| number = ML15247A410
| number = ML15247A410
| issue date = 09/04/2015
| issue date = 09/04/2015
| title = Oconee Initial Exam 2015-301 Draft Administrative JPMs
| title = Initial Exam 2015-301 Draft Administrative JPMs
| author name =  
| author name =  
| author affiliation = NRC/RGN-II
| author affiliation = NRC/RGN-II
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:ADM-105 1.1R Page 1 of 11 REGION II JOB PERFORMANCE MEASURE   ADM-105 PERFORM A POWER IMBALANCE VERIFICATION   Alternate Path: N/A Alt Path Failure: ____________________________________________________________
{{#Wiki_filter:ADM-105 1.1R Page 1 of 11 REGION II JOB PERFORMANCE MEASURE ADM-105 PERFORM A POWER IMBALANCE VERIFICATION Alternate Path: N/A Alt Path Failure: ____________________________________________________________
Time Critical: No Time Critical Criteria: ________________________________________________________   Prepared By:                                                                                                   Date:     EP Review By:                                   N/A                                                       Date:           Reviewed By:                                                                                                 Date:       Approved By:                                                                                                 Date:
Time Critical: No Time Critical Criteria: ________________________________________________________
ADM-105 1.1R Page 2 of 11 REGION II JOB PERFORMANCE MEASURE Task Title : Perform a power imbalance verification. Task Number : N/A Alternate Path: N/A Time Critical: No Validation Time: 27 minutes       K/A Rating(s):   System:   G K/A:         2.1.25 Rating:   3.9/4.2 Task Standard:   Candidate determines that Axial Power Imbalance is NOT within the limits of the COLR.
Prepared By:                                                 Date:
EP Review By:                       N/A                       Date:
Reviewed By:                                                 Date:
Approved By:                                                 Date:
 
ADM-105 1.1R Page 2 of 11 REGION II JOB PERFORMANCE MEASURE Task Title : Perform a power imbalance verification.
Task Number : N/A Alternate Path: N/A Time Critical: No Validation Time: 27 minutes K/A Rating(s):
System: G K/A:     2.1.25 Rating: 3.9/4.2 Task Standard:
Candidate determines that Axial Power Imbalance is NOT within the limits of the COLR.


==References:==
==References:==
PT/1/A/0600/001 (Periodic Instrument Surveillance) procedure and Enclosures 13.1  OP/1/A/1105/014 (Control Room Instrumentation Operation and Information) Core Operating Limits Report  Tools/Equipment/Procedures Needed:    PT/1/A/0600/001 (Periodic Instrument Surveillance) procedure and Enclosures 13.1  OP/1/A/1105/014 (Control Room Instrumentation Operation and Information) Core Operating Limits Report    =====================================================================================              Candidate:  __________________________________                Time Start: _______________    NAME              Time Finish: ______________  Performance Rating:  SAT ______ UNSAT ______            Performance Time: _________
Examiner: ______________________________        ___________________________________/_________    NAME      SIGNATURE                            DATE ===================================================================================== Comments ADM-105  1.1R Page 3 of 11  SIMULATOR OPERATOR JPM SETUP INSTRUCTIONS  1. NONE ADM-105  1.1R Page 4 of 11  READ TO OPERATOR  DIRECTIONS TO STUDENT  When I tell you to begin, you are to PERFORM A POWER IMBALANCE VERIFICATION. Before you begin, I will describe the general plant conditions, state the initiating cues, and answer any questions you have. Perform procedure steps as if you were actually performing the task. INITIAL CONDITIONS  Unit 1 had a transient from 100% power 4 hours ago. The current time is 0800. The Reactor Calculations package is NOT running. All other equipment is operable. PT/1/A/0600/001 (Periodic Instrument Surveillance), Enclosure 13.1 (Mode 1 & 2) has been completed up to page 7, Axial Power Imbalance Operating Limits. Minimum incore detector operability requirements have been verified met per PT/0/A/1103/019 (Backup Incore Detector System). INITIATING CUE  The SRO directs you to: 1. Perform Axial Power Imbalance verification in accordance with PT/1/A/0600/001 (Periodic Instrument Surveillance), Enclosure 13.1 (Mode 1 & 2).     


ADM-105  1.1R Page 5 of 11  START TIME: _______  SEQ STEP PROC STEP DESCRIPTION  1  PT/1/A/0600/001, SR 3.2.2.1 Axial Power Imbalance Operating Limit:  IF > 40% RTP, verify Power imbalance within operational alarm limits in COLR. IF Reactor Calculations package is NOT running on computer, refer to OP/1/A/1105/014 (Control Room Instrumentation Operation And Information). STANDARD: Determine reactor power is greater than 40%. Determine Reactor Calculation package is NOT running per Initial Conditions and refer to OP/1/A/1105/014 (Control Room Instrumentation Operation And Information). COMMENTS:    ___ SAT 
PT/1/A/0600/001 (Periodic Instrument Surveillance) procedure and Enclosures 13.1 OP/1/A/1105/014 (Control Room Instrumentation Operation and Information)
Core Operating Limits Report Tools/Equipment/Procedures Needed:
PT/1/A/0600/001 (Periodic Instrument Surveillance) procedure and Enclosures 13.1 OP/1/A/1105/014 (Control Room Instrumentation Operation and Information)
Core Operating Limits Report
=====================================================================================
Candidate: __________________________________                                  Time Start: _______________
NAME                                          Time Finish: ______________
Performance Rating: SAT ______ UNSAT ______                                  Performance Time: _________
Examiner: ______________________________              ___________________________________/_________
NAME                                            SIGNATURE                    DATE
=====================================================================================
Comments
 
ADM-105 1.1R Page 3 of 11 SIMULATOR OPERATOR JPM SETUP INSTRUCTIONS
: 1. NONE
 
ADM-105 1.1R Page 4 of 11 READ TO OPERATOR DIRECTIONS TO STUDENT When I tell you to begin, you are to PERFORM A POWER IMBALANCE VERIFICATION. Before you begin, I will describe the general plant conditions, state the initiating cues, and answer any questions you have. Perform procedure steps as if you were actually performing the task.
INITIAL CONDITIONS
* Unit 1 had a transient from 100% power 4 hours ago.
* The current time is 0800.
* The Reactor Calculations package is NOT running.
* All other equipment is operable.
* PT/1/A/0600/001 (Periodic Instrument Surveillance), Enclosure 13.1 (Mode 1 & 2) has been completed up to page 7, Axial Power Imbalance Operating Limits.
* Minimum incore detector operability requirements have been verified met per PT/0/A/1103/019 (Backup Incore Detector System).
INITIATING CUE The SRO directs you to:
: 1. Perform Axial Power Imbalance verification in accordance with PT/1/A/0600/001 (Periodic Instrument Surveillance), Enclosure 13.1 (Mode 1 & 2).


___ UNSAT      2 3.2.3 OP/1/A/1105/014 Encl. 4.13   IF Reactor Calculations package is NOT running, verify minimum incore detector operability requirements are met. Refer to PT/0/A/1103/019 (Backup Incore Detector System). STANDARD: Determine the minimum incore detector operability requirements are met from the initiating cue. COMMENTS:    ___ SAT
ADM-105 1.1R Page 5 of 11 START TIME: _______
___ UNSAT ADM-105  1.1R Page 6 of 11  3  3.2.4 Order of preference of measurement systems to determine axial imbalance and quadrant power tilt is as follows: A. Incore Detectors (Computer Reactor Calculation Package). B. Outcore Detectors (Power Range Outcore Detectors). C. Backup Incore Detectors. Refer to PT/0/A/1103/019 (Backup Incore Detector System).                STANDARD: Candidate reviews step and determines Outcore Detectors should be used. Continues to Step 3.2.5  COMMENTS:    ___ SAT    ___ UNSAT     4  3.2.5 IF at least one power range outcore detector is NOT operable in each quadrant (NI-5 thru NI-8), outcore detectors shall NOT be used to measure axial imbalance or quadrant power tilt  STANDARD: Determine NI-5 thru NI-8 are operable and can be used to measure axial imbalance. COMMENTS:   ___ SAT 
SEQ  PROC DESCRIPTION STEP  STEP PT/1/A/0600/001, SR 3.2.2.1 Axial Power Imbalance Operating Limit:
IF > 40% RTP, verify Power imbalance within operational alarm limits in COLR.
IF Reactor Calculations package is NOT running on computer, refer to OP/1/A/1105/014 (Control Room Instrumentation Operation And      ___ SAT Information).
1            STANDARD: Determine reactor power is greater than 40%.
___ UNSAT Determine Reactor Calculation package is NOT running per Initial Conditions and refer to OP/1/A/1105/014 (Control Room Instrumentation Operation And Information).
COMMENTS:
OP/1/A/1105/014 Encl. 4.13 IF Reactor Calculations package is NOT running, verify minimum incore detector operability requirements are met. Refer to           ___ SAT PT/0/A/1103/019 (Backup Incore Detector System).
2    3.2.3  STANDARD: Determine the minimum incore detector operability requirements are met from the initiating cue.         ___ UNSAT COMMENTS:


