| number = ML13212A115
| number = ML13212A115
| issue date = 07/31/2013
| issue date = 07/31/2013
| title = Shearon Harris Nuclear Plant, Unit 1 - Notification of Inspection and Request for Information
| title = Notification of Inspection and Request for Information
| author name = Vias S J
| author name = Vias S
| author affiliation = NRC/RGN-II/DRS/EB3
| author affiliation = NRC/RGN-II/DRS/EB3
| addressee name = Kapopoulos E J
| addressee name = Kapopoulos E
| addressee affiliation = Carolina Power & Light Co
| addressee affiliation = Carolina Power & Light Co
| docket = 05000400
| docket = 05000400
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 July 31, 2013       Mr. Ernie Kapopoulos Vice President Shearon Harris Nuclear Power Plant Carolina Power and Light Company P.O. Box 165, Mail Code: Zone 1  
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 July 31, 2013 Mr. Ernie Kapopoulos Vice President Shearon Harris Nuclear Power Plant Carolina Power and Light Company P.O. Box 165, Mail Code: Zone 1 New Hill, NC 27562-0165
 
New Hill, NC 27562-0165  


==SUBJECT:==
==SUBJECT:==
SHEARON HARRIS NUCLEAR POWER PLANT, UNIT 1 - NOTIFICATION OF INSPECTION AND REQUEST FOR INFORMATION  
SHEARON HARRIS NUCLEAR POWER PLANT, UNIT 1 - NOTIFICATION OF INSPECTION AND REQUEST FOR INFORMATION


==Dear Mr. Kapopoulos:==
==Dear Mr. Kapopoulos:==


On September 9, 2013, the Nuclear Regulatory Commission will begin inspection activities for the Shearon Harris Nuclear Power Plant, Unit 1 in accordance with Temporary Instruction (TI) 2515-182, "Review of Implementation of the Indu stry Initiative to Control Degradation of Underground Piping and Tanks.This inspection is scheduled to be performed from September 9 - 11, 2013, and will address the inspection requirements for Phase 2 of this TI.  
On September 9, 2013, the Nuclear Regulatory Commission will begin inspection activities for the Shearon Harris Nuclear Power Plant, Unit 1 in accordance with Temporary Instruction (TI) 2515-182, Review of Implementation of the Industry Initiative to Control Degradation of Underground Piping and Tanks. This inspection is scheduled to be performed from September 9 - 11, 2013, and will address the inspection requirements for Phase 2 of this TI.
 
In order to minimize the impact to your on-site resources, and to ensure a productive inspection, we have enclosed a list of documents needed for the preparation and implementation of this inspection. The documents that are requested for this inspection include all relevant documents that will allow the inspector(s) to adequately complete Phase 2 of this inspection.
In order to minimize the impact to your on-site resources, and to ensure a productive inspection, we have enclosed a list of documents needed for the preparation and implementation of this inspection. The documents that are requested for this inspection include all relevant documents that will allow the inspector(s) to adequately complete Phase 2 of this inspection. We have discussed the schedule for these inspection activities with your staff and understand that our regulatory contact for this inspection will be Ms. Shirelle Allen, of your organization. If there are any questions about this inspection or the material requested, please contact the lead inspector Joel Rivera-Ortiz at (404) 997-4825 or Joel.Rivera-Ortiz@nrc.gov. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electr onically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide E. Kapopoulos 2 Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/ adams.html (the Public Electronic Reading Room).
We have discussed the schedule for these inspection activities with your staff and understand that our regulatory contact for this inspection will be Ms. Shirelle Allen, of your organization. If there are any questions about this inspection or the material requested, please contact the lead inspector Joel Rivera-Ortiz at (404) 997-4825 or Joel.Rivera-Ortiz@nrc.gov.
Sincerely,
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide
 
RA Steven J. Vias, Chief Engineering Branch 3 Division of Reactor Safety


Docket No.: 50-400 License No.: NPF-63  
E. Kapopoulos                              2 Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/ adams.html (the Public Electronic Reading Room).
Sincerely, RA Steven J. Vias, Chief Engineering Branch 3 Division of Reactor Safety Docket No.: 50-400 License No.: NPF-63


==Enclosure:==
==Enclosure:==


Temporary Instruction (TI 2515-182)
Temporary Instruction (TI 2515-182)
Inspection Document Request TI-182 Phase II Questions  
Inspection Document Request TI-182 Phase II Questions cc: (See page 3)
 
cc: (See page 3)  
 
__________      X SUNSI REVIEW COMPLETE  X FORM 665 ATTACHED OFFICE RII:DRS RII:DRS RII:DRS  SIGNATURE      NAME J. Rivera-Ortiz C Fletcher S Vias  DATE 7/ 29 /2013 7/ 29 /2013 7/30 /2013  E-MAIL COPY?    YES  NO      YES NO      YES NO 3  cc: Brian Bernard
 
Manager, Nuclear Services and EP Nuclear Protective Services Shearon Harris Nuclear Power Plant Electronic Mail Distribution
 
George T. Hamrick Vice President Carolina Power and Light Company Shearon Harris Nuclear Power Plant Electronic Mail Distribution


Lara S. Nichols Deputy General Counsel Duke Energy Corporation Electronic Mail Distribution  
__________            X SUNSI REVIEW COMPLETE X FORM 665 ATTACHED OFFICE            RII:DRS            RII:DRS          RII:DRS SIGNATURE NAME              J. Rivera-Ortiz    C Fletcher        S Vias DATE              7/ 29 /2013        7/ 29 /2013      7/30 /2013 E-MAIL COPY?          YES    NO      YES      NO      YES      NO 3
cc:                                  Kate Nolan Brian Bernard                        Associate General Counsel Manager, Nuclear Services and EP    Duke Energy Corporation Nuclear Protective Services          Electronic Mail Distribution Shearon Harris Nuclear Power Plant Electronic Mail Distribution        John H. O'Neill, Jr.
Shaw, Pittman, Potts & Trowbridge George T. Hamrick                    2300 N. Street, NW Vice President                      Washington, DC 20037-1128 Carolina Power and Light Company Shearon Harris Nuclear Power Plant  Joseph W. Donahue Electronic Mail Distribution        Vice President - Nuclear Oversight Duke Energy Corporation Lara S. Nichols                     Electronic Mail Distribution Deputy General Counsel Duke Energy Corporation             W. Lee Cox, III Electronic Mail Distribution        Section Chief Radiation Protection Section M. Christopher Nolan                N.C. Department of Environmental Director, Regulatory Affairs        Commerce & Natural Resources Duke Energy Corporation              Electronic Mail Distribution Electronic Mail Distribution Public Service Commission Robert J. Duncan II                  State of South Carolina Senior Vice President                P.O. Box 11649 Progress Energy                      Columbia, SC 29211 Electronic Mail Distribution Chairman Sean T. O'Connor                    North Carolina Utilities Commission Manager, Support Services            Electronic Mail Distribution Shearon Harris Nuclear Power Plant Electronic Mail Distribution        Terrence E. Slake Manager Donald L. Griffith                  Nuclear Plant Security Training Manager                    Shearon Harris Nuclear Power Plant Shearon Harris Nuclear Power Plant  Electronic Mail Distribution Progress Energy Electronic Mail Distribution        Robert P. Gruber Executive Director R. Keith Holbrook                    Public Staff - NCUC Manager, Support Services            4326 Mail Service Center Shearon Harris Nuclear Power Plant  Raleigh, NC 27699-4326 Electronic Mail Distribution David H. Corlett Supervisor Licensing/Regulatory Programs Progress Energy Electronic Mail Distribution         (cc contd - See page 4)


M. Christopher Nolan Director, Regulatory Affairs Duke Energy Corporation Electronic Mail Distribution  
4 (cc contd)
Chair Board of County Commissioners of Wake County P.O. Box 550 Raleigh, NC 27602 Ernest J. Kapopoulos Jr.
Plant General Manager Carolina Power and Light Company Shearon Harris Nuclear Power Plant Electronic Mail Distribution Chair Board of County Commissioners of Chatham County P.O. Box 1809 Pittsboro, NC 27312 Senior Resident Inspector U.S. Nuclear Regulatory Commission Shearon Harris Nuclear Power Plant U.S. NRC 5421 Shearon Harris Rd New Hill, NC 27562-9998


Robert J. Duncan II Senior Vice President Progress Energy Electronic Mail Distribution
Letter to Ernie Kapopoulos from Steven J. Vias dated July 30, 2013.
 
Sean T. O'Connor
 
Manager, Support Services Shearon Harris Nuclear Power Plant Electronic Mail Distribution
 
Donald L. Griffith
 
Training Manager Shearon Harris Nuclear Power Plant Progress Energy Electronic Mail Distribution
 
R. Keith Holbrook
 
Manager, Support Services Shearon Harris Nuclear Power Plant Electronic Mail Distribution
 
David H. Corlett
 
Supervisor Licensing/Regulatory Programs Progress Energy Electronic Mail Distribution
 
Kate Nolan Associate General Counsel Duke Energy Corporation Electronic Mail Distribution
 
John H. O'Neill, Jr.
 
Shaw, Pittman, Potts & Trowbridge
 
2300 N. Street, NW Washington, DC  20037-1128 Joseph W. Donahue Vice President - Nuclear Oversight Duke Energy Corporation Electronic Mail Distribution W. Lee Cox, III Section Chief
 
Radiation Protection Section N.C. Department of Environmental Commerce & Natural Resources Electronic Mail Distribution
 
Public Service Commission
 
State of South Carolina P.O. Box 11649 Columbia, SC  29211
 
Chairman North Carolina Utilities Commission Electronic Mail Distribution Terrence E. Slake
 
Manager Nuclear Plant Security Shearon Harris Nuclear Power Plant Electronic Mail Distribution Robert P. Gruber Executive Director Public Staff - NCUC
 
4326 Mail Service Center Raleigh, NC  27699-4326
 
  (cc cont'd - See page 4)
 
4  (cc cont'd)
Chair Board of County Commissioners of Wake County P.O. Box 550
 
Raleigh, NC  27602
 
Ernest J. Kapopoulos Jr.
 
Plant General Manager Carolina Power and Light Company Shearon Harris Nuclear Power Plant Electronic Mail Distribution
 
Chair Board of County Commissioners of Chatham County P.O. Box 1809
 
Pittsboro, NC  27312
 
Senior Resident Inspector U.S. Nuclear Regulatory Commission Shearon Harris Nuclear Power Plant U.S. NRC
 
5421 Shearon Harris Rd
 
New Hill, NC  27562-9998
 
Letter to Ernie Kapopoulos from Steven J. Vias dated July 30, 2013.


==SUBJECT:==
==SUBJECT:==
SHEARON HARRIS NUCLEAR POWER PLANT, UNIT 1 - NOTIFICATION OF INSPECTION AND REQUEST FOR INFORMATION  
SHEARON HARRIS NUCLEAR POWER PLANT, UNIT 1 - NOTIFICATION OF INSPECTION AND REQUEST FOR INFORMATION Distribution:
 
RIDSNRRDIRS PUBLIC RidsNrrResource
Distribution:
RIDSNRRDIRS PUBLIC RidsNrrResource Enclosure TEMPORARY INSTRUCTION 2515-182 INSPECTION DOCUMENT REQUEST Inspection Dates:  September 9 - 11, 2013 Inspection Procedures: TI 2515-182, "Review of Implementation of the Industry Initiative to Control Degradation of Underground Piping and Tanks" 
 
Inspector:  Joel Rivera-Ortiz, Senior Reactor Inspector        Information Requested for the Preparation and Completion of the In-Office Inspection:
 
The following documents listed below are requested (electronic copy, if possible) by August 30, 2013, to facilitate the preparation for the on-site inspection week 
: 1. Contact information for plant staff responsible for the implementation of the underground piping and tanks program.
: 2. Copy of the documents governing the implementation of the site's underground piping and tanks program. For example, this includes administrative and implementing procedures for the program.
: 3. Please review the Attachment to this Enclosure, "TI 2515-182, Review of Implementation of the Industry Initiative to Control Degradation of Underground Piping and Tanks, Phase 2 Questions" and provide response to all the questions, as applicable. 
: 4. Schedule for completion of the following NEI 09-14, "Guideline For The Management of Underground Piping and Tank Integrity," Revision 3, attributes:


Buried Piping Procedures and Oversight Risk Ranking Inspection Plan Plan Implementation Asset Management Plan  
TEMPORARY INSTRUCTION 2515-182 INSPECTION DOCUMENT REQUEST Inspection Dates:                September 9 - 11, 2013 Inspection Procedures:          TI 2515-182, Review of Implementation of the Industry Initiative to Control Degradation of Underground Piping and Tanks Inspector:                      Joel Rivera-Ortiz, Senior Reactor Inspector Information Requested for the Preparation and Completion of the In-Office Inspection:
 
The following documents listed below are requested (electronic copy, if possible) by August 30, 2013, to facilitate the preparation for the on-site inspection week
Underground Piping and Tanks Procedures and Oversight Prioritization Condition Assessment Plan Plan Implementation Asset Management Plan  
: 1. Contact information for plant staff responsible for the implementation of the underground piping and tanks program.
 
: 2. Copy of the documents governing the implementation of the sites underground piping and tanks program. For example, this includes administrative and implementing procedures for the program.
Information to be provided On-Site to the Inspector following the Entrance Meeting: 1. Copy or ready access to the program drawings showing the location of buried and underground piping and tanks within the scope of the program.  
: 3. Please review the Attachment to this Enclosure, TI 2515-182, Review of Implementation of the Industry Initiative to Control Degradation of Underground Piping and Tanks, Phase 2 Questions and provide response to all the questions, as applicable.
: 4. Schedule for completion of the following NEI 09-14, Guideline For The Management of Underground Piping and Tank Integrity, Revision 3, attributes:
Buried Piping Procedures and Oversight Risk Ranking Inspection Plan Plan Implementation Asset Management Plan Underground Piping and Tanks Procedures and Oversight Prioritization Condition Assessment Plan Plan Implementation Asset Management Plan Information to be provided On-Site to the Inspector following the Entrance Meeting:
: 1. Copy or ready access to the program drawings showing the location of buried and underground piping and tanks within the scope of the program.
: 2. Copy or ready access to the industry standards and guidelines associated with the program.
: 2. Copy or ready access to the industry standards and guidelines associated with the program.
Enclosure  
Enclosure
: 3. Self or third party assessments of the underground piping and tanks program (if any have been performed).
: 4. Response to additional information requested prior to the inspection based on the response to the TI 2515-182 questions in the Attachment.
: 5. For any of the NEI 09-14 (Revision 3) attributes identified below which have been completed prior to the NRC's onsite inspection, provide written records that demonstrate that the program attribute is complete.


2
: 3. Self or third party assessments of the underground piping and tanks program (if any have been performed).
: 4. Response to additional information requested prior to the inspection based on the response to the TI 2515-182 questions in the Attachment.
: 5. For any of the NEI 09-14 (Revision 3) attributes identified below which have been completed prior to the NRCs onsite inspection, provide written records that demonstrate that the program attribute is complete.
Buried Piping
Buried Piping
* Procedures and Oversight
* Procedures and Oversight
Line 146: Line 74:
* Condition Assessment Plan
* Condition Assessment Plan
* Plan Implementation
* Plan Implementation
* Asset Management Plan  
* Asset Management Plan Inspector Contact Information               Mailing Address Joel Rivera-Ortiz                           US NRC- Region II Sr. Reactor Inspector                       Attn: Joel Rivera-Ortiz 404-997-4825                                 245 Peachtree Center Avenue, Suite 1200 Joel.Rivera-Ortiz@nrc.gov                   Atlanta, GA 30303 Enclosure
 
Inspector Contact Information Mailing Address Joel Rivera-Ortiz   US NRC- Region II Sr. Reactor Inspector   Attn: Joel Rivera-Ortiz 404-997-4825     245 Peachtree Center Avenue, Suite 1200 Joel.Rivera-Ortiz@nrc.gov   Atlanta, GA 30303
 
Attachment TI 2515-182 Review of Implementation of the Industry Initiative to Control Degradation of Underground Piping and Tanks Phase 2 Questions Questions Response Question Number Subpart Initiative Consistency 1 a Has the licensee taken any deviations to either of the initiatives?
Yes / No  b If so, what deviations have been taken and what is (are) the basis for these deviations?
2 a Does the licensee have an onsite buried piping program manager (owner) and, potentially, a
 
staff? Yes / No  b How many buried piping program owners have there been since January 1, 2010?
c How many other site programs are assigned to the buried piping program owner?
3 a Does the licensee have requirements to capture program performance, such as system health reports and performance indicators?
Yes / No  b Are these requirements periodic or event driven? Periodic / Event Driven /
None  c Are there examples where these requirements have been successfully used to upgrade piping systems or to avert piping or tank leaks?
Yes / No 4 a Does the licensee have a program or procedure to confirm the as-built location of buried and underground piping and tanks at the plant?
Yes / No  b Has the licensee used this program? Yes / No  c Was the program effective in identifying the location of buried pipe?
Yes / No 2  Attachment 5  For a sample of buried pipe and underground piping and tanks (sample size at least 1 high and 1 low risk/priority pipe or tank), did the risk ranking and/or prioritization process utilized by the licensee produce results in accordance with the initiative guidelines, i.e., which emphasize the importance of components which have a high likelihood and consequence of failure and
 
deemphasize the importance of components which have a low likelihood and consequence of failure?
Yes / No Sample size
 
examined
 
_____ 6 a As part of its risk ranking process did the licensee estimate/determine the total length of buried/ underground piping included in the initiatives?
Yes / No  b As part of its risk ranking process did the licensee estimate/determine the total length of high risk buried/underground piping included in the initiatives?
Yes / No Preventive Actions / System Maintenance 1 a For uncoated steel piping, has the licensee developed a technical basis for concluding that structural (e.g. ASME Code minimum wall, if applicable) and leaktight integrity of buried piping can be maintained?
Yes / No / Not Applicable (no
 
uncoated
 
buried steel pipe)  b Is the technical basis provided as justification by the licensee consistent with the initiative (including its reference documents) or industry standards (e.g. NACE SP0169)
Yes / No  2 a For buried steel, copper, or aluminum piping or tanks which are not cathodically protected, has the licensee developed a technical basis for concluding that structural (e.g. ASME Code minimum wall, if applicable) and leaktight integrity of buried piping can be maintained?
Yes / No / Not Applicable (no buried steel,
 
copper, or
 
aluminum piping which is not cathodically protected)  b Is the technical basis provided as justification by the licensee consistent with the initiative (including its reference documents) or industry standards (e.g. NACE SP0169)
Yes / No 3  Attachment 3 a For licensees with cathodic protection systems, does the licensee have procedures for the
 
maintenance, monitoring and surveys of this
 
equipment?
Yes / No / Not Applicable (no
 
cathodic
 
protection systems)  b Are the licensee procedures consistent with the initiative (including its reference documents) or industry standards (e.g. NACE SP0169)?
Yes / No  c Is the cathodic protection system, including the evaluation of test data, being operated and maintained by personnel knowledgeable of, or trained in, such activities Yes / No 4  Is there a program to ensure chase and vault areas which contain piping or tanks subject to the underground piping and tanks initiative are monitored for, or protected against, accumulation of leakage from these pipes or tanks?
Yes / No / N/A (No piping in chases or vaults)    Inspection Activities / Corrective Actions 1 a Has the licensee prepared an inspection plan for its buried piping and underground piping and tanks?
Yes / No  b Does the plan specify dates and locations where inspections are planned?
Yes / No  c Have inspections, for which the planned dates have passed, occurred as scheduled or have a substantial number of inspections been deferred?
Occurred as scheduled /
 
