ML15364A421: Difference between revisions

From kanterella
Jump to navigation Jump to search
Created page by program invented by StriderTol
StriderTol Bot change
 
(One intermediate revision by the same user not shown)
Line 1: Line 1:
#REDIRECT [[L-2015-299, Turkey Point, Units 3 and 4 - Annual Post-Uprate Monitoring Report for Uprate Project. Part 4 of 18]]
{{Adams
| number = ML15364A421
| issue date = 08/31/2014
| title = Annual Post-Uprate Monitoring Report for Uprate Project. Part 4 of 18
| author name =
| author affiliation = Ecology & Environment, Inc
| addressee name =
| addressee affiliation = NRC/NRO
| docket = 05000250, 05000251, 05200040, 05200041
| license number =
| contact person =
| case reference number = L-2015-299, +reviewed
| package number = ML15364A396
| document type = Environmental Monitoring Report
| page count = 8
}}
 
=Text=
{{#Wiki_filter:FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014 Canal Extent of Saltwater Intrusion (USGS 2008)
Estimated Extent of Saltwater Intrusion USGS 2008 Note: 1) Avg =Average: Jun 2013 through May 2014;
: 2) Std Dev= Standani Deviation;
: 3) Samples Collected at 3 Depths (S: shallow; M: intermediate; D: deep)
Figure 2.1-18. Average and Standard Deviation of Salinity (PSS-78) for Groundwater Stations.
2-52 Section 2 9-2014
 
FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project-August 2014
'E 90000 u
(i5 80000 2:
~ 70000 c:
(U t) 60000
::t
~---~-----...---~---~
...Jr- ~~ ~~----------..-.---...-----!----..~~~~~~--!
~--;~
=....
.......;.:i.t-.
~-~~--~~---------
"C
~
§ 50000
(.)
u i;::::: 40000
*c::;
~ 30000 Cl) 20000 10000 I
0 +--~~~~~~~~~~~~~~~--.~~~~~~~~~~~---+~~~~~~--.~--I 6/1/10 9/1/10 12/1/10 3/1/11 6/1/11 9/1/11 12/1/11 3/1/12 6/1/12 9/1/12 12/1/12 3/1/13 6/1/13 9/1/13 12/1/13 3/1/14 6/1/14 c::::::J Interim Operating Period --TPGW-1 OS TPGW-11S -
TPGW-14S 27 0
~ 26 Cl)
I..
::t -
(U I..
Cl)
Q.
E 25 Cl)
I-24 23 I
6/1/10 9/1/10 12/1/10 3/1/11 6/1/11 9/1/11 12/1/11 3/1/12 6/1/12 9/1/12 12/1/12 3/1/13 6/1/13 9/1/13 12/1/13 3/1/14 6/1/14 c...:J Interim Operating Period --TPGW-1 OS TPGW-11S -
TPGW-14S 100000
'E 90000 u
(i5 80000 2:
Cl) 70000 u
c:
(U - 60000 u
::t "C c: 50000 0
(.)
u i;::::: 40000
*c::;
~ 30000 Cl) 20000 10000
,._.--~-------------r-~
! i i Section2
~~'~-----~-------~..._.--.---;.~-----.......__
*-~~---------:.::::=~=====:=;:==1
-::::=::::~~~~~*~~-::;S'.:!~~
::.--',_ __ -:::::,...r-0 +-~~~~~~~~~~~~~~~---.~~~~~~~~~~~---+~~~~~~---.~--1 6/1/10 9/1/10 12/1/10 3/1/11 6/1/11 9/1/11 12/1/11 3/1/12 6/1/12 9/1/12 12/1/12 3/1/13 6/1/13 9/1/13 12/1/13 3/1/14 6/1/14 c_J lnterim Operating Period --TPGW-100 TPGW-110 -
TPGW-140 28 I
27 I
l I
(.)
~ 26 Cl)
I..
::t -
(U I..
Cl)
I I
I I
Q.
E 25 Cl)
I-I 24 23 I
6/1/10 9/1/10 12/1/10 3/1/11 6/1/11 9/1/11 12/1/11 3/1/12 6/1/12 9/1/12 12/1/12 3/1/13 6/1/13 9/1/13 12/1/13 3/1/14 6/1/14 C_J lnterim Operating Period --TPGW-100 TPGW-110 -
TPGW-140 Figure 2.1-19. Comparison of Specific Conductance and Temperature in Biscayne Bay Shallow and Deep Wells TPGW-10, TPGW-11, and TPGW-14.
2-53
 
FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project-August 2014 100000 ~--------------~----------~--------~
e :::::
~
-,.,.. __ _,,,., _ _,,,__,,__....-* *-+--~-------
(.)
~ 70000 Q)
~ 60000
~
... g 50000 "C
c: 8 40000
(.)
!E 30000
(.)
Q)
~ 20000 10000
-----~--*-----...J,__ --
0 -__,....s~~====;l!!5!!!5!!5~!!!!!!!=:~~~;o!55!!~~==::::~~~==:!~~~~~""""":::=;!!:!::::::.:=~==~===I 6/1/10 9/1/10 12/1/10 3/1/11 6/1/11 9/1/11 12/1/11 3/1/12 6/1/12 9/1/12 12/1/12 3/1/13 6/1/13 9/1/13 12/1/13 3/1/14 6/1/14 c==i lnterim Operating Period --TPGW-14S TPGW-3S -
TPGW-13S -
TPGW-5S -
TPGW-7S 31 30 29
(.)
0 28 Q)...
::::J...
~
27 Q)
Q.
E 26 Q) 25 24 23 -t---~~~~~~~~~~~~~~~~~~~~~~~-----~~~~~~~--<
6/1/10 9/1/10 12/1/10 3/1/11 6/1/11 9/1/11 12/1/11 3/1/12 6/1/12 9/1/12 12/1/12 3/1/13 6/1/13 9/1/13 12/1/13 3/1/14 6/1/14 c_] Interim Operating Period --TPGW-14S TPGW-3S -
TPGW-13S -
TPGW-5S -
TPGW-7S Section2 100000 I
90000 e 80000,...
J.-"'---.:,
I :..,_.i......_,.... * -
I
*----r'L-4-*-1**
1~
(.)
~ 70000 Q) i 60000
... g 50000 "C
c: 8 40000
(.)
!E 30000
(.)
Q)
~ 20000 10000 0
I I -
r I
I I I
6/1/10 9/1/10 12/1/10 3/1/11 6/1/11 9/1/11 12/1/11 3/1/12 6/1/12 9/1/12 12/1/12 3/1/13 6/1/13 9/1/13 12/1/13 3/1/14 6/1/14 1 Interim Operating Period --TPGW-1 40 TPGW TPGW-130 -
TPGW TPGW-70 31 30 I
29 I
0 0
28 Q)...
::::J...
~
27 Q)
Q.
E 26 Q)
I I I I I I
I I
I 25 24 I
i 23 6/1/10 9/1/10 12/1/10 3/1/11 6/1/11 9/1/11 12/1/11 3/1/12 6/1/12 9/1/12 12/1/12 3/1/13 6/1/13 9/1/13 12/1/13 3/1/14 6/1/14 c==i Interim Operating Period --TPGW-140 TPGW TPGW-130 -
TPGW TPGW-70 Figure 2.1-20. Comparison of Specific Conductance and Temperature across the Landscape in Shallow and Deep Wells TPGW-14, TPGW-3, TPGW-13, TPGW-5, and TPGW 7.
2-54
 
FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project-August 2014 100000 ~--------------~----------~--------~
90000 e 80000
~
~ 70000 Cl) g 60000 I'll -g 50000 "C
c: 8 40000 CJ i;:: 30000
'(j Cl)
~ 20000 10000 0 ---=;======r====T'====;======;======;;==-==;====;======r====o;=====;====;=====;=====;====;====-I 6/1/10 9/1/10 12/1/10 3/1/11 6/1/11 9/1/11 12/1/11 3/1/12 6/1/12 9/1/12 12/1/12 3/1/13 6/1/13 9/1/13 12/1/13 3/1/14 6/1/14 c_] Interim Operating Period --TPGW-11 S --TPGW-13S -- TPGW-2S TPGW-4S -
TPGW-9S 31 30 29
(.)
0 28 Cl)...
:::J -
I'll 27 Cl) c.
E 26 Cl)
I-25
~
24 23 --,-----.--.---~---.-----,.----.----,-----.--.,.--~--T---.----.----,-----l 6/1/10 9/1/10 12/1/10 3/1/11 6/1/11 9/1/11 12/1/11 3/1/12 6/1/12 9/1/12 12/1/12 3/1/13 6/1/13 9/1/13 12/1/13 3/1/14 6/1/14 c:::J lnterim Operating Period --TPGW-11S--TPGW-13S -
TPGW-2S TPGW-4S -
TPGW-9S 100000 90000 e 80000
~
~ 70000 Cl) g 60000 I'll -g 50000 "C
c: 8 40000 CJ i;:: 30000
'(j Cl)
~ 20000 10000 0
,~..,."'---'*"""t-I
........ ~-
I Section2
, ____,.,l~-...
1'""'
.......,. -~1~~-
4.-
I
,. I 6/1/10 9/1/10 12/1/10 3/1/11 6/1/11 9/1/11 12/1/11 3/1/12 6/1/12 9/1/12 12/1/12 3/1/13 6/1/13 9/1/13 12/1/13 3/1/14 6/1/14
~ Interim Operating Period --TPGW-11 D --TPGW-13D --TPGW-2D TPGW-4D -
TPGW-9D 31 I
30 29
(.)
0 28 Cl)...
:::J I'll 27 Cl) c.
E 26 Cl)
I-25 I
24 ---
23 6/1/10 9/1/10 12/1/10 3/1/11 6/1/11 9/1/11 12/1/11 3/1/12 6/1/12 9/1/12 12/1/12 3/1/13 6/1/13 9/1/13 12/1/13 3/1/14 6/1/14 c:::J Interim Operating Period --TPGW-11 D -
TPGW-13D --TPGW-2D TPGW-4D -
TPGW-9D Figure 2.1-21. Comparison of Specific Conductance and Temperature across the Landscape in Shallow and Deep Wells TPGW-11, TPGW-13, TPGW-2, TPGW-4, and TPGW-9.
2-55
 
FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project-August 2014 100000 ~--------------~-------------------~
90000
'E 80000 u
cg_ 70000 Q) g 60000 IV -g 50000 "C
c: 8 40000 u
!E 30000 u
Q)
~ 20000 10000
---...-:----------------,_....__.., ____..:*-* -+-~ -....... __ _
I F-AF~'-----~~~r--__,..!
0 +-===:..::;::::::==::::::;===::::::;::::==::::::;::==::=;:====;:::::::==:;::::==::;::====:;====;====:;::====l;:====;====:;::===:::;::::====l 6/1/10 9/1/10 12/1/10 3/1/11 6/1/11 9/1/11 12/1/11 3/1/12 6/1/12 9/1/12 12/1/12 3/1/13 6/1/13 9/1/13 12/1/13 3/1/14 6/1/14 C-::J lnterim Operating Period --TPGW-11S --TPGW-13S TPGW-1S --TPGW-6S 31 30 29 u
~ 28 Q)...
:I -
IV 27 Q)
Q.
E 26 Q) 25 24 23 6/1/10 9/1/10 12/1/10 3/1/11 6/1/11 9/1/11 12/1/11 3/1/12 6/1/12 9/1/12 12/1/12 3/1/13 6/1/13 9/1/13 12/1/13 3/1/14 6/1/14 C=:J lnterim Operating Period --TPGW-11S --TPGW-13S -- TPGW-1S --TPGW-6S 100000 90000
'E 80000 u
~ 70000 Q) g 60000 IV -g 50000 "C
c: 8 40000 u
!E 30000 u
Q)
~ 20000 10000 0
I
..)...-"---*
I :..,_Jo_.__L._ -
j.,
~
I
** -~
I I
Section2 I
.-..... --r'L--l-..,........ 1**
1'--'
l i 1
I l l 6/1/10 9/1/10 12/1/10 3/1/11 6/1/11 9/1/11 12/1/11 3/1/12 6/1/12 9/1/12 12/1/12 3/1/13 6/1/13 9/1/13 12/1/13 3/1/14 6/1/14 c
J Interim Operating Period TPGW-110 TPGW-130 TPGW-10 TPGW-60 31 30 I
29 u
~ 28 Q)...
:I -
IV 27 Q)
Q.
E 26 Q)
I I
I I
25 I
I 24 I
23 I
6/1/10 9/1/10 12/1/10 3/1/11 6/1/11 9/1/11 12/1/11 3/1/12 6/1/12 9/1/12 12/1/12 3/1/13 6/1/13 9/1/13 12/1/13 3/1/14 6/1/14 c_] lnterim Operating Period
--TPGW-110 --TPGW-130 --TPGW-10 -- TPGW-60 Figure 2.1-22. Comparison of Specific Conductance and Temperature across the Landscape in Shallow and Deep Wells TPGW-11, TPGW-13, TPGW-1, and TPGW-6.
2-56
 
FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project-August 2014 100000 90000
'E 80000 u
cg_ 70000 Q) g 60000 I'll -g 50000 I.. -*
~-
I
*-*,~T~--..-
"C c:
t-~'
I I
r-'-'
*T-b 8 40000 u
~ 30000
*c:;
Q)
~ 20000 10000 0
~,.
-w 6/1/10 9/1/10 12/1/10 3/1/11 6/1/11 9/1/11 12/1/11 3/1/12 6/1/12 9/1/12 12/1/12 3/1/13 6/1/13 9/1/13 12/1/13 3/1/14 6/1/14 C-:J lnterim Operating Period --TPGW-10S -- TPGW-12S --TPGW-13S --TPGW-6S 31 30 29 0
~ 28 Q)...
:I -
I'll 27 Q)
Q, E
26 Q)
I-25 24 23 6/1/10 9/1/10 12/1/10 3/1/11 6/1/11 9/1/11 12/1/11 3/1/12 6/1/12 9/1/12 12/1/12 3/1/13 6/1/13 9/1/13 12/1/13 3/1/14 6/1/14 c:=::i lnterim Operating Period --TPGW-10S --TPGW-1 2S --TPGW-13S --TPGW-6S 100000 90000
'E 80000 u
cg_ 70000 Q) g 60000 I'll -g 50000 "C c: 8 40000 u
~ 30000
*c:;
Q)
~ 20000 10000 0
.J....-"--....:
. :..__1.-
Section2 I
- *---r'i.,.+."""'-1** 1'--'
f f i
-r--~
I I
I i
f 6/1/10 9/1/10 12/1/10 3/1/11 6/1/11 9/1/11 12/1/11 3/1/12 6/1/12 9/1/12 12/1/12 3/1/13 6/1/13 9/1/13 12/1/13 3/1/14 6/1/14
~ Interim Operating Period
--TPGW-10D TPGW-12D
--TPGW-13D
--TPGW-6D I
I I
I I I 23 6/1/10 9/1/10 12/1/10 3/1/11 6/1/11 9/1/11 12/1/11 3/1/12 6/1/12 9/1/12 12/1/12 3/1/13 6/1/13 9/1/13 12/1/13 3/1/14 6/1/14 r
Interim Operating Period
--TPGW-10D --TPGW-12D --TPGW-13D --TPGW-6D Figure 2.1-23. Comparison of Specific Conductance and Temperature across the Landscape in Shallow and Deep Wells TPGW-10, TPGW-12, TPGW-13, and TPGW-6.
2-57
 
FPL Turkey Point Comprehensive Annual Report for Units 3 & 4 Uprate Project-August 2014 90000
'E 80000
~ 70000 "'~~--n\\~~~
Q)
~ 60000 Ill -g 50000 "C s 40000 ---------
(.)
~ 30000 0
~ 20000 en 10000 0 -+--------.--.....-----...... --....-----....... ----.--......--------.--..-----....... -----1
(.)
~
f
::::J cu...
Q) 0..
E Q)
I-6/1/10 9/1/10 12/1/10 3/1/11 6/1/11 9/1/11 12/1/11 3/1/12 6/1/12 9/1/12 c:::J lnterim Operating Period
--TPGW-1S TPGW-3S TPGW-10S TPGW-12S TPGW-13S 30 29 28 27 26 25 24 12/1/12 3/1/13 6/1/13 9/1/13 12/1/13 3/1/14 6/1/14 TPGW-2S TPGW-11 S
-TPGW-14S 23 +---~-~--~-~-~--~-...,_-~-~--~-~-~--~-~-~------j 6/1/10 9/1/10 12/1/10 3/1/11 6/1/11 9/1/11 12/1/11 3/1/12 6/1/12 9/1/12
---:::! Interim Operating Period
--TPGW-1S TPGW-3S TPGW-10S TPGW-1 2S TPGW-13S 12/1/12 3/1/13 6/1/13 9/1/13 12/1/13 3/1/14 TPGW-2S TPGW-11S TPGW-14S 6/1/14 Section2 100000 90000
'E 80000 *-
I
-..r--...-----r*~-,. 1 '""'----
0
~
~ 70000 Q) 0 60000 c:
Ill i
- r=c::
0 50000
::J "C c: 40000 0
(.)
0 30000
!E 0
~ 20000 en 10000 0 -+--------.--..-----...... --....-----....... ----.--......--------.--..-----....... ~
-u
~
f
::::J cu...
Q) 0..
E Q)
I-6/1/10 9/1/10 12/1/10 3/1/11 6/1/11 9/1/11 12/1/11 3/1/12 6/1/12 9/1/12 r..:::.:J Interim Operating Period
--TPGW-10 TPGW-30 TPGW-100 TPGW-12D TPGW-13S 30 29 28 27 26 25 24 12/1/12 3/1/13 6/1/13 9/1/13 12/1/13 3/1/14 E TPGW-20 TPGW-110
-TPGW-14S 23 +---~-~--~-~-~--~--T--~-~--~-~-~--~-~-~-
6/1/10 9/1/10 12/1/10 3/1/11 6/1/11 9/1/11 12/1/11 3/1/12 6/1/12 9/1/12 Jlnterim Operating Period
--TPGW-10 TPGW-3D TPGW-10D TPGW-12D TPGW-13D 12/1/12 3/1/13 6/1/13 9/1/13 12/1/13 3/1/14 E TPGW-20 TPGW-11D TPGW-14D Figure 2.1-24. Comparison of Specific Conductance and Temperature across the Landscape in Shallow and Deep Wells Close to the CCS -TPGW-1, TPGW-2, TPGW-3, TPGW 10, TPGW-11, TPGW-12, TPGW-13, and TPGW-14.
2-58
 
FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project-August 2014 Section2 Top view of probes in stilling well.
Biscayne Bay non-telemetry setup.
Figure 2.2-1. Automated Surface Water Stations.
2-59
 
FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014 Canal Extent of Saltwater Intrusion (USGS 2008)
Estimated Extent of Saltwater Intrusion USGS 2008 Note: 1) Avg =Average: Jun 2013 through May 2014;
: 2) Std Dev= Standani Deviation;
: 3) Samples Collected at 3 Depths (S: shallow; M: intermediate; D: deep)
Figure 2.1-18. Average and Standard Deviation of Salinity (PSS-78) for Groundwater Stations.
2-52 Section 2 9-2014
 
FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project-August 2014
'E 90000 u
(i5 80000 2:
~ 70000 c:
(U t) 60000
::t
~---~-----...---~---~
...Jr- ~~ ~~----------..-.---...-----!----..~~~~~~--!
~--;~
=....
.......;.:i.t-.
~-~~--~~---------
"C
~
&sect; 50000
(.)
u i;::::: 40000
*c::;
~ 30000 Cl) 20000 10000 I
0 +--~~~~~~~~~~~~~~~--.~~~~~~~~~~~---+~~~~~~--.~--I 6/1/10 9/1/10 12/1/10 3/1/11 6/1/11 9/1/11 12/1/11 3/1/12 6/1/12 9/1/12 12/1/12 3/1/13 6/1/13 9/1/13 12/1/13 3/1/14 6/1/14 c::::::J Interim Operating Period --TPGW-1 OS TPGW-11S -
TPGW-14S 27 0
~ 26 Cl)
I..
::t -
(U I..
Cl)
Q.
E 25 Cl)
I-24 23 I
6/1/10 9/1/10 12/1/10 3/1/11 6/1/11 9/1/11 12/1/11 3/1/12 6/1/12 9/1/12 12/1/12 3/1/13 6/1/13 9/1/13 12/1/13 3/1/14 6/1/14 c...:J Interim Operating Period --TPGW-1 OS TPGW-11S -
TPGW-14S 100000
'E 90000 u
(i5 80000 2:
Cl) 70000 u
c:
(U - 60000 u
::t "C c: 50000 0
(.)
u i;::::: 40000
*c::;
~ 30000 Cl) 20000 10000
,._.--~-------------r-~
! i i Section2
~~'~-----~-------~..._.--.---;.~-----.......__
*-~~---------:.::::=~=====:=;:==1
-::::=::::~~~~~*~~-::;S'.:!~~
::.--',_ __ -:::::,...r-0 +-~~~~~~~~~~~~~~~---.~~~~~~~~~~~---+~~~~~~---.~--1 6/1/10 9/1/10 12/1/10 3/1/11 6/1/11 9/1/11 12/1/11 3/1/12 6/1/12 9/1/12 12/1/12 3/1/13 6/1/13 9/1/13 12/1/13 3/1/14 6/1/14 c_J lnterim Operating Period --TPGW-100 TPGW-110 -
TPGW-140 28 I
27 I
l I
(.)
~ 26 Cl)
I..
::t -
(U I..
Cl)
I I
I I
Q.
E 25 Cl)
I-I 24 23 I
6/1/10 9/1/10 12/1/10 3/1/11 6/1/11 9/1/11 12/1/11 3/1/12 6/1/12 9/1/12 12/1/12 3/1/13 6/1/13 9/1/13 12/1/13 3/1/14 6/1/14 C_J lnterim Operating Period --TPGW-100 TPGW-110 -
TPGW-140 Figure 2.1-19. Comparison of Specific Conductance and Temperature in Biscayne Bay Shallow and Deep Wells TPGW-10, TPGW-11, and TPGW-14.
2-53
 
FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project-August 2014 100000 ~--------------~----------~--------~
e :::::
~
-,.,.. __ _,,,., _ _,,,__,,__....-* *-+--~-------
(.)
~ 70000 Q)
~ 60000
~
... g 50000 "C
c: 8 40000
(.)
!E 30000
(.)
Q)
~ 20000 10000
-----~--*-----...J,__ --
0 -__,....s~~====;l!!5!!!5!!5~!!!!!!!=:~~~;o!55!!~~==::::~~~==:!~~~~~""""":::=;!!:!::::::.:=~==~===I 6/1/10 9/1/10 12/1/10 3/1/11 6/1/11 9/1/11 12/1/11 3/1/12 6/1/12 9/1/12 12/1/12 3/1/13 6/1/13 9/1/13 12/1/13 3/1/14 6/1/14 c==i lnterim Operating Period --TPGW-14S TPGW-3S -
TPGW-13S -
TPGW-5S -
TPGW-7S 31 30 29
(.)
0 28 Q)...
::::J...
~
27 Q)
Q.
E 26 Q) 25 24 23 -t---~~~~~~~~~~~~~~~~~~~~~~~-----~~~~~~~--<
6/1/10 9/1/10 12/1/10 3/1/11 6/1/11 9/1/11 12/1/11 3/1/12 6/1/12 9/1/12 12/1/12 3/1/13 6/1/13 9/1/13 12/1/13 3/1/14 6/1/14 c_] Interim Operating Period --TPGW-14S TPGW-3S -
TPGW-13S -
TPGW-5S -
TPGW-7S Section2 100000 I
90000 e 80000,...
J.-"'---.:,
I :..,_.i......_,.... * -
I
*----r'L-4-*-1**
1~
(.)
~ 70000 Q) i 60000
... g 50000 "C
c: 8 40000
(.)
!E 30000
(.)
Q)
~ 20000 10000 0
I I -
r I
I I I
6/1/10 9/1/10 12/1/10 3/1/11 6/1/11 9/1/11 12/1/11 3/1/12 6/1/12 9/1/12 12/1/12 3/1/13 6/1/13 9/1/13 12/1/13 3/1/14 6/1/14 1 Interim Operating Period --TPGW-1 40 TPGW TPGW-130 -
TPGW TPGW-70 31 30 I
29 I
0 0
28 Q)...
::::J...
~
27 Q)
Q.
E 26 Q)
I I I I I I
I I
I 25 24 I
i 23 6/1/10 9/1/10 12/1/10 3/1/11 6/1/11 9/1/11 12/1/11 3/1/12 6/1/12 9/1/12 12/1/12 3/1/13 6/1/13 9/1/13 12/1/13 3/1/14 6/1/14 c==i Interim Operating Period --TPGW-140 TPGW TPGW-130 -
TPGW TPGW-70 Figure 2.1-20. Comparison of Specific Conductance and Temperature across the Landscape in Shallow and Deep Wells TPGW-14, TPGW-3, TPGW-13, TPGW-5, and TPGW 7.
2-54
 
FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project-August 2014 100000 ~--------------~----------~--------~
90000 e 80000
~
~ 70000 Cl) g 60000 I'll -g 50000 "C
c: 8 40000 CJ i;:: 30000
'(j Cl)
~ 20000 10000 0 ---=;======r====T'====;======;======;;==-==;====;======r====o;=====;====;=====;=====;====;====-I 6/1/10 9/1/10 12/1/10 3/1/11 6/1/11 9/1/11 12/1/11 3/1/12 6/1/12 9/1/12 12/1/12 3/1/13 6/1/13 9/1/13 12/1/13 3/1/14 6/1/14 c_] Interim Operating Period --TPGW-11 S --TPGW-13S -- TPGW-2S TPGW-4S -
TPGW-9S 31 30 29
(.)
0 28 Cl)...
:::J -
I'll 27 Cl) c.
E 26 Cl)
I-25
~
24 23 --,-----.--.---~---.-----,.----.----,-----.--.,.--~--T---.----.----,-----l 6/1/10 9/1/10 12/1/10 3/1/11 6/1/11 9/1/11 12/1/11 3/1/12 6/1/12 9/1/12 12/1/12 3/1/13 6/1/13 9/1/13 12/1/13 3/1/14 6/1/14 c:::J lnterim Operating Period --TPGW-11S--TPGW-13S -
TPGW-2S TPGW-4S -
TPGW-9S 100000 90000 e 80000
~
~ 70000 Cl) g 60000 I'll -g 50000 "C
c: 8 40000 CJ i;:: 30000
'(j Cl)
~ 20000 10000 0
,~..,."'---'*"""t-I
........ ~-
I Section2
, ____,.,l~-...
1'""'
.......,. -~1~~-
4.-
I
,. I 6/1/10 9/1/10 12/1/10 3/1/11 6/1/11 9/1/11 12/1/11 3/1/12 6/1/12 9/1/12 12/1/12 3/1/13 6/1/13 9/1/13 12/1/13 3/1/14 6/1/14
~ Interim Operating Period --TPGW-11 D --TPGW-13D --TPGW-2D TPGW-4D -
TPGW-9D 31 I
30 29
(.)
0 28 Cl)...
:::J I'll 27 Cl) c.
E 26 Cl)
I-25 I
24 ---
23 6/1/10 9/1/10 12/1/10 3/1/11 6/1/11 9/1/11 12/1/11 3/1/12 6/1/12 9/1/12 12/1/12 3/1/13 6/1/13 9/1/13 12/1/13 3/1/14 6/1/14 c:::J Interim Operating Period --TPGW-11 D -
TPGW-13D --TPGW-2D TPGW-4D -
TPGW-9D Figure 2.1-21. Comparison of Specific Conductance and Temperature across the Landscape in Shallow and Deep Wells TPGW-11, TPGW-13, TPGW-2, TPGW-4, and TPGW-9.
2-55
 
FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project-August 2014 100000 ~--------------~-------------------~
90000
'E 80000 u
cg_ 70000 Q) g 60000 IV -g 50000 "C
c: 8 40000 u
!E 30000 u
Q)
~ 20000 10000
---...-:----------------,_....__.., ____..:*-* -+-~ -....... __ _
I F-AF~'-----~~~r--__,..!
0 +-===:..::;::::::==::::::;===::::::;::::==::::::;::==::=;:====;:::::::==:;::::==::;::====:;====;====:;::====l;:====;====:;::===:::;::::====l 6/1/10 9/1/10 12/1/10 3/1/11 6/1/11 9/1/11 12/1/11 3/1/12 6/1/12 9/1/12 12/1/12 3/1/13 6/1/13 9/1/13 12/1/13 3/1/14 6/1/14 C-::J lnterim Operating Period --TPGW-11S --TPGW-13S TPGW-1S --TPGW-6S 31 30 29 u
~ 28 Q)...
:I -
IV 27 Q)
Q.
E 26 Q) 25 24 23 6/1/10 9/1/10 12/1/10 3/1/11 6/1/11 9/1/11 12/1/11 3/1/12 6/1/12 9/1/12 12/1/12 3/1/13 6/1/13 9/1/13 12/1/13 3/1/14 6/1/14 C=:J lnterim Operating Period --TPGW-11S --TPGW-13S -- TPGW-1S --TPGW-6S 100000 90000
'E 80000 u
~ 70000 Q) g 60000 IV -g 50000 "C
c: 8 40000 u
!E 30000 u
Q)
~ 20000 10000 0
I
..)...-"---*
I :..,_Jo_.__L._ -
j.,
~
I
** -~
I I
Section2 I
.-..... --r'L--l-..,........ 1**
1'--'
l i 1
I l l 6/1/10 9/1/10 12/1/10 3/1/11 6/1/11 9/1/11 12/1/11 3/1/12 6/1/12 9/1/12 12/1/12 3/1/13 6/1/13 9/1/13 12/1/13 3/1/14 6/1/14 c
J Interim Operating Period TPGW-110 TPGW-130 TPGW-10 TPGW-60 31 30 I
29 u
~ 28 Q)...
:I -
IV 27 Q)
Q.
E 26 Q)
I I
I I
25 I
I 24 I
23 I
6/1/10 9/1/10 12/1/10 3/1/11 6/1/11 9/1/11 12/1/11 3/1/12 6/1/12 9/1/12 12/1/12 3/1/13 6/1/13 9/1/13 12/1/13 3/1/14 6/1/14 c_] lnterim Operating Period
--TPGW-110 --TPGW-130 --TPGW-10 -- TPGW-60 Figure 2.1-22. Comparison of Specific Conductance and Temperature across the Landscape in Shallow and Deep Wells TPGW-11, TPGW-13, TPGW-1, and TPGW-6.
2-56
 
FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project-August 2014 100000 90000
'E 80000 u
cg_ 70000 Q) g 60000 I'll -g 50000 I.. -*
~-
I
*-*,~T~--..-
"C c:
t-~'
I I
r-'-'
*T-b 8 40000 u
~ 30000
*c:;
Q)
~ 20000 10000 0
~,.
-w 6/1/10 9/1/10 12/1/10 3/1/11 6/1/11 9/1/11 12/1/11 3/1/12 6/1/12 9/1/12 12/1/12 3/1/13 6/1/13 9/1/13 12/1/13 3/1/14 6/1/14 C-:J lnterim Operating Period --TPGW-10S -- TPGW-12S --TPGW-13S --TPGW-6S 31 30 29 0
~ 28 Q)...
:I -
I'll 27 Q)
Q, E
26 Q)
I-25 24 23 6/1/10 9/1/10 12/1/10 3/1/11 6/1/11 9/1/11 12/1/11 3/1/12 6/1/12 9/1/12 12/1/12 3/1/13 6/1/13 9/1/13 12/1/13 3/1/14 6/1/14 c:=::i lnterim Operating Period --TPGW-10S --TPGW-1 2S --TPGW-13S --TPGW-6S 100000 90000
'E 80000 u
cg_ 70000 Q) g 60000 I'll -g 50000 "C c: 8 40000 u
~ 30000
*c:;
Q)
~ 20000 10000 0
.J....-"--....:
. :..__1.-
Section2 I
- *---r'i.,.+."""'-1** 1'--'
f f i
-r--~
I I
I i
f 6/1/10 9/1/10 12/1/10 3/1/11 6/1/11 9/1/11 12/1/11 3/1/12 6/1/12 9/1/12 12/1/12 3/1/13 6/1/13 9/1/13 12/1/13 3/1/14 6/1/14
~ Interim Operating Period
--TPGW-10D TPGW-12D
--TPGW-13D
--TPGW-6D I
I I
I I I 23 6/1/10 9/1/10 12/1/10 3/1/11 6/1/11 9/1/11 12/1/11 3/1/12 6/1/12 9/1/12 12/1/12 3/1/13 6/1/13 9/1/13 12/1/13 3/1/14 6/1/14 r
Interim Operating Period
--TPGW-10D --TPGW-12D --TPGW-13D --TPGW-6D Figure 2.1-23. Comparison of Specific Conductance and Temperature across the Landscape in Shallow and Deep Wells TPGW-10, TPGW-12, TPGW-13, and TPGW-6.
2-57
 
FPL Turkey Point Comprehensive Annual Report for Units 3 & 4 Uprate Project-August 2014 90000
'E 80000
~ 70000 "'~~--n\\~~~
Q)
~ 60000 Ill -g 50000 "C s 40000 ---------
(.)
~ 30000 0
~ 20000 en 10000 0 -+--------.--.....-----...... --....-----....... ----.--......--------.--..-----....... -----1
(.)
~
f
::::J cu...
Q) 0..
E Q)
I-6/1/10 9/1/10 12/1/10 3/1/11 6/1/11 9/1/11 12/1/11 3/1/12 6/1/12 9/1/12 c:::J lnterim Operating Period
--TPGW-1S TPGW-3S TPGW-10S TPGW-12S TPGW-13S 30 29 28 27 26 25 24 12/1/12 3/1/13 6/1/13 9/1/13 12/1/13 3/1/14 6/1/14 TPGW-2S TPGW-11 S
-TPGW-14S 23 +---~-~--~-~-~--~-...,_-~-~--~-~-~--~-~-~------j 6/1/10 9/1/10 12/1/10 3/1/11 6/1/11 9/1/11 12/1/11 3/1/12 6/1/12 9/1/12
---:::! Interim Operating Period
--TPGW-1S TPGW-3S TPGW-10S TPGW-1 2S TPGW-13S 12/1/12 3/1/13 6/1/13 9/1/13 12/1/13 3/1/14 TPGW-2S TPGW-11S TPGW-14S 6/1/14 Section2 100000 90000
'E 80000 *-
I
-..r--...-----r*~-,. 1 '""'----
0
~
~ 70000 Q) 0 60000 c:
Ill i
- r=c::
0 50000
::J "C c: 40000 0
(.)
0 30000
!E 0
~ 20000 en 10000 0 -+--------.--..-----...... --....-----....... ----.--......--------.--..-----....... ~
-u
~
f
::::J cu...
Q) 0..
E Q)
I-6/1/10 9/1/10 12/1/10 3/1/11 6/1/11 9/1/11 12/1/11 3/1/12 6/1/12 9/1/12 r..:::.:J Interim Operating Period
--TPGW-10 TPGW-30 TPGW-100 TPGW-12D TPGW-13S 30 29 28 27 26 25 24 12/1/12 3/1/13 6/1/13 9/1/13 12/1/13 3/1/14 E TPGW-20 TPGW-110
-TPGW-14S 23 +---~-~--~-~-~--~--T--~-~--~-~-~--~-~-~-
6/1/10 9/1/10 12/1/10 3/1/11 6/1/11 9/1/11 12/1/11 3/1/12 6/1/12 9/1/12 Jlnterim Operating Period
--TPGW-10 TPGW-3D TPGW-10D TPGW-12D TPGW-13D 12/1/12 3/1/13 6/1/13 9/1/13 12/1/13 3/1/14 E TPGW-20 TPGW-11D TPGW-14D Figure 2.1-24. Comparison of Specific Conductance and Temperature across the Landscape in Shallow and Deep Wells Close to the CCS -TPGW-1, TPGW-2, TPGW-3, TPGW 10, TPGW-11, TPGW-12, TPGW-13, and TPGW-14.
2-58
 
FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project-August 2014 Section2 Top view of probes in stilling well.
Biscayne Bay non-telemetry setup.
Figure 2.2-1. Automated Surface Water Stations.
2-59}}

Latest revision as of 06:50, 10 January 2025

Annual Post-Uprate Monitoring Report for Uprate Project. Part 4 of 18
ML15364A421
Person / Time
Site: Turkey Point  
Issue date: 08/31/2014
From:
Ecology & Environment
To:
Office of New Reactors
Shared Package
ML15364A396 List:
References
L-2015-299, +reviewed
Download: ML15364A421 (8)


Text

FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014 Canal Extent of Saltwater Intrusion (USGS 2008)

Estimated Extent of Saltwater Intrusion USGS 2008 Note: 1) Avg =Average: Jun 2013 through May 2014;

2) Std Dev= Standani Deviation;
3) Samples Collected at 3 Depths (S: shallow; M: intermediate; D: deep)

Figure 2.1-18. Average and Standard Deviation of Salinity (PSS-78) for Groundwater Stations.