___ UNSAT   5 3.2.6 IF Outcore Detectors (Power Range Outcore Detectors) are needed for tilt calculations, contact Rx Engineering group to perform PT/0/A/1103/018 (Excore Tilt Calculations). STANDARD: Determine this step does not apply because they are not determining tilt calculation at this time. EXAMINER CUE: If asked, notify the candidate that tilt calculations are not required. COMMENTS:    ___ SAT
ADM-105 1.1R Page 6 of 11 Order of preference of measurement systems to determine axial imbalance and quadrant power tilt is as follows:
___ UNSAT ADM-105  1.1R Page 7 of 11  6  3.2.7 IF Outcore Detectors (Power Range Outcore Detectors) are needed for imbalance calculations, refer to the following alternate method for determining (%) Reactor Power Axial Imbalance: NI-5* + NI-6* + NI-7* + NI-8* = % Imbalance (Avg.)                      4
A. Incore Detectors (Computer Reactor Calculation Package).            ___ SAT B. Outcore Detectors (Power Range Outcore Detectors).
* Use Imbalance CR gauges reading for each NI. STANDARD: Using the attached NI graphic determine that % Imbalance (Avg.) is - 19.2%. COMMENTS:    CRITICAL        STEP      ___ SAT  ___ UNSAT 7  Refer to the Unit 1 COLR to determine if the calculated outcore imbalance is within the limit for current plant conditions. STANDARD: Determine the calculated outcore imbalance (- 19.2%) exceeds the limit (- 17.7%) for current plant conditions. COMMENTS:   END TASK  CRITICAL        STEP      ___ SAT
C. Backup Incore Detectors. Refer to PT/0/A/1103/019 (Backup Incore Detector System).
___ UNSAT  TIME STOP: ________     
___ UNSAT 3 3.2.4 STANDARD: Candidate reviews step and determines Outcore Detectors should be used. Continues to Step 3.2.5 COMMENTS:
IF at least one power range outcore detector is NOT operable in each quadrant (NI-5 thru NI-8), outcore detectors shall NOT be used to measure axial imbalance or quadrant power tilt
___ SAT STANDARD: Determine NI-5 thru NI-8 are operable and can be 4 3.2.5                  used to measure axial imbalance.
___ UNSAT COMMENTS:
IF Outcore Detectors (Power Range Outcore Detectors) are needed for tilt calculations, contact Rx Engineering group to perform PT/0/A/1103/018 (Excore Tilt Calculations).
STANDARD: Determine this step does not apply because they are           ___ SAT not determining tilt calculation at this time.
5 3.2.6 EXAMINER CUE: If asked, notify the candidate that tilt calculations are not required.                   ___ UNSAT COMMENTS:


ADM-105 1.1R Page 8 of 11   CRITICAL STEP EXPLANATIONS SEQ STEP # Explanation   6 This step is required to determine average imbalance. 7  This step is required to determine if imbalance is within the limits of the COLR.
ADM-105 1.1R Page 7 of 11 IF Outcore Detectors (Power Range Outcore Detectors) are needed for imbalance calculations, refer to the following alternate method for CRITICAL determining (%) Reactor Power Axial Imbalance:
1.1R   BACKUP INCORE CHART "ABACKUP INCORE CHART "B" POINT # % Location POINT # % Location 1 158.6 G09-L2 1   98.6 E07-L6 2 112.1 G09-L4 2   97.4 G11-L6 3   98.6 G09-L6 3   99.2 M09-L6 4 159.2 E09-L2 4 *OOS K05-L6 5 111.8 E09-L4 5 *OOS K05-L4 6   98.4 E09-L6 6 *OOS L06-L2 7 158.8 G05-L2 7 *OOS L06-L4 8   97.5 G05-L6 8 *OOS L06-L6 9 159.9 M07-L2 9 156.2 M09-L2 10   99.2 M07-L6 10 *OOS K05-L2 11 158.6 K11-L2 11 159.2 G11-L2 12   98.1 K11-L6 12 *OOS E07-L2 13 157.8 F13-L2 13 158.2 C10-L2 14 158.6 D05-L2 14   98.1 C10-L6 15 112.3 F13-L4 15 *OOS F03-L2 16 158.1 C06-L2 16   98.5 F03-L6 17   99.6 C06-L6 17 *OOS N04-L2 18   98.8 F13-L6 18 112.1 N04-L4 19   97.6 O10-L6 19 *OOS N04-L6 20   98.3 L03-L6 20 159.3 O06-L2 21 159.6 L03-L2 21 *OOS O06-L4 22   98.6 D05-L6 22 *OOS O06-L6 23 158.7 O10-L2 23 *OOS L13-L2 24 111.9 D05-L4 24   98.8 L13-L6   Note: Listed points with values are "in calibration".
STEP NI-5* + NI-6* + NI-7* + NI-8* = % Imbalance (Avg.)
* Work Request written 1.1R  % IMB020406080100125-19.3NI 5% FP-600-40-20+20+40+60100.1% IMB020406080100125-19.1NI 6% FP-600-40-20+20+40+6099.9% IMB020406080100125-19.2NI 7% FP-600-40-20+20+40+60100.0% IMB020406080100125-19.2NI 8% FP-600-40-20+20+40+60100.0POWER RANGE NI'S 1.1R   CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)
4
INITIAL CONDITIONS   Unit 1 had a transient from 100% power 4 hours ago. The current time is 0800. The Reactor Calculations package is NOT running. All other equipment is operable. PT/1/A/0600/001 (Periodic Instrument Surveillance), Enclosures 13.1 (Mode 1 & 2) has been completed up to page 7, Axial Power Imbalance Operating Limits. Minimum incore detector operability requirements have been verified met per PT/0/A/1103/019 (Backup Incore Detector System). INITIATING CUE The SRO directs you to: 1. Perform Axial Power Imbalance verification in accordance with PT/1/A/0600/001 (Periodic Instrument Surveillance), Enclosure 13.1 (Mode 1 & 2).
___ SAT
ADM-S105 1.1S Page 1 of 11 REGION II JOB PERFORMANCE MEASURE   ADM-S105 PERFORM A POWER IMBALANCE VERIFICATION AND DETERMINE ANY REQUIRED ACTIONS AND COMPLETION TIMES   Alternate Path: N/A Alt Path Failure: ____________________________________________________________
* Use Imbalance CR gauges reading for each NI.
Time Critical: No Time Critical Criteria: ________________________________________________________   Prepared By:                                                                                                   Date:     EP Review By:                                   N/A                                                       Date:           Reviewed By:                                                                                                 Date:       Approved By:                                                                                                 Date:
6    3.2.7
ADM-S105 1.1S Page 2 of 11 REGION II JOB PERFORMANCE MEASURE Task Title : Perform a power imbalance verification and determine any required actions and completion times. Task Number : N/A Alternate Path: N/A Time Critical: No   Validation Time: 35 minutes       K/A Rating(s):   System:   G K/A:         2.1.25 Rating:   3.9/4.2 Task Standard:   Candidate determines that Axial Power Imbalance is NOT within the limits of the COLR and determines the appropriate TS requirements.
___ UNSAT STANDARD: Using the attached NI graphic determine that %
Imbalance (Avg.) is - 19.2%.
COMMENTS:
Refer to the Unit 1 COLR to determine if the calculated outcore imbalance is within the limit for current plant conditions.
CRITICAL STEP STANDARD: Determine the calculated outcore imbalance (- 19.2%)
exceeds the limit (- 17.7%) for current plant conditions.                                                ___ SAT 7
COMMENTS:
___ UNSAT END TASK TIME STOP: ________
 
ADM-105 1.1R Page 8 of 11 CRITICAL STEP EXPLANATIONS SEQ                                           Explanation STEP #
6   This step is required to determine average imbalance.
7  This step is required to determine if imbalance is within the limits of the COLR.
 
