NL-13-089, Indian Point, Unit 3, Enclosure to NL-13-089, Seismic Walkdown Report Update, Part 5 of 6
ML13176A009 | |
Person / Time | |
---|---|
Site: | Indian Point |
Issue date: | 05/24/2013 |
From: | Lo K Entergy Nuclear Northeast |
To: | Office of Nuclear Reactor Regulation |
References | |
NL-13-089 | |
Download: ML13176A009 (67) | |
Text
ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet I of 5 IP3 Status: YEI NOIl U-Seismic Walkdown Checklist (SWC) SWELl-016 Equipment ID No. 52/RTB & 52/RTA Equip. Class 1 2 Equipment Description RX TRIP SWITCHGEAR RTA, RTB Location:
Bldg. CB Floor El. 33-O" Room, Area Manufacturer, Model, Etc. (optional but recommended)
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.R1 Anchorage 1. Is theanchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
Not part of anchorage checks.2. Is the anchorage free of bent, broken, missing or loose hardware?The bottom cubicles were opened in 3R1 7. The anchorage is free of bent, broken, missing or loose hardware 3. Is the anchorage free of corrosion that is more than mild surface oxidation?
The bottom cubicles were opened in 3R1 7. The anchorage is free of corrosion that is more than mild surface oxidation.
- 4. Is the anchorage free of visible cracks in the concrete near the anchors?There is a crack on the coating near the angle iron attachment; however there is no crack on the concrete.
The anchorage is free of visible cracks in the concrete near the anchors.Enter the equipment class name from EPRI 1025286, Appendix B: Classes of Equipment.
YD- NEI YE N-- U0I N/AD YOZ ND I U[E N/AD R1 YIE NDI UEi N/A--EN-DC-168 REV 0 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 2 of 5 IP3 Status: YE NEI U--Seismic Walkdown Checklist (SWC) SWELl-016 Equipment ID No. 52/RTB & 52/RTA Equip. Class' 2 Equipment Description RX TRIP SWITCHGEAR RTA. RTB 5. Is the anchorage configuration consistent with plant documentation?
YOI NO UOi N/A[(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of YO NEI U-potentially adverse seismic conditions?
R1 Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
Masonry block walls were addressed by the IE 80-11 license commitment program.9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?YEE NEI U- N/AD YE ND UL-] N/AD R1 YED NDI UD N/AD YE NO Ur-D EN-DC-168 REV 0 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 3 of 5 IP3 Status: YE NEI- UI-Seismic Walkdown Checklist (SWC) SWELl-016 Equipment ID No. 52/RTB & 52/RTA Equip. Class' 2 Equipment Description RX TRIP SWITCHGEAR RTA, RTB Other Adverse Conditions
- 11. Have you looked for and found no other seismic conditions that could YE Nil UI--adversely affect the safety functions of the equipment?
The following conditions were observed but they are not adverse to the equipment functionality:
- 1. Fuse blocks in the cubicle above RX breaker A and Bypass breaker A cubicles is lying on the shelf during the breaker outage. This will be placed back to on position once the breakers are energized.
- 2. The labels for the RX breaker A and Bypass breaker A cubicle have only one screw instead of two. The label is very light and 1 screw will be sufficient to hold it in place during a DBE.3. The back panels for the breakers all have two top bolts and one right hand side bottom bolt. This condition seems to be generic because 1P2 has the same condition.
Three bolts have sufficient capacity to hold the panel in place during a DBE.4. There is a slight, localized surface corrosion on the left lever arm of the breaker.Comments (Additional pages may be added as necessary)
Since Operations advised us that this equipment cannot be opened during an operating cycle, and that It is only allowed to be opened during anoutage, the RX Trip Switchgear RTA, RTB were inspected during the 3R1 7 Outage. The equipment was looked at from the front and back during 3R1 7.
References:
9321-F-30523-50 Equipment Arrangement, Control Building AWC-007 R1 R1 Evaluated by: Dan Nuta Kai Lo /C 2 6 Date: 3/7/2013 Date: 3/7/2013 EN-DC-168 REV 0 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM ATrACHMENT 9.6 SEISMIC WALK DOWN CHECKLIST FORM Sheet 4 of 5 Seismic Walkdown Checklist (SWC) SWELl-016 Equipment ID No. 52IRTB & 52/RTA Equipment Description RX TRIP SWITCHGEAR RTA, RTB IP3 Status: YE NO- U-- R1 Equip. Class 1 2 Photographs R1 Note: anchorage front (typ.)Note: anchorage rear (typ.)EN-DC-168 REV 0 ATTACHMENT 9.6 Sheet 5 of 5 Seismic Walkdown Checklist (SWC) SWELl-016 Equipment ID No. 52IRTB & 52/RTA Eauipment Description RX TRIP SWITCHGEAR RTA, RTB SEISMIC WALKDOWN CHECKLIST FORM IP3 Status: YE ND-- U-i Equip. Class 1 2 R1 R1 Note: anchorage (rear).EN-DC-168 REV 0 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet I of 5 Status: YE Ni1 UD-Seismic Walkdown Checklist (SWC) SWELl-033 Equipment ID No. 32 RECIRC PUMP Equip. Class 1 6 Equipment Description 32 RECIR PUMP Location:
Bldg. VC Floor El. 46'-0" Room, Area Recirc Pumo Room Manufacturer, Model, Etc. (optional but recommended)
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
YE-I NO NOT PART OF ANCHOR CHECKS 2. Is the anchorage free of bent, broken, missing or loose hardware?The anchorage is free of bent, broken, missing or loose hardware.3. Is the anchorage free of corrosion that is more than mild surface oxidation?
The anchorage is free of corrosion that is more than mild surface oxidation.
- 4. Is the anchorage free of visible cracks in the concrete near the anchors?YOZ N[:] U-I N/AD YIE NEI[ U[- N/AF-YE NEI U[:I N/A[]The anchorage is free of visible cracks in the concrete near the anchors.Enter the equipment class name fromn EPRI 1025286, Appendix B: Classes of Equipment.
EN-DC-168 REV 0 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 2 of 5 Status: YE NE UI--Seismic Walkdown Checklist (SWC) SWELl-033 Equipment ID No. 32 RECIRC PUMP Equip. Class 1 6 Equipment Description 32 RECIR PUMP 5. Is the anchorage configuration consistent with plant documentation?
Y-- NrI U-I N/A[(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
This item is not one of the 50% for which an anchorage configuration verification is required.6. Based on the above anchorage evaluations, is the anchorage free of YZ Nil UI-potentially adverse seismic conditions?
The anchorage is free of potentially adverse seismic conditions.
Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?YEA NEI UiEl N/A[D-Y[D NEI ul N/AD-YE ND-] u[-] N/AtZ YM ND U[--EN-DC-168 REV 0 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 3 of 5 Status: YEI NF- uE--Seismic Walkdown Checklist (SWC) SWELl-033 Equipment ID No. 32 RECIRC PUMP Equip. Class 1 6 Equipment Description 32 RECIR PUMP Other Adverse Conditions
- 11. Have you looked for and found no other seismic conditions that could YE ND- UrI adversely affect the safety functions of the equipment?
Comments (Additional pages may be added as necessary)
See AWC-55 for other observations.
References:
9321-F-25033 Containment Building General Arrangement Plan "E-E' Plan "F-F" AWC-55 Evaluated by: Dan Nuta Date: 3/13/2013 Kai Lo I3/13/2013 EN-DC-168 REV 0 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 4 of 5 Status: Y[ NnI U-]Seismic Walkdown Checklist (SWC) SWELl-033 Equipment ID No. 32 RECIRC PUMP Equip. Class 1 6 Equipment Description 32 RECIR PUMP Photographs Note: 32 RECIRC Pump Note: 32 RECIRC Pump EN-DC-168 REV 0 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 5 of 5 Status: YE N--- ui--Seismic Walkdown Checklist (SWC) SWELl-033 Equipment ID No. 32 RECIRC PUMP Equip. Class 1 6 Equipment Description 32 RECIR PUMP Note: 32 RECIRC Pump Note: EN-DC-168 REV 0 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 1 of 8 Status: YO NIl U--Seismic Walkdown Checklist (SWC) SWELl-049 Equipment ID No. CRF1 Equip. Class 1 10 Equipment Description CONTAINMENT RECIRC FAN 31 Location:
Bldg. VC Floor El. 68-0" Room, Area Manufacturer, Model, Etc. (optional but recommended)
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
YE NE]YES CHECK THE ANCHORAGE 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
Most anchorages are in good condition with a few that have part of the coating peeled off All except one motor support assembly that has mild but more pronounced surface corrosion.
- 4. Is the anchorage free of visible cracks in the concrete near the anchors?YE ND U[-I N/AD YIE NEI uEr- N/A[--YE ND UD- N/AFD Enter the equipment class nane from EPRI 1025286, Appendix B: Classes of Equipment.
EN-DC-168 REV 0 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 2 of 8 Status: YE] ND UD--Seismic Walkdown Checklist (SWC) SWELl-049 Equipment ID No. CRFI Equip. Class 1 10 Equipment Description CONTAINMENT RECIRC FAN 31 5. Is the anchorage configuration consistent with plant documentation?
Y[ ND-- UD- N/AD--(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of YE N[: U[I potentially adverse seismic conditions?
Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
Mild surface corrosion were observed in the following locations:
- Rectangular duct flange connection
- 12" circular duct surface and flange joint* 30" circular duct flange joint* 60" circular duct flange See AWC-45 for the above observations and photos.9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?YE NDI uDl N/AD YEZ NDI ur- N/AD YEA NDJ uD- N/AD YE N[ ui--EN-DC-168 REV 0 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 3 of 8 Status: YE NiD UD--Seismic Walkdown Checklist (SWC) SWELl-049 Equipment ID No. CRF1 Equip. Class 1 10 Equipment Description CONTAINMENT RECIRC FAN 31 Other Adverse Conditions
- 11. Have you looked for and found no other seismic conditions that could YE NEI ULI adversely affect the safety functions of the equipment?
Comments (Additional pages may be added as necessary)
Drain covers have minor rust on them.Water stream flowed through the door leading to the fan inlet. This is a temporary condition as a result of maintainence work performed at this location while we performed our inspection.
Reference:
IP3V-439-1528 Reactor Containment Fan Cooler 636F269 Reactor Containment Fan Enclosure AWC-45 Evaluated by: Dan Nuta Date: 3/4/2013 Kai Lo /C. &-1 3/4/2013 EN-DC-168 REV 0 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 4 of 8 Status: YE Nr D ULI Seismic Walkdown Checklist (SWC) SWELl-049 Equipment ID No. CRFI Equip. Class 1 10 Equipment Description CONTAINMENT RECIRC FAN 31 Photographs Note: Containment Recirculation Fan 31 Note: More pronounced surface corrosion on one of the ten motor support anchorage assembly.EN-DC-168 REV 0 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 5 of 8 Status: YZ Nr- Ur-Seismic Walkdown Checklist (SWC) SWELl-049 Equipment ID No. CRF1 Equip. Class' 10 Equipment Description CONTAINMENT RECIRC FAN 31 Note: Inside the fan inlet door, mild surface corrosion observed on some of the steel surface.Note: : Inside the fan inlet door, mild surface corrosion observed on some of the steel surface.EN-DC-168 REV 0 hhh-ATAHMENT I9of6 SEISMIC WALKDOWN CHECKLIST FORM Sheet I of 8 Note: Inside the door upstream of coil section, baseplate coating is partially peeled off very mild surface corrosion observed.Note: Inside the door upstream of coil section, baseplate coating is partially peeled off very mild surface corrosion observed.EN-DC-168 REV 0 ATTACHMENT 9.6 Sheet 2 of 8 SEISMIC WALKDOWN CHECKLIST FORM Note: Inside the door upstream of coil section, angle steel has mild surface corrosion.
