|
|
(5 intermediate revisions by the same user not shown) |
Line 2: |
Line 2: |
| | number = ML16180A249 | | | number = ML16180A249 |
| | issue date = 06/27/2016 | | | issue date = 06/27/2016 |
| | title = 2016/06/27 NRR E-mail Capture - Hope Creek Generating Station - Acceptance Review of LAR to Amend TSs to Modify Section 2.1, Safety Limits (CAC No. MF7793) | | | title = NRR E-mail Capture - Hope Creek Generating Station - Acceptance Review of LAR to Amend TSs to Modify Section 2.1, Safety Limits |
| | author name = Parker C J | | | author name = Parker C |
| | author affiliation = NRC/NRR/DORL/LPLI-2 | | | author affiliation = NRC/NRR/DORL/LPLI-2 |
| | addressee name = Duke P R, Thomas B | | | addressee name = Duke P, Thomas B |
| | addressee affiliation = PSEG Nuclear, LLC | | | addressee affiliation = PSEG Nuclear, LLC |
| | docket = 05000354 | | | docket = 05000354 |
Line 18: |
Line 18: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:1NRR-PMDAPEm Resource From:Parker, Carleen J Sent:Monday, June 27, 2016 2:19 PM To:Duke, Paul R. (Paul.Duke@pseg.com); Th omas, Brian J. (Brian.Thomas@pseg.com) | | {{#Wiki_filter:NRR-PMDAPEm Resource From: Parker, Carleen J Sent: Monday, June 27, 2016 2:19 PM To: Duke, Paul R. (Paul.Duke@pseg.com); Thomas, Brian J. (Brian.Thomas@pseg.com) |
| Cc:BROADDUS, Doug A; Forsaty, Fred M; Tilton, Caroline E; OESTERLE, ERIC R | | Cc: BROADDUS, Doug A; Forsaty, Fred M; Tilton, Caroline E; OESTERLE, ERIC R |
|
| |
|
| ==Subject:== | | ==Subject:== |
| Acceptance Review - Hope Creek LAR To Modify TS 2.1, Safety Limits Paul, By letter dated June 8, 2016, PSEG Nuclear LLC submitted a license amendment request to modify Technical Specification (TS) Section 2.1, Safety Limits, for Hope Creek Generating Station (HCGS). Specifically, this change would incorporate a revised Safety Limit Minimum Critical Power Ratio (SLMCPR) for single recirculation loop operation (SLO) due to the cycle specific analysis performed by Global Nuclear Fuel for HCGS Cycle 21. | | Acceptance Review - Hope Creek LAR To Modify TS 2.1, Safety Limits |
| | : Paul, By letter dated June 8, 2016, PSEG Nuclear LLC submitted a license amendment request to modify Technical Specification (TS) Section 2.1, Safety Limits, for Hope Creek Generating Station (HCGS). Specifically, this change would incorporate a revised Safety Limit Minimum Critical Power Ratio (SLMCPR) for single recirculation loop operation (SLO) due to the cycle specific analysis performed by Global Nuclear Fuel for HCGS Cycle 21. |
| | The purpose of this email is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staffs acceptance review of this amendment request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant. |
| | Consistent with Section 50.90 of Title 10 of the Code of Federal Regulations (10 CFR), an amendment to the license (including the technical specifications) must fully describe the changes requested, and following as far as applicable, the form prescribed for original applications. Section 50.34 of 10 CFR addresses the content of technical information required. This section stipulates that the submittal address the design and operating characteristics, unusual or novel design features, and principal safety considerations. |
| | The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. You will be advised of any further information needed to support the NRC staffs detailed technical review by separate correspondence. |
| | If you have any questions, please contact me. |
| | Carleen Parker Project Manager - |
| | Hope Creek and Salem Plant Licensing Branch I-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission (301)415-1603 carleen.parker@nrc.gov 1 |
|
| |
|
| The purpose of this email is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staff
| | 2 Hearing Identifier: NRR_PMDA Email Number: 2922 Mail Envelope Properties (d01fe9697624452fad9a99e926b77b63) |
| 's acceptance review of this amendment request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to a llow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant. Consistent with Section 50.90 of Title 10 of the Code of Federal Regulations (10 CFR), an amendment to the license (including the technical specifications) must fully describe the changes requested, and following as far as applicable, the form prescribed for original applications. Section 50.34 of 10 CFR addresses the content of technical information required. This section stipulates that the submittal address the design and operating characteristics, unusual or novel design features, and principal safety considerations.
