ML14171A290: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
(3 intermediate revisions by the same user not shown) | |||
Line 2: | Line 2: | ||
| number = ML14171A290 | | number = ML14171A290 | ||
| issue date = 06/17/2014 | | issue date = 06/17/2014 | ||
| title = | | title = NRR E-mail Capture - Point Beach Nuclear Plant, Units 1 and 2 - Acceptance Review for Relief Requests RR-8 and RR-9 (TAC Nos. MF4140/MF4141 and MF4142/MF4143) | ||
| author name = Beltz T | | author name = Beltz T | ||
| author affiliation = NRC/NRR/DORL/LPLIII-1 | | author affiliation = NRC/NRR/DORL/LPLIII-1 | ||
| addressee name = Millen M | | addressee name = Millen M | ||
Line 18: | Line 18: | ||
=Text= | =Text= | ||
{{#Wiki_filter: | {{#Wiki_filter:NRR-PMDAPEm Resource From: Beltz, Terry Sent: Tuesday, June 17, 2014 10:03 AM To: Millen, Michael (Michael.Millen@nexteraenergy.com) | ||
Cc: 'harv.hanneman@nexteraenergy.com'; 'Clark, Roger | Cc: 'harv.hanneman@nexteraenergy.com'; 'Clark, Roger'; Carlson, Robert; Audrain, Margaret | ||
'; Carlson, Robert; Audrain, Margaret | |||
==Subject:== | ==Subject:== | ||
Point Beach Nuclear Plant, Units 1 and 2 - | Point Beach Nuclear Plant, Units 1 and 2 - Acceptance Review for Relief Requests RR-8 and RR-9 (TAC Nos. MF4140/MF4141 and MF4142/MF4143) | ||
==Dear Mr. Millen:== | ==Dear Mr. Millen:== | ||
By letter to the U.S. Nuclear Regulatory Commission (NRC) dated May 13, 2014 (Agencywide Documents Access and Management System Accession No. ML14133A365), NextEra Energy Point Beach, LLC (NextEra, the licensee) submitted relief requests (RR-8 and RR-9) for the Point Beach Nuclear Plant (Point Beach), Units 1 and 2. Specifically, NextEra is requesting relief from the requirements of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI, 2007 Edition with 2008 Addenda, as it applies to the requirements of IWA-5244 for buried service water piping and buried fuel oil piping and tanks, and the requirements of IWD-5220 for pressure testing of emergency diesel generator Class 3 sub-systems. The requested duration of these relief requests is for the Fifth Ten-Year Inservice Inspection Interval which commenced on August 1, 2012, and is scheduled to end on July 31, 2022, for both Point Beach units. | By letter to the U.S. Nuclear Regulatory Commission (NRC) dated May 13, 2014 (Agencywide Documents Access and Management System Accession No. ML14133A365), NextEra Energy Point Beach, LLC (NextEra, the licensee) submitted relief requests (RR-8 and RR-9) for the Point Beach Nuclear Plant (Point Beach), Units 1 and 2. Specifically, NextEra is requesting relief from the requirements of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI, 2007 Edition with 2008 Addenda, as it applies to the requirements of IWA-5244 for buried service water piping and buried fuel oil piping and tanks, and the requirements of IWD-5220 for pressure testing of emergency diesel generator Class 3 sub-systems. The requested duration of these relief requests is for the Fifth Ten-Year Inservice Inspection Interval which commenced on August 1, 2012, and is scheduled to end on July 31, 2022, for both Point Beach units. | ||
The NRC staff has reviewed your application and concluded that it provides technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed relief request in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. You will be advised of any further information needed to support the NRC staffs detailed technical review by separate correspondence. | |||
Please dont hesitate to contact me if you have any questions. | |||
Sincerely, TERRY A. BELTZ, SENIOR PROJECT MANAGER U.S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike Rockville, MD 20852-2738 Mail Stop: O-8D15 (301) 415-3049 Terry.Beltz@nrc.gov 1 | |||
Hearing Identifier: NRR_PMDA Email Number: 1393 Mail Envelope Properties (Terry.Beltz@nrc.gov20140617100200) | |||
Hearing Identifier: | |||
==Subject:== | ==Subject:== | ||
Point Beach Nuclear Plant, Units 1 and 2 - Acceptance Review for Relief Requests RR-8 and RR-9 (TAC Nos. MF4140/MF4141 and MF4142/MF4143) | Point Beach Nuclear Plant, Units 1 and 2 - Acceptance Review for Relief Requests RR-8 and RR-9 (TAC Nos. MF4140/MF4141 and MF4142/MF4143) | ||