Note: Inside the door upstream of charcoal filter, peeled surface coating on the base plate.EN-DC-168 REV 0 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM ATTACHMENT 9.6 SEISMIC WALKIDOWN CHECKLIST FORM Sheet 3 of 8 Fote: Coating peeled off from the steel enclosure.
here is mild surface corrosion.
EN-DC-168 REV 0 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 1 of 9 Status: YE Ni UD--Seismic Walkdown Checklist (SWC) SWELl-050 Equipment ID No. CRF2 Equip. Class 1 10 Equipment Description CONTAINMENT RECIRC FAN 32 Location:
Bldg. VC Floor El. 68"-0" Room, Area Manufacturer, Model, Etc. (optional but recommended)
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
YES CHECK THE ANCHORAGE YE N-2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
Minor surface corrosion was observed at the following locations (See photos): YEE NO U[I- N/A--YO Ni U-- N/A[--" One of the ten motor support anchorage assemblies." Coating peeled off from a motor support anchorage assembly." Inside the door to the fan inlet, at the lower portion of the steel column and column anchorage." Inside the door to upstream of coil section, at the lower portion of the steel column and column anchorage on the coil side." Inside the door to upstream of coil section, at the lower portion of the steel column and column anchorage on the damper side.Enter the equipment class name from EPRI 1025286, Appendix B: Classes of Equipment.
EN-DC-168 REV 0 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 2 of 9 Status: YIE NE] U[--Seismic Walkdown Checklist (SWC) SWELl-050 Equipment ID No. CRF2 Equip. Class 1 10 Equipment Description CONTAINMENT RECIRC FAN 32 4. Is the anchorage free of visible cracks in the concrete near the Y[Z ND U[I N/AD anchors?5. Is the anchorage configuration consistent with plant documentation?
YIE NO] UD N/AD--(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of YZ NE] U-potentially adverse seismic conditions?
Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
3/4" (1.05" OD) riser, Station Air piping has support at EL. 68' and 93'.A vertical pipe span of 25' was evaluated for seismic structural adequacy, see License Basis Evaluation LB-21. The existing condition is acceptable.
- 9. Do attached lines have adequate flexibility to avoid damage?YE NDI uE N/AD YE NEI UD N/ADl YIZ NO UD N/AD EN-DC-168 REV 0 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 3 of 9 Status: YEZ NEil ULI Seismic Walkdown Checklist (SWC) SWELl-050 Equipment ID No. CRF2 Equip. Class 1 10 Equipment Description CONTAINMENT RECIRC FAN 32 10. Based on the above seismic interaction evaluations, is equipment free YE] NEi UI-of potentially adverse seismic interaction effects?Other Adverse Conditions
- 11. Have you looked for and found no other seismic conditions that could YE NEI U[--adversely affect the safety functions of the equipment?
Comments (Additional pages may be added as necessary)
The is no door latch and broken door handle. No locking mechanism. (See photo)Localized, minor surface corrosion is found on the rib-deck floor inside the door to the fan inlet.(See photo)Inside the door to the Hepa filter, minor surface corrosion at the surface of floor drain. (See photo)Rectangular duct flange joints have minor surface corrosion. (See photo)The concrete floor between the fan inlet enclosure and fan motor has Boron deposit on it. (See photo)
References:
IP3V-439-1528 Reactor Containment Fan Cooler 636F269 Reactor Containment Fan Enclosure AWC-49 Evaluated by: Dan Nuta Date: 3/5/2013 Kai Lo /C. P 3/5/2013 EN-DC-168 REV 0 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 4 of 9 Status: YZ NF-] ULI Seismic Walkdown Checklist (SWC) SWELl-050 Equipment ID No. CRF2 Equip. Class 1 10 Equipment Description CONTAINMENT RECIRC FAN 32 Photographs Note: CONTAINMENT RECIRC FAN 32 Note: One of the ten motor support anchorage assemblies EN-DC-168 REV 0 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 5 of 9 Status: YZ NFI- UF[Seismic Walkdown Checklist (SWC) SWELl-050 Equipment ID No. CRF2 Equip. Class 1 10 Equipment Description CONTAINMENT RECIRC FAN 32 Note: Coating peeled off from a motor support anchorage assembly.Note: Inside the door to the fan inlet, minor surface corrosion at the lower portion of the steel column and column anchorage.
EN-DC-168 REV 0 ATTACHMENT 9.SEISMIC WALKIDOWN CHECKLIST FORM Sheet 6 of 9 Note: Inside the door to upstream of coil section, minor surface corrosion at the lower portion of the steel column and column anchorage on the coil side.Note: Inside the door to upstream of coil section, minor surface corrosion at the lower portion of the steel column and column anchorage on the damper side.EN-DC-168 REV 0 ATTACHMENT 9.6 Sheet 7 of 9 SEISMIC WALKDOWN CHECKLIST FORM Note: No door latch and broken door handle. No locking mechanism.
Localized, minor surface corrosion are found on the rib-deck floor inside the door to the fan inlet.EN-DC-168 REV 0 ATTACHMENT 9.6 Sheet 8 of 9 SEISMIC WALKDOWN CHECKLIST FORM Note: Inside the door to the Hepa filter, minor surface corrosion at the surface of floor drain.Note: Rectangular duct surface and flange joints have minor surface corrosion EN-DC-168 REV 0 ATTACHMENT 9.SEISMIC WALKDOWN CHECKLIST FORM Sheet 9 of 9 Note: Inside the door to the Hepa filter, minor surface corrosion at the surface of floor drain.EN-DC-168 REV 0 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet I of 8 Status: YE NEI1 UrI Seismic Walkdown Checklist (SWC) SWELl-051 Equipment ID No. CRF3 Equip. Class 1 10 Equipment Description CONTAINMENT RECIRC FAN 33 Location:
Bldg. VC Floor El. 68'-0" Room, Area Manufacturer, Model, Etc. (optional but recommended)
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
YE Nr-I YES CHECK THE ANCHORAGE 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
Mild surface corrosion on one of ten motor support anchorage assembly.
Coating peeled off from three motor support anchorage assemblies.
- 4. Is the anchorage free of visible cracks in the concrete near the anchors?YE N I UEL N/ALl YE NEI LI-M N/Ar Y[E N[-] U[-] N/AL--I Enter the equipment class name from EPRI 1025286. Appendix B: Classes of Equipment.
EN-DC-168 REV 0 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 2 of 8 Status: YO NFI- UI-Seismic Walkdown Checklist (SWC) SWELl-051 Equipment ID No. CRF3 Equip. Class 1 10 Equipment Description CONTAINMENT RECIRC FAN 33 5. Is the anchorage configuration consistent with plant documentation?
YE NR Ur- N/A[-](Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of YE NEI url potentially adverse seismic conditions?
Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?YE NDI U[- N/ADl YED NDI UD N/ADl YE NDI UD N/ADl YE NEI U-EN-DC-168 REV 0 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 3 of 8 Status: YZ NR UF--Seismic Walkdown Checklist (SWC) SWELl-051 Equipment ID No. CRF3 Equip. Class 1 10 Equipment Description CONTAINMENT RECIRC FAN 33 Other Adverse Conditions
- 11. Have you looked for and found no other seismic conditions that could YO N[:-I UF adversely affect the safety functions of the equipment?
Comments (Additional pages may be added as necessary)
Door to 3 compartments cannot be opened with the keys provided.Circular duct flange joint has mild surface corrosion. (See photo)Rectangular duct flange joint has mild surface corrosion.
Boric acid residue is found on the floor between fan inlet enclosure and motor frame.Cracked coating on concrte floor slab, approximately 2 feet from the anchorage area..Coating peeled off from motor frame.Mild surface rust on the floor drain cover inside the door to Hepa filter The C. S. nuts on the 3" SW pipe flange have pronounced surface corrosion.
CR-IP3-2013-02092 was previously written by OPS to identify this issue.
References:
IP3V-439-1528 Reactor Containment Fan Cooler 636F269 Reactor Containment Fan Enclosure AWC-46-zv Evaluated by: Dan Nuta Date: 3/12/2013 KaiLo (~ 7i-3/12/2013 EN-DC-168 REV 0 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 4 of 8 Status: YE NF UI-Seismic Walkdown Checklist (SWC) SWELl-051 Equipment ID No. CRF3 Equip. Class 1 10 Equipment Description CONTAINMENT RECIRC FAN 33 Photographs Note: CONTAINMENT RECIRC FAN 33 Note: 1. Mild surface corrosion on motor support anchorage assembly.2. Mild surface corrosion on motor frame.EN-DC-168 REV 0 ATAHMENT 59of6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 5 of 8 Seismic Walkdown Checklist (SWC) SWELl-051 Equipment ID No. CRF3 Equipment Description CONTAINMENT RECIRC FAN 33 Status: YE NF-] Ur-]Equip. Class 1 10 Note: Coating peeled off from motor support anchorage assembly.Note: Coating peeled off from motor support anchorage assembly.EN-DC-168 REV 0 ATAHMENT 69of6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 6 of 8 Note: Circular duct flange joint has mild surface corrosion.
Note: Boric acid residue is found on the floor between fan inlet enclosure and motor frame.EN-DC-168 REV 0 ATAHMENT 79of6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 7 of 8 Note: 1. Cracked coating on concrete floor slab, approximately 2 feet from the plate.2. Coating peeled off from motor frame.Note: Mild surface rust on the floor drain cover inside the door to Hepa filter.EN-DC-168 REV 0 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 8 of 8 1 1 Note: CS Nuts on 3" SW pipe flange have pronounced surface corrosion.
Note: 1. CS Nuts on 3" SW pipe flange have pronounced surface corrosion.
- 2. Rust bleeding stains the 3" SW pipe flange.EN-DC-168 REV 0 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 1 of 7 Status: YE Nr-- U--1 Seismic Walkdown Checklist (SWC) SWELI-052 Equipment ID No. CRF4 Equip. Class 1 10 Equipment Description CONTAINMENT RECIRC FAN 34 Location:
Bldg. VC Floor El. 68-0" Room, Area Manufacturer, Model, Etc. (optional but recommended)
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
YES CHECK THE ANCHORAGE YO N[-]2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
Y[Z NO U-II N/AD YE N[] UED N/AD 1. Mild surface corrosion on I of 10 motor support anchorage assembly. (See photo)2. Minor surface corrosion and coating blisters are found on motor frame.. (See photo)3. Coating peeled off from 3 of 10 motor support anchorage assembly.. (See photo)Enter the equipment class name from EPRI 1025286. Appendix B: Classes of Equipment.
EN-DC-168 REV 0 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 2 of 7 Status: YE- ND-1 UD-I Seismic Walkdown Checklist (SWC) SWELl-052 Equipment ID No. CRF4 Equip. Class 1 10 Equipment Description CONTAINMENT RECIRC FAN 34 4. Is the anchorage free of visible cracks in the concrete near the YE] ND:] U[:- N/A[D anchors?5. Is the anchorage configuration consistent with plant documentation?
YIU NDl] UD- N/AD--(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of YIE ND] UD potentially adverse seismic conditions?
Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage?YEE ND:] UD- N/AD1 YIZ NDJ UDi N/ADl YE NDI uD- N/AD EN-DC-168 REV 0 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 3 of 7 Status: YE N-] U--Seismic Walkdown Checklist (SWC) SWELl-052 Equipment ID No. CRF4 Equip. Class 1 10 Equipment Description CONTAINMENT RECIRC FAN 34 10. Based on the above seismic interaction evaluations, is equipment free YE NE] Ur-I of potentially adverse seismic interaction effects?Other Adverse Conditions
- 11. Have you looked for and found no other seismic conditions that could YE NEI U-I adversely affect the safety functions of the equipment?
Comments (Additional pages may be added as necessary)
The doors to the FCU compartments cannot be opened with the keys provided.1. Mild surface corrosion at the rectangular duct flange joints. (See photo)2. Mild surface corrosion on the conduit coupling. (See photo)3. Defective coating (estimated to be 2'x4') on concrete wall. (See photo)4. Boric acid residue on the floor between fan inlet enclosure and motor frame. (See photo)5. Coating peeled off from fan inlet enclosure. (See photo)
References:
IP3 V-439-1528 Reactor Containment Fan Cooler 636F269 Reactor Containment Fan Enclosure AWC-47 Date: 3/12/2013 Evaluated by: Dan Nuta Kai Lo /c 6 Date: 3/12/2013 EN-DC-168 REV 0 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 4 of 7 Status: YO ND UD Seismic Walkdown Checklist (SWC) SWELl-052 Equipment ID No. CRF4 Equip. Class 1 10 Equipment Description CONTAINMENT RECIRC FAN 34 Photographs Note: CONTAINMENT RECIRC FAN 34 Note: 4. Mild surface corrosion on one of the ten motor support anchorage assembly.5, Minor surface corrosion and coating blisters are found on motor frame.EN-DC-168 REV 0 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 5 of 7 Status: YZ Nil U-]Seismic Walkdown Checklist (SWC) SWELl-052 Equipment ID No. CRF4 Equip. Class' 10 Equipment Description CONTAINMENT RECIRC FAN 34 Note: Coating peeled off from motor support anchorage assembly.Note: Coating peeled off from 2 motor support anchorage assemblies.
EN-DC-168 REV 0 ATAHMENT 69of6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 6 of 7 Note: Mild surface corrosion at the rectangular duct flange joints.Note: 1. Mild surface corrosion on the conduit coupling.2. Defective coating (estimated to be 2'x4') on concrete wall.EN-DC-168 REV 0 ATAHMENT 79of6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 7 of 7 Note: 1. Boric acid deposit on the floor between fan inlet enclosure and motor frame.2. Coating peeled off from fan inlet enclosure.
EN-DC-168 REV 0 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet I of 11 Status: YE NFi- U--Seismic Walkdown Checklist (SWC) SWELl-053 Equipment ID No. CRF5 Equip. Class 1 10 Equipment Description CONTAINMENT RECIRC FAN 35 Location:
Bldg. VC Floor El. 68"-0" Room, Area Manufacturer, Model, Etc. (optional but recommended)
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL, The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
YES CHECK THE ANCHORAGE 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
- 1. Inside the door to the upstream of coil section, mild surface corrosion was found on the anchorage at the four comers of the compartment. (See photos)2. Mild surface corrosion at two of the ten motor support anchorage assemblies. (See photos)4. Is the anchorage free of visible cracks in the concrete near the anchors?Y[Z N[l YE NDJ UI N/AD YE ND I UEI N/ADl Y[E N-I UD] N/AD--I Enter the equipment class name from EPRI 1025286, Appendix B: Classes of Equipment.
EN-DC-168 REV 0 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 2 of 11 Status: YEZ ND I Ut]Seismic Walkdown Checklist (SWC) SWELl-053 Equipment ID No. CRF5 Equip. Class 1 10 Equipment Description CONTAINMENT RECIRC FAN 35 5. Is the anchorage configuration consistent with plant documentation?
YO ND U[D] N/AD--(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of YN NDI Ut-]potentially adverse seismic conditions?
Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?YE ND Ut] N/AD YO NDI Ut] N/AD YIZ ND Ut] N/ADi YIO NDI UD--EN-DC-168 REV 0 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 3 of 11 Status: Y[ NIl U-]Seismic Walkdown Checklist (SWC) SWELl-053 Equipment ID No. CRF5 Equip. Class 1 10 Equipment Description CONTAINMENT RECIRC FAN 35 Other Adverse Conditions
- 11. Have you looked for and found no other seismic conditions that could YE NEI UI adversely affect the safety functions of the equipment?
Comments (Additional pages may be added as necessary)
- 1. Inside the door to the upstream of fan inlet, mild surface corrosion was observed on the following locations:
- On the top of the rib deck.(See photo)" On the condulet. (See photo)* On the steel column of the enclosure (See photo)2. Boric acid residue was found in the following locations:
- Inside the compartment upstream of the coil. (See photo)* Inside the compartment upstream of the charcoal filter. (See photo)" Inside the compartment upstream of the Hepa filter. (See photo)* On the floor between the fan inlet enclosure and the motor frame. (See photo)3. Minor surface corrosion was found at the duct flange joint at the following locations:
- 30" circular duct above the FCU* 60" circular duct above the FCU 4. A Y/" Station Air riser has support at EL. 68' and 93'. A vertical span of 25'. This was addressed in AWC-48.
