| title = Indian Point, Unit 2 - Seismic Walkdown Report Update, Enclosure to NL-14-071 - Engineering Report No. IP-RPT-12-00037, Rev 1. Part 5 of 5
| title = Seismic Walkdown Report Update, Enclosure to NL-14-071 - Engineering Report No. IP-RPT-12-00037, Rev 1. Part 5 of 5
| author name =  
| author name =  
| author affiliation = Entergy Nuclear Operations, Inc
| author affiliation = Entergy Nuclear Operations, Inc
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORMSheet I of 5 IP2Status: YN NEI UD-Seismic Walkdown Checklist (SWC) SWELl-054Equipment ID No. O023CRF Equip. Class1 10Equipment Description CONTAINMENT RECIRC FAN 23Location: Bldg. VC Floor El. 68'-O" Room, AreaManufacturer, Model, Etc. (optional but recommended)Instructions for Completing ChecklistThis checklist may be used to document the results of the Seismic Walkdown of an item of equipment on theSWEL. The space below each of the following questions may be used to record the results of judgments andfindings. Additional space is provided at the end of this checklist for documenting other comments.Anchorage1.. Is the anchorage configuration verification required (i.e., is the item oneof the 50% of SWEL items requiring such verification)?Y[-I NE2. Is the anchorage free of bent, broken, missing or loose hardware?The anchorage is free of bent, broken, missing and loose hardware.3. Is the anchorage free of corrosion that is more than mild surfaceoxidation?Observed surface oxidation on the vibration isolators judged to be ok.4. Is the anchorage free of visible cracks in the concrete near theanchors?No significant cracks found.YZ N[-] ULI N/Ar-Y[ NEI U[-] N/AElYZ NEI U[-] N/AD11 Enter the equipment class name from EPRI 1025286, Appendix B: Classes of Equipment.EN-DC-168 REV 0 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORMSheet 2 of 5 IP2Status: YI NE-- U-ISeismic Walkdown Checklist (SWC) SWELl-054Equipment ID No. O023CRF Equip. Class1 10Equipment Description CONTAINMENT RECIRC FAN 235. Is the anchorage configuration consistent with plant documentation? YEI NEI UE- N/AZ(Note: This question only applies if the item is one of the 50% for whichan anchorage configuration verification is required.)6. Based on the above anchorage evaluations, is the anchorage free of YN N[i u[-]potentially adverse seismic conditions?The anchorage is free of potentially adverse seismic conditions.Interaction Effects7. Are soft targets free from impact by nearby equipment or structures?Soft targets are free from impact by nearby equipment or structures.8. Are overhead equipment, distribution systems, ceiling tiles and lighting,and masonry block walls not likely to collapse onto the equipment?Overhead equipment, distribution systems and lighting are not likely tocollapse onto the equipment.9. Do attached lines have adequate flexibility to avoid damage?YZ NEI U-I N/AE1YE NEI- UE N/AE1YN N[:] UE1 N/AEAttached lines have adequate flexibility.10. Based on the above seismic interaction evaluations, is equipment freeof potentially adverse seismic interaction effects?The equipment is free of potentially adverse seismic interaction.YE NE:1U[EN-DC-168 REV 0 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORMSheet 3 of 5 IP2Status: YE NEI U[-]Seismic Walkdown Checklist (SWC) SWELl-054Equipment ID No. O023CRF Equip. Class1 10Equipment Description CONTAINMENT RECIRC FAN 23Other Adverse Conditions11. Have you looked for and found no other seismic conditions that could Y[ N[l UI[-adversely affect the safety functions of the equipment?We have looked and found no other seismic conditions that couldadversely affect the safety functions of the equipment.Comments (Additional pages may be added as necessary)Reference Drawings: 9321-F-2710-04 Rev 04, (A200746)Reference AWC-044Observed piping near 23CRF that is rusted. This is being addressed in CR-IP2-2014-01653. TheCR indicated that this is a surface condition only and does not impact component or systempressure boundry, structural integrity, or design fuctions.Date: 3/6/14Evaluated by: Maggie Staub*31611Kai LoEN-DC-168 REV 0 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORMSheet 4 of 5 IP2Status: YZ Nr-] UL]Seismic Walkdown Checklist (SWC) SWELl-054Equipment ID No. O023CRF Equip. Class' 10Equipment Description CONTAINMENT RECIRC FAN 23PhotographsNote: vibration isolator with surface oxidationNote: interior of 23CRFEN-DC-168 REV 0 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORMSheet 5 of 5 IP2Status: YO NEI Ur-Seismic Walkdown Checklist (SWC) SWELl-054Equipment ID No. O023CRF Equip. Class1 10Equipment Description CONTAINMENT RECIRC FAN 23Note: rusted pipingNote: no other photos.EN-DC-168 REV 0 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORMSheet I of 5 1P2Status: YE Nr-7 U-ISeismic Walkdown Checklist (SWC) SWELl-055Equipment ID No. O024CRF Equip. Class1 10Equipment Description CONTAINMENT RECIRC FAN 24Location: Bldg. VC Floor El. 68-0" Room, AreaManufacturer, Model, Etc. (optional but recommended)Instructions for Completing ChecklistThis checklist may be used to document the results of the Seismic Walkdown of an item of equipment on theSWEL. The space below each of the following questions may be used to record the results of judgments andfindings. Additional space is provided at the end of this checklist for documenting other comments.Anchorage1. Is the anchorage configuration verification required (i.e., is the item oneof the 50% of SWEL items requiring such verification)?2. Is the anchorage free of bent, broken, missing or loose hardware?Anchorage for all compartments are OK. Intend plenum anchorage forthe fan in HEPA filter room has only 13 bolts out of 28 bolt holes. Oneof the remaining bolts is slightly bent. A comparison with 23CRF showsthat orginal design has 16 bolts. CR-IP2-2014-01662 has beengenerated to address this condition. LB- 17 assessed this condition anddetermined that the remaining bolts are adequate.The fan circular wire screen is missing one bolt. Currenly the cover isheld by 3 bolts. CR-IP2-2014-01662 has been generated to addressthis condition.3. Is the anchorage free of corrosion that is more than mild surfaceoxidation?YE-- NOYE ND] UD- N/AElY[ NDI UD- N/A--Viberation isolators have surface oxidation.4. Is the anchorage free of visible cracks in the concrete near theanchors?No cracks in the concrete near anchors.'Enter the equipment class name from EPRI 1025286, Appendix B: Classes of Equipment.YO NDI uD- N/AD--EN-DC-168 REV 0 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORMSheet 2 of 5 IP2Status: YE NF] Ut[lSeismic Walkdown Checklist (SWC) SWELl-055Equipment ID No. O024CRF Equip. Class1 10Equipment Description CONTAINMENT RECIRC FAN 245. Is the anchorage configuration consistent with plant documentation? YOI NI U[]l N/A0(Note: This question only applies if the item is one of the 50% for whichan anchorage configuration verification is required.)6. Based on the above anchorage evaluations, is the anchorage free of YE NOi Ulipotentially adverse seismic conditions?The anchorage is free of potentially adverse seismic conditions. Seeitem #2.Interaction Effects7. Are soft targets free from impact by nearby equipment or structures?YE NOI UOL N/AlSoft targets are free from impact by nearby equipment.8. Are overhead equipment, distribution systems, ceiling tiles and lighting,and masonry block walls not likely to collapse onto the equipment?Overhead equipment, distrubtion systems and lighting are not likely tocollapse onto the equipment.9. Do attached lines have adequate flexibility to avoid damage?Attached lines have adequate flexibility.10. Based on the above seismic interaction evaluations, is equipment freeof potentially adverse seismic interaction effects?The equipment is free of potentially adverse seismic interaction.Y[ NOI u[] N/ALYN Nr] U[J N/ALYZ Nr urEN-DC-168 REV 0 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORMSheet 3 of 5 1P2Status: YZ NEI U-Seismic Walkdown Checklist (SWC) SWELl-055Equipment ID No. O024CRF Equip. Class1 10Equipment Description CONTAINMENT RECIRC FAN 24Other Adverse Conditions11. Have you looked for and found no other seismic conditions that could Y[ NEI U-Iadversely affect the safety functions of the equipment?We have looked for and found no other seismic conditions that couldadversely affect the safety functions of the equipment.Comments (Additional pages may be added as necessary)Reference Drawings:9321-F-2710-04, Rev 04 (A200746)AWC-045Date: 3/6/14Evaluated by: Maggie Staub____________________________________________ 3/6/14Kai LoEN-DC-168 REV 0 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORMSheet 4 of 5 IP2Status: YO NE] U[-]Seismic Walkdown Checklist (SWC) SWELl-055Equipment ID No. O024CRF Equip. Class1 10Equipment Description CONTAINMENT RECIRC FAN 24PhotographsNote: isolator with surface oxidationNote: Steel face for thewith missing boltsin HEPA filter roomEN-DC-168 REV 0 ATTACHMENT 9.6SEISMIC WALKDOWN CHECKLIST FORMSheet 5 of 5Seismic Walkdown Checklist (SWC) SWEL1-055Equipment I D No. O024CRFEquipment Description CONTAINMENT RECIRC FAN 24IP2Status: Y[ N[] Ur]Equip. Class110Note: Steel face for the fan in HEPA filter roomwith missing boltsNote: slightly bent boltEN-DC-168 REV 0 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORMSheet 1 of 5 1P2Status: YN NEI[ U-Seismic Walkdown Checklist (SWC) SWELl-056Equipment ID No. O025CRF Equip. Class1 10Equipment Description CONTAINMENT RECIRC FAN 25Location: Bldg. VC Floor El. 68-0" Room, AreaManufacturer, Model, Etc. (optional but recommended)Instructions for Completing ChecklistThis checklist may be used to document the results of the Seismic Walkdown of an item of equipment on theSWEL. The space below each of the following questions may be used to record the results of judgments andfindings. Additional space is provided at the end of this checklist for documenting other comments.Anchorage1. Is the anchorage configuration verification required (i.e., is the item oneof the 50% of SWEL items requiring such verification)?Anchorage verification is not required.2. Is the anchorage free of bent, broken, missing or loose hardware?The anchorage is free of bent, broken, missing and loose hardware.3. Is the anchorage free of corrosion that is more than mild surfaceoxidation?Inside of closure observed mild oxidation on several isolator supports(see attached photos)4. Is the anchorage free of visible cracks in the concrete near theanchors?Anchorage is free of visible cracks.Enter the equipment class name from EPRI 1025286, Appendix B: Classes of Equipment.YI NEDYE NEIl U-I N/A[']YE NE U[I-] N/A--YED NEI Ur- N/AE-EN-DC-168 REV 0 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORMSheet 2 of 5 IP2Status: YEE NEJ UE-ISeismic Walkdown Checklist (SWC) SWELl-056Equipment ID No. O025CRF Equip. Class1 10Equipment Description CONTAINMENT RECIRC FAN 255. Is the anchorage configuration consistent with plant documentation? YLI Nil UiE N/A[(Note: This question only applies if the item is one of the 50% for whichan anchorage configuration verification is required.)6. Based on the above anchorage evaluations, is the anchorage free of YZ NEI Uipotentially adverse seismic conditions?The anchorage is free of potentially adverse seismic conditions.Interaction Effects7. Are soft targets free from impact by nearby equipment or structures?Soft targets are free from impact by nearby equipment and structures.YZ NEI LJL N/A[]8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YN N[] U[-I N/AEland masonry block walls not likely to collapse onto the equipment?Overhead equipment, distribution systems, lighting and walls are notlikely to collapse.9. Do attached lines have adequate flexibility to avoid damage? YN N[E U[] N/AEIAttached line have adequate flexibility.10. Based on the above seismic interaction evaluations, is equipment free YZ NEI UE-of potentially adverse seismic interaction effects?The equipment is free of adverse seismic interaction effects.EN-DC-168 REV 0 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORMSheet 3 of 5 1P2Status: YE NEI UI-Seismic Walkdown Checklist (SWC) SWELl-056Equipment ID No. O025CRF Equip. Class1 10Equipment Description CONTAINMENT RECIRC FAN 25Other Adverse Conditions11. Have you looked for and found no other seismic conditions that could YE Ni ULIadversely affect the safety functions of the equipment?We have looked and found no other seismic conditions that couldadversely affect the safety functions of the equipment.Comments (Additional pages may be added as necessary)Reference Drawings.- 9321-F-2710-04 Rev 04 (A200746)Reference AWC-046...._ _ Date: 3/5/14Evaluated by: Maggie Staub35. .-4Kai LoEN-DC-168 REV 0 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORMSheet 4 of 5 IP2Status: YZ Nr- Ur-Seismic Walkdown Checklist (SWC) SWELl-056Equipment ID No. O025CRF Equip. Class1 10Equipment Description CONTAINMENT RECIRC FAN 25PhotographsNote: mild oxidation on isolatorNote: mild oxidation on isolatorEN-DC-168 REV 0 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORMSheet 5 of 5 IP2Status: Y[ NEI U'EISeismic Walkdown Checklist (SWC) SWELl-056Equipment ID No. O025CRF Equip. Class1 10Equipment Descrption CONTAINMENT RECIRC FAN 25Note: mild oxidation on isolatorNote: no other photos.EN-DC-168 REV 0 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORMSheet I of 5 IP2Status: YE NF]1 ULI]Seismic Walkdown Checklist (SWC) SWELI-063Equipment ID No. IBUS21 Equip. Class1 14Equipment Description 118 VAC INSTR BUS 21Location: Bldg. CB Floor El. 53"-" Room, AreaManufacturer, Model, Etc. (optional but recommended)Instructions for Completing ChecklistThis checklist may be used to document the results of the Seismic Walkdown of an item of equipment on theSWEL. The space below each of the following questions may be used to record the results of judgments andfindings. Additional space is provided at the end of this checklist for documenting other comments.Anchorage1. Is the anchorage configuration verification required (i.e., is the item oneof the 50% of SWEL items requiring such verification)?Y-I NM2. Is the anchorage free of bent, broken, missing or loose hardware?The anchorage is free of bent, broken, missing and loose hardware.3. Is the anchorage free of corrosion that is more than mild surfaceoxidation?The anchorage is free of corrosion.4. Is the anchorage free of visible cracks in the concrete near theanchors?Panel is bolted to steel.Y[ NEi UDi N/ADY[ N[D UD- N/AD-YD-- NDl UD- N/AI0I Enter the equipment class name from EPRI 1025286, Appendix B: Classes of Equipment.EN-DC-168 REV 0 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORMSheet 2 of 5 IP2Status: Y[ NEI UD--Seismic Walkdown Checklist (SWC) SWELl-063Equipment ID No. IBUS21 Equip. Class1 14Equipment Description 118 VAC INSTR BUS 215. Is the anchorage configuration consistent with plant documentation? YO NOi U- N/AE(Note: This question only applies if the item is one of the 50% for whichan anchorage configuration verification is required.)6. Based on the above anchorage evaluations, is the anchorage free of YE NEI UIOpotentially adverse seismic conditions?The anchorage is free of potentially adverse seismic conditions.Interaction Effects7. Are soft targets free from impact by nearby equipment or structures?Soft targets are free from impact by nearby equipment and structures.8. Are overhead equipment, distribution systems, ceiling tiles and lighting,and masonry block walls not likely to collapse onto the equipment?Overhead equipment, distribution systems, ceiling tiles and lighting,and masonry block walls are not likely to collapse onto the equipment.9. Do attached lines have adequate flexibility to avoid damage?Attached lines have adequate flexibility.10. Based on the above seismic interaction evaluations, is equipment freeof potentially adverse seismic interaction effects?The equipment is free of potentially adverse seismic interactioneffects.Y[ NEIr U[-] N/ADYE NO U[- N/ADYZ NEI UL- N/ADYE NEI U-]EN-DC-168 REV 0 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORMSheet 3 of 5 IP2Status: YZ NEI UI-Seismic Walkdown Checklist (SWC) SWELl-063Equipment ID No. IBUS21 Equip. Class1 14Equipment Description 118 VAC INSTR BUS 21Other Adverse Conditions11. Have you looked for and found no other seismic conditions that could YE Nil U[Iadversely affect the safety functions of the equipment?Observed red screen door inside the supervisory panel that was notsecured (see attached photo). During a seismic event, the door maymove and stirke the sensitive equipment inside the panel. This isdocumented in CR-IP2-2014-01660.It was indicated that the door will be placed back into its orginiallocation and secured once the work on a specific component is done.Observed a portable light fixture with cord resting on the floor inside thesupervisory panel (see attached photo). During a seismic even, the lightfixture may move and strike nearby sensitive equipment. This isaddressed in CR-IP2-2014-01660.Observed a broken and bent plastice wireway inside SL compartmentof the supervisory panel (see attached photo). This is a housekeepingmatter that has no adverse affect on the safety function of theequipment and is addressed in CR-IP2-2014-01660.Comments (Additional pages may be added as necessary)Ref: A WC-037___Date: 317/14Evaluated by: Maggie Staub___317/14Kai LoEN-DC-168 REV 0 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORMSheet 4 of 5 IP2Status: YIN NF- UI]Seismic Walkdown Checklist (SWC) SWELl-063Equipment ID No. IBUS21 Equip. Class' 14Equipment Description 118 VAC INSTR BUS 21PhotographsNote: Bus2lNote: intemalsEN-DC-168 REV 0 ATTACHMENT 9.6SEISMIC WALKDOWN CI4ECKUsT FoRmATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORMSheet 5 of 5Seismic Walkdown Checklist (SWC) SWELI-OEEquipment ID No. IBUS21Equipment Description 118 VAC INSTR BUS 21Note: red screen door inside supervisory panelIP2Status: YO NR U-Equip. Class114Note: light fixture inside supervisory panelNote: brokenlbent wireway inside onNote: noother photos.EN-DC-168 REV 0 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORMSheet I of 4 IP2Status: YE NEI- UI-Seismic Walkdown Checklist (SWC) SWELl-064Equipment ID No. DPNL22 Equip. Class1 14Equipment Description 125 VDC DISTRIBUTION PNL 22 PC4Location: Bldg. CB Floor El. 53-0" Room, AreaManufacturer, Model, Etc. (optional but recommended)Instructions for Completing ChecklistThis checklist may be used to document the results of the Seismic Walkdown of an item of equipment on theSWEL. The space below each of the following questions may be used to record the results of judgments andfindings. Additional space is provided at the end of this checklist for documenting other comments.Anchorage1. Is the anchorage configuration verification required (i.e., is the item oneof the 50% of SWEL items requiring such verification)?No documentation available for anchorage.2. Is the anchorage free of bent, broken, missing or loose hardware?Observed four approximately Y2" diameter bolts. The bolts are spacedat 17" in the horizontal direction and 44" in the vertical direction.3. Is the anchorage free of corrosion that is more than mild surfaceoxidation?The anchorage is free of corrosion.4. Is the anchorage free of visible cracks in the concrete near theanchors?Mounted to panel frameYI NEI UlI N/AilYE N[-] U[l N/ADlYrI NEIl UE N/AEI Enter the equipment class name from EPRI 1025286, Appendix B: Classes of Equipment.EN-DC-168 REV 0 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORMSheet 2 of 4 IP2Status: Y[ NEI UD-1Seismic Walkdown Checklist (SWC) SWELl-064Equipment ID No. DPNL22 Equip. Class' 14Equipment Description 125 VDC DISTRIBUTION PNL 22 PC45. Is the anchorage configuration consistent with plant documentation? Y[-] NE] UI-l N/AZ(Note: This question only applies if the item is one of the 50% for whichan anchorage configuration verification is required.)See #16. Based on the above anchorage evaluations, is the anchorage free of YE NEI U[-Lpotentially adverse seismic conditions?The anchorage is free of potentially adverse seismic conditions.Interaction Effects7. Are soft targets free from impact by nearby equipment or structures?Soft targets are free from impact.8. Are overhead equipment, distribution systems, ceiling tiles and lighting,and masonry block walls not likely to collapse onto the equipment?Overhead equipment, distribution systems, ceiling titles and lighting,and masonry block walls are not likely to collapse.9. Do attached lines have adequate flexibility to avoid damage?Attached lines have adequate flexibility.10. Based on the above seismic interaction evaluations, is equipment freeof potentially adverse seismic interaction effects?The equipment is free of potentially adverse seismic interactioneffects.YE NE] U[] N/A[]Y[ NE] UE] N/AOYZ NE] uE] N/AE]YE N-] UE]EN-DC-168 REV 0 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORMSheet 3 of 4 1P2Status: YZ Nil U--Seismic Walkdown Checklist (SWC) SWELl-064Equipment ID No. DPNL22 Equip. Class1 14Equipment Description 125 VDC DISTRIBUTION PNL 22 PC4Other Adverse Conditions11. Have you looked for and found no other seismic conditions that could YN NEi UE1adversely affect the safety functions of the equipment?We have looked for and found no other seismic conditions that couldadversely affect the safety functions of the equipment.Comments (Additional pages may be added as necessary)Ref AWC-037Date: 317/14Evaluated by: Magqgie Staub/~317114Kai LoEN-DC-168 REV 0 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORMSheet 4 of 4 IP2Status: YZ NI'- UL-Seismic Walkdown Checklist (SWC) SWELl-064Equipment ID No. DPNL22 Equip. Class1 14Equipment Description 125 VDC DISTRIBUTION PNL 22 PC4PhotographsNote: PNL 22Note: internalsEN-DC-168 REV 0 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORMSheet 1 of 4 IP2Status: Nil U[WSeismic Walkdown Checklist (SWC) SWELl-067Equipment ID No. EDC1 Equip. Class' 14Equipment Description STATIC INV. #23 MANUAL BY-PASS SWITCHLocation: Bldg. CB Floor El. 33'-0" Room, AreaManufacturer, Model, Etc. (optional but recommended)Instructions for Completing ChecklistThis checklist may be used to document the results of the Seismic Walkdown of an item of equipment on theSWEL. The space below each of the following questions may be used to record the results of judgments andfindings. Additional space is provided at the end of this checklist for documenting other comments.R1Anchorage1. Is the anchorage configuration verification required (i.e., is the item oneof the 50% of SWEL items requiring such verification)?No, the anchorage configuration verification is not required.2. Is the anchorage free of bent, broken, missing or loose hardware?Anchorage external to cabinet checked and found to be free of bent,broken, missing or loose hardware.Cabinet door was opened on 2/28/14 and anchorage is free of bent,broken, missing or loose hardware.3. Is the anchorage free of corrosion that is more than mild surfaceoxidation?Anchorage is free of corrosion that is more than mild surface oxidation.4. Is the anchorage free of visible cracks in the concrete near theanchors?External anchorage is free of significant visible cracks in the masonrywall near the anchors.'Enter the equipment class name from EPRI 1025286, Appendix B: Classes of Equipment.Y[-I NEYE NI1-- U1 N/A[-R1YE NEI UrI N/ALYN N[: U-I N/A[EN-DC-168 REV 0 ATTACHMENT 9.6Sheet 2 of 4SEISMIC WALKDOWN CHECKLIST FORMIP2Status: YN NEI UL- RISeismic Walkdown Checklist (SWC) SWELl-067Equipment ID No. EDC1 Equip. Class1 14Equipment Description STATIC INV. #23 MANUAL BY-PASS SWITCH5. Is the anchorage configuration consistent with plant documentation? Y--] NEI U[I- N/AZ(Note: This question only applies if the item is one of the 50% for whichan anchorage configuration verification is required.)Not applicable since component is not part of the anchorageconfiguration verification.6. Based on the above anchorage evaluations, is the anchorage free of YZ NEI UE-potentially adverse seismic conditions?The anchorage is free of potentially adverse seismic conditions.IInteraction Effects7. Are soft targets free from impact by nearby equipment or structures?Yes soft targets are free from impact by nearby equipment orstructures.Y[; NEi UE- N/AE8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Y[ NEI UE-- N/AE-and masonry block walls not likely to collapse onto the equipment?Block wall is seismiclly qualified by Computech report No. R547. 01.Fluorescent bulbs need to be secured to fixtures with wires. CR IP2-2012-06120 tracks installation of wires to tie florescent bulb to fixture. Itis judged the hard target inverter will remain operable if the florescentbulbs were to fall on it.9. Do attached lines have adequate flexibility to avoid damage? YN NEl UE N/A[]Yes attached lines have adequate flexibility to avoid damage.10. Based on the above seismic interaction evaluations, is equipment free Y[ NE UE:of potentially adverse seismic interaction effects?Yes based on the above seismic interaction evaluations, the equipmentis free of potentially adverse seismic interaction effects.EN-DC-168 REV 0 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORMSheet 3 of 4 1P2Status: YIO NEI UI--Seismic Walkdown Checklist (SWC) SWELl-067Equipment ID No. EDC1 Equip. Class1 14Equipment Description STATIC INV. #23 MANUAL BY-PASS SWITCHOther Adverse Conditions11. Have you looked for and found no other seismic conditions that could YE NEI UEiadversely affect the safety functions of the equipment?Yes we have looked for and found no other seismic conditions thatcould adversely affect the safety functions of the equipment.Comments (Additional pages may be added as necessary)
{{#Wiki_filter:ATTACHMENT     9.6                                                                   SEISMIC WALKDOWN CHECKLIST FORM Sheet I of 5                                                                                                         IP2 Status: YN NEI   UD-Seismic Walkdown Checklist (SWC)                   SWELl-054 Equipment ID No.         O023CRF                                                       Equip. Class1 10 Equipment Description         CONTAINMENT RECIRC FAN 23 Location: Bldg.       VC                               Floor El.     68'-O"           Room, Area Manufacturer, Model, Etc. (optional but recommended)
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage 1.. Is the anchorage configuration verification required (i.e., is the item one        Y[-I NE of the 50% of SWEL items requiring such verification)?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?                   YZ N[-] ULI N/Ar-The anchorageis free of bent, broken, missing and loose hardware.
: 3. Is the anchorage free of corrosion that is more than mild surface                   Y[    NEI U[-] N/AEl oxidation?
Observed surface oxidation on the vibrationisolatorsjudged to be ok.
: 4. Is the anchorage free of visible cracks in the concrete near the                    YZ NEI U[-] N/AD1 anchors?
No significantcracks found.
1 Enter the equipment class name from EPRI 1025286, Appendix B: Classes of Equipment.
EN-DC-168 REV 0
 
ATTACHMENT   9.6                                                             SEISMIC WALKDOWN CHECKLIST FORM Sheet 2 of 5                                                                                               IP2 Status: YI   NE-- U-I Seismic Walkdown Checklist (SWC)               SWELl-054 Equipment ID No.     O023CRF                                                 Equip. Class 1 10 Equipment Description     CONTAINMENT RECIRC FAN 23
: 5. Is the anchorage configuration consistent with plant documentation?         YEI   NEI   UE- N/AZ (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 6. Based on the above anchorage evaluations, is the anchorage free of         YN N[i     u[-]
potentially adverse seismic conditions?
The anchorageis free of potentially adverseseismic conditions.
Interaction Effects
: 7. Are soft targets free from impact by nearby equipment or structures?       YZ NEI U-I N/AE1 Soft targets are free from impact by nearby equipment or structures.
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting,   YE NEI- UE N/AE1 and masonry block walls not likely to collapse onto the equipment?
Overhead equipment, distributionsystems and lighting are not likely to collapse onto the equipment.
: 9. Do attached lines have adequate flexibility to avoid damage?               YN N[:] UE1 N/AE Attached lines have adequate flexibility.
: 10. Based on the above seismic interaction evaluations, is equipment free      YE NE:1U[
of potentially adverse seismic interaction effects?
The equipment is free of potentially adverse seismic interaction.
EN-DC-168 REV 0
 
ATTACHMENT 9.6                                                               SEISMIC WALKDOWN CHECKLIST FORM Sheet 3 of 5                                                                                               IP2 Status: YE NEI U[-]
Seismic Walkdown Checklist (SWC)               SWELl-054 Equipment ID No. O023CRF                                                 Equip. Class1 10 Equipment Description     CONTAINMENT RECIRC FAN 23 Other Adverse Conditions
: 11. Have you looked for and found no other seismic conditions that could       Y[     N[l UI[-
adversely affect the safety functions of the equipment?
We have looked and found no other seismic conditions that could adversely affect the safety functions of the equipment.
Comments (Additional pages may be added as necessary)
Reference Drawings: 9321-F-2710-04Rev 04, (A200746)
Reference AWC-044 Observed piping near 23CRF that is rusted. This is being addressedin CR-IP2-2014-01653.The CR indicated that this is a surface condition only and does not impact component or system pressure boundry, structural integrity, or design fuctions.
Evaluated by:   Maggie Staub                                                      Date:    3/6/14
                                              *31611 Kai Lo EN-DC-168 REV 0
 
ATTACHMENT 9.6                                                     SEISMIC WALKDOWN CHECKLIST FORM Sheet 4 of 5                                                                                   IP2 Status: YZ Nr-]   UL]
Seismic Walkdown Checklist (SWC)             SWELl-054 Equipment ID No.     O023CRF                                       Equip. Class' 10 Equipment Description     CONTAINMENT RECIRC FAN 23 Photographs Note:     vibration isolatorwith surface oxidation  Note: interiorof 23CRF EN-DC-168 REV 0
 
ATTACHMENT 9.6                                               SEISMIC WALKDOWN CHECKLIST FORM Sheet 5 of 5                                                                               IP2 Status: YO NEI   Ur-Seismic Walkdown Checklist (SWC)       SWELl-054 Equipment ID No. O023CRF                                   Equip. Class1 10 Equipment Description   CONTAINMENT RECIRC FAN 23 Note:     rusted piping                        Note: no otherphotos.
EN-DC-168 REV 0
 
ATTACHMENT 9.6                                                                       SEISMIC WALKDOWN CHECKLIST FORM Sheet I of 5                                                                                                       1P2 Status: YE Nr-7 U-I Seismic Walkdown Checklist (SWC)                   SWELl-055 Equipment ID No.       O024CRF                                                       Equip. Class1 10 Equipment Description       CONTAINMENT RECIRC FAN 24 Location: Bldg.     VC                               Floor El.     68-0"           Room, Area Manufacturer, Model, Etc. (optional but recommended)
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
: 1. Is the anchorage configuration verification required (i.e., is the item one        YE-- NO of the 50% of SWEL items requiring such verification)?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?                   YE ND] UD- N/AEl Anchorage for all compartmentsare OK. Intend plenum anchoragefor the fan in HEPA filter room has only 13 bolts out of 28 bolt holes. One of the remainingbolts is slightly bent. A comparison with 23CRF shows that orginal design has 16 bolts. CR-IP2-2014-01662has been generatedto addressthis condition. LB- 17 assessedthis condition and determined that the remaining bolts are adequate.
The fan circularwire screen is missing one bolt. Currenly the cover is held by 3 bolts. CR-IP2-2014-01662has been generatedto address this condition.
: 3. Is the anchorage free of corrosion that is more than mild surface                  Y[    NDI  UD- N/A--
oxidation?
Viberation isolatorshave surface oxidation.
: 4. Is the anchorage free of visible cracks in the concrete near the                    YO NDI    uD- N/AD--
anchors?
No cracks in the concrete near anchors.
'Enter the equipment class name from EPRI 1025286, Appendix B: Classes of Equipment.
EN-DC-168 REV 0
 
ATTACHMENT 9.6                                                               SEISMIC WALKDOWN CHECKLIST FORM Sheet 2 of 5                                                                                               IP2 Status: YE NF] Ut[l Seismic Walkdown Checklist (SWC)               SWELl-055 Equipment ID No.       O024CRF                                                 Equip. Class1 10 Equipment Description     CONTAINMENT RECIRC FAN 24
: 5. Is the anchorage configuration consistent with plant documentation?         YOI   NI   U[]l N/A0 (Note: This question only applies ifthe item is one of the 50% for which an anchorage configuration verification is required.)
: 6. Based on the above anchorage evaluations, is the anchorage free of         YE NOi     Uli potentially adverse seismic conditions?
The anchorageis free of potentially adverse seismic conditions. See item #2.
Interaction Effects
: 7. Are soft targets free from impact by nearby equipment or structures?       YE NOI     UOL N/Al Soft targets are free from impact by nearby equipment.
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting,   Y[    NOI u[] N/AL and masonry block walls not likely to collapse onto the equipment?
Overhead equipment, distrubtion systems and lighting are not likely to collapse onto the equipment.
: 9. Do attached lines have adequate flexibility to avoid damage?               YN Nr] U[J      N/AL Attached lines have adequate flexibility.
: 10. Based on the above seismic interaction evaluations, is equipment free YZ Nr      ur of potentially adverse seismic interaction effects?
The equipment is free of potentially adverse seismic interaction.
EN-DC-168 REV 0
 
ATTACHMENT 9.6                                                             SEISMIC WALKDOWN CHECKLIST FORM Sheet 3 of 5                                                                                             1P2 Status: YZ NEI     U-Seismic Walkdown Checklist (SWC)               SWELl-055 Equipment ID No. O024CRF                                               Equip. Class1 10 Equipment Description     CONTAINMENT RECIRC FAN 24 Other Adverse Conditions
: 11. Have you looked for and found no other seismic conditions that could     Y[     NEI U-I adversely affect the safety functions of the equipment?
We have looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment.
Comments (Additional pages may be added as necessary)
Reference Drawings:9321-F-2710-04,Rev 04 (A200746)
AWC-045 Evaluated by:  Maggie Staub                                                    Date:   3/6/14 Kai Lo            ____________________________________________          3/6/14 EN-DC-168 REV 0
 
ATTACHMENT 9.6                                                     SEISMIC WALKDOWN CHECKLIST       FORM Sheet 4 of 5                                                                                         IP2 Status: YO NE]       U[-]
Seismic Walkdown Checklist (SWC)         SWELl-055 Equipment ID No. O024CRF                                         Equip. Class1 10 Equipment Description   CONTAINMENT RECIRC FAN 24 Photographs Note:     isolatorwith surface oxidation        Note:     Steel face for the    in HEPA filter room with missing bolts EN-DC-168 REV 0
 
ATTACHMENT   9.6                                                    SEISMIC WALKDOWN CHECKLIST FORM Sheet 5 of 5                                                                                      IP2 Status: Y[  N[] Ur]
Seismic Walkdown Checklist (SWC)               SWEL1-055 Equipment ID No. O024CRF                                            Equip. Class1 10 Equipment Description     CONTAINMENT RECIRC FAN 24 Note:     Steel face for the fan in HEPA filter room  Note: slightly bent bolt with missing bolts EN-DC-168 REV 0
 
ATTACHMENT 9.6                                                                         SEISMIC WALKDOWN CHECKLIST FORM Sheet 1 of 5                                                                                                         1P2 Status: YN NEI[ U-Seismic Walkdown Checklist (SWC)                   SWELl-056 Equipment ID No.         O025CRF                                                       Equip. Class 1 10 Equipment Description         CONTAINMENT RECIRC FAN 25 Location: Bldg.       VC                               Floor El. 68-0"             Room, Area Manufacturer, Model, Etc. (optional but recommended)
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
: 1. Is the anchorage configuration verification required (i.e., is the item one          YI NED of the 50% of SWEL items requiring such verification)?
Anchorage verification is not required.
: 2. Is the anchorage free of bent, broken, missing or loose hardware?                   YE    NEIl U-I N/A[']
The anchorage is free of bent, broken, missing and loose hardware.
: 3. Is the anchorage free of corrosion that is more than mild surface                    YE NE      U[I-] N/A--
oxidation?
Inside of closure observed mild oxidation on several isolatorsupports (see attachedphotos)
: 4. Is the anchorage free of visible cracks in the concrete near the                    YED NEI    Ur-  N/AE-anchors?
Anchorage is free of visible cracks.
Enter the equipment class name from EPRI 1025286, Appendix B: Classes of Equipment.
EN-DC-168 REV 0
 
ATTACHMENT 9.6                                                               SEISMIC WALKDOWN CHECKLIST FORM Sheet 2 of 5                                                                                               IP2 Status: YEE NEJ   UE-I Seismic Walkdown Checklist (SWC)               SWELl-056 Equipment ID No.       O025CRF                                                 Equip. Class1 10 Equipment Description     CONTAINMENT RECIRC FAN 25
: 5. Is the anchorage configuration consistent with plant documentation?         YLI Nil UiE N/A[
(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 6. Based on the above anchorage evaluations, is the anchorage free of           YZ NEI Ui potentially adverse seismic conditions?
The anchorage is free of potentially adverse seismic conditions.
Interaction Effects
: 7. Are soft targets free from impact by nearby equipment or structures?       YZ NEI LJL N/A[]
Soft targets are free from impact by nearby equipment and structures.
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting,   YN N[] U[-I N/AEl and masonry block walls not likely to collapse onto the equipment?
Overhead equipment, distributionsystems, lighting and walls are not likely to collapse.
: 9. Do attached lines have adequate flexibility to avoid damage?                 YN N[E U[] N/AEI Attached line have adequateflexibility.
: 10. Based on the above seismic interaction evaluations, is equipment free       YZ NEI   UE-of potentially adverse seismic interaction effects?
The equipment is free of adverse seismic interaction effects.
EN-DC-168 REV 0
 
ATTACHMENT 9.6                                                             SEISMIC WALKDOWN CHECKLIST FORM Sheet 3 of 5                                                                                             1P2 Status: YE NEI     UI-Seismic Walkdown Checklist (SWC)             SWELl-056 Equipment ID No. O025CRF                                               Equip. Class1 10 Equipment Description     CONTAINMENT RECIRC FAN 25 Other Adverse Conditions
: 11. Have you looked for and found no other seismic conditions that could     YE Ni       ULI adversely affect the safety functions of the equipment?
We have looked and found no other seismic conditions that could adversely affect the safety functions of the equipment.
Comments (Additional pages may be added as necessary)
Reference Drawings.-9321-F-2710-04 Rev 04 (A200746)
Reference AWC-046 Evaluated by:    Maggie Staub                    ....           _       _       Date:   3/5/14
                                      .-                                                35. 4 Kai Lo EN-DC-168 REV 0
 
ATTACHMENT 9.6                                             SEISMIC WALKDOWN CHECKLIST FORM Sheet 4 of 5                                                                             IP2 Status: YZ Nr-     Ur-Seismic Walkdown Checklist (SWC)   SWELl-056 Equipment ID No. O025CRF                                 Equip. Class1 10 Equipment Description CONTAINMENT RECIRC FAN 25 Photographs Note:   mild oxidation on isolator          Note: mild oxidation on isolator EN-DC-168 REV 0
 
ATTACHMENT 9.6                                             SEISMIC WALKDOWN CHECKLIST FORM Sheet 5 of 5                                                                           IP2 Status: Y[   NEI U'EI Seismic Walkdown Checklist (SWC)     SWELl-056 Equipment ID No. O025CRF                               Equip. Class1 10 Equipment Descrption CONTAINMENT RECIRC FAN 25 Note:     mild oxidation on isolator        Note: no otherphotos.
EN-DC-168 REV 0
 
ATTACHMENT     9.6                                                                   SEISMIC WALKDOWN CHECKLIST FORM Sheet I of 5                                                                                                         IP2 Status: YE NF]1   ULI]
Seismic Walkdown Checklist (SWC)                   SWELI-063 Equipment ID No.         IBUS21                                                         Equip. Class1 14 Equipment Description         118 VAC INSTR BUS 21 Location: Bldg.       CB                               Floor El.     53"-"           Room, Area Manufacturer, Model, Etc. (optional but recommended)
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
: 1. Is the anchorage configuration verification required (i.e., is the item one        Y-I NM of the 50% of SWEL items requiring such verification)?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?                   Y[    NEi  UDi N/AD The anchorage is free of bent, broken, missing and loose hardware.
: 3. Is the anchorage free of corrosion that is more than mild surface                    Y[    N[D UD- N/AD-oxidation?
The anchorageis free of corrosion.
: 4. Is the anchorage free of visible cracks in the concrete near the                    YD-- NDl UD- N/AI0 anchors?
Panelis bolted to steel.
I Enter the equipment class name from EPRI 1025286, Appendix B: Classes of Equipment.
EN-DC-168 REV 0
 
ATTACHMENT 9.6                                                               SEISMIC WALKDOWN CHECKLIST FORM Sheet 2 of 5                                                                                               IP2 Status: Y[   NEI UD--
Seismic Walkdown Checklist (SWC)               SWELl-063 Equipment ID No.       IBUS21                                                 Equip. Class1 14 Equipment Description     118 VAC INSTR BUS 21
: 5. Is the anchorage configuration consistent with plant documentation?         YO NOi     U- N/AE (Note: This question only applies ifthe item is one of the 50% for which an anchorage configuration verification is required.)
: 6. Based on the above anchorage evaluations, is the anchorage free of         YE NEI UIO potentially adverse seismic conditions?
The anchorageis free of potentially adverse seismic conditions.
Interaction Effects
: 7. Are soft targets free from impact by nearby equipment or structures?       Y[    NEIrU[-] N/AD Soft targets are free from impact by nearby equipment and structures.
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting,   YE NO U[-      N/AD and masonry block walls not likely to collapse onto the equipment?
Overhead equipment, distributionsystems, ceiling tiles and lighting, and masonry block walls are not likely to collapse onto the equipment.
: 9. Do attached lines have adequate flexibility to avoid damage?               YZ NEI UL- N/AD Attached lines have adequateflexibility.
: 10. Based on the above seismic interaction evaluations, is equipment free      YE NEI U-]
of potentially adverse seismic interaction effects?
The equipment is free of potentially adverse seismic interaction effects.
EN-DC-168 REV 0
 
ATTACHMENT 9.6                                                               SEISMIC WALKDOWN CHECKLIST FORM Sheet 3 of 5                                                                                               IP2 Status: YZ   NEI UI-Seismic Walkdown Checklist (SWC)               SWELl-063 Equipment ID No. IBUS21                                                   Equip. Class1 14 Equipment Description     118 VAC INSTR BUS 21 Other Adverse Conditions
: 11. Have you looked for and found no other seismic conditions that could       YE Nil     U[I adversely affect the safety functions of the equipment?
Observed red screen door inside the supervisorypanel that was not secured (see attachedphoto). During a seismic event, the doormay move and stirke the sensitive equipment inside the panel. This is documented in CR-IP2-2014-01660.
It was indicated that the door will be placed back into its orginial location and secured once the work on a specific component is done.
Observed a portablelight fixture with cord resting on the floor inside the supervisory panel (see attachedphoto). During a seismic even, the light fixture may move and strike nearby sensitive equipment. This is addressed in CR-IP2-2014-01660.
Observed a broken and bent plastice wireway inside SL compartment of the supervisorypanel (see attachedphoto). This is a housekeeping matter that has no adverse affect on the safety function of the equipment and is addressed in CR-IP2-2014-01660.
Comments (Additional pages may be added as necessary)
Ref: A WC-037 Evaluated by: Maggie Staub          ___Date:                                                317/14
___317/14 Kai Lo EN-DC-168 REV 0
 
ATTACHMENT   9.6                                           SEISMIC WALKDOWN CHECKLIST FORM Sheet 4 of 5                                                                             IP2 Status: YIN NF- UI]
Seismic Walkdown Checklist (SWC)       SWELl-063 Equipment ID No. IBUS21                                   Equip. Class' 14 Equipment Description 118 VAC INSTR BUS 21 Photographs Note:     Bus2l                                Note: intemals EN-DC-168 REV 0
 
ATTACHMENT 9.6                                                        SEISMIC WALKDOWN CI4ECKUsT FoRm SEISMIC WALKDOWN CHECKLIST FORM Sheet 5 of 5 9.6 ATTACHMENT                                                                                          IP2 Status: YO NR U-Seismic Walkdown Checklist (SWC)           SWELI-OE Equipment ID No. IBUS21                                            Equip. Class1 14 Equipment Description   118 VAC INSTR BUS 21 Note:     red screen door inside supervisorypanel  Note: light fixture inside supervisory panel Note:     brokenlbent wireway inside on                                                  Note: no otherphotos.
EN-DC-168 REV 0
 
ATTACHMENT 9.6                                                                       SEISMIC WALKDOWN CHECKLIST FORM Sheet I of 4                                                                                                     IP2 Status: YE NEI-   UI-Seismic Walkdown Checklist (SWC)                   SWELl-064 Equipment ID No.         DPNL22                                                       Equip. Class1 14 Equipment Description       125 VDC DISTRIBUTION PNL 22 PC4 Location: Bldg. CB                                     Floor El.     53-0"           Room, Area Manufacturer, Model, Etc. (optional but recommended)
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
: 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
No documentation availablefor anchorage.
: 2. Is the anchorage free of bent, broken, missing or loose hardware?                 YI    NEI  UlI N/Ail Observed four approximately Y2" diameterbolts. The bolts are spaced at 17" in the horizontal directionand 44" in the verticaldirection.
: 3. Is the anchorage free of corrosion that is more than mild surface                  YE N[-] U[l N/ADl oxidation?
The anchorageis free of corrosion.
: 4. Is the anchorage free of visible cracks in the concrete near the                  YrI NEIl UE N/AE anchors?
Mounted to panel frame IEnter the equipment class name from EPRI 1025286, Appendix B: Classes of Equipment.
EN-DC-168 REV 0
 
ATTACHMENT 9.6                                                                 SEISMIC WALKDOWN CHECKLIST FORM Sheet 2 of 4                                                                                               IP2 Status: Y[   NEI UD-1 Seismic Walkdown Checklist (SWC)               SWELl-064 Equipment ID No.       DPNL22                                                   Equip. Class' 14 Equipment Description     125 VDC DISTRIBUTION PNL 22 PC4
: 5. Is the anchorage configuration consistent with plant documentation?         Y[-] NE] UI-l N/AZ (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
See #1
: 6. Based on the above anchorage evaluations, is the anchorage free of           YE NEI U[-L potentially adverse seismic conditions?
The anchorage is free of potentially adverse seismic conditions.
Interaction Effects
: 7. Are soft targets free from impact by nearby equipment or structures?       YE NE] U[] N/A[]
Soft targets are free from impact.
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting,   Y[    NE] UE] N/AO and masonry block walls not likely to collapse onto the equipment?
Overhead equipment, distributionsystems, ceiling titles and lighting, and masonry block walls are not likely to collapse.
: 9. Do attached lines have adequate flexibility to avoid damage?               YZ NE] uE] N/AE]
Attached lines have adequate flexibility.
: 10. Based on the above seismic interaction evaluations, is equipment free        YE N-] UE]
of potentially adverse seismic interaction effects?
The equipment is free of potentially adverse seismic interaction effects.
EN-DC-168 REV 0
 
ATTACHMENT 9.6                                                             SEISMIC WALKDOWN CHECKLIST FORM Sheet 3 of 4                                                                                           1P2 Status: YZ Nil U--
Seismic Walkdown Checklist (SWC)               SWELl-064 Equipment ID No. DPNL22                                                 Equip. Class1 14 Equipment Description     125 VDC DISTRIBUTION PNL 22 PC4 Other Adverse Conditions
: 11. Have you looked for and found no other seismic conditions that could     YN NEi     UE1 adversely affect the safety functions of the equipment?
We have looked for and found no otherseismic conditions that could adversely affect the safety functions of the equipment.
Comments (Additional pages may be added as necessary)
Ref AWC-037 Evaluated by:   Magqgie Staub                                                  Date:  317/14
                                              /~317114 Kai Lo EN-DC-168 REV 0
 
ATTACHMENT   9.6                                             SEISMIC WALKDOWN CHECKLIST FORM Sheet 4 of 4                                                                             IP2 Status: YZ NI'-   UL-Seismic Walkdown Checklist (SWC)       SWELl-064 Equipment ID No. DPNL22                                     Equip. Class1 14 Equipment Description 125 VDC DISTRIBUTION PNL 22 PC4 Photographs Note:     PNL 22                                Note: internals EN-DC-168 REV 0
 
ATTACHMENT 9.6                                                                       SEISMIC WALKDOWN CHECKLIST FORM Sheet 1 of 4                                                                                                     IP2 Status: Y*;: Nil U[W R1 (SWC)       SWELl-067 Seismic Walkdown Checklist Equipment ID No.       EDC1                                                           Equip. Class' 14 Equipment Description       STATIC INV. #23 MANUAL BY-PASS SWITCH Location: Bldg. CB                               Floor El.     33'-0"           Room, Area Manufacturer, Model, Etc. (optional but recommended)
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
: 1. Is the anchorage configuration verification required (i.e., is the item one        Y[-I NE of the 50% of SWEL items requiring such verification)?
No, the anchorage configuration verification is not required.
: 2. Is the anchorage free of bent, broken, missing or loose hardware?                   YE NI1--U1 N/A[-
Anchorage external to cabinet checked and found to be free of bent, broken, missing or loose hardware.
Cabinetdoor was opened on 2/28/14 and anchorageis free of bent, broken, missing or loose hardware.                                                                           R1
: 3. Is the anchorage free of corrosion that is more than mild surface                  YE NEI UrI N/AL oxidation?
Anchorage is free of corrosionthat is more than mild surface oxidation.
: 4. Is the anchorage free of visible cracks in the concrete near the                    YN N[: U-I N/A[
anchors?
External anchorageis free of significant visible cracks in the masonry wall near the anchors.
'Enter the equipment class name from EPRI 1025286, Appendix B: Classes of Equipment.
EN-DC-168 REV 0
 
ATTACHMENT 9.6                                                                  SEISMIC WALKDOWN CHECKLIST FORM Sheet 2 of 4                                                                                                  IP2 Status: YN NEI UL-       RI I
Seismic Walkdown Checklist (SWC)               SWELl-067 Equipment ID No.       EDC1                                                     Equip. Class1 14 Equipment Description     STATIC INV. #23 MANUAL BY-PASS SWITCH
: 5. Is the anchorage configuration consistent with plant documentation?           Y--] NEI   U[I- N/AZ (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Not applicable since component is not part of the anchorage configurationverification.
: 6. Based on the above anchorage evaluations, is the anchorage free of             YZ NEI     UE-potentially adverse seismic conditions?
The anchorageis free of potentially adverse seismic conditions.
Interaction Effects
: 7. Are soft targets free from impact by nearby equipment or structures?           Y[;  NEi UE- N/AE Yes soft targets are free from impact by nearby equipment or structures.
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting,     Y[   NEI UE-- N/AE-and masonry block walls not likely to collapse onto the equipment?
Block wall is seismiclly qualified by Computech report No. R547.01.
Fluorescentbulbs need to be secured to fixtures with wires. CR IP2-2012-06120 tracks installationof wires to tie florescent bulb to fixture. It is judged the hard target inverterwill remain operable if the florescent bulbs were to fall on it.
: 9. Do attached lines have adequate flexibility to avoid damage?                 YN NEl UE N/A[]
Yes attached lines have adequate flexibility to avoid damage.
: 10. Based on the above seismic interaction evaluations, is equipment free         Y[   NE UE:
of potentially adverse seismic interaction effects?
Yes based on the above seismic interactionevaluations, the equipment is free of potentially adverse seismic interaction effects.
EN-DC-168 REV 0
 
ATTACHMENT 9.6                                                             SEISMIC WALKDOWN CHECKLIST FORM Sheet 3 of 4                                                                                           1P2 Status: YIO NEI   UI--
Seismic Walkdown Checklist (SWC)               SWELl-067                                                  I R1 Equipment ID No. EDC1                                                   Equip. Class1 14 Equipment Description     STATIC INV. #23 MANUAL BY-PASS SWITCH Other Adverse Conditions
: 11. Have you looked for and found no other seismic conditions that could     YE NEI UEi adversely affect the safety functions of the equipment?
Yes we have looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment.
Comments (Additional pages may be added as necessary)


==References:==
==References:==
Drawings and AWCDrawings: A206648, Rev 46, Conduit layout Control building, elev. 33' plan west halfAWC-004I R1Dae -2/28/14" " Date:Evaluated by: Maggie StaubR1' -2/28/14Kai LoEN-DC-168 REV 0 ATTACHMENT 9.6SEISMIC WALKDOWN CHECKLIST FoRmATTAHMEN 9. SEIMICWALKOWN HECLISTFO IShoot 4 of 4IP2Status: YZ NEI UI-7] R1Equip. Class' 14Seismic Walkdown Checklist (SWC) SWELl-067Equipment ID No. EDC1Equipment Description STATIC INV. #23 MANUAL BY-PASS SWITCHPhotographsR1Note:STATIC INV #23 MANUAL BY-PASS SWITCHNote:STATIC INV #23 MANUAL BY-PASS SWITCHinteral componentsEN-DC-168 REV 0 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORMSheet I of 5 IP2Status: YM NEI uFi R1Seismic Walkdown Checklist (SWC) SWELl-072Equipment ID No. M19 Equip. Class' 16Equipment Description BATTERY CHARGER 21Location: Bldg. CB Floor El. 3X-O" Room, AreaManufacturer, Model, Etc. (optional but recommended)Instructions for Completing ChecklistThis checklist may be used to document the results of the Seismic Walkdown of an item of equipment on theSWEL. The space below each of the following questions may be used to record the results of judgments andfindings. Additional space is provided at the end of this checklist for documenting other comments.Anchorage1. Is the anchorage configuration verification required (i.e., is the item oneof the 50% of SWEL items requiring such verification)?Yes the anchorage configuration verification is required.2. Is the anchorage free of bent, broken, missing or loose hardware?Cabinet doors were opened on 3/4/14 and internal components wereinspected. Yes the anchorage is free of bent, broken, missing or loosehardware.3. Is the anchorage free of corrosion that is more than mild surfaceoxidation?Yes the anchorage is free of corrosion that is more than mild surfaceoxidation.4. Is the anchorage free of visible cracks in the concrete near theanchors?YN NEIYO NEI UL N/ADR1Y[ N[ U0- N/A[YN NEI uE- N/A[--Yes, the anchorage is free of visible cracks in the concrete near theanchor.'Enter the equipment class name from EPRI 1025286, Appendix B: Classes of Equipment.EN-DC-168 REV 0 ATTACHMENT 9.6Sheet 2 of 5SEISMIC WALKDOWN CHECKLIST FORMIP2Status: NE ULI RiSeismic Walkdown Checklist (SWC) SWELl-072Equipment ID No. M19 Equip. Class1 16Equipment Description BATTERY CHARGER 215. Is the anchorage configuration consistent with plant documentation? YN NE] UE- N/AFl(Note: This question only applies if the item is one of the 50% for whichan anchorage configuration verification is required.)Anchorage matches drawing 01 1D13800.6. Based on the above anchorage evaluations, is the anchorage free of YE NEI UI-potentially adverse seismic conditions?Yes based on the above anchorage evaluations, the anchorage isfree of potentially adverse seismic conditions.IInteraction Effects7. Are soft targets free from impact by nearby equipment or structures? Y] NEi UE- N/Al]Gap between the cabinet and adjacent frame west of the cabinet is0. 5". This seismic seperation requires analysis to determine adequacy.LB-08 concluded that the existing gap is acceptable.8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YZ NEI UE] N/AOand masonry block walls not likely to collapse onto the equipment?Floresent bulbs overhead are unsecured and could fall out of the lightfixture. Hard target cabinet will protect internals from damage. Judgedacceptable. CR IP2-2012-06120 tracks installation of wires to tieflorescent bulb to fixture for good seismic housekeeping.Masonry block wall is seismically qualified by Computech Report no.R547. 01 as discussed in SQUG SEWS.9. Do attached lines have adequate flexibility to avoid damage? YE NEI U[-] N/A[lYes attached lines have adequate flexibility to avoid damage.10. Based on the above seismic interaction evaluations, is equipment free YE NE: UE1of potentially adverse seismic interaction effects?R1The equipment is free of potentially adverse seismic interaction.EN-DC-168 REV 0 ATTACHMENT 9.6SEISMIC WALKDOWN CHECKLIST FORMATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORMSheet 3 of 5Seismic Walkdown Checklist (SWC) SWELl-072Equipment ID No. M19IP2Status: Y[ N[I U[D RIEquip. Class116Equipment Description BATTERY CHARGER 21Other Adverse Conditions11. Have you looked for and found no other seismic conditions that could YE NE] UI-]adversely affect the safety functions of the equipment?Yes we have looked for and found no other seismic conditions thatcould adversely affect the safety functions of the equipment.Comments (Additional pages may be added as necessary)
Drawingsand AWC Drawings:A206648, Rev 46, Conduit layout Control building, elev. 33' plan west half AWC-004 Dae -2/28/14
                                                "   "                           Date:
Evaluated by:   Maggie Staub R1 Kai Lo                    '     -                                       2/28/14 EN-DC-168 REV 0
 
ATTACHMENT   9.6                                                  SEISMIC WALKDOWN CHECKLIST FoRm ATTAHMEN 9.                             SEIMICWALKOWN       HECLISTFO   I Shoot 4 of 4                                                                                  IP2 Status: YZ NEI UI-7]       R1 Seismic Walkdown Checklist (SWC)       SWELl-067 Equipment ID No. EDC1                                          Equip. Class' 14 Equipment Description STATIC INV. #23 MANUAL BY-PASS SWITCH Photographs R1 Note:                                           Note:
STATIC INV #23 MANUAL BY-PASS SWITCH            STATIC INV #23 MANUAL BY-PASS SWITCH interal components EN-DC-168 REV 0
 
ATTACHMENT 9.6                                                                       SEISMIC WALKDOWN CHECKLIST FORM Sheet I of 5                                                                                                         IP2 Status: YM NEI     uFi     R1 Seismic Walkdown Checklist (SWC)                   SWELl-072 Equipment ID No.       M19                                                           Equip. Class' 16 Equipment Description       BATTERY CHARGER 21 Location: Bldg.     CB                               Floor El.     3X-O"           Room, Area Manufacturer, Model, Etc. (optional but recommended)
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
: 1. Is the anchorage configuration verification required (i.e., is the item one        YN NEI of the 50% of SWEL items requiring such verification)?
Yes the anchorageconfiguration verification is required.
: 2. Is the anchorage free of bent, broken, missing or loose hardware?                   YO NEI    UL N/AD R1 Cabinetdoors were opened on 3/4/14 and internalcomponents were inspected. Yes the anchorage is free of bent, broken, missing or loose hardware.
: 3. Is the anchorage free of corrosion that is more than mild surface                  Y[    N[  U0- N/A[
oxidation?
Yes the anchorage is free of corrosion that is more than mild surface oxidation.
: 4. Is the anchorage free of visible cracks in the concrete near the                    YN NEI     uE- N/A[--
anchors?
Yes, the anchorage is free of visible cracks in the concrete near the anchor.
'Enter the equipment class name from EPRI 1025286, Appendix B: Classes of Equipment.
EN-DC-168 REV 0
 
ATTACHMENT 9.6                                                                SEISMIC WALKDOWN CHECKLIST FORM Sheet 2 of 5                                                                                              IP2 Status: Y[* NE ULI       Ri Seismic Walkdown Checklist (SWC)
Equipment ID No.       M19 SWELl-072 Equip. Class1 16 I
Equipment Description     BATTERY CHARGER 21
: 5. Is the anchorage configuration consistent with plant documentation?           YN NE] UE- N/AFl (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Anchorage matches drawing 01 1D13800.
: 6. Based on the above anchorage evaluations, is the anchorage free of           YE NEI UI-potentially adverse seismic conditions?
Yes based on the above anchorage evaluations, the anchorage is free of potentially adverse seismic conditions.
Interaction Effects
: 7. Are soft targets free from impact by nearby equipment or structures?         Y] NEi UE- N/Al]
Gap between the cabinet and adjacent frame west of the cabinet is 0.5". This seismic seperation requiresanalysis to determine adequacy.
LB-08 concluded that the existing gap is acceptable.
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting,   YZ NEI   UE] N/AO and masonry block walls not likely to collapse onto the equipment?
Floresentbulbs overhead are unsecured and could fall out of the light fixture. Hardtarget cabinet will protect internalsfrom damage. Judged acceptable. CR IP2-2012-06120tracks installation of wires to tie florescent bulb to fixture for good seismic housekeeping.
Masonry block wall is seismically qualified by Computech Report no.
R547.01 as discussed in SQUG SEWS.
: 9. Do attached lines have adequate flexibility to avoid damage?                 YE NEI   U[-] N/A[l Yes attachedlines have adequate flexibility to avoid damage.
: 10. Based on the above seismic interaction evaluations, is equipment free         YE NE: UE1 of potentially adverse seismic interaction effects?
R1 The equipment is free of potentially adverse seismic interaction.
EN-DC-168 REV 0
 
ATTACHMENT 9.6                                                              SEISMIC WALKDOWN CHECKLIST FORM ATTACHMENT  9.6                                                           SEISMIC WALKDOWN CHECKLIST FORM Sheet 3 of 5                                                                                              IP2 Status: Y[    N[I U[D    RI Seismic Walkdown Checklist (SWC)             SWELl-072 Equipment ID No. M19                                                    Equip. Class 1 16 Equipment Description     BATTERY CHARGER 21 Other Adverse Conditions
: 11. Have you looked for and found no other seismic conditions that could       YE NE] UI-]
adversely affect the safety functions of the equipment?
Yes we have looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment.
Comments (Additional pages may be added as necessary)


==References:==
==References:==
Drawings and AWCDrawings: A206640, Rev 10. Arrangement of equipment in cable spreading room, elev. 33'01 ID 13800, Rev 7. Outline for the battery charger 22,24,21 and 23.AWC-004R1Evaluated by: Mag-gie Staub3/4/14Date:AfýKai Lo3/4/14EN-DC-168 REV 0 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORMSheet 4 of 5 IP2Status: YN NO ULI R1Seismic Walkdown Checklist (SWC) SWELl-072Equipment ID No. M19 Equip. Class' 16Equipment Description BATTERY CHARGER 21PhotographsNote: Battery charger 21 is cabinet on rightEN-DC-168 REV 0 ATTACHMENT 9.6SEISMIC WALKDOWN CHECKLIST FoRmATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORMSheet 5 of 5Seismic Walkdown Checklist (SWC) SWELl-072Equipment ID No. M19Equipment Descrption BATTERY CHARGER 21I IIP2Status: Y[E N[:] Ur- R1Equip. Class116Note: Battery charger 21 3Note: internal componenets (bottom)Note: internal componenets (top)R1Note: no other photos.EN-DC-168 REV 0 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORMSheet I of 5 IP2Status: YZ NO U[-D R1Seismic Walkdown Checklist (SWC) SWELl-073Equipment ID No. EGA3 Equip. Class1 16Equipment Description BATTERY CHARGER 24Location: Bldg. CB Floor El. 33'-0" Room, AreaManufacturer, Model, Etc. (optional but recommended)Instructions for Completing ChecklistThis checklist may be used to document the results of the Seismic Walkdown of an item of equipment on theSWEL. The space below each of the following questions may be used to record the results of judgments andfindings. Additional space is provided at the end of this checklist for documenting other comments.Anchorage1. Is the anchorage configuration verification required (i.e., is the item one Y] NEIof the 50% of SWEL items requiring such verification)?Yes the anchorage configuration verification is required.2. Is the anchorage free of bent, broken, missing or loose hardware?Cabinet doors were opened on 3/4/13 and anchorage of internalcomponent was inspected.Anchorage of cabinet to concrete floor is external to cabinet and wasinspected.Internal and external anchorage are free of bent, broken, missing andloose hardware.3. Is the anchorage free of corrosion that is more than mild surfaceoxidation?Yes the anchorage is free of corrosion that is more than mild surfaceoxidation.4. Is the anchorage free of visible cracks in the concrete near theanchors?Yes, the anchorage is free of visible cracks in the concrete near theanchor.YE NE] U['-] N/AI-]YE NEI uE-1 N/A--YE NEIl U[-- N/ADlR1' Enter the equipment class name from EPRI 1025286, Appendix B: Classes of Equipment.EN-DC-168 REV 0 ATTACHMENT 9.6Sheet 2 of 5SEISMIC WALKDOWN CHECKLIST FORMIP2Status: YE NEI U--I RISeismic Walkdown Checklist (SWC) SWELl-073Equipment ID No. EGA3 Equip. Class1 16Equipment Description BATTERY CHARGER 245. Is the anchorage configuration consistent with plant documentation? YX N[I] U-I N/A--(Note: This question only applies if the item is one of the 50% for whichan anchorage configuration verification is required.)One Hilti anchor bolt is 3/8" diameter not Y per DWG 01ID13800-7.Smaller anchor bolt was documented by SQUG (SEWS) and is therforeseismically acceptable.6. Based on the above anchorage evaluations, is the anchorage free of YZ NEIl UIpotentially adverse seismic conditions?Yes based on the above anchorage evaluations, the anchorage isfree of potentially adverse seismic conditions.[Interaction Effects7. Are soft targets free from impact by nearby equipment or structures?Yes soft targets are free from impact by nearby equipment orstructures.Y[ NE] u[-] N/AL]8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YO NEI u[1 N/All]and masonry block walls not likely to collapse onto the equipment?Masonry wall is qualified by computech report no. R547.9. Do attached lines have adequate flexibility to avoid damage?Yes attached lines have adequate flexibility to avoid damage.YE N[] UE- N/AII10. Based on the above seismic interaction evaluations, is equipment free YN NEIl U[Iof potentially adverse seismic interaction effects?Yes based on the above seismic interaction evaluations, the equipmentis free of potentially adverse seismic interaction effects.EN-DC-168 REV 0 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORMSheet 3 of 5 IP2Status: YE NEIl UfI R1Seismic Walkdown Checklist (SWC) SWELl-073Equipment ID No. EGA3 Equip. Class1 16Equipment Description BATTERY CHARGER 24Other Adverse Conditions11. Have you looked for and found no other seismic conditions that could YE NEI U[-Iadversely affect the safety functions of the equipment?Yes we have looked for and found no other seismic conditions thatcould adversely affect the safety functions of the equipment.Comments (Additional pages may be added as necessary)
Drawings and AWC Drawings: A206640, Rev 10. Arrangement of equipment in cable spreadingroom, elev. 33' 01 ID 13800, Rev 7. Outline for the battery charger 22,24,21 and 23.
AWC-004 R1 3/4/14 Evaluated by:   Mag-gie Staub                                                    Date:
Kai Lo    Afý                                                           3/4/14 EN-DC-168 REV 0
 
ATTACHMENT   9.6                                           SEISMIC WALKDOWN CHECKLIST FORM Sheet 4 of 5                                                                               IP2 Status: YN NO       ULI   R1 Seismic Walkdown Checklist (SWC)     SWELl-072 Equipment ID No. M19                                     Equip. Class' 16 Equipment Description   BATTERY CHARGER 21 Photographs Note: Battery charger21 is cabinet on right EN-DC-168 REV 0
 
ATTACHMENT 9.6                                                  SEISMIC WALKDOWN CHECKLIST FoRm ATTACHMENT 9.6                                                   SEISMIC WALKDOWN CHECKLIST FORM Sheet 5 of 5                                                                                  IP2 Status: Y[E N[:] Ur-    R1 Seismic Walkdown Checklist (SWC)         SWELl-072 Equipment ID No. M19                                          Equip. Class1 16 I
Equipment Descrption     BATTERY CHARGER 21 I
Note:     Battery charger21                  3  Note:   internal componenets (top)             R1 Note:     internal componenets (bottom)           Note:   no other photos.
EN-DC-168 REV 0
 
ATTACHMENT 9.6                                                                         SEISMIC WALKDOWN CHECKLIST FORM Sheet I of 5                                                                                                       IP2 Status: YZ NO U[-D       R1 Seismic Walkdown Checklist (SWC)                   SWELl-073 Equipment ID No.         EGA3                                                           Equip. Class1 16 Equipment Description         BATTERY CHARGER 24 Location: Bldg.       CB                               Floor El.     33'-0"           Room, Area Manufacturer, Model, Etc. (optional but recommended)
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
: 1. Is the anchorage configuration verification required (i.e., is the item one         Y] NEI of the 50% of SWEL items requiring such verification)?
Yes the anchorageconfiguration verification is required.
: 2. Is the anchorage free of bent, broken, missing or loose hardware?                   YE NE] U['-] N/AI-]
Cabinetdoors were opened on 3/4/13 and anchorage of internal                                                R1 component was inspected.
Anchorage of cabinet to concrete floor is external to cabinet and was inspected.
Internaland external anchorageare free of bent, broken, missing and loose hardware.
: 3. Is the anchorage free of corrosion that is more than mild surface                    YE NEI    uE-1 N/A--
oxidation?
Yes the anchorageis free of corrosion that is more than mild surface oxidation.
: 4. Is the anchorage free of visible cracks in the concrete near the                    YE NEIl U[--  N/ADl anchors?
Yes, the anchorageis free of visible cracks in the concrete near the anchor.
' Enter the equipment class name from EPRI 1025286, Appendix B: Classes of Equipment.
EN-DC-168 REV 0
 
ATTACHMENT     9.6                                                            SEISMIC WALKDOWN CHECKLIST FORM Sheet 2 of 5                                                                                              IP2 Status: YE NEI U--I     RI Seismic Walkdown Checklist (SWC)               SWELl-073 Equipment ID No.       EGA3                                                   Equip. Class1 16
[
Equipment Description     BATTERY CHARGER 24
: 5. Is the anchorage configuration consistent with plant documentation?         YX N[I] U-I N/A--
(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
One Hilti anchorbolt is 3/8"diameter not Y per DWG 01ID13800-7.
Smaller anchorbolt was documented by SQUG (SEWS) and is therfore seismically acceptable.
: 6. Based on the above anchorage evaluations, is the anchorage free of           YZ NEIl   UI potentially adverse seismic conditions?
Yes based on the above anchorage evaluations, the anchorage is free of potentiallyadverse seismic conditions.
Interaction Effects
: 7. Are soft targets free from impact by nearby equipment or structures?       Y[   NE] u[-] N/AL]
Yes soft targets are free from impact by nearby equipment or structures.
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting,   YO NEI   u[1 N/All]
and masonry block walls not likely to collapse onto the equipment?
Masonry wall is qualified by computech report no. R547.
: 9. Do attached lines have adequate flexibility to avoid damage?                 YE N[] UE- N/AII Yes attached lines have adequate flexibility to avoid damage.
: 10. Based on the above seismic interaction evaluations, is equipment free       YN NEIl U[I of potentially adverse seismic interaction effects?
Yes based on the above seismic interaction evaluations, the equipment is free of potentially adverse seismic interactioneffects.
EN-DC-168 REV 0
 
ATTACHMENT 9.6                                                             SEISMIC WALKDOWN CHECKLIST FORM Sheet 3 of 5                                                                                             IP2 Status: YE     NEIl UfI   R1 Seismic Walkdown Checklist (SWC)               SWELl-073 Equipment ID No. EGA3                                                   Equip. Class 1 16 Equipment Description   BATTERY CHARGER 24 Other Adverse Conditions
: 11. Have you looked for and found no other seismic conditions that could     YE NEI     U[-I adversely affect the safety functions of the equipment?
Yes we have looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment.
Comments (Additional pages may be added as necessary)


==References:==
==References:==
Drawings and AWCDrawings:01 ID13800, Rev 7, Outline for battery charger 22,24,21 & 23A206640, Rev 10, Arrangement of equipment in cable spreading room elev. 33'AWC-004t 3/4/14.......Date:Evaluated by: Maggie StaubRI314114Kai LoEN-DC-168 REV 0 PhoTogACHMETs.SEISMIC WALKDOWN CHECKLIST FoRmArTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORMSheet 4 of 5Seismic Walkdown Checklist (SWC) SWELl-073Equipment ID No. EGA3Equipment Description BATTERY CHARGER 24IP2Status: YN Nr'- UL"I R1Equip, Class116PhotographsNote: 3/8" anchor on north-west cornerNote: North-east comerEN-DC-168 REV 0 ATTACHMENT 9.6SEISMIC WALKDOWN CHECKLIST FORMATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORMSheet 2 of 5IP2RI.Note: Battery Charger 24Note: Intemal componentsEN-DC-168 REV 0 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORMSheet I of 5 IP2Status: YE NEI UD-Seismic Walkdown Checklist (SWC) SWELl-074Equipment ID No. EGAI Equip. Class1 16Equipment Description 10 KVA STATIC INVERTER #21Location: Bldg. CB Floor El. 33'-0" Room, AreaManufacturer, Model, Etc. (optional but recommended)Instructions for Completing ChecklistThis checklist may be used to document the results of the Seismic Walkdown of an item of equipment on theSWEL. The space below each of the following questions may be used to record the results of judgments andfindings. Additional space is provided at the end of this checklist for documenting other comments.Anchorage1. Is the anchorage configuration verification required (i.e., is the item one YZ NE-]of the 50% of SWEL items requiring such verification)?Yes the anchorage configuration verification is required.2. Is the anchorage free of bent, broken, missing or loose hardware? YZ N-- UL] N/A[--RAnchorage of internal components to cabinet inspected on 3/7/14 andfound OKAnchorage of cabinet to concrete floor is external to cabinet and wasinspected.3. Is the anchorage free of corrosion that is more than mild surface YE NEi UEI-- N/A[:oxidation?Yes the anchorage is free of corrosion that is more than mild surfaceoxidation.4. Is the anchorage free of visible cracks in the concrete near the YZ NEi UI- N/A[anchors?Yes, the anchorage is free of visible cracks in the concrete near theanchor.R1I1Enter the equipment class name from EPRI 1025286, Appendix B: Classes of Equipment.EN-DC-168 REV 0 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORMSheet 2 of 5 IP2Status: Y[ NEI UI- R1Seismic Walkdown Checklist (SWC) SWELl-074Equipment ID No. EGAI Equip. Class' 16Equipment Description 10 KVA STATIC INVERTER #215. Is the anchorage configuration consistent with plant documentation? Y] N[I UL-I N/AL](Note: This question only applies if the item is one of the 50% for whichan anchorage configuration verification is required.)Anchorage matches description provided in SQUG (SEWS) andDWG 011D13800-7.6. Based on the above anchorage evaluations, is the anchorage free of YN NEil UIIpotentially adverse seismic conditions?Yes based on the above anchorage evaluations, the anchorage isfree of potentially adverse seismic conditions.Interaction Effects7. Are soft targets free from impact by nearby equipment or structures?Yes soft targets are free from impact by nearby equipment orstructures.8. Are overhead equipment, distribution systems, ceiling tiles and lighting,and masonry block walls not likely to collapse onto the equipment?Masonry wall qualified by computech report no. R54 7.01 per SQUG(SEWS).9. Do attached lines have adequate flexibility to avoid damage?Yes attached lines have adequate flexibility to avoid damage.10. Based on the above seismic interaction evaluations, is equipment freeof potentially adverse seismic interaction effects?Yes based on the above seismic interaction evaluations, the equipmentis free of potentially adverse seismic interaction effects.YE NEIl UE- N/AllY[E NEI U[] N/A[]YE NE]I ul N/AllYE NEIUE1EN-DC-168 REV 0 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORMSheet 3 of 5 IP2Status: YN NI! U[I R1Seismic Walkdown Checklist (SWC) SWELl-074Equipment ID No. EGAI Equip. Class' 16Equipment Description 10 KVA STATIC INVERTER #21Other Adverse Conditions11. Have you looked for and found no other seismic conditions that could YN NEI U[--adversely affect the safety functions of the equipment?Yes we have looked for and found no other seismic conditions thatcould adversely affect the safety functions of the equipment.Comments (Additional pages may be added as necessary)
Drawings and AWC Drawings:01ID13800, Rev 7, Outline for battery charger22,24,21 & 23 A206640, Rev 10, Arrangement of equipment in cable spreadingroom elev. 33' AWC-004 t      3/4/14 Evaluated by:    Maggie Staub                    .......                         Date:
RI 314114 Kai Lo EN-DC-168 REV 0
 
SEISMIC WALKDOWN CHECKLIST FoRm ArTACHMENT  9.6                                               SEISMIC WALKDOWN CHECKLIST FORM Sheet 4 of 5                                                                                IP2 Status: YN Nr'-  UL"I  R1 PhoTogACHMETs.
Seismic  Walkdown Checklist (SWC)         SWELl-073 Equipment ID No. EGA3                                        Equip, Class1 16 Equipment Description BATTERY CHARGER 24 Photographs Note:     3/8" anchoron north-west corner          Note: North-eastcomer EN-DC-168 REV 0
 
ATTACHMENT 9.6                        SEISMIC WALKDOWN CHECKLIST FORM ATTACHMENT 9.6                       SEISMIC WALKDOWN CHECKLIST FORM Sheet 2 of 5                                                      IP2 RI.
Note: Battery Charger24 Note: Intemal components EN-DC-168 REV 0
 
ATTACHMENT 9.6                                                                         SEISMIC WALKDOWN CHECKLIST FORM Sheet I of 5                                                                                                         IP2 Status: YE NEI       UD-R1 Seismic Walkdown Checklist (SWC)                   SWELl-074 Equipment ID No.         EGAI                                                           Equip. Class 1 16 Equipment Description         10 KVA STATIC INVERTER #21 Location: Bldg.     CB                                 Floor El. 33'-0"           Room, Area Manufacturer, Model, Etc. (optional but recommended)
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
: 1. Is the anchorage configuration verification required (i.e., is the item one         YZ NE-]
of the 50% of SWEL items requiring such verification)?
Yes the anchorage configuration verification is required.
: 2. Is the anchorage free of bent, broken, missing or loose hardware?                   YZ N-- UL] N/A[--
RI1 Anchorage of internalcomponents to cabinet inspected on 3/7/14 and found OK Anchorage of cabinet to concrete floor is external to cabinet and was inspected.
: 3. Is the anchorage free of corrosion that is more than mild surface                   YE NEi     UEI-- N/A[:
oxidation?
Yes the anchorageis free of corrosion that is more than mild surface oxidation.
: 4. Is the anchorage free of visible cracks in the concrete near the                     YZ NEi UI- N/A[
anchors?
Yes, the anchorage is free of visible cracks in the concrete near the anchor.
Enter the equipment class name from EPRI 1025286, Appendix B: Classes of Equipment.
EN-DC-168 REV 0
 
ATTACHMENT 9.6                                                               SEISMIC WALKDOWN CHECKLIST FORM Sheet 2 of 5                                                                                               IP2 Status: Y[   NEI UI-   R1 Seismic Walkdown Checklist (SWC)               SWELl-074 Equipment ID No.     EGAI                                                     Equip. Class' 16 Equipment Description     10 KVA STATIC INVERTER #21
: 5. Is the anchorage configuration consistent with plant documentation?         Y] N[I UL-I N/AL]
(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Anchorage matches description provided in SQUG (SEWS) and DWG 011D13800-7.
: 6. Based on the above anchorage evaluations, is the anchorage free of         YN NEil UII potentially adverse seismic conditions?
Yes based on the above anchorage evaluations, the anchorage is free of potentially adverse seismic conditions.
Interaction Effects
: 7. Are soft targets free from impact by nearby equipment or structures?       YE NEIl UE- N/All Yes soft targets are free from impact by nearby equipment or structures.
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting,   Y[E NEI U[] N/A[]
and masonry block walls not likely to collapse onto the equipment?
Masonry wall qualified by computech report no. R54 7.01 per SQUG (SEWS).
: 9. Do attached lines have adequate flexibility to avoid damage?               YE NE]I ul    N/All Yes attached lines have adequate flexibility to avoid damage.
: 10. Based on the above seismic interaction evaluations, is equipment free      YE NEIUE1 of potentially adverse seismic interaction effects?
Yes based on the above seismic interactionevaluations, the equipment is free of potentially adverse seismic interactioneffects.
EN-DC-168 REV 0
 
ATTACHMENT 9.6                                                             SEISMIC WALKDOWN CHECKLIST FORM Sheet 3 of 5                                                                                             IP2 Status: YN NI!     U[I   R1 Seismic Walkdown Checklist (SWC)             SWELl-074 Equipment ID No. EGAI                                                   Equip. Class' 16 Equipment Description     10 KVA STATIC INVERTER #21 Other Adverse Conditions
: 11. Have you looked for and found no other seismic conditions that could     YN NEI     U[--
adversely affect the safety functions of the equipment?
Yes we have looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment.
Comments (Additional pages may be added as necessary)


==References:==
==References:==
Drawings and AWCDrawings: A206640, Rev 10, arrangement of equipment in cable spreading room elev. 33'.AWC-004'" 3/7/14 REvaluated by: Maggie Staub Date:Kai Lo 3/7/14EN-DC-168 REV 0 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORMATTACHM ENT 9.6SEISMIC WALKDOWN CHECKLIST FoRmSheet 4 of 5Seismic Walkdown Checklist (SWC) SWELl-074Equipment ID No. EGA1Equipment Description 10 KVA STATIC INVERTER #21IP2Status: YZ Nr-] UrI R1Equip. Class116PhotographsNote:CabinetNote: North west anchorNote: East anchorsNote: South-west anchorEN-DC-168 REV 0 ATAHMENT 59of6SEISMIC WALKDOWN CHECKLIST FoRmShoot 5 of 5IP2R1Note: intemals at top INote: internals at bottomEN-DC-168 REV 0 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORMSheet I of 5 IP2Status: NE-- UE RSeismic Walkdown Checklist (SWC) SWELl-075 R1Equipment ID No. EGA8 Equip. Class1 16Equipment Description IOKVA STATIC INVERTER #23Location: Bldg. CB Floor El. 33'-0" Room, AreaManufacturer, Model, Etc. (optional but recommended)Instructions for Completing ChecklistThis checklist may be used to document the results of the Seismic Walkdown of an item of equipment on theSWEL. The space below each of the following questions may be used to record the results of judgments andfindings. Additional space is provided at the end of this checklist for documenting other comments.Anchorage1. Is the anchorage configuration verification required (i.e., is the item oneof the 50% of SWEL items requiring such verification)?The anchorage configuration verification is not required.2. Is the anchorage free of bent, broken, missing or loose hardware?Cabinet doors were opened on 2/28/14 and all internal anchorage isfree of bent, broken, missing or loose hardware.3. Is the anchorage free of corrosion that is more than mild surfaceoxidation?Yes the anchorage is free of corrosion that is more than mild surfaceoxidation.4. Is the anchorage free of visible cracks in the concrete near theanchors?Yes, the anchorage is free of visible cracks in the concrete near theanchor.'Enter the equipment class name from EPRI 1025286, Appendix B: Classes of Equipment.Y[I- NYE N[EI UOI N/AElRIYE NEI UE7 N/A[-YE NEI U"- N/A[-EN-DC-168 REV 0 ATTACHMEISheet 2 ofiT 9.65SEISMIC WALKDOWN CHECKLIST FORMIP2Status: YE NEI U- KSeismic Walkdown Checklist (SWC) SWELI-075Equipment ID No. EGA8 Equip. Class1 16Equipment Description IOKVA STATIC INVERTER#235. Is the anchorage configuration consistent with plant documentation? YE] Ni] U-L N/AN(Note: This question only applies if the item is one of the 50% for whichan anchorage configuration verification is required.)Not applicable since component is not part of the anchorageconfiguration verification.6. Based on the above anchorage evaluations, is the anchorage free of YZ N[I ULipotentially adverse seismic conditions?Yes based on the above anchorage evaluations, the anchorage isfree of potentially adverse seismic conditions.I R1Interaction Effects7. Are soft targets free from impact by nearby equipment or structures?Yes soft targets are free from impact by nearby equipment orstructures.Y0 NE] UE] N/AE]8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YO NE] UE] N/AE]and masonry block walls not likely to collapse onto the equipment?Block wall is seismiclly qualified by Computech report No. R547. 01.Fluorescent bulbs need to be secured to fixture with wires. CR IP2-2012-06120 tracks installation of wires to tie florescent bulb to fixture. Itis judged the hard target inverter will remain operable if the fluorescentbulbs were to fall on it.9. Do attached lines have adequate flexibility to avoid damage? YO NE] u[-] N/AE]Yes attached lines have adequate flexibility to avoid damage.10. Based on the above seismic interaction evaluations, is equipment free YN NE] UE]of potentially adverse seismic interaction effects?Yes based on the above anchorage evaluations, the anchorage is freeof potentially adverse seismic conditions.EN-DC-168 REV 0 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORMSheet 3 of 5 1P2Status: YN NEI- UL-Seismic Walkdown Checklist (SWC) SWELl-075Equipment ID No. EGA8 Equip. Class' 16Equipment Description 10 KVA STATIC INVERTER #23Other Adverse Conditions11. Have you looked for and found no other seismic conditions that could YE N[-i UI-adversely affect the safety functions of the equipment?Yes we have looked for and found no other seismic conditions thatcould adversely affect the safety functions of the equipment.Comments (Additional pages may be added as necessary)
Drawings and AWC Drawings: A206640, Rev 10, arrangementof equipment in cable spreadingroom elev. 33'.
AWC-004
                                                    .*.*  '"                               3/7/14           R Date:
Evaluated by:   Maggie Staub Kai Lo                                                                   3/7/14 EN-DC-168 REV 0
 
SEISMIC WALKDOWN CHECKLIST FORM ATTACHMENT ATTACHM      9.6 ENT 9.6                                                SEISMIC WALKDOWN CHECKLIST FoRm Sheet 4 of 5                                                                              IP2 Status: YZ Nr-] UrI    R1 Seismic Walkdown Checklist (SWC)       SWELl-074 Equipment ID No. EGA1                                        Equip. Class1 16 Equipment Description 10 KVA STATIC INVERTER #21 Photographs Note:     Cabinet                              Note: North west anchor Note:     South-west anchor                      Note: East anchors EN-DC-168 REV 0
 
59of6 ATAHMENT                                 SEISMIC WALKDOWN CHECKLIST FoRm Shoot 5 of 5 IP2 R1 Note:     intemals at top I Note: internalsat bottom EN-DC-168 REV 0
 
ATTACHMENT 9.6                                                                       SEISMIC WALKDOWN CHECKLIST FORM Sheet I of 5                                                                                                       IP2 Status: YI* NE-- UE       R Seismic Walkdown Checklist (SWC)                   SWELl-075                                                             R1 Equipment ID No.       EGA8                                                           Equip. Class1 16 Equipment Description       IOKVA STATIC INVERTER #23 Location: Bldg.     CB                               Floor El.       33'-0"           Room, Area Manufacturer, Model, Etc. (optional but recommended)
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
: 1. Is the anchorage configuration verification required (i.e., is the item one        Y[I- N of the 50% of SWEL items requiring such verification)?
The anchorageconfiguration verification is not required.
: 2. Is the anchorage free of bent, broken, missing or loose hardware?                   YE N[EI UOI N/AEl RI Cabinet doors were opened on 2/28/14 and all internal anchorage is free of bent, broken, missing or loose hardware.
: 3. Is the anchorage free of corrosion that is more than mild surface                  YE NEI    UE7 N/A[-
oxidation?
Yes the anchorageis free of corrosionthat is more than mild surface oxidation.
: 4. Is the anchorage free of visible cracks in the concrete near the                    YE NEI    U"- N/A[-
anchors?
Yes, the anchorageis free of visible cracks in the concrete near the anchor.
'Enter the equipment class name from EPRI 1025286, Appendix B: Classes of Equipment.
EN-DC-168 REV 0
 