"'Clark, Roger'" <Roger.Clark@nexteraenergy.com> | Sent Date: 6/17/2014 10:02:40 AM Received Date: 6/17/2014 10:02:00 AM From: Beltz, Terry Created By: Terry.Beltz@nrc.gov Recipients: | ||
Tracking Status: None | "'harv.hanneman@nexteraenergy.com'" <harv.hanneman@nexteraenergy.com> | ||
Tracking Status: None | |||
Options | "'Clark, Roger'" <Roger.Clark@nexteraenergy.com> | ||
Tracking Status: None "Carlson, Robert" <Robert.Carlson@nrc.gov> | |||
Tracking Status: None "Audrain, Margaret" <Margaret.Audrain@nrc.gov> | |||
Tracking Status: None "Millen, Michael (Michael.Millen@nexteraenergy.com)" <Michael.Millen@nexteraenergy.com> | |||
Tracking Status: None Post Office: | |||
Files Size Date & Time MESSAGE 2101 6/17/2014 10:02:00 AM Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date: | |||
Recipients Received:}} |
Latest revision as of 06:33, 5 December 2019
ML14171A290 | |
Person / Time | |
---|---|
Site: | Point Beach |
Issue date: | 06/17/2014 |
From: | Beltz T Plant Licensing Branch III |
To: | Millen M Point Beach |
References | |
MF4140, MF4141, MF4142, MF4143 | |
Download: ML14171A290 (2) | |
Text
NRR-PMDAPEm Resource From: Beltz, Terry Sent: Tuesday, June 17, 2014 10:03 AM To: Millen, Michael (Michael.Millen@nexteraenergy.com)
Cc: 'harv.hanneman@nexteraenergy.com'; 'Clark, Roger'; Carlson, Robert; Audrain, Margaret
Subject:
Point Beach Nuclear Plant, Units 1 and 2 - Acceptance Review for Relief Requests RR-8 and RR-9 (TAC Nos. MF4140/MF4141 and MF4142/MF4143)
Dear Mr. Millen:
By letter to the U.S. Nuclear Regulatory Commission (NRC) dated May 13, 2014 (Agencywide Documents Access and Management System Accession No. ML14133A365), NextEra Energy Point Beach, LLC (NextEra, the licensee) submitted relief requests (RR-8 and RR-9) for the Point Beach Nuclear Plant (Point Beach), Units 1 and 2. Specifically, NextEra is requesting relief from the requirements of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code,Section XI, 2007 Edition with 2008 Addenda, as it applies to the requirements of IWA-5244 for buried service water piping and buried fuel oil piping and tanks, and the requirements of IWD-5220 for pressure testing of emergency diesel generator Class 3 sub-systems. The requested duration of these relief requests is for the Fifth Ten-Year Inservice Inspection Interval which commenced on August 1, 2012, and is scheduled to end on July 31, 2022, for both Point Beach units.
The NRC staff has reviewed your application and concluded that it provides technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed relief request in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. You will be advised of any further information needed to support the NRC staffs detailed technical review by separate correspondence.
Please dont hesitate to contact me if you have any questions.
Sincerely, TERRY A. BELTZ, SENIOR PROJECT MANAGER U.S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike Rockville, MD 20852-2738 Mail Stop: O-8D15 (301) 415-3049 Terry.Beltz@nrc.gov 1
Hearing Identifier: NRR_PMDA Email Number: 1393 Mail Envelope Properties (Terry.Beltz@nrc.gov20140617100200)
Subject:
Point Beach Nuclear Plant, Units 1 and 2 - Acceptance Review for Relief Requests RR-8 and RR-9 (TAC Nos. MF4140/MF4141 and MF4142/MF4143)
Sent Date: 6/17/2014 10:02:40 AM Received Date: 6/17/2014 10:02:00 AM From: Beltz, Terry Created By: Terry.Beltz@nrc.gov Recipients:
"'harv.hanneman@nexteraenergy.com'" <harv.hanneman@nexteraenergy.com>
Tracking Status: None
"'Clark, Roger'" <Roger.Clark@nexteraenergy.com>
Tracking Status: None "Carlson, Robert" <Robert.Carlson@nrc.gov>
Tracking Status: None "Audrain, Margaret" <Margaret.Audrain@nrc.gov>
Tracking Status: None "Millen, Michael (Michael.Millen@nexteraenergy.com)" <Michael.Millen@nexteraenergy.com>
Tracking Status: None Post Office:
Files Size Date & Time MESSAGE 2101 6/17/2014 10:02:00 AM Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:
Recipients Received: