| title = Unit 2 Declared An Unusual Event Due To Loss Of Offsite Power To The 4Kv Emergency Buses
| title = Unit 2 Declared an Unusual Event Due to Loss of Offsite Power to the 4Kv Emergency Buses
| event text = At 1823 EST, Unit 2 was manually scrammed due to a loss of offsite power from the Startup Auxiliary Transformer to both 4KV Emergency (E) buses.  Both Emergency Diesel Generators (EDGs) 3&4 autostarted and re-energized the affected electrical buses.  At 1823 EST, an Unusual Event was declared based on EAL 06.01.01, "Inability to power either 4KV E bus from offsite power."   
| event text = At 1823 EST, Unit 2 was manually scrammed due to a loss of offsite power from the Startup Auxiliary Transformer to both 4KV Emergency (E) buses.  Both Emergency Diesel Generators (EDGs) 3&4 autostarted and re-energized the affected electrical buses.  At 1823 EST, an Unusual Event was declared based on EAL 06.01.01, "Inability to power either 4KV E bus from offsite power."   
Unit 2 is currently stable in mode 3, Hot Shutdown, with MSIVs closed and HPCI controlling pressure and RPV Water Level.  All control rods fully inserted following the manual reactor scram. The licensee determined that no emergency facilities will be activated and that no offsite assistance is needed at this time.
Unit 2 is currently stable in mode 3, Hot Shutdown, with MSIVs closed and HPCI controlling pressure and RPV Water Level.  All control rods fully inserted following the manual reactor scram. The licensee determined that no emergency facilities will be activated and that no offsite assistance is needed at this time.

Latest revision as of 21:17, 1 March 2018

ENS 42955 +/-
Where
Brunswick Duke Energy icon.png
North Carolina (NRC Region 2)
Reporting
Emergency class: Unusual Event
10 CFR 50.72(a) (1) (i), Emergency Class Declaration

10 CFR 50.72(b)(2)(iv)(A), System Actuation - ECCS Discharge

10 CFR 50.72(b)(2)(iv)(B), RPS Actuation

10 CFR 50.72(b)(3)(iv)(A), System Actuation
Time - Person (Reporting Time:+-4.45 h-0.185 days <br />-0.0265 weeks <br />-0.0061 months <br />)
Opened: Shawn Zander
19:10 Nov 1, 2006
NRC Officer: Steve Sandin
Last Updated: Nov 2, 2006
42955 - NRC Website
Loading map...