ATTACHMEI iT9.6                                                                SEISMIC WALKDOWN CHECKLIST FORM Sheet 2 of5                                                                                                  IP2 Status: YE NEI     U-   K Seismic Walkdown Checklist (SWC)               SWELI-075 I R1 Equipment ID No.       EGA8                                                     Equip. Class 1 16 Equipment Description       IOKVA STATIC INVERTER#23
: 5. Is the anchorage configuration consistent with plant documentation?           YE] Ni] U-L N/AN (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Not applicable since component is not part of the anchorage configuration verification.
: 6. Based on the above anchorage evaluations, is the anchorage free of             YZ N[I ULi potentially adverse seismic conditions?
Yes based on the above anchorage evaluations, the anchorageis free of potentially adverse seismic conditions.
Interaction Effects
: 7. Are soft targets free from impact by nearby equipment or structures?         Y0 NE] UE] N/AE]
Yes soft targets are free from impact by nearby equipment or structures.
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting,     YO   NE] UE] N/AE]
and masonry block walls not likely to collapse onto the equipment?
Block wall is seismiclly qualified by Computech report No. R547.01.
Fluorescentbulbs need to be secured to fixture with wires. CR IP2-2012-06120 tracks installationof wires to tie florescent bulb to fixture. It is judged the hard target inverterwill remain operableif the fluorescent bulbs were to fall on it.
: 9. Do attached lines have adequate flexibility to avoid damage?                 YO NE] u[-] N/AE]
Yes attachedlines have adequateflexibility to avoid damage.
: 10. Based on the above seismic interaction evaluations, is equipment free         YN NE] UE]
of potentially adverse seismic interaction effects?
Yes based on the above anchorageevaluations, the anchorageis free of potentiallyadverse seismic conditions.
EN-DC-168 REV 0
 
ATTACHMENT 9.6                                                             SEISMIC WALKDOWN CHECKLIST FORM Sheet 3 of 5                                                                                             1P2 Status: YN NEI-   UL-R1 Seismic Walkdown Checklist (SWC)             SWELl-075 Equipment ID No. EGA8                                                   Equip. Class' 16 Equipment Description     10 KVA STATIC INVERTER #23 Other Adverse Conditions
: 11. Have you looked for and found no other seismic conditions that could     YE N[-i   UI-adversely affect the safety functions of the equipment?
Yes we have looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment.
Comments (Additional pages may be added as necessary)


==References:==
==References:==
Drawings and AWCDrawings: A206640, Rev 10, Arrangement of equipment in cable spreading room elev. 33'AWC-004R1Evaluated by:Mnaaip. 2/28/14Date:Maryryie StaubR1212811Kai LoEN-DC-168 REV 0 ATTACHMENT 9.6SEISMIC WALKDOWN CHECKLIST FoRmATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORMSheet 4 of 5Seismic Walkdown Checklist (SWC) SWELl-075Equipment ID No. EGA8Equipment Description 10 KVA STATIC INVERTER #23IP2Status: YE NEI uE] R1Equip. Class116PhotographsNote:Note:Right side anchorage.R1Note:Left side anchorage.I Note:internal components at bottomEN-DC-168 REV 0 ATTACHMENT 9.6SEISMIC WALKDOWN CHECKUsT FoRmATTACHMENT 9.6 SEISMIC WALKOOWN CHECKLIST FORMSheet 5 of 5IP2RINote: intemal components at topNote: no other photos.EN-DC-168 REV 0 ATTACHMENT 9.6Sheet 1 of 6SEISMIC WALKDOWN CHECKLIST FORMIP2Status: YE NOI ULISeismic Walkdown Checklist (SWC) SWELl-076Equipment ID No. 21EDG Equip. Class1 17Equipment Description DIESEL GENERATOR NO. 21Location: Bldg. EDG Floor El. 72'-O" Room, AreaManufacturer, Model, Etc. (optional but recommended)Instructions for Completing ChecklistThis checklist may be used to document the results of the Seismic Walkdown of an item of equipment on theSWEL. The space below each of the following questions may be used to record the results of judgments andfindings. Additional space is provided at the end of this checklist for documenting other comments.Anchorage1. Is the anchorage configuration verification required (i.e., is the item one YE NIZof the 50% of SWEL items requiring such verification)?Yes the anchorage configuration verification is required.R12. Is the anchorage free of bent, broken, missing or loose hardware?Anchorage of components internal to cabinets that are attached todiesel were examined. See comments on page 3.External anchorage was inspected and is acceptable.3. Is the anchorage free of corrosion that is more than mild surfaceoxidation?Minor surface rust. Accepable.4. Is the anchorage free of visible cracks in the concrete near theanchors?A few minor hair like cracks. No significant structural cracks.Y[ NI U[E- NIAEYE NE- UF-1 N/AE]YE NEI UE- N/AE[R1Enter the equipment class name from EPRI 1025286, Appendix B: Classes of Equipment.EN-DC-168 REV 0 ATTACHMENT 9.6Sheet 2 of 6SEISMIC WALKDOWN CHECKLIST FORMIP2Status: Y; NM Ur--Seismic Walkdown Checklist (SWC) SWELl-076Equipment ID No. 21EDG Equip. Class1 17Equipment Description DIESEL GENERA TOR NO. 215. Is the anchorage configuration consistent with plant documentation? Y[ N-I Ur] N/Al(Note: This question only applies if the item is one of the 50% for whichan anchorage configuration verification is required.)Anchorage matches the SQUG (SEWS).6. Based on the above anchorage evaluations, is the anchorage free of YN NOI UOIpotentially adverse seismic conditions?Yes based on the above anchorage evaluations, the anchorage isfree of potentially adverse seismic conditions.R1Interaction Effects7. Are soft targets free from impact by nearby equipment or structures?Numerious tubes touch each other. Judged OK.YN N-] UL- N/AZ!8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Y[ NEI] U[] N/A[--and masonry block walls not likely to collapse onto the equipment?Refer to A WC-01 1 for partition discussion.9. Do attached lines have adequate flexibility to avoid damage?Yes attached lines have adequate flexibility to avoid damage.Y[E NE] U[- N/Al-]10. Based on the above seismic interaction evaluations, is equipment free Y[Z NEI urDof potentially adverse seismic interaction effects?Yes based on the above seismic interaction evaluations, the equipmentis free of potentially adverse seismic interaction effects.EN-DC-168 REV 0 ATTACHMENT 9.6Sheet 3 of 6SEISMIC WALKDOWN CHECKLIST FORMIP2Status: YM NEI UL 1R1Equip. Class' 17Seismic Walkdown Checklist (SWC) SWELl-076Equipment ID No. 21EDGIFniiinmrnt flr3_crintinn fI-')II.L (FNFRATOR NC) 21Other Adverse Conditions11. Have you looked for and found no other seismic conditions that could YZ NEI ULIadversely affect the safety functions of the equipment?Yes we have looked for and found no other seismic conditions thatcould adversely affect the safety functions of the equipment.Comments (Additional pages may be added as necessary)West lower air filters bottom clip does not hold air filter in place. Air can by-pass filter Operationspersonnel fixed issue while inspection team was their. Operations CR IP2-2012-06238 issued fortrend tracking resolusion.
Drawings and AWC Drawings: A206640, Rev 10, Arrangement of equipment in cable spreadingroom elev. 33' AWC-004 2/28/14 Evaluated by:     Mnaaip. ,*tnllh                                                Date:
Maryryie Staub                                                                            R1 Kai Lo                                                                  212811 EN-DC-168 REV 0
 
ATTACHMENT   9.6                                                    SEISMIC WALKDOWN CHECKLIST FoRm ATTACHMENT  9.6                                                   SEISMIC WALKDOWN CHECKLIST FORM Sheet 4 of 5                                                                                    IP2 Status: YE NEI    uE]  R1 Seismic Walkdown Checklist (SWC)       SWELl-075 Equipment ID No. EGA8                                            Equip. Class1 16 Equipment Description 10 KVA STATIC INVERTER #23 Photographs Note:                                             Note:
Right side anchorage.
R1 Note:                                                       internal components at bottom Left side anchorage.                           I Note:
EN-DC-168 REV 0
 
ATTACHMENT   9.6                                  SEISMIC WALKDOWN CHECKUsT FoRm SEISMIC WALKOOWN CHECKLIST FORM Sheet 5 of 5 9.6 ATTACHMENT IP2 RI Note:     intemal components at top Note: no otherphotos.
EN-DC-168 REV 0
 
ATTACHMENT     9.6                                                                    SEISMIC WALKDOWN CHECKLIST FORM Sheet 1 of 6                                                                                                        IP2 Status: YE NOI ULI Seismic Walkdown Checklist (SWC)                   SWELl-076                                                            R1 1
Equipment ID No.         21EDG                                                         Equip. Class  17 Equipment Description         DIESEL GENERATOR NO. 21 Location: Bldg.       EDG                               Floor El.     72'-O"           Room, Area Manufacturer, Model, Etc. (optional but recommended)
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
: 1. Is the anchorage configuration verification required (i.e., is the item one         YE NIZ of the 50% of SWEL items requiring such verification)?
Yes the anchorageconfiguration verification is required.
: 2. Is the anchorage free of bent, broken, missing or loose hardware?                   Y[    NI U[E- NIAE R1 Anchorage of components internalto cabinets that are attached to diesel were examined. See comments on page 3.
External anchoragewas inspected and is acceptable.
: 3. Is the anchorage free of corrosion that is more than mild surface                    YE NE- UF-1 N/AE]
oxidation?
Minor surface rust. Accepable.
: 4. Is the anchorage free of visible cracks in the concrete near the YE NEI UE- N/AE[
anchors?
A few minor hairlike cracks. No significantstructuralcracks.
Enter the equipment class name from EPRI 1025286, Appendix B: Classes of Equipment.
EN-DC-168 REV 0
 
ATTACHMENT 9.6                                                                SEISMIC WALKDOWN CHECKLIST FORM Sheet 2 of 6                                                                                                IP2 Status: Y;   NM Ur--
Seismic Walkdown Checklist (SWC)               SWELl-076                                                      R1 1
Equipment ID No.     21EDG                                                   Equip. Class  17 Equipment Description     DIESEL GENERA TOR NO. 21
: 5. Is the anchorage configuration consistent with plant documentation?         Y[   N-I Ur] N/Al (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Anchorage matches the SQUG (SEWS).
: 6. Based on the above anchorage evaluations, is the anchorage free of           YN NOI     UOI potentially adverse seismic conditions?
Yes based on the above anchorage evaluations, the anchorage is free of potentially adverse seismic conditions.
Interaction Effects
: 7. Are soft targets free from impact by nearby equipment or structures?       YN N-] UL-     N/AZ!
Numerious tubes touch each other. Judged OK.
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting,   Y[   NEI] U[] N/A[--
and masonry block walls not likely to collapse onto the equipment?
Refer to A WC-01 1 for partition discussion.
: 9. Do attached lines have adequate flexibility to avoid damage?               Y[E NE] U[-     N/Al-]
Yes attachedlines have adequateflexibility to avoid damage.
: 10. Based on the above seismic interaction evaluations, is equipment free       Y[Z NEI urD of potentially adverse seismic interaction effects?
Yes based on the above seismic interaction evaluations, the equipment is free of potentially adverse seismic interaction effects.
EN-DC-168 REV 0
 
ATTACHMENT   9.6                                                                SEISMIC WALKDOWN CHECKLIST FORM Sheet 3 of 6                                                                                                      IP2 Status: YM NEI       UL 1 Seismic Walkdown Checklist (SWC)               SWELl-076                                                            R1 Equipment ID No.       21EDG                                                      Equip. Class' 17 IFniiinmrntflr3_crintinn  fI-')II.L (FNFRATOR NC) 21 Other Adverse Conditions
: 11. Have you looked for and found no other seismic conditions that could           YZ NEI       ULI adversely affect the safety functions of the equipment?
Yes we have looked for and found no otherseismic conditions that could adversely affect the safety functions of the equipment.
Comments (Additional pages may be added as necessary)
West lower airfilters bottom clip does not hold air filter in place. Air can by-pass filter Operations personnel fixed issue while inspection team was their. OperationsCR IP2-2012-06238issued for trend tracking resolusion.


==References:==
==References:==
Drawings and AWCDrawings: 9321-H-2250, Rev 7, Diesel generator building general arrangement plan.9321-F-18533 (A201351), Control and diesel generator buildings foundation plan anddetails.AWC-011The upper roof panel has one bolt that doesn't have a nut. This is acceptable because the remainingbolts are adequate to hold the panel. This is addressed in CR-IP2-2013-04549.The anchorage of the following components that are inside a cabinet are inspected:1. Power panel for 21 Pre Lube Pump, 21 Lube Oil Heater, and 21 Jacket Water Heater OK2. Panel EPZ44: Fuses for 21 Pre Lube Pump, 21 Lube Oil Heater, 21 jacket water heater OK3. 21 EDG Gauge Board panel OK4. 21EDG Jacket water pressure switch box OK5. 21EDG Crankcase Exhaust Fan Starter Enclosure OKR1Evaluated by:Kiu I nDate: 11/12/13John Skoniecznv11/12/13EN-DC-168 REV 0 ATTACHMENT 9.6SEISMIC WALKDOWN CHECKLIST FORMATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORMShoot 4 of 6Seismic Walkdown Checklist (SWC) SWELl-076Equipment ID No. 21EDGEquipment Description DIESEL GENERATOR NO. 21IP2Status: Y0 N-- U-IR1Equip. Class' 17Photographsi Note: DIESEL GENERATOR NO 21.Note: LOWER AIR FILTER NOT FULLY LATCHED.LOWER AIR FILTER NOT FULLY LATCHED.Note: no photo.EN-DC-168 REV 0 ATTACHMENT 9.6SEISMIC WALKDOWN CHECKLIST FORMATrACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORMSheet 5 of 6IP2Note: Panel EPZ44 Note: Panel EPZ44 internalsR1Note: 21 EDG Gauge BoardEN-DC-168 REV 0 ATTACHMENT 9.6SEISMIC WALKDOWN CHECKLIST FORMSheet 6 of 6IP2Note:Note: 21EDG Crankcase Exhaust Fan StarterEnclosureEN-DC-168 REV 0 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORMSheet 1 of 10Status: YN NEI UI1Seismic Walkdown Checklist (SWC) SWELl-077Equipment ID No. O022EDG Equip. Class1 17Equipment Description DIESEL GENERATOR NO. 22Location: Bldg. EDG Floor El. 72-0" Room, AreaManufacturer, Model, Etc. (optional but recommended)Instructions for Completing ChecklistThis checklist may be used to document the results of the Seismic Walkdown of an item of equipment on theSWEL. The space below each of the following questions may be used to record the results of judgments andfindings. Additional space is provided at the end of this checklist for documenting other comments.AnchorageRI1. Is the anchorage configuration verification required (i.e., is the item oneof the 50% of SWEL items requiring such verification)?Yes the anchorage configuration verification is required.2. Is the anchorage free of bent, broken, missing or loose hardware?Anchorage of components internal to cabinets attached to diesel wereopened and examined. Internals were inspected.Southwest of the EDG near the western post of the EDG exhaust pipethere is a base plate missing I of 4 anchor bolt nuts. This is judgedseismically adequate as this base plate was abandoned from the oldEDG exhaust pipe support and now a 4" pipe bears on but is notwelded to the base plate.3. Is the anchorage free of corrosion that is more than mild surfaceoxidation?YE NEIYN NO~ ULI N/AEIR1YN NO UI-] N/AElYes the anchorage is free of corrosion that is more than mild surfaceoxidation.Enter the equipment class name from EPRI 1025286, Appendix B: Classes of Equipment.EN-DC-168 REV 0 ATTACHMENT 9.6Sheet 2 of 10SEISMIC WALKOOWN CHECKLIST FORMSeismic Walkdown Checklist (SWC) SWELl-077Equipment ID No. O022EDGStatus: Y[ NE] UE- RIEquip. Class117Equipment Description DIESEL GENERA TOR NO. 224. Is the anchorage free of visible cracks in the concrete near theanchors?EDG Pedestal has some minor hair line cracks that are none structural.They are not near the anchors. Acceptable.EDG exhaust pipe is supported on a post frame that also supports fusepanel for 22 Pre Lube Pump, 22 Lube oil HTR, and 22 Jacket WaterHTR. This support has damaged & missing grout under the easternpost base plate. LB-11 was issued to resolve.5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for whichan anchorage configuration verification is required.)YEI NE uE- N/AE-Y1; NE] UE- N/AE]Anchorage matches the SQUG (SEWS).6. Based on the above anchorage evaluations, is the anchorage free ofpotentially adverse seismic conditions?Yes based on the above anchorage evaluations, the anchorage isfree of potentially adverse seismic conditions.YE NEI uErInteraction Effects7. Are soft targets free from impact by nearby equipment or structures?A lot of tubing, hoses, etc. touch each other. All occurences wherejudged acceptable. Some but not all of the occurences are noted below.-Fuel oil filter line DF-80 touches DF-78 on south west side of 22EDG.-EDG DLO 13-1 EDG 22 STRNR Vent Stop Valve tubing touches pipeto 22EDLOS.-EDG JWP-1-1 22EDG PS-1-1 and PS-5-1 stop tubing touches pipe toFE-6469 on east side of 22EDG.-Line on west side of 22EDG to DL0-539 touches line to DF-107.YO NE-] UE- NIAE1EN-DC-168 REV 0 ATTACHMENTSheet 3 of I9.6SEISMIC WALKDOWN CHECKLIST FORM[0Status: N[7l UL-I R1Seismic Walkdown Checklist (SWC) SWELl-077Equipment ID No. O022EDG Equip. Class1 17Equipment Description DIESEL GENERATOR NO. 228. Are overhead equipment, distribution systems, ceiling tiles and lighting, Y(Z N[Il U[] N/AD1and masonry block walls not likely to collapse onto the equipment?Refer to AWC-01 1 for partition discussion.9. Do attached lines have adequate flexibility to avoid damage?Yes attached lines have adequate flexibility to avoid damage.Y[ N[-] U[-] N/AII10. Based on the above seismic interaction evaluations, is equipment free YZ ND] U[Iof potentially adverse seismic interaction effects?Yes based on the above seismic interaction evaluations, the equipmentis free of potentially adverse seismic interaction effects.Other Adverse Conditions11. Have you looked for and found no other seismic conditions that couldadversely affect the safety functions of the equipment?Yes we have looked for and found no other seismic conditions thatcould adversely affect the safety functions of the equipment.YE NDI U--EN-DC-168 REV 0 ATTACHMENT 9.6Sheet 4 of 10SEISMIC WALKDOWN CHECKLIST FORMStatus: YZ NEI- UL- g1zSeismic Walkdown Checklist (SWC) SWELI-077Equipment ID No. O022EDG Equip. Class1 17Equipment Description DIESEL GENERATOR NO. 22Comments (Additional pages may be added as necessary)The following are house keeping issues and judged acceptable for seismic concerns.Grating at valve DA-559 DG22 Starting Air Right Side supply is touching valve hand wheel. This is anon- seismic issue.One of the roof light bulbs is out. CR IP2-2012-06515 issued to track resolution.Minor surface rust on some threaded rods, bolts, nuts, and other components. Judged acceptable.Flange on 22EDG JW & LO Coolers cooling WTR outlet has one out of 23 bolts flush with nut. Judgedacceptable.Latch on 22EDG Gauge board cover panel on north side is not latched. CR IP2-2012-06238 issued totrack resolution.Noted WRT 00172112 was tagged to track resolution of a leak on south east side of diesel.Evidence of oil leaks below south side of diesel typical for all diesels in area. Judged acceptable.The Starting Air Pressure Gauge is missing I of 3 screws. The remaining 2 screws will be seismicallyadequate. This condition is captured in CR-IP2-2013-02336.
Drawings and AWC Drawings: 9321-H-2250, Rev 7, Diesel generatorbuilding general arrangementplan.
9321-F-18533 (A201351), Control and diesel generatorbuildings foundation plan and details.
AWC-011 The upper roof panel has one bolt that doesn't have a nut. This is acceptable because the remaining bolts are adequate to hold the panel.This is addressedin CR-IP2-2013-04549.
The anchorageof the following components that are inside a cabinet are inspected:
: 1. Powerpanel for 21 Pre Lube Pump, 21 Lube Oil Heater, and 21 Jacket Water Heater OK
: 2. Panel EPZ44: Fuses for 21 Pre Lube Pump, 21 Lube Oil Heater,21 jacket water heaterOK
: 3. 21 EDG Gauge Boardpanel                                                                        OK
: 4. 21EDG Jacket water pressure switch box                                                         OK OK      R1
: 5. 21EDG CrankcaseExhaust Fan StarterEnclosure Evaluated by:     Kiu I n                                                              Date:     11/12/13 John Skoniecznv                                                                  11/12/13 EN-DC-168 REV 0
 
ATTACHMENT   9.6                                              SEISMIC WALKDOWN CHECKLIST FORM SEISMIC WALKDOWN CHECKLIST FORM Shoot 4 of 6 9.6 ATTACHMENT                                                                                IP2 Status: Y0 N--    U-I Seismic Walkdown Checklist (SWC)     SWELl-076                                                R1 Equipment ID No. 21EDG                                      Equip. Class' 17 Equipment Description DIESEL GENERATOR NO. 21 Photographs Note: LOWER AIR FILTER NOT FULLY LATCHED.
i Note:     DIESEL GENERATOR NO 21.
Note:   no photo.
LOWER AIR FILTER NOT FULLY LATCHED.
EN-DC-168 REV 0
 
ATTACHMENT 9.6                          SEISMIC WALKDOWN CHECKLIST FORM SEISMIC WALKDOWN CHECKLIST FORM Sheet 5 of 6 9.6 ATrACHMENT IP2 Note:     Panel EPZ44       Note: PanelEPZ44 internals R1 Note:     21 EDG Gauge Board EN-DC-168 REV 0
 
ATTACHMENT   9.6                                  SEISMIC WALKDOWN CHECKLIST FORM Sheet 6 of 6 IP2 Note:
Note: 21EDG Crankcase Exhaust Fan Starter Enclosure EN-DC-168 REV 0
 
ATTACHMENT 9.6                                                                         SEISMIC WALKDOWN CHECKLIST FORM Sheet 1 of 10 Status: YN NEI     UI1 Seismic Walkdown Checklist (SWC)                   SWELl-077 RI Equipment ID No.         O022EDG                                                       Equip. Class 1 17 Equipment Description         DIESEL GENERATOR NO. 22 Location: Bldg.       EDG                             Floor El.       72-0"           Room, Area Manufacturer, Model, Etc. (optional but recommended)
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
: 1. Is the anchorage configuration verification required (i.e., is the item one        YE NEI of the 50% of SWEL items requiring such verification)?
Yes the anchorageconfiguration verification is required.
: 2. Is the anchorage free of bent, broken, missing or loose hardware?                   YN NO~ ULI N/AEI            R1 Anchorage of components internalto cabinets attached to diesel were opened and examined. Internals were inspected.
Southwest of the EDG near the western post of the EDG exhaust pipe there is a base plate missing I of 4 anchorbolt nuts. This is judged seismically adequate as this base plate was abandoned from the old EDG exhaust pipe support and now a 4" pipe bearson but is not welded to the base plate.
: 3. Is the anchorage free of corrosion that is more than mild surface                    YN NO UI-] N/AEl oxidation?
Yes the anchorageis free of corrosion that is more than mild surface oxidation.
Enter the equipment class name from EPRI 1025286, Appendix B: Classes of Equipment.
EN-DC-168 REV 0
 
ATTACHMENT 9.6                                                              SEISMIC WALKOOWN CHECKLIST FORM Sheet 2 of 10 Status: Y[  NE] UE-    RI Seismic Walkdown Checklist (SWC)               SWELl-077 Equipment ID No.         O022EDG                                              Equip. Class1 17 Equipment Description         DIESEL GENERA TOR NO. 22
: 4. Is the anchorage free of visible cracks in the concrete near the            YEI NE uE- N/AE-anchors?
EDG Pedestalhas some minor hair line cracks that are none structural.
They are not near the anchors.Acceptable.
EDG exhaust pipe is supported on a post frame that also supports fuse panel for 22 Pre Lube Pump, 22 Lube oil HTR, and 22 Jacket Water HTR. This support has damaged &missing grout under the eastern post base plate. LB-11 was issued to resolve.
: 5. Is the anchorage configuration consistent with plant documentation?         Y1;  NE] UE- N/AE]
(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Anchorage matches the SQUG (SEWS).
: 6. Based on the above anchorage evaluations, is the anchorage free of          YE NEI uEr potentially adverse seismic conditions?
Yes based on the above anchorage evaluations, the anchorage is free of potentially adverse seismic conditions.
Interaction Effects
: 7. Are soft targets free from impact by nearby equipment or structures?       YO NE-] UE- NIAE1 A lot of tubing, hoses, etc. touch each other. All occurences where judged acceptable. Some but not all of the occurencesare noted below.
        -Fuel oil filter line DF-80 touches DF-78 on south west side of 22EDG.
        -EDG DLO 13-1 EDG 22 STRNR Vent Stop Valve tubing touches pipe to 22EDLOS.
        -EDG JWP-1-1 22EDG PS-1-1 and PS-5-1 stop tubing touches pipe to FE-6469 on east side of 22EDG.
        -Line on west side of 22EDG to DL0-539 touches line to DF-107.
EN-DC-168 REV 0
 
ATTACHMENT    9.6                                                            SEISMIC WALKDOWN CHECKLIST FORM Sheet 3 of I [0 Status: YI* N[7l UL-I   R1 Seismic Walkdown Checklist (SWC)               SWELl-077 Equipment ID No.     O022EDG                                                 Equip. Class1 17 Equipment Description     DIESEL GENERATOR NO. 22
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Y(Z N[Il U[] N/AD1 and masonry block walls not likely to collapse onto the equipment?
Refer to AWC-01 1 for partitiondiscussion.
: 9. Do attached lines have adequate flexibility to avoid damage?               Y[   N[-] U[-] N/AII Yes attached lines have adequate flexibility to avoid damage.
: 10. Based on the above seismic interaction evaluations, is equipment free       YZ ND] U[I of potentially adverse seismic interaction effects?
Yes based on the above seismic interaction evaluations, the equipment is free of potentially adverse seismic interaction effects.
Other Adverse Conditions
: 11. Have you looked for and found no other seismic conditions that could        YE NDI U--
adversely affect the safety functions of the equipment?
Yes we have looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment.
EN-DC-168 REV 0
 
ATTACHMENT 9.6                                                                SEISMIC WALKDOWN CHECKLIST FORM Sheet 4 of 10 Status: YZ NEI- UL-     g1z Seismic Walkdown Checklist (SWC)               SWELI-077 Equipment ID No. O022EDG                                                     Equip. Class1 17 Equipment Description   DIESEL GENERATOR NO. 22 Comments (Additional pages may be added as necessary)
The following are house keeping issues and judged acceptable for seismic concerns.
Grating at valve DA-559 DG22 Starting Air Right Side supply is touching valve hand wheel. This is a non- seismic issue.
One of the roof light bulbs is out. CR IP2-2012-06515issued to track resolution.
Minor surface rust on some threaded rods, bolts, nuts, and other components. Judged acceptable.
Flange on 22EDG JW & LO Coolers cooling WTR outlet has one out of 23 bolts flush with nut. Judged acceptable.
Latch on 22EDG Gauge boardcover panel on north side is not latched. CR IP2-2012-06238 issued to track resolution.
Noted WRT 00172112 was tagged to track resolution of a leak on south east side of diesel.
Evidence of oil leaks below south side of diesel typical for all diesels in area. Judged acceptable.
The StartingAir PressureGauge is missing I of 3 screws. The remaining 2 screws will be seismically adequate. This condition is captured in CR-IP2-2013-02336.


==References:==
==References:==
Drawings and AWCDrawings: 9321-H-2250, Rev 7, Diesel generator building general arrangement plan.CR IP2-2012-06515CR IP2-2012-06238WRT 00172112AWC-011Left hand starting air pressure gauge missing one screw. Found6/10/13Evaluated by: Kai LoDate:Dan NutaR16/10/13EN-DC-168 REV 0 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORMSheet 5 of 10Status: YtZ NO UL-Seismic Walkdown Checklist (SWC) SWELl-077Equipment ID No. O022EDG Equip. Class1 17Equipment Description DIESEL GENERATOR NO. 22R1PhotographsNote: Flange on 22EDG JW & LO Coolerscooling WTR outlet with flush nut and showingminor surface corrosion.Note: Minor surface corrosion on flangecouplings. Possible galvanic corrosion stainlesssteel pipe and carbon steel bolts.EN-DC-168 REV 0 ATAHMENT 9.o61SEISMIC WALKDOWN CHECKLIST FORMSheet 6 of 10Seismic Walkdown Checklist (SWC) SWELl-077Equipment ID No. O022EDGEcauiDment Descrption DIESEL GENERATOR NO. 22Status: YZ NEIr U[]Equip. Class117R1Note: ý;nows ruse panel for 22 Pre LubePump, 22 Lube oil HTR, and 22 Jacket Water HTRthat has damaged & missing grout under theeastern (close) posts base plate.Note: Example of rubber tubing touching.Note: Latch on 22EDG Gauge board coverpanel on north side is not latched.EN-DC-168 REV 0 ATAHMENT 9.6 1SEISMIC WALKDOWN CHECKLIST FORMSheet 7 of 10Status: Y[ NEI U1,ISeismic Walkdown Checklist (SWC) SWELl-077R1Equipment ID No. O022EDGEquip. Class117Equipment Description DIESEL GENERATOR NO. 22Note: tracKea weios on parrion wan oetweendiesels.Note: Partition wall between diesels that needsverification of seismic design. This is addressed inCalculation FCX-00534 and A WC-011.SR1EN-DC-168 REV 0 ATTACHMENT 9.6SEISMIC WALKDOWN CHECKLIST FORMArrACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORMSheet 8 of 10Note: Panel EPZ45Note: Panel EPZ45 internalsR1Note: 22 jacket water heaterNote: 22 jacket water heater internalsEN-DC-168 REV 0 ATTACHMENT 9.6SEISMIC WALKDOWN CHECKLIST FORMSheet 9 of 10Note: 22 jacket water heater internalsRlI Note:22 EDG Gauge BoardNote: 22 EDG Gauge Board intemalsEN-DC-168 REV 0 ATTACHMENT 9.6SEISMIC WALKDOWN CHECKLIST FoRmATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORMSheet 10 of 10Note: missing screw from starting air pressure Note: 22 EDG Jacket Water Pressure Switchgauge cabinetRlNote: 22 EDG CrankCase Exhaust Fan Note: 22 EDG CrankCase Exhaust Fan StarterStarter Encolure Encolure internalsEN-DC-168 REV 0 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORMSheet I of 9 IP2Status: Y[ NEIl UE-Seismic Walkdown Checklist (SWC) SWELl-078Equipment ID No. O023EDG Equip. Class1 17Equipment Description DIESEL GENERATOR NO. 23Location: Bldg. EDG Floor El. 72'-O" Room, AreaManufacturer, Model, Etc. (optional but recommended)Instructions for Completing ChecklistThis checklist may be used to document the results of the Seismic Walkdown of an item of equipment on theSWEL. The space below each of the following questions may be used to record the results of judgments andfindings. Additional space is provided at the end of this checklist for documenting other comments.111Anchorage1. Is the anchorage configuration verification required (i.e., is the item, oneof the 50% of SWEL items requiring such verification)?Yes the anchorage configuration verification is required.2. Is the anchorage free of bent, broken, missing or loose hardware?Anchorage of components internal to cabinets attached to diesel wereexamined. Internals were inspected when cabinets were opened.3. Is the anchorage free of corrosion that is more than mild surfaceoxidation?YE NEIYE N[DI U[I N/ADR1YE NDI UD-] N/A[lSurface corrosion. Not significant.4. Is the anchorage free of visible cracks in the concrete near theanchors?Minor hair line cracks. Not significant.Enter the equipment class name from EPRI 1025286, Appendix B: Classes of Equipment.YE NDl UD-- N/ADlEN-DC-168 REV 0 ATTACHMENT 9.6Sheet 2 of 9SEISMIC WALKDOWN CHECKLIST FORMIP2Status: YE. NEI U[D R1Seismic Walkdown Checklist (SWC) SWELI-078Equipment ID No. O023EDG Equip. Class1 17Equipment Description DIESEL GENERATOR NO. 235. Is the anchorage configuration consistent with plant documentation? YE Nr-o U-- N/All](Note: This question only applies if the item is one of the 50% for whichan anchorage configuration verification is required.)Anchorage matches the SQUG (SEWS).6. Based on the above anchorage evaluations, is the anchorage free of YE N- U[Ipotentially adverse seismic conditions?Yes based on the above anchorage evaluations, the anchorage isfree of potentially adverse seismic conditions.IInteraction Effects7. Are soft targets free from impact by nearby equipment or structures?Yes soft targets are free from impact by nearby equipment orstructures.YZ NIl U-I N/A-8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YE NEI- U0---Z N/A--and masonry block walls not likely to collapse onto the equipment?Refer to AWC-01 I for partition discussion.9. Do attached lines have adequate flexibility to avoid damage?Numerious lines touching. Judged acceptable.YZ N- ULI N/AD10. Based on the above seismic interaction evaluations, is equipment free YZ NO U-]of potentially adverse seismic interaction effects?Yes based on the above seismic interaction evaluations, the equipmentis free of potentially adverse seismic interaction effects.EN-DC-168 REV 0 ATTACHMEI?Sheet 3 ofiT 9.69SEISMIC WALKDOWN CHECKLIST FORMIP2Status: YN NiE U-- R1Equip. Class117Seismic Walkdown Checklist (SWC) SWELl-078Equipment ID No. O023EDGEquipment Description DIESEL GENERATOR NO. 23Other Adverse Conditions11. Have you looked for and found no other seismic conditions that could YZ NEI U-1adversely affect the safety functions of the equipment?Yes we have looked for and found no other seismic conditions thatcould adversely affect the safety functions of the equipment.Comments (Additional pages may be added as necessary)1 of 4 air filter latches do not hold air filter in place. Air can by-pass filter. Operations personnel fixedissue in our presence. CR IP2-2012-06238 issued for trend tracking purposes.
Drawings and AWC Drawings: 9321-H-2250, Rev 7, Diesel generatorbuilding general arrangementplan.
CR IP2-2012-06515 CR IP2-2012-06238 WRT 00172112 AWC-011 Left hand starting airpressuregauge missing one screw. Found 6/10/13 Evaluated by:   Kai Lo                                                              Date:
R1 Dan Nuta                                                                      6/10/13 EN-DC-168 REV 0
 
ATTACHMENT 9.6                                                       SEISMIC WALKDOWN CHECKLIST FORM Sheet 5 of 10 Status: YtZ NO UL-R1 Seismic Walkdown Checklist (SWC)           SWELl-077 Equipment ID No. O022EDG                                           Equip. Class1 17 Equipment Description   DIESEL GENERATOR NO. 22 Photographs Note:     Flange on 22EDG JW & LO Coolers          Note:      Minor surface corrosion on flange cooling WTR outlet with flush nut and showing      couplings. Possible galvanic corrosion stainless minor surface corrosion.                           steel pipe and carbon steel bolts.
EN-DC-168 REV 0
 
ATAHMENT 9.o61                                                        SEISMIC WALKDOWN CHECKLIST FORM Sheet 6 of 10 Status: YZ NEIrU[]      R1 Seismic Walkdown Checklist (SWC)           SWELl-077 Equipment ID No. O022EDG                                          Equip. Class1 17 EcauiDment Descrption   DIESEL GENERATOR NO. 22 Note:     ý;nows ruse panel for 22 PreLube Pump, 22 Lube oil HTR, and 22 Jacket Water HTR that has damaged & missing grout under the eastern (close) posts base plate.
Note:     Example of rubber tubing touching.       Note:     Latch on 22EDG Gauge boardcover panel on north side is not latched.
EN-DC-168 REV 0
 
ATAHMENT 1 9.6                                                     SEISMIC WALKDOWN CHECKLIST FORM Sheet 7 of 10 Status: Y[   NEI   U1,I  R1 Seismic Walkdown Checklist (SWC)         SWELl-077 Equipment ID No. O022EDG                                          Equip. Class1 17 Equipment Description DIESEL GENERATOR NO. 22 Note:     tracKea weios on parrionwan oetween  Note: Partitionwall between diesels that needs diesels.                                        verificationof seismic design.This is addressedin  SR1 CalculationFCX-00534 and A WC-011.
EN-DC-168 REV 0
 
ATTACHMENT 9.6                                  SEISMIC WALKDOWN CHECKLIST FORM SEISMIC WALKDOWN CHECKLIST FORM Sheet 8 of 109.6 ArrACHMENT Note:     PanelEPZ45            Note: PanelEPZ45 internals R1 Note:     22 jacket water heater Note: 22 jacket waterheaterinternals EN-DC-168 REV 0
 
ATTACHMENT 9.6                                        SEISMIC WALKDOWN CHECKLIST FORM Sheet 9 of 10 Note:     22 jacket water heaterinternals Rl 22 EDG Gauge Board              Note: 22 EDG Gauge Board intemals I Note:
EN-DC-168 REV 0
 
ATTACHMENT 9.6                                                  SEISMIC WALKDOWN CHECKLIST FoRm ATTACHMENT  9.6                                                 SEISMIC WALKDOWN CHECKLIST FORM Sheet 10 of 10 Note:   missing screw from startingairpressure Note:   22 EDG Jacket Water Pressure Switch gauge                                          cabinet Rl Note:       22 EDG CrankCase Exhaust Fan       Note:     22 EDG CrankCase Exhaust Fan Starter StarterEncolure                                Encolure internals EN-DC-168 REV 0
 
ATTACHMENT     9.6                                                                   SEISMIC WALKDOWN CHECKLIST FORM Sheet I of 9                                                                                                       IP2 Status: Y[   NEIl UE-     111 Seismic Walkdown Checklist (SWC)                   SWELl-078 Equipment ID No.         O023EDG                                                       Equip. Class1 17 Equipment Description         DIESEL GENERATOR NO. 23 Location: Bldg.     EDG                               Floor El.     72'-O"           Room, Area Manufacturer, Model, Etc. (optional but recommended)
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
: 1. Is the anchorage configuration verification required (i.e., is the item, one        YE NEI of the 50% of SWEL items requiring such verification)?
Yes the anchorageconfiguration verification is required.
: 2. Is the anchorage free of bent, broken, missing or loose hardware?                   YE N[DI U[I N/AD R1 Anchorage of components internalto cabinets attached to diesel were examined. Internals were inspected when cabinets were opened.
: 3. Is the anchorage free of corrosion that is more than mild surface                    YE NDI   UD-] N/A[l oxidation?
Surface corrosion.Not significant.
: 4. Is the anchorage free of visible cracks in the concrete near the                    YE NDl UD-- N/ADl anchors?
Minor hair line cracks. Not significant.
Enter the equipment class name from EPRI 1025286, Appendix B: Classes of Equipment.
EN-DC-168 REV 0
 
ATTACHMENT 9.6                                                                SEISMIC WALKDOWN CHECKLIST FORM Sheet 2 of 9                                                                                                  IP2 Status: YE. NEI     U[D   R1 Seismic Walkdown Checklist (SWC)               SWELI-078 I
Equipment ID No.       O023EDG                                                 Equip. Class1 17 Equipment Description     DIESEL GENERATOR NO. 23
: 5. Is the anchorage configuration consistent with plant documentation?           YE Nr-o U-- N/All]
(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Anchorage matches the SQUG (SEWS).
: 6. Based on the above anchorage evaluations, is the anchorage free of           YE N-     U[I potentially adverse seismic conditions?
Yes based on the above anchorage evaluations, the anchorageis free of potentially adverse seismic conditions.
Interaction Effects
: 7. Are soft targets free from impact by nearby equipment or structures?         YZ NIl U-I N/A-Yes soft targets are free from impact by nearby equipment or structures.
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting,   YE   NEI- U0---Z N/A--
and masonry block walls not likely to collapse onto the equipment?
Refer to AWC-01 I for partitiondiscussion.
: 9. Do attached lines have adequate flexibility to avoid damage?                 YZ N-    ULI N/AD Numerious lines touching. Judged acceptable.
: 10. Based on the above seismic interaction evaluations, is equipment free         YZ NO U-]
of potentially adverse seismic interaction effects?
Yes based on the above seismic interaction evaluations, the equipment is free of potentially adverse seismic interaction effects.
EN-DC-168 REV 0
 
ATTACHMEI? iT9.6                                                                  SEISMIC WALKDOWN CHECKLIST FORM Sheet 3 of 9                                                                                                       IP2 Status: YN NiE U--         R1 Seismic Walkdown Checklist (SWC)                 SWELl-078 Equipment ID No.       O023EDG                                                      Equip. Class 1 17 Equipment Description     DIESEL GENERATOR NO. 23 Other Adverse Conditions
: 11. Have you looked for and found no other seismic conditions that could               YZ NEI   U-1 adversely affect the safety functions of the equipment?
Yes we have looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment.
Comments (Additional pages may be added as necessary) 1 of 4 airfilter latches do not hold air filter in place. Air can by-pass filter. Operationspersonnel fixed issue in our presence. CR IP2-2012-06238issued for trend tracking purposes.