Deferred 2 a Has the licensee experienced leaks and/or significant degradation in safety related piping or piping carrying licensed material since January 1,
 
2009?  Leaks Yes / No Degradation


Yes / No b If leakage or significant degradation did occur, did the licensee determine the cause of the leakage or degradation?
TI 2515-182 Review of Implementation of the Industry Initiative to Control Degradation of Underground Piping and Tanks Phase 2 Questions Questions                                          Response Question Subpart Number Initiative Consistency 1    a        Has the licensee taken any deviations to either of Yes / No the initiatives?
Yes / No 4 Attachment  c Based on a review of a sample of root cause analyses for leaks from buried piping or underground piping and tanks which are safety related or contain licensed material, did the licensee's corrective action taken as a result of the incident include addressing the cause of the degradation?
b       If so, what deviations have been taken and what is (are) the basis for these deviations?
Yes / No / N/A (no leaks)  d Did the corrective action include an evaluation of extent of condition of the piping or tanks and possible expansion of scope of inspections? 
2    a        Does the licensee have an onsite buried piping    Yes / No program manager (owner) and, potentially, a staff?
(Preference should be given to high risk piping and "significant" leaks where more information is likely to be available).
b        How many buried piping program owners have there been since January 1, 2010?
Yes / No / N/A (no leaks) 3 a Based on a review of a sample of NDE activities which were either directly observed or for which
c        How many other site programs are assigned to the buried piping program owner?
3    a        Does the licensee have requirements to capture    Yes / No program performance, such as system health reports and performance indicators?
b        Are these requirements periodic or event driven?   Periodic /
Event Driven /
None c        Are there examples where these requirements        Yes / No have been successfully used to upgrade piping systems or to avert piping or tank leaks?
4     a       Does the licensee have a program or procedure      Yes / No to confirm the as-built location of buried and underground piping and tanks at the plant?
b        Has the licensee used this program?               Yes / No c        Was the program effective in identifying the       Yes / No location of buried pipe?
Attachment


records were reviewed, were the inspections conducted using a predetermined set of licensee/contractor procedures?
2 5  For a sample of buried pipe and underground          Yes / No piping and tanks (sample size at least 1 high and    Sample size 1 low risk/priority pipe or tank), did the risk      examined ranking and/or prioritization process utilized by    _____
Yes / No b Were these procedures sufficiently described and recorded such that the inspection could be reproduced at a later date?
the licensee produce results in accordance with the initiative guidelines, i.e., which emphasize the importance of components which have a high likelihood and consequence of failure and deemphasize the importance of components which have a low likelihood and consequence of failure?
Yes / No c Were the procedures appropriate to detect the targeted degradation mechanism?
6 a As part of its risk ranking process did the          Yes / No licensee estimate/determine the total length of buried/ underground piping included in the initiatives?
Yes / No  d For quantitative inspections, were the procedures used adequate to collect quantitative
b As part of its risk ranking process did the          Yes / No licensee estimate/determine the total length of high risk buried/underground piping included in the initiatives?
Preventive Actions / System Maintenance 1 a For uncoated steel piping, has the licensee          Yes / No / Not developed a technical basis for concluding that      Applicable (no structural (e.g. ASME Code minimum wall, if          uncoated applicable) and leaktight integrity of buried piping buried steel can be maintained?                                  pipe) b Is the technical basis provided as justification by Yes / No the licensee consistent with the initiative (including its reference documents) or industry standards (e.g. NACE SP0169) 2 a For buried steel, copper, or aluminum piping or      Yes / No / Not tanks which are not cathodically protected, has      Applicable (no the licensee developed a technical basis for        buried steel, concluding that structural (e.g. ASME Code          copper, or minimum wall, if applicable) and leaktight          aluminum integrity of buried piping can be maintained?        piping which is not cathodically protected) b Is the technical basis provided as justification by  Yes / No the licensee consistent with the initiative (including its reference documents) or industry standards (e.g. NACE SP0169)
Attachment


information?
3 3 a For licensees with cathodic protection systems,    Yes / No / Not does the licensee have procedures for the          Applicable (no maintenance, monitoring and surveys of this        cathodic equipment?                                          protection systems) b Are the licensee procedures consistent with the    Yes / No initiative (including its reference documents) or industry standards (e.g. NACE SP0169)?
Yes / No 4  Did the licensee disposition direct or indirect NDE results in accordance with their procedural
c Is the cathodic protection system, including the    Yes / No evaluation of test data, being operated and maintained by personnel knowledgeable of, or trained in, such activities Is there a program to ensure chase and vault        Yes / No / N/A areas which contain piping or tanks subject to the  (No piping in underground piping and tanks initiative are        chases or monitored for, or protected against, accumulation  vaults) of leakage from these pipes or tanks?
Inspection Activities / Corrective Actions 1 a Has the licensee prepared an inspection plan for    Yes / No its buried piping and underground piping and tanks?
b Does the plan specify dates and locations where    Yes / No inspections are planned?
c Have inspections, for which the planned dates      Occurred as have passed, occurred as scheduled or have a        scheduled /
substantial number of inspections been deferred?    Deferred 2 a Has the licensee experienced leaks and/or          Leaks Yes / No significant degradation in safety related piping or Degradation piping carrying licensed material since January 1,  Yes / No 2009?
b If leakage or significant degradation did occur,    Yes / No did the licensee determine the cause of the leakage or degradation?
Attachment