2-52 Section 2 9-2014

FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project-August 2014

'E 90000 u

(i5 80000 2:

~ 70000 c:

(U t) 60000

t

~---~-----...---~---~

...Jr- ~~ ~~----------..-.---...-----!----..~~~~~~--!

~--;~

=....

.......;.:i.t-.

~-~~--~~---------

"C

~

§ 50000

(.)

u i;::::: 40000

  • c::;

~ 30000 Cl) 20000 10000 I

0 +--~~~~~~~~~~~~~~~--.~~~~~~~~~~~---+~~~~~~--.~--I 6/1/10 9/1/10 12/1/10 3/1/11 6/1/11 9/1/11 12/1/11 3/1/12 6/1/12 9/1/12 12/1/12 3/1/13 6/1/13 9/1/13 12/1/13 3/1/14 6/1/14 c::::::J Interim Operating Period --TPGW-1 OS TPGW-11S -

TPGW-14S 27 0

~ 26 Cl)

I..

t -

(U I..

Cl)

Q.

E 25 Cl)

I-24 23 I

6/1/10 9/1/10 12/1/10 3/1/11 6/1/11 9/1/11 12/1/11 3/1/12 6/1/12 9/1/12 12/1/12 3/1/13 6/1/13 9/1/13 12/1/13 3/1/14 6/1/14 c...:J Interim Operating Period --TPGW-1 OS TPGW-11S -

TPGW-14S 100000

'E 90000 u

(i5 80000 2:

Cl) 70000 u

c:

(U - 60000 u

t "C c: 50000 0

(.)

u i;::::: 40000

  • c::;

~ 30000 Cl) 20000 10000

,._.--~-------------r-~

! i i Section2

~~'~-----~-------~..._.--.---;.~-----.......__

  • -~~---------:.::::=~=====:=;:==1

-::::=::::~~~~~*~~-::;S'.:!~~

.--',_ __ -:::::,...r-0 +-~~~~~~~~~~~~~~~---.~~~~~~~~~~~---+~~~~~~---.~--1 6/1/10 9/1/10 12/1/10 3/1/11 6/1/11 9/1/11 12/1/11 3/1/12 6/1/12 9/1/12 12/1/12 3/1/13 6/1/13 9/1/13 12/1/13 3/1/14 6/1/14 c_J lnterim Operating Period --TPGW-100 TPGW-110 -

TPGW-140 28 I

27 I

l I

(.)

~ 26 Cl)

I..

t -

(U I..

Cl)

I I

I I

Q.

E 25 Cl)

I-I 24 23 I

6/1/10 9/1/10 12/1/10 3/1/11 6/1/11 9/1/11 12/1/11 3/1/12 6/1/12 9/1/12 12/1/12 3/1/13 6/1/13 9/1/13 12/1/13 3/1/14 6/1/14 C_J lnterim Operating Period --TPGW-100 TPGW-110 -

TPGW-140 Figure 2.1-19. Comparison of Specific Conductance and Temperature in Biscayne Bay Shallow and Deep Wells TPGW-10, TPGW-11, and TPGW-14.

2-53

FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project-August 2014 100000 ~--------------~----------~--------~

e :::::

~

-,.,.. __ _,,,., _ _,,,__,,__....-* *-+--~-------

(.)

~ 70000 Q)

~ 60000

~

... g 50000 "C

c: 8 40000

(.)

!E 30000

(.)

Q)

~ 20000 10000


~--*-----...J,__ --

0 -__,....s~~====;l!!5!!!5!!5~!!!!!!!=:~~~;o!55!!~~==::::~~~==:!~~~~~""""":::=;!!:!::::::.:=~==~===I 6/1/10 9/1/10 12/1/10 3/1/11 6/1/11 9/1/11 12/1/11 3/1/12 6/1/12 9/1/12 12/1/12 3/1/13 6/1/13 9/1/13 12/1/13 3/1/14 6/1/14 c==i lnterim Operating Period --TPGW-14S TPGW-3S -

TPGW-13S -

TPGW-5S -

TPGW-7S 31 30 29

(.)

0 28 Q)...

J...

~

27 Q)

Q.

E 26 Q) 25 24 23 -t---~~~~~~~~~~~~~~~~~~~~~~~-----~~~~~~~--<

6/1/10 9/1/10 12/1/10 3/1/11 6/1/11 9/1/11 12/1/11 3/1/12 6/1/12 9/1/12 12/1/12 3/1/13 6/1/13 9/1/13 12/1/13 3/1/14 6/1/14 c_] Interim Operating Period --TPGW-14S TPGW-3S -

TPGW-13S -

TPGW-5S -

TPGW-7S Section2 100000 I

90000 e 80000,...

J.-"'---.:,

I :..,_.i......_,.... * -

I

  • ----r'L-4-*-1**

1~

(.)

~ 70000 Q) i 60000

... g 50000 "C

c: 8 40000

(.)

!E 30000

(.)

Q)

~ 20000 10000 0

I I -

r I

I I I

6/1/10 9/1/10 12/1/10 3/1/11 6/1/11 9/1/11 12/1/11 3/1/12 6/1/12 9/1/12 12/1/12 3/1/13 6/1/13 9/1/13 12/1/13 3/1/14 6/1/14 1 Interim Operating Period --TPGW-1 40 TPGW TPGW-130 -

TPGW TPGW-70 31 30 I

29 I

0 0

28 Q)...

J...

~

27 Q)

Q.

E 26 Q)

I I I I I I

I I

I 25 24 I

i 23 6/1/10 9/1/10 12/1/10 3/1/11 6/1/11 9/1/11 12/1/11 3/1/12 6/1/12 9/1/12 12/1/12 3/1/13 6/1/13 9/1/13 12/1/13 3/1/14 6/1/14 c==i Interim Operating Period --TPGW-140 TPGW TPGW-130 -

TPGW TPGW-70 Figure 2.1-20. Comparison of Specific Conductance and Temperature across the Landscape in Shallow and Deep Wells TPGW-14, TPGW-3, TPGW-13, TPGW-5, and TPGW 7.

2-54

FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project-August 2014 100000 ~--------------~----------~--------~

90000 e 80000

~

~ 70000 Cl) g 60000 I'll -g 50000 "C

c: 8 40000 CJ i;:: 30000

'(j Cl)

~ 20000 10000 0 ---=;======r====T'====;======;======;;==-==;====;======r====o;=====;====;=====;=====;====;====-I 6/1/10 9/1/10 12/1/10 3/1/11 6/1/11 9/1/11 12/1/11 3/1/12 6/1/12 9/1/12 12/1/12 3/1/13 6/1/13 9/1/13 12/1/13 3/1/14 6/1/14 c_] Interim Operating Period --TPGW-11 S --TPGW-13S -- TPGW-2S TPGW-4S -

TPGW-9S 31 30 29

(.)

0 28 Cl)...

J -

I'll 27 Cl) c.

E 26 Cl)

I-25

~

24 23 --,-----.--.---~---.-----,.----.----,-----.--.,.--~--T---.----.----,-----l 6/1/10 9/1/10 12/1/10 3/1/11 6/1/11 9/1/11 12/1/11 3/1/12 6/1/12 9/1/12 12/1/12 3/1/13 6/1/13 9/1/13 12/1/13 3/1/14 6/1/14 c:::J lnterim Operating Period --TPGW-11S--TPGW-13S -

TPGW-2S TPGW-4S -

TPGW-9S 100000 90000 e 80000

~

~ 70000 Cl) g 60000 I'll -g 50000 "C

c: 8 40000 CJ i;:: 30000

'(j Cl)

~ 20000 10000 0

,~..,."'---'*"""t-I

........ ~-

I Section2

, ____,.,l~-...

1'""'

.......,. -~1~~-

4.-

I

,. I 6/1/10 9/1/10 12/1/10 3/1/11 6/1/11 9/1/11 12/1/11 3/1/12 6/1/12 9/1/12 12/1/12 3/1/13 6/1/13 9/1/13 12/1/13 3/1/14 6/1/14

~ Interim Operating Period --TPGW-11 D --TPGW-13D --TPGW-2D TPGW-4D -

TPGW-9D 31 I

30 29

(.)