References:
IP3V-439-1528 Reactor Containment Fan Cooler 636F269 Reactor Containment Fan Enclosure AWC-48 Evaluated by: Dan Nuta Date: 3-9-2013 Kai Lo /C. -. 3-9-2013 EN-DC-168 REV 0 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 4 of 11 Status: YE NO UD--Seismic Walkdown Checklist (SWC) SWELl-053 Equipment ID No. CRF5 Equip. Class 1 10 Equipment Description CONTAINMENT RECIRC FAN 35 Photographs Note: CONTAINMENT RECIRC FAN 35 Note: Mild surface corrosion on the anchorage at the left side of the door to the upstream of coil section.EN-DC-168 REV 0 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 5 of 11 Status: YIZ NR UD--Seismic Walkdown Checklist (SWC) SWELl-053 Equipment ID No. CRF5 Equip. Class 1 10 Equipment Description CONTAINMENT RECIRC FAN 35 1~~ 1 Note: Mild surface corrosion on the anchorage at the right side of the door to the upstream of coil section.Note: Mild surface corrosion on the anchorage at the far left side of the door to the upstream of coil section.EN-DC-168 REV 0 ATAHMENT 9.6 1 SEISMIC WALKDOWN CHECKLIST FORM Sheet 6 of 11 Note: Mild surface corrosion on the anchorage at the far right side of the door to the upstream of coil section.3. Mild surface corrosion at one of ten motor support anchorage assemblies.
- 4. Coating peeled off from the motor frame and mild surface corrosion on the frame.EN-DC-168 REV 0 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 7 of 11 Note: Note: 1. Mild surface corrosion at one of ten motor support anchorage assemblies.
- 2. Coating peeled off from the motor fame.Mild surface corrosion at the rectangular duct flange joint.EN-DC-168 REV 0 ATAHMENT 9.6 1 SEISMIC WALKDOWN CHECKLIST FORM Sheet 8 of 11 Note: 1. Mild surface corrosion was observed on the top of the rib deck.2. Mild surface corrosion was observed on the condulet.Note: Mild surface corrosion was observed on the steel column.EN-DC-168 REV 0 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 9 of 11 Note: Boric acid residue was found on the concrete floor inside the door upstream of the coil.Note: Boric acid residue was found on the concrete floor inside the door upstream of the charcoal filter.EN-DC-168 REV 0 ATAHMENT 10.f61 SEISMIC WALKDOWN CHECKLIST FORM Sheet 10 of 11 Note: Boric acid residue was found on the concrete floor inside the door upstream of the Hepa filter.Boric acid residue was found on the floor between the fan inlet enclosure and the motor frame.EN-DC-168 REV 0 ATAHMENT 11.f61 SEISMIC WALKDOWN CHECKLIST FORM Sheet 11 of 11 Note: Minor surface corrosion was found at the duct flange joint at the following locations:
0 30" circular duct above the FCU 0 60" circular duct above the FCU Note: Vertical Y 4" (1.05" OD )riser (Station Air system) has support at EL. 68' and 93'.EN-DC-168 REV 0 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 1 of 5 IP3 Status: ND UD--Seismic Walkdown Checklist (SWC) SWELl-061 Equipment ID No. 311B Equip. Class 1 14 Equipment Description SINGLE PHASE 118VAC INSTRUMENT BUS 31 CHANNEL II Location:
Bldg. CB Floor El. 53-0" Room, Area CONTROL ROOM Manufacturer, Model, Etc. (optional but recommended)
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
YEI- N[]The anchorage configuration verification is not required.2. Is the anchorage free of bent, broken, missing or loose hardware?The panel is flush mounted with the wall. The panel cover is secured to a wall plate with 3 bolts on each side (see attached photo) Panel was removed in 3R1 7 to reveal the anchorage and interior for inspection.
The anchorage is free of bent, broken, missing or loose hardware.3. Is the anchorage free of corrosion that is more than mild surface oxidation?
Panel was removed in 3R1 7 to reveal the anchorage and interior for inspection.
The anchorage is free of corrosion that is more than mild surface oxidation.
- 4. Is the anchorage free of visible cracks in the concrete near the anchors?Panel was removed in 3R1 7 to reveal the anchorage and interior for inspection.
The anchorage is free of visible cracks in the concrete near the anchors.YE ND UD1 N/AD I YE ND ULD N/AD: R1 YE ND:] UD N/ADýI Enter the equipment class name from EPRI 1025286, Appendix B: Classes of Equipment.
EN-DC-168 REV 0 ATTACHMENT 9.6 Sheet 2 of 5 SEISMIC WALKDOWN CHECKLIST FORM IP3 Status: YEZ NDI ULI R1 Seismic Walkdown Checklist (SWC) SWELl-061 Equipment ID No. 311B Equip. Class 1 14 Equipment Description SINGLE PHASE 118VAC INSTRUMENT BUS 31 CHANNEL/I 5. Is the anchorage configuration consistent with plant documentation?
YEI- NEI UI N/AO (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Not applicable since is not part of the anchorage configuration verification.
- 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Panel was removed in 3R17 to reveal the anchorage and interior for inspection.
YZ NEIUD R1 Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
Yes, soft targets are free from impact by nearby equipment or structures.
YO N[] U[-] N/AD 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YN NEI U[-' N/ADl and masonry block walls not likely to collapse onto the equipment?
Observed two ceiling tiles at the south corner of the room directly above FDR-20-CB door. The east ends of the tiles are slightly mislaid. The tiles seemed to be well secured by screws along one edge and will not dislodge during a seismic event. This is judged to be acceptable.