| |
| | |
| The NRC staff has reviewed your application and concluded that it does provide technical information in
| |
| | |
| sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that
| |
| | |
| impact the NRC staff's ability to complete the detailed te chnical review are identified despite completion of an adequate acceptance review. You will be advised of any further information needed to support the NRC staff
| |
| 's detailed technical review by separate correspondence.
| |
| | |
| If you have any questions, please contact me.
| |
| | |
| Carleen Parker Project Manager - Hope Creek and Salem Plant Licensing Branch I-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission (301)415-1603
| |
| | |
| carleen.parker@nrc.gov
| |
| | |
| 2 Hearing Identifier: NRR_PMDA Email Number: 2922 Mail Envelope Properties (d01fe9697624452fad9a99e926b77b63) | |
|
| |
|
| ==Subject:== | | ==Subject:== |
| Acceptance Review - Hope Creek LAR To Modify TS 2.1, Safety Limits Sent Date: 6/27/2016 2:19:05 PM Received Date: 6/27/2016 2:19:00 PM From: Parker, Carleen J Created By: Carleen.Parker@nrc.gov Recipients: "BROADDUS, Doug A" <Doug.Broaddus@nrc.gov> | | Acceptance Review - Hope Creek LAR To Modify TS 2.1, Safety Limits Sent Date: 6/27/2016 2:19:05 PM Received Date: 6/27/2016 2:19:00 PM From: Parker, Carleen J Created By: Carleen.Parker@nrc.gov Recipients: |
| Tracking Status: None "Forsaty, Fred M" <Fred.Forsaty@nrc.gov> | | "BROADDUS, Doug A" <Doug.Broaddus@nrc.gov> |
| Tracking Status: None "Tilton, Caroline E" <Caroline.Tilton@nrc.gov> Tracking Status: None "OESTERLE, ERIC R" <Eric.Oesterle@nrc.gov> Tracking Status: None "Duke, Paul R. (Paul.Duke@pseg.com)" <Paul.Duke@pseg.com> Tracking Status: None "Thomas, Brian J. (Brian.Thomas@pseg.com)" <Brian.Thomas@pseg.com> Tracking Status: None | | Tracking Status: None "Forsaty, Fred M" <Fred.Forsaty@nrc.gov> |
| | | Tracking Status: None "Tilton, Caroline E" <Caroline.Tilton@nrc.gov> |
| Post Office: HQPWMSMRS04.nrc.gov Files Size Date & Time MESSAGE 2738 6/27/2016 2:19:00 PM | | Tracking Status: None "OESTERLE, ERIC R" <Eric.Oesterle@nrc.gov> |
| | | Tracking Status: None "Duke, Paul R. (Paul.Duke@pseg.com)" <Paul.Duke@pseg.com> |
| Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date: Recipients Received:}} | | Tracking Status: None "Thomas, Brian J. (Brian.Thomas@pseg.com)" <Brian.Thomas@pseg.com> |
| | Tracking Status: None Post Office: HQPWMSMRS04.nrc.gov Files Size Date & Time MESSAGE 2738 6/27/2016 2:19:00 PM Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date: |
| | Recipients Received:}} |
Letter Sequence Acceptance Review |
---|
|
|
|
|
---|
Category:E-Mail
MONTHYEARML24253A1942024-09-0909 September 2024 NRR E-mail Capture - Final Eeeb RAI - Hope Creek Amendment to Revise TS to Change Surveillance Interval to Accommodate 24-Month Fuel Cycle ML24249A1362024-09-0404 September 2024 EN 57304 - Westinghouse Electric Company, LLC, Final Report - No Embedded Files. Notification of the Potential Existence of Defects Pursuant to 10 CFR Part 21 ML24240A2092024-08-27027 August 2024 NRR E-mail Capture - Acceptance Review - Hope Creek - Relief Request VR-04, SSW Rupture Disc Replacement ML24197A1022024-07-15015 July 2024 NRR E-mail Capture - Acceptance Review - Hope Creek - Revise TS Lift Settings for Reactor Coolant System Safety Relief Valves ML24163A1632024-06-11011 June 2024 NRR E-mail Capture - Acceptance