0 28 Cl)...

J I'll 27 Cl) c.

E 26 Cl)

I-25 I

24 ---

23 6/1/10 9/1/10 12/1/10 3/1/11 6/1/11 9/1/11 12/1/11 3/1/12 6/1/12 9/1/12 12/1/12 3/1/13 6/1/13 9/1/13 12/1/13 3/1/14 6/1/14 c:::J Interim Operating Period --TPGW-11 D -

TPGW-13D --TPGW-2D TPGW-4D -

TPGW-9D Figure 2.1-21. Comparison of Specific Conductance and Temperature across the Landscape in Shallow and Deep Wells TPGW-11, TPGW-13, TPGW-2, TPGW-4, and TPGW-9.

2-55

FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project-August 2014 100000 ~--------------~-------------------~

90000

'E 80000 u

cg_ 70000 Q) g 60000 IV -g 50000 "C

c: 8 40000 u

!E 30000 u

Q)

~ 20000 10000

---...-:----------------,_....__.., ____..:*-* -+-~ -....... __ _

I F-AF~'-----~~~r--__,..!

0 +-===:..::;::::::==::::::;===::::::;::::==::::::;::==::=;:====;:::::::==:;::::==::;::====:;====;====:;::====l;:====;====:;::===:::;::::====l 6/1/10 9/1/10 12/1/10 3/1/11 6/1/11 9/1/11 12/1/11 3/1/12 6/1/12 9/1/12 12/1/12 3/1/13 6/1/13 9/1/13 12/1/13 3/1/14 6/1/14 C-::J lnterim Operating Period --TPGW-11S --TPGW-13S TPGW-1S --TPGW-6S 31 30 29 u

~ 28 Q)...

I -

IV 27 Q)

Q.

E 26 Q) 25 24 23 6/1/10 9/1/10 12/1/10 3/1/11 6/1/11 9/1/11 12/1/11 3/1/12 6/1/12 9/1/12 12/1/12 3/1/13 6/1/13 9/1/13 12/1/13 3/1/14 6/1/14 C=:J lnterim Operating Period --TPGW-11S --TPGW-13S -- TPGW-1S --TPGW-6S 100000 90000

'E 80000 u

~ 70000 Q) g 60000 IV -g 50000 "C

c: 8 40000 u

!E 30000 u

Q)

~ 20000 10000 0

I

..)...-"---*

I :..,_Jo_.__L._ -

j.,

~

I

    • -~

I I

Section2 I

.-..... --r'L--l-..,........ 1**

1'--'

l i 1

I l l 6/1/10 9/1/10 12/1/10 3/1/11 6/1/11 9/1/11 12/1/11 3/1/12 6/1/12 9/1/12 12/1/12 3/1/13 6/1/13 9/1/13 12/1/13 3/1/14 6/1/14 c

J Interim Operating Period TPGW-110 TPGW-130 TPGW-10 TPGW-60 31 30 I

29 u

~ 28 Q)...

I -

IV 27 Q)

Q.

E 26 Q)

I I

I I

25 I

I 24 I

23 I

6/1/10 9/1/10 12/1/10 3/1/11 6/1/11 9/1/11 12/1/11 3/1/12 6/1/12 9/1/12 12/1/12 3/1/13 6/1/13 9/1/13 12/1/13 3/1/14 6/1/14 c_] lnterim Operating Period

--TPGW-110 --TPGW-130 --TPGW-10 -- TPGW-60 Figure 2.1-22. Comparison of Specific Conductance and Temperature across the Landscape in Shallow and Deep Wells TPGW-11, TPGW-13, TPGW-1, and TPGW-6.

2-56

FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project-August 2014 100000 90000

'E 80000 u

cg_ 70000 Q) g 60000 I'll -g 50000 I.. -*

~-

I

  • -*,~T~--..-

"C c:

t-~'

I I

r-'-'

  • T-b 8 40000 u

~ 30000

  • c:;

Q)

~ 20000 10000 0

~,.

-w 6/1/10 9/1/10 12/1/10 3/1/11 6/1/11 9/1/11 12/1/11 3/1/12 6/1/12 9/1/12 12/1/12 3/1/13 6/1/13 9/1/13 12/1/13 3/1/14 6/1/14 C-:J lnterim Operating Period --TPGW-10S -- TPGW-12S --TPGW-13S --TPGW-6S 31 30 29 0

~ 28 Q)...

I -

I'll 27 Q)

Q, E

26 Q)

I-25 24 23 6/1/10 9/1/10 12/1/10 3/1/11 6/1/11 9/1/11 12/1/11 3/1/12 6/1/12 9/1/12 12/1/12 3/1/13 6/1/13 9/1/13 12/1/13 3/1/14 6/1/14 c:=::i lnterim Operating Period --TPGW-10S --TPGW-1 2S --TPGW-13S --TPGW-6S 100000 90000

'E 80000 u

cg_ 70000 Q) g 60000 I'll -g 50000 "C c: 8 40000 u

~ 30000

  • c:;

Q)

~ 20000 10000 0

.J....-"--....:

. :..__1.-

Section2 I

- *---r'i.,.+."""'-1** 1'--'

f f i

-r--~

I I

I i

f 6/1/10 9/1/10 12/1/10 3/1/11 6/1/11 9/1/11 12/1/11 3/1/12 6/1/12 9/1/12 12/1/12 3/1/13 6/1/13 9/1/13 12/1/13 3/1/14 6/1/14

~ Interim Operating Period

--TPGW-10D TPGW-12D

--TPGW-13D

--TPGW-6D I

I I

I I I 23 6/1/10 9/1/10 12/1/10 3/1/11 6/1/11 9/1/11 12/1/11 3/1/12 6/1/12 9/1/12 12/1/12 3/1/13 6/1/13 9/1/13 12/1/13 3/1/14 6/1/14 r

Interim Operating Period

--TPGW-10D --TPGW-12D --TPGW-13D --TPGW-6D Figure 2.1-23. Comparison of Specific Conductance and Temperature across the Landscape in Shallow and Deep Wells TPGW-10, TPGW-12, TPGW-13, and TPGW-6.

2-57

FPL Turkey Point Comprehensive Annual Report for Units 3 & 4 Uprate Project-August 2014 90000

'E 80000

~ 70000 "'~~--n\\~~~

Q)

~ 60000 Ill -g 50000 "C s 40000 ---------

(.)

~ 30000 0

~ 20000 en 10000 0 -+--------.--.....-----...... --....-----....... ----.--......--------.--..-----....... -----1

(.)

~

f

J cu...

Q) 0..

E Q)

I-6/1/10 9/1/10 12/1/10 3/1/11 6/1/11 9/1/11 12/1/11 3/1/12 6/1/12 9/1/12 c:::J lnterim Operating Period

--TPGW-1S TPGW-3S TPGW-10S TPGW-12S TPGW-13S 30 29 28 27 26 25 24 12/1/12 3/1/13 6/1/13 9/1/13 12/1/13 3/1/14 6/1/14 TPGW-2S TPGW-11 S

-TPGW-14S 23 +---~-~--~-~-~--~-...,_-~-~--~-~-~--~-~-~------j 6/1/10 9/1/10 12/1/10 3/1/11 6/1/11 9/1/11 12/1/11 3/1/12 6/1/12 9/1/12

---:::! Interim Operating Period

--TPGW-1S TPGW-3S TPGW-10S TPGW-1 2S TPGW-13S 12/1/12 3/1/13 6/1/13 9/1/13 12/1/13 3/1/14 TPGW-2S TPGW-11S TPGW-14S 6/1/14 Section2 100000 90000

'E 80000 *-

I

-..r--...-----r*~-,. 1 '""'----

0

~

~ 70000 Q) 0 60000 c:

Ill i

- r=c::

0 50000

J "C c: 40000 0

(.)

0 30000

!E 0

~ 20000 en 10000 0 -+--------.--..-----...... --....-----....... ----.--......--------.--..-----....... ~

-u

~

f

J cu...

Q) 0..

E Q)

I-6/1/10 9/1/10 12/1/10 3/1/11 6/1/11 9/1/11 12/1/11 3/1/12 6/1/12 9/1/12 r..:::.:J Interim Operating Period

--TPGW-10 TPGW-30 TPGW-100 TPGW-12D TPGW-13S 30 29 28 27 26 25 24 12/1/12 3/1/13 6/1/13 9/1/13 12/1/13 3/1/14 E TPGW-20 TPGW-110

-TPGW-14S 23 +---~-~--~-~-~--~--T--~-~--~-~-~--~-~-~-

6/1/10 9/1/10 12/1/10 3/1/11 6/1/11 9/1/11 12/1/11 3/1/12 6/1/12 9/1/12 Jlnterim Operating Period

--TPGW-10 TPGW-3D TPGW-10D TPGW-12D TPGW-13D 12/1/12 3/1/13 6/1/13 9/1/13 12/1/13 3/1/14 E TPGW-20 TPGW-11D TPGW-14D Figure 2.1-24. Comparison of Specific Conductance and Temperature across the Landscape in Shallow and Deep Wells Close to the CCS -TPGW-1, TPGW-2, TPGW-3, TPGW 10, TPGW-11, TPGW-12, TPGW-13, and TPGW-14.