1.1R BACKUP INCORE CHART A                               BACKUP INCORE CHART B POINT #         %       Location                   POINT #     %   Location 1           158.6         G09-L2                   1         98.6   E07-L6 2           112.1         G09-L4                   2         97.4   G11-L6 3             98.6         G09-L6                   3         99.2   M09-L6 4           159.2         E09-L2                   4       *OOS     K05-L6 5           111.8         E09-L4                   5       *OOS     K05-L4 6             98.4         E09-L6                   6       *OOS     L06-L2 7           158.8         G05-L2                   7       *OOS     L06-L4 8             97.5         G05-L6                   8       *OOS     L06-L6 9           159.9         M07-L2                   9       156.2   M09-L2 10           99.2         M07-L6                   10       *OOS     K05-L2 11           158.6         K11-L2                   11       159.2   G11-L2 12           98.1         K11-L6                   12       *OOS     E07-L2 13           157.8         F13-L2                   13       158.2   C10-L2 14           158.6         D05-L2                   14       98.1   C10-L6 15           112.3         F13-L4                   15       *OOS     F03-L2 16           158.1         C06-L2                   16       98.5   F03-L6 17           99.6         C06-L6                   17       *OOS     N04-L2 18           98.8         F13-L6                   18       112.1   N04-L4 19           97.6         O10-L6                   19       *OOS     N04-L6 20           98.3         L03-L6                   20       159.3   O06-L2 21           159.6         L03-L2                   21       *OOS     O06-L4 22           98.6         D05-L6                   22       *OOS     O06-L6 23           158.7         O10-L2                   23       *OOS     L13-L2 24           111.9         D05-L4                   24       98.8   L13-L6 Note: Listed points with values are in calibration.
* Work Request written
 
1.1R POWER RANGE NIS NI 5        NI 6        NI 7        NI 8
   % FP        % FP        % FP        % FP 100.1        99.9      100.0      100.0
      +60        +60        +60        +60 125        125        125        125 100 +40    100 +40    100 +40    100 +40 80 +20      80 +20     80 +20     80 +20 60      0  60      0  60      0  60      0 40     -20  40    -20  40    -20  40     -20 20     -40 20    -40  20    -40  20    -40 0    -60  0    -60  0    -60  0     -60
-19.3      -19.1      -19.2      -19.2
% IMB      % IMB      % IMB      % IMB
 
1.1R CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)
INITIAL CONDITIONS
* Unit 1 had a transient from 100% power 4 hours ago.
* The current time is 0800.
* The Reactor Calculations package is NOT running.
* All other equipment is operable.
* PT/1/A/0600/001 (Periodic Instrument Surveillance), Enclosures 13.1 (Mode 1 &
: 2) has been completed up to page 7, Axial Power Imbalance Operating Limits.
* Minimum incore detector operability requirements have been verified met per PT/0/A/1103/019 (Backup Incore Detector System).
INITIATING CUE The SRO directs you to:
: 1. Perform Axial Power Imbalance verification in accordance with PT/1/A/0600/001 (Periodic Instrument Surveillance), Enclosure 13.1 (Mode 1 & 2).
 
ADM-S105 1.1S Page 1 of 11 REGION II JOB PERFORMANCE MEASURE ADM-S105 PERFORM A POWER IMBALANCE VERIFICATION AND DETERMINE ANY REQUIRED ACTIONS AND COMPLETION TIMES Alternate Path: N/A Alt Path Failure: ____________________________________________________________
Time Critical: No Time Critical Criteria: ________________________________________________________
Prepared By:                                                 Date:
EP Review By:                       N/A                       Date:
Reviewed By:                                                 Date:
Approved By:                                                 Date:
 
ADM-S105 1.1S Page 2 of 11 REGION II JOB PERFORMANCE MEASURE Task Title : Perform a power imbalance verification and determine any required actions and completion times.
Task Number : N/A Alternate Path: N/A Time Critical: No Validation Time: 35 minutes K/A Rating(s):
System: G K/A:     2.1.25 Rating: 3.9/4.2 Task Standard:
Candidate determines that Axial Power Imbalance is NOT within the limits of the COLR and determines the appropriate TS requirements.


==References:==
==References:==
PT/1/A/0600/001 (Periodic Instrument Surveillance) procedure and Enclosures 13.1  OP/1/A/1105/014 (Control Room Instrumentation Operation and Information) Core Operating Limits Report Tech Specs Tools/Equipment/Procedures Needed:    PT/1/A/0600/001 (Periodic Instrument Surveillance) procedure and Enclosures 13.1  OP/1/A/1105/014 (Control Room Instrumentation Operation and Information) Core Operating Limits Report Tech Specs  =====================================================================================
Candidate:  __________________________________                Time Start: _______________    NAME              Time Finish: ______________  Performance Rating:  SAT ______ UNSAT ______            Performance Time: _________  Examiner: ______________________________        ___________________________________/_________    NAME      SIGNATURE                            DATE ===================================================================================== Comments ADM-S105  1.1S Page 3 of 11  SIMULATOR OPERATOR JPM SETUP INSTRUCTIONS  1. NONE ADM-S105  1.1S Page 4 of 11  READ TO OPERATOR  DIRECTIONS TO STUDENT  When I tell you to begin, you are to PERFORM A POWER IMBALANCE VERIFICATION. Before you begin, I will describe the general plant conditions, state the initiating cues, and answer any questions you have. Perform procedure steps as if you were actually performing the task.
INITIAL CONDITIONS  Unit 1 had a transient from 100% power 4 hours ago. The current time is 0800. The Reactor Calculations package is NOT running. All other equipment is operable. PT/1/A/0600/001 (Periodic Instrument Surveillance), Enclosure 13.1 (Mode 1 & 2) has been completed up to page 7, Axial Power Imbalance Operating Limits. Minimum incore detector operability requirements have been verified met per PT/0/A/1103/019 (Backup Incore Detector System). INITIATING CUE  The SRO directs you to: 1. Perform Axial Power Imbalance verification in accordance with PT/1/A/0600/001 (Periodic Instrument Surveillance), Enclosure 13.1 (Mode 1 & 2). 2. Determine all Tech Spec/SLC required actions and completion times, if any.   


ADM-S105  1.1S Page 5 of 11  START TIME: _______  SEQ STEP PROC STEP DESCRIPTION  1  PT/1/A/0600/001, SR 3.2.2.1 Axial Power Imbalance Operating Limit:  IF > 40% RTP, verify Power imbalance within operational alarm limits in COLR. IF Reactor Calculations package is NOT running on computer, refer to OP/1/A/1105/014 (Control Room Instrumentation Operation And Information). STANDARD: Determine reactor power is greater than 40%. Determine Reactor Calculation package is NOT running per Initial Conditions and refer to OP/1/A/1105/014 (Control Room Instrumentation Operation And Information). COMMENTS:   ___ SAT 
PT/1/A/0600/001 (Periodic Instrument Surveillance) procedure and Enclosures 13.1 OP/1/A/1105/014 (Control Room Instrumentation Operation and Information)
Core Operating Limits Report Tech Specs Tools/Equipment/Procedures Needed:
PT/1/A/0600/001 (Periodic Instrument Surveillance) procedure and Enclosures 13.1 OP/1/A/1105/014 (Control Room Instrumentation Operation and Information)
Core Operating Limits Report Tech Specs
=====================================================================================
Candidate: __________________________________                                  Time Start: _______________
NAME                                          Time Finish: ______________
Performance Rating: SAT ______ UNSAT ______                                  Performance Time: _________
Examiner: ______________________________              ___________________________________/_________
NAME                                            SIGNATURE                    DATE
=====================================================================================
Comments
 
ADM-S105 1.1S Page 3 of 11 SIMULATOR OPERATOR JPM SETUP INSTRUCTIONS
: 1. NONE
 
ADM-S105 1.1S Page 4 of 11 READ TO OPERATOR DIRECTIONS TO STUDENT When I tell you to begin, you are to PERFORM A POWER IMBALANCE VERIFICATION. Before you begin, I will describe the general plant conditions, state the initiating cues, and answer any questions you have. Perform procedure steps as if you were actually performing the task.
INITIAL CONDITIONS
* Unit 1 had a transient from 100% power 4 hours ago.
* The current time is 0800.
* The Reactor Calculations package is NOT running.
* All other equipment is operable.
* PT/1/A/0600/001 (Periodic Instrument Surveillance), Enclosure 13.1 (Mode 1 & 2) has been completed up to page 7, Axial Power Imbalance Operating Limits.
* Minimum incore detector operability requirements have been verified met per PT/0/A/1103/019 (Backup Incore Detector System).
INITIATING CUE The SRO directs you to:
: 1. Perform Axial Power Imbalance verification in accordance with PT/1/A/0600/001 (Periodic Instrument Surveillance), Enclosure 13.1 (Mode 1 & 2).
: 2. Determine all Tech Spec/SLC required actions and completion times, if any.


___ UNSAT      2 3.2.3 OP/1/A/1105/014 Encl. 4.13   IF Reactor Calculations package is NOT running, verify minimum incore detector operability requirements are met. Refer to PT/0/A/1103/019 (Backup Incore Detector System). STANDARD: Determine the minimum incore detector operability requirements are met from the initiating cue. COMMENTS:    ___ SAT
ADM-S105 1.1S Page 5 of 11 START TIME: _______
___ UNSAT ADM-S105  1.1S Page 6 of 11  3  3.2.4 Order of preference of measurement systems to determine axial imbalance and quadrant power tilt is as follows: A. Incore Detectors (Computer Reactor Calculation Package). B. Outcore Detectors (Power Range Outcore Detectors). C. Backup Incore Detectors. Refer to PT/0/A/1103/019 (Backup Incore Detector System).                STANDARD: Candidate reviews step and determines Outcore Detectors should be used. Continues to Step 3.2.5  COMMENTS:    ___ SAT    ___ UNSAT     4  3.2.5 IF at least one power range outcore detector is NOT operable in each quadrant (NI-5 thru NI-8), outcore detectors shall NOT be used to measure axial imbalance or quadrant power tilt  STANDARD: Determine NI-5 thru NI-8 are operable and can be used to measure axial imbalance. COMMENTS:   ___ SAT 
SEQ  PROC DESCRIPTION STEP  STEP PT/1/A/0600/001, SR 3.2.2.1 Axial Power Imbalance Operating Limit:
IF > 40% RTP, verify Power imbalance within operational alarm limits in COLR.
IF Reactor Calculations package is NOT running on computer, refer to OP/1/A/1105/014 (Control Room Instrumentation Operation And        ___ SAT Information).
1            STANDARD: Determine reactor power is greater than 40%.
___ UNSAT Determine Reactor Calculation package is NOT running per Initial Conditions and refer to OP/1/A/1105/014 (Control Room Instrumentation Operation And Information).
COMMENTS:
OP/1/A/1105/014 Encl. 4.13 IF Reactor Calculations package is NOT running, verify minimum incore detector operability requirements are met. Refer to             ___ SAT PT/0/A/1103/019 (Backup Incore Detector System).
2    3.2.3  STANDARD: Determine the minimum incore detector operability requirements are met from the initiating cue.         ___ UNSAT COMMENTS:


___ UNSAT   5 3.2.6 IF Outcore Detectors (Power Range Outcore Detectors) are needed for tilt calculations, contact Rx Engineering group to perform PT/0/A/1103/018 (Excore Tilt Calculations). STANDARD: Determine this step does not apply because they are not determining tilt calculation at this time. EXAMINER CUE: If asked, notify the candidate that tilt calculations are not required. COMMENTS:   ___ SAT
ADM-S105 1.1S Page 6 of 11 Order of preference of measurement systems to determine axial imbalance and quadrant power tilt is as follows:
___ UNSAT ADM-S105 1.1S Page 7 of 11 6  3.2.7 IF Outcore Detectors (Power Range Outcore Detectors) are needed for imbalance calculations, refer to the following alternate method for determining (%) Reactor Power Axial Imbalance: NI-5* + NI-6* + NI-7* + NI-8* = % Imbalance (Avg.)                       4
A. Incore Detectors (Computer Reactor Calculation Package).            ___ SAT B. Outcore Detectors (Power Range Outcore Detectors).
* Use Imbalance CR gauges reading for each NI. STANDARD: Using the attached NI graphic determine that % Imbalance (Avg.) is - 19.2%. COMMENTS:     CRITICAL        STEP      ___ SAT  ___ UNSAT  7  Refer to the Unit 1 COLR to determine if the calculated outcore imbalance is within the limit for current plant conditions. STANDARD: Determine the calculated outcore imbalance (- 19.2%) exceeds the limit (- 17.7%) for current plant conditions. COMMENTS:     CRITICAL        STEP      ___ SAT
C. Backup Incore Detectors. Refer to PT/0/A/1103/019 (Backup Incore Detector System).
___ UNSAT Reference Tech Specs to determine required actions. STANDARD: Enter TS 3.2.2 Condition A:                       Restore AXIAL POWER IMBALANCE to within limits within 2 hours. COMMENTS:   END TASK  CRITICAL        STEP      ___ SAT
___ UNSAT 3 3.2.4 STANDARD: Candidate reviews step and determines Outcore Detectors should be used. Continues to Step 3.2.5 COMMENTS:
___ UNSAT TIME STOP: ________
IF at least one power range outcore detector is NOT operable in each quadrant (NI-5 thru NI-8), outcore detectors shall NOT be used to measure axial imbalance or quadrant power tilt
ADM-S105 1.1S Page 8 of 11   CRITICAL STEP EXPLANATIONS SEQ STEP # Explanation   6 This step is required to determine average imbalance. 7 8 This step is required to determine if imbalance is within the limits of the COLR. This step is required to determine actions required by Tech Specs.
___ SAT STANDARD: Determine NI-5 thru NI-8 are operable and can be 4 3.2.5                  used to measure axial imbalance.
1.1S   BACKUP INCORE CHART "ABACKUP INCORE CHART "B" POINT # % Location POINT # % Location 1 158.6 G09-L2 1   98.6 E07-L6 2 112.1 G09-L4 2   97.4 G11-L6 3   98.6 G09-L6 3   99.2 M09-L6 4 159.2 E09-L2 4 *OOS K05-L6 5 111.8 E09-L4 5 *OOS K05-L4 6   98.4 E09-L6 6 *OOS L06-L2 7 158.8 G05-L2 7 *OOS L06-L4 8   97.5 G05-L6 8 *OOS L06-L6 9 159.9 M07-L2 9 156.2 M09-L2 10   99.2 M07-L6 10 *OOS K05-L2 11 158.6 K11-L2 11 159.2 G11-L2 12   98.1 K11-L6 12 *OOS E07-L2 13 157.8 F13-L2 13 158.2 C10-L2 14 158.6 D05-L2 14   98.1 C10-L6 15 112.3 F13-L4 15 *OOS F03-L2 16 158.1 C06-L2 16   98.5 F03-L6 17   99.6 C06-L6 17 *OOS N04-L2 18   98.8 F13-L6 18 112.1 N04-L4 19   97.6 O10-L6 19 *OOS N04-L6 20   98.3 L03-L6 20 159.3 O06-L2 21 159.6 L03-L2 21 *OOS O06-L4 22   98.6 D05-L6 22 *OOS O06-L6 23 158.7 O10-L2 23 *OOS L13-L2 24 111.9 D05-L4 24   98.8 L13-L6   Note: Listed points with values are "in calibration".
___ UNSAT COMMENTS:
* Work Request written 1.1S  % IMB020406080100125-19.3NI 5% FP-600-40-20+20+40+60100.1% IMB020406080100125-19.1NI 6% FP-600-40-20+20+40+6099.9% IMB020406080100125-19.2NI 7% FP-600-40-20+20+40+60100.0% IMB020406080100125-19.2NI 8% FP-600-40-20+20+40+60100.0POWER RANGE NI'S 1.1S   CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)
IF Outcore Detectors (Power Range Outcore Detectors) are needed for tilt calculations, contact Rx Engineering group to perform PT/0/A/1103/018 (Excore Tilt Calculations).
INITIAL CONDITIONS   Unit 1 had a transient from 100% power 4 hours ago. The current time is 0800. The Reactor Calculations package is NOT running. All other equipment is operable. PT/1/A/0600/001 (Periodic Instrument Surveillance), Enclosures 13.1 (Mode 1 & 2) has been completed up to page 7, Axial Power Imbalance Operating Limits. Minimum incore detector operability requirements have been verified met per PT/0/A/1103/019 (Backup Incore Detector System). INITIATING CUE The SRO directs you to: 1. Perform Axial Power Imbalance verification in accordance with PT/1/A/0600/001 (Periodic Instrument Surveillance), Enclosure 13.1 (Mode 1 & 2). 2. Determine all Tech Spec/SLC required actions and completion times, if any.
STANDARD: Determine this step does not apply because they are           ___ SAT not determining tilt calculation at this time.
ADM-102 1.2B Page 1 of 9 REGION II JOB PERFORMANCE MEASURE   ADM-102 CALCULATE REQUIREMENTS TO MAKEUP TO THE BWST   Alternate Path: (N/A)   Alt Path Failure: ____________________________________________________________
5 3.2.6 EXAMINER CUE: If asked, notify the candidate that tilt calculations are not required.                   ___ UNSAT COMMENTS:
Time Critical: (No) Time Critical Criteria: ________________________________________________________   Prepared By:                                                                                                   Date:     Reviewed By:                                                                                                 Date:       Approved By:                                                                                                 Date:
 