Review - Hope Creek - Revise TS to Change Surveillance Interval to Accommodate 24-Month Fuel Cycle ML24060A0492024-02-28028 February 2024 NRR E-mail Capture - Final Exhb RAI for Hope Creek, Salem 1 and 2 Amendment to Modify Exclusion Area Boundary ML24002A7222023-12-29029 December 2023 NRR E-mail Capture - (External_Sender) Salem Generating Station - 2023 Annual Report - Inspection of the Circulating Water Intake Structure (Cwis) Trash Rack Bars ML23355A2732023-12-21021 December 2023 NRR E-mail Capture - (External_Sender) PSEG Response to Questions Associated with Supplement to Salem-Hope Creek Eab Reduction LAR ML23277A0482023-10-0404 October 2023 NRR E-mail Capture - 10/4/2023 Email: Acceptance Review - Hope Creek and Salem 1 and 2 - LAR to Modify Exclusion Area Boundary ML23277A0732023-09-29029 September 2023 NRR E-mail Capture - (External_Sender) 9/29/2023 Email from PSEG: Supplement to Proposed Amendment to PSEG Master Decommissioning Trust Amendment ML23129A7892023-05-0909 May 2023 NRR E-mail Capture - Acceptance Review - Hope Creek - Revise Trip and Standby Auto-Start Logic Associated with Safety Related HVAC Trains ML23122A1672023-05-0202 May 2023 NRR E-mail Capture - Acceptance Review - Hope Creek and Salem 1 and 2 - Revise TS to Delete TS Section 5.5 - Meteorological Tower Location ML23079A0032023-03-17017 March 2023 NRR E-mail Capture - Hope Creek, Salem 1 and 2 - Evacuation Time Estimate Review ML23065A0452023-02-23023 February 2023 NRR E-mail Capture - (External_Sender) Salem & Hope Creek Generating STATIONS-ANNUAL Incidental Take REPORT-STATION & REMP ML22194A0522022-07-13013 July 2022 NRR E-mail Capture - Acceptance Review - Hope Creek, Salem 1 and 2 - Relocate Staff Qualification Requirements to Licensee Quality Assurance Topical Report ML22038A1552022-02-0404 February 2022 NRR E-mail Capture - (External_Sender) Salem & Hope Creek Generating STATIONS-ANNUAL Incidental Take REPORT-STATION & REMP ML22021A7012022-01-21021 January 2022 NRR E-mail Capture - Acceptance Review - Hope Creek -Relief Request HC-I4R-220 Regarding Partial Penetration Nozzle Repairs (L-2022-LLR-0003) ML22006A3212022-01-0606 January 2022 NRR E-mail Capture - Final RAI - Hope Creek - Revise TS Limits for Ultimate Heat Sink ML21334A1182021-11-30030 November 2021 NRR E-mail Capture - Acceptance Review - Hope Creek -Revise SRs for Electric Power Monitor Channels for RPS and Power Range Neutron Monitoring System ML21154A0102021-05-28028 May 2021 NRR E-mail Capture - Acceptance Review - Hope Creek - Revise TS Limits for Ultimate Heat Sink ML20295A4922020-10-21021 October 2020 NRR E-mail Capture - Hope Creek - Final RAI Revise ECCS TS with Respect to HPCI System Inoperability (L-2020-LLA-0131) ML20293A1832020-10-19019 October 2020 NRR E-mail Capture - Acceptance Review - Hope Creek - Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements ML20289A7062020-10-15015 October 2020 NRR E-mail Capture - Acceptance Review - Hope Creek - Revise Low Pressure Safety Limit to Address GE Part-21 Safety Communication SC05-03 ML20246G5952020-09-0202 September 2020 Acceptance Review - Hope Creek - Adopt TSTF-427, Allowance for Non TS Barrier Degradation ML20191A0202020-07-0202 July 2020 NRR E-mail Capture - Acceptance Review - Hope Creek - Revise ECCS TS with Respect to HPCI System Inoperability ML20153A3782020-06-0101 June 2020 NRR E-mail Capture - Acceptance Review - Hope Creek - Revise