==References:==
==References:==
Drawings and AWCDrawings: 9321-H-2250, Rev 7, Diesel generator building general arrangement plan,AWC-0111. Fuse panel EWZ69 OK2. Power panel -light adaptor is loose from panel cover (adhesive) at 23 lube oil heater powerlight. This is addressed in CR-IP2-2013-04158.3. Panel adjacent to gauge board (jacket water pressure switch) OK4. EDG gauge board -electrical tape at back of panel at 2 locations. This is a housekeepingissue.5. Crankcase starter enclosure OK10/15/13Evaluated by:Kai LoDate:R1Dan Nuta A 10/15/13EN-DC-168 REV 0 ATTACHMENT 9.6SEISMIC WALKDOWN CHECKLIST FoRmATrACHMENT 9.6 SEIsMIc WALKDOWN CHECKLIST FoRMSheet 4 of 9Seismic Walkdown Checklist (SWC) SWELI -078Equipment ID No. 0023EDGEquipment Description DIESEL GENERATOR NO. 23IP2Status: YN NE] UI- R1Equip. Class117PhotographsNote:DIESEL GENERATOR NO 23.Note:PARTITION WALL BETWEEN GENERATORS.EN-DC-168 REV 0 ATTACHMENT 9.6SEISMIC WALKDOWN CHECKLIST FoRmSheet 2 of 9 IP2Note: #23 EDG panelNote: Panel EWZ69EN-DC-168 REV 0 ATTACHMENT 9.6SEISMIC WALKDOWN CHECKLIST FORMATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORMSheet 2 of 9 IP2Note: Panel EWZ69 intemals Note:R1Note: panel internalsEN-DC-168 REV 0 ATTACHMENT 9.6SEISMIC WALKDOWN CHECKLIST FORMATTAHMEN 9. SEIMICWALKOWN HECLISTFORSheet 2 of 9IP2Note: side panelNote: side panel internalsR1Note: 23 EDG Gauge BoardNote: 23 EDG Gauge Board internalsEN-DC-1 68 REV 0 ATTACHMENT 9.6SEISMIC WALKDOWN CHECKLIST FoRmATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FoRMSheet 2 of 9IP2Note: 23 EDG Gauge Board -electrical tape onback of panelNote: 23 EDG Gauge Board internalsR1Note: 23 EDG Gauge Board internalsNote: 23 EDG Gauge Board internalsEN-DC-168 REV 0 ATTAC HM ENT 9.6SEISMIC WALKDOWN CHECKLIST FORMATrACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORMSheet 2 of 9 IP2R1Note: Crankcase exhuast fan starter enclosureNote: Crankcase exhuast fan starter enclosureinternalsEN-DC-168 REV 0 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORMSheet I of 8 IP2Status: YZ NE] ULISeismic Walkdown Checklist (SWC) SWELl-081Equipment ID No. IP2-EDGB-72-DB6 Equip. Class' 18Equipment Description EDG BLDG 72' EL ENGINE AUXILIARIES CTRL PNLLocation: Bldg. EDG Floor El. 72'-O" Room, AreaManufacturer, Model, Etc. (optional but recommended)Instructions for Completing ChecklistThis checklist may be used to document the results of the Seismic Walkdown of an item of equipment on theSWEL. The space below each of the following questions may be used to record the results of judgments andfindings. Additional space is provided at the end of this checklist for documenting other comments.RIAnchorage1. Is the anchorage configuration verification required (i.e., is the item oneof the 50% of SWEL items requiring such verification)?No, the anchorage configuration verification is not required.2. Is the anchorage free of bent, broken, missing or loose hardware?Cabinet was opened for internal inspection during A TO and internalsinspected. See sheet 3.External anchorage is present and was inspected. Extemal anchorageis free of bent, brocken, missing or loose hardware.3. Is the anchorage free of corrosion that is more than mild surfaceoxidation?YEI NEYZ NEI U[] N/A[IR1Y[ N[-1 uE] N/AE]Minor surface corrosion. Judged OK.4. Is the anchorage free of visible cracks in the concrete near theanchors?Floor is coated. No visible cracks.Enter the equipment class name from EPRI 1025286, Appendix B: Classes of Equipment.YE NEi U1-1 N/AEIEN-DC-168 REV 0 SEISMIC WALKDOWN CHECKLIST FORMATTAC HM ENT 9.6Sheet 2 of 8SEISMIC WALKDOWN CHECKLIST FORMIP2Status: YZ NEIr U--I R1Seismic Walkdown Checklist (SWC) SWELl-081Equipment ID No. 1P2-EDGB-72-DB6 Equip. Class1 18Equipment Description EDG BLDG 72' EL ENGINE AUXILIARIES CTRL PNL5. Is the anchorage configuration consistent with plant documentation? YE-] NEI U[-] N/AZ(Note: This question only applies if the item is one of the 50% for whichan anchorage configuration verification is required.)Not applicable since component is not part of the anchorageconfiguration verification.6. Based on the above anchorage evaluations, is the anchorage free of YE NEI U-Ipotentially adverse seismic conditions?R1Yes based on the above anchorage evaluations, the anchorage isfree of potentially adverse seismic conditions. Internal componentswere examined duing EDG A TO. See sheet 3.Interaction Effects7. Are soft targets free from impact by nearby equipment or structures?Yes soft targets are free from impact by nearby equipment orstructures.YZ NEI UE] N/AE18. Are overhead equipment, distribution systems, ceiling tiles and lighting, YE NEI UE] N/A[3and masonry block walls not likely to collapse onto the equipment?Speaker and heater overhead judged to be adequately supported.9. Do attached lines have adequate flexibility to avoid damage?Yes attached lines have adequate flexibility to avoid damage.Y; NE] UE] N/AE]10. Based on the above seismic interaction evaluations, is equipment free YE NE] UE]of potentially adverse seismic interaction effects?Yes based on the above seismic interaction evaluations, the equipmentis free of potentially adverse seismic interaction effects.EN-DC-168 REV 0 ATTACHMENT 9.6Sheet 3 of 8SEISMIC WALKDOWN CHECKLIST FORMIP2Status: YE NEI ULI R1Equip. Class118Seismic Walkdown Checklist (SWC) SWELl-081Equipment ID No. IP2-EDGB-72-DB6Equipment Description EDG BLDG 72' EL ENGINE AUXILIARIES CTRL PNLOther Adverse Conditions11. Have you looked for and found no other seismic conditions that could YZ N[Il U[Iadversely affect the safety functions of the equipment?Yes we have looked for and found no other seismic conditions thatcould adversely affect the safety functions of the equipment.Comments (Additional pages may be added as necessary)Top right cover screw is loose. Panel is judged by the walkdown team to be seismicly adequate withmissing screw. Operations personnel fixed issue immediately for walkdown team.
Drawings and AWC Drawings: 9321-H-2250, Rev 7, Dieselgeneratorbuilding general arrangementplan, AWC-011
: 1. Fuse panel EWZ69 OK
: 2. Powerpanel - light adaptoris loose from panel cover (adhesive) at 23 lube oil heaterpower light. This is addressed in CR-IP2-2013-04158.
: 3. Panel adjacent to gauge board (jacket waterpressure switch) OK
: 4. EDG gauge board- electrical tape at back of panel at 2 locations. This is a housekeeping issue.
: 5. Crankcasestarterenclosure OK 10/15/13 Evaluated by:     Kai Lo                                                                Date:
R1 Dan Nuta     A                                                                 10/15/13 EN-DC-168 REV 0
 
ATTACHMENT 9.6                                            SEISMIC WALKDOWN CHECKLIST FoRm SEIsMIc WALKDOWN CHECKLIST FoRM Sheet 4 of 99.6 ATrACHMENT                                                                                IP2 Status: YN NE] UI-      R1 Seismic Walkdown Checklist (SWC)     SWELI -078 Equipment IDNo. 0023EDG                                  Equip. Class 1 17 Equipment Description DIESEL GENERATOR NO. 23 Photographs Note:                                         Note:
DIESEL GENERATOR NO 23.                       PARTITION WALL BETWEEN GENERATORS.
EN-DC-168 REV 0
 
ATTACHMENT   9.6                    SEISMIC WALKDOWN CHECKLIST FoRm Sheet 2 of 9                                                     IP2 Note:   #23 EDG panel Note: PanelEWZ69 EN-DC-168 REV 0
 
ATTACHMENT 9.6                        SEISMIC WALKDOWN CHECKLIST FORM SEISMIC WALKDOWN CHECKLIST FORM Sheet 2 of 9 9.6 ATTACHMENT                                                        IP2 Note:   Panel EWZ69 intemals Note:
R1 Note:   panel internals EN-DC-168 REV 0
 
ATTACHMENT 9.6                                  SEISMIC WALKDOWN CHECKLIST FORM ATTAHMEN 9.             SEIMICWALKOWN     HECLISTFOR Sheet 2 of 9                                                                IP2 Note:   side panel              Note: side panel internals R1 Note:   23 EDG Gauge Board      Note: 23 EDG Gauge Board internals EN-DC-1 68 REV 0
 
ATTACHMENT 9.6                                              SEISMIC WALKDOWN CHECKLIST FoRm SEISMIC WALKDOWN CHECKLIST FoRM Sheet 2 of 9 9.6 ATTACHMENT                                                                              IP2 Note: 23 EDG Gauge Board - electrical tape on Note: 23 EDG Gauge Board internals back of panel R1 Note:   23 EDG Gauge Board internals        Note: 23 EDG Gauge Board internals EN-DC-168 REV 0
 
ATTAC HM ENT 9.6                                              SEISMIC WALKDOWN CHECKLIST FORM ATrACHMENT 9.6                                               SEISMIC WALKDOWN CHECKLIST FORM Sheet 2 of 9                                                                                 IP2 R1 Note:   Crankcase exhuast fan starterenclosure Note: Crankcase exhuast fan starterenclosure internals EN-DC-168 REV 0
 
ATTACHMENT 9.6                                                                         SEISMIC WALKDOWN CHECKLIST FORM Sheet I of 8                                                                                                         IP2 Status: YZ NE] ULI RI Seismic Walkdown Checklist (SWC)                   SWELl-081 Equipment ID No.         IP2-EDGB-72-DB6                                               Equip. Class' 18 Equipment Description         EDG BLDG 72' EL ENGINE AUXILIARIES CTRL PNL Location: Bldg.       EDG                               Floor El.     72'-O"           Room, Area Manufacturer, Model, Etc. (optional but recommended)
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
: 1. Is the anchorage configuration verification required (i.e., is the item one          YEI NE of the 50% of SWEL items requiring such verification)?
No, the anchorageconfiguration verification is not required.
: 2. Is the anchorage free of bent, broken, missing or loose hardware?                   YZ NEI U[] N/A[I R1 Cabinet was opened for internalinspection during A TO and internals inspected. See sheet 3.
External anchorageis present and was inspected. Extemal anchorage is free of bent, brocken, missing or loose hardware.
: 3. Is the anchorage free of corrosion that is more than mild surface                    Y[   N[-1 uE] N/AE]
oxidation?
Minor surface corrosion.Judged OK.
: 4. Is the anchorage free of visible cracks in the concrete near the                    YE NEi    U1-1 N/AEI anchors?
Floor is coated. No visible cracks.
Enter the equipment class name from EPRI 1025286, Appendix B: Classes of Equipment.
EN-DC-168 REV 0
 
SEISMIC WALKDOWN CHECKLIST FORM ATTAC HM ENT 9.6                                                            SEISMIC WALKDOWN CHECKLIST FORM Sheet 2 of 8                                                                                                IP2 Status: YZ NEIr U--I       R1 Seismic Walkdown Checklist (SWC)               SWELl-081 Equipment ID No.       1P2-EDGB-72-DB6                                         Equip. Class 1 18 Equipment Description     EDG BLDG 72' EL ENGINE AUXILIARIES CTRL PNL
: 5. Is the anchorage configuration consistent with plant documentation?         YE-] NEI U[-] N/AZ (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Not applicable since component is not part of the anchorage configuration verification.
: 6. Based on the above anchorage evaluations, is the anchorage free of           YE NEI     U-I potentially adverse seismic conditions?
R1 Yes based on the above anchorageevaluations, the anchorage is free of potentially adverse seismic conditions. Internalcomponents were examined duing EDG A TO. See sheet 3.
Interaction Effects
: 7. Are soft targets free from impact by nearby equipment or structures?       YZ NEI UE] N/AE1 Yes soft targets are free from impact by nearby equipment or structures.
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting,   YE NEI     UE] N/A[3 and masonry block walls not likely to collapse onto the equipment?
Speaker and heateroverheadjudged to be adequately supported.
: 9. Do attached lines have adequate flexibility to avoid damage?                 Y;   NE] UE] N/AE]
Yes attachedlines have adequate flexibility to avoid damage.
: 10. Based on the above seismic interaction evaluations, is equipment free       YE NE] UE]
of potentially adverse seismic interaction effects?
Yes based on the above seismic interactionevaluations, the equipment is free of potentially adverse seismic interaction effects.
EN-DC-168 REV 0
 
ATTACHMENT 9.6                                                            SEISMIC WALKDOWN CHECKLIST FORM Sheet 3 of 8                                                                                              IP2 Status: YE NEI     ULI   R1 Seismic Walkdown Checklist (SWC)             SWELl-081 Equipment IDNo.     IP2-EDGB-72-DB6                                        Equip. Class1 18 Equipment Description     EDG BLDG 72' EL ENGINE AUXILIARIES CTRL PNL Other Adverse Conditions
: 11. Have you looked for and found no other seismic conditions that could     YZ N[Il U[I adversely affect the safety functions of the equipment?
Yes we have looked for and found no otherseismic conditions that could adversely affect the safety functions of the equipment.
Comments (Additional pages may be added as necessary)
Top right cover screw is loose. Panel is judged by the walkdown team to be seismicly adequate with missing screw. Operationspersonnel fixed issue immediately for walkdown team.


==References:==
==References:==
Drawings and AWC.Drawings: 9321-F-3049, Rev 30, Conduit layout diesel generator building, elev 67' and 72' plan.A209208, Rev 11. Conduit layout diesel generator buildingelev 67' and 72' section 4Details.932 1-H-2250, Rev 7. Diesel generator building general arrangement plan.AWC-011During EDG A TO, the following cabinets were opened and the internals inspected:1. Air Compressor Panel O.K.2. Fuel Oil Pump Disconnect O.K.3. Crankcase Exhaust Fan Fuse Box O.K.R1Date: 11-12-2013Evaluated by: Kai LoJohn Skoniecznv11-12-2013EN-DC-168 REV 0 ATTACHMENT 9.6SEISMIC WALKDOWN CHECKLIST FORMATTAHMEN 9. SEIMICWALKOWN HECLISTFORSheet 4 of 8 IP2Status: YZ NrI- Ur-I R1Seismic Walkdown Checklist (SWC) SWELl-081Equipment ID No. IP2-EDGB-72-DB6 Equip. Class1 18Equipment Description EDG BLDG 72' EL ENGINE AUXILIARIES CTRL PNLPhotographsNote:EDG BLDG 72' EL ENGINE AUXILIARIES CTRLPANEL.Note:ENGINE AUXILIARIES CTRL PANEL close upEN-DC-168 REV 0 ATTACHMENT 9.6SEISMIC WALKDOWN CHECKLIST FORMATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORMSheet 5 of 8IP2PhotographsRINote:EN-DC-168 REV 0 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORMSheet 6 of 8IP2PhotographsNote: 21,RiEN-DC-168 REV 0 ATTACHMENT 9.6SEISMIC WALKDOWN CHECKLIST FORMIP2PhotoaraohsNote:21 Diesel Fuel Oil Pump DisconnectNote:21 Diesel Fuel Oil Pump DisconnectEN-DC-168 REV 0 ATTACHMENT 9.6Sheet 8 of8SEISMIC WALKDOWN CHECKLIST FORMIP2PhotographsNote:Crankcase Exhaust Fan 21 Fuse BoxNote: no other photos.EN-DC-168 REV 0 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORMSheet I of 4 IP2Status: YZ Nil U-ISeismic Walkdown Checklist (SWC) SWELl-082Equipment ID No. INSTRK 19 Equip. Class' 18Equipment Description INSTRUMENT RACK 19Location: Bldg. VC Floor El. 68'-0" Room, AreaManufacturer, Model, Etc. (optional but recommended)Instructions for Completing ChecklistThis checklist may be used to document the results of the Seismic Walkdown of an item of equipment on theSWEL. The space below each of the following questions may be used to record the results of judgments andfindings. Additional space is provided at the end of this checklist for documenting other comments.Anchorage1. Is the anchorage configuration verification required (i.e., is the item oneof the 50% of SWEL items requiring such verification)?YZ NEIThe anchorage configuration verification is required.2. Is the anchorage free of bent, broken, missing or loose hardware?Anchorage is free of bent, broken, missing and loose hardware.3. Is the anchorage free of corrosion that is more than mild surfaceoxidation?Anchorage is free of corrosion that is more than mild surface oxidation.4. Is the anchorage free of visible cracks in the concrete near theanchors?Observed two cracks that are approximately < 1/64" near bolts 9 and 12(see SQUG Rack 19 for bolt numbering scheme). For bolt 9, the crackis approximately 3" away. For bolt 12, the crack is approximately 2"away.LB-16 evaluation was generated to assess the anchorage based oncracked concrete. The evaluation determined that the existingcondition is acceptable.1 Enter the equipment class name from EPRI 1025286, Appendix B: Classes of Equipment.YEE NO UrI N/ADYS ND U[I N/ADYE NDI U[-] N/ADEN-DC-168 REV 0 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORMSheet 2 of 4 IP2Status: YE ND UD--Seismic Walkdown Checklist (SWC) SWELl-082Equipment ID No. INSTRK 19 Equip. Class1 18Equipment Description INSTRUMENT RACK 195. Is the anchorage configuration consistent with plant documentation? YDI NO U-I N/AD-(Note: This question only applies if the item is one of the 50% for whichan anchorage configuration verification is required.)Anchorage configuration is consistent with SQUG documentation forRack 19. However, bolt configuration is not consistent with drawingA208247. CR-IP2-2014-01607 is generated to document this and toupdate this drawing based on as-built configuration.6. Based on the above anchorage evaluations, is the anchorage free of YO NEI ULIpotentially adverse seismic conditions?See question #4.Interaction Effects7. Are soft targets free from impact by nearby equipment or structures?Soft targets are free from impact by nearby equipment and structures.Y0 NDI uD-- N/AD8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YO ND] UD- N/ADland masonry block walls not likely to collapse onto the equipment?Overhead equipment, distribution systems, and lighting are not likely tocollapse.9. Do attached lines have adequate flexibility to avoid damage? YE NDI U[D] N/A[DAttached lines have adequate flexibility.10. Based on the above seismic interaction evaluations, is equipment free YO ND-] u[-]of potentially adverse seismic interaction effects?The equipment is free of potentially adverse seismic interaction effects.EN-DC-168 REV 0 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORMSheet 3 of 4 1P2Status: YE NEI UE-1Seismic Walkdown Checklist (SWC) SWELl-082Equipment ID No. INSTRK 19 Equip. Class' 18Equipment Description INSTRUMENT RACK 19Other Adverse Conditions11. Have you looked for and found no other seismic conditions that could YE NEI UE-adversely affect the safety functions of the equipment?We have looked and found no other seismic conditions that couldadversely affect the safety functions of the equipment.Comments (Additional pages may be added as necessary)
Drawings and AWC.
Drawings: 9321-F-3049,Rev 30, Conduit layout diesel generatorbuilding,elev 67' and 72' plan.
A209208, Rev 11. Conduit layout diesel generatorbuildingelev 67' and 72' section 4 Details.
9321-H-2250,Rev 7. Diesel generatorbuilding general arrangementplan.
AWC-011 During EDG A TO, the following cabinets were opened and the internalsinspected:
: 1. Air CompressorPanel O.K.
: 2. Fuel Oil Pump Disconnect O.K.                                                                   R1
: 3. Crankcase Exhaust Fan Fuse Box O.K.
Evaluated by:    Kai Lo                                                        Date:   11-12-2013 John Skoniecznv                                                        11-12-2013 EN-DC-168 REV 0
 
ATTACHMENT 9.6                                                  SEISMIC WALKDOWN CHECKLIST FORM ATTAHMEN 9.                           SEIMICWALKOWN       HECLISTFOR Sheet 4 of 8                                                                                 IP2 Status: YZ NrI-   Ur-I R1 Seismic Walkdown Checklist (SWC)         SWELl-081 Equipment ID No. IP2-EDGB-72-DB6                               Equip. Class1 18 Equipment Description   EDG BLDG 72' EL ENGINE AUXILIARIES CTRL PNL Photographs Note:                                            Note:
EDG BLDG 72' EL ENGINE AUXILIARIES CTRL              ENGINE AUXILIARIES CTRL PANEL close up PANEL.
EN-DC-168 REV 0
 
ATTACHMENT   9.6      SEISMIC WALKDOWN CHECKLIST FORM ATTACHMENT  9.6       SEISMIC WALKDOWN CHECKLIST FORM Sheet 5 of 8 IP2 Photographs RI Note:
EN-DC-168 REV 0
 
ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 6 of 8 IP2 Photographs Ri Note:     21, EN-DC-168 REV 0
 
ATTACHMENT 9.6                                    SEISMIC WALKDOWN CHECKLIST FORM IP2 Photoaraohs Note:                             Note:
21 Diesel Fuel Oil Pump Disconnect 21 Diesel Fuel Oil Pump Disconnect EN-DC-168 REV 0
 
8 of8 9.6 ATTACHMENT Sheet                                          SEISMIC WALKDOWN CHECKLIST FORM IP2 Photographs Note:                             Note: no otherphotos.
Crankcase Exhaust Fan 21 Fuse Box EN-DC-168 REV 0
 
ATTACHMENT 9.6                                                                       SEISMIC WALKDOWN CHECKLIST FORM Sheet I of 4                                                                                                       IP2 Status: YZ Nil U-I Seismic Walkdown Checklist (SWC)                   SWELl-082 Equipment ID No.         INSTRK 19                                                     Equip. Class' 18 Equipment Description       INSTRUMENT RACK 19 Location: Bldg.     VC                               Floor El.     68'-0"           Room, Area Manufacturer, Model, Etc. (optional but recommended)
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
: 1. Is the anchorage configuration verification required (i.e., is the item one        YZ NEI of the 50% of SWEL items requiring such verification)?
The anchorageconfiguration verification is required.
: 2. Is the anchorage free of bent, broken, missing or loose hardware?                   YEE NO UrI N/AD Anchorage is free of bent, broken, missing and loose hardware.
: 3. Is the anchorage free of corrosion that is more than mild surface                  YS ND U[I N/AD oxidation?
Anchorage is free of corrosionthat is more than mild surface oxidation.
: 4. Is the anchorage free of visible cracks in the concrete near the                    YE NDI U[-] N/AD anchors?
Observed two cracks that are approximately < 1/64" near bolts 9 and 12 (see SQUG Rack 19 for bolt numbering scheme). Forbolt 9, the crack is approximately 3" away. Forbolt 12, the crack is approximately2" away.
LB-16 evaluation was generatedto assess the anchoragebased on cracked concrete. The evaluation determined that the existing condition is acceptable.
1Enter the equipment class name from EPRI 1025286, Appendix B: Classes of Equipment.
EN-DC-168 REV 0
 
ATTACHMENT 9.6                                                               SEISMIC WALKDOWN CHECKLIST FORM Sheet 2 of 4                                                                                               IP2 Status: YE ND UD--
Seismic Walkdown Checklist (SWC)               SWELl-082 Equipment ID No.       INSTRK 19                                               Equip. Class1 18 Equipment Description     INSTRUMENT RACK 19
: 5. Is the anchorage configuration consistent with plant documentation?         YDI NO U-I N/AD-(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Anchorage configurationis consistent with SQUG documentationfor Rack 19. However, bolt configuration is not consistent with drawing A208247. CR-IP2-2014-01607is generated to document this and to update this drawing based on as-built configuration.
: 6. Based on the above anchorage evaluations, is the anchorage free of           YO NEI ULI potentially adverse seismic conditions?
See question #4.
Interaction Effects
: 7. Are soft targets free from impact by nearby equipment or structures?         Y0 NDI uD-- N/AD Soft targets are free from impact by nearby equipment and structures.
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting,   YO ND] UD- N/ADl and masonry block walls not likely to collapse onto the equipment?
Overhead equipment, distributionsystems, and lighting are not likely to collapse.
: 9. Do attached lines have adequate flexibility to avoid damage?                 YE NDI   U[D] N/A[D Attached lines have adequate flexibility.
: 10. Based on the above seismic interaction evaluations, is equipment free       YO ND-] u[-]
of potentially adverse seismic interaction effects?
The equipment is free of potentially adverse seismic interactioneffects.
EN-DC-168 REV 0
 
ATTACHMENT 9.6                                                             SEISMIC WALKDOWN CHECKLIST FORM Sheet 3 of 4                                                                                             1P2 Status: YE NEI     UE-1 Seismic Walkdown Checklist (SWC)               SWELl-082 Equipment ID No. INSTRK 19                                             Equip. Class' 18 Equipment Description     INSTRUMENT RACK 19 Other Adverse Conditions
: 11. Have you looked for and found no other seismic conditions that could     YE NEI UE-adversely affect the safety functions of the equipment?
We have looked and found no otherseismic conditions that could adversely affect the safety functions of the equipment.
Comments (Additional pages may be added as necessary)


==References:==
==References:==
Drawings and AWCDrawings: 9321-F-7027-42 Rev 42 (A-201121), Containment building instrument arrangement sht. IinstrumentationA201145 Rev 15.AWC-048Date: 3/5/14Evaluated by: Maggie Staub"- 3/5/14Kai LoEN-DC-168 REV 0 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORMSheet 4 of 4 IP2Status: Y[ NM U-Seismic Walkdown Checklist (SWC) SWELl-082Equipment ID No. INST RK 19 Equip. Class1 18Equipment Description INSTRUMENT RACK 19PhotographsNote: Rack 19 Note: Anchoragel Note: concrete crack at bolt 9 i[Note: concrete crack near bolt 12EN-DC-168 REV 0 ATTACHMENT 9.6Sheet I of 4IP2SEISMIC WALKDOWN CHECKLIST FORMStatus: YE NEI U-lSeismic Walkdown Checklist (SWC) SWELI-083Equipment ID No. INSTRK21Equip. Class118Equipment Description INSTRUMENT RACK 21Location: Bldg. VC Floor El. 68"-" Room, AreaManufacturer, Model, Etc. (optional but recommended)Instructions for Completing ChecklistThis checklist may be used to document the results of the Seismic Walkdown of an item of equipment on theSWEL. The space below each of the following questions may be used to record the results of judgments andfindings. Additional space is provided at the end of this checklist for documenting other comments.Anchorage1. Is the anchorage configuration verification required (i.e., is the item oneof the 50% of SWEL items requiring such verification)?YE NE1The anchorage configuration verification is required.2. Is the anchorage free of bent, broken, missing or loose hardware?Anchorage is free of bent, broken, missing and loose hardware.3. Is the anchorage free of corrosion that is more than mild surfaceoxidation?Anchorage is free of corrosion that is more than mild surface oxidation.4. Is the anchorage free of visible cracks in the concrete near theanchors?Y[ N[:] UE- N/AEYE NEi U[:] N/AL-YN NEI U[-- N/A[--Anchorage is free of visible cracks.5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for whichan anchorage configuration verification is required.)Anchorage configuration is consistent with drawing A208288-4 andSQUG documentation.Y[ NEI u- N/ALiI Enter the equipment class name from EPRI 1025286, Appendix B: Classes of Equipment.EN-DC-168 REV 0 ATTACHMENT 9.6Sheet 2 of 4IP2SEISMIC WALKDOWN CHECKLIST FORMStatus: YER NEI U--Seismic Walkdown Checklist (SWC) SWELl-083Equipment ID No. INSTRK21Equip. Class118Equipment Description INSTRUMENT RACK 216. Based on the above anchorage evaluations, is the anchorage free of YI Nil U[I-potentially adverse seismic conditions?The anchorage is free of potentially adverse seismic conditions.Interaction Effects7. Are soft targets free from impact by nearby equipment or structures? YN N[-] UrI N/A[DSoft targets are free from impact by nearby equipment and structures.8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YE N[i U[I N/Al]and masonry block walls not likely to collapse onto the equipment?Overhead equipment, distribution systems,and lighting and masonryblack walls not likely to collapse.9. Do attached lines have adequate flexibility to avoid damage? Y[Z N[il UD:] N/A[l]Attached line have adequate flexibility.10. Based on the above seismic interaction evaluations, is equipment free YZ N[I- U-Iof potentially adverse seismic interaction effects?The equipment is free of potentially adverse seismic interaction effects.Other Adverse Conditions11. Have you looked for and found no other seismic conditions that couldadversely affect the safety functions of the equipment?We have looked and found no other seismic conditions that couldadversely affect the safety funcitons of the equipment.YE NEIUEJEN-DC-168 REV 0 ATTACHMENT 9.6Sheet 3 of 4IP2SEISMIC WALKDOWN CHECKLIST FORMSeismic Walkdown Checklist (SWC) SWELl-083Equipment ID No. INST RK 21Equipment Description INSTRUMENT RACK 21Status: YE NEIl UI-Equip. Class118Comments (Additional pages may be added as necessary)
Drawings and AWC Drawings:9321-F-7027-42 Rev 42 (A-201121), Containment building instrument arrangementsht. I instrumentation A201145 Rev 15.
AWC-048 Evaluated by:   Maggie Staub                                                    Date:    3/5/14 Kai Lo                "-                                               3/5/14 EN-DC-168 REV 0
 
ATTACHMENT 9.6                                             SEISMIC WALKDOWN CHECKLIST FORM Sheet 4 of 4                                                                           IP2 Status: Y[   NM U-Seismic Walkdown Checklist (SWC)     SWELl-082 Equipment ID No. INST RK 19                               Equip. Class1 18 Equipment Description   INSTRUMENT RACK 19 Photographs Note:     Rack 19                             Note: Anchorage
[Note: concrete crack nearbolt 12 l Note:     concrete crack at bolt 9        i EN-DC-168 REV 0
 
ATTACHMENT 9.6                                                                          SEISMIC WALKDOWN CHECKLIST FORM Sheet I of 4 IP2 Status: YE NEI     U-l Seismic Walkdown Checklist (SWC)                     SWELI-083 Equipment ID No.           INSTRK21                                                      Equip. Class1 18 Equipment Description         INSTRUMENT RACK 21 Location: Bldg.       VC                               Floor El.       68"-"           Room, Area Manufacturer, Model, Etc. (optional but recommended)
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
: 1. Is the anchorage configuration verification required (i.e., is the item one        YE NE1 of the 50% of SWEL items requiring such verification)?
The anchorageconfiguration verification is required.
: 2. Is the anchorage free of bent, broken, missing or loose hardware?                   Y[    N[:] UE-  N/AE Anchorage is free of bent, broken, missing and loose hardware.
: 3. Is the anchorage free of corrosion that is more than mild surface                  YE NEi U[:] N/AL-oxidation?
Anchorage is free of corrosion that is more than mild surface oxidation.
: 4. Is the anchorage free of visible cracks in the concrete near the                    YN NEI     U[-- N/A[--
anchors?
Anchorage is free of visible cracks.
: 5. Is the anchorage configuration consistent with plant documentation?                 Y[    NEI u-    N/ALi (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Anchorage configurationis consistent with drawing A208288-4 and SQUG documentation.
I Enter the equipment class name from EPRI 1025286, Appendix B: Classes of Equipment.
EN-DC-168 REV 0
 
ATTACHMENT 9.6                                                                SEISMIC WALKDOWN CHECKLIST FORM Sheet 2 of 4 IP2 Status: YER NEI   U--
Seismic Walkdown Checklist (SWC)               SWELl-083 Equipment ID No.     INSTRK21                                                Equip. Class 1 18 Equipment Description     INSTRUMENT RACK 21
: 6. Based on the above anchorage evaluations, is the anchorage free of           YI   Nil U[I-potentially adverse seismic conditions?
The anchorageis free of potentially adverse seismic conditions.
Interaction Effects
: 7. Are soft targets free from impact by nearby equipment or structures?         YN N[-] UrI N/A[D Soft targets are free from impact by nearby equipment and structures.
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting,   YE N[i     U[I N/Al]
and masonry block walls not likely to collapse onto the equipment?
Overhead equipment, distributionsystems,and lighting and masonry black walls not likely to collapse.
: 9. Do attached lines have adequate flexibility to avoid damage?                 Y[Z N[il UD:] N/A[l]
Attached line have adequate flexibility.
: 10. Based on the above seismic interaction evaluations, is equipment free       YZ N[I-   U-I of potentially adverse seismic interaction effects?
The equipment is free of potentially adverse seismic interaction effects.
Other Adverse Conditions
: 11. Have you looked for and found no other seismic conditions that could        YE NEIUEJ adversely affect the safety functions of the equipment?
We have looked and found no other seismic conditions that could adversely affect the safety funcitons of the equipment.
EN-DC-168 REV 0
 
ATTACHMENT 9.6                                                          SEISMIC WALKDOWN CHECKLIST FORM Sheet 3 of 4 IP2 Status: YE NEIl UI-Seismic Walkdown Checklist (SWC)         SWELl-083 Equipment ID No. INST RK 21                                          Equip. Class1 18 Equipment Description   INSTRUMENT RACK 21 Comments (Additional pages may be added as necessary)


==References:==
==References:==
Drawings and AWCDrawings: 9321-F-7027-42 Rev 42 (A-201121), Containment building instrument arrangement sheetno. 1 instrumentationA208248-6 Rev 5, Modification to steam generator level transmitter rack no. 21A208288-4 Rev 4, Steam generator level and main steam flow transmitter rack replacementdetail, racks 4A,4B and 21AWC-040___Date: 3/5/14Evaluated by: Maggie Staub____________-_.........___...._ Date: 3/5/14Kai LoEN-DC-168 REV 0 ATTACHMENT 9.6SEISMIC WALKDOWN CHECKLIST FORMSheet 4 of 4IP2Status: Nr"] UL-Seismic Walkdown Checklist (SWC) SWELl-083Equipment ID No. INSTRK21 Equip. Class' 18Equipment Description INSTRUMENT RACK 21PhotoaraDhsNote: Rack 21Note:Rack 21Note: anchor flush with angle as indicated ondrawing A208288-4 and SQUG documentationNote: anchorage consistent with drawingA208288-4 and SQUG documentationEN-DC-168 REV 0 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORMSheet I of 4 1P2Status: YE N-- UD--Seismic Walkdown Checklist (SWC) SWELl-086Equipment ID No. TE-122 Equip. Class1 19Equipment Description EXCESS LETDOWN TEMP ELEMENTLocation: Bldg. VCI Floor El. 46'-0" Room, AreaManufacturer, Model, Etc. (optional but recommended)Instructions for Completing ChecklistThis checklist may be used to document the results of the Seismic Walkdown of an item of equipment on theSWEL. The space below each of the following questions may be used to record the results of judgments andfindings. Additional space is provided at the end of this checklist for documenting other comments.Anchorage1. Is the anchorage configuration verification required (i.e., is the item oneof the 50% of SWEL items requiring such verification)?The anchorage configuration verification is not required.2. Is the anchorage free of bent, broken, missing or loose hardware?Y[- NZY[Z NEi U-I N/A[-The anchorage is free of bent, broken, missing and loosehardware. Temperature element is welded to pipe.3. Is the anchorage free of corrosion that is more than mild surfaceoxidation?The anchorage is free of corrosion that is more than mild surfaceoxidation.4. Is the anchorage free of visible cracks in the concrete near theanchors?Temperature element is welded to pipe.1 Enter the equipment class name from EPRI 1025286, Appendix B: Classes of Equipment.YE NO U[-] N/A--YO'L NO uOl NIANEN-DC-168 REV 0 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORMSheet 2 of 4 1P2Status: YEE NE] UE7Seismic Walkdown Checklist (SWC) SWELl-086Equipment ID No. TE-122 Equip. Class1 19Equipment Description EXCESS LETDOWN TEMP ELEMENT5. Is the anchorage configuration consistent with plant documentation? YEI NEil U-I N/AZ(Note: This question only applies if the item is one of the 50% for whichan anchorage configuration verification is required.)6. Based on the above anchorage evaluations, is the anchorage free of Y[ NEI ULipotentially adverse seismic conditions?The anchorage is free of potentially adverse seismic conditions.Interaction Effects7. Are soft targets free from impact by nearby equipment or structures?Soft targets are free from impact by nearby equipment and structures.8. Are overhead equipment, distribution systems, ceiling tiles and lighting,and masonry block walls not likely to collapse onto the equipment?Overhead equipment, distribution systems, ceiling tiles and lighting arenot likely to collapse onto the equipment.9. Do attached lines have adequate flexibility to avoid damage?Attached lines have adequate flexibility to avoid damage.10. Based on the above seismic interaction evaluations, is equipment freeof potentially adverse seismic interaction effects?The equipment is free of potentially adverse seismic interaction effects.YE N[-] ul-] N/A"-YE NEr] UE] N/AE]YE NEl ur-] N/AllY[ NEl Ul]EN-DC-168 REV 0 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORMSheet 3 of 4 IP2Status: YZ NO- U[ISeismic Walkdown Checklist (SWC) SWELl-086Equipment ID No. TE-122 Equip. Class' 19Equipment Description EXCESS LETDOWN TEMP ELEMENTOther Adverse Conditions11. Have you looked for and found no other seismic conditions that could Y[ NEI U[-]adversely affect the safety functions of the equipment?We have looked and found no other seismic conditions that couldadversely affect the safety fuctions of the equipment.Comments (Additional pages may be added as necessary)
Drawingsand AWC Drawings: 9321-F-7027-42 Rev 42 (A-201121), Containment building instrument arrangementsheet no.1 instrumentation A208248-6 Rev 5, Modification to steam generatorlevel transmitterrack no. 21 A208288-4 Rev 4, Steam generatorlevel and main steam flow transmitterrack replacement detail, racks 4A,4B and 21 AWC-040 Evaluated by: Maggie Staub      ___Date:                                          3/5/14 Kai Lo      ____________-_.........___...._ Date: 3/5/14 EN-DC-168 REV 0
 
ATTACHMENT   9.6                                                  SEISMIC WALKDOWN CHECKLIST FORM Sheet 4 of 4 IP2 Status: Y*;  Nr"] UL-(SWC)     SWELl-083 Seismic Walkdown Checklist Equipment ID No. INSTRK21                                       Equip. Class' 18 Equipment Description   INSTRUMENT RACK 21 PhotoaraDhs Note:     Rack 21                                  Note:   Rack 21 Note:     anchorflush with angle as indicatedon    Note:  anchorageconsistent with drawing drawing A208288-4 and SQUG documentation            A208288-4 and SQUG documentation EN-DC-168 REV 0
 
ATTACHMENT 9.6                                                                         SEISMIC WALKDOWN CHECKLIST FORM Sheet I of 4                                                                                                         1P2 Status: YE N-- UD--
Seismic Walkdown Checklist (SWC)                     SWELl-086 Equipment ID No.           TE-122                                                       Equip. Class1 19 Equipment Description         EXCESS LETDOWN TEMP ELEMENT Location: Bldg.       VCI                               Floor El.     46'-0"           Room, Area Manufacturer, Model, Etc. (optional but recommended)
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
: 1. Is the anchorage configuration verification required (i.e., is the item one        Y[-  NZ of the 50% of SWEL items requiring such verification)?
The anchorage configuration verification is not required.
: 2. Is the anchorage free of bent, broken, missing or loose hardware?                   Y[Z NEi   U-I N/A[-
The anchorageis free of bent, broken, missing and loose hardware.Temperature element is welded to pipe.
: 3. Is the anchorage free of corrosion that is more than mild surface                    YE NO U[-] N/A--
oxidation?
The anchorageis free of corrosion that is more than mild surface oxidation.
: 4. Is the anchorage free of visible cracks in the concrete near the                    YO'L NO uOl NIAN anchors?
Temperature element is welded to pipe.
1 Enter the equipment class name from EPRI 1025286, Appendix B: Classes of Equipment.
EN-DC-168 REV 0
 
ATTACHMENT   9.6                                                             SEISMIC WALKDOWN CHECKLIST FORM Sheet 2 of 4                                                                                                 1P2 Status: YEE NE] UE7 Seismic Walkdown Checklist (SWC)               SWELl-086 Equipment ID No.       TE-122                                                   Equip. Class1 19 Equipment Description     EXCESS LETDOWN TEMP ELEMENT
: 5. Is the anchorage configuration consistent with plant documentation?         YEI NEil U-I N/AZ (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 6. Based on the above anchorage evaluations, is the anchorage free of           Y[     NEI ULi potentially adverse seismic conditions?
The anchorageis free of potentially adverse seismic conditions.
Interaction Effects
: 7. Are soft targets free from impact by nearby equipment or structures?       YE N[-] ul-] N/A"-
Soft targets are free from impact by nearbyequipment and structures.
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting,   YE NEr] UE] N/AE]
and masonry block walls not likely to collapse onto the equipment?
Overhead equipment, distributionsystems, ceiling tiles and lighting are not likely to collapse onto the equipment.
: 9. Do attached lines have adequate flexibility to avoid damage?               YE NEl ur-] N/All Attached lines have adequate flexibility to avoid damage.
: 10. Based on the above seismic interaction evaluations, is equipment free        Y[    NEl Ul]
of potentially adverse seismic interaction effects?
The equipment is free of potentially adverse seismic interaction effects.
EN-DC-168 REV 0
 
ATTACHMENT 9.6                                                             SEISMIC WALKDOWN CHECKLIST FORM Sheet 3 of 4                                                                                             IP2 Status: YZ NO-     U[I Seismic Walkdown Checklist (SWC)               SWELl-086 Equipment ID No. TE-122                                                 Equip. Class' 19 Equipment Description     EXCESS LETDOWN TEMP ELEMENT Other Adverse Conditions
: 11. Have you looked for and found no other seismic conditions that could     Y[   NEI U[-]
adversely affect the safety functions of the equipment?
We have looked and found no otherseismic conditions that could adversely affect the safety fuctions of the equipment.
Comments (Additional pages may be added as necessary)


==References:==
==References:==
Drawings and A WCDrawings: 9321-F-7028-46 (A201122), Rev 46, Containment building instrument arrangement-sheet no. 2 instrumentation.A WC-041Date: 3/3/14Evaluated by: Maqgie StaubKai Lo3/3/14EN-DC-168 REV 0 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORMSheet 4 of 4 IP2Status: YE NEIl Ur-Seismic Walkdown Checklist (SWC) SWELl-086Equipment ID No. TE-122 Equip. Class1 19Equipment Descrption EXCESS LETDOWN TEMP ELEMENTPhotographsNote: TE-122Note: TE-122EN-DC-168 REV 0 ATAHMENT I9of6SEISMIC WALKDOWN CHECKLIST FORMSheet I of 61132Seismic Walkdown Checklist (SWC) SWELl-087Status: YE NEI UDEquip. Class120Equipment ID No. IPNL PP9Equipment Description EDG 21 CONTROL PANELLocation: Bldg. EDG Floor El. 72-0" Room, AreaManufacturer, Model, Etc. (optional but recommended)Instructions for Completing ChecklistThis checklist may be used to document the results of the Seismic Walkdown of an item of equipment on theSWEL. The space below each of the following questions may be used to record the results of judgments andfindings. Additional space is provided at the end of this checklist for documenting other comments.Anchorage1. Is the anchorage configuration verification required (i.e., is the item oneof the 50% of SWEL items requiring such verification)?No, the anchorage configuration verification is not required.2. Is the anchorage free of bent, broken, missing or loose hardware?Internal anchorage was inspected during 21EDG A TO and internalanchorage was inspected. See sheet 3.External anchors where inspected and are free of bent, broken, missingor loose hardware.3. Is the anchorage free of corrosion that is more than mild surfaceoxidation?No corrosion found on extemal bolts. Internal bolts were inspectedwhen panel was opened during 21EDG A TO.4. Is the anchorage free of visible cracks in the concrete near theanchors?Internal bolts were inspected when panel was opened. No visiblecracks at extemal anchors during 21EDG A TO.Enter the equipment class name from EPRI 1025286, Appendix B: Classes of Equipment.YO-- NEYN NEI UI- N//AR1YE NEJ uEJE N/AE1YZ NE] ULI N/AElEN-DC-168 REV 0 STAheet 2 of6SEISMIC WALKDOWN CHECKLIST FORMSheet 2 of 6IP2Seismic Walkdown Checklist (SWC) SWELl-087Status: YE NEI UE-1Equip. Class120Equipment ID No. e PNL PP9Equipment Description EDG 21 CONTROL PANEL5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for whichan anchorage configuration verification is required.)Not applicable since component is not part of the anchorageconfiguration verification.6. Based on the above anchorage evaluations, is the anchorage free ofpotentially adverse seismic conditions?Anchorage internal to cabinet was inspected during 21EDG ATOand there is no it is free of potentially adverse seismic conditions.YEI NEI UE-- N/AZY[ NEI uE-RI4-Interaction Effects7. Are soft targets free from impact by nearby equipment or structures?The 21EDG control panel has a side synch panel. The side synch panelis free to swing on hinge into 21EDG control panel. Restraint bracket onbottom of side panel is broken. Operations personnel reattached andrepaired restraint bracket immediately in our presence. CR IP2-2012-6207 issued for tracking purposes.Swing of the side synch panel will be limited because the two nuts willact as a restraint.8. Are overhead equipment, distribution systems, ceiling tiles and lighting,and masonry block walls not likely to collapse onto the equipment?Yes overhead equipment, distribution systems, ceiling tiles and lighting,and masonry block walls are not likely to collapse onto the equipment.9. Do attached lines have adequate flexibility to avoid damage?Yes attached lines have adequate flexibility to avoid damage.10. Based on the above seismic interaction evaluations, is equipment freeof potentially adverse seismic interaction effects?Yes based on the above seismic interaction evaluations, the equipmentis free of potentially adverse seismic interaction effects.YE NEI u[-] N/AEYE NEI uEr N/AE]Y[ NEI uE- N/AEYN NEIuElEN-DC-168 REV 0 ATTACHMENT 9.6Sheet 3 of 6IP2Seismic Walkdown Checklist (SWC) SWELI-087SEISMIC WALKDOWN CHECKLIST FORMStatus: YI NEI U-- RIEquip. Class120Equipment ID No. PNL PP9Equipment Description EDG 21 CONTROL PANELOther Adverse Conditions11. Have you looked for and found no other seismic conditions that could YE NEIl ULIadversely affect the safety functions of the equipment?Yes we have looked for and found no other seismic conditions thatcould adversely affect the safety functions of the equipment.Comments (Additional pages may be added as necessary)Panel on north end of #23 EDG control panel is missing I of 24 bolts. Bottom latch of #22 and #23EDG control panel not lached. Operations personnel fixed issues on the spot in our presence. CR IP2-2012-06238 issued for tracking.
Drawings and A WC Drawings: 9321-F-7028-46 (A201122), Rev 46, Containment building instrument arrangement-sheet no. 2 instrumentation.
A WC-041 Evaluated by:  Maqgie Staub                                                    Date: 3/3/14 Kai Lo                                                                  3/3/14 EN-DC-168 REV 0
 
ATTACHMENT   9.6                                         SEISMIC WALKDOWN CHECKLIST FORM Sheet 4 of 4                                                                         IP2 Status: YE NEIl   Ur-Seismic Walkdown Checklist (SWC)   SWELl-086 Equipment ID No. TE-122                                 Equip. Class1 19 Equipment Descrption EXCESS LETDOWN TEMP ELEMENT Photographs Note:     TE-122                            Note: TE-122 EN-DC-168 REV 0
 
ATAHMENTI9of6                                                                          SEISMIC WALKDOWN CHECKLIST FORM Sheet I of 6 1132 Status: YE NEI  UD Seismic Walkdown Checklist (SWC)                   SWELl-087 Equipment ID No.             IPNL PP9                                                      Equip. Class1 20 Equipment Description         EDG 21 CONTROL PANEL Location: Bldg.       EDG                               Floor El.     72-0"           Room, Area Manufacturer, Model, Etc. (optional but recommended)
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
: 1. Is the anchorage configuration verification required (i.e., is the item one        YO-- NE of the 50% of SWEL items requiring such verification)?
No, the anchorageconfigurationverification is not required.
: 2. Is the anchorage free of bent, broken, missing or loose hardware?                   YN NEI UI- N//A Internalanchorage was inspected during 21EDG A TO and internal anchoragewas inspected. See sheet 3.
External anchors where inspected and are free of bent, broken, missing or loose hardware.
R1
: 3. Is the anchorage free of corrosion that is more than mild surface                  YE NEJ uEJE N/AE1 oxidation?
No corrosionfound on extemal bolts. Internal bolts were inspected when panel was opened during 21EDG A TO.
: 4. Is the anchorage free of visible cracks in the concrete near the                    YZ NE] ULI N/AEl anchors?
Internal bolts were inspected when panel was opened. No visible cracks at extemal anchors during 21EDG A TO.
Enter the equipment class name from EPRI 1025286, Appendix B: Classes of Equipment.
EN-DC-168 REV 0
 
STAheet 2 of6                                                                  SEISMIC WALKDOWN CHECKLIST FORM Sheet 2 of 6 IP2 Status: YE NEI    UE-1 Seismic Walkdown Checklist (SWC)                   SWELl-087 Equipment IDe No.       PNL PP9                                                Equip. Class1 20 Equipment Description       EDG 21 CONTROL PANEL
: 5. Is the anchorage configuration consistent with plant documentation?           YEI NEI UE-- N/AZ (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Not applicable since component is not part of the anchorage configuration verification.
: 6. Based on the above anchorage evaluations, is the anchorage free of            Y[    NEI  uE-potentially adverse seismic conditions?
RI Anchorage internalto cabinet was inspected during 21EDG ATO and there is no it is free of potentially adverse seismic conditions.
4-Interaction Effects
: 7. Are soft targets free from impact by nearby equipment or structures?         YE NEI    u[-] N/AE The 21EDG control panel has a side synch panel. The side synch panel is free to swing on hinge into 21EDG control panel. Restraint bracket on bottom of side panel is broken. Operationspersonnel reattachedand repairedrestraintbracket immediately in our presence. CR IP2-2012-6207 issued for trackingpurposes.
Swing of the side synch panel will be limited because the two nuts will act as a restraint.
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting,   YE NEI    uEr  N/AE]
and masonry block walls not likely to collapse onto the equipment?
Yes overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls are not likely to collapse onto the equipment.
: 9. Do attached lines have adequate flexibility to avoid damage?                 Y[    NEI uE- N/AE Yes attachedlines have adequate flexibility to avoid damage.
: 10. Based on the above seismic interaction evaluations, is equipment free        YN NEIuEl of potentially adverse seismic interaction effects?
Yes based on the above seismic interactionevaluations, the equipment is free of potentially adverse seismic interaction effects.
EN-DC-168 REV 0
 
ATTACHMENT 9.6                                                                SEISMIC WALKDOWN CHECKLIST FORM Sheet 3 of 6 IP2 Status: YI      NEI U--  RI Seismic Walkdown Checklist (SWC)               SWELI-087 Equipment ID No.     PNL PP9                                                  Equip. Class1 20 Equipment Description     EDG 21 CONTROL PANEL Other Adverse Conditions
: 11. Have you looked for and found no other seismic conditions that could         YE NEIl   ULI adversely affect the safety functions of the equipment?
Yes we have looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment.
Comments (Additional pages may be added as necessary)
Panel on north end of #23 EDG control panel is missing I of 24 bolts. Bottom latch of #22 and #23 EDG control panel not lached. Operationspersonnel fixed issues on the spot in our presence. CR IP2-2012-06238 issued for tracking.