2-58

FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project-August 2014 Section2 Top view of probes in stilling well.

Biscayne Bay non-telemetry setup.

Figure 2.2-1. Automated Surface Water Stations.

2-59

FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014 Canal Extent of Saltwater Intrusion (USGS 2008)

Estimated Extent of Saltwater Intrusion USGS 2008 Note: 1) Avg =Average: Jun 2013 through May 2014;

2) Std Dev= Standani Deviation;
3) Samples Collected at 3 Depths (S: shallow; M: intermediate; D: deep)

Figure 2.1-18. Average and Standard Deviation of Salinity (PSS-78) for Groundwater Stations.

2-52 Section 2 9-2014

FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project-August 2014

'E 90000 u

(i5 80000 2:

~ 70000 c:

(U t) 60000

t

~---~-----...---~---~

...Jr- ~~ ~~----------..-.---...-----!----..~~~~~~--!

~--;~

=....

.......;.:i.t-.

~-~~--~~---------

"C

~

§ 50000

(.)

u i;::::: 40000

  • c::;

~ 30000 Cl) 20000 10000 I

0 +--~~~~~~~~~~~~~~~--.~~~~~~~~~~~---+~~~~~~--.~--I 6/1/10 9/1/10 12/1/10 3/1/11 6/1/11 9/1/11 12/1/11 3/1/12 6/1/12 9/1/12 12/1/12 3/1/13 6/1/13 9/1/13 12/1/13 3/1/14 6/1/14 c::::::J Interim Operating Period --TPGW-1 OS TPGW-11S -

TPGW-14S 27 0

~ 26 Cl)

I..

t -

(U I..

Cl)

Q.

E 25 Cl)

I-24 23 I

6/1/10 9/1/10 12/1/10 3/1/11 6/1/11 9/1/11 12/1/11 3/1/12 6/1/12 9/1/12 12/1/12 3/1/13 6/1/13 9/1/13 12/1/13 3/1/14 6/1/14 c...:J Interim Operating Period --TPGW-1 OS TPGW-11S -

TPGW-14S 100000

'E 90000 u

(i5 80000 2:

Cl) 70000 u

c:

(U - 60000 u

t "C c: 50000 0

(.)

u i;::::: 40000

  • c::;

~ 30000 Cl) 20000 10000

,._.--~-------------r-~

! i i Section2

~~'~-----~-------~..._.--.---;.~-----.......__

  • -~~---------:.::::=~=====:=;:==1

-::::=::::~~~~~*~~-::;S'.:!~~

.--',_ __ -:::::,...r-0 +-~~~~~~~~~~~~~~~---.~~~~~~~~~~~---+~~~~~~---.~--1 6/1/10 9/1/10 12/1/10 3/1/11 6/1/11 9/1/11 12/1/11 3/1/12 6/1/12 9/1/12 12/1/12 3/1/13 6/1/13 9/1/13 12/1/13 3/1/14 6/1/14 c_J lnterim Operating Period --TPGW-100 TPGW-110 -

TPGW-140 28 I

27 I

l I

(.)

~ 26 Cl)

I..

t -

(U I..

Cl)

I I

I I

Q.

E 25 Cl)

I-I 24 23 I

6/1/10 9/1/10 12/1/10 3/1/11 6/1/11 9/1/11 12/1/11 3/1/12 6/1/12 9/1/12 12/1/12 3/1/13 6/1/13 9/1/13 12/1/13 3/1/14 6/1/14 C_J lnterim Operating Period --TPGW-100 TPGW-110 -

TPGW-140 Figure 2.1-19. Comparison of Specific Conductance and Temperature in Biscayne Bay Shallow and Deep Wells TPGW-10, TPGW-11, and TPGW-14.

2-53

FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project-August 2014 100000 ~--------------~----------~--------~

e :::::

~

-,.,.. __ _,,,., _ _,,,__,,__....-* *-+--~-------

(.)

~ 70000 Q)

~ 60000

~

... g 50000 "C

c: 8 40000

(.)

!E 30000

(.)

Q)

~ 20000 10000


~--*-----...J,__ --

0 -__,....s~~====;l!!5!!!5!!5~!!!!!!!=:~~~;o!55!!~~==::::~~~==:!~~~~~""""":::=;!!:!::::::.:=~==~===I 6/1/10 9/1/10 12/1/10 3/1/11 6/1/11 9/1/11 12/1/11 3/1/12 6/1/12 9/1/12 12/1/12 3/1/13 6/1/13 9/1/13 12/1/13 3/1/14 6/1/14 c==i lnterim Operating Period --TPGW-14S TPGW-3S -

TPGW-13S -

TPGW-5S -

TPGW-7S 31 30 29

(.)

0 28 Q)...

J...

~

27 Q)

Q.

E 26 Q) 25 24 23 -t---~~~~~~~~~~~~~~~~~~~~~~~-----~~~~~~~--<

6/1/10 9/1/10 12/1/10 3/1/11 6/1/11 9/1/11 12/1/11 3/1/12 6/1/12 9/1/12 12/1/12 3/1/13 6/1/13 9/1/13 12/1/13 3/1/14 6/1/14 c_] Interim Operating Period --TPGW-14S TPGW-3S -

TPGW-13S -

TPGW-5S -

TPGW-7S Section2 100000 I

90000 e 80000,...

J.-"'---.:,

I :..,_.i......_,.... * -

I

  • ----r'L-4-*-1**

1~

(.)

~ 70000 Q) i 60000

... g 50000 "C

c: 8 40000

(.)

!E 30000

(.)

Q)

~ 20000 10000 0

I I -

r I

I I I

6/1/10 9/1/10 12/1/10 3/1/11 6/1/11 9/1/11 12/1/11 3/1/12 6/1/12 9/1/12 12/1/12 3/1/13 6/1/13 9/1/13 12/1/13 3/1/14 6/1/14 1 Interim Operating Period --TPGW-1 40 TPGW TPGW-130 -

TPGW TPGW-70 31 30 I

29 I

0 0

28 Q)...

J...

~

27 Q)

Q.

E 26 Q)

I I I I I I

I I

I 25 24 I

i 23 6/1/10 9/1/10 12/1/10 3/1/11 6/1/11 9/1/11 12/1/11 3/1/12 6/1/12 9/1/12 12/1/12 3/1/13 6/1/13 9/1/13 12/1/13 3/1/14 6/1/14 c==i Interim Operating Period --TPGW-140 TPGW TPGW-130 -

TPGW TPGW-70 Figure 2.1-20. Comparison of Specific Conductance and Temperature across the Landscape in Shallow and Deep Wells TPGW-14, TPGW-3, TPGW-13, TPGW-5, and TPGW 7.

2-54

FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project-August 2014 100000 ~--------------~----------~--------~

90000 e 80000

~

~ 70000 Cl) g 60000 I'll -g 50000 "C

c: 8 40000 CJ i;:: 30000

'(j Cl)

~ 20000 10000 0 ---=;======r====T'====;======;======;;==-==;====;======r====o;=====;====;=====;=====;====;====-I 6/1/10 9/1/10 12/1/10 3/1/11 6/1/11 9/1/11 12/1/11 3/1/12 6/1/12 9/1/12 12/1/12 3/1/13 6/1/13 9/1/13 12/1/13 3/1/14 6/1/14 c_] Interim Operating Period --TPGW-11 S --TPGW-13S -- TPGW-2S TPGW-4S -

TPGW-9S 31 30 29

(.)

0 28 Cl)...

J -

I'll 27 Cl) c.

E 26 Cl)

I-25

~

24 23 --,-----.--.---~---.-----,.----.----,-----.--.,.--~--T---.----.----,-----l 6/1/10 9/1/10 12/1/10 3/1/11 6/1/11 9/1/11 12/1/11 3/1/12 6/1/12 9/1/12 12/1/12 3/1/13 6/1/13 9/1/13 12/1/13 3/1/14 6/1/14 c:::J lnterim Operating Period --TPGW-11S--TPGW-13S -

TPGW-2S TPGW-4S -

TPGW-9S 100000 90000 e 80000

~

~ 70000 Cl) g 60000 I'll -g 50000 "C

c: 8 40000 CJ i;:: 30000

'(j Cl)

~ 20000 10000 0

,~..,."'---'*"""t-I

........ ~-

I Section2

, ____,.,l~-...

1'""'

.......,. -~1~~-

4.-

I

,. I 6/1/10 9/1/10 12/1/10 3/1/11 6/1/11 9/1/11 12/1/11 3/1/12 6/1/12 9/1/12 12/1/12 3/1/13 6/1/13 9/1/13 12/1/13 3/1/14 6/1/14

~ Interim Operating Period --TPGW-11 D --TPGW-13D --TPGW-2D TPGW-4D -

TPGW-9D 31 I

30 29

(.)

0 28 Cl)...

J I'll 27 Cl) c.