TS Actions for Suppression Pool Cooling ML20006E2802020-01-0606 January 2020 NRR E-mail Capture - Acceptance Review - Hope Creek: LAR Regarding Proposed Adoption of 10 CFR 50.69, Risk- Informed Categorization and Treatment of SSCs for Nuclear Power Plants ML19280A0002019-10-0303 October 2019 NRR E-mail Capture - Hope Creek, Salem 1 and 2 - Final RAI Emergency Plan Staffing Requirements (L-2019-LLA-0145) ML19267A1622019-09-24024 September 2019 NRR E-mail Capture - Hope Creek - Acceptance Review: Alternative for Exam of ASME Section XI, Exam Category B-G-1, Item Number B6.40, Threads in Flange (L-2019-LLR-0090) ML19226A3932019-08-14014 August 2019 NRR E-mail Capture - Salem 1 & 2, Hope Creek - Acceptance Review: Delete License Conditions Related to Decommissioning Trust Provisions and License Transfer ML19198A0992019-07-17017 July 2019 NRR E-mail Capture - Salem 1 & 2, Hope Creek - Acceptance Review: Changes to Emergency Plan Staffing ML19186A3842019-07-0505 July 2019 NRR E-mail Capture - Acceptance Review - Hope Creek, Revise TS to Adopt TSTF-563, Revise Instrumentation Testing Definition ML19123A2172019-05-0303 May 2019 NRR E-mail Capture - Re Acceptance Review - Hope Creek, Revise TS to Adopt TSTF-564, Safety Limit MCPR ML19081A1532019-03-22022 March 2019 NRR E-mail Capture - Acceptance Review: Hope Creek - Revise TS to Adopt TSTF-546 (L-2019-LLA-0032) ML19046A2382019-02-15015 February 2019 NRR E-mail Capture - Acceptance Review Result: Hope Creek-Relief Request to Use ASME Code Case OMN-17 (L-2019-LLR-0010) ML18323A0252018-11-16016 November 2018 NRR E-mail Capture - Acceptance Review: Hope Creek - Remote Shutdown System I & C Amendment (L-2018-LLA-0295) ML18288A2512018-10-15015 October 2018 NRR E-mail Capture - Acceptance Review Result: Hope Creek-Relief Request Associated with Third 10-Year ISI Interval (L-2018-LLR-0124) ML18271A0342018-09-13013 September 2018 Receipt of Stephen Comley, We the People, September 6, 11 and 12 2018 Voicemail and Email ML18263A1442018-09-12012 September 2018 NRR E-mail Capture - Final RAI from Apla: Revise Technical Specifications to Increase Inverter AOT Extension (L-2018-LLA-0101) ML18250A3142018-09-0606 September 2018 NRR E-mail Capture - Final RAI: Revise Technical Specifications to Increase Inverter AOT Extension (L-2018-LLA-0101) ML18206A7302018-07-27027 July 2018 (50-272, 50-311, 50-354), Transmittal Email 26.717 Updates ML18201A1112018-07-20020 July 2018 NRR E-mail Capture - Acceptance Review Results: Hope Creek, Salem 1 & 2 Revise TS to Adopt TSTF-529 (L-2018-LLA-0185) ML18150A6912018-05-30030 May 2018 NRR E-mail Capture - Hope Creek - Final RAI Revise TS to Adopt TSTF-542 ML18128A3862018-05-0808 May 2018 NRR E-mail Capture - Acceptance Review Results: Hope Creek Revise Inverter AOT TS Actions (L-2018-LLA-0101) ML18122A2392018-05-0202 May 2018 NRR E-mail Capture - Acceptance Review Results: Revise Emergency Diesel Generator Technical Specifications Action to Remove Salem Unit 3 Gas Turbine Generator (L-2018-LLA-0079) ML17348A6242017-12-14014 December 2017 NRR E-mail Capture - Final Request for Additional Information for Human Factors Associated with the Hope Creek Measurement Uncertainty Recapture Uprate Request (L-2017-LLS-002) ML17348A9972017-12-14014 December 2017 NRR E-mail Capture - Final Request for Additional Information for Steam Dryer Analysis with the Hope Creek Measurement Uncertainty Recapture Uprate