ADM-102 1.2B Page 2 of 9 REGION II JOB PERFORMANCE MEASURE Task Title : Calculate requirements to makeup to the BWST Task Number : N/A Alternate Path: N/A Time Critical: No   Validation Time: 15 min       K/A Rating(s):   System: GEN K/A: 2.1.37 Rating:   4.3/4.6 Task Standard:   Calculate volume of CBAST and DW needed to yield the proper volume at the correct Boron concentration to makeup to the BWST.  
ADM-S105 1.1S Page 7 of 11 IF Outcore Detectors (Power Range Outcore Detectors) are needed for imbalance calculations, refer to the following alternate method for CRITICAL determining (%) Reactor Power Axial Imbalance:
STEP NI-5* + NI-6* + NI-7* + NI-8* = % Imbalance (Avg.)
4
___ SAT
* Use Imbalance CR gauges reading for each NI.
6    3.2.7
___ UNSAT STANDARD: Using the attached NI graphic determine that %
Imbalance (Avg.) is - 19.2%.
COMMENTS:
Refer to the Unit 1 COLR to determine if the calculated outcore imbalance is within the limit for current plant conditions.
CRITICAL STEP STANDARD: Determine the calculated outcore imbalance (- 19.2%)
exceeds the limit (- 17.7%) for current plant conditions.                                                 ___ SAT 7
COMMENTS:
___ UNSAT Reference Tech Specs to determine required actions.
STANDARD: Enter TS 3.2.2 Condition A:                                       CRITICAL STEP Restore AXIAL POWER IMBALANCE to within limits within 2 hours.
8                                                                                        ___ SAT COMMENTS:
___ UNSAT END TASK TIME STOP: ________
 
ADM-S105 1.1S Page 8 of 11 CRITICAL STEP EXPLANATIONS SEQ                                           Explanation STEP #
6   This step is required to determine average imbalance.
7   This step is required to determine if imbalance is within the limits of the COLR.
This step is required to determine actions required by Tech Specs.
 
1.1S BACKUP INCORE CHART A                               BACKUP INCORE CHART B POINT #         %       Location                   POINT #     %   Location 1           158.6         G09-L2                   1         98.6   E07-L6 2           112.1         G09-L4                   2         97.4   G11-L6 3             98.6         G09-L6                   3         99.2   M09-L6 4           159.2         E09-L2                   4       *OOS     K05-L6 5           111.8         E09-L4                   5       *OOS     K05-L4 6             98.4         E09-L6                   6       *OOS     L06-L2 7           158.8         G05-L2                   7       *OOS     L06-L4 8             97.5         G05-L6                   8       *OOS     L06-L6 9           159.9         M07-L2                   9       156.2   M09-L2 10           99.2         M07-L6                   10       *OOS     K05-L2 11           158.6         K11-L2                   11       159.2   G11-L2 12           98.1         K11-L6                   12       *OOS     E07-L2 13           157.8         F13-L2                   13       158.2   C10-L2 14           158.6         D05-L2                   14       98.1   C10-L6 15           112.3         F13-L4                   15       *OOS     F03-L2 16           158.1         C06-L2                   16       98.5   F03-L6 17           99.6         C06-L6                   17       *OOS     N04-L2 18           98.8         F13-L6                   18       112.1   N04-L4 19           97.6         O10-L6                   19       *OOS     N04-L6 20           98.3         L03-L6                   20       159.3   O06-L2 21           159.6         L03-L2                   21       *OOS     O06-L4 22           98.6         D05-L6                   22       *OOS     O06-L6 23           158.7         O10-L2                   23       *OOS     L13-L2 24           111.9         D05-L4                   24       98.8   L13-L6 Note: Listed points with values are in calibration.
* Work Request written
 
1.1S POWER RANGE NIS NI 5        NI 6        NI 7        NI 8
   % FP        % FP        % FP        % FP 100.1        99.9      100.0      100.0
      +60        +60        +60        +60 125        125        125        125 100 +40    100 +40    100 +40    100 +40 80 +20      80 +20     80 +20     80 +20 60      0  60      0  60      0  60      0 40     -20  40    -20  40    -20  40     -20 20     -40 20    -40  20    -40  20    -40 0    -60  0    -60  0    -60  0     -60
-19.3      -19.1      -19.2      -19.2
% IMB      % IMB      % IMB      % IMB
 
1.1S CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)
INITIAL CONDITIONS
* Unit 1 had a transient from 100% power 4 hours ago.
* The current time is 0800.
* The Reactor Calculations package is NOT running.
* All other equipment is operable.
* PT/1/A/0600/001 (Periodic Instrument Surveillance), Enclosures 13.1 (Mode 1 &
: 2) has been completed up to page 7, Axial Power Imbalance Operating Limits.
* Minimum incore detector operability requirements have been verified met per PT/0/A/1103/019 (Backup Incore Detector System).
INITIATING CUE The SRO directs you to:
: 1. Perform Axial Power Imbalance verification in accordance with PT/1/A/0600/001 (Periodic Instrument Surveillance), Enclosure 13.1 (Mode 1 & 2).
: 2. Determine all Tech Spec/SLC required actions and completion times, if any.
 
ADM-102 1.2B Page 1 of 9 REGION II JOB PERFORMANCE MEASURE ADM-102 CALCULATE REQUIREMENTS TO MAKEUP TO THE BWST Alternate Path: (N/A)
Alt Path Failure: ____________________________________________________________
Time Critical: (No)
Time Critical Criteria: ________________________________________________________
Prepared By:                                                 Date:
Reviewed By:                                                 Date:
Approved By:                                                 Date:
 
ADM-102 1.2B Page 2 of 9 REGION II JOB PERFORMANCE MEASURE Task Title : Calculate requirements to makeup to the BWST Task Number : N/A Alternate Path: N/A Time Critical: No Validation Time: 15 min K/A Rating(s):
System: GEN K/A:     2.1.37 Rating: 4.3/4.6 Task Standard:
Calculate volume of CBAST and DW needed to yield the proper volume at the correct Boron concentration to makeup to the BWST.


==References:==
==References:==
EOP Encl. 5.4 (Makeup to the BWST) OP/0/A/1108/001 (Curves and General Information) (Rev. 109) COLR  Tools/Equipment/Procedures Needed:  EOP Encl. 5.4 (Makeup to the BWST) OP/0/A/1108/001 (Curves and General Information) Calculator Straight edge/ruler          =====================================================================================
Candidate:  __________________________________                Time Start: _______________    NAME              Time Finish: ______________
Performance Rating:  SAT ______ UNSAT ______            Performance Time: _________  Examiner: ______________________________        ___________________________________/_________    NAME      SIGNATURE                            DATE ===================================================================================== Comments ADM-102  1.2B Page 3 of 9  SIMULATOR OPERATOR JPM SETUP INSTRUCTIONS  1. NONE ADM-102  1.2B Page 4 of 9  READ TO OPERATOR  DIRECTIONS TO STUDENT  When I tell you to begin, you are to CALCULATE REQUIREMENTS TO MAKEUP TO THE BWST . Before you begin, I will describe the general plant conditions, state the initiating cues, and answer any questions. Perform procedure steps as if you were actually performing the task. INITIAL CONDITIONS  OAC is not available  Unit 1 shutdown and cool down in progress due to a tube rupture in the 1A SG  SGTR Tab in progress    Unit 1 BWST level = 38 feet  Unit 1 BWST Boron concentration = 2600 ppm    1A BHUT level = 40 inches  1A BHUT Boron Concentration = 240 ppm  CBAST Boron Concentration = 12,501 ppm    INITIATING CUES The CRS instructs you to initiate EOP Encl. 5.4 (Makeup to the BWST) to determine the required volumes of CBAST and DW to begin makeup to the BWST from 1A BHUT. You are to calculate the required volumes of CBAST and DW to fill 1A BHUT to 168 inches and match the current BWST Boron concentration.   


ADM-102 1.2B Page 5 of 9 START TIME: _______ SEQ STEP PROC STEP DESCRIPTION  1  1 Determine current volume in 1A BHUT using any of the following: OAC graphic CS01 BHUT Volume vs. Level Curve in OP/0/A/1108/001 (Curves and General Information) STANDARD: Refer to Enclosure 4.1, BHUT Volume vs. Level Curve in OP/0/A/1108/001 (Curves and General Information) and determine that the volume of water in the 1A BHUT:   40" 18,250 gallons (18,000 to 18,500 gal)                       168" 81,000 gallons (80,750 to 81,250 gal)   COMMENTS:   CRITICAL STEP  ___ SAT  ___ UNSAT ADM-102 1.2B Page 6 of 9 2  2 Determine volume of CBAST required per the following to yield a volume in 1A BHUT of 81,000 gals at 2600 ppm: (BHUTvf x BHUTcf)- ( BHUTvi x BHUTci ) = # gal of CBAST needed   CBASTc, (80,750 x 2,600) - (18,500 x 240 ) =   16,439 gal of CBAST needed                                       12,501         (81,250 x 2,600) - (18,000 x 240 ) =   16,553 gal of CBAST needed                                     12,501         STANDARD: Candidate calculates the required volumes from CBAST between: 16,439 and 16,553 gallons. BHUTvf = Final BHUT volume (gal) 80,750 to 81,250 gals BHUTvi = Initial BHUT volume (gal) 18,000 to 18,500 gals BHUTcf = Final BHUT conc (ppmb) 2600 ppmb BHUTci = Initial BHUT conc (ppmb) 240 ppmb CBASTc = CBAST conc (ppmb) 12,501 ppmb Note: Instructions are to fill 1A BHUT to 168" which correlates to ~81,000 gal. COMMENTS:   CRITICAL STEP  ___ SAT  ___ UNSAT ADM-102 1.2B Page 7 of 9 3  2 Determine volume of DW required per the following to yield a volume in 1A BHUT of 80,750 to 81,250 gals at 2600 ppm: BHUTvf - BHUTvi - # gallons CBAST needed = # gallons of DW needed 81,250 - 18,000 - 16,439 =   46,811 gallons of DW needed 80,750 - 18,500 - 16,553 =   45,697 gallons of DW needed STANDARD: Candidate calculates the required volumes from DW between: 45,697 and 46,811 gallons COMMENTS:     END OF TASK CRITICAL STEP  ___ SAT  ___ UNSAT TIME STOP: ________
EOP Encl. 5.4 (Makeup to the BWST)
ADM-102 1.2B Page 8 of 9   CRITICAL STEP EXPLANATIONS SEQ STEP # Explanation   1 Required for determining the correct water volumes. 2 3 These calculations are required for determining the correct water volumes. These calculations are required for determining the correct water volumes.            
OP/0/A/1108/001 (Curves and General Information) (Rev. 109)
COLR Tools/Equipment/Procedures Needed:
EOP Encl. 5.4 (Makeup to the BWST)
OP/0/A/1108/001 (Curves and General Information)
Calculator Straight edge/ruler
=====================================================================================
Candidate: __________________________________                              Time Start: _______________
NAME                                        Time Finish: ______________
Performance Rating: SAT ______ UNSAT ______                              Performance Time: _________
Examiner: ______________________________            ___________________________________/_________
NAME                                        SIGNATURE                      DATE
=====================================================================================
Comments
 
ADM-102 1.2B Page 3 of 9 SIMULATOR OPERATOR JPM SETUP INSTRUCTIONS
: 1. NONE
 
ADM-102 1.2B Page 4 of 9 READ TO OPERATOR DIRECTIONS TO STUDENT When I tell you to begin, you are to CALCULATE REQUIREMENTS TO MAKEUP TO THE BWST . Before you begin, I will describe the general plant conditions, state the initiating cues, and answer any questions. Perform procedure steps as if you were actually performing the task.
INITIAL CONDITIONS
* OAC is not available
* Unit 1 shutdown and cool down in progress due to a tube rupture in the 1A SG
* SGTR Tab in progress
* Unit 1 BWST level = 38 feet
* Unit 1 BWST Boron concentration = 2600 ppm
* 1A BHUT level = 40 inches
* 1A BHUT Boron Concentration = 240 ppm
* CBAST Boron Concentration = 12,501 ppm INITIATING CUES The CRS instructs you to initiate EOP Encl. 5.4 (Makeup to the BWST) to determine the required volumes of CBAST and DW to begin makeup to the BWST from 1A BHUT.
You are to calculate the required volumes of CBAST and DW to fill 1A BHUT to 168 inches and match the current BWST Boron concentration.
 
ADM-102 1.2B Page 5 of 9 START TIME: _______
SEQ   PROC DESCRIPTION STEP   STEP Determine current volume in 1A BHUT using any of the following:
* OAC graphic CS01
* BHUT Volume vs. Level Curve in OP/0/A/1108/001 (Curves and General Information)
CRITICAL STANDARD: Refer to Enclosure 4.1, BHUT Volume vs. Level Curve         STEP in OP/0/A/1108/001 (Curves and General Information) and determine that the volume of water in the 1A
___ SAT 1    1                    BHUT:
40  18,250 gallons (18,000 to 18,500 gal)         ___ UNSAT 168  81,000 gallons (80,750 to 81,250 gal)
COMMENTS:
 
ADM-102 1.2B Page 6 of 9 Determine volume of CBAST required per the following to yield a volume in 1A BHUT of 81,000 gals at 2600 ppm:
(BHUTvf x BHUTcf)- ( BHUTvi x BHUTci ) = # gal of CBAST needed CRITICAL CBASTc, STEP (80,750 x 2,600) - (18,500 x 240 ) = 16,439 gal of CBAST needed 12,501                                       ___ SAT (81,250 x 2,600) - (18,000 x 240 ) = 16,553 gal of CBAST needed   ___ UNSAT 12,501 STANDARD: Candidate calculates the required volumes from CBAST between:
16,439 and 16,553 gallons.
2 2 BHUTvf = Final BHUT volume (gal) 80,750 to 81,250 gals BHUTvi = Initial BHUT volume (gal) 18,000 to 18,500 gals BHUTcf = Final BHUT conc (ppmb) 2600 ppmb BHUTci = Initial BHUT conc (ppmb) 240 ppmb CBASTc = CBAST conc (ppmb) 12,501 ppmb Note: Instructions are to fill 1A BHUT to 168 which correlates to ~81,000 gal.
COMMENTS:
 
ADM-102 1.2B Page 7 of 9 Determine volume of DW required per the following to yield a volume in 1A BHUT of 80,750 to 81,250 gals at 2600 ppm:
CRITICAL BHUTvf - BHUTvi - # gallons CBAST needed = # gallons of DW STEP needed 81,250 - 18,000 - 16,439 = 46,811 gallons of DW needed                 ___ SAT 80,750 - 18,500 - 16,553 = 45,697 gallons of DW needed               ___ UNSAT 3    2 STANDARD: Candidate calculates the required volumes from DW between:
45,697 and 46,811 gallons COMMENTS:
END OF TASK TIME STOP: ________
 
ADM-102 1.2B Page 8 of 9 CRITICAL STEP EXPLANATIONS SEQ                                         Explanation STEP #
1   Required for determining the correct water volumes.
2   These calculations are required for determining the correct water volumes.
These calculations are required for determining the correct water volumes.
 