E 26 Cl)

I-25 I

24 ---

23 6/1/10 9/1/10 12/1/10 3/1/11 6/1/11 9/1/11 12/1/11 3/1/12 6/1/12 9/1/12 12/1/12 3/1/13 6/1/13 9/1/13 12/1/13 3/1/14 6/1/14 c:::J Interim Operating Period --TPGW-11 D -

TPGW-13D --TPGW-2D TPGW-4D -

TPGW-9D Figure 2.1-21. Comparison of Specific Conductance and Temperature across the Landscape in Shallow and Deep Wells TPGW-11, TPGW-13, TPGW-2, TPGW-4, and TPGW-9.

2-55

FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project-August 2014 100000 ~--------------~-------------------~

90000

'E 80000 u

cg_ 70000 Q) g 60000 IV -g 50000 "C

c: 8 40000 u

!E 30000 u

Q)

~ 20000 10000

---...-:----------------,_....__.., ____..:*-* -+-~ -....... __ _

I F-AF~'-----~~~r--__,..!

0 +-===:..::;::::::==::::::;===::::::;::::==::::::;::==::=;:====;:::::::==:;::::==::;::====:;====;====:;::====l;:====;====:;::===:::;::::====l 6/1/10 9/1/10 12/1/10 3/1/11 6/1/11 9/1/11 12/1/11 3/1/12 6/1/12 9/1/12 12/1/12 3/1/13 6/1/13 9/1/13 12/1/13 3/1/14 6/1/14 C-::J lnterim Operating Period --TPGW-11S --TPGW-13S TPGW-1S --TPGW-6S 31 30 29 u

~ 28 Q)...

I -

IV 27 Q)

Q.

E 26 Q) 25 24 23 6/1/10 9/1/10 12/1/10 3/1/11 6/1/11 9/1/11 12/1/11 3/1/12 6/1/12 9/1/12 12/1/12 3/1/13 6/1/13 9/1/13 12/1/13 3/1/14 6/1/14 C=:J lnterim Operating Period --TPGW-11S --TPGW-13S -- TPGW-1S --TPGW-6S 100000 90000

'E 80000 u

~ 70000 Q) g 60000 IV -g 50000 "C

c: 8 40000 u

!E 30000 u

Q)

~ 20000 10000 0

I

..)...-"---*

I :..,_Jo_.__L._ -

j.,

~

I

    • -~

I I

Section2 I

.-..... --r'L--l-..,........ 1**

1'--'

l i 1

I l l 6/1/10 9/1/10 12/1/10 3/1/11 6/1/11 9/1/11 12/1/11 3/1/12 6/1/12 9/1/12 12/1/12 3/1/13 6/1/13 9/1/13 12/1/13 3/1/14 6/1/14 c

J Interim Operating Period TPGW-110 TPGW-130 TPGW-10 TPGW-60 31 30 I

29 u

~ 28 Q)...

I -

IV 27 Q)

Q.

E 26 Q)

I I

I I

25 I

I 24 I

23 I

6/1/10 9/1/10 12/1/10 3/1/11 6/1/11 9/1/11 12/1/11 3/1/12 6/1/12 9/1/12 12/1/12 3/1/13 6/1/13 9/1/13 12/1/13 3/1/14 6/1/14 c_] lnterim Operating Period

--TPGW-110 --TPGW-130 --TPGW-10 -- TPGW-60 Figure 2.1-22. Comparison of Specific Conductance and Temperature across the Landscape in Shallow and Deep Wells TPGW-11, TPGW-13, TPGW-1, and TPGW-6.

2-56

FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project-August 2014 100000 90000

'E 80000 u

cg_ 70000 Q) g 60000 I'll -g 50000 I.. -*

~-

I

  • -*,~T~--..-

"C c:

t-~'

I I

r-'-'

  • T-b 8 40000 u

~ 30000

  • c:;

Q)

~ 20000 10000 0

~,.

-w 6/1/10 9/1/10 12/1/10 3/1/11 6/1/11 9/1/11 12/1/11 3/1/12 6/1/12 9/1/12 12/1/12 3/1/13 6/1/13 9/1/13 12/1/13 3/1/14 6/1/14 C-:J lnterim Operating Period --TPGW-10S -- TPGW-12S --TPGW-13S --TPGW-6S 31 30 29 0

~ 28 Q)...

I -

I'll 27 Q)

Q, E

26 Q)

I-25 24 23 6/1/10 9/1/10 12/1/10 3/1/11 6/1/11 9/1/11 12/1/11 3/1/12 6/1/12 9/1/12 12/1/12 3/1/13 6/1/13 9/1/13 12/1/13 3/1/14 6/1/14 c:=::i lnterim Operating Period --TPGW-10S --TPGW-1 2S --TPGW-13S --TPGW-6S 100000 90000

'E 80000 u

cg_ 70000 Q) g 60000 I'll -g 50000 "C c: 8 40000 u

~ 30000

  • c:;

Q)

~ 20000 10000 0

.J....-"--....:

. :..__1.-

Section2 I

- *---r'i.,.+."""'-1** 1'--'

f f i

-r--~

I I

I i

f 6/1/10 9/1/10 12/1/10 3/1/11 6/1/11 9/1/11 12/1/11 3/1/12 6/1/12 9/1/12 12/1/12 3/1/13 6/1/13 9/1/13 12/1/13 3/1/14 6/1/14

~ Interim Operating Period

--TPGW-10D TPGW-12D

--TPGW-13D

--TPGW-6D I

I I

I I I 23 6/1/10 9/1/10 12/1/10 3/1/11 6/1/11 9/1/11 12/1/11 3/1/12 6/1/12 9/1/12 12/1/12 3/1/13 6/1/13 9/1/13 12/1/13 3/1/14 6/1/14 r

Interim Operating Period

--TPGW-10D --TPGW-12D --TPGW-13D --TPGW-6D Figure 2.1-23. Comparison of Specific Conductance and Temperature across the Landscape in Shallow and Deep Wells TPGW-10, TPGW-12, TPGW-13, and TPGW-6.

2-57

FPL Turkey Point Comprehensive Annual Report for Units 3 & 4 Uprate Project-August 2014 90000

'E 80000

~ 70000 "'~~--n\\~~~

Q)

~ 60000 Ill -g 50000 "C s 40000 ---------

(.)

~ 30000 0

~ 20000 en 10000 0 -+--------.--.....-----...... --....-----....... ----.--......--------.--..-----....... -----1

(.)

~

f

J cu...

Q) 0..

E Q)

I-6/1/10 9/1/10 12/1/10 3/1/11 6/1/11 9/1/11 12/1/11 3/1/12 6/1/12 9/1/12 c:::J lnterim Operating Period

--TPGW-1S TPGW-3S TPGW-10S TPGW-12S TPGW-13S 30 29 28 27 26 25 24 12/1/12 3/1/13 6/1/13 9/1/13 12/1/13 3/1/14 6/1/14 TPGW-2S TPGW-11 S

-TPGW-14S 23 +---~-~--~-~-~--~-...,_-~-~--~-~-~--~-~-~------j 6/1/10 9/1/10 12/1/10 3/1/11 6/1/11 9/1/11 12/1/11 3/1/12 6/1/12 9/1/12

---:::! Interim Operating Period

--TPGW-1S TPGW-3S TPGW-10S TPGW-1 2S TPGW-13S 12/1/12 3/1/13 6/1/13 9/1/13 12/1/13 3/1/14 TPGW-2S TPGW-11S TPGW-14S 6/1/14 Section2 100000 90000

'E 80000 *-

I

-..r--...-----r*~-,. 1 '""'----

0

~

~ 70000 Q) 0 60000 c:

Ill i

- r=c::

0 50000

J "C c: 40000 0

(.)

0 30000

!E 0

~ 20000 en 10000 0 -+--------.--..-----...... --....-----....... ----.--......--------.--..-----....... ~

-u

~

f

J cu...

Q) 0..

E Q)

I-6/1/10 9/1/10 12/1/10 3/1/11 6/1/11 9/1/11 12/1/11 3/1/12 6/1/12 9/1/12 r..:::.:J Interim Operating Period

--TPGW-10 TPGW-30 TPGW-100 TPGW-12D TPGW-13S 30 29 28 27 26 25 24 12/1/12 3/1/13 6/1/13 9/1/13 12/1/13 3/1/14 E TPGW-20 TPGW-110

-TPGW-14S 23 +---~-~--~-~-~--~--T--~-~--~-~-~--~-~-~-

6/1/10 9/1/10 12/1/10 3/1/11 6/1/11 9/1/11 12/1/11 3/1/12 6/1/12 9/1/12 Jlnterim Operating Period

--TPGW-10 TPGW-3D TPGW-10D TPGW-12D TPGW-13D 12/1/12 3/1/13 6/1/13 9/1/13 12/1/13 3/1/14 E TPGW-20 TPGW-11D TPGW-14D Figure 2.1-24. Comparison of Specific Conductance and Temperature across the Landscape in Shallow and Deep Wells Close to the CCS -TPGW-1, TPGW-2, TPGW-3, TPGW 10, TPGW-11, TPGW-12, TPGW-13, and TPGW-14.

2-58

FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project-August 2014 Section2 Top view of probes in stilling well.

Biscayne Bay non-telemetry setup.

Figure 2.2-1. Automated Surface Water Stations.

2-59