==References:==
==References:==
Drawings and AWCDrawings: 9321-H-2250, Rev 7, Diesel generator building general arrangement plan.AWC-011A bolt connecting the top cover panel to steel frame is missing a nut. Since the vertical seismicacceleration is less than 1.0, there is no uplift and just shear. The remaining bolts will be adequateto restraint the top cover panel in place. This condition is captured by CR-IP2-2013-04549.Slight surface rust was observed at the top panel bolt holes.Evaluated by: Kai LoJohn Skoniecznv ,Date: 11-12-2013R111-12-2013EN-DC-168 REV 0 PhoTogACHMETs.SEISMIC WALKDOWN CHECKLIST FoRmSheet 4 of 6IP2Seismic Walkdown Checklist (SWC) SWELl-087Equipment ID No. PNL PP9Equipment Description EDG 21 CONTROL PANELStatus: YZ NE] Ur] RiEquip. Class' 20PhotographsR1Note: EDG 21 control panel showing side Synchpanel that is free to swing.EN-DC-168 REV 0 ATAHMENT 59of6SEISMIC WALKDOWN CHECKLIST FORMSheet 5 of 6IP2Seismic Walkdown Checklist (SWC) SWELl-087Equipment ID No. PNL PP9Equipment Description EDG 21 CONTROL PANELStatus: YN NMI- UI- RiEquip. Class120PhotographsNote: EDG 21 contrl panel anchorage Note: A bolt on the top cover panel is missing anut. Slight surface rust at the bolt holes.EN-DC-168 REV 0 ATAHMENT 69of6SEISMIC WALKDOWN CHECKLIST FORMSheet 6 of 6IP2Seismic Walkdown Checklist (SWC) SWELl-087Status: YE NrM U-EEquip. Class' 20R1Equipment ID No. PNL PP9Equipment Description EDG 21 CONTROL PANELPhotographsNote: Side synch panel of the 21EDG controlPanelNote: Side synch panel is restraint by the twonuts during a seismic event and horizontalmovement will be limited.EN-DC-168 REV 0 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORMSheet I of 4 IP2Status: YZ NEI- U-ilSeismic Walkdown Checklist (SWC) SWELl-101Equipment ID No. 21AT Equip. Class1 21Equipment Description 21 SIS ACCUMULATORLocation: Bldg. VC Floor El. 46'-0" Room, AreaManufacturer, Model, Etc. (optional but recommended)Instructions for Completing ChecklistThis checklist may be used to document the results of the Seismic Walkdown of an item of equipment on theSWEL. The space below each of the following questions may be used to record the results of judgments andfindings. Additional space is provided at the end of this checklist for documenting other comments.Anchorage1. Is the anchorage configuration verification required (i.e., is the item one YZ NEof the 50% of SWEL items requiring such verification)?The anchorage configuration verification is required.2. Is the anchorage free of bent, broken, missing or loose hardware?The anchorage is free of bent, broken, missing or loose hardware.3. Is the anchorage free of corrosion that is more than mild surfaceoxidation?The anchorage is free of corrosion that is more than mild surfaceoxidation.4. Is the anchorage free of visible cracks in the concrete near theanchors?The anchorage is free of visible cracks in the concrete near theanchors.YE NE U[-- N/AE-YZ NE U- N/AE--YN NE UEJ N/AE--Enter the equipment class name from EPRI 1025286, Appendix 13: Classes of Equipment.EN-DC-168 REV 0 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORMSheet 2 of 4 IP2Status: YN NEI UISeismic Walkdown Checklist (SWC) SWELl-101Equipment ID No. 21AT Equip. Class' 21Equipment Description 21 SIS ACCUMULATOR5. Is the anchorage configuration consistent with plant documentation? Y[ NEI UEr N/AE-1(Note: This question only applies if the item is one of the 50% for whichan anchorage configuration verification is required.)The anchorage configuration is consistent with drawing 9321-01-2921-1.6. Based on the above anchorage evaluations, is the anchorage free of YZ NiE U-Ipotentially adverse seismic conditions?The anchorage is free of potentially adverse seismic conditions.Interaction Effects7. Are soft targets free from impact by nearby equipment or structures?Soft targets are free from impact by nearby equipment or structures.8. Are overhead equipment, distribution systems, ceiling tiles and lighting,and masonry block walls not likely to collapse onto the equipment?Overhead equipment, distribution systems, ceiling tiles and lighting, andmasonry block walls are not likely to collapse onto the equipment.9. Do attached lines have adequate flexibility to avoid damage?Attached lines have adequate flexibility to avoid damage.10. Based on the above seismic interaction evaluations, is equipment freeof potentially adverse seismic interaction effects?Equipment is free of potentially adverse seismic interaction effects.YN NEI UIE N/AE-YE NEI U[E1 N/ALLYE NEI uE- N/AllYE NEI UElEN-DC-168 REV 0 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORMSheet 3 of 4 IP2Status: YZ Nil U--Seismic Walkdown Checklist (SWC) SWELl-101Equipment ID No. 21AT Equip. Class1 21Equipment Description 21 SIS ACCUMULATOROther Adverse Conditions11. Have you looked for and found no other seismic conditions that could YZ NDl U[-iadversely affect the safety functions of the equipment?We have looked and found no other seismic conditions that couldadversely affect the safety functions of the equipment.Comments (Additional pages may be added as necessary)
Drawingsand AWC Drawings: 9321-H-2250, Rev 7, Diesel generatorbuilding general arrangementplan.
AWC-011 A bolt connecting the top cover panel to steel frame is missing a nut. Since the verticalseismic acceleration is less than 1.0, there is no uplift andjust shear. The remaining bolts will be adequate to restraintthe top cover panel in place. This condition is capturedby CR-IP2-2013-04549.
Slight surface rust was observed at the top panel bolt holes.
Evaluated by:     Kai Lo                                                            Date:     11-12-2013 R1 John Skoniecznv      ,                                                    11-12-2013 EN-DC-168 REV 0
 
SEISMIC WALKDOWN CHECKLIST FoRm Sheet 4 of 6 IP2 PhoTogACHMETs.                                                Status: YZ NE] Ur]    Ri Seismic Walkdown Checklist (SWC)           SWELl-087 Equipment ID No.       PNL PP9                        Equip. Class' 20 Equipment Description     EDG 21 CONTROL PANEL Photographs R1 Note:   EDG 21 control panel showing side Synch panel that is free to swing.
EN-DC-168 REV 0
 
59of6 ATAHMENT                                                         SEISMIC WALKDOWN CHECKLIST FORM Sheet 5 of 6 IP2 Status: YN    NMI- UI- Ri Seismic Walkdown Checklist (SWC)       SWELl-087 Equipment ID No. PNL PP9                                        Equip. Class1 20 Equipment Description EDG 21 CONTROL PANEL Photographs Note:   EDG 21 contrl panel anchorage         Note: A bolt on the top coverpanel is missing a nut. Slight surface rust at the bolt holes.
EN-DC-168 REV 0
 
69of6 ATAHMENT                                                           SEISMIC WALKDOWN CHECKLIST FORM Sheet 6 of 6 IP2 Status: YE NrM    U-E  R1 Seismic Walkdown Checklist (SWC)         SWELl-087 Equipment ID No. PNL PP9                                          Equip. Class' 20 Equipment Description EDG 21 CONTROL PANEL Photographs Note:   Side synch panel of the 21EDG control    Note: Side synch panel is restraintby the two Panel                                            nuts during a seismic event and horizontal movement will be limited.
EN-DC-168 REV 0
 
ATTACHMENT 9.6                                                                         SEISMIC WALKDOWN CHECKLIST FORM Sheet I of 4                                                                                                         IP2 Status: YZ NEI- U-il Seismic Walkdown Checklist (SWC)                   SWELl-101 Equipment ID No.         21AT                                                           Equip. Class1 21 Equipment Description         21 SIS ACCUMULATOR Location: Bldg.       VC                               Floor El.       46'-0"           Room, Area Manufacturer, Model, Etc. (optional but recommended)
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
: 1. Is the anchorage configuration verification required (i.e., is the item one           YZ NE of the 50% of SWEL items requiring such verification)?
The anchorageconfigurationverification is required.
: 2. Is the anchorage free of bent, broken, missing or loose hardware?                     YE NE U[--    N/AE-The anchorageis free of bent, broken, missing or loose hardware.
: 3. Is the anchorage free of corrosion that is more than mild surface                    YZ NE U-      N/AE--
oxidation?
The anchorageis free of corrosion that is more than mild surface oxidation.
: 4. Is the anchorage free of visible cracks in the concrete near the                      YN NE UEJ N/AE--
anchors?
The anchorageis free of visible cracks in the concrete near the anchors.
Enter the equipment class name from EPRI 1025286, Appendix 13: Classes of Equipment.
EN-DC-168 REV 0
 
ATTACHMENT 9.6                                                               SEISMIC WALKDOWN CHECKLIST FORM Sheet 2 of 4                                                                                                 IP2 Status: YN NEI     UI Seismic Walkdown Checklist (SWC)               SWELl-101 Equipment ID No.       21AT                                                     Equip. Class' 21 Equipment Description     21 SIS ACCUMULATOR
: 5. Is the anchorage configuration consistent with plant documentation?         Y[   NEI UEr N/AE-1 (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
The anchorage configurationis consistent with drawing 9321-01-2921-1.
: 6. Based on the above anchorage evaluations, is the anchorage free of           YZ NiE U-I potentially adverse seismic conditions?
The anchorageis free of potentially adverse seismic conditions.
Interaction Effects
: 7. Are soft targets free from impact by nearby equipment or structures?         YN NEI    UIE N/AE-Soft targets are free from impact by nearby equipment or structures.
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YE NEI      U[E1 N/ALL and masonry block walls not likely to collapse onto the equipment?
Overhead equipment, distributionsystems, ceiling tiles and lighting, and masonry block walls are not likely to collapse onto the equipment.
: 9. Do attached lines have adequate flexibility to avoid damage?                 YE NEI    uE- N/All Attached lines have adequate flexibility to avoid damage.
: 10. Based on the above seismic interaction evaluations, is equipment free        YE NEI UEl of potentially adverse seismic interaction effects?
Equipment is free of potentially adverse seismic interactioneffects.
EN-DC-168 REV 0
 
ATTACHMENT 9.6                                                             SEISMIC WALKDOWN CHECKLIST FORM Sheet 3 of 4                                                                                           IP2 Status: YZ Nil   U--
Seismic Walkdown Checklist (SWC)             SWELl-101 Equipment ID No. 21AT                                                   Equip. Class1 21 Equipment Description     21 SIS ACCUMULATOR Other Adverse Conditions
: 11. Have you looked for and found no other seismic conditions that could     YZ NDl U[-i adversely affect the safety functions of the equipment?
We have looked and found no otherseismic conditions that could adversely affect the safety functions of the equipment.
Comments (Additional pages may be added as necessary)


==References:==
==References:==
Drawings and AWCDrawings: SIO 41042
Drawings and AWC Drawings: SIO 41042 Rev 6, IPP-2Accumulator tank A205745-11, Rev 11, Instrumentation.
MIC no. 1999MC3434 Rev 17A Containment building general arrangementplans sheet 3 9321-01-2921-1 AWC-038 Evaluated by:    Maggie Staub                                                  Date:    3/3/14 S -"--                                            3/3/14 Kai Lo EN-DC-168 REV 0
 
ATTACHMENT 9.6                                            SEISMIC WALKDOWN CHECKLIST FoRM Shoet 4 of 4                                                                          IP2 Status: YE Nn Ur]
Seismic Walkdown Checklist (SWC)      SWELl-101 Equipment ID No. 21AT                                  Equip. Class1 21 Equipment Description  21 SIS ACCUMULATOR Photographs Note:    21 SIS Accumulator                  Note: 21 SIS Accumulator- anchorage EN-DC-168 REV 0
 
IP-RPT-12-00037 Rev. 1 ATTACHMENT K - DEFERRED AREA WALK-BY CHECKLISTS (AWCs)
 
ATTACHMENT      9.7                                                                                AREA WALK-BY CHECKLIST Sheet 1 of 4 Status: YN NI- UE-Area Walk-By Checklist (AWC)                  AWC- 037 Location: Bldg. CB                Floor El. 53'-0            Room, Area 1 SWEL Components:                SWELl -063, SWELl -064 Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.
: 1. Does anchorage of equipment in the area appear to be free of                        YN NEI UOL        N/A-potentially adverse seismic conditions (if visible without necessarily opening cabinets)?
Anchorage appearsto be free of potentially adverse seismic conditions.
: 2. Does anchorage of equipment in the area appear to be free of                          YjE NOi    UIE- N/A]
significant degraded conditions?
Equipment appearsto be free of significant degraded conditions.
: 3. Based on a visual inspection from the floor, do the cable/conduit                  YE    NO EJlui N/A[L raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?
Cable/conduitraceways and HVAC ducting appearto be free of potentially adverse seismic conditions.
1 If the room in which the SWEL item is located is very large (e.g., Turbine Hall), the area selected should be described.
This selected area should be based on judgment, e.g., on the order of about 35 feet from the SWEL item.
EN-DC-168 REV 0
 
ATTACHMENT 9.7                                                                        AREA WALK-BY CHECKLIST Sheet 2 of 4 Status: YE NEI  uEI Area Walk-By Checklist (AWC)                  AWC- 037 Location: Bldg. CB                Floor El. 53'-0      Room, Area 1 SWEL Components:                SWELl -063,

Latest revision as of 20:29, 5 February 2020

Seismic Walkdown Report Update, Enclosure to NL-14-071 - Engineering Report No. IP-RPT-12-00037, Rev 1. Part 5 of 5
ML14168A063
Person / Time
Site: Indian Point Entergy icon.png
Issue date: 06/05/2014
From:
Entergy Nuclear Operations
To:
Office of Nuclear Reactor Regulation
References
NL-14-071 IP-RPT-12-00037, Rev 1
Download: ML14168A063 (165)


Text

ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet I of 5 IP2 Status: YN NEI UD-Seismic Walkdown Checklist (SWC) SWELl-054 Equipment ID No. O023CRF Equip. Class1 10 Equipment Description CONTAINMENT RECIRC FAN 23 Location: Bldg. VC Floor El. 68'-O" Room, Area Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage 1.. Is the anchorage configuration verification required (i.e., is the item one Y[-I NE of the 50% of SWEL items requiring such verification)?

2. Is the anchorage free of bent, broken, missing or loose hardware? YZ N[-] ULI N/Ar-The anchorageis free of bent, broken, missing and loose hardware.
3. Is the anchorage free of corrosion that is more than mild surface Y[ NEI U[-] N/AEl oxidation?

Observed surface oxidation on the vibrationisolatorsjudged to be ok.

4. Is the anchorage free of visible cracks in the concrete near the YZ NEI U[-] N/AD1 anchors?

No significantcracks found.

1 Enter the equipment class name from EPRI 1025286, Appendix B: Classes of Equipment.

EN-DC-168 REV 0

ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 2 of 5 IP2 Status: YI NE-- U-I Seismic Walkdown Checklist (SWC) SWELl-054 Equipment ID No. O023CRF Equip. Class 1 10 Equipment Description CONTAINMENT RECIRC FAN 23

5. Is the anchorage configuration consistent with plant documentation? YEI NEI UE- N/AZ (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
6. Based on the above anchorage evaluations, is the anchorage free of YN N[i u[-]

potentially adverse seismic conditions?

The anchorageis free of potentially adverseseismic conditions.

Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? YZ NEI U-I N/AE1 Soft targets are free from impact by nearby equipment or structures.
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YE NEI- UE N/AE1 and masonry block walls not likely to collapse onto the equipment?

Overhead equipment, distributionsystems and lighting are not likely to collapse onto the equipment.

9. Do attached lines have adequate flexibility to avoid damage? YN N[:] UE1 N/AE Attached lines have adequate flexibility.
10. Based on the above seismic interaction evaluations, is equipment free YE NE:1U[

of potentially adverse seismic interaction effects?

The equipment is free of potentially adverse seismic interaction.

EN-DC-168 REV 0

ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 3 of 5 IP2 Status: YE NEI U[-]

Seismic Walkdown Checklist (SWC) SWELl-054 Equipment ID No. O023CRF Equip. Class1 10 Equipment Description CONTAINMENT RECIRC FAN 23 Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could Y[ N[l UI[-

adversely affect the safety functions of the equipment?

We have looked and found no other seismic conditions that could adversely affect the safety functions of the equipment.

Comments (Additional pages may be added as necessary)

Reference Drawings: 9321-F-2710-04Rev 04, (A200746)

Reference AWC-044 Observed piping near 23CRF that is rusted. This is being addressedin CR-IP2-2014-01653.The CR indicated that this is a surface condition only and does not impact component or system pressure boundry, structural integrity, or design fuctions.

Evaluated by: Maggie Staub Date: 3/6/14

ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 4 of 5 IP2 Status: YZ Nr-] UL]

Seismic Walkdown Checklist (SWC) SWELl-054 Equipment ID No. O023CRF Equip. Class' 10 Equipment Description CONTAINMENT RECIRC FAN 23 Photographs Note: vibration isolatorwith surface oxidation Note: interiorof 23CRF EN-DC-168 REV 0

ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 5 of 5 IP2 Status: YO NEI Ur-Seismic Walkdown Checklist (SWC) SWELl-054 Equipment ID No. O023CRF Equip. Class1 10 Equipment Description CONTAINMENT RECIRC FAN 23 Note: rusted piping Note: no otherphotos.

EN-DC-168 REV 0

ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet I of 5 1P2 Status: YE Nr-7 U-I Seismic Walkdown Checklist (SWC) SWELl-055 Equipment ID No. O024CRF Equip. Class1 10 Equipment Description CONTAINMENT RECIRC FAN 24 Location: Bldg. VC Floor El. 68-0" Room, Area Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one YE-- NO of the 50% of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware? YE ND] UD- N/AEl Anchorage for all compartmentsare OK. Intend plenum anchoragefor the fan in HEPA filter room has only 13 bolts out of 28 bolt holes. One of the remainingbolts is slightly bent. A comparison with 23CRF shows that orginal design has 16 bolts. CR-IP2-2014-01662has been generatedto addressthis condition. LB- 17 assessedthis condition and determined that the remaining bolts are adequate.

The fan circularwire screen is missing one bolt. Currenly the cover is held by 3 bolts. CR-IP2-2014-01662has been generatedto address this condition.

3. Is the anchorage free of corrosion that is more than mild surface Y[ NDI UD- N/A--

oxidation?

Viberation isolatorshave surface oxidation.

4. Is the anchorage free of visible cracks in the concrete near the YO NDI uD- N/AD--

anchors?

No cracks in the concrete near anchors.

'Enter the equipment class name from EPRI 1025286, Appendix B: Classes of Equipment.

EN-DC-168 REV 0

ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 2 of 5 IP2 Status: YE NF] Ut[l Seismic Walkdown Checklist (SWC) SWELl-055 Equipment ID No. O024CRF Equip. Class1 10 Equipment Description CONTAINMENT RECIRC FAN 24

5. Is the anchorage configuration consistent with plant documentation? YOI NI U[]l N/A0 (Note: This question only applies ifthe item is one of the 50% for which an anchorage configuration verification is required.)
6. Based on the above anchorage evaluations, is the anchorage free of YE NOi Uli potentially adverse seismic conditions?

The anchorageis free of potentially adverse seismic conditions. See item #2.

Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? YE NOI UOL N/Al Soft targets are free from impact by nearby equipment.
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Y[ NOI u[] N/AL and masonry block walls not likely to collapse onto the equipment?

Overhead equipment, distrubtion systems and lighting are not likely to collapse onto the equipment.

9. Do attached lines have adequate flexibility to avoid damage? YN Nr] U[J N/AL Attached lines have adequate flexibility.
10. Based on the above seismic interaction evaluations, is equipment free YZ Nr ur of potentially adverse seismic interaction effects?

The equipment is free of potentially adverse seismic interaction.

EN-DC-168 REV 0

ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 3 of 5 1P2 Status: YZ NEI U-Seismic Walkdown Checklist (SWC) SWELl-055 Equipment ID No. O024CRF Equip. Class1 10 Equipment Description CONTAINMENT RECIRC FAN 24 Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could Y[ NEI U-I adversely affect the safety functions of the equipment?

We have looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment.

Comments (Additional pages may be added as necessary)

Reference Drawings:9321-F-2710-04,Rev 04 (A200746)

AWC-045 Evaluated by: Maggie Staub Date: 3/6/14 Kai Lo ____________________________________________ 3/6/14 EN-DC-168 REV 0

ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 4 of 5 IP2 Status: YO NE] U[-]

Seismic Walkdown Checklist (SWC) SWELl-055 Equipment ID No. O024CRF Equip. Class1 10 Equipment Description CONTAINMENT RECIRC FAN 24 Photographs Note: isolatorwith surface oxidation Note: Steel face for the in HEPA filter room with missing bolts EN-DC-168 REV 0

ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 5 of 5 IP2 Status: Y[ N[] Ur]

Seismic Walkdown Checklist (SWC) SWEL1-055 Equipment ID No. O024CRF Equip. Class1 10 Equipment Description CONTAINMENT RECIRC FAN 24 Note: Steel face for the fan in HEPA filter room Note: slightly bent bolt with missing bolts EN-DC-168 REV 0

ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 1 of 5 1P2 Status: YN NEI[ U-Seismic Walkdown Checklist (SWC) SWELl-056 Equipment ID No. O025CRF Equip. Class 1 10 Equipment Description CONTAINMENT RECIRC FAN 25 Location: Bldg. VC Floor El. 68-0" Room, Area Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one YI NED of the 50% of SWEL items requiring such verification)?

Anchorage verification is not required.

2. Is the anchorage free of bent, broken, missing or loose hardware? YE NEIl U-I N/A[']

The anchorage is free of bent, broken, missing and loose hardware.

3. Is the anchorage free of corrosion that is more than mild surface YE NE U[I-] N/A--

oxidation?

Inside of closure observed mild oxidation on several isolatorsupports (see attachedphotos)

4. Is the anchorage free of visible cracks in the concrete near the YED NEI Ur- N/AE-anchors?

Anchorage is free of visible cracks.

Enter the equipment class name from EPRI 1025286, Appendix B: Classes of Equipment.

EN-DC-168 REV 0

ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 2 of 5 IP2 Status: YEE NEJ UE-I Seismic Walkdown Checklist (SWC) SWELl-056 Equipment ID No. O025CRF Equip. Class1 10 Equipment Description CONTAINMENT RECIRC FAN 25

5. Is the anchorage configuration consistent with plant documentation? YLI Nil UiE N/A[

(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

6. Based on the above anchorage evaluations, is the anchorage free of YZ NEI Ui potentially adverse seismic conditions?

The anchorage is free of potentially adverse seismic conditions.

Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? YZ NEI LJL N/A[]

Soft targets are free from impact by nearby equipment and structures.

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YN N[] U[-I N/AEl and masonry block walls not likely to collapse onto the equipment?

Overhead equipment, distributionsystems, lighting and walls are not likely to collapse.

9. Do attached lines have adequate flexibility to avoid damage? YN N[E U[] N/AEI Attached line have adequateflexibility.
10. Based on the above seismic interaction evaluations, is equipment free YZ NEI UE-of potentially adverse seismic interaction effects?

The equipment is free of adverse seismic interaction effects.

EN-DC-168 REV 0

ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 3 of 5 1P2 Status: YE NEI UI-Seismic Walkdown Checklist (SWC) SWELl-056 Equipment ID No. O025CRF Equip. Class1 10 Equipment Description CONTAINMENT RECIRC FAN 25 Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YE Ni ULI adversely affect the safety functions of the equipment?

We have looked and found no other seismic conditions that could adversely affect the safety functions of the equipment.

Comments (Additional pages may be added as necessary)

Reference Drawings.-9321-F-2710-04 Rev 04 (A200746)

Reference AWC-046 Evaluated by: Maggie Staub .... _ _ Date: 3/5/14

.- 35. 4 Kai Lo EN-DC-168 REV 0

ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 4 of 5 IP2 Status: YZ Nr- Ur-Seismic Walkdown Checklist (SWC) SWELl-056 Equipment ID No. O025CRF Equip. Class1 10 Equipment Description CONTAINMENT RECIRC FAN 25 Photographs Note: mild oxidation on isolator Note: mild oxidation on isolator EN-DC-168 REV 0

ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 5 of 5 IP2 Status: Y[ NEI U'EI Seismic Walkdown Checklist (SWC) SWELl-056 Equipment ID No. O025CRF Equip. Class1 10 Equipment Descrption CONTAINMENT RECIRC FAN 25 Note: mild oxidation on isolator Note: no otherphotos.

EN-DC-168 REV 0

ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet I of 5 IP2 Status: YE NF]1 ULI]

Seismic Walkdown Checklist (SWC) SWELI-063 Equipment ID No. IBUS21 Equip. Class1 14 Equipment Description 118 VAC INSTR BUS 21 Location: Bldg. CB Floor El. 53"-" Room, Area Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one Y-I NM of the 50% of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware? Y[ NEi UDi N/AD The anchorage is free of bent, broken, missing and loose hardware.
3. Is the anchorage free of corrosion that is more than mild surface Y[ N[D UD- N/AD-oxidation?

The anchorageis free of corrosion.

4. Is the anchorage free of visible cracks in the concrete near the YD-- NDl UD- N/AI0 anchors?

Panelis bolted to steel.

I Enter the equipment class name from EPRI 1025286, Appendix B: Classes of Equipment.

EN-DC-168 REV 0

ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 2 of 5 IP2 Status: Y[ NEI UD--

Seismic Walkdown Checklist (SWC) SWELl-063 Equipment ID No. IBUS21 Equip. Class1 14 Equipment Description 118 VAC INSTR BUS 21

5. Is the anchorage configuration consistent with plant documentation? YO NOi U- N/AE (Note: This question only applies ifthe item is one of the 50% for which an anchorage configuration verification is required.)
6. Based on the above anchorage evaluations, is the anchorage free of YE NEI UIO potentially adverse seismic conditions?

The anchorageis free of potentially adverse seismic conditions.

Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? Y[ NEIrU[-] N/AD Soft targets are free from impact by nearby equipment and structures.
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YE NO U[- N/AD and masonry block walls not likely to collapse onto the equipment?

Overhead equipment, distributionsystems, ceiling tiles and lighting, and masonry block walls are not likely to collapse onto the equipment.

9. Do attached lines have adequate flexibility to avoid damage? YZ NEI UL- N/AD Attached lines have adequateflexibility.
10. Based on the above seismic interaction evaluations, is equipment free YE NEI U-]

of potentially adverse seismic interaction effects?

The equipment is free of potentially adverse seismic interaction effects.

EN-DC-168 REV 0

ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 3 of 5 IP2 Status: YZ NEI UI-Seismic Walkdown Checklist (SWC) SWELl-063 Equipment ID No. IBUS21 Equip. Class1 14 Equipment Description 118 VAC INSTR BUS 21 Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YE Nil U[I adversely affect the safety functions of the equipment?

Observed red screen door inside the supervisorypanel that was not secured (see attachedphoto). During a seismic event, the doormay move and stirke the sensitive equipment inside the panel. This is documented in CR-IP2-2014-01660.

It was indicated that the door will be placed back into its orginial location and secured once the work on a specific component is done.

Observed a portablelight fixture with cord resting on the floor inside the supervisory panel (see attachedphoto). During a seismic even, the light fixture may move and strike nearby sensitive equipment. This is addressed in CR-IP2-2014-01660.

Observed a broken and bent plastice wireway inside SL compartment of the supervisorypanel (see attachedphoto). This is a housekeeping matter that has no adverse affect on the safety function of the equipment and is addressed in CR-IP2-2014-01660.

Comments (Additional pages may be added as necessary)

Ref: A WC-037 Evaluated by: Maggie Staub ___Date: 317/14

___317/14 Kai Lo EN-DC-168 REV 0

ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 4 of 5 IP2 Status: YIN NF- UI]

Seismic Walkdown Checklist (SWC) SWELl-063 Equipment ID No. IBUS21 Equip. Class' 14 Equipment Description 118 VAC INSTR BUS 21 Photographs Note: Bus2l Note: intemals EN-DC-168 REV 0

ATTACHMENT 9.6 SEISMIC WALKDOWN CI4ECKUsT FoRm SEISMIC WALKDOWN CHECKLIST FORM Sheet 5 of 5 9.6 ATTACHMENT IP2 Status: YO NR U-Seismic Walkdown Checklist (SWC) SWELI-OE Equipment ID No. IBUS21 Equip. Class1 14 Equipment Description 118 VAC INSTR BUS 21 Note: red screen door inside supervisorypanel Note: light fixture inside supervisory panel Note: brokenlbent wireway inside on Note: no otherphotos.

EN-DC-168 REV 0

ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet I of 4 IP2 Status: YE NEI- UI-Seismic Walkdown Checklist (SWC) SWELl-064 Equipment ID No. DPNL22 Equip. Class1 14 Equipment Description 125 VDC DISTRIBUTION PNL 22 PC4 Location: Bldg. CB Floor El. 53-0" Room, Area Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?

No documentation availablefor anchorage.

2. Is the anchorage free of bent, broken, missing or loose hardware? YI NEI UlI N/Ail Observed four approximately Y2" diameterbolts. The bolts are spaced at 17" in the horizontal directionand 44" in the verticaldirection.
3. Is the anchorage free of corrosion that is more than mild surface YE N[-] U[l N/ADl oxidation?

The anchorageis free of corrosion.

4. Is the anchorage free of visible cracks in the concrete near the YrI NEIl UE N/AE anchors?

Mounted to panel frame IEnter the equipment class name from EPRI 1025286, Appendix B: Classes of Equipment.

EN-DC-168 REV 0

ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 2 of 4 IP2 Status: Y[ NEI UD-1 Seismic Walkdown Checklist (SWC) SWELl-064 Equipment ID No. DPNL22 Equip. Class' 14 Equipment Description 125 VDC DISTRIBUTION PNL 22 PC4

5. Is the anchorage configuration consistent with plant documentation? Y[-] NE] UI-l N/AZ (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

See #1

6. Based on the above anchorage evaluations, is the anchorage free of YE NEI U[-L potentially adverse seismic conditions?

The anchorage is free of potentially adverse seismic conditions.

Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? YE NE] U[] N/A[]

Soft targets are free from impact.

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Y[ NE] UE] N/AO and masonry block walls not likely to collapse onto the equipment?

Overhead equipment, distributionsystems, ceiling titles and lighting, and masonry block walls are not likely to collapse.

9. Do attached lines have adequate flexibility to avoid damage? YZ NE] uE] N/AE]

Attached lines have adequate flexibility.

10. Based on the above seismic interaction evaluations, is equipment free YE N-] UE]

of potentially adverse seismic interaction effects?

The equipment is free of potentially adverse seismic interaction effects.

EN-DC-168 REV 0

ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 3 of 4 1P2 Status: YZ Nil U--

Seismic Walkdown Checklist (SWC) SWELl-064 Equipment ID No. DPNL22 Equip. Class1 14 Equipment Description 125 VDC DISTRIBUTION PNL 22 PC4 Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YN NEi UE1 adversely affect the safety functions of the equipment?

We have looked for and found no otherseismic conditions that could adversely affect the safety functions of the equipment.

Comments (Additional pages may be added as necessary)

Ref AWC-037 Evaluated by: Magqgie Staub Date: 317/14

/~317114 Kai Lo EN-DC-168 REV 0

ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 4 of 4 IP2 Status: YZ NI'- UL-Seismic Walkdown Checklist (SWC) SWELl-064 Equipment ID No. DPNL22 Equip. Class1 14 Equipment Description 125 VDC DISTRIBUTION PNL 22 PC4 Photographs Note: PNL 22 Note: internals EN-DC-168 REV 0

ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 1 of 4 IP2 Status: Y*;: Nil U[W R1 (SWC) SWELl-067 Seismic Walkdown Checklist Equipment ID No. EDC1 Equip. Class' 14 Equipment Description STATIC INV. #23 MANUAL BY-PASS SWITCH Location: Bldg. CB Floor El. 33'-0" Room, Area Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one Y[-I NE of the 50% of SWEL items requiring such verification)?

No, the anchorage configuration verification is not required.

2. Is the anchorage free of bent, broken, missing or loose hardware? YE NI1--U1 N/A[-

Anchorage external to cabinet checked and found to be free of bent, broken, missing or loose hardware.

Cabinetdoor was opened on 2/28/14 and anchorageis free of bent, broken, missing or loose hardware. R1

3. Is the anchorage free of corrosion that is more than mild surface YE NEI UrI N/AL oxidation?

Anchorage is free of corrosionthat is more than mild surface oxidation.

4. Is the anchorage free of visible cracks in the concrete near the YN N[: U-I N/A[

anchors?

External anchorageis free of significant visible cracks in the masonry wall near the anchors.

'Enter the equipment class name from EPRI 1025286, Appendix B: Classes of Equipment.

EN-DC-168 REV 0

ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 2 of 4 IP2 Status: YN NEI UL- RI I

Seismic Walkdown Checklist (SWC) SWELl-067 Equipment ID No. EDC1 Equip. Class1 14 Equipment Description STATIC INV. #23 MANUAL BY-PASS SWITCH

5. Is the anchorage configuration consistent with plant documentation? Y--] NEI U[I- N/AZ (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Not applicable since component is not part of the anchorage configurationverification.

6. Based on the above anchorage evaluations, is the anchorage free of YZ NEI UE-potentially adverse seismic conditions?

The anchorageis free of potentially adverse seismic conditions.

Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? Y[; NEi UE- N/AE Yes soft targets are free from impact by nearby equipment or structures.
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Y[ NEI UE-- N/AE-and masonry block walls not likely to collapse onto the equipment?

Block wall is seismiclly qualified by Computech report No. R547.01.

Fluorescentbulbs need to be secured to fixtures with wires. CR IP2-2012-06120 tracks installationof wires to tie florescent bulb to fixture. It is judged the hard target inverterwill remain operable if the florescent bulbs were to fall on it.

9. Do attached lines have adequate flexibility to avoid damage? YN NEl UE N/A[]

Yes attached lines have adequate flexibility to avoid damage.

10. Based on the above seismic interaction evaluations, is equipment free Y[ NE UE:

of potentially adverse seismic interaction effects?

Yes based on the above seismic interactionevaluations, the equipment is free of potentially adverse seismic interaction effects.

EN-DC-168 REV 0

ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 3 of 4 1P2 Status: YIO NEI UI--

Seismic Walkdown Checklist (SWC) SWELl-067 I R1 Equipment ID No. EDC1 Equip. Class1 14 Equipment Description STATIC INV. #23 MANUAL BY-PASS SWITCH Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YE NEI UEi adversely affect the safety functions of the equipment?

Yes we have looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment.

Comments (Additional pages may be added as necessary)

References:

Drawingsand AWC Drawings:A206648, Rev 46, Conduit layout Control building, elev. 33' plan west half AWC-004 Dae -2/28/14

" " Date:

Evaluated by: Maggie Staub R1 Kai Lo ' - 2/28/14 EN-DC-168 REV 0

ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FoRm ATTAHMEN 9. SEIMICWALKOWN HECLISTFO I Shoot 4 of 4 IP2 Status: YZ NEI UI-7] R1 Seismic Walkdown Checklist (SWC) SWELl-067 Equipment ID No. EDC1 Equip. Class' 14 Equipment Description STATIC INV. #23 MANUAL BY-PASS SWITCH Photographs R1 Note: Note:

STATIC INV #23 MANUAL BY-PASS SWITCH STATIC INV #23 MANUAL BY-PASS SWITCH interal components EN-DC-168 REV 0

ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet I of 5 IP2 Status: YM NEI uFi R1 Seismic Walkdown Checklist (SWC) SWELl-072 Equipment ID No. M19 Equip. Class' 16 Equipment Description BATTERY CHARGER 21 Location: Bldg. CB Floor El. 3X-O" Room, Area Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one YN NEI of the 50% of SWEL items requiring such verification)?

Yes the anchorageconfiguration verification is required.

2. Is the anchorage free of bent, broken, missing or loose hardware? YO NEI UL N/AD R1 Cabinetdoors were opened on 3/4/14 and internalcomponents were inspected. Yes the anchorage is free of bent, broken, missing or loose hardware.
3. Is the anchorage free of corrosion that is more than mild surface Y[ N[ U0- N/A[

oxidation?

Yes the anchorage is free of corrosion that is more than mild surface oxidation.

4. Is the anchorage free of visible cracks in the concrete near the YN NEI uE- N/A[--

anchors?

Yes, the anchorage is free of visible cracks in the concrete near the anchor.

'Enter the equipment class name from EPRI 1025286, Appendix B: Classes of Equipment.

EN-DC-168 REV 0

ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 2 of 5 IP2 Status: Y[* NE ULI Ri Seismic Walkdown Checklist (SWC)

Equipment ID No. M19 SWELl-072 Equip. Class1 16 I

Equipment Description BATTERY CHARGER 21

5. Is the anchorage configuration consistent with plant documentation? YN NE] UE- N/AFl (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Anchorage matches drawing 01 1D13800.

6. Based on the above anchorage evaluations, is the anchorage free of YE NEI UI-potentially adverse seismic conditions?

Yes based on the above anchorage evaluations, the anchorage is free of potentially adverse seismic conditions.

Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? Y] NEi UE- N/Al]

Gap between the cabinet and adjacent frame west of the cabinet is 0.5". This seismic seperation requiresanalysis to determine adequacy.

LB-08 concluded that the existing gap is acceptable.

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YZ NEI UE] N/AO and masonry block walls not likely to collapse onto the equipment?

Floresentbulbs overhead are unsecured and could fall out of the light fixture. Hardtarget cabinet will protect internalsfrom damage. Judged acceptable. CR IP2-2012-06120tracks installation of wires to tie florescent bulb to fixture for good seismic housekeeping.

Masonry block wall is seismically qualified by Computech Report no.

R547.01 as discussed in SQUG SEWS.

9. Do attached lines have adequate flexibility to avoid damage? YE NEI U[-] N/A[l Yes attachedlines have adequate flexibility to avoid damage.
10. Based on the above seismic interaction evaluations, is equipment free YE NE: UE1 of potentially adverse seismic interaction effects?

R1 The equipment is free of potentially adverse seismic interaction.

EN-DC-168 REV 0

ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 3 of 5 IP2 Status: Y[ N[I U[D RI Seismic Walkdown Checklist (SWC) SWELl-072 Equipment ID No. M19 Equip. Class 1 16 Equipment Description BATTERY CHARGER 21 Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YE NE] UI-]

adversely affect the safety functions of the equipment?

Yes we have looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment.

Comments (Additional pages may be added as necessary)

References:

Drawings and AWC Drawings: A206640, Rev 10. Arrangement of equipment in cable spreadingroom, elev. 33' 01 ID 13800, Rev 7. Outline for the battery charger 22,24,21 and 23.

AWC-004 R1 3/4/14 Evaluated by: Mag-gie Staub Date:

Kai Lo Afý 3/4/14 EN-DC-168 REV 0

ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 4 of 5 IP2 Status: YN NO ULI R1 Seismic Walkdown Checklist (SWC) SWELl-072 Equipment ID No. M19 Equip. Class' 16 Equipment Description BATTERY CHARGER 21 Photographs Note: Battery charger21 is cabinet on right EN-DC-168 REV 0

ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FoRm ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 5 of 5 IP2 Status: Y[E N[:] Ur- R1 Seismic Walkdown Checklist (SWC) SWELl-072 Equipment ID No. M19 Equip. Class1 16 I

Equipment Descrption BATTERY CHARGER 21 I

Note: Battery charger21 3 Note: internal componenets (top) R1 Note: internal componenets (bottom) Note: no other photos.

EN-DC-168 REV 0

ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet I of 5 IP2 Status: YZ NO U[-D R1 Seismic Walkdown Checklist (SWC) SWELl-073 Equipment ID No. EGA3 Equip. Class1 16 Equipment Description BATTERY CHARGER 24 Location: Bldg. CB Floor El. 33'-0" Room, Area Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one Y] NEI of the 50% of SWEL items requiring such verification)?

Yes the anchorageconfiguration verification is required.

2. Is the anchorage free of bent, broken, missing or loose hardware? YE NE] U['-] N/AI-]

Cabinetdoors were opened on 3/4/13 and anchorage of internal R1 component was inspected.

Anchorage of cabinet to concrete floor is external to cabinet and was inspected.

Internaland external anchorageare free of bent, broken, missing and loose hardware.

3. Is the anchorage free of corrosion that is more than mild surface YE NEI uE-1 N/A--

oxidation?

Yes the anchorageis free of corrosion that is more than mild surface oxidation.

4. Is the anchorage free of visible cracks in the concrete near the YE NEIl U[-- N/ADl anchors?

Yes, the anchorageis free of visible cracks in the concrete near the anchor.

' Enter the equipment class name from EPRI 1025286, Appendix B: Classes of Equipment.

EN-DC-168 REV 0

ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 2 of 5 IP2 Status: YE NEI U--I RI Seismic Walkdown Checklist (SWC) SWELl-073 Equipment ID No. EGA3 Equip. Class1 16

[

Equipment Description BATTERY CHARGER 24

5. Is the anchorage configuration consistent with plant documentation? YX N[I] U-I N/A--

(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

One Hilti anchorbolt is 3/8"diameter not Y per DWG 01ID13800-7.

Smaller anchorbolt was documented by SQUG (SEWS) and is therfore seismically acceptable.

6. Based on the above anchorage evaluations, is the anchorage free of YZ NEIl UI potentially adverse seismic conditions?

Yes based on the above anchorage evaluations, the anchorage is free of potentiallyadverse seismic conditions.

Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? Y[ NE] u[-] N/AL]

Yes soft targets are free from impact by nearby equipment or structures.

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YO NEI u[1 N/All]

and masonry block walls not likely to collapse onto the equipment?

Masonry wall is qualified by computech report no. R547.

9. Do attached lines have adequate flexibility to avoid damage? YE N[] UE- N/AII Yes attached lines have adequate flexibility to avoid damage.
10. Based on the above seismic interaction evaluations, is equipment free YN NEIl U[I of potentially adverse seismic interaction effects?

Yes based on the above seismic interaction evaluations, the equipment is free of potentially adverse seismic interactioneffects.

EN-DC-168 REV 0

ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 3 of 5 IP2 Status: YE NEIl UfI R1 Seismic Walkdown Checklist (SWC) SWELl-073 Equipment ID No. EGA3 Equip. Class 1 16 Equipment Description BATTERY CHARGER 24 Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YE NEI U[-I adversely affect the safety functions of the equipment?

Yes we have looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment.

Comments (Additional pages may be added as necessary)

References:

Drawings and AWC Drawings:01ID13800, Rev 7, Outline for battery charger22,24,21 & 23 A206640, Rev 10, Arrangement of equipment in cable spreadingroom elev. 33' AWC-004 t 3/4/14 Evaluated by: Maggie Staub ....... Date:

RI 314114 Kai Lo EN-DC-168 REV 0

SEISMIC WALKDOWN CHECKLIST FoRm ArTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 4 of 5 IP2 Status: YN Nr'- UL"I R1 PhoTogACHMETs.

Seismic Walkdown Checklist (SWC) SWELl-073 Equipment ID No. EGA3 Equip, Class1 16 Equipment Description BATTERY CHARGER 24 Photographs Note: 3/8" anchoron north-west corner Note: North-eastcomer EN-DC-168 REV 0

ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 2 of 5 IP2 RI.

Note: Battery Charger24 Note: Intemal components EN-DC-168 REV 0

ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet I of 5 IP2 Status: YE NEI UD-R1 Seismic Walkdown Checklist (SWC) SWELl-074 Equipment ID No. EGAI Equip. Class 1 16 Equipment Description 10 KVA STATIC INVERTER #21 Location: Bldg. CB Floor El. 33'-0" Room, Area Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one YZ NE-]

of the 50% of SWEL items requiring such verification)?

Yes the anchorage configuration verification is required.

2. Is the anchorage free of bent, broken, missing or loose hardware? YZ N-- UL] N/A[--

RI1 Anchorage of internalcomponents to cabinet inspected on 3/7/14 and found OK Anchorage of cabinet to concrete floor is external to cabinet and was inspected.

3. Is the anchorage free of corrosion that is more than mild surface YE NEi UEI-- N/A[:

oxidation?

Yes the anchorageis free of corrosion that is more than mild surface oxidation.

4. Is the anchorage free of visible cracks in the concrete near the YZ NEi UI- N/A[

anchors?

Yes, the anchorage is free of visible cracks in the concrete near the anchor.

Enter the equipment class name from EPRI 1025286, Appendix B: Classes of Equipment.

EN-DC-168 REV 0

ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 2 of 5 IP2 Status: Y[ NEI UI- R1 Seismic Walkdown Checklist (SWC) SWELl-074 Equipment ID No. EGAI Equip. Class' 16 Equipment Description 10 KVA STATIC INVERTER #21

5. Is the anchorage configuration consistent with plant documentation? Y] N[I UL-I N/AL]

(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Anchorage matches description provided in SQUG (SEWS) and DWG 011D13800-7.

6. Based on the above anchorage evaluations, is the anchorage free of YN NEil UII potentially adverse seismic conditions?

Yes based on the above anchorage evaluations, the anchorage is free of potentially adverse seismic conditions.

Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? YE NEIl UE- N/All Yes soft targets are free from impact by nearby equipment or structures.
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Y[E NEI U[] N/A[]

and masonry block walls not likely to collapse onto the equipment?

Masonry wall qualified by computech report no. R54 7.01 per SQUG (SEWS).

9. Do attached lines have adequate flexibility to avoid damage? YE NE]I ul N/All Yes attached lines have adequate flexibility to avoid damage.
10. Based on the above seismic interaction evaluations, is equipment free YE NEIUE1 of potentially adverse seismic interaction effects?

Yes based on the above seismic interactionevaluations, the equipment is free of potentially adverse seismic interactioneffects.

EN-DC-168 REV 0

ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 3 of 5 IP2 Status: YN NI! U[I R1 Seismic Walkdown Checklist (SWC) SWELl-074 Equipment ID No. EGAI Equip. Class' 16 Equipment Description 10 KVA STATIC INVERTER #21 Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YN NEI U[--

adversely affect the safety functions of the equipment?

Yes we have looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment.

Comments (Additional pages may be added as necessary)

References:

Drawings and AWC Drawings: A206640, Rev 10, arrangementof equipment in cable spreadingroom elev. 33'.

AWC-004

.*.* '" 3/7/14 R Date:

Evaluated by: Maggie Staub Kai Lo 3/7/14 EN-DC-168 REV 0

SEISMIC WALKDOWN CHECKLIST FORM ATTACHMENT ATTACHM 9.6 ENT 9.6 SEISMIC WALKDOWN CHECKLIST FoRm Sheet 4 of 5 IP2 Status: YZ Nr-] UrI R1 Seismic Walkdown Checklist (SWC) SWELl-074 Equipment ID No. EGA1 Equip. Class1 16 Equipment Description 10 KVA STATIC INVERTER #21 Photographs Note: Cabinet Note: North west anchor Note: South-west anchor Note: East anchors EN-DC-168 REV 0

59of6 ATAHMENT SEISMIC WALKDOWN CHECKLIST FoRm Shoot 5 of 5 IP2 R1 Note: intemals at top I Note: internalsat bottom EN-DC-168 REV 0

ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet I of 5 IP2 Status: YI* NE-- UE R Seismic Walkdown Checklist (SWC) SWELl-075 R1 Equipment ID No. EGA8 Equip. Class1 16 Equipment Description IOKVA STATIC INVERTER #23 Location: Bldg. CB Floor El. 33'-0" Room, Area Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one Y[I- N of the 50% of SWEL items requiring such verification)?

The anchorageconfiguration verification is not required.

2. Is the anchorage free of bent, broken, missing or loose hardware? YE N[EI UOI N/AEl RI Cabinet doors were opened on 2/28/14 and all internal anchorage is free of bent, broken, missing or loose hardware.
3. Is the anchorage free of corrosion that is more than mild surface YE NEI UE7 N/A[-

oxidation?

Yes the anchorageis free of corrosionthat is more than mild surface oxidation.

4. Is the anchorage free of visible cracks in the concrete near the YE NEI U"- N/A[-

anchors?

Yes, the anchorageis free of visible cracks in the concrete near the anchor.

'Enter the equipment class name from EPRI 1025286, Appendix B: Classes of Equipment.

EN-DC-168 REV 0

ATTACHMEI iT9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 2 of5 IP2 Status: YE NEI U- K Seismic Walkdown Checklist (SWC) SWELI-075 I R1 Equipment ID No. EGA8 Equip. Class 1 16 Equipment Description IOKVA STATIC INVERTER#23

5. Is the anchorage configuration consistent with plant documentation? YE] Ni] U-L N/AN (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Not applicable since component is not part of the anchorage configuration verification.

6. Based on the above anchorage evaluations, is the anchorage free of YZ N[I ULi potentially adverse seismic conditions?

Yes based on the above anchorage evaluations, the anchorageis free of potentially adverse seismic conditions.

Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? Y0 NE] UE] N/AE]

Yes soft targets are free from impact by nearby equipment or structures.

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YO NE] UE] N/AE]

and masonry block walls not likely to collapse onto the equipment?

Block wall is seismiclly qualified by Computech report No. R547.01.

Fluorescentbulbs need to be secured to fixture with wires. CR IP2-2012-06120 tracks installationof wires to tie florescent bulb to fixture. It is judged the hard target inverterwill remain operableif the fluorescent bulbs were to fall on it.

9. Do attached lines have adequate flexibility to avoid damage? YO NE] u[-] N/AE]

Yes attachedlines have adequateflexibility to avoid damage.

10. Based on the above seismic interaction evaluations, is equipment free YN NE] UE]

of potentially adverse seismic interaction effects?

Yes based on the above anchorageevaluations, the anchorageis free of potentiallyadverse seismic conditions.

EN-DC-168 REV 0

ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 3 of 5 1P2 Status: YN NEI- UL-R1 Seismic Walkdown Checklist (SWC) SWELl-075 Equipment ID No. EGA8 Equip. Class' 16 Equipment Description 10 KVA STATIC INVERTER #23 Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YE N[-i UI-adversely affect the safety functions of the equipment?

Yes we have looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment.

Comments (Additional pages may be added as necessary)

References:

Drawings and AWC Drawings: A206640, Rev 10, Arrangement of equipment in cable spreadingroom elev. 33' AWC-004 2/28/14 Evaluated by: Mnaaip. ,*tnllh Date:

Maryryie Staub R1 Kai Lo 212811 EN-DC-168 REV 0

ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FoRm ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 4 of 5 IP2 Status: YE NEI uE] R1 Seismic Walkdown Checklist (SWC) SWELl-075 Equipment ID No. EGA8 Equip. Class1 16 Equipment Description 10 KVA STATIC INVERTER #23 Photographs Note: Note:

Right side anchorage.

R1 Note: internal components at bottom Left side anchorage. I Note:

EN-DC-168 REV 0

ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKUsT FoRm SEISMIC WALKOOWN CHECKLIST FORM Sheet 5 of 5 9.6 ATTACHMENT IP2 RI Note: intemal components at top Note: no otherphotos.

EN-DC-168 REV 0

ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 1 of 6 IP2 Status: YE NOI ULI Seismic Walkdown Checklist (SWC) SWELl-076 R1 1

Equipment ID No. 21EDG Equip. Class 17 Equipment Description DIESEL GENERATOR NO. 21 Location: Bldg. EDG Floor El. 72'-O" Room, Area Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one YE NIZ of the 50% of SWEL items requiring such verification)?

Yes the anchorageconfiguration verification is required.

2. Is the anchorage free of bent, broken, missing or loose hardware? Y[ NI U[E- NIAE R1 Anchorage of components internalto cabinets that are attached to diesel were examined. See comments on page 3.

External anchoragewas inspected and is acceptable.

3. Is the anchorage free of corrosion that is more than mild surface YE NE- UF-1 N/AE]

oxidation?

Minor surface rust. Accepable.

4. Is the anchorage free of visible cracks in the concrete near the YE NEI UE- N/AE[

anchors?

A few minor hairlike cracks. No significantstructuralcracks.

Enter the equipment class name from EPRI 1025286, Appendix B: Classes of Equipment.

EN-DC-168 REV 0

ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 2 of 6 IP2 Status: Y; NM Ur--

Seismic Walkdown Checklist (SWC) SWELl-076 R1 1

Equipment ID No. 21EDG Equip. Class 17 Equipment Description DIESEL GENERA TOR NO. 21

5. Is the anchorage configuration consistent with plant documentation? Y[ N-I Ur] N/Al (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Anchorage matches the SQUG (SEWS).

6. Based on the above anchorage evaluations, is the anchorage free of YN NOI UOI potentially adverse seismic conditions?

Yes based on the above anchorage evaluations, the anchorage is free of potentially adverse seismic conditions.

Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? YN N-] UL- N/AZ!

Numerious tubes touch each other. Judged OK.

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Y[ NEI] U[] N/A[--

and masonry block walls not likely to collapse onto the equipment?

Refer to A WC-01 1 for partition discussion.

9. Do attached lines have adequate flexibility to avoid damage? Y[E NE] U[- N/Al-]

Yes attachedlines have adequateflexibility to avoid damage.

10. Based on the above seismic interaction evaluations, is equipment free Y[Z NEI urD of potentially adverse seismic interaction effects?

Yes based on the above seismic interaction evaluations, the equipment is free of potentially adverse seismic interaction effects.

EN-DC-168 REV 0

ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 3 of 6 IP2 Status: YM NEI UL 1 Seismic Walkdown Checklist (SWC) SWELl-076 R1 Equipment ID No. 21EDG Equip. Class' 17 IFniiinmrntflr3_crintinn fI-')II.L (FNFRATOR NC) 21 Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YZ NEI ULI adversely affect the safety functions of the equipment?

Yes we have looked for and found no otherseismic conditions that could adversely affect the safety functions of the equipment.

Comments (Additional pages may be added as necessary)

West lower airfilters bottom clip does not hold air filter in place. Air can by-pass filter Operations personnel fixed issue while inspection team was their. OperationsCR IP2-2012-06238issued for trend tracking resolusion.

References:

Drawings and AWC Drawings: 9321-H-2250, Rev 7, Diesel generatorbuilding general arrangementplan.

9321-F-18533 (A201351), Control and diesel generatorbuildings foundation plan and details.

AWC-011 The upper roof panel has one bolt that doesn't have a nut. This is acceptable because the remaining bolts are adequate to hold the panel.This is addressedin CR-IP2-2013-04549.

The anchorageof the following components that are inside a cabinet are inspected:

1. Powerpanel for 21 Pre Lube Pump, 21 Lube Oil Heater, and 21 Jacket Water Heater OK
2. Panel EPZ44: Fuses for 21 Pre Lube Pump, 21 Lube Oil Heater,21 jacket water heaterOK
3. 21 EDG Gauge Boardpanel OK
4. 21EDG Jacket water pressure switch box OK OK R1
5. 21EDG CrankcaseExhaust Fan StarterEnclosure Evaluated by: Kiu I n Date: 11/12/13 John Skoniecznv 11/12/13 EN-DC-168 REV 0

ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM SEISMIC WALKDOWN CHECKLIST FORM Shoot 4 of 6 9.6 ATTACHMENT IP2 Status: Y0 N-- U-I Seismic Walkdown Checklist (SWC) SWELl-076 R1 Equipment ID No. 21EDG Equip. Class' 17 Equipment Description DIESEL GENERATOR NO. 21 Photographs Note: LOWER AIR FILTER NOT FULLY LATCHED.

i Note: DIESEL GENERATOR NO 21.

Note: no photo.

LOWER AIR FILTER NOT FULLY LATCHED.

EN-DC-168 REV 0

ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM SEISMIC WALKDOWN CHECKLIST FORM Sheet 5 of 6 9.6 ATrACHMENT IP2 Note: Panel EPZ44 Note: PanelEPZ44 internals R1 Note: 21 EDG Gauge Board EN-DC-168 REV 0

ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 6 of 6 IP2 Note:

Note: 21EDG Crankcase Exhaust Fan Starter Enclosure EN-DC-168 REV 0

ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 1 of 10 Status: YN NEI UI1 Seismic Walkdown Checklist (SWC) SWELl-077 RI Equipment ID No. O022EDG Equip. Class 1 17 Equipment Description DIESEL GENERATOR NO. 22 Location: Bldg. EDG Floor El. 72-0" Room, Area Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one YE NEI of the 50% of SWEL items requiring such verification)?

Yes the anchorageconfiguration verification is required.

2. Is the anchorage free of bent, broken, missing or loose hardware? YN NO~ ULI N/AEI R1 Anchorage of components internalto cabinets attached to diesel were opened and examined. Internals were inspected.

Southwest of the EDG near the western post of the EDG exhaust pipe there is a base plate missing I of 4 anchorbolt nuts. This is judged seismically adequate as this base plate was abandoned from the old EDG exhaust pipe support and now a 4" pipe bearson but is not welded to the base plate.

3. Is the anchorage free of corrosion that is more than mild surface YN NO UI-] N/AEl oxidation?

Yes the anchorageis free of corrosion that is more than mild surface oxidation.

Enter the equipment class name from EPRI 1025286, Appendix B: Classes of Equipment.

EN-DC-168 REV 0

ATTACHMENT 9.6 SEISMIC WALKOOWN CHECKLIST FORM Sheet 2 of 10 Status: Y[ NE] UE- RI Seismic Walkdown Checklist (SWC) SWELl-077 Equipment ID No. O022EDG Equip. Class1 17 Equipment Description DIESEL GENERA TOR NO. 22

4. Is the anchorage free of visible cracks in the concrete near the YEI NE uE- N/AE-anchors?

EDG Pedestalhas some minor hair line cracks that are none structural.

They are not near the anchors.Acceptable.

EDG exhaust pipe is supported on a post frame that also supports fuse panel for 22 Pre Lube Pump, 22 Lube oil HTR, and 22 Jacket Water HTR. This support has damaged &missing grout under the eastern post base plate. LB-11 was issued to resolve.

5. Is the anchorage configuration consistent with plant documentation? Y1; NE] UE- N/AE]

(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Anchorage matches the SQUG (SEWS).

6. Based on the above anchorage evaluations, is the anchorage free of YE NEI uEr potentially adverse seismic conditions?

Yes based on the above anchorage evaluations, the anchorage is free of potentially adverse seismic conditions.

Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? YO NE-] UE- NIAE1 A lot of tubing, hoses, etc. touch each other. All occurences where judged acceptable. Some but not all of the occurencesare noted below.

-Fuel oil filter line DF-80 touches DF-78 on south west side of 22EDG.

-EDG DLO 13-1 EDG 22 STRNR Vent Stop Valve tubing touches pipe to 22EDLOS.

-EDG JWP-1-1 22EDG PS-1-1 and PS-5-1 stop tubing touches pipe to FE-6469 on east side of 22EDG.

-Line on west side of 22EDG to DL0-539 touches line to DF-107.

EN-DC-168 REV 0

ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 3 of I [0 Status: YI* N[7l UL-I R1 Seismic Walkdown Checklist (SWC) SWELl-077 Equipment ID No. O022EDG Equip. Class1 17 Equipment Description DIESEL GENERATOR NO. 22

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Y(Z N[Il U[] N/AD1 and masonry block walls not likely to collapse onto the equipment?

Refer to AWC-01 1 for partitiondiscussion.

9. Do attached lines have adequate flexibility to avoid damage? Y[ N[-] U[-] N/AII Yes attached lines have adequate flexibility to avoid damage.
10. Based on the above seismic interaction evaluations, is equipment free YZ ND] U[I of potentially adverse seismic interaction effects?

Yes based on the above seismic interaction evaluations, the equipment is free of potentially adverse seismic interaction effects.

Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YE NDI U--

adversely affect the safety functions of the equipment?

Yes we have looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment.

EN-DC-168 REV 0

ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 4 of 10 Status: YZ NEI- UL- g1z Seismic Walkdown Checklist (SWC) SWELI-077 Equipment ID No. O022EDG Equip. Class1 17 Equipment Description DIESEL GENERATOR NO. 22 Comments (Additional pages may be added as necessary)

The following are house keeping issues and judged acceptable for seismic concerns.

Grating at valve DA-559 DG22 Starting Air Right Side supply is touching valve hand wheel. This is a non- seismic issue.

One of the roof light bulbs is out. CR IP2-2012-06515issued to track resolution.

Minor surface rust on some threaded rods, bolts, nuts, and other components. Judged acceptable.

Flange on 22EDG JW & LO Coolers cooling WTR outlet has one out of 23 bolts flush with nut. Judged acceptable.

Latch on 22EDG Gauge boardcover panel on north side is not latched. CR IP2-2012-06238 issued to track resolution.

Noted WRT 00172112 was tagged to track resolution of a leak on south east side of diesel.

Evidence of oil leaks below south side of diesel typical for all diesels in area. Judged acceptable.

The StartingAir PressureGauge is missing I of 3 screws. The remaining 2 screws will be seismically adequate. This condition is captured in CR-IP2-2013-02336.

References:

Drawings and AWC Drawings: 9321-H-2250, Rev 7, Diesel generatorbuilding general arrangementplan.

CR IP2-2012-06515 CR IP2-2012-06238 WRT 00172112 AWC-011 Left hand starting airpressuregauge missing one screw. Found 6/10/13 Evaluated by: Kai Lo Date:

R1 Dan Nuta 6/10/13 EN-DC-168 REV 0

ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 5 of 10 Status: YtZ NO UL-R1 Seismic Walkdown Checklist (SWC) SWELl-077 Equipment ID No. O022EDG Equip. Class1 17 Equipment Description DIESEL GENERATOR NO. 22 Photographs Note: Flange on 22EDG JW & LO Coolers Note: Minor surface corrosion on flange cooling WTR outlet with flush nut and showing couplings. Possible galvanic corrosion stainless minor surface corrosion. steel pipe and carbon steel bolts.

EN-DC-168 REV 0

ATAHMENT 9.o61 SEISMIC WALKDOWN CHECKLIST FORM Sheet 6 of 10 Status: YZ NEIrU[] R1 Seismic Walkdown Checklist (SWC) SWELl-077 Equipment ID No. O022EDG Equip. Class1 17 EcauiDment Descrption DIESEL GENERATOR NO. 22 Note: ý;nows ruse panel for 22 PreLube Pump, 22 Lube oil HTR, and 22 Jacket Water HTR that has damaged & missing grout under the eastern (close) posts base plate.

Note: Example of rubber tubing touching. Note: Latch on 22EDG Gauge boardcover panel on north side is not latched.

EN-DC-168 REV 0

ATAHMENT 1 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 7 of 10 Status: Y[ NEI U1,I R1 Seismic Walkdown Checklist (SWC) SWELl-077 Equipment ID No. O022EDG Equip. Class1 17 Equipment Description DIESEL GENERATOR NO. 22 Note: tracKea weios on parrionwan oetween Note: Partitionwall between diesels that needs diesels. verificationof seismic design.This is addressedin SR1 CalculationFCX-00534 and A WC-011.

EN-DC-168 REV 0

ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM SEISMIC WALKDOWN CHECKLIST FORM Sheet 8 of 109.6 ArrACHMENT Note: PanelEPZ45 Note: PanelEPZ45 internals R1 Note: 22 jacket water heater Note: 22 jacket waterheaterinternals EN-DC-168 REV 0

ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 9 of 10 Note: 22 jacket water heaterinternals Rl 22 EDG Gauge Board Note: 22 EDG Gauge Board intemals I Note:

EN-DC-168 REV 0

ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FoRm ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 10 of 10 Note: missing screw from startingairpressure Note: 22 EDG Jacket Water Pressure Switch gauge cabinet Rl Note: 22 EDG CrankCase Exhaust Fan Note: 22 EDG CrankCase Exhaust Fan Starter StarterEncolure Encolure internals EN-DC-168 REV 0

ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet I of 9 IP2 Status: Y[ NEIl UE- 111 Seismic Walkdown Checklist (SWC) SWELl-078 Equipment ID No. O023EDG Equip. Class1 17 Equipment Description DIESEL GENERATOR NO. 23 Location: Bldg. EDG Floor El. 72'-O" Room, Area Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1. Is the anchorage configuration verification required (i.e., is the item, one YE NEI of the 50% of SWEL items requiring such verification)?

Yes the anchorageconfiguration verification is required.

2. Is the anchorage free of bent, broken, missing or loose hardware? YE N[DI U[I N/AD R1 Anchorage of components internalto cabinets attached to diesel were examined. Internals were inspected when cabinets were opened.
3. Is the anchorage free of corrosion that is more than mild surface YE NDI UD-] N/A[l oxidation?

Surface corrosion.Not significant.

4. Is the anchorage free of visible cracks in the concrete near the YE NDl UD-- N/ADl anchors?

Minor hair line cracks. Not significant.

Enter the equipment class name from EPRI 1025286, Appendix B: Classes of Equipment.

EN-DC-168 REV 0

ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 2 of 9 IP2 Status: YE. NEI U[D R1 Seismic Walkdown Checklist (SWC) SWELI-078 I

Equipment ID No. O023EDG Equip. Class1 17 Equipment Description DIESEL GENERATOR NO. 23

5. Is the anchorage configuration consistent with plant documentation? YE Nr-o U-- N/All]

(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Anchorage matches the SQUG (SEWS).

6. Based on the above anchorage evaluations, is the anchorage free of YE N- U[I potentially adverse seismic conditions?

Yes based on the above anchorage evaluations, the anchorageis free of potentially adverse seismic conditions.

Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? YZ NIl U-I N/A-Yes soft targets are free from impact by nearby equipment or structures.
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YE NEI- U0---Z N/A--

and masonry block walls not likely to collapse onto the equipment?

Refer to AWC-01 I for partitiondiscussion.

9. Do attached lines have adequate flexibility to avoid damage? YZ N- ULI N/AD Numerious lines touching. Judged acceptable.
10. Based on the above seismic interaction evaluations, is equipment free YZ NO U-]

of potentially adverse seismic interaction effects?

Yes based on the above seismic interaction evaluations, the equipment is free of potentially adverse seismic interaction effects.

EN-DC-168 REV 0

ATTACHMEI? iT9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 3 of 9 IP2 Status: YN NiE U-- R1 Seismic Walkdown Checklist (SWC) SWELl-078 Equipment ID No. O023EDG Equip. Class 1 17 Equipment Description DIESEL GENERATOR NO. 23 Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YZ NEI U-1 adversely affect the safety functions of the equipment?

Yes we have looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment.

Comments (Additional pages may be added as necessary) 1 of 4 airfilter latches do not hold air filter in place. Air can by-pass filter. Operationspersonnel fixed issue in our presence. CR IP2-2012-06238issued for trend tracking purposes.

References:

Drawings and AWC Drawings: 9321-H-2250, Rev 7, Dieselgeneratorbuilding general arrangementplan, AWC-011

1. Fuse panel EWZ69 OK
2. Powerpanel - light adaptoris loose from panel cover (adhesive) at 23 lube oil heaterpower light. This is addressed in CR-IP2-2013-04158.
3. Panel adjacent to gauge board (jacket waterpressure switch) OK
4. EDG gauge board- electrical tape at back of panel at 2 locations. This is a housekeeping issue.
5. Crankcasestarterenclosure OK 10/15/13 Evaluated by: Kai Lo Date:

R1 Dan Nuta A 10/15/13 EN-DC-168 REV 0

ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FoRm SEIsMIc WALKDOWN CHECKLIST FoRM Sheet 4 of 99.6 ATrACHMENT IP2 Status: YN NE] UI- R1 Seismic Walkdown Checklist (SWC) SWELI -078 Equipment IDNo. 0023EDG Equip. Class 1 17 Equipment Description DIESEL GENERATOR NO. 23 Photographs Note: Note:

DIESEL GENERATOR NO 23. PARTITION WALL BETWEEN GENERATORS.

EN-DC-168 REV 0

ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FoRm Sheet 2 of 9 IP2 Note: #23 EDG panel Note: PanelEWZ69 EN-DC-168 REV 0

ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM SEISMIC WALKDOWN CHECKLIST FORM Sheet 2 of 9 9.6 ATTACHMENT IP2 Note: Panel EWZ69 intemals Note:

R1 Note: panel internals EN-DC-168 REV 0

ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM ATTAHMEN 9. SEIMICWALKOWN HECLISTFOR Sheet 2 of 9 IP2 Note: side panel Note: side panel internals R1 Note: 23 EDG Gauge Board Note: 23 EDG Gauge Board internals EN-DC-1 68 REV 0

ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FoRm SEISMIC WALKDOWN CHECKLIST FoRM Sheet 2 of 9 9.6 ATTACHMENT IP2 Note: 23 EDG Gauge Board - electrical tape on Note: 23 EDG Gauge Board internals back of panel R1 Note: 23 EDG Gauge Board internals Note: 23 EDG Gauge Board internals EN-DC-168 REV 0

ATTAC HM ENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM ATrACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 2 of 9 IP2 R1 Note: Crankcase exhuast fan starterenclosure Note: Crankcase exhuast fan starterenclosure internals EN-DC-168 REV 0

ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet I of 8 IP2 Status: YZ NE] ULI RI Seismic Walkdown Checklist (SWC) SWELl-081 Equipment ID No. IP2-EDGB-72-DB6 Equip. Class' 18 Equipment Description EDG BLDG 72' EL ENGINE AUXILIARIES CTRL PNL Location: Bldg. EDG Floor El. 72'-O" Room, Area Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one YEI NE of the 50% of SWEL items requiring such verification)?

No, the anchorageconfiguration verification is not required.

2. Is the anchorage free of bent, broken, missing or loose hardware? YZ NEI U[] N/A[I R1 Cabinet was opened for internalinspection during A TO and internals inspected. See sheet 3.

External anchorageis present and was inspected. Extemal anchorage is free of bent, brocken, missing or loose hardware.

3. Is the anchorage free of corrosion that is more than mild surface Y[ N[-1 uE] N/AE]

oxidation?

Minor surface corrosion.Judged OK.

4. Is the anchorage free of visible cracks in the concrete near the YE NEi U1-1 N/AEI anchors?

Floor is coated. No visible cracks.

Enter the equipment class name from EPRI 1025286, Appendix B: Classes of Equipment.

EN-DC-168 REV 0

SEISMIC WALKDOWN CHECKLIST FORM ATTAC HM ENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 2 of 8 IP2 Status: YZ NEIr U--I R1 Seismic Walkdown Checklist (SWC) SWELl-081 Equipment ID No. 1P2-EDGB-72-DB6 Equip. Class 1 18 Equipment Description EDG BLDG 72' EL ENGINE AUXILIARIES CTRL PNL

5. Is the anchorage configuration consistent with plant documentation? YE-] NEI U[-] N/AZ (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Not applicable since component is not part of the anchorage configuration verification.

6. Based on the above anchorage evaluations, is the anchorage free of YE NEI U-I potentially adverse seismic conditions?

R1 Yes based on the above anchorageevaluations, the anchorage is free of potentially adverse seismic conditions. Internalcomponents were examined duing EDG A TO. See sheet 3.

Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? YZ NEI UE] N/AE1 Yes soft targets are free from impact by nearby equipment or structures.
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YE NEI UE] N/A[3 and masonry block walls not likely to collapse onto the equipment?

Speaker and heateroverheadjudged to be adequately supported.

9. Do attached lines have adequate flexibility to avoid damage? Y; NE] UE] N/AE]

Yes attachedlines have adequate flexibility to avoid damage.

10. Based on the above seismic interaction evaluations, is equipment free YE NE] UE]

of potentially adverse seismic interaction effects?

Yes based on the above seismic interactionevaluations, the equipment is free of potentially adverse seismic interaction effects.

EN-DC-168 REV 0

ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 3 of 8 IP2 Status: YE NEI ULI R1 Seismic Walkdown Checklist (SWC) SWELl-081 Equipment IDNo. IP2-EDGB-72-DB6 Equip. Class1 18 Equipment Description EDG BLDG 72' EL ENGINE AUXILIARIES CTRL PNL Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YZ N[Il U[I adversely affect the safety functions of the equipment?

Yes we have looked for and found no otherseismic conditions that could adversely affect the safety functions of the equipment.

Comments (Additional pages may be added as necessary)

Top right cover screw is loose. Panel is judged by the walkdown team to be seismicly adequate with missing screw. Operationspersonnel fixed issue immediately for walkdown team.

References:

Drawings and AWC.

Drawings: 9321-F-3049,Rev 30, Conduit layout diesel generatorbuilding,elev 67' and 72' plan.

A209208, Rev 11. Conduit layout diesel generatorbuildingelev 67' and 72' section 4 Details.

9321-H-2250,Rev 7. Diesel generatorbuilding general arrangementplan.

AWC-011 During EDG A TO, the following cabinets were opened and the internalsinspected:

1. Air CompressorPanel O.K.
2. Fuel Oil Pump Disconnect O.K. R1
3. Crankcase Exhaust Fan Fuse Box O.K.

Evaluated by: Kai Lo Date: 11-12-2013 John Skoniecznv 11-12-2013 EN-DC-168 REV 0

ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM ATTAHMEN 9. SEIMICWALKOWN HECLISTFOR Sheet 4 of 8 IP2 Status: YZ NrI- Ur-I R1 Seismic Walkdown Checklist (SWC) SWELl-081 Equipment ID No. IP2-EDGB-72-DB6 Equip. Class1 18 Equipment Description EDG BLDG 72' EL ENGINE AUXILIARIES CTRL PNL Photographs Note: Note:

EDG BLDG 72' EL ENGINE AUXILIARIES CTRL ENGINE AUXILIARIES CTRL PANEL close up PANEL.

EN-DC-168 REV 0

ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 5 of 8 IP2 Photographs RI Note:

EN-DC-168 REV 0

ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 6 of 8 IP2 Photographs Ri Note: 21, EN-DC-168 REV 0

ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM IP2 Photoaraohs Note: Note:

21 Diesel Fuel Oil Pump Disconnect 21 Diesel Fuel Oil Pump Disconnect EN-DC-168 REV 0

8 of8 9.6 ATTACHMENT Sheet SEISMIC WALKDOWN CHECKLIST FORM IP2 Photographs Note: Note: no otherphotos.

Crankcase Exhaust Fan 21 Fuse Box EN-DC-168 REV 0

ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet I of 4 IP2 Status: YZ Nil U-I Seismic Walkdown Checklist (SWC) SWELl-082 Equipment ID No. INSTRK 19 Equip. Class' 18 Equipment Description INSTRUMENT RACK 19 Location: Bldg. VC Floor El. 68'-0" Room, Area Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one YZ NEI of the 50% of SWEL items requiring such verification)?

The anchorageconfiguration verification is required.

2. Is the anchorage free of bent, broken, missing or loose hardware? YEE NO UrI N/AD Anchorage is free of bent, broken, missing and loose hardware.
3. Is the anchorage free of corrosion that is more than mild surface YS ND U[I N/AD oxidation?

Anchorage is free of corrosionthat is more than mild surface oxidation.

4. Is the anchorage free of visible cracks in the concrete near the YE NDI U[-] N/AD anchors?

Observed two cracks that are approximately < 1/64" near bolts 9 and 12 (see SQUG Rack 19 for bolt numbering scheme). Forbolt 9, the crack is approximately 3" away. Forbolt 12, the crack is approximately2" away.

LB-16 evaluation was generatedto assess the anchoragebased on cracked concrete. The evaluation determined that the existing condition is acceptable.

1Enter the equipment class name from EPRI 1025286, Appendix B: Classes of Equipment.

EN-DC-168 REV 0

ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 2 of 4 IP2 Status: YE ND UD--

Seismic Walkdown Checklist (SWC) SWELl-082 Equipment ID No. INSTRK 19 Equip. Class1 18 Equipment Description INSTRUMENT RACK 19

5. Is the anchorage configuration consistent with plant documentation? YDI NO U-I N/AD-(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Anchorage configurationis consistent with SQUG documentationfor Rack 19. However, bolt configuration is not consistent with drawing A208247. CR-IP2-2014-01607is generated to document this and to update this drawing based on as-built configuration.

6. Based on the above anchorage evaluations, is the anchorage free of YO NEI ULI potentially adverse seismic conditions?

See question #4.

Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? Y0 NDI uD-- N/AD Soft targets are free from impact by nearby equipment and structures.
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YO ND] UD- N/ADl and masonry block walls not likely to collapse onto the equipment?

Overhead equipment, distributionsystems, and lighting are not likely to collapse.

9. Do attached lines have adequate flexibility to avoid damage? YE NDI U[D] N/A[D Attached lines have adequate flexibility.
10. Based on the above seismic interaction evaluations, is equipment free YO ND-] u[-]

of potentially adverse seismic interaction effects?

The equipment is free of potentially adverse seismic interactioneffects.

EN-DC-168 REV 0

ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 3 of 4 1P2 Status: YE NEI UE-1 Seismic Walkdown Checklist (SWC) SWELl-082 Equipment ID No. INSTRK 19 Equip. Class' 18 Equipment Description INSTRUMENT RACK 19 Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YE NEI UE-adversely affect the safety functions of the equipment?

We have looked and found no otherseismic conditions that could adversely affect the safety functions of the equipment.

Comments (Additional pages may be added as necessary)

References:

Drawings and AWC Drawings:9321-F-7027-42 Rev 42 (A-201121), Containment building instrument arrangementsht. I instrumentation A201145 Rev 15.

AWC-048 Evaluated by: Maggie Staub Date: 3/5/14 Kai Lo "- 3/5/14 EN-DC-168 REV 0

ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 4 of 4 IP2 Status: Y[ NM U-Seismic Walkdown Checklist (SWC) SWELl-082 Equipment ID No. INST RK 19 Equip. Class1 18 Equipment Description INSTRUMENT RACK 19 Photographs Note: Rack 19 Note: Anchorage

[Note: concrete crack nearbolt 12 l Note: concrete crack at bolt 9 i EN-DC-168 REV 0

ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet I of 4 IP2 Status: YE NEI U-l Seismic Walkdown Checklist (SWC) SWELI-083 Equipment ID No. INSTRK21 Equip. Class1 18 Equipment Description INSTRUMENT RACK 21 Location: Bldg. VC Floor El. 68"-" Room, Area Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one YE NE1 of the 50% of SWEL items requiring such verification)?

The anchorageconfiguration verification is required.

2. Is the anchorage free of bent, broken, missing or loose hardware? Y[ N[:] UE- N/AE Anchorage is free of bent, broken, missing and loose hardware.
3. Is the anchorage free of corrosion that is more than mild surface YE NEi U[:] N/AL-oxidation?

Anchorage is free of corrosion that is more than mild surface oxidation.

4. Is the anchorage free of visible cracks in the concrete near the YN NEI U[-- N/A[--

anchors?

Anchorage is free of visible cracks.

5. Is the anchorage configuration consistent with plant documentation? Y[ NEI u- N/ALi (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Anchorage configurationis consistent with drawing A208288-4 and SQUG documentation.

I Enter the equipment class name from EPRI 1025286, Appendix B: Classes of Equipment.

EN-DC-168 REV 0

ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 2 of 4 IP2 Status: YER NEI U--

Seismic Walkdown Checklist (SWC) SWELl-083 Equipment ID No. INSTRK21 Equip. Class 1 18 Equipment Description INSTRUMENT RACK 21

6. Based on the above anchorage evaluations, is the anchorage free of YI Nil U[I-potentially adverse seismic conditions?

The anchorageis free of potentially adverse seismic conditions.

Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? YN N[-] UrI N/A[D Soft targets are free from impact by nearby equipment and structures.
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YE N[i U[I N/Al]

and masonry block walls not likely to collapse onto the equipment?

Overhead equipment, distributionsystems,and lighting and masonry black walls not likely to collapse.

9. Do attached lines have adequate flexibility to avoid damage? Y[Z N[il UD:] N/A[l]

Attached line have adequate flexibility.

10. Based on the above seismic interaction evaluations, is equipment free YZ N[I- U-I of potentially adverse seismic interaction effects?

The equipment is free of potentially adverse seismic interaction effects.

Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YE NEIUEJ adversely affect the safety functions of the equipment?

We have looked and found no other seismic conditions that could adversely affect the safety funcitons of the equipment.

EN-DC-168 REV 0

ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 3 of 4 IP2 Status: YE NEIl UI-Seismic Walkdown Checklist (SWC) SWELl-083 Equipment ID No. INST RK 21 Equip. Class1 18 Equipment Description INSTRUMENT RACK 21 Comments (Additional pages may be added as necessary)

References:

Drawingsand AWC Drawings: 9321-F-7027-42 Rev 42 (A-201121), Containment building instrument arrangementsheet no.1 instrumentation A208248-6 Rev 5, Modification to steam generatorlevel transmitterrack no. 21 A208288-4 Rev 4, Steam generatorlevel and main steam flow transmitterrack replacement detail, racks 4A,4B and 21 AWC-040 Evaluated by: Maggie Staub ___Date: 3/5/14 Kai Lo ____________-_.........___...._ Date: 3/5/14 EN-DC-168 REV 0

ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 4 of 4 IP2 Status: Y*; Nr"] UL-(SWC) SWELl-083 Seismic Walkdown Checklist Equipment ID No. INSTRK21 Equip. Class' 18 Equipment Description INSTRUMENT RACK 21 PhotoaraDhs Note: Rack 21 Note: Rack 21 Note: anchorflush with angle as indicatedon Note: anchorageconsistent with drawing drawing A208288-4 and SQUG documentation A208288-4 and SQUG documentation EN-DC-168 REV 0

ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet I of 4 1P2 Status: YE N-- UD--

Seismic Walkdown Checklist (SWC) SWELl-086 Equipment ID No. TE-122 Equip. Class1 19 Equipment Description EXCESS LETDOWN TEMP ELEMENT Location: Bldg. VCI Floor El. 46'-0" Room, Area Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one Y[- NZ of the 50% of SWEL items requiring such verification)?

The anchorage configuration verification is not required.