1.2B CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)
INITIAL CONDITIONS
* OAC is not available
* Unit 1 shutdown and cool down in progress due to a tube rupture in the 1A SG
* SGTR Tab in progress
* Unit 1 BWST level = 38 feet
* Unit 1 BWST Boron concentration = 2600 ppm
* 1A BHUT level = 40 inches
* 1A BHUT Boron Concentration = 240 ppm
* CBAST Boron Concentration = 12,501 ppm INITIATING CUES The CRS instructs you to initiate EOP Encl. 5.4 (Makeup to the BWST) to determine the required volumes of CBAST and DW to begin makeup to the BWST from 1A BHUT.
You are to calculate the required volumes of CBAST and DW to fill 1A BHUT to 168 inches and match the current BWST Boron concentration.
 
ADM-201 2.R Page 1 of 7 REGION II JOB PERFORMANCE MEASURE ADM-201 Determine SSF RCMU Pump Operability Alternate Path: (N/A)
Alt Path Failure: ____________________________________________________________
Time Critical: (N/A)
Time Critical Criteria: ________________________________________________________
Prepared By:                                                Date:
Reviewed By:                                                Date:
Approved By:                                                Date:


1.2B      CANDIDATE CUE SHEET  (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)
ADM-201 2.R Page 2 of 7 REGION II JOB PERFORMANCE MEASURE Task Title : Determine SSF RCMU Pump Operability Task Number : N/A Alternate Path: N/A Time Critical: No Validation Time: 10 minutes K/A Rating(s):
INITIAL CONDITIONS  OAC is not available  Unit 1 shutdown and cool down in progress due to a tube rupture in the 1A SG  SGTR Tab in progress    Unit 1 BWST level = 38 feet  Unit 1 BWST Boron concentration = 2600 ppm  1A BHUT level = 40 inches  1A BHUT Boron Concentration = 240 ppm  CBAST Boron Concentration = 12,501 ppm    INITIATING CUES The CRS instructs you to initiate EOP Encl. 5.4 (Makeup to the BWST) to determine the required volumes of CBAST and DW to begin makeup to the BWST from 1A BHUT. You are to calculate the required volumes of CBAST and DW to fill 1A BHUT to 168 inches and match the current BWST Boron concentration.
System: GEN K/A:       2.2.42 Rating: 3.9/4.6 Task Standard:
ADM-201 2.R Page 1 of 7  REGION II JOB PERFORMANCE MEASURE  ADM-201 Determine SSF RCMU Pump Operability    Alternate Path:  (N/A)
Determine SSF RCMUP Operability as directed by OP/1/A/1105/014 (Control Room Instrumentation And Information) Encl. 4.1 (Mode 1 & 2). Curve on Page of Encl. 4.1 (Unit 1&2 Spent Fuel Pool Level Vs Temperature Curves) of OP/0/A/1108/001B (Spent Fuel Pool Level Vs Temperature Curves) is used to determine the RCMUP is Operable.
Alt Path Failure:  ____________________________________________________________
Time Critical:  (N/A)
Time Critical Criteria:  ________________________________________________________    Prepared By:                                                                                                  Date:      Reviewed By:                                                                                                  Date:      Approved By:                                                                                                  Date:
ADM-201  2.R Page 2 of 7 REGION II JOB PERFORMANCE MEASURE Task Title : Determine SSF RCMU Pump Operability Task Number : N/A Alternate Path: N/A Time Critical: No Validation Time: 10 minutes       K/A Rating(s):   System: GEN K/A: 2.2.42 Rating:   3.9/4.6 Task Standard:   Determine SSF RCMUP Operability as directed by OP/1/A/1105/014 (Control Room Instrumentation And Information) Encl. 4.1 (Mode 1 & 2). Curve on Page of Encl. 4.1 (Unit 1&2 Spent Fuel Pool Level Vs Temperature Curves) of OP/0/A/1108/001B (Spent Fuel Pool Level Vs Temperature Curves) is used to determine the RCMUP is Operable.  


==References:==
==References:==
OP/1/A/1105/014 (Control Room Instrumentation And Information), Encl. 4.1 (Mode 1 & 2) Encl. 4.1 (Unit 1&2 Spent Fuel Pool Level Vs Temperature Curves) of OP/0/A/1108/001B (Spent Fuel Pool Level Vs Temperature Curves)  Tools/Equipment/Procedures Needed:    OP/1/A/1105/014 (Control Room Instrumentation And Information)  Encl. 4.1 (Mode 1 & 2)  OP/0/A/1108/001B (Spent Fuel Pool Level Vs Temperature Curves) Encl. 4.1 (Unit 1&2 Spent Fuel Pool Level Vs Temperature Curves)          =====================================================================================              Candidate:  __________________________________                Time Start: _______________    NAME              Time Finish: ______________
Performance Rating:  SAT ______ UNSAT ______            Performance Time: _________
Examiner: ______________________________        ___________________________________/_________    NAME      SIGNATURE                            DATE ===================================================================================== Comments ADM-201  2.R Page 3 of 7  SIMULATOR OPERATOR JPM SETUP INSTRUCTIONS  1. NONE ADM-201  2.R Page 4 of 7  READ TO OPERATOR  DIRECTIONS TO STUDENT  When I tell you to begin, you are to DETERMINE SSF RC MAKEUP PUMP OPERABILITY. Before you begin, I will describe the general plant conditions, state the initiating cues, and answer any questions you have. Perform procedure steps as if you were actually performing the task. 


INITIAL CONDITIONS: Unit 1 at 100%   Unit 2 was shutdown (subcritical) on 06/01 at 1900 Current date and time: 06/13 at 2300 Unit 2 core 2EOC26 defueling has just completed 2SF-1 and 2SF-2 are open 2SF-1 and 2SF-2 leakage = 0.0 gpm Spent Fuel Pool Level = - 1.8 feet (0SF LT0001; OAC points O1A2186 and O1A2187) Spent Fuel Pool Temperature = 120°F (0SF TT0002P) OP/1/A/1105/014 Encl. 4.1 (Mode 1 & 2) in progress   INITIATING CUES: The CRS instructs you to continue with OP/1/A/1105/014 (Control Room Instrumentation and Information) Encl. 4.1 (Mode 1 & 2) starting on page 15 of 16, and determine Unit 1 SSF RCMUP Operability.  
OP/1/A/1105/014 (Control Room Instrumentation And Information), Encl. 4.1 (Mode 1 & 2)
Encl. 4.1 (Unit 1&2 Spent Fuel Pool Level Vs Temperature Curves) of OP/0/A/1108/001B (Spent Fuel Pool Level Vs Temperature Curves)
Tools/Equipment/Procedures Needed:
* OP/1/A/1105/014 (Control Room Instrumentation And Information) Encl. 4.1 (Mode 1 & 2)
* OP/0/A/1108/001B (Spent Fuel Pool Level Vs Temperature Curves) Encl. 4.1 (Unit 1&2 Spent Fuel Pool Level Vs Temperature Curves)
=====================================================================================
Candidate: __________________________________                                Time Start: _______________
NAME                                          Time Finish: ______________
Performance Rating: SAT ______ UNSAT ______                                  Performance Time: _________
Examiner: ______________________________            ___________________________________/_________
NAME                                          SIGNATURE                    DATE
=====================================================================================
Comments
 