requirements?
4 c Based on a review of a sample of root cause        Yes / No / N/A analyses for leaks from buried piping or            (no leaks) underground piping and tanks which are safety related or contain licensed material, did the licensee's corrective action taken as a result of the incident include addressing the cause of the degradation?
Yes / No 5  Based on a sample of piping segments, is there evidence that licensees are substantially meeting the pressure testing requirements of ASME Section XI IWA-5244?
d Did the corrective action include an evaluation of  Yes / No / N/A extent of condition of the piping or tanks and      (no leaks) possible expansion of scope of inspections?
Yes / No}}
(Preference should be given to high risk piping and significant leaks where more information is likely to be available).
3 a Based on a review of a sample of NDE activities    Yes / No which were either directly observed or for which records were reviewed, were the inspections conducted using a predetermined set of licensee/contractor procedures?
b Were these procedures sufficiently described and    Yes / No recorded such that the inspection could be reproduced at a later date?
c Were the procedures appropriate to detect the      Yes / No targeted degradation mechanism?
d For quantitative inspections, were the procedures  Yes / No used adequate to collect quantitative information?
4  Did the licensee disposition direct or indirect NDE Yes / No results in accordance with their procedural requirements?
5  Based on a sample of piping segments, is there     Yes / No evidence that licensees are substantially meeting the pressure testing requirements of ASME Section XI IWA-5244?
Attachment}}

Latest revision as of 03:55, 6 February 2020

Notification of Inspection and Request for Information
ML13212A115
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 07/31/2013
From: Vias S
NRC/RGN-II/DRS/EB3
To: Kapopoulos E
Carolina Power & Light Co
References
Download: ML13212A115 (10)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 July 31, 2013 Mr. Ernie Kapopoulos Vice President Shearon Harris Nuclear Power Plant Carolina Power and Light Company P.O. Box 165, Mail Code: Zone 1 New Hill, NC 27562-0165

SUBJECT:

SHEARON HARRIS NUCLEAR POWER PLANT, UNIT 1 - NOTIFICATION OF INSPECTION AND REQUEST FOR INFORMATION

Dear Mr. Kapopoulos:

On September 9, 2013, the Nuclear Regulatory Commission will begin inspection activities for the Shearon Harris Nuclear Power Plant, Unit 1 in accordance with Temporary Instruction (TI) 2515-182, Review of Implementation of the Industry Initiative to Control Degradation of Underground Piping and Tanks. This inspection is scheduled to be performed from September 9 - 11, 2013, and will address the inspection requirements for Phase 2 of this TI.

In order to minimize the impact to your on-site resources, and to ensure a productive inspection, we have enclosed a list of documents needed for the preparation and implementation of this inspection. The documents that are requested for this inspection include all relevant documents that will allow the inspector(s) to adequately complete Phase 2 of this inspection.

We have discussed the schedule for these inspection activities with your staff and understand that our regulatory contact for this inspection will be Ms. Shirelle Allen, of your organization. If there are any questions about this inspection or the material requested, please contact the lead inspector Joel Rivera-Ortiz at (404) 997-4825 or Joel.Rivera-Ortiz@nrc.gov.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide

E. Kapopoulos 2 Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/ adams.html (the Public Electronic Reading Room).

Sincerely, RA Steven J. Vias, Chief Engineering Branch 3 Division of Reactor Safety Docket No.: 50-400 License No.: NPF-63

Enclosure:

Temporary Instruction (TI 2515-182)

Inspection Document Request TI-182 Phase II Questions cc: (See page 3)

__________ X SUNSI REVIEW COMPLETE X FORM 665 ATTACHED OFFICE RII:DRS RII:DRS RII:DRS SIGNATURE NAME J. Rivera-Ortiz C Fletcher S Vias DATE 7/ 29 /2013 7/ 29 /2013 7/30 /2013 E-MAIL COPY? YES NO YES NO YES NO 3

cc: Kate Nolan Brian Bernard Associate General Counsel Manager, Nuclear Services and EP Duke Energy Corporation Nuclear Protective Services Electronic Mail Distribution Shearon Harris Nuclear Power Plant Electronic Mail Distribution John H. O'Neill, Jr.

Shaw, Pittman, Potts & Trowbridge George T. Hamrick 2300 N. Street, NW Vice President Washington, DC 20037-1128 Carolina Power and Light Company Shearon Harris Nuclear Power Plant Joseph W. Donahue Electronic Mail Distribution Vice President - Nuclear Oversight Duke Energy Corporation Lara S. Nichols Electronic Mail Distribution Deputy General Counsel Duke Energy Corporation W. Lee Cox, III Electronic Mail Distribution Section Chief Radiation Protection Section M. Christopher Nolan N.C. Department of Environmental Director, Regulatory Affairs Commerce & Natural Resources Duke Energy Corporation Electronic Mail Distribution Electronic Mail Distribution Public Service Commission Robert J. Duncan II State of South Carolina Senior Vice President P.O. Box 11649 Progress Energy Columbia, SC 29211 Electronic Mail Distribution Chairman Sean T. O'Connor North Carolina Utilities Commission Manager, Support Services Electronic Mail Distribution Shearon Harris Nuclear Power Plant Electronic Mail Distribution Terrence E. Slake Manager Donald L. Griffith Nuclear Plant Security Training Manager Shearon Harris Nuclear Power Plant Shearon Harris Nuclear Power Plant Electronic Mail Distribution Progress Energy Electronic Mail Distribution Robert P. Gruber Executive Director R. Keith Holbrook Public Staff - NCUC Manager, Support Services 4326 Mail Service Center Shearon Harris Nuclear Power Plant Raleigh, NC 27699-4326 Electronic Mail Distribution David H. Corlett Supervisor Licensing/Regulatory Programs Progress Energy Electronic Mail Distribution (cc contd - See page 4)

4 (cc contd)

Chair Board of County Commissioners of Wake County P.O. Box 550 Raleigh, NC 27602 Ernest J. Kapopoulos Jr.

Plant General Manager Carolina Power and Light Company Shearon Harris Nuclear Power Plant Electronic Mail Distribution Chair Board of County Commissioners of Chatham County P.O. Box 1809 Pittsboro, NC 27312 Senior Resident Inspector U.S. Nuclear Regulatory Commission Shearon Harris Nuclear Power Plant U.S. NRC 5421 Shearon Harris Rd New Hill, NC 27562-9998

Letter to Ernie Kapopoulos from Steven J. Vias dated July 30, 2013.

SUBJECT:

SHEARON HARRIS NUCLEAR POWER PLANT, UNIT 1 - NOTIFICATION OF INSPECTION AND REQUEST FOR INFORMATION Distribution:

RIDSNRRDIRS PUBLIC RidsNrrResource

TEMPORARY INSTRUCTION 2515-182 INSPECTION DOCUMENT REQUEST Inspection Dates: September 9 - 11, 2013 Inspection Procedures: TI 2515-182, Review of Implementation of the Industry Initiative to Control Degradation of Underground Piping and Tanks Inspector: Joel Rivera-Ortiz, Senior Reactor Inspector Information Requested for the Preparation and Completion of the In-Office Inspection:

The following documents listed below are requested (electronic copy, if possible) by August 30, 2013, to facilitate the preparation for the on-site inspection week

1. Contact information for plant staff responsible for the implementation of the underground piping and tanks program.
2. Copy of the documents governing the implementation of the sites underground piping and tanks program. For example, this includes administrative and implementing procedures for the program.
3. Please review the Attachment to this Enclosure, TI 2515-182, Review of Implementation of the Industry Initiative to Control Degradation of Underground Piping and Tanks, Phase 2 Questions and provide response to all the questions, as applicable.
4. Schedule for completion of the following NEI 09-14, Guideline For The Management of Underground Piping and Tank Integrity, Revision 3, attributes:

Buried Piping Procedures and Oversight Risk Ranking Inspection Plan Plan Implementation Asset Management Plan Underground Piping and Tanks Procedures and Oversight Prioritization Condition Assessment Plan Plan Implementation Asset Management Plan Information to be provided On-Site to the Inspector following the Entrance Meeting:

1. Copy or ready access to the program drawings showing the location of buried and underground piping and tanks within the scope of the program.
2. Copy or ready access to the industry standards and guidelines associated with the program.

Enclosure

2

3. Self or third party assessments of the underground piping and tanks program (if any have been performed).
4. Response to additional information requested prior to the inspection based on the response to the TI 2515-182 questions in the Attachment.
5. For any of the NEI 09-14 (Revision 3) attributes identified below which have been completed prior to the NRCs onsite inspection, provide written records that demonstrate that the program attribute is complete.

Buried Piping

  • Procedures and Oversight
  • Risk Ranking
  • Inspection Plan
  • Plan Implementation
  • Asset Management Plan Underground Piping and Tanks
  • Procedures and Oversight
  • Prioritization
  • Condition Assessment Plan
  • Plan Implementation
  • Asset Management Plan Inspector Contact Information Mailing Address Joel Rivera-Ortiz US NRC- Region II Sr. Reactor Inspector Attn: Joel Rivera-Ortiz 404-997-4825 245 Peachtree Center Avenue, Suite 1200 Joel.Rivera-Ortiz@nrc.gov Atlanta, GA 30303 Enclosure

TI 2515-182 Review of Implementation of the Industry Initiative to Control Degradation of Underground Piping and Tanks Phase 2 Questions Questions Response Question Subpart Number Initiative Consistency 1 a Has the licensee taken any deviations to either of Yes / No the initiatives?

b If so, what deviations have been taken and what is (are) the basis for these deviations?

2 a Does the licensee have an onsite buried piping Yes / No program manager (owner) and, potentially, a staff?

b How many buried piping program owners have there been since January 1, 2010?

c How many other site programs are assigned to the buried piping program owner?

3 a Does the licensee have requirements to capture Yes / No program performance, such as system health reports and performance indicators?

b Are these requirements periodic or event driven? Periodic /

Event Driven /

None c Are there examples where these requirements Yes / No have been successfully used to upgrade piping systems or to avert piping or tank leaks?

4 a Does the licensee have a program or procedure Yes / No to confirm the as-built location of buried and underground piping and tanks at the plant?

b Has the licensee used this program? Yes / No c Was the program effective in identifying the Yes / No location of buried pipe?

Attachment

2 5 For a sample of buried pipe and underground Yes / No piping and tanks (sample size at least 1 high and Sample size 1 low risk/priority pipe or tank), did the risk examined ranking and/or prioritization process utilized by _____

the licensee produce results in accordance with the initiative guidelines, i.e., which emphasize the importance of components which have a high likelihood and consequence of failure and deemphasize the importance of components which have a low likelihood and consequence of failure?

6 a As part of its risk ranking process did the Yes / No licensee estimate/determine the total length of buried/ underground piping included in the initiatives?

b As part of its risk ranking process did the Yes / No licensee estimate/determine the total length of high risk buried/underground piping included in the initiatives?

Preventive Actions / System Maintenance 1 a For uncoated steel piping, has the licensee Yes / No / Not developed a technical basis for concluding that Applicable (no structural (e.g. ASME Code minimum wall, if uncoated applicable) and leaktight integrity of buried piping buried steel can be maintained? pipe) b Is the technical basis provided as justification by Yes / No the licensee consistent with the initiative (including its reference documents) or industry standards (e.g. NACE SP0169) 2 a For buried steel, copper, or aluminum piping or Yes / No / Not tanks which are not cathodically protected, has Applicable (no the licensee developed a technical basis for buried steel, concluding that structural (e.g. ASME Code copper, or minimum wall, if applicable) and leaktight aluminum integrity of buried piping can be maintained? piping which is not cathodically protected) b Is the technical basis provided as justification by Yes / No the licensee consistent with the initiative (including its reference documents) or industry standards (e.g. NACE SP0169)

Attachment

3 3 a For licensees with cathodic protection systems, Yes / No / Not does the licensee have procedures for the Applicable (no maintenance, monitoring and surveys of this cathodic equipment? protection systems) b Are the licensee procedures consistent with the Yes / No initiative (including its reference documents) or industry standards (e.g. NACE SP0169)?

c Is the cathodic protection system, including the Yes / No evaluation of test data, being operated and maintained by personnel knowledgeable of, or trained in, such activities 4 Is there a program to ensure chase and vault Yes / No / N/A areas which contain piping or tanks subject to the (No piping in underground piping and tanks initiative are chases or monitored for, or protected against, accumulation vaults) of leakage from these pipes or tanks?

Inspection Activities / Corrective Actions 1 a Has the licensee prepared an inspection plan for Yes / No its buried piping and underground piping and tanks?

b Does the plan specify dates and locations where Yes / No inspections are planned?

c Have inspections, for which the planned dates Occurred as have passed, occurred as scheduled or have a scheduled /

substantial number of inspections been deferred? Deferred 2 a Has the licensee experienced leaks and/or Leaks Yes / No significant degradation in safety related piping or Degradation piping carrying licensed material since January 1, Yes / No 2009?

b If leakage or significant degradation did occur, Yes / No did the licensee determine the cause of the leakage or degradation?

Attachment

4 c Based on a review of a sample of root cause Yes / No / N/A analyses for leaks from buried piping or (no leaks) underground piping and tanks which are safety related or contain licensed material, did the licensee's corrective action taken as a result of the incident include addressing the cause of the degradation?

d Did the corrective action include an evaluation of Yes / No / N/A extent of condition of the piping or tanks and (no leaks) possible expansion of scope of inspections?

(Preference should be given to high risk piping and significant leaks where more information is likely to be available).

3 a Based on a review of a sample of NDE activities Yes / No which were either directly observed or for which records were reviewed, were the inspections conducted using a predetermined set of licensee/contractor procedures?

b Were these procedures sufficiently described and Yes / No recorded such that the inspection could be reproduced at a later date?

c Were the procedures appropriate to detect the Yes / No targeted degradation mechanism?

d For quantitative inspections, were the procedures Yes / No used adequate to collect quantitative information?

4 Did the licensee disposition direct or indirect NDE Yes / No results in accordance with their procedural requirements?

5 Based on a sample of piping segments, is there Yes / No evidence that licensees are substantially meeting the pressure testing requirements of ASME Section XI IWA-5244?

Attachment