- 9. Do attached lines have adequate flexibility to avoid damage? YDI NDI UD- N/As Not applicable since there are no attached lines.10. Based on the above seismic interaction evaluations, is equipment free Y[ NDI UD-of potentially adverse seismic interaction effects?Yes, based on the above seismic interaction evaluations, the equipment is free of potentially adverse seismic interaction effects.EN-DC-168 REV 0 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 3 of 5 IP3 Status: Y[Z NEi I u-I iF Seismic Walkdown Checklist (SWC) SWELl-061 Equipment ID No. 311B Equip. Class 1 14 Equipment Description SINGLE PHASE 118VAC INSTRUMENT BUS 31 CHANNEL II Other Adverse Conditions
- 11. Have you looked for and found no other seismic conditions that could Y[] NEil UL-adversely affect the safety functions of the equipment?
We have looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment.
Comments (Additional pages may be added as necessary)
Panel door was opened and panel internals were examined.
Panel was removed in 3R1 7 to reveal the anchorage and interior for inspection.
R1
References:
9321-F-30523, Rev. 50, EQUIPMENT ARRANGEMENT CONTROL BUILDING 9321-F-31423, Rev. 25, EQUIPMENT ARRANGEMENT CONTROL BUILDING SECTIONS AWC-015 Dan Nuta .Evaluated by:.Date: 3/8/2013 KaiLo /C- 6i 3/812013 EN-DC-168 REV 0 ATTACHMENT 9.6 Sheet 4 of 5 Seismic Walkdown Checklist (SWC) SWELl-061 SEISMIC WALKDOWN CHECKLIST FORM IP3 Status: YIZ NEI UI-R1 Equipment ID No. 311B Equip. Class 1 14 Equipment Description SINGLE PHASE 118VAC INSTRUMENT BUS 31 CHANNEL II Photographs Note: Instrument bus 31 Note: Mislaid tiles above the control room door.EN-DC-168 REV 0 ATTACHMENT 9.6 SEISMIC WALKIDOWN CHECKLIST FORM Sheet 5 of 5 IP3 Photographs R1 Note: Instrument bus 31 Note: EN-DC-168 REV 0 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 1 of 5 Status: Y[ NOI U-Seismic Walkdown Checklist (SWC) SWELl-062 Equipment ID No. 32DP Equip. Class 1 14 Equipment Description 125VDC DISTRIBUTION PANEL 32 Location:
Bldg. CB Floor El. 53-O" Room, Area CONTROL ROOM Manufacturer, Model, Etc. (optional but recommended)
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one YZ NDI of the 50% of SWEL items requiring such verification)?
The anchorage configuration verification is required.R1 2. Is the anchorage free of bent, broken, missing or loose hardware?The panel is flush mounted with the wall. The panel cover is secured to a wall plate with 3 bolts on each side (see attached photo) Panel was removed in 3R1 7 to reveal the anchorage and interior for inspection.
The anchorage is free of bent, broken, missing or loose hardware 3. Is the anchorage free of corrosion that is more than mild surface oxidation?
Panel was removed in 3R1 7 to reveal the anchorage and interior for inspection.
The anchorage is free of corrosion that is more than mild surface oxidation.
- 4. Is the anchorage free of visible cracks in the concrete near the anchors?Panel was removed in 3R17 to reveal the anchorage and interior for inspection.
The anchorage is free of visible cracks in the concrete near the anchors.YIE NDI UD- N/AD YE N[1 U[I N/ADl R1 YE NDI UD- N/AD-I Enter the equipment class name from EPRI 1025286, Appendix B: Classes of Equipment.
EN-DC-168 REV 0 ATTACHMEl Sheet 2 of NT 9.6 SEISMIC WALKDOWN CHECKLIST FORM 5 Status: YZ NEi U-I R1 Seismic Walkdown Checklist (SWC) SWELl-062 Equipment ID No. 32DP Equip. Class 1 14 Equipment Description 125VDC DISTRIBUTION PANEL 32 5. Is the anchorage configuration consistent with plant documentation?
YEA N[iI U[-I N/A[:-(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Drawing IP3V-384-0004, Rev. I shows 4 bolt holes on the inside of the panel. SEWS for 125 VDC Distribution panel 32 evaluates the anchorage based on four 3/8" diameter bolts. The panel cover was removed in 3R1 7 for anchorage and interior inspection.
- 6. Based on the above anchorage evaluations, is the anchorage free of YE ND: UD-potentially adverse seismic conditions?
R1 R1 Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
YE NDi UD-- N/AD--Nearby equipment and structures are properly restrained.
Soft targets are free from impact by nearby equipment or structures.
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YE NDI UD- N/AD-and masonry block walls not likely to collapse onto the equipment?
All ceiling tiles are tied together and well secured.Overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls are not likely to collapse onto the equipment.
- 9. Do attached lines have adequate flexibility to avoid damage? YD NDI U[D] N/As Not aplicable as lines are internal to wall that panel is mounted to so they will move together.EN-DC-168 REV 0 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 3 of 5 Status: YE NO ULI Seismic Walkdown Checklist (SWC) SWELl-062 Equipment ID No. 32DP Equip. Class 1 14 Equipment Description 125VDC DISTRIBUTION PANEL 32 10. Based on the above seismic interaction evaluations, is equipment free Y[E NEr U-I of potentially adverse seismic interaction effects?Based on the above seismic interaction evaluations, the equipment is free of potentially adverse interaction effects.Other Adverse Conditions
- 11. Have you looked for and found no other seismic conditions that could YEZ N[i UFi-adversely affect the safety functions of the equipment?
We have looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment.
