ENS 42492: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by Mark Hawes)
 
(Created page by program invented by StriderTol)
 
Line 16: Line 16:
| event date = 02/28/2006 02:50 EDT
| event date = 02/28/2006 02:50 EDT
| last update date = 04/12/2006
| last update date = 04/12/2006
| title = Invalid System Actuation Due To Work Instruction Error
| title = Invalid System Actuation Due to Work Instruction Error
| event text = General containment isolation signals affecting containment isolation valves in more than one system or multiple main steam isolation valves.
| event text = General containment isolation signals affecting containment isolation valves in more than one system or multiple main steam isolation valves.
The following information is provided as a 60 day telephone notification to NRC under 10 CFR 50.73(a)(1) in lieu of submitting a written LER to report a condition that resulted in an invalid actuation of the 10CFR50.73(a)(2)(iv)(B) system checked above.  NUREG1022 Revision 2 identifies the information that needs to be reported as discussed below.
The following information is provided as a 60 day telephone notification to NRC under 10 CFR 50.73(a)(1) in lieu of submitting a written LER to report a condition that resulted in an invalid actuation of the 10CFR50.73(a)(2)(iv)(B) system checked above.  NUREG1022 Revision 2 identifies the information that needs to be reported as discussed below.

Latest revision as of 21:18, 1 March 2018

ENS 42492 +/-
Where
Hatch Southern Nuclear icon.png
Georgia (NRC Region 2)
Reporting
10 CFR 50.73(a)(1), Submit an LER, Invalid Actuation
Time - Person (Reporting Time:+1035.8 h43.158 days <br />6.165 weeks <br />1.419 months <br />)
Opened: Alan Wolfe
09:38 Apr 12, 2006
NRC Officer: Bill Huffman
Last Updated: Apr 12, 2006
42492 - NRC Website
Loading map...