2. Is the anchorage free of bent, broken, missing or loose hardware? Y[Z NEi U-I N/A[-

The anchorageis free of bent, broken, missing and loose hardware.Temperature element is welded to pipe.

3. Is the anchorage free of corrosion that is more than mild surface YE NO U[-] N/A--

oxidation?

The anchorageis free of corrosion that is more than mild surface oxidation.

4. Is the anchorage free of visible cracks in the concrete near the YO'L NO uOl NIAN anchors?

Temperature element is welded to pipe.

1 Enter the equipment class name from EPRI 1025286, Appendix B: Classes of Equipment.

EN-DC-168 REV 0

ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 2 of 4 1P2 Status: YEE NE] UE7 Seismic Walkdown Checklist (SWC) SWELl-086 Equipment ID No. TE-122 Equip. Class1 19 Equipment Description EXCESS LETDOWN TEMP ELEMENT

5. Is the anchorage configuration consistent with plant documentation? YEI NEil U-I N/AZ (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
6. Based on the above anchorage evaluations, is the anchorage free of Y[ NEI ULi potentially adverse seismic conditions?

The anchorageis free of potentially adverse seismic conditions.

Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? YE N[-] ul-] N/A"-

Soft targets are free from impact by nearbyequipment and structures.

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YE NEr] UE] N/AE]

and masonry block walls not likely to collapse onto the equipment?

Overhead equipment, distributionsystems, ceiling tiles and lighting are not likely to collapse onto the equipment.

9. Do attached lines have adequate flexibility to avoid damage? YE NEl ur-] N/All Attached lines have adequate flexibility to avoid damage.
10. Based on the above seismic interaction evaluations, is equipment free Y[ NEl Ul]

of potentially adverse seismic interaction effects?

The equipment is free of potentially adverse seismic interaction effects.

EN-DC-168 REV 0

ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 3 of 4 IP2 Status: YZ NO- U[I Seismic Walkdown Checklist (SWC) SWELl-086 Equipment ID No. TE-122 Equip. Class' 19 Equipment Description EXCESS LETDOWN TEMP ELEMENT Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could Y[ NEI U[-]

adversely affect the safety functions of the equipment?

We have looked and found no otherseismic conditions that could adversely affect the safety fuctions of the equipment.

Comments (Additional pages may be added as necessary)

References:

Drawings and A WC Drawings: 9321-F-7028-46 (A201122), Rev 46, Containment building instrument arrangement-sheet no. 2 instrumentation.

A WC-041 Evaluated by: Maqgie Staub Date: 3/3/14 Kai Lo 3/3/14 EN-DC-168 REV 0

ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 4 of 4 IP2 Status: YE NEIl Ur-Seismic Walkdown Checklist (SWC) SWELl-086 Equipment ID No. TE-122 Equip. Class1 19 Equipment Descrption EXCESS LETDOWN TEMP ELEMENT Photographs Note: TE-122 Note: TE-122 EN-DC-168 REV 0

ATAHMENTI9of6 SEISMIC WALKDOWN CHECKLIST FORM Sheet I of 6 1132 Status: YE NEI UD Seismic Walkdown Checklist (SWC) SWELl-087 Equipment ID No. IPNL PP9 Equip. Class1 20 Equipment Description EDG 21 CONTROL PANEL Location: Bldg. EDG Floor El. 72-0" Room, Area Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one YO-- NE of the 50% of SWEL items requiring such verification)?

No, the anchorageconfigurationverification is not required.

2. Is the anchorage free of bent, broken, missing or loose hardware? YN NEI UI- N//A Internalanchorage was inspected during 21EDG A TO and internal anchoragewas inspected. See sheet 3.

External anchors where inspected and are free of bent, broken, missing or loose hardware.

R1

3. Is the anchorage free of corrosion that is more than mild surface YE NEJ uEJE N/AE1 oxidation?

No corrosionfound on extemal bolts. Internal bolts were inspected when panel was opened during 21EDG A TO.

4. Is the anchorage free of visible cracks in the concrete near the YZ NE] ULI N/AEl anchors?

Internal bolts were inspected when panel was opened. No visible cracks at extemal anchors during 21EDG A TO.

Enter the equipment class name from EPRI 1025286, Appendix B: Classes of Equipment.

EN-DC-168 REV 0

STAheet 2 of6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 2 of 6 IP2 Status: YE NEI UE-1 Seismic Walkdown Checklist (SWC) SWELl-087 Equipment IDe No. PNL PP9 Equip. Class1 20 Equipment Description EDG 21 CONTROL PANEL

5. Is the anchorage configuration consistent with plant documentation? YEI NEI UE-- N/AZ (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Not applicable since component is not part of the anchorage configuration verification.

6. Based on the above anchorage evaluations, is the anchorage free of Y[ NEI uE-potentially adverse seismic conditions?

RI Anchorage internalto cabinet was inspected during 21EDG ATO and there is no it is free of potentially adverse seismic conditions.

4-Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? YE NEI u[-] N/AE The 21EDG control panel has a side synch panel. The side synch panel is free to swing on hinge into 21EDG control panel. Restraint bracket on bottom of side panel is broken. Operationspersonnel reattachedand repairedrestraintbracket immediately in our presence. CR IP2-2012-6207 issued for trackingpurposes.

Swing of the side synch panel will be limited because the two nuts will act as a restraint.

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YE NEI uEr N/AE]

and masonry block walls not likely to collapse onto the equipment?

Yes overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls are not likely to collapse onto the equipment.

9. Do attached lines have adequate flexibility to avoid damage? Y[ NEI uE- N/AE Yes attachedlines have adequate flexibility to avoid damage.
10. Based on the above seismic interaction evaluations, is equipment free YN NEIuEl of potentially adverse seismic interaction effects?

Yes based on the above seismic interactionevaluations, the equipment is free of potentially adverse seismic interaction effects.

EN-DC-168 REV 0

ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 3 of 6 IP2 Status: YI NEI U-- RI Seismic Walkdown Checklist (SWC) SWELI-087 Equipment ID No. PNL PP9 Equip. Class1 20 Equipment Description EDG 21 CONTROL PANEL Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YE NEIl ULI adversely affect the safety functions of the equipment?

Yes we have looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment.

Comments (Additional pages may be added as necessary)

Panel on north end of #23 EDG control panel is missing I of 24 bolts. Bottom latch of #22 and #23 EDG control panel not lached. Operationspersonnel fixed issues on the spot in our presence. CR IP2-2012-06238 issued for tracking.

References:

Drawingsand AWC Drawings: 9321-H-2250, Rev 7, Diesel generatorbuilding general arrangementplan.

AWC-011 A bolt connecting the top cover panel to steel frame is missing a nut. Since the verticalseismic acceleration is less than 1.0, there is no uplift andjust shear. The remaining bolts will be adequate to restraintthe top cover panel in place. This condition is capturedby CR-IP2-2013-04549.

Slight surface rust was observed at the top panel bolt holes.

Evaluated by: Kai Lo Date: 11-12-2013 R1 John Skoniecznv , 11-12-2013 EN-DC-168 REV 0

SEISMIC WALKDOWN CHECKLIST FoRm Sheet 4 of 6 IP2 PhoTogACHMETs. Status: YZ NE] Ur] Ri Seismic Walkdown Checklist (SWC) SWELl-087 Equipment ID No. PNL PP9 Equip. Class' 20 Equipment Description EDG 21 CONTROL PANEL Photographs R1 Note: EDG 21 control panel showing side Synch panel that is free to swing.

EN-DC-168 REV 0

59of6 ATAHMENT SEISMIC WALKDOWN CHECKLIST FORM Sheet 5 of 6 IP2 Status: YN NMI- UI- Ri Seismic Walkdown Checklist (SWC) SWELl-087 Equipment ID No. PNL PP9 Equip. Class1 20 Equipment Description EDG 21 CONTROL PANEL Photographs Note: EDG 21 contrl panel anchorage Note: A bolt on the top coverpanel is missing a nut. Slight surface rust at the bolt holes.

EN-DC-168 REV 0

69of6 ATAHMENT SEISMIC WALKDOWN CHECKLIST FORM Sheet 6 of 6 IP2 Status: YE NrM U-E R1 Seismic Walkdown Checklist (SWC) SWELl-087 Equipment ID No. PNL PP9 Equip. Class' 20 Equipment Description EDG 21 CONTROL PANEL Photographs Note: Side synch panel of the 21EDG control Note: Side synch panel is restraintby the two Panel nuts during a seismic event and horizontal movement will be limited.

EN-DC-168 REV 0

ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet I of 4 IP2 Status: YZ NEI- U-il Seismic Walkdown Checklist (SWC) SWELl-101 Equipment ID No. 21AT Equip. Class1 21 Equipment Description 21 SIS ACCUMULATOR Location: Bldg. VC Floor El. 46'-0" Room, Area Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one YZ NE of the 50% of SWEL items requiring such verification)?

The anchorageconfigurationverification is required.

2. Is the anchorage free of bent, broken, missing or loose hardware? YE NE U[-- N/AE-The anchorageis free of bent, broken, missing or loose hardware.
3. Is the anchorage free of corrosion that is more than mild surface YZ NE U- N/AE--

oxidation?

The anchorageis free of corrosion that is more than mild surface oxidation.

4. Is the anchorage free of visible cracks in the concrete near the YN NE UEJ N/AE--

anchors?

The anchorageis free of visible cracks in the concrete near the anchors.

Enter the equipment class name from EPRI 1025286, Appendix 13: Classes of Equipment.

EN-DC-168 REV 0

ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 2 of 4 IP2 Status: YN NEI UI Seismic Walkdown Checklist (SWC) SWELl-101 Equipment ID No. 21AT Equip. Class' 21 Equipment Description 21 SIS ACCUMULATOR

5. Is the anchorage configuration consistent with plant documentation? Y[ NEI UEr N/AE-1 (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

The anchorage configurationis consistent with drawing 9321-01-2921-1.

6. Based on the above anchorage evaluations, is the anchorage free of YZ NiE U-I potentially adverse seismic conditions?

The anchorageis free of potentially adverse seismic conditions.

Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? YN NEI UIE N/AE-Soft targets are free from impact by nearby equipment or structures.
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YE NEI U[E1 N/ALL and masonry block walls not likely to collapse onto the equipment?

Overhead equipment, distributionsystems, ceiling tiles and lighting, and masonry block walls are not likely to collapse onto the equipment.

9. Do attached lines have adequate flexibility to avoid damage? YE NEI uE- N/All Attached lines have adequate flexibility to avoid damage.
10. Based on the above seismic interaction evaluations, is equipment free YE NEI UEl of potentially adverse seismic interaction effects?

Equipment is free of potentially adverse seismic interactioneffects.

EN-DC-168 REV 0

ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 3 of 4 IP2 Status: YZ Nil U--

Seismic Walkdown Checklist (SWC) SWELl-101 Equipment ID No. 21AT Equip. Class1 21 Equipment Description 21 SIS ACCUMULATOR Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YZ NDl U[-i adversely affect the safety functions of the equipment?

We have looked and found no otherseismic conditions that could adversely affect the safety functions of the equipment.

Comments (Additional pages may be added as necessary)

References:

Drawings and AWC Drawings: SIO 41042 Rev 6, IPP-2Accumulator tank A205745-11, Rev 11, Instrumentation.

MIC no. 1999MC3434 Rev 17A Containment building general arrangementplans sheet 3 9321-01-2921-1 AWC-038 Evaluated by: Maggie Staub Date: 3/3/14 S -"-- 3/3/14 Kai Lo EN-DC-168 REV 0

ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FoRM Shoet 4 of 4 IP2 Status: YE Nn Ur]

Seismic Walkdown Checklist (SWC) SWELl-101 Equipment ID No. 21AT Equip. Class1 21 Equipment Description 21 SIS ACCUMULATOR Photographs Note: 21 SIS Accumulator Note: 21 SIS Accumulator- anchorage EN-DC-168 REV 0

IP-RPT-12-00037 Rev. 1 ATTACHMENT K - DEFERRED AREA WALK-BY CHECKLISTS (AWCs)

ATTACHMENT 9.7 AREA WALK-BY CHECKLIST Sheet 1 of 4 Status: YN NI- UE-Area Walk-By Checklist (AWC) AWC- 037 Location: Bldg. CB Floor El. 53'-0 Room, Area 1 SWEL Components: SWELl -063, SWELl -064 Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.

1. Does anchorage of equipment in the area appear to be free of YN NEI UOL N/A-potentially adverse seismic conditions (if visible without necessarily opening cabinets)?

Anchorage appearsto be free of potentially adverse seismic conditions.

2. Does anchorage of equipment in the area appear to be free of YjE NOi UIE- N/A]

significant degraded conditions?

Equipment appearsto be free of significant degraded conditions.

3. Based on a visual inspection from the floor, do the cable/conduit YE NO EJlui N/A[L raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?

Cable/conduitraceways and HVAC ducting appearto be free of potentially adverse seismic conditions.

1 If the room in which the SWEL item is located is very large (e.g., Turbine Hall), the area selected should be described.

This selected area should be based on judgment, e.g., on the order of about 35 feet from the SWEL item.

EN-DC-168 REV 0

ATTACHMENT 9.7 AREA WALK-BY CHECKLIST Sheet 2 of 4 Status: YE NEI uEI Area Walk-By Checklist (AWC) AWC- 037 Location: Bldg. CB Floor El. 53'-0 Room, Area 1 SWEL Components: SWELl -063, SWELl -064

4. Does it appear that the area is free of potentially adverse seismic YZ NEI uEr N/A[E spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)?

All ceiling tiles are tied to the supportingframe.

5. Does it appear that the area is free of potentially adverse seismic YN N['] U-- N/AE-interactions that could cause flooding or spray in the area?

The areais free of potentially adverse seismic interactionsthat could cause flooding or spray.

6. Does it appear that the area is free of potentially adverse seismic YN NEI UE- N/AE[

interactions that could cause a fire in the area?

The area is free of potentially adverse seismic interactionsthat could cause a fire.

7. Does it appear that the area is free of potentially adverse seismic Y[E] NZ uE] N/AE-interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?

Observed a cart with equipment and cables near OPS Analog Channel No. I panel. The cart has four wheels that are not locked nor have wheel lock mechanism (see photos). Duringa seismic event, the cart may dislodge and strike nearbypanels such as supervisorypanel. This is addressedin CR-IP2-2014-01660.

EN-DC-168 REV 0

ATTACHMENT 9.7 AREA WALK-BY CHECKLIST Sheet 3 of 4 Status: YO NEIl UEI Area Walk-By Checklist (AWC) AWC- 037 Location: Bldg. CB Floor El. 53'-0 Room, Area 1 SWEL Components: SWELl -063, SWELl -064

8. Have you looked for and found no other seismic conditions that could YZ NEI- Uil adversely affect the safety functions of the equipment in the area?

We have looked and found no other seismic conditions that could adversely affect the safety functions of the equipment in the area.

Comments (Additional pages may be added as necessary)

Evaluated by: Maggie Staub A,`Zý Date: 317/14 Kai Lo 3/714 EN-DC-168 REV 0

ATTACHMENT 9.7 AREA WALK-BY CHECKUST Sheet 4 of 4 Status: YZ NEI ULM Area Walk-By Checklist (AWC) AWC- 037 Location: Bldg. CB Floor El. 53'-0 Room, Area1 SWEL Components: SWELl -063. SWELl-064 Photographs EN-DC-168 REV 0

ATTACHMENT 9.7 AREA WALK-BY CHECKLIST Sheet I of 4 Status: YE NOI U-I Area Walk-By Checklist (AWC) AWC- 038 Location: Bldg. VC Floor El. 46'-0 Room, Area1 SWEL Components: SWELl-101 Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.

1. Does anchorage of equipment in the area appear to be free of YO NEO UE- N/A[L]

potentially adverse seismic conditions (if visible without necessarily opening cabinets)?

The anchorageof equipment in the area appearsto be free of potentially adverse seismic conditions.

2. Does anchorage of equipment in the area appear to be free of Y[ NEI U[- N/A[l significant degraded conditions?

The anchorage of equipment in the area appears to be free of significant degraded conditions.

3. Based on a visual inspection from the floor, do the cable/conduit YN NEO ur] N/AEJ raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?

Cable/conduit raceways and HVAC ducting appearto be free of potentiallyadverse seismic conditions.

'If the room in which the SWEL item is located is very large (e.g., Turbine Hall), the area selected should be described.

This selected area should be based on judgment, e.g., on the order of about 35 feet from the SWEL item.

EN-DC-168 REV 0

ATTACHMENT 9.7 AREA WALK-BY CHECKLIST Sheet 2 of 4 Status: YE NEI UE-Area Walk-By Checklist (AWC) AWC- 038 Location: Bldg. VC Floor El. 46"-O Room, Area' SWEL Components: SWELl -101

4. Does it appear that the area is free of potentially adverse seismic YN NEI UE[ N/AE-spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)?

The area is free of potentially adverse seismic spatial interactionswith other equipment.

5. Does it appear that the area is free of potentially adverse seismic YE NEI UE- N/AE-interactions that could cause flooding or spray in the area?

The area is free of potentially adverse seismic interactionsthat could cause flooding or spray.

6. Does it appear that the area is free of potentially adverse seismic Y[ NEI ur N/AE-interactions that could cause a fire in the area?

The area is free of potentially adverse seismic interactionsthat could cause a fire.

7. Does it appear that the area is free of potentially adverse seismic YZ NEI uEr NIAE[

interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?

Observed temporary tools and scaffolding used for outage. These will be removed once outage is done based on Attachment 7 of procedure OAP-007. The scaffolding is noted to be well anchored. Therefore, the area is free of potentiallyadverse seismic interactionsassociatedwith housekeeping practices,storage of portable equipment, and temporary installations.

EN-DC-168 REV 0

ATTACHMENT 9.7 AREA WALK-BY CHECKLIST Sheet 3 of 4 Status: YZ Nil U[--

Area Walk-By Checklist (AWC) AWC- 038 Location: Bldg. VC Floor El. 46"-O Room, Area 1 SWEL Components: SWELl-101

8. Have you looked for and found no other seismic conditions that could YZ NEI UE]

adversely affect the safety functions of the equipment in the area?

Observed a cable tray support and u-bolt near equipment 21AT that have surface oxidation (seephotos). This is judged to be acceptable.

Therefore, We have looked and found no otherseismic conditions that could adversely affect the safety functions of the equipment in the area.

Comments (Additional pages may be added as necessary)

Evaluated by: Maggie Staub Date: 3/3/14 Kai Lo 3/3/14 EN-DC-168 REV 0

ATTACHMENT 9.7 AREA WALK-BY CHECKLIST Sheet 4 of 4 Status: YO NEI U" Area Walk-By Checklist (AWC) AWC- 038 Location: Bldg. VC Floor El. 46'-O Room, Area' SWEL Components: SWELl-101 Photographs Uaole tray supportnearz7 1o Accumulator EN-DC-168 REV 0

ATTACHMENT 9.7 AREA WALK-BY CHECKLIST Sheet 1 of 4 Status: YE NEI UE-Area Walk-By Checklist (AWC) AWC- 039 Location: Bldg. VC Floor El. 46'-0 Room, Area 1 SWEL Components: SWELl -003 Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.

1. Does anchorage of equipment in the area appear to be free of YE NEI UE] N/AE-potentially adverse seismic conditions (if visible without necessarily opening cabinets)?

The anchorageof equipment in the area appearsto be free of potentially adverse seismic conditions.

2. Does anchorage of equipment in the area appear to be free of YO NE] uE] N/AE]

significant degraded conditions?

The anchorage of equipment in the area appears to be free of significant degraded conditions.

3. Based on a visual inspection from the floor, do the cable/conduit YE NEI UE] N/A--

raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?

Cable/conduitraceways and HVAC ducting appearto be free of potentiallyadverse seismic conditions.

'If the room in which the SWEL item is located is very large (e.g., Turbine Hall), the area selected should be described.

This selected area should be based on judgment, e.g., on the order of about 35 feet from the SWEL item.

EN-DC-168 REV 0

ATTACHMENT 9.7 AREA WALK-BY CHECKLIST Sheet 2 of 4 Status: YE NDI UM Area Walk-By Checklist (AWC) AWC- 039 Location: Bldg. VC Floor El. 46"-O Room, Area 1 SWEL'Components: SWELl -003

4. Does it appear that the area is free of potentially adverse seismic YM NEI U0 N/ADl spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)?

The area is free of potentially adverse seismic spatial interactionswith other equipment.

5. Does it appear that the area is free of potentially adverse seismic YN NDJ UD1 N/AD interactions that could cause flooding or spray in the area?

The area is free of potentially adverse seismic interactionsthat could cause flooding or spray.

6. Does it appear that the area is free of potentially adverse seismic YZ N[-D UD1 N/AD interactions that could cause a fire in the area?

The area is free of potentially adverse seismic interactionsthat could cause a fire.

7. Does it appear that the area is free of potentially adverse seismic YE NDI UD- N/AD-interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?

Observed several temporary tools, scaffolding and loose flex conduits/cables (seephoto) being used for the outage. These would be removed once the outage is over as documented in Attachment 7 of procedure OAP-007. Therefore, the area is free of potentially adverse seismic interactions associatedwith housekeeping practices,storage of portable equipment, and temporary installations.

EN-DC-168 REV 0

ATTACHMENT 9.7 AREA WALK-BY CHECKLIST Sheet 3 of 4 Status: YN NEI UEI Area Walk-By Checklist (AWC) AWC- 039 Location: Bldg. VC Floor El. 46'-O Room, Area 1 SWEL Components: SWELl -003

8. Have you looked for and found no other seismic conditions that could YZ NI-] UI-adversely affect the safety functions of the equipment in the area?

Observed mild surface oxidation on a nut of a pipe support near 22A T (see photo). This is considered acceptable since its only surface oxidation.

Comments (Additional pages may be added as necessary)

Evaluated by: Maqqie Staub Date: 3/3/14 Kai Lo 3/3/14 EN-DC-168 REV 0

ATTACHMENT 9.7 AREA WALK-BY CHECKLIST Sheet 4 of 4 Status: Y0 NEI ur]

Area Walk-By Checklist (AWC) AWC- 039 Location: Bldg. VC Floor El. 46'-0 Room, Area' SWEL Components: SWELl-003 Photographs Note: pipe support near 22A T loose flex conduits & cables near 22AT EN-DC-168 REV 0

ATTACHMENT 9.7 AREA WALK-BY CHECKLIST Sheet 1 of 4 Status: YO NEI UEl Area Walk-By Checklist (AWC) AWC- 040 Location: Bldg. VC Floor El. 68'-0 Room, Area 1 SWEL Components: SWELl -083 Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.

1. Does anchorage of equipment in the area appear to be free of YE N[E U[-- N/A[--

potentially adverse seismic conditions (if visible without necessarily opening cabinets)?

The anchorage of equipment in the area appears to be free of potentially adverse seismic conditions.

2. Does anchorage of equipment in the area appear to be free of Y[ NEI U[:] N/AZ1 significant degraded conditions?

The anchorage of equipment in the area appears to be free of significantdegraded conditions.

3. Based on a visual inspection from the floor, do the cable/conduit YE NEJ UZ1 N/AZ-]

raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?

Cable/conduit raceways and HVAC ducting appear to be free of potentially adverse seismic conditions.

'If the room in which the SWEL item is located is very large (e.g., Turbine Hall), the area selected should be described.

This selected area should be based on judgment, e.g., on the order of about 35 feet from the SWEL item.

EN-DC-168 REV 0

ATTACHMENT 9.7 AREA WALK-BY CHECKLIST Sheet 2 of 4 Status: YE NEI UD-Area Walk-By Checklist (AWC) AWC- 040 Location: Bldg. VC Floor El. 68'-0 Room, Area' SWEL Components: SWELl -083

4. Does it appear that the area is free of potentially adverse seismic YE NEi ULi N/AD spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)?

The area is free of potentially adverse seismic spatialinteractionswith other equipment.

5. Does it appear that the area is free of potentially adverse seismic YN ND UD- N/AD interactions that could cause flooding or spray in the area?

The area is free of potentially adverse seismic interactionsthat could cause flooding or spray.

6. Does it appear that the area is free of potentially adverse seismic YS ND UDI N/AD interactions that could cause a fire in the area?

The area is free of potentially adverse seismic interactionsthat could cause a fire.

7. Does it appear that the area is free of potentially adverse seismic YZ NDI UD N/ADl interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?

Observed temporary tools and buckets near Rack 21 being used for the outage (see attached photo). These will be removed once the outage is done based on Attachment 7 of procedure OAP-007.

EN-DC-168 REV 0

ATTACHMENT 9.7 AREA WALK-BY CHECKLIST Sheet 3 of 4 Status: Y] NEI- ULI Area Walk-By Checklist (AWC) AWC- 040 Location: Bldg. VC Floor El. 68'-0 Room, Area1 SWEL Components: SWELl-083

8. Have you looked for and found no other seismic conditions that could Y[EN[:]UEJ adversely affect the safety functions of the equipment in the area?

We have looked and found no other seismic conditions that could adversely affect the safety functions of the equipment in the area.

Comments (Additional pages may be added as necessary)

Evaluated by: Maggie Staub Date: 3/5/14 Kai Lo 3/5/14 EN-DC-168 REV 0

ATTACHMENT 9.7 AREA WALK-By CHECKLIST Sheet 4 of 4 Status: YO Nil UE]

Area Walk-By Checklist (AWC) AWC- 040 Location: Bldg. VC Floor El. 68-0 Room, Area' SWEL Components: SWELl -083 Photographs Note: no photo EN-DC-168 REV 0

ATTACHMENT 9.7 AREA WALK-BY CHECKLIST Sheet I of 4 Status: YE NEI UEj Area Walk-By Checklist (AWC) AWC- 041 Location: Bldg. VC Floor El. 46"-O Room, Area1 SWEL Components: SWELl -086 Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.

1. Does anchorage of equipment in the area appear to be free of YE NO] U-- N/AE]

potentially adverse seismic conditions (if visible without necessarily opening cabinets)?

The anchorageof equipment in the area appears to be free of potentially adverse seismic conditions.

2. Does anchorage of equipment in the area appear to be free of YN NE] ur] N/AEI significant degraded conditions?

The anchorageof equipment in the area appears to be free of significant degradedconditions.

3. Based on a visual inspection from the floor, do the cable/conduit Y[ NE] uOl N/AE-raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?

Cable/conduitraceways and HVAC ducting appearto be free of potentially adverse seismic conditions.

'If the room in which the SWEL item is located is very large (e.g., Turbine Hall), the area selected should be described.

This selected area should be based on judgment, e.g., on the order of about 35 feet from the SWEL item.

EN-DC-168 REV 0

ATTACHMENT 9.7 AREA WALK-BY CHECKLIST Sheet 2 of 4 Status: YE NEI- U-I Area Walk-By Checklist (AWC) AWC- 041 Location: Bldg. VC Floor El. 46'-0 Room, Area 1 SWEL Components: SWELl -086

4. Does it appear that the area is free of potentially adverse seismic YZ N[E] UEI N/AE[

spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)?

The area is free of potentially adverse seismic spatialinteractionswith other equipment.

5. Does it appear that the area is free of potentially adverse seismic YO N[-- UEI N/A[--

interactions that could cause flooding or spray in the area?

The area is free of potentially adverse seismic interactionsthat could cause flooding or spray.

6. Does it appear that the area is free of potentially adverse seismic YZ NEI U[I N/AE1 interactions that could cause a fire in the area?

The area is free of potentially adverse seismic interactionsthat could cause a fire.

7. Does it appear that the area is free of potentially adverse seismic YN NEI U[-] N/AE-interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?

Temporary outage equipment and scaffolding were present and will be removed once outage is over. This is in accordance with Attachment 7 of procedure OAP-007.

The scaffolding was noted to be well anchored. Therefore, the area is free of potentially adverse seismic interactionsassociatedwith housekeeping practices,storage of portable equipment, and temporary installations.

EN-DC-168 REV 0

ATTACHMENT 9.7 AREA WALK-BY CHECKLIST Sheet 3 of 4 Status: Y[ NEI ULI--

Area Walk-By Checklist (AWC) AWC- 041 Location: Bldg. VC Floor El. 46-0 Room, Area 1 SWEL Components: SWELl -086

8. Have you looked for and found no other seismic conditions that could YN NEI UEI adversely affect the safety functions of the equipment in the area?

We have looked and found no otherseismic conditions that could adversely affect the safety functions of the equipment in the area.

Comments (Additional pages may be added as necessary)

Ref. SWELI-086 Evaluated by: Maggie Staub Date: 3/3/14 Kai Lo 3/3/14 EN-DC-168 REV 0

ATTACHMENT 9.7 AREA WALK-BY CHECKLIST Sheet 4 of 4 Status: Y[* NE] U[-I (AWC) AWC- 041 Area Walk-By Checklist Location: Bldg. VC Floor El. 46'-0 Room, Area 1 SWEL Components: SWELl -086 Photographs Note: no photo. Note: no photo No deficiencies were noted and no pictures were No deficiencies were noted and no pictures were required. required.

EN-DC-168 REV 0

ATTACHMENT 9.7 AREA WALK-BY CHECKLIST Sheet I of 4 Status: YZ NEI U-I Area Walk-By Checklist (AWC) AWC- 042 Location: Bldg. VC Floor El. 68'-0 Room, Area 1 SWEL Components: SWELl -052 Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.

1. Does anchorage of equipment in the area appear to be free of Y[I N[ U-- N/A[--

potentially adverse seismic conditions (if visible without necessarily opening cabinets)?

A vertical Unistrut member of a rack located between column 12 and 13 has a broken weld. The vertical Unistruton the left and right have good weld. The rack is lightly loaded with a multiple of 3/8" weld channel CS tubings, 1" conduit and 1.5" pipes. This condition is identified by CR-IP2-2014-01250.LB-15 evaluated this condition and determined that the 3/8" tubing (most critically stressed)is structurally adequate without the broken weld Unistrut.

Unistrutwas welded properlyprior to end of outage (W. . 00376005).

2. Does anchorage of equipment in the area appear to be free of YE] NO U[I] N/AL]

significant degraded conditions?

See item I

3. Based on a visual inspection from the floor, do the cable/conduit YE N[D UD- N/A[-]

raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?

Slight surface rust on pipe whip restraint'scable.

1 If the room in which the SWEL item is located is very large (e.g., Turbine Hall), the area selected should be described.

This selected area should be based on judgment, e.g., on the order of about 35 feet from the SWEL item.

EN-DC-168 REV 0

ATTACHMENT 9.7 AREA WALK-BY CHECKLIST Sheet 2 of 4 Status: YZ NEI UE]

Area Walk-By Checklist (AWC) AWC- 042 Location: Bldg. VC Floor El. 68'-0 Room, Area 1 SWEL Components: SWELl-052

4. Does it appear that the area is free of potentially adverse seismic YN NE] uE] N/AE-spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)?

The area is free of potentially adverse seismic spatial interactionswith other equipment in the area.

5. Does it appear that the area is free of potentially adverse seismic YZ NEI uEI N/AE]

interactions that could cause flooding or spray in the area?

The area is free of potentially adverse seismic interactionsthat could cause flooding or spray.

6. Does it appear that the area is free of potentially adverse seismic YZ NEI] uE N/AE]

interactions that could cause a fire in the area?

The area is free of potentially adverse seismic interactionsthat could cause a fire.

7. Does it appear that the area is free of potentially adverse seismic YN NE] UE] N/A-]

interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?

The inspection is performed during the RFO, so tools and various equipment are stored on the floor. These items will be removed per OAP-007. Being enclosed by a very rugged steel structure, the charcoalfilter room appearedto be used for storage.

EN-DC-168 REV 0

ATTACHMENT 9.7 AREA WALK-BY CHECKLIST Sheet 3 of 4 Status: YM NE* UE-Area Walk-By Checklist (AWC) AWC- 042 Location: Bldg. VC Floor El. 68'-0 Room, Area 1 SWEL Components: SWELI-052

8. Have you looked for and found no other seismic conditions that could YN NEI UI[]

adversely affect the safety functions of the equipment in the area?

We have looked and found no otherseismic conditions that could adversely affect the safety functions of the equipment.

Comments (Additional pages may be added as necessary)

1. The structural steel beam above has a burnt mark and appearedto be superficial, i.e. on the surface.
2. Service WaterProgram engineer wrote CR-IP2-2014-01478to identify surface rusting, loose and flaking exterior coating on the 3" supply and return piping spools between the 10" header and cooling coils.

Evaluated by: Kai Lo Date: 2-27-2014 Dan Nuta 2-27-2014 EN-DC-168 REV 0

ATTACHMENT 9.7 AREA WALK-BY CHECKLIST Sheet 4 of 4 Status: Y0 N[--] Ur-Area Walk-By Checklist (AWC) AWC- 042 Location: Bldg. VC Floor El. 68'-O Room, Area1 SWEL Components: SWELl -052 Photographs I I Noe: ournrmark on mie srrucruralsreel Deam IIULU.

Surface rust on the pipe whip cable restraint EN-DC-168 REV 0

ATTACHMENT 9.7 AREA WALK-BY CHECKLIST Sheet I of 4 Status: YE NEI U-Area Walk-By Checklist (AWC) AWC- 043 Location: Bldg. VC Floor El. 68'-0 Room, Area 1 SWEL Components: SWELl -053 Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.

1. Does anchorage of equipment in the area appear to be free of YO NE] uE- NIAE]

potentially adverse seismic conditions (if visible without necessarily opening cabinets)?

The area appears to be free of potentiallyadverse seismic conditions.

2. Does anchorage of equipment in the area appear to be free of YO~ NEI uE] N/A[:]

significant degraded conditions?

The area appears to be free of significant degradedconditions.

3. Based on a visual inspection from the floor, do the cable/conduit Y[ NEI u-- N/A[-

raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?

Cable/conduit raceways and HVAC ducting appearto be free of potentially adverse seismic conditions.

'If the room in which the SWEL item is located is very large (e.g., Turbine Hall), the area selected should be described.

This selected area should be based on judgment, e.g., on the order of about 35 feet from the SWEL item.

EN-DC-168 REV 0

ATTACHMENT 9.7 AREA WALK-BY CHECKLIST Sheet 2 of 4 Status: YN NEI U-I Area Walk-By Checklist (AWC) AWC- 043 Location: Bldg. VC Floor El. 68'-0 Room, Area 1 SWEL Components: SWELl -053

4. Does it appear that the area is free of potentially adverse seismic Y[E NE U-- N/A-spatial interactions with other equipment in the area (e.g., ceiling tiles and fighting)?

The area is free of potentially adverse seismic spatial interactionswith otherequipment in the area.

5. Does it appear that the area is free of potentially adverse seismic YN NE U[-- NIA-interactions that could cause flooding or spray in the area?

The area is free of potentially adverse seismic interactionsthat could cause flooding.

6. Does it appear that the area is free of potentially adverse seismic YN NE U- N/AE interactions that could cause a fire in the area?

The area is free of potentially adverse seismic interactionsthat could cause a fire.

7. Does it appear that the area is free of potentially adverse seismic Y[ NE U- N/AE-interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?

The inspection is performed during the RFO, so tools and various equipment are stored on the floor. These items will be removed per OAP-007. Being enclosed by a very rugged steel structure, the charcoalfilter room appearedto be used for storage.

EN-DC-168 REV 0

ATTACHMENT 9.7 AREA WALK-BY CHECKLIST Sheet 3 of 4 Status: YED NEI U--i Area Walk-By Checklist (AWC) AWC- 043 Location: Bldg. VC Floor El. 68'-0 Room, Area 1 SWEL Components: SWELl -053

8. Have you looked for and found no other seismic conditions that could YN NEi UI--]

adversely affect the safety functions of the equipment in the area?

We have looked and found no other seismic conditions that could adversely affect safety functions of the equipment.

Comments (Additional pages may be added as necessary)

1. Spots of wom out coating on the floor.
2. Loose nut on the floor, a house keeping issue.

Evaluated by: KaiLo Date: 2-27-2014 Dan Nuta 2-27-2014 EN-DC-168 REV 0

ATTACHMENT 9.7 AREA WALK-BY CHECKLIST Sheet 4 of 4 Status: YE NEI UI-Area Walk-By Checklist (AWC) AWC- 043 Location: Bldg. VC Floor El. 68'-0 Room, Area 1 SWEL Components: SWELl -053 Photographs Note: No photos. Note: No photos.

No deficiencies were noted and no pictures were No deficiencies were noted and no pictures were required. required.

EN-DC-168 REV 0

ATTACHMENT 9.7 AREA WALK-BY CHECKLIST Sheet I of 4 Status: Y] NEI U--

Area Walk-By Checklist (AWC) AWC- 044 Location: Bldg. VC Floor El. 68'-O Room, Area 1 SWEL Components: SWELl -054 Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.

1. Does anchorage of equipment in the area appear to be free of YE N[-] UEr N/A-]

potentially adverse seismic conditions (if visible without necessarily opening cabinets)?

Anchorage appears to be free of potentially adverse seismic conditions.

2. Does anchorage of equipment in the area appear to be free of YE NEI Ul-] N/Al]

significant degraded conditions?

Anchorage appears to be free of significantdegraded conditions.

3. Based on a visual inspection from the floor, do the cable/conduit Y[ NEI UE] N/A--

raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?

Cable/conduitraceways and HVAC ducting appearto be free of potentially adverse seismic condition.

'If the room in which the SWEL item is located is very large (e.g., Turbine Hall), the area selected should be described.

This selected area should be based on judgment, e.g., on the order of about 35 feet from the SWEL item.

EN-DC-168 REV 0

ATTACHMENT 9.7 AREA WALK-BY CHECKLIST Sheet 2 of 4 Status: YE NEIl U-I Area Walk-By Checklist (AWC) AWC- 044 Location: Bldg. VC Floor El. 68"-O Room, Area1 SWEL Components: SWELl -054

4. Does it appear that the area is free of potentially adverse seismic YZ NEI uEr N/A[-

spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)?

The area is free of potentially adverse seismic spatial interactionwith otherequipment in the area.

5. Does it appear that the area is free of potentially adverse seismic YE NEI UE] NIAE-'

interactions that could cause flooding or spray in the area?

The area is free of potentially adverse seismic interactionsthat could cause flooding or spray.

6. Does it appear that the area is free of potentially adverse seismic Y[Z NEI UEJ N/AEI interactions that could cause a fire in the area?

The area is free of potentially adverse seismic interaction that could cause a fire.

7. Does it appear that the area is free of potentially adverse seismic Y; NEI UE1 N/AE-interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?

Observed tools and scaffolding being used for the outage. These will be removed once the outage is over in accordancewith Attachment 7 or OAP-007. Therefore, no adverse seismic interaction.

Observed permanent scaffolding storage rack that has been previously evaluated. This has no adverse seismic interactions.

Observed a stainless steel wall liner not fully attached to the wall. This is documented in CR-IP2-2014-01023. This has no adverse seismic interaction. It is only a housekeeping matter.

EN-DC-168 REV 0

ATTACHMENT 9.7 AREA WALK-BY CHECKLIST Sheet 3 of 4 Status: YE NI Ul-i Area Walk-By Checklist (AWC) AWC- 044 Location: Bldg. VC Floor El. 68-0 Room, Area 1 SWEL Components: SWELl-054

8. Have you looked for and found no other seismic conditions that could YE NEI UE]I adversely affect the safety functions of the equipment in the area?

We have looked and found no other seismic conditions that could adversely affect the safety functions of the equipment.

Comments (Additional pages may be added as necessary)

Loose containment stainless steel linerpreviously addressedby the constructiongroup and wrote CR-IP2-2014-01128.

Evaluated by: Maggie Staub Date: 3/6/14 Kai Lo 3/6/14 EN-DC-168 REV 0

ATTACHMENT 9.7 AREA WALK-BY CHECKLIST Sheet 4 of 4 Status: YE NiJ UIM Area Walk-By Checklist (AWC) AWC- 044 Location: Bldg. VC Floor El. 68'-O Room, Area' SWEL Components: SWELl-054 Photographs Note: stainless steel wall topht Note:

Note: no photo wall EN-DC-168 REV 0

ATTACHMENT 9.7 AREA WALK-BY CHECKLIST Sheet I of 4 Status: YE NEI U[

Area Walk-By Checklist (AWC) AWC- 045 Location: Bldg. VC Floor El. 68'-O Room, Area 1 SWEL Components: SWELl -055 Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.

1. Does anchorage of equipment in the area appear to be free of YE NEI ULi N/ALl potentially adverse seismic conditions (if visible without necessarily opening cabinets)?

The anchorage in the areaappears to be free of potentially adverse seismic conditions.

2. Does anchorage of equipment in the area appear to be free of YO NEI U[-- N/All significant degraded conditions?

Anchorage appearsto be free of significantdegraded conditions.

3. Based on a visual inspection from the floor, do the cable/conduit YNI NDI U- N/AL-raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?

Cable/conduitraceways and HVAC ducting appearto be free of potentially adverse seismic conditions.

'If the room in which the SWEL item is located is very large (e.g., Turbine Hall), the area selected should be described.

This selected area should be based on judgment, e.g., on the order of about 35 feet from the SWEL item.

EN-DC-168 REV 0

ATTACHMENT 9.7 AREA WALK-BY CHECKLIST Sheet 2 of 4 Status: YN NEI U-'i Area Walk-By Checklist (AWC) AWC- 045 Location: Bldg. VC Floor El. 68-0 Room, Area 1 SWEL Components: SWELl -055

4. Does it appear that the area is free of potentially adverse seismic YN NEI U-I N/Al]

spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)?

The area is free of potentially adverse seismic spatialinteractions.

5. Does it appear that the area is free of potentially adverse seismic YE NEI UL- N/AE]

interactions that could cause flooding or spray in the area?

The area is free of potentially adverse seismic interactionsthat could cause flooding or spray.

6. Does it appear that the area is free of potentially adverse seismic YM NEI U[-- N/A['-

interactions that could cause a fire in the area?

The area is free of potentially adverse seismic interactionsthat could cause a fire.

7. Does it appear that the area is free of potentially adverse seismic YO NDI UE- N/A[D-interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?

Observed tools and equipment being used for the outage. These will be removed once the outage is over in accordancewith Attachment 7 of OAP-007.

EN-DC-168 REV 0

ATTACHMENT 9.7 AREA WALK-BY CHECKLIST Sheet 3 of 4 Status: YZ NEI UnI Area Walk-By Checklist (AWC) AWC- 045 Location: Bldg. VC Floor El. 68'-0 Room, Area1 SWEL Components: SWELl -055

8. Have you looked for and found no other seismic conditions that could YN NEl UEI adversely affect the safety functions of the equipment in the area?

We have looked and found no other seismic conditions that could adversely affect the safety functions of the equipment.

Comments (Additional pages may be added as necessary)

Observed piping that is rusted outside of 24CRF. This is being addressedin CR-IP2-2014-01654.This CR states that that this is a surface condition issue only and does not impact component or system pressure boundary, structuralintegrity, or design functions.

Evaluated by: Maggie Staub Date: 3/6/14 Kai Lo 3/6/14 EN-DC-168 REV 0

ATTACHMENT 9.7 AREA WALK-BY CHECKLIST Sheet 4 of 4 Status: YZ NEIL Ufl Area Walk-By Checklist (AWC) AWC- 045 Location: Bldg. VC Floor El. 68'-0 Room, Area1 SWEL Components: SWELl -055 Photographs Note: no photo EN-DC-168 REV 0

ATTACHMENT 9.7 AREA WALK-BY CHECKLIST Sheet I of 4 Status: YZ NEI U-I Area Walk-By Checklist (AWC) AWC- 046 Location: Bldg. VC Floor El. 68'-0 Room, Area 1 SWEL Components: SWELl -056 Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.