Comments (Additional pages may be added as necessary)
Panel door was opened, panel cover was removed to reveal the panel anchorage and intemas during 3R1 7.
References:
SEWS for 125 VDC Distribution Pnl 32 9321-F-30523, Rev. 50, EQUIPMENT ARRANGEMENT CONTROL BUILDING AWC-015 R1 R1 R1 Date: 3/13/2013 Evaluated by: Dan Nuta Kai Lo / 6C 3/13/2013 EN-DC-168 REV 0 ATTACHMENT 9.6 SEISMIC WALKIDOWN CHECKLIST FORM ATrACHMENT 9.6 SEISMIC WALKOOWN CHECKLIST FORM Sheet 4 of 5 Seismic Walkdown Checklist (SWC) SWELl-062 Equipment ID No. 32DP Equipment Description 125VDC DISTRIBUTION PANEL 32 Status: YEI NEI UD1 R1 Equip. Class 1 14 Photographs Note: 125VDC DISTRIBUTION PANEL 32 Note: 125VDC DISTRIBUTION PANEL 32 INTERNALS EN-DC-168 REV 0 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 5 of 5 Photographs RN Note:Note:
125VDC DISTRIBUTION PANEL 32 INTERNALS AND ANCHORAGE EN-DC-168 REV 0 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM A. _ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 1 of 4 IP3 Status: Y[ NIZ U-I R1 Equip. Class 1 14 Seismic Walkdown Checklist (SWC) SWELl-063 Equipment ID No. 32PP Equipment Description 125VDC POWER PANEL 32 Location:
Bldg. CB Floor El. 33-0" Room, Area Manufacturer, Model, Etc. (optional but recommended)
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
YEA NEI The anchorage configuration verification is required.2. Is the anchorage free of bent, broken, missing or loose hardware?The panel is mounted to the wall and the anchorage cannot be visually inspected since the anchorage is behind a panel cover. The panel cover is secured with 3 bolts on each side. Panel was removed in 3R1 7 to allow for inspection of the anchorage and interiors.
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation?
Panel was removed in 3R1 7 to allow for inspection of the anchorage and interiors.
The anchorage is free of corrosion that is more than mild surface oxidation.
The head of a bolt has a slight, mild surface corrosion.
- 4. Is the anchorage free of visible cracks in the concrete near the anchors.YO NEI UE] N/A[--Y[ NDI UEI N/AD-R1 YE NDI U-- N/AD Panel was removed in 3R1 7 to allow for inspection of the anchorage and interiors.
The anchorage is the through bolt type and is free of visible cracks in the masonry block near the anchors.Enter the equipment class name from EPRI 1025286, Appendix B: Classes of Equipment.
EN-DC-168 REV 0 ATTACHMENT 9.6 Sheet 2 of 4 SEISMIC WALKDOWN CHECKLIST FORM IP3 Status: YE NEI U-- R1 Equip. Class 1 14 Seismic Walkdown Checklist (SWC) SWELl-063 Equipment ID No. 32PP Equipment Description 125VDC POWER PANEL 32 5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
See #2 details.A drawing of the panel anchorage shows 6 bolts. Inspection of the anchorage was performed inside Battery Room 31 and verified to be (6)- Y4" through bolts.Anchorage details provided in SEWS for 125 VDC Power Panel #32 and 31 conservatively used (4) -3/8" Wegit bolts. The allowable capacity for the (4) -3/8" Wegit bolts are much smaller than the actual capacity of the (6) -Y/" through bolts used.6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
YE NEI UI- N/AI R1 YEE NR] U--See #2 for details.Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
Soft targets are free from impact by nearby equipment or structures.
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
Masonry block wall at Battery Room 31 which is near the equipment was evaluated as part of the IEB 80-11 analysis (Calculation 6620.210-1-CB-001-L, wall 52B) and found to be seismically qualified.
- 9. Do attached lines have adequate flexibility to avoid damage?YEA NDI UEI N/Ar-YIZ NEI ui- N/AD]YE NE'I UI Attached lines have adequate flexibility to avoid damage.EN-DC-168 REV 0 ATTACHMENT 9.6 Sheet 3 of 4 SEISMIC WALKDOWN CHECKLIST FORM IP3 Seismic Walkdown Checklist (SWC) SWELl-063 Equipment ID No. 32PP E(Equipment Description 125VDC POWER PANEL 32 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Status: YZ NEI UD--quip. Class 1 14 YE NEI U[D R1 Yes, based on the above seismic interaction evaluations the equipment free of potentially adverse seismic interaction effects.Other Adverse Conditions
- 11. Have you looked for and found no other seismic conditions that could YE NE] ULI adversely affect the safety functions of the equipment?
Yes, we have looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment.
Comments (Additional pages may be added as necessary)
The door on the panel cover plate was opened and faces of the breaker/switches were examined.Panel cover was removed in 3R17 for proper anchorage and internal examination.
References:
SEWS for 125 VDC Power Panel #32 and 31 9321-F-30523, Rev. 50,, EQUIPMENT ARRANGEMENT CONTROL BUILDING AWC-007 R1 Evaluated by: Dan NLta Kai Lo /.6 Date: 3/11/2013 Date: 3/11/2013 EN-DC-168 REV 0 ATTACHMENT 9.6 Sheet 4 of 4 Seismic Walkdown Checklist (SWC) SWELl-063 Equipment ID No. 32PP Equipment Description 125VDC POWER PANEL 32 Photographs SEISMIC WALKDOWN CHECKLIST FORM IP3 Status: YE NEI UD- R1 Equip. Class 1 14 R1 Note: panel removed to expose the anchorage& interior Note: slight, mild surface corrosion at the head of the bolt EN-DC-168 REV 0