WBT-NP 0 24

[ Iac. Irhis is negligible, and will not cause any energy-related damage to the incore cabling or IITA.

5.3 Incore Cable Charge-up issue This section addresses disconnection of the SPND detector signal cable while at power, and the resulting voltage build-up on the signal lead. The purpose is to demonstrate that the maximum voltage is always less than the [ ]a c dielectric rating of the IITA seal table connector. Note that this is only an issue while at power, since detector current is negligible when shut down.

a,c The maximum detector current for which the SPS is designed is [ a,c. Actual current will be less [ ]a~c, and will be even lower for the progressively shorter SPNDs in each IITA. However, for conservatism it is assumed that all detectors are sourcing the design maximum current of [ I .

It is also conservatively assumed that the cable is disconnected at the seal table, so that any parallel resistance paths to Common in downstream MI cabling or the SPS are excluded.

These would further reduce the voltage build up, since V = I X R, where V is the voltage build up on the emitter wire, I is the detector current (assumed to be [ ]ac), and R is the maximum cable leakage resistance.

]a,c Using the IST maximum measured leakage resistance of [ ] the maximum cable voltage build up assuming head area cable disconnection with a [ ]ac input current would be:

[]ac This is significantly below the [ xac rating of the reactor head area connectors and is negligible.

However, the IR 400 readings defined above are taken at a temperature of

].c, which is significantly higher than the Watts Bar reactor operating temperature. In addition, cable leakage resistance decreases as temperature increases in a non linear fashion. For these reasons, cable leakage resistance at the minimum expected temperature for criticality must be derived. For Watts Bar the minimum temperature for criticality is 551 degrees F.

Word Version 6.1

Westinghouse Non-Proprietary Class 3 WESTINGHOUSE ELECTRIC COMPANY LLC Calculation Note Number Revision Page WNA-CN-00157-WBT-NP 0 25 Therefore it will be necessary to conservatively specify a maximum permissible cable leakage resistance at a temperature of 551 degrees F so as not to exceed the connector rating of

]a,c when detector current is at its maximum of [ ]a,c This is calculated as:

I. ]a,c This must be verified by test or a combination of test and analysis. For example, it may be possible to use an empirical correlation to calculate the cable resistance at 551 degrees F based upon actual production testing at 752 degrees F (the temperature at which the IR400 readings are taken).. However this correlation must be sufficiently robust to provide a high confidence of successful extrapolation.

]apc This issue is listed as an open item in Section 4.2 5.4 Defense In Depth Disconnection of the IITA at power with Connector Failure This section addresses the hypothetical case in which, for whatever reason, the barrier between CET and SPND is breached during normal operation. This could be due to excessively high IITA cable resistance when the IITA is disconnected, producing a voltage high enough to force a current through the connector pins to the CET.

[

I aC Word Version 6.1

Westinghouse Non-Proprietary Class 3 WESTINGHOUSE ELECTRIC COMPANY LLC Calculation Note Number Revision Page WNA-CN-00157-WBT-NP 0 26

[

a'c If the fault occurs at this point, it is possible to calculate the resulting voltage on the Thermocouple leads.

]a,c This represents approximately a worst case [ ]axc error in temperature reading and will not cause any equipment damage. For most of the SPND detectors in the IITA, the current will be much lower, perhaps, on average, [ ]ac. This will produce a proportionally smaller error [ ]a,c. This error could be detected both as an anomalous reading in the PAMS channel and would be immediately flagged to the SPS by the loss of normal SPND signal, so it is a detectable error. Loss of one CET while at power would not affect the PAMS function, which only requires two CETs per core quadrant per train to be operable. In addition, in a post accident environment, power (and SPND current), would be negligible, so the CET would be completely unaffected.

ac Finally, if it is assumed that, for whatever reason, the grounded junction connection of the CET is disconnected, simultaneous with a shorting of the SPND current to the CET lead to the PAMS, then the [ ]a,c worst case fault current will be processed by the PAMS CET-reading analog input modules. These have an input impedance of approximately [ ] ,c. This impedance with a [ ]a,c input current would produce only [ ]a,c at the CET temperature measurement circuitry, which is within the acceptable range of inputs to the input module.

Therefore, this portion of the evaluation demonstrates that even if the CET/SPND barrier at the Seal Table connector were to be breached for any reason, while the normally available SPND signal path to the SPS was open circuited while at power, the resulting temperature error during any post-trip situation would be negligible, and that even at power and assuming a direct short to the CET temperature processing circuitry, there will be no equipment damage.

Word Version 6.1

Westinghouse Non-Proprietary Class 3 WESTINGHOUSE ELECTRIC COMPANY LLC Calculation Note Number Revision Page WNA-CN-00157-WBT-NP 0 27 Checklist A: Proprietary Class Statement Checklist Directions (this section is to be completed by authors): Authors are to determine the appropriate proprietary classification of their document. Start with the Westinghouse Proprietary Class 1 category and review for applicability, proceeding to Westinghouse Proprietary Class 2 - Non-Releasable and finally to Westinghouse Proprietary Class 2 - Releasable. The proprietary classification is established when the first criterion is satisfied.

Westinghouse Proprietary Class I FD Ifthe document contains highly sensitive information such as commercial documents, pricing information, legal privilege, strategic documents, including business strategic and financial plans and certain documents of the utmost strategic importance, it is Proprietary Class 1. Check the box to the left and see Appendix B of Procedure 1.0 in WCAP-7211, Revision 5, for guidance on the use of Form 36 and the distribution of this document. This document can be found at http://worldwide.westincqhouse.com/pdf/e3 wcap-7211.pdf.

Westinghouse Proprietary Class 2 - Non-Releasable Review the questions below for applicability to this calculation, checking the box to the left of each question that is applicable. If one or more boxes are checked, the calculation is considered a Westinghouse Proprietary Class 2 - Non-Releasable document. See Appendix B of Procedure 1.0 in WCAP-721 1, Revision 5, for guidance on the use of Form 36 and the distribution of this document.

LI Does the document contain one or more of the following: detailed manufacturing information or technology, computer source codes, design manuals, priced procurement documents or design reviews?

[] Does the document contain sufficient detail of explanation of computer codes to allow their recreation?

LI Does the document contain special methodology or calculation techniques developed by or for Westinghouse using a knowledge base that is not available in the open literature?

0I Does the document contain any cost information or commercially or legally sensitive data?

0 Does the document contain negotiating strategy or commercial position justification?

LI Does the document contain Westinghouse management business direction or commercial strategic directions?

LI Does the document contain third party proprietary information?

LI Does the document contain information that supports Westinghouse patented technologies, including specialized test data?

LI Does the document contain patentable ideas for which patent protection may be desirable?

Westinghouse Proprietary Class 2 - Releasable

[] If the calculation note is determined to be neither Westinghouse Proprietary Class 1 nor Westinghouse Proprietary Class 2 - Non-Releasable, it is considered Westinghouse Proprietary Class 2 - Releasable.

Check the box to the left and refer to Appendix B of Procedure 1.0 in WCAP-721 1, Revision 5, for guidance on use of Form 36 and the distribution of the document.

Word Version 6.1

Westinghouse Non-Proprietary Class 3 WESTINGHOUSE ELECTRIC COMPANY LLC Calculation Note Number Revision Page WNA-CN-00157-WBT-NP 0 28 Checklist B: Calculation Note Methodology Checklist (Completed By Author)

No. Self Review Topic Yes No N/A 1 Was the latest version of the calculation note template used? X 2 Is all information in the cover page header block provided appropriately? X 3 Are all the pages sequentially numbered, and are the calculation note number, revision X number, and appropriate proprietary classification listed on each page? Are the page numbers in the Table of Contents provided and correct?

4 Does this calculation note fulfill the customer requirements? X 5 Is the Summary of Results and Conclusions provided in Section 2.0 consistent with the X purpose stated in Section 1.0 and calculations contained in Section 5.0?

6 Is sufficient information provided for all References in Section 3.0 to facilitate their retrieval X (e.g., from EDMS, SAP, CAPs, NRC's ADAMS system, open literature, etc.), or has a copy been provided in Appendix A?

7 Are Section 4.2 and the open items box on the calculation note cover sheet consistent? X 8 Are all computer outputs documented in Table 6-2 and consistent with Table 6-1? X 9 Are all computer codes used under Configuration Control and released for use? X 10 Are the computer codes used applicable for modeling the physical and/or computational X problem contained in this calculation note?

11 Have the latest and/or most appropriate versions of all computer codes been used? X 12 Have all open computer code errors identified in Software Error Reports been addressed? X 13 Are the units of measure clearly identified? X 14 Are approved design control practices (e.g., Level 3 procedures, guidebooks, etc.) followed X without exception? If Level 3 procedures are used, please list those used, either in the body of the calculation note or here:

15 Are all hand-annotated changes to the calculation note initialed and dated by author and X verifier? Has a single line been drawn through any changes with the original information remaining legible?

16 Was a Pre-Job Brief held prior to beginning the analysis? X 17 Was a Self Check performed prior to submitting the analysis for Peer Checks and/or final X verification?

18 Was a Peer Check performed to review inputs documented in Section 4.6 prior to performing X analyses?

19 Was a Peer Check performed to review results before documenting them in Section 5.0? X 20 If required, have computer files been transferred to archive storage? Provide page number for X list of files if not included in Table 6-2. Page 21 If applicable, have the results of any previous assessments on the analysis of record been X incorporated in this calculation note?

22 If this calculation note requires a change to a safety analysis database (e.g., SAIK), has the X change been submitted such that the database will be updated?

23 If this calculation note used FEA methods, were the guidelines discussed in WCAP-16904-P X used?

If'NO' to any of the above, provide page number of justification or provide additional explanation here or on subsequent pages.

Word Version 6.1

Westinghouse Non-Proprietary Class 3 WESTINGHOUSE ELECTRIC COMPANY LLC Calculation Note Number Revision Page WNA-CN-00157-WBT-NP 0 29 Checklist C: Verification Method Checklist (Completed By Verifier(s))

Initial If Verification Method (One or more must be completed by each verifier) Performed 1 Independent review of document. (Briefly explain method of review below or attach.) ACD 1

2 Verification performed by alternative calculations as indicated below. )

a. Comparison to a sufficient number of simplified calculations which give persuasive support to the original analysis.
b. Comparison to an analysis by an alternate verified method.
c. Comparison to a similar verified design or calculation.
d. Comparison to test results.
e. Comparison to measured and documented plant data for a comparable design.
f. Comparison to published data and correlations confirmed by experience in the industry.

3 Completed Group-Specific Verification Checklist. (Optional, attach ifused.)

4 Other (Describe)

(1) For independent verification accomplished by comparisons with results of one or more alternate calculations or processes, the comparison should be referenced, shown below, or attached to the checklist.

Verification: The verifier's signature (or Electronic Approval) on the cover sheet indicates that all comments or necessary corrections identified during the review of this document have been incorporated as required and that this document has been verified using the method(s) described above. For multiple verifiers, appropriate methods are indicated by initials. If necessary, technical comments and responses (if required) have been made on the "Additional Verifier's Comments" page.

Additional Details of Verifier's Review Reviewed design input. Reviewed IEEE-384, and IEEE-603 to determine if approach was acceptable.

Reviewed calculations for accuracy and checked with cable and probe designers to verify accurate information is presented herein. Reviewed the content of the analysis and its conclusions and agreed with results.

Word Version 6.1

Westinghouse Non-Proprietary Class 3 WESTINGHOUSE ELECTRIC COMPANY LLC Calculation Note Number Revision Page WNA-CN-00157-WBT-NP 0 30 Checklist D: 3-Pass Verification Methodology Checklist (Completed by Verifier(s))

No. 3-Pass Verification Review Topic Yes No N/A First Pass I Were the general theme, scope of document, and scope of review clear? X Second Pass 2 Do the references appear to be documented correctly? Is there enough information X present to ensure the referenced document is retrievable?

3 Do the acceptance criteria seem appropriate? X 4 Does the technical content of the calculation note make sense from a qualitative X standpoint and are appropriate methods used?

Third Pass 5 Do the results and conclusions meet the acceptance criteria? Do the results and X conclusions make sense and support the purpose of the calculation note?

6 Has the technical content of the document been verified in adequate detail? Examples X of technical content include inputs, models, techniques, output, hand calculations, results, tables, plots, units of measure, etc.

7 Does the calculation note provide sufficient detail in a concise manner? Note that X sufficient detail is enough information such that a qualified person could understand the analysis and replicate the results without consultation with the author.

8 Is the calculation note acceptable with respect to spelling, punctuation, and grammar? X 9 Are the references accurate? Do the references to other documents point to the latest X revision? Ifnot, are the reasons documented? Are the references retrievable?

10 Are computer code names spelled correctly? If applicable, are numerals included in X the official code name as appropriate?

11 Has the calculation note been read word-for-word, cover-to-cover? X If 'NO' to any of the above, provide page number of justification or provide additional explanation here or on subsequent pages.

Word Version 6.1

Westinghouse Non-Proprietary Class 3 WESTINGHOUSE ELECTRIC COMPANY LLC Calculation Note Number Revision Page WNA-CN-00157-WBT-NP 0 31 Additional Verifier's Comments The signatures of the Author(s) and Verifier(s) on the cover page (or Electronic Approval) indicate acceptance of the comments and responses.

No. Verifier's Comments Author's Response (If Required)

+

-4 .1.

-4 4

-4 4 4

-4 4

-~ 4

-4 4

-4 *1*

-4 .1.

-4 4

-4 4

-4 4

-4 +

-4 4 Word Version 6.1

Westinghouse Non-Proprietary Class 3 WESTINGHOUSE ELECTRIC COMPANY LLC Calculation Note Number Revision Page WNA-CN-00157-WBT-NP 0 32 Appendix A: Supporting Documentation A.1 [ ]a~c Power Supply Fault Voltage Assessment Letter (Reference 6)

(The following page contains this letter.)

Word Version 6.1

Westinghouse Non-Proprietary Class 3 WESTINGHOUSE ELECTRIC COMPANY LLC Calculation Note Number Revision Page WNA-CN-00157-WBT-NP 0 33 A.2 Iaa

[

Ia,c Word Version 6.1

Westinghouse Non-Proprietary Class 3 WESTINGHOUSE ELECTRIC COMPANY LLC Calculation Note Number Revision Page WNA-CN-00157-WBT-NP 0 34 A.3 [ Ia,

[

Ia,c Word Version 6.1

Westinghouse Non-Proprietary Class 3 WESTINGHOUSE ELECTRIC COMPANY LLC Calculation Note Number Revision Page WNA-CN-00157-WBT-NP 0 35 I A.4 Vendor Letter on [ ]a~c (Reference 13)

(The following page contains this letter)

Word Version 6.1

Attachment 4 Westinghouse Electric Company CAW-1 1-3215, Application for Withholding Proprietary Information from Public Disclosure, WNA-CN-00157-WBT-P, Revision 0, "Watts Bar 2 Incore Instrument System (IIS) Signal Processing System (SPS) Isolation Requirements," (Proprietary)

  • Westinghouse Westinghouse Electric Company Nuclear Services 1000 Westinghouse Drive Cranberry Township, Pennsylvania 16066 USA U.S. Nuclear Regulatory Commission Direct tel: (412) 374-4643 Document Control Desk Direct fax: (724) 720-0754 11555 Rockville Pike e-mail: greshaja@westinghouse.com Rockville, MD 20852 Proj letter: WBT-D-3328 CAW-1 1-3215 August 2, 2011 APPLICATION FOR WITHHOLDING PROPRIETARY INFORMATION FROM PUBLIC DISCLOSURE

Subject:

WNA-CN-00157-WBT-P, Revision 0, "Watts Bar 2 Incore Instrument System (IIS) Signal Processing System (SPS) Isolation Requirements" (Proprietary)

The proprietary information for which withholding is being requested in the above-referenced report is further identified in Affidavit CAW-1 1-3215 signed by the owner of the proprietary information, Westinghouse Electric Company LLC. The affidavit, which accompanies this letter, sets forth the basis on which the information may be withheld from public disclosure by the Commission and addresses with specificity the considerations listed in paragraph (b)(4) of 10 CFR Section 2.390 of the Commission's regulations.

Accordingly, this letter authorizes the utilization of the accompanying affidavit by Tennessee Valley Authority.

Correspondence with respect to the proprietary aspects of the application for withholding or the Westinghouse affidavit should reference this letter, CAW-1 1-3215, and should be addressed to J. A. Gresham, Manager, Regulatory Compliance, Westinghouse Electric Company LLC, Suite 428, 1000 Westinghouse Drive, Cranberry Township, Pennsylvania 16066.

Very truly yours, J. A. Gresham, Manager Regulatory Compliance Enclosures

CAW-1 1-3215 AFFIDAVIT COMMONWEALTH OF PENNSYLVANIA:

ss COUNTY OF BUTLER:

Before me, the undersigned authority, personally appeared B. F. Maurer, who, being by me duly sworn according to law, deposes and says that he is authorized to execute this Affidavit on behalf of Westinghouse Electric Company LLC (Westinghouse), and that the averments of fact set forth in this Affidavit are true and correct to the best of his knowledge, information, and belief:

B. F. Maurer, Manager ABWR Licensing Sworn to and subscribed before me this 2nd day of August 2011 Notary Public COMMONWEALTH OF PENNSYLVANIA Notarial Seal Cynthia Olesky, Notary Public Manor Boro, Westmoreland County My Commission Expires July 16, 2014 Member. Pennsvlvania Association of Notaries

2 CAW-1 1-3215 (1) I am Manager, ABWR Licensing, in Nuclear Services, Westinghouse Electric Company LLC (Westinghouse), and as such, I have been specifically delegated the function of reviewing the proprietary information sought to be withheld from public disclosure in connection with nuclear power plant licensing and rule making proceedings, and am authorized to apply for its withholding on behalf of Westinghouse.

(2) I am making this Affidavit in conformance with the provisions of 10 CFR Section 2.390 of the Commission's regulations and in conjunction with the Westinghouse Application for Withholding Proprietary Information from Public Disclosure accompanying this Affidavit.

(3) I have personal knowledge of the criteria and procedures utilized by Westinghouse in designating information as a trade secret, privileged or as confidential commercial or financial information.

(4) Pursuant to the provisions of paragraph (b)(4) of Section 2.390 of the Commission's regulations, the following is furnished for consideration by the Commission in determining whether the information sought to be withheld from public disclosure should be withheld.

(i) The information sought to be withheld from public disclosure is owned and has been held in confidence by Westinghouse.

(ii) The information is of a type customarily held in confidence by Westinghouse and not customarily disclosed to the public. Westinghouse has a rational basis for determining the types of information customarily held in confidence by it and, in that connection, utilizes a system to determine when and whether to hold certain types of information in confidence. The application of that system and the substance of that system constitutes Westinghouse policy and provides the rational basis required.

Under that system, information is held in confidence if it falls in one or more of several types, the release of which might result in the loss of an existing or potential competitive advantage, as follows:

(a) The information reveals the distinguishing aspects of a process (or component, structure, tool, method, etc.) where prevention of its use by any of

3 CAW-11-3215 Westinghouse's competitors without license from Westinghouse constitutes a competitive economic advantage over other companies.

(b) It consists of supporting data, including test data, relative to a process (or component, structure, tool, method, etc.), the application of which data secures a competitive economic advantage, e.g., by optimization or improved marketability.

(c) Its use by a competitor would reduce his expenditure of resources or improve his competitive position in the design, manufacture, shipment, installation, assurance of quality, or licensing a similar product.

(d) It reveals cost or price information, production capacities, budget levels, or commercial strategies of Westinghouse, its customers or suppliers.

(e) It reveals aspects of past, present, or future Westinghouse or customer funded development plans and programs of potential commercial value to Westinghouse.

(f) It contains patentable ideas, for which patent protection maybe desirable.

There are sound policy reasons behind the Westinghouse system which include the following:

(a) The use of such information by Westinghouse gives Westinghouse a competitive advantage over its competitors. It is, therefore, withheld from disclosure to protect the Westinghouse competitive position.

(b) It is information that is marketable in many ways. The extent to which such information is available to competitors diminishes the Westinghouse ability to sell products and services involving the use of the information.

(c) Use by our competitor would put Westinghouse at a competitive disadvantage by reducing his expenditure of resources at our expense.

4 CAW- 11-3215 (d) Each component of proprietary information pertinent to a particular competitive advantage is potentially as valuable as the total competitive advantage. If competitors acquire components of proprietary information, any one component may be the key to the entire puzzle, thereby depriving Westinghouse of a competitive advantage.

(e) Unrestricted disclosure would jeopardize the position of prominence of Westinghouse in the world market, and thereby give a market advantage to the competition of those countries.

(f) The Westinghouse capacity to invest corporate assets in research and development depends upon the success in obtaining and maintaining a competitive advantage.

(iii) The information is being transmitted to the Commission in confidence and, under the provisions of 10 CFR Section 2.3 90; it is to be received in confidence by the Commission.

(iv) The information sought to be protected is not available in public sources or available information has not been previously employed in the same original manner or method to the best of our knowledge and belief.

(v) The proprietary information sought to be withheld in this submittal is that which is appropriately marked in WNA-CN-00 157-WBT-P, Revision 0, "Watts Bar 2 Incore Instrument System (IIS) Signal Processing System (SPS) Isolation Requirements" (Proprietary) for submittal to the Commission, being transmitted by Tennessee Valley Authority letter and Application for Withholding Proprietary Information from Public Disclosure, to the Document Control Desk. The proprietary information as submitted by Westinghouse is that associated with the Incore Instrument System (IIS) and may be used only for that purpose.

5 CAW-1 1-3215 This information is part of that which will enable Westinghouse to:

(a) Assist the customer in providing technical licensing information to the NRC that is required for approval of the Watts Bar Nuclear Unit 2 IIS System.

Further this information has substantial commercial value as follows:

(a) Westinghouse plans to sell the use of similar information to its customers for the purpose of licensing in-core instrumentation systems.

(b) Its use by a competitor would improve his competitive position in the development and licensing of a similar product.

(c) The information requested to be withheld reveals the distinguishing aspects of a design developed by Westinghouse.

Public disclosure of this proprietary information is likely to cause substantial harm to the competitive position of Westinghouse because it would enhance the ability of competitors to provide similar calculations, analysis and licensing defense services for commercial power reactors without commensurate expenses. Also, public disclosure of the information would enable others to use the information to meet NRC requirements for licensing documentation without purchasing the right to use the information.

The development of the technology described in part by the information is the result of applying the results of many years of experience in an intensive Westinghouse effort and the expenditure of a considerable sum of money.

In order for competitors of Westinghouse to duplicate this information, similar technical programs would have to be performed and a significant manpower effort, having the requisite talent and experience, would have to be expended.

Further the deponent sayeth not.

PROPRIETARY INFORMATION NOTICE Transmitted herewith are proprietary and/or non-proprietary versions of documents furnished to the NRC in connection with requests for generic and/or plant-specific review and approval.

In order to conform to the requirements of 10 CFR 2.390 of the Commission's regulations concerning the protection of proprietary information so submitted to the NRC, the information which is proprietary in the proprietary versions is contained within brackets, and where the proprietary information has been deleted in the non-proprietary versions, only the brackets remain (the information that was contained within the brackets in the proprietary versions having been deleted). The justification for claiming the information so designated as proprietary is indicated in both versions by means of lower case letters (a) through (f) located as a superscript immediately following the brackets enclosing each item of information being identified as proprietary or in the margin opposite such information. These lower case letters refer to the types of information Westinghouse customarily holds in confidence identified in Sections (4)(ii)(a) through (4)(ii)(f) of the affidavit accompanying this transmittal pursuant to 10 CFR 2.390(b)(1).

COPYRIGHT NOTICE The reports transmitted herewith each bear a Westinghouse copyright notice. The NRC is permitted to make the number of copies of the information contained in these reports which are necessary for its internal use in connection with generic and plant-specific reviews and approvals as well as the issuance, denial, amendment, transfer, renewal, modification, suspension, revocation, or violation of a license, permit, order, or regulation subject to the requirements of 10 CFR 2.390 regarding restrictions on public disclosure to the extent such information has been identified as proprietary by Westinghouse, copyright protection notwithstanding. With respect to the non-proprietary versions of these reports, the NRC is permitted to make the number of copies beyond those necessary for its internal use which are necessary in order to have one copy available for public viewing in the appropriate docket files in the public document room in Washington, DC and in local public document rooms as may be required by NRC regulations if the number of copies submitted is insufficient for this purpose. Copies made by the NRC must include the copyright notice in all instances and the proprietary notice if the original was identified as proprietary.

Tennessee Valley Authority Letter for Transmittal to the NRC The following paragraphs should be included in your letter to the NRC:

Enclosed are:

1. _ copies of WNA-CN-00 157-WBT-P, Revision 0, "Watts Bar 2 Incore Instrument System (IIS)

Signal Processing System (SPS) Isolation Requirements" (Proprietary)

2. - copies of WNA-CN-00157-WBT-NP, Revision 0, "Watts Bar 2 Incore Instrument System (IIS)

Signal Processing System (SPS) Isolation Requirements" (Non-Proprietary)

Also enclosed is the Westinghouse Application for Withholding Proprietary Information from Public Disclosure CAW-1 1-3215, accompanying Affidavit, Proprietary Information Notice, and Copyright Notice.

As Item 1 contains information proprietary to Westinghouse Electric Company LLC, it is supported by an affidavit signed by Westinghouse, the owner of the information. The affidavit sets forth the basis on which the information may be withheld from public disclosure by the Commission and addresses with specificity the considerations listed in paragraph (b)(4) of Section 2.390 of the Commission's regulations.

Accordingly, it is respectfully requested that the information which is proprietary to Westinghouse be withheld from public disclosure in accordance with 10 CFR Section 2.390 of the Commission's regulations.

Correspondence with respect to the copyright or proprietary aspects of the items listed above or the supporting Westinghouse affidavit should reference CAW- 11-3215 and should be addressed to J. A. Gresham, Manager, Regulatory Compliance, Westinghouse Electric Company LLC, Suite 428, 1000 Westinghouse Drive, Cranberry Township, Pennsylvania 16066.