1. Does anchorage of equipment in the area appear to be free of YE N[E U[E] N/AE--

potentially adverse seismic conditions (if visible without necessarily opening cabinets)?

The anchorageof equipment in the areaappears to be free of potentially adverse seismic conditions.

2. Does anchorage of equipment in the area appear to be free of YO NEI UE1 N/AE]

significant degraded conditions?

The anchorageof equipment in the area appears to be free of significant degraded conditions.

3. Based on a visual inspection from the floor, do the cable/conduit YE NEI UE- N/AE-raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?

Cable/conduitraceways and HVAC ducting appearto be free of potentially adverse seismic conditions.

If the room in which the SWEL item is located is very large (e.g., Turbine Hall), the area selected should be described.

This selected area should be based 6n judgment, e.g., on the order of about 35 feet from the SWEL item.

EN-DC-168 REV 0

ATTACHMENT 9.7 AREA WALK-BY CHECKLIST Sheet 2 of 4 Status: YE NEO UI-Area Walk-By Checklist (AWC) AWC- 046 Location: Bldg. VC Floor El. 68'-0 Room, Area 1 SWEL Components: SWELl -056

4. Does it appear that the area is free of potentially adverse seismic YN NEI UE] NIAE]

spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)?

The area is free of potentially adverse seismic spatialinteractionswith other equipment.

5. Does it appear that the area is free of potentially adverse seismic YZ NEI UE] N/AE-interactions that could cause flooding or spray in the area?

The area is free of potentially adverse seismic interactionsthat could cause flooding or spray.

6. Does it appear that the area is free of potentially adverse seismic YZ NEI U[71 N/A[]

interactions that could cause a fire in the area?

The area is free of potentially adverse seismic interactionsthat could cause a fire.

7. Does it appear that the area is free of potentially adverse seismic YZ NEI U-- N/AE]

interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?

Observed tools being used for the outage. These tools are for temporary usage and will be removed once outage is over. This is in accordancewith Attachment 7 of procedure OAP-007. Therefore, the area is free of potentiallyadverse seismic interactionsassociatedwith housekeeping practices.

EN-DC-168 REV 0

ATTACHMENT 9.7 AREA WALK-BY CHECKLIST Sheet 3 of 4 Status: YZ NIO! UFl Area Walk-By Checklist (AWC) AWC- 046 Location: Bldg. VC Floor El. 68'-0 Room, Area 1 SWEL Components: SWELl-056

8. Have you looked for and found no other seismic conditions that could YZ N[-] UE[

adversely affect the safety functions of the equipment in the area?

Observed a checkered floor plate (at elevation 95, above) with several weld marks (see photos). The plate is judged to be acceptable.

Observed light surface oxidation on a U-bolt for a pipe support (see photos). This is judged to be adequate since its only surface oxidation.

Observed rusted piping with poor coating nearFCU #25 (see photo).

This has been already addressed in CR-IP2-2014-01596. The CR concluded that this is a surface condition issue only and does not impact component or system pressure boundary, structuralintegrity, or design functions.

Comments (Additional pages may be added as necessary)

Evaluated by: Macqqie Staub Date: 3/4/14 Kai Lo ___________________________________ 3/4/14 EN-DC-168 REV 0

ATTACHMENT 9.7 AREA WALK-BY CHECKLIST Sheet 4 of 4 Status: YO NEI UE' Area Walk-By Checklist (AWC) AWC- 046 Location: Bldg. VC Floor El. 68Q-0 Room, Area1 SWEL Components: SWELl -056 Photographs I Note: weld marks on checkered floor plate I rIO1e: ilgnr surface oxioarion on u-Doon Die: iignr surface oxicarion on u-oowr EN-DC-168 REV 0

ATTACHMENT 9.7 AREA WALK-BY CHECKLIST Sheet I of 4 Status: YE NEI U-Area Walk-By Checklist (AWC) AWC- 047 Location: VC Floor El. 46"-O Room, Area1 Bldg.

SWEL SWELl -033 Components:

Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.

1. Does anchorage of equipment in the area appear to be free of YN NEI uE-l N/AE-potentially adverse seismic conditions (if visible without necessarily opening cabinets)?

The anchorageof equipment in the area appearsto be free of potentiallyadverse seismic conditions.

2. Does anchorage of equipment in the area appear to be free of YN NEI uLIE N/AE-significant degraded conditions?

The anchorageof equipment in the area appearsto be free of significant degradedconditions.

3. Based on a visual inspection from the floor, do the cable/conduit Y[ NEI uE- NIA[-]

raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?

Cable/conduitraceways and HVAC ducting appearto be free of potentially adverse seismic conditions.

I If the room in which the SWEL item is located is very large (e.g., Turbine Hall), the area selected should be described.

This selected area should be based on judgment, e.g., on the order of about 35 feet from the SWEL item.

EN-DC-168 REV 0

ATTACHMENT 9.7 AREA WALK-BY CHECKLIST Sheet 2 of 4 Status: YN NEIl UD Area Walk-By Checklist (AWC) AWC- 047 Location: VC Floor El. 46"-O Room, Area 1 Bldg.

SWEL SWELl -033 Components:

4. Does it appear that the area is free of potentially adverse seismic YN NDI UD- N/ADl spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)?

The areais free of potentially adverse seismic spatial interactionswith other equipment in the area.

5. Does it appear that the area is free of potentially adverse seismic YE NDJ uD- N/AD-interactions that could cause flooding or spray in the area?

The areais free of potentially adverse seismic interactionsthat could cause flooding or spray.

6. Does it appear that the area is free of potentially adverse seismic YN NDI UD] N/AD-interactions that could cause a fire in the area?

The area is free of potentially adverse seismic interactionsthat could cause a fire

7. Does it appear that the area is free of potentially adverse seismic YM NDJ u[-D N/AD-interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?

Observed scaffolding in the area that seemed to be well anchored. The scaffolding is temporary and will be removed after the outage.

Therefore, the area is free of potentially adverse seismic interactions associated with housekeepingpractices, storage of portable equipment, and temporary installations.

EN-DC-168 REV 0

ATTACHMENT 9.7 AREA WALK-BY CHECKLIST Sheet 3 of 4 Status: YE NEI UL-I Area Walk-By Checklist (AWC) AWC- 047 Location: VC Floor El. 46"-O Room, Area 1 Bldg.

SWEL SWELl -033 Components:

8. Have you looked for and found no other seismic conditions that could YO N[l U-I adversely affect the safety functions of the equipment in the area?

We have looked and found no other seismic conditions that could adversely affect the safety functions of the equipment in the area.

Comments (Additional pages may be added as necessary)

Ref: SWELI-033 Evaluated *.

by: Maggie Staub Date: 3/3/14 Kai Lo 3/3/14 EN-DC-168 REV 0

ATTACHMENT 9.7 AREA WALK-BY CHECKLIST Sheet 4 of 4 Status: YN NEI] U[]

Area Walk-By Checklist (AWC) AWC- 047 Location: VC Floor El. 46'-0 Room, Area1 Bldg.

SWEL SWELl -033 Components:

Photographs Note: no photo Note: no photo No deficiencies were noted and no pictureswere No deficiencies were noted and no pictures were required. required.

EN-DC-168 REV 0

ATTACHMENT 9.7 AREA WALK-BY CHECKLIST Sheet I of 4 Status: YE NEIl ULI Area Walk-By Checklist (AWC) AWC- 048 Location: Bldg. VC Floor El. 68'-0 Room, Area' SWEL Components: SWELl-082 Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.

1. Does anchorage of equipment in the area appear to be free of Y[ NEI U-] N/AE]

potentially adverse seismic conditions (if visible without necessarily opening cabinets)?

Anchorage appears to be free of potentially adverse seismic conditions.

2. Does anchorage of equipment in the area appear to be free of YN NEI Ur N/AD-significant degraded conditions?

Anchorage of equipment in the area appearsto be free of significant degradedconditions.

3. Based on a visual inspection from the floor, do the cable/conduit YE NEI U[I N/AF-raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?

Cable/conduit raceway and HVAC ducting appearto be free of potentiallyadverse seismic conditions.

If the room in which the SWEL item is located is very large (e.g., Turbine Hall), the area selected should be described.

This selected area should be based on judgment, e.g., on the order of about 35 feet from the SWEL item.

EN-DC-168 REV 0

ATTACHMENT 9.7 AREA WALK-BY CHECKLIST Sheet 2 of 4 Status: YZ NEIl U-I Area Walk-By Checklist (AWC) AWC- 048 Location: Bldg. VC Floor El. 68'-0 Room, Area' SWEL Components: SWELl -082

4. Does it appear that the area is free of potentially adverse seismic YZ NEIl UL N/A[]

spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)?

The area is free of potentially adverse seismic spatial interactions.

5. Does it appear that the area is free of potentially adverse seismic YM NEIl UE- N/A-'

interactions that could cause flooding or spray in the area?

The area is free of potentially adverse seismic interactionsthat could cause flooding or spray in the area.

6. Does it appear that the area is free of potentially adverse seismic YEE NEIl UI N/AZl interactions that could cause a fire in the area?

The areais free of potentially adverse seismic interactionsthat could cause a fire in the area.

7. Does it appear that the area is free of potentially adverse seismic YN NZ-- U-I N/A[-]

interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?

Observed a bucket, small tools and gages on the floor. These are being used for the outage and will be removed at the end of the outage in accordancewith Attachment 7 or OAP-O07.

Observed a pipe (by column line 1) near Rack 19 with missing insulation. This causes no adverse seismic interactions.

EN-DC-168 REV 0

ATTACHMENT 9.7 AREA WALK-BY CHECKLIST Sheet 3 of 4 Status: YE NEI- UEi--

Area Walk-By Checklist (AWC) AWC- 048 Location: Bldg. VC Floor El. 68'-0 Room, Area 1 SWEL Components: SWELl -082

8. Have you looked for and found no other seismic conditions that could YE NEI ULIEI adversely affect the safety functions of the equipment in the area?

We have looked and found no otherseismic conditions that could adversely affect the safety functions of the equipment in the area.

Comments (Additional pages may be added as necessary)

Evaluated by: Maggie Staub Date: 3/5/14 Kai Lo 3/5/14 EN-DC-168 REV 0

ATTACHMENT 9.7 AREA WALK-BY CHECKLIST Sheet 4 of 4 Status: YO NEl UI-Area Walk-By Checklist (AWC) AWC- 048 Location: Bldg. VC Floor El. 68"0O Room, Area 1 SWEL Components: SWELl-082 Photographs Note: pipe %

Note: bucket and tools on floor Note: no photo EN-DC-168 REV 0

ATTACHMENT L - DEFERRED WALKDOWNS POTENTIALLY ADVERSE SEISMIC CONDITIONS Engineering Report No. IP-RPT-12-00037 Rev. 1 Page L1 of 8

  • 'LB #. SWC/AWC #: IDENTIF:"...

I EDm~m CONDITI.O...N

... ID."E.NT*I-."F'.." . .,.. °'.

.,:. LICENSING BASIS EVALUATION# " .. :"

o..-.,a.,,*;COCUSO ' i.*".=.RESOLUTION

RESOLUTION .". .. C.R# /STATUSi Initial Action: CR Generated - see status column During the walkdown of MCC 26AA, one handle is missing on a CR Operability Review:. No degraded or nonconforming cubicle, one handle cannot be turned, and unable to turn a few condition exists per EN-OP-104. I concur with the engineering SWELl-007 latches to open a few other cubicles. The cubicles that cannot be evaluation made at the time of the inspection that there is no CR-IP2-2014-01465 N/A (MCC-26AA) opened are mainly the spare ones. One the vertical wire trough, a Condition entered directly into CAP seismic or operability concerns with the conditions found. MCC- Closed red color plastic cover for the opening is not engaged fully. At the 26AA and the safety related valves and equipment fed from the bottom compartment, tie wraps and broken red plastic covers are MCC are operable. There is no IP-SMM-LI-108 immediate found in various places. reportability associated with this condition.

CR Action: WR# 333187 generated.

Initial Action: CR Generated - see status column Most of the compartment doors' cam-locks were found to be CR Operability Review: No degraded or nonconforming condition exists per EN-OP-104.The compartment door cam-SWELl-010 jammed. None of the spare compartment doors on the east side of locks that were found to be jammed do not affect the operation or CR-IP2-2014-01835 N/A (MCw-27A) the MCC could be opened. Fewer spare compartment doors' cam- Condition entered directly into CAP the operability of MCC-27A. MCC-27A is operable. There is no Closed locks were jammed on the west side. IP-SMM-LI-108 immediate reportability associated with this condition.

CR Action: WR# 00333883 Initial Action: CR Generated - see status column During the walkdown of MCC29, an abandoned conduit bushing CR Operability Review. There is no degraded or non-DurL-01I them akdound ofre hanging MCt an a found thconitmhng conforming condition in accordance with EN-OP-104 Rev 7. The SWELl-N1 found Sethe hangingcfrom a groundhwires withsa scrkeepingS compartmento un-used conduit and bushing do not challenge the ability of MCC CR-IP2-2014-1426 N/A (MCC-29) attached) The ground wire is attached and there are no other Condition entered directly into CAP 29 to perform its function of providing power to its associated Closed loads. The MCC 29 is functional. There is no immediate components within the vicinity of the bushing. reportability law IP-SMM-LI-108.

CR Action: The bushing should be removed when other works are to be performed on this MCC in the future. WR# 333130 During the walkdown of MCC-26C, the following issues were Initial Action: CR Generated - see status column identified:

- The panel covers of the two middle bottom compartments were CR Operability Review: No degraded or nonconforming SWELl-012 jammed and couldn't be open to inspect the anchors. The cam- condition exists per EN-OP-104. The cover plate that couldn't be lock may be defective. Condition entered directly into CAP opened and the missing cam-lock do not affect the operability of CR-IP2-2014-01604 N/A (MCC-26C) - Missing cam-lock on spare compartment MCC26C-4H. This is a MCC-26C. No immediate reportability required per IP-SMM-LI- Closed housekeeping matter that has no adverse affect on the safety 108.

functions of the equipment. The remaining cam-lock can provide adequate strength to keep the door closed.

CR Action: WR# 333438

ATTACHMENT L - DEFERRED WALKDOWNS POTENTIALLY ADVERSE SEISMIC CONDITIONS Engineering Report No. IP-RPT-12-00037 Rev. 1 Paae L2 of 8 LICENSING BASIS EVALUATION L. # SWCIAWC .. IDENTIFIED CONDITION ,RESOLUTION*

CONCLUSION '

....... _l_...... _ _. ....... .. . . . . . . . . . .... . .ll . ... ... l" ; ',t , .;, --. *-- " ""lll-".-*.... l ..... ... .. .. "

Initial Action: CR Generated - see status column During the walkdown of 21CRF and 22CRF, surface corrosion CR Operability Review: There is no degraded or non-were found in the following area: conforming condition law EN-OP-104 Rev 7. The condition SWELI-052

  • At all of the motor vibration isolator supports.

described is cosmetic in nature and does not challenge the N/A (0021CRF) Condition entered directly into CAP operability of the 21 and 22 FCU's. 21 and 22 FCU are operable. CR-IP2-2014-01405 I

  • The inside surface of the cooling coil discharge door.

There is no immediate reportability requirement in accordance Closed

  • Cooling coil intake panels, and the structuralattachments on the with IP-SMM-LI-108.

floor and adjacent to the door.

CR Action: Clean, prep and recoats surfaces to arrest further corrosion and degradation. WR# 333078 was initiated for the work.

Initial Action: CR Generated - see status column During the walkdown of 21CRF and 22CRF, surface corrosion CR Operability Review: There is no degraded or non-were found in the following area: conforming condition iaw EN-OP-104 Rev 7. The condition

  • At all of the motor vibration isolator supports. described is cosmetic in nature and does not challenge the CR-IP2-2014-01405 SWELl-053 (0022CRF)
  • The inside surface of the cooling coil discharge door. Condition entered directly into CAP operability of the 21 and 22 FCU's. 21 and 22 FCU are operable. Closed
  • Cooling coil intake panels, and the structural attachments on the There is no immediate reportability requirement in accordance N/A floor and adjacent to the door. with IP-SMM-LI-108.

CR Action: Clean, prep and recoats surfaces to arrest further corrosion and degradation. WR# 333078 was initiated for the work.

Initial Action: CR Generated - see status column CR Operability Review: Concur with engineer evaluation that the surface rust in chamber between the demister and fan inlet and fan motor supports poses no threat to structural integrity of 22 FCU fan housing. It will not affect the operation of 22 FCU or During PEO inspection under WO 323344, the 22 FCU chamber challenge its ability to remove heat from containment during between the demister and fan inlet showed signs of rust and normal operation and post accident conditions.22 FCU remains CR-IP2-2014-01153 SWELl -053 corrosion on the walls, supports and fan motor. Rust and operable. There is no IP-SMM-LI-108 immediate reportability Closed N/A (OO22CRF) corrosion observed is surface only and poses no threat to Condition entered directly into CAP associated with this condition.

structural integrity of 22 FCU fan housing or frame. There are no operability or functionality concerns at this time. CR Action: Clean, prep and repaint surfaces inside 22 FCU to prevent further corrosion and degradation. Initiated WR# 332661 and informed Engineering Supervision

ATTACHMENT L - DEFERRED WALKDOWNS POTENTIALLY ADVERSE SEISMIC CONDITIONS Engineering Report No. IP-RPT-12-00037 Rev. 1 Page L3 of 8 LB... SWI.... .. * .. .:"* ' LICENSING BASIS EVALUATION RES.LUTION 113 SCAC#IDENTIFIED CONDITION CONCLUSION REOUTO During PEO inspection under WO 323329, the 22 FCU discharge Initial Action: CR Generated - see status columnCR-P2-2014-01154 SWELl-053 air expansion joint was discovered to have two tears. These tears CR Operability Review: Concur with engineer evaluation that Closed (0022CRF) were approximately 2 inch by 1 inch. This expansion joint is the relatively small size of the holes will not affect the operation of located on top of 22 FCU directly downstream of FCV-22. Based 22 FCU or challenge its ability to remove heat from containment N/A on the relatively small size of the holes, this should not affect the Condition entered directly into CAP during normal operation and post accident conditions. 22 eCU operation of 22 FCU or challenge its ability to remove heat from remains operable. There is no IP-SMM-LI-108 immediate containment durng normal operation and post accident condition. reportability associated with this condition.

CR Action: Replace 22 FCU discharge air expansion joint.

Initiated WR# 332660 and informed Engineering Supervision.

Initial Action: CR Generated - see status column CR Operability Review: No degraded or nonconforming The 23 FCU (23CRFCC) Service Water 3" supply and retumn condition exists per EN-OP-104. Based on the evaluation made piping spools between the 10" headers and cooling coils are by engineering, this is a surface condition issue only and does piping spoolsabaetween por 1 eadersiaconditem noio g ls,bared not impact component or system pressure boundary, structural carbon steel and are in poor material condition extemally, based integrity, or design functions; therefore. This condition does not 054 on visual inspection after insulation removal. All have signicant make #23 FCU inoperable. No immediate reportability required CR-P2-20141653 N/A (0023CRF) surface rusting and loose & flaking exterior coatings. Ref. 1P2 Cdierdrcyn APr-M L1 Dwg. # 208105. This is a surface condition issue only and does Condition entered directly into CAP per IP-SMM-LI-108. Closed not impact component or system pressure boundary, structural CR Action: Although the piping is normally insulated, the integrity, or design functions. See CR-IP2-2014-01478 for similar exteriors should be prepped and recoated to mitigate further conditions found in 2R21 at the 21 ECU, and see CR-1P2-2014- rusting and generation of debris in the VC. This can be done at a 01596 for the 25 ECU. later date, and does not need to be performed in 2R21. WR#

00333617 was initiated for the work.

During the walkdown of 23 and 24 CRE, the following was Considering the remaining 13 bolts, the bolts are Initial Action: CR Generated - see status column Sobserved:

" *In the 24CRF HEPA outlet compartment, the anchor bolts evaluated for differential pressure and Design connecting the panel to the crane wall has only 13 bolts out of Basis Earthquake. Bolt shear interaction is 0.34 CR Operability Review: No Degraded or Nonconforming 20 holes. 7 bolts are broken inside the hole. By comparison with which is less than 1. Therefore, the condition Condition exists per EN-OP-104. As described by the CR 23CRF, the total number of anchor bolts should be 16. This 3 meets the design basis. originator, civil engineering evaluated the missing bolts for 24 SWELl-055 bolts deficiency was evaluated and the current condition is FCU and determined that there are sufficient fasteners remaining LB-17 structurallyto adequate (24CR) generated restore to and meets original designthecondition.

design criteria. WR is to FCUprovide even structural during a integrity seismic of the panel event. and wire Therefore, 24 screen on 24 FCU remains CR-1P2-2014-01662 Closed

" The wire screen in front of the fan is missing one of the three Condition entered directly into CAP operable. No immediate reportability required per IP-SMM-LI-108.

screws. The weight of the screen is estimated to be less than 10 pounds. The remaining two screws are sufficient to hold the CR Action: WR# 00333563 screen in place during a seismic event.

ATTACHMENT L - DEFERRED WALKDOWNS POTENTIALLY ADVERSE SEISMIC CONDITIONS Engineering Report No. IP-RPT-12-00037 Rev. 1 Paoe L4 of 8 LICENSING BAI VAUTO L0-7SWCJAWC iDENTIIED IONIED CONDITION ' ".. 0 . .VN RESOLUTION .CR /S*.TATUS

.. . . . .CONCLUSION *. 5." ...

During the walkdown of 118 VAC Instrument Bus 21, the following Initial Action: CR Generated - see status column items are observed:

" Observed red screen door inside the supervisory panel that was CR Operability Review: The issues identified by the author not fully secured. During a seismic event, the door may move have been addressed and no longer pose a challenge. The and strike the sensitive equipment inside the panel. It was affected components required to support entry into Mode 6 are indicated that the door will be placed back into its original operable. There is no immediate reportability iaw IP-SMM-LI-1 08.

SWELl-063 location and secured once the work on a specific component is NIA (IBUS21) done. A minimum of two bolts should be used to restrain the Condition entered directly into CAP CR Action: WR# 00333558 CR-IP2-2014-01660 door. Closed

" Observed a portable light fixture with cord resting on the floor inside the supervisory panel. During a seismic even, the light fixture may move and strike nearby sensitive equipment.

" Observed a broken and bent plastic wireway inside SL compartment of the supervisory panel. This is a housekeeping matter that has no adverse affect on the safety function of the equipment.

Initial Action: CR Generated - see status column CR Operability Review: No degraded or nonconforming condition exists per EN-OP-104 Revision 6 Attachment 9.1 Table

1. The identified condition is that one of several Cabinet nuts is missing, which does not adversely affect the operation of a safety EWEL1-076 During the seismic walkdown of 21EDG Control Panel, a screw relatedisSSC.

there In accordance no seismic with the operability input for concern fromthis Civilscrew Engineering, that is N/A '0O21EDG' conectising nthuppobervpael wto aint'orampeed the is missingant the uppecoer ntu.connecting Condition enteredpanel to into directiy thecotl CAPcabinet' connecting the upper cover panel to the control cabinet becauseisig because CR-1P2-201 3-04549 The

' ' missing nut was observed with the door opened and looking there is no vertical uplift for this EDG building elevation during a Closed seismic event. The screw can still resist the horizontal seismic force. The existing condition is structurally acceptable and therefore does not impact the operability of the EDGs. SMM-LI-108 reporting is not required.

CR Action: WR# 00323933 Initial Action: CR Generated - see status column CR Operability Review: No Degraded or Nonconforming Durng the walkdown and inspection of the cabinets attached to Condition exists per EN-OP-104 rev 6 Attachment 9.1 Table 1. As stated in the condition description, the missing screw for the the 22EDG, one out of three screws was found missing on thecoeon2ED aiprsueggedsntrpeeta SWEl-077 Diesel Air Pressure Gauge mounting (located on the lower right cover on 22 EDG air pressure gauge does not represent a 077 seismic challenge to the mounting or structure of the gauge or CR-IP2-2013-02336 N/A (0022EDG) side of the gauge board cover) when the cover was opened. There Condition entered directly into CAP gauge panel. The remaining two screws are capable of Closed is no past or present operability issue because the other two the reurelodseendrngasesideet remaining screws appear to be tight and have sufficient structural supporting the required loads even during a seismic event.

capacity to restraint the PI dudng a design basis event. Additionally, the described screw has been replaced and the Furthermore thes EDG22 is in AOT. panel is now held in place by three screws. Therefore, this condition does not impact the operability of 22 EDG. 22 EDG remains in an AOT for other maintenance work. Reference LCO tracking 2-TS-13-2051. No immediate reportability required per I I_ I IP-SMM-LI-108.

ATTACHMENT L - DEFERRED WALKDOWNS POTENTIALLY ADVERSE SEISMIC CONDITIONS Engineering Report No. IP-RPT-112-00037 Rev. 1 Paae L5 of 8 LICENSING BSIS EVALUATION * " *. . ... ... *

  • LB #> SWCIAWC# IDENTIFIED CONDITION NGCBASISOVLUTO COICNS RESOLUTO CR5 /STATUS CR Action: Get a new screw and fix it now while the EDG is in AOT to maintain the 3 screws mounting configuration. WR#

310832 was initiated for the work.

Initial Action: CR Generated - see status column CR Operability Review:. No degraded or nonconforming condition exists per EN-OP-104 Revision 6 Attachment 9.1 Table

1. The loose light socket does not challenge the function of 23 EDG Lube Oil Heater nor the operability of 23 EDG. 23 EDG is currently out of service for planned maintenance. This is not During an engineering walkdown of 23 EDG, an indicating light immediately reportable per IP-SMM-LI-108.

N/A SWEL1-078 (0023EDG) socket Afloating ini-panel flaigin 23 its EDG Auxiliary respective panel hole.was found unmounted pnlhe.heidctglihisabedCondition The indicating light isand free labeled entered directly into CAP No 6.

rev degraded The lightor for nonconforming condition 23 Lube Oil Heater exists is for per EN-OP-104 indication only and Closed COP2-2013-04158 "Power Available 23 Lube Oil Heater" and is in the right most does not perform any control functions. The "floating" light is position. The socket appears broken and may need mplacement. secured to the back of the panel using a plastic bracket approximately 6" from the socket. During a seismic event the light would be free to move within the socket, but would not come free from the panel, would not impact any equipment which performs a safety-related function and is too light to break free from its bracket. 23 EDG is operable. This is not immediately reportable per IP-SMM-LI-108.

CR Action: WR# 00321339 was initiated for the work.

Initial Action: CR Generated - see status column CR Operability Review:. No degraded or nonconforming condition exists per EN-OP-104. The current anchorage of During walkdown of Instrument Rack 19, the anchorage Calculation 42100-C-002 does not consider a Instrument Rack 19 was evaluated and there were no operability configuration does not match the information shown on drawing reduction factor for cracked concrete. A reduction issues. The drawings need to be updated to match the current SWEL1-082 9321-F-7051. The SOUG SEWS for Rack 19 referred to factor of 0.75 was used to compute a new plant condition of Rack 19. This condition does not make Rack 19 LB-16 (INST RK 19) calculation 42100-C-002 that evaluated the as built condition of interaction ratio. The interaction ratio (with the or the safety related instruments housed in the rack inoperable. CR-P2-2014-01607 Rack 19, consequently the as built condition was analyzed and reduction factor) is 0.637. This is still less tha No immediate reportability required per IP-SMM-LI-108.

there is no operability issue. and the bolts are acceptable. CR Action: Drawing 9321-F-7051 needs to be updated to show the actual configuration in the plant. CA# 2 was initiated for drawing update.

Initial Action: CR Generated - see status column During the walkdown of 118 VAC Instrument Bus 21, the following items are observed: CR Operability Review. The issues identified by the author Observed a cart with equipment and cables near OPS Analog have been addressed and no longer pose a challenge. The N/A AWC-037 Channel No. 1 panel. The cart has four wheels that are not Condition entered directly into CAP affected components required to support entry into Mode 6 are CR-IP2-2014-01660 locked nor have wheel lock mechanism. During a seismic event, operable. There is no immediate reportability jaw IP-SMM-Li-108. Closed the cart may dislodge and strike nearby panels such as supervisory panel. CR Action: WR# 00333558

ATTACHMENT L - DEFERRED WALKDOWNS POTENTIALLY ADVERSE SEISMIC CONDITIONS Engineering Report No. IP-RPT-12-00037 Rev. 1 Paoe L6 of 8 q , LICENSING BASIS EVALUATION 3/4 S LB # SWC.AWC IDENTIFIED CONDITION CONCLUSION RESOLUTION CR8ISTATUS The 21 FCU Service Water 3" supply and return piping spools Initial Action: CR Generated - see status column CR-lP2-20141478 between the 10" headers and cooling coils are carbon steel and CR Operability Review: No degraded or nonconforming Closed are in poor material condition externally. All have significant condition exists per EN-OP-104. I concur with engineering that surface rusting and loose & flaking exterior coatings. See this is a surface condition issue only and does not impact AWC-042 attached photos. Ref. IP2 Dwg. # 208105. This is a surface component or system pressure boundary, structural integrity, or condition issue N/A only and doesintgriy, resureboudar, srucura not impact component r dsig or system fuctins.design Condition entered directly into CAP functions. Therefore #21 FCU is operable. There is no IP-pressure boundary, structural integrity, or design functions. SMM-LI-108 immediate reportability assodated with this condition.

CR Action: Although the piping is normally insulated, the exteriors should be prepped and recoated to mitigate further rusting and generation of debris in the VC.

Initial Action: CR Generated - see status column CR Operability Review. Engineering has evaluated the During the Fukushima Seismic walkdowns of the areas nearby condition as follows:

FCU 21 and FCU 22, in the VC, Elev. 68', it was observed that ar The unistrut frame structure has one weld broken. As stated in The maximum computed stress is 19,879 psi which the condition report that the balance of the unistrut frame unistrut support part of a frame located between steel Column 12 is 10% above the allowable stress for OBE loading, members are properly supported and component supported from attached pictures of the area. As part of our immediate The is acceptable since the unistrut with the broken the structure have adequate support as assessed in the field. It assessment in 'the field, we observed that the balance of the weld was conservatively assumed to be ineffective is also stated in the condition report description that the support LBiaWnstsutsframent membiers, ae properldsothed baanconder in carrying any loads while there is another structure is seismically sufficient and will not be labeled as a CR-IP2-2014-01250 LB-15 AWC-t42 unistrut frame members are properly supported and considesrng horizontal unistrut connecting it to the adjacent deficiency. This unistrut structure is supported against the Closed frame, consisting mostly of some pipes and tubing, e tbelbe along andthe unistrutwith a multimode factor of 1.5 was used containment outer wall and supporting only small bore tubing and peak response accelerations with piping for the Weld Channel Pressurization System. Based on defidency as not seismically significant, the condition needs to be 0.5% damping. The 0.5% damping is consider very this, the support structure is considered to be performing its assessed and the deficient weld should be repaired as soon as higher low forthepiping and spectral response lower damping value lead to accelerations. design function.

possible to preclude further degradation and restoration to the Therefore, No degraded or nonconforming condition exists per original design condition. EN-OP-104 Revision 7 Attachment 9.1 Table 1. SMM-LI-108 reporting is not required.

CR Action: The unistrut weld was repaired.

Initial Action: CR Generated - see status column CR Operability Review:. N/A N/A AWC-044 Safety Concern U# 2: 68' VC opposite the # 23 FCU motor area, a CR-IP2-2014-01128 section of SS liner sheet metal was found to be peeling away from Closed the wall; we taped the issue back in-place. A possible cut hazard.

CR Action: The taping of this sheet will be easily identifiable.

N/A AWC-0444 Metal liner on 68' between columns 6 and 7 has a corner pulling Condition entered directly into CAP Initial Action: CR Generated - see status column CR-IP2-2014-01023

______ I_away from the wall. ISee resolution column I___________________I________ Closed

ATTACHMENT L - DEFERRED WALKDOWNS POTENTIALLY ADVERSE SEISMIC CONDITIONS Engineering Report No. IP-RPT-12-00037 Rev. 1 Page L7 of 8 LB:***.....:!*!* *"!*i L8fSWCIAWC SIDENTIFIED * "* * ...CONDITION

    • ....*  :*K ~~~~~LICENSING BASIS EVALUATION
..**.!I
*I,...CONCLUSION CONCLUS ION :ii i*ii,!

RSLTO EOUIN . R;SAU CR Operability Review: No Degraded or Nonconforming Condition exists per EN-OP-104. Based on the below input from civil engineering, the identified conditions do not impact the structural integrity of the steel liner or the containment building.

Therefore the vapor containment system remains operable. No immediate reportability required per IP-SMM-LI-108.

During tours of the VC at the start of 2R21, Operations identified an additional area of liner insulation that is degraded on the 68' elevation of the VC behind column 7. This area has been added to WO 308669.

This condition is not an immediate operability issue as the insulation is not structural and their sole design basis function is to protect the liner from hot liquid due to possible high energy line breaks and provide a vapor barrier against possible flooding of the 46' elevation. The identified insulation degradation is minor and represents a very small percentage of the insulation coverage, and, as a result, the identified degradation will not adversely affect the design function of the steel liner.

CR Action: Fix liner. Reference WO# 308669 Initial Action: CR Generated - see status column The 24 FCU (24CRFCC) Service Water 3" supply and return CR Operability Review. No degraded or nonconforming piping spools between the 10" headers and cooling coils are condition exists per EN-OP-104. Based on the evaluation made carbon steel and are in poor material condition externally, based by engineering, this is a surface condition issue only and does on visual inspection after insulation removal. All have significant not impact component or system pressure boundary, structural surface rusting and loose & flaking exterior coatings. Ref. IP2 integrity, or design functions; therefore, this condition does not N/A AWC-045 Dwg. # 208105. This is a surface condition issue only and does ion entered directly into CAP make #24 FCU inoperable. No immediate reportability required CR-IP2-2014-01654 not impact component or system pressure boundary, structural Condit per IP-SMM-LI-108. Closed integrity, or design functions.

CR Action: Although the piping is normally insulated, the Similar conditions have been found in 2R21 at the 21 FCU (CR- exteriors should be prepped and recoated to mitigate further IP2-2014-01478), 23 FCU (CR-IP2-2014-01653), and 25 FCU rusting and generation of debris in the VC. This can be done at a (CR-IP2-2014-01596). later date, and does not need to be performed in 2R21. WR#

00333616 was initiated for the work.

Initial Action: CR Generated - see status column piping spools and3"cooling The 25 FCU Service Water supplycoils and are return carbon steel and CR Operability Review. No degraded or nonconforming between the 10" headers are in poor material condition externally. All have significant condition exists per EN-OP-104. I concur with the evaluation N/A AWC-046 surface rusting and loose & flaking exterior coatings. Ref. IP2 made by engineering that this is a surface condition issue only CR-IP2-2014-01596 Dwg. # 208105. This is a surface condition issue only and does and does not impact component or system pressure boundary, Closed not impact component or system pressure boundary, structural structural integrity, or design functions. This condition does not integrity, or design functions. See CR-IP2-2014-01478 for similar make #25 FCU inoperable. No immediate reportability required conditions found at the 21 FCU in 2R21. per IP-SMM-LI-108.

ATTACHMENT L - DEFERRED WALKDOWNS POTENTIALLY ADVERSE SEISMIC CONDITIONS Engineering Report No. IP-RPT-12-00037 Rev. 1 Pane 18 nf 8v LE# SWC.IAWC # ~ IDENTIFIED CONDITION'. LI ONSI B SIS VLATONESLTO CONCLUS N......... ...... S.L.TO...

CR# ISTATUS CR Action: Although the piping is normally insulated, the exteriors should be prepped and recoated to mitigate further rusting and generation of debris in the VC. This can be done at a later date, and does not need to be performed in 2R21. WR#

00333554 was initiated for the work.

Thneactuai number or boo noles is 28.

Prepared by: Magpie Staub Date: 3/14/14 Reviewed by: Kai Lo ý--I_-- Date: 3/14/14

ATTACHMENT M - DEFERRED WALKDOWNS LICENSING BASIS EVALUATION FORMS Engineering Report No. IP-RPT-12-00037 Rev. 1 Page M-1 or 5 ATTACHMENT 9.9 LICENSING BASIS EVALUATION FORMS AND INSTRUCTIONS Sheet 1 of 3 Licensing Basis (LB) Evaluation Form LB Evaluation No. 15 Originating SWC/AWC AWC-42 Equipment ID No. SWELl-052 Equip. Class 10 Equipment Description Containment Recir Fan 21 Location: Bldg. Vc Floor El. 68' Room, Area Condition A vertical Unistrut channel support for a 3/8" Weld Channel tubing has a cracked weld.

Although the Unistrut top weld is intact, inferring the Unistrut will provide vertical and lateral resistance, conservatively, the support shall be considered totally ineffective. As a result, the support span is changed from 6' to 11'-10" in this evaluation. There are many tubings and pipes on this Strut, but the 3/8" tubing is the most critical by comparison because of its small diameter and wall thickness.

Documents Reviewed Specification 9321-01-248-18 Drawing 9321-F-70.33 Licensing Basis

1. ALTRAN Report 92128-TR-01
2. UFSAR
3. 1955 & 1973 831.1 Power Piping Code Evaluation Sh allowable stress of CS tubing = 15000 psi E modulus of elasticity = 2.79E+07 psi gravitational constant = 386.4

- --design pressure L50 psi Gh peak 0.5% seismic acceleration at VC EL. 68' 1.A2 Gv 1.213 mrm = multi-modal response multiplier 1.5 t = wall thickness = 0.035 In

0) outside diameter = 0.375 in d = inside diameter = D-2t = 0.305 ill

ATTACHMENT M - DEFERRED WALKDOWNS LICENSING BASIS EVALUATION FORMS Engineering Report No. IP-RPT-12-00037 Rev. 1 Page M-2 or 5 L = tubing span = 142 in 0.75i = 1.0 I = moment of inertia = 0.0491(D4 - d 4] = 0.000546 in" Z = section modulus = 0I0(.5D) = 0.002912 in' w = uniform weight of tubing (N 2 inside) = 0.1271 plf= 0.01059 #/in cons..

fý = natural frequency for fix -fix beam = 4 22.4/(2n)[Elg/wL 1 = 4.11 Hz M= bending moment based on fix-fix end condition =wL'/12 = 17.80 in-lb For dead weight loading:

M,/Z = 6111 psi PD/(4t) = 402 psi PD/(4t) + 0.75i(MJZ) = 6512 psi <Sh = 18750 psi For DBE loading:

20 5 Gr = mrm(Gh 2 + Gv ) = 3.28 Mb = Gr(Ma) = 58.4 in-lb PD/(4t) + 0.75i(Ma+Mb)/Z = 26562 psi < 1.8Sh = 27000 psi For OBE loading Mb = 2/3(DBE Mb) = 38.93 in-lb PD/(4t) + 0.75i(M,+Mb)/Z = 19879 psi > 1.2Sh= 18000 psi There is a 10% overstress for the OBE loading case. The 10% exceedance is acceptable as: (1) unistrut with broken weld was conservatively assumed to be ineffective in carrying any loads, while there is another horizontal Unistrut connecting it to the adjacent Unistrut; (2) the multimode factor of 1.5 is conservative, using the peak of both the vertical and horizontal spectra is conservative, and (4) the 0.5% damping ratio is very low for piping.

Conclusion (8) Condition Meets the Licensing Basis: Z Yes E No Prepared by: Kai Lo Z ,. Date 3-1-2014 Licensing Basis Reviewer Reviewed by: Toi, kolzA e - Date 3-1-2014 Oeer~Rviewer

ATTACHMENT M - DEFERRED WALKDOWNS LICENSING BASIS EVALUATION FORMS Engineering Report No. IP-RPT-12-00037 Rev. 1 Page M-3 or 5 ATTACHMENT 9.9 LICENSING BASIS EVALUATION FORMS AND INSTRUCTIONS Sheet 1 of 3 Licensing Basis (LB) Evaluation Form LB Evaluation No. 16 Originating SWC/AWC SWELl-082 Equipment ID No. INST RK 19 Equip. Class 18 Equipment Description Instrument Rack 19 Location: Bldg. VC Floor El. 68' Room, Area Condition Two anchor bolts has concrete crack 2" and 3" away from the bolt. The calculation for the anchorage does not take into account of the crack reduction factor. The two bolts need to be re-revaluated for the concrete crack.

Documents Reviewed

1. SEWS INST RK 19
2. EQE Calculation 42100-C-002 (INST RK 21)

Licensing Basis

1. Safety factor = 4 for expansion anchor
2. Hilti Report No. 878.3R
3. Linear interaction for combine tension and shear Evaluation Based on the conservative values from Calculation 42100-C-002 T = tension at bolt = 313#

S = shear at bolt = 111#

Interaction = 313/844+111/781 = 0.51 For crack size < 0.02", RCP =0.75 Pall = 844(0.75) = 633#

Accounting for crack, revised interaction ratio = 313/633 + 111/781 0.637 < 1.0. o.k.

Conclusion (8) Condition Meets the Licensing Basis: 0I Yes [1 No Prepared by: Kai Lo .," Date 3/5/2014 Licensing Basis Reviewer Reviewed by: J. Skoniecznvy/ L , Date 3-6-2014 Pe~r F~wewer

ATTACHMENT M - DEFERRED WALKDOWNS LICENSING BASIS EVALUATION FORMS Engineering Report No. IP-RPT-12-00037 Rev. 1 Page M-4 or 5 ATTACHMENT 9.9 LICENSING BASIS EVALUATION FORMS AND INSTRUCTIONS Sheet 1 of 2 Licensing Basis (LB) Evaluation Form LB Evaluation No. 17 Originating SWC/AWC SWELl -055 Equipment ID No. 24CRF Equip. Class 10 Equipment Description Containment Recirculation Fan 24 Location: Bldg. VC Floor El. 68' Room, Area Condition There are only 13 bolts in 20 holes. Original design condition is 16 bolts. Evaluate the structural adequacy of the remaining 13 bolts.

Documents Reviewed

1. 9321 -F-4026
2. ALTRAN Report NO. 92128-TR-01
3. DG-04, Rev. 1, Fig. 39 Licensing Basis Safety related SSC must be structurally designed to perform its function during and after a design basis earthquake.

Evaluation w = width of panel = 0.83 ft, field measured h height of panel = 15.5:" Ift, field measured

,%p= differential pressure betw. the two compartments = O.4 :psi, (cons. For fan pressure)

N number of anchor bolts = 13-.,

Sa shear capacity of Philips "Red Head" wedge anchor 969. lb for 1.5 emb. (cons.)

d = density for steel .0.283.. pci Gh - peak horizontal seismic acceleration = 0.95 for 2% damping W = total weight of panel = wh(144)(0.75")d 4658 lb, use 5500:

otI Ap loading during normal operation P = force induced by Ap = pwh = 8779.20 lb R = reaction at the crane wall side = Pfh/2(w+h)] = 2686 lb S1 = shear per bolt = R/N = 207 lb For DBE seismic loading R = G.,Wfh/2(w+h)j = 1598 lb

.2 - shear per bolt ý: R/N - 123 Ib S = total ,hear from operating ,p and OBE = S1 t S2 = 330 S/Sa = 0.34 < .1.0, ok.

ATTACHMENT M - DEFERRED WALKDOWNS LICENSING BASIS EVALUATION FORMS Engineering Report No. IP-RPT-12-00037 Rev. 1 Page M-5 or 5 Sheet 2 of 2 Conclusion (8')J Condition Meets the Licensing Basis: Yes ] No Prepared by: Kai Lo Licensing Basis Reviewer 6? Date 3/7/2014 Reviewed by: J. Skonieczn/ J1~.~.-. Date 3-7-2014 F-(erAeviewer