Request (L-2017-LLS-002) ML17349A0812017-12-14014 December 2017 NRR E-mail Capture - Final Request for Additional Information for Reactor Systems Branch (Srxb) - Hope Creek Mur ML17340B2682017-12-0606 December 2017 NRR E-mail Capture - Notification to State of New Jersey of Impending License Amendment Issuance for Hope Creek (MF9501; EPID L-2017-LLA-0183) ML17338A2742017-12-0404 December 2017 NRR E-mail Capture - State of New Jersey: Notification of Impending Amendment Issuance for Hope Creek - Relocate Pressure-Temperature Limits Curves to the Pressure-Temperature Limits Report 2024-09-09
[Table view] |
Text
NRR-PMDAPEm Resource From: Parker, Carleen J Sent: Monday, June 27, 2016 2:19 PM To: Duke, Paul R. (Paul.Duke@pseg.com); Thomas, Brian J. (Brian.Thomas@pseg.com)
Cc: BROADDUS, Doug A; Forsaty, Fred M; Tilton, Caroline E; OESTERLE, ERIC R
Subject:
Acceptance Review - Hope Creek LAR To Modify TS 2.1, Safety Limits
- Paul, By letter dated June 8, 2016, PSEG Nuclear LLC submitted a license amendment request to modify Technical Specification (TS) Section 2.1, Safety Limits, for Hope Creek Generating Station (HCGS). Specifically, this change would incorporate a revised Safety Limit Minimum Critical Power Ratio (SLMCPR) for single recirculation loop operation (SLO) due to the cycle specific analysis performed by Global Nuclear Fuel for HCGS Cycle 21.
The purpose of this email is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staffs acceptance review of this amendment request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.
Consistent with Section 50.90 of Title 10 of the Code of Federal Regulations (10 CFR), an amendment to the license (including the technical specifications) must fully describe the changes requested, and following as far as applicable, the form prescribed for original applications. Section 50.34 of 10 CFR addresses the content of technical information required. This section stipulates that the submittal address the design and operating characteristics, unusual or novel design features, and principal safety considerations.
The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. You will be advised of any further information needed to support the NRC staffs detailed technical review by separate correspondence.
If you have any questions, please contact me.
Carleen Parker Project Manager -
Hope Creek and Salem Plant Licensing Branch I-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission (301)415-1603 carleen.parker@nrc.gov 1
2 Hearing Identifier: NRR_PMDA Email Number: 2922 Mail Envelope Properties (d01fe9697624452fad9a99e926b77b63)
Subject:
Acceptance Review - Hope Creek LAR To Modify TS 2.1, Safety Limits Sent Date: 6/27/2016 2:19:05 PM Received Date: 6/27/2016 2:19:00 PM From: Parker, Carleen J Created By: Carleen.Parker@nrc.gov Recipients:
"BROADDUS, Doug A" <Doug.Broaddus@nrc.gov>
Tracking Status: None "Forsaty, Fred M" <Fred.Forsaty@nrc.gov>
Tracking Status: None "Tilton, Caroline E" <Caroline.Tilton@nrc.gov>
Tracking Status: None "OESTERLE, ERIC R" <Eric.Oesterle@nrc.gov>
Tracking Status: None "Duke, Paul R. (Paul.Duke@pseg.com)" <Paul.Duke@pseg.com>
Tracking Status: None "Thomas, Brian J. (Brian.Thomas@pseg.com)" <Brian.Thomas@pseg.com>
Tracking Status: None Post Office: HQPWMSMRS04.nrc.gov Files Size Date & Time MESSAGE 2738 6/27/2016 2:19:00 PM Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:
Recipients Received: