ENS Event | |
---|---|
06:16 Dec 8, 2012 | |
Title | 60-Day Optional Telephone Notification of Invalid System Actuation |
Event Description | On December 8, 2012, at 0116 EST, with Unit 1 operating near 100 percent rated thermal power (RTP), annunciator 601-135 'Torus Level High' was received in the main control room and immediately cleared. Torus water level was reading between 148.1 inches and 148.8 inches on torus water level sensors but torus water level indications from the High Pressure Coolant Injection (HPCI) sensors were observed to be fluctuating between 149 inches and 150 inches immediately after the event. Technical Specification LCO 3.6.2.2 requires torus water level to remain greater than or equal to 146 inches and less than or equal to 150 inches. The Technical Specification allowable limit is 154 inches for the HPCI torus water level sensors and the actual set point for the HPCI suction swap is 152 inches. When the HPCI torus water level instruments' reference legs are not completely filled, fluctuations in indicated level occur. This was determined to be the cause for this invalid actuation. Enough fluctuation occurred such that the HPCI suction swap instruments completed the actuation logic causing the HPCI suction swap design function to occur. This resulted in HPCI automatically realigning to the torus. It had been manually aligned to the condensate storage tank (CST), which is its primary source. HPCI DID NOT realign to mitigate an event or condition nor did it realign for actuation and injection to send water to the reactor vessel. Should the automatic suction swap fail to occur, the Technical Specifications require that the suction be manually realigned to the torus in accordance with plant procedures and training. The operability of HPCI was maintained throughout the event and no HPCI system actuation signal (low reactor water level or high drywell pressure) was received during the event.
At approximately 0337 EST, Instrumentation and Controls technicians began backfilling the reference legs for sensors 1E41N062B, 1T48N010A, and 1T48N021A. This task was completed at approximately 0503 EST at which time the normal torus water level and HPCI torus water level instrument indications were in agreement. The HPCI suction source was then realigned to the CST in accordance with plant procedures at approximately 0507 EST. This report is being made as an actuation of a system named in 50.73(a)(2)(iv)(B)(4) and is being reported in accordance with 50.73(a)(2)(iv)(A) and under the provision of 50.73(a)(1) based on an NRC interpretation that this actuation within the HPCI system was considered an ECCS actuation. Since the actual torus water level never actually reached 152 inches, the automatic realignment was determined to be an invalid actuation. SNC [Southern Nuclear Company] takes exception to the NRC interpretation on reportability of this condition, but are making this 60 day phone LER notification on a voluntary basis while this issue is being pursued with the NRC. The initiating signal was invalid and this report is being made under the auspices of 10 CFR 50.73(a)(1) for invalid specified system actuations. The licensee notified the NRC Resident Inspector. |
Where | |
---|---|
Hatch ![]() Georgia (NRC Region 2) | |
Reporting | |
10 CFR 50.73(a)(1), Submit an LER, Invalid Actuation | |
Time - Person (Reporting Time:+1445.38 h60.224 days <br />8.603 weeks <br />1.98 months <br />) | |
Opened: | John D Sellers 11:39 Feb 6, 2013 |
NRC Officer: | Mark Abramovitz |
Last Updated: | Feb 6, 2013 |
48721 - NRC Website
Loading map... {"minzoom":false,"maxzoom":false,"mappingservice":"leaflet","width":"350px","height":"250px","centre":false,"title":"","label":"","icon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"zoom":6,"defzoom":14,"layers":["OpenStreetMap"],"image layers":[],"overlays":[],"resizable":false,"fullscreen":false,"scrollwheelzoom":true,"cluster":false,"clustermaxzoom":20,"clusterzoomonclick":true,"clustermaxradius":80,"clusterspiderfy":true,"geojson":"","clicktarget":"","imageLayers":[],"locations":[{"text":"\u003Cb\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003E\u003Ca class=\"mw-selflink selflink\"\u003EENS 48721\u003C/a\u003E - \u003Ca href=\"/Hatch\" title=\"Hatch\"\u003EHatch\u003C/a\u003E\n\u003C/p\u003E\u003C/div\u003E\u003C/b\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003E60-Day Optional Telephone Notification of Invalid System Actuation\n\u003C/p\u003E\u003C/div\u003E","title":"ENS 48721 - Hatch\n","link":"","lat":31.93298888888889,"lon":-82.34381666666667,"icon":"/w/images/1/14/Southern_Nuclear_icon.png"}],"imageoverlays":null} | |
Unit 1 | |
---|---|
Reactor critical | Critical |
Scram | No |
Before | Power Operation (100 %) |
After | Power Operation (100 %) |
WEEKMONTHYEARENS 568972023-11-02T01:11:0002 November 2023 01:11:00
[Table view]10 CFR 50.73(a)(1), Submit an LER 60 Day Notification for an Invalid Specified System Actuation ENS 551882021-02-18T03:20:00018 February 2021 03:20:00 10 CFR 50.73(a)(1), Submit an LER Automatic Actuation of Group 2 Containment Isolation Logic ENS 551872021-02-13T03:23:00013 February 2021 03:23:00 10 CFR 50.73(a)(1), Submit an LER Automatic Actuation of Group I Containment Isolation Logic ENS 538172018-11-12T05:00:00012 November 2018 05:00:00 10 CFR 50.73(a)(1), Submit an LER Invalid Specified System Actuation ENS 528182017-04-27T04:29:00027 April 2017 04:29:00 10 CFR 50.73(a)(1), Submit an LER Invalid Specified System Actuation Due to Failed Relay ENS 528032017-04-17T15:20:00017 April 2017 15:20:00 10 CFR 50.73(a)(1), Submit an LER 60-Day Optional Telephonic Notification of Invalid Specified System Actuation ENS 526852017-02-17T15:21:00017 February 2017 15:21:00 10 CFR 50.73(a)(1), Submit an LER 60-Day Optional Telephonic Notification of Invalid Specified System Actuation ENS 496412013-10-21T09:19:00021 October 2013 09:19:00 10 CFR 50.73(a)(1), Submit an LER 60 Optional Report - Invalid Partial Reactor Protection System Actuation ENS 490552013-03-24T14:09:00024 March 2013 14:09:00 10 CFR 50.73(a)(1), Submit an LER Invalid Actuation of Hpci Suction Valves ENS 487212012-12-08T06:16:0008 December 2012 06:16:00 10 CFR 50.73(a)(1), Submit an LER 60-Day Optional Telephone Notification of Invalid System Actuation ENS 485652012-10-08T22:09:0008 October 2012 22:09:00 10 CFR 50.73(a)(1), Submit an LER 60-Day Optional Telephonic Notification of Invalid System Actuation ENS 483702012-08-06T01:25:0006 August 2012 01:25:00 10 CFR 50.73(a)(1), Submit an LER Rps Sub-Component Failure Caused Half Scram with Group 2 Pciv Actuation ENS 478592012-02-25T05:38:00025 February 2012 05:38:00 10 CFR 50.73(a)(1), Submit an LER Invalid Actuation of Standby Gas Treatment Secondary Containment Isolation Valves (Scivs) ENS 473372011-08-12T09:03:00012 August 2011 09:03:00 10 CFR 50.73(a)(1), Submit an LER 60 Day Optional Telephone Notification for an Invalid Specified System Actuation ENS 461152010-05-29T12:49:00029 May 2010 12:49:00 10 CFR 50.73(a)(1), Submit an LER Invalid Actuation of Primary Containment Isolation Valves Due to a Faulty Transistor ENS 459812010-04-16T23:15:00016 April 2010 23:15:00 10 CFR 50.73(a)(1), Submit an LER Invalid Specified System Actuation ENS 458352010-02-23T14:50:00023 February 2010 14:50:00 10 CFR 50.73(a)(1), Submit an LER Invalid Actuation of Standby Gas Treatment System ENS 432762007-02-25T08:58:00025 February 2007 08:58:00 10 CFR 50.73(a)(1), Submit an LER Invalid Secondary Containment Isolation ENS 424922006-02-28T06:50:00028 February 2006 06:50:00 10 CFR 50.73(a)(1), Submit an LER Invalid System Actuation Due to Work Instruction Error ENS 421102005-10-07T15:37:0007 October 2005 15:37:00 10 CFR 50.73(a)(1), Submit an LER Invalid System Actuation ENS 415902005-02-19T10:50:00019 February 2005 10:50:00 10 CFR 50.73(a)(1), Submit an LER 60 Day Invalid Actuation of System Report. 2023-11-02T01:11:00 | |