ADM-201 2.R Page 3 of 7 SIMULATOR OPERATOR JPM SETUP INSTRUCTIONS
: 1. NONE
 
ADM-201 2.R Page 4 of 7 READ TO OPERATOR DIRECTIONS TO STUDENT When I tell you to begin, you are to DETERMINE SSF RC MAKEUP PUMP OPERABILITY. Before you begin, I will describe the general plant conditions, state the initiating cues, and answer any questions you have. Perform procedure steps as if you were actually performing the task.
INITIAL CONDITIONS:
* Unit 1 at 100%
* Unit 2 was shutdown (subcritical) on 06/01 at 1900
* Current date and time: 06/13 at 2300
* Unit 2 core 2EOC26 defueling has just completed
* 2SF-1 and 2SF-2 are open
* 2SF-1 and 2SF-2 leakage = 0.0 gpm
* Spent Fuel Pool Level = - 1.8 feet (0SF LT0001; OAC points O1A2186 and O1A2187)
* Spent Fuel Pool Temperature = 120°F (0SF TT0002P)
* OP/1/A/1105/014 Encl. 4.1 (Mode 1 & 2) in progress INITIATING CUES:
The CRS instructs you to continue with OP/1/A/1105/014 (Control Room Instrumentation and Information) Encl. 4.1 (Mode 1 & 2) starting on page 15 of 16, and determine Unit 1 SSF RCMUP Operability.


ADM-201 2.R Page 5 of 7 START TIME: _______ SEQ STEP PROC STEP DESCRIPTION  1  flow chart page 2 Determine pages of Encl. 4.1 (Unit 1&2 Spent Fuel Pool Level Vs Temperature Curves) that apply. STANDARD: Refer to flowchart on page 2 of Encl. 4.1 (Unit 1&2 Spent Fuel Pool Level Vs Temperature Curves) of OP/0/A/1108/001B since the most recent RFO was on Unit 2 and determine that either Figure 20 or 27 is to be used. COMMENTS:     ___ SAT  ___ UNSAT    2  flow chart page 2 Determine appropriate curve. STANDARD: Determine that Figure 20 on page 27 of 35 should be utilized since alternate temperature indication is not being used per cue sheet. COMMENTS:   CRITICAL STEP  ___ SAT  ___ UNSAT  3  Figure  20 Verify SFP level > specified on appropriate curve on Figure 20 (page 27 of 35). STANDARD: Determine that correct curve is "Day > 12 & < 13".                         Determine from initiating cue that Spent Fuel Pool water temperature is 120&deg;F. Determine from initiating cue that Spent Fuel Pool water level is -1.8 feet. Determine that SFP level is > than the appropriate curve and therefore the RCMUP is OPERABLE. COMMENTS:   END OF TASK CRITICAL STEP  ___ SAT    ___ UNSAT TIME STOP: ________
ADM-201 2.R Page 5 of 7 START TIME: _______
ADM-201 2.R Page 6 of 7   CRITICAL STEP EXPLANATIONS SEQ STEP # Explanation   2 This step is required to determine correct curves. 3 This step is required to determine SSF RCMUP is operable.
SEQ   PROC DESCRIPTION STEP   STEP Determine pages of Encl. 4.1 (Unit 1&2 Spent Fuel Pool Level Vs Temperature Curves) that apply.
2.R     CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)
___ SAT STANDARD: Refer to flowchart on page 2 of Encl. 4.1 (Unit 1&2 flow Spent Fuel Pool Level Vs Temperature Curves) of         ___ UNSAT chart                OP/0/A/1108/001B since the most recent RFO was on 1
INITIAL CONDITIONS: Unit 1 at 100%   Unit 2 was shutdown (subcritical) on 06/01 at 1900 Current date and time: 06/13 at 2300 Unit 2 core 2EOC26 defueling has just completed 2SF-1 and 2SF-2 are open 2SF-1 and 2SF-2 leakage = 0.0 gpm Spent Fuel Pool Level = - 1.8 feet (0SF LT0001; OAC points O1A2186 and O1A2187) Spent Fuel Pool Temperature = 120&deg;F (0SF TT0002P) OP/1/A/1105/014 Encl. 4.1 (Mode 1 & 2) in progress   INITIATING CUES: The CRS instructs you to continue with OP/1/A/1105/014 (Control Room Instrumentation and Information) Encl. 4.1 (Mode 1 & 2) starting on page 15 of 16, and determine Unit 1 SSF RCMUP Operability.
page                  Unit 2 and determine that either Figure 20 or 27 is to 2                  be used.
ADM-S201 2.S Page 1 of 7 REGION II JOB PERFORMANCE MEASURE   ADM-S201 DETERMINE TECH SPEC REQUIREMENTS FOR INOPERABLE PZR HEATERS   Alternate Path: (No)
COMMENTS:
Alt Path Failure: ____________________________________________________________
Determine appropriate curve.                                           CRITICAL STEP flow  STANDARD: Determine that Figure 20 on page 27 of 35 should be utilized since alternate temperature indication is not   ___ SAT chart 2                          being used per cue sheet.
Time Critical: (No)
page
Time Critical Criteria: ________________________________________________________   Prepared By:                                                                                                   Date:     Reviewed By:                                                                                                 Date:       Approved By:                                                                                                 Date:
___ UNSAT 2    COMMENTS:
ADM-S201 2.S Page 2 of 7 REGION II JOB PERFORMANCE MEASURE Task Title : Determine Tech Spec Requirements for Inoperable PZR Heaters Task Number : N/A Alternate Path: N/A Time Critical: No Validation Time: 15 minutes       K/A Rating(s):   System: GEN K/A: 2.2.40 Rating:   3.4/4.7 Task Standard:   Determine that minimum number of PZR heaters for SSF operability are NOT operable and as a result TS 3.10.1 Condition A must be entered. The Required Action and Completion Time is to restore SSF ASW system to Operable within 7 days.  
Verify SFP level > specified on appropriate curve on Figure 20 (page   CRITICAL 27 of 35).                                                               STEP STANDARD: Determine that correct curve is "Day > 12 & < 13".           ___ SAT Determine from initiating cue that Spent Fuel Pool water temperature is 120&deg;F.
Figure                Determine from initiating cue that Spent Fuel Pool
___ UNSAT 3                          water level is -1.8 feet.
20 Determine that SFP level is > than the appropriate curve and therefore the RCMUP is OPERABLE.
COMMENTS:
END OF TASK TIME STOP: ________
 
ADM-201 2.R Page 6 of 7 CRITICAL STEP EXPLANATIONS SEQ                                           Explanation STEP #
2   This step is required to determine correct curves.
3   This step is required to determine SSF RCMUP is operable.
 
2.R CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)
INITIAL CONDITIONS:
* Unit 1 at 100%
* Unit 2 was shutdown (subcritical) on 06/01 at 1900
* Current date and time: 06/13 at 2300
* Unit 2 core 2EOC26 defueling has just completed
* 2SF-1 and 2SF-2 are open
* 2SF-1 and 2SF-2 leakage = 0.0 gpm
* Spent Fuel Pool Level = - 1.8 feet (0SF LT0001; OAC points O1A2186 and O1A2187)
* Spent Fuel Pool Temperature = 120&deg;F (0SF TT0002P)
* OP/1/A/1105/014 Encl. 4.1 (Mode 1 & 2) in progress INITIATING CUES:
The CRS instructs you to continue with OP/1/A/1105/014 (Control Room Instrumentation and Information) Encl. 4.1 (Mode 1 & 2) starting on page 15 of 16, and determine Unit 1 SSF RCMUP Operability.
 
ADM-S201 2.S Page 1 of 7 REGION II JOB PERFORMANCE MEASURE ADM-S201 DETERMINE TECH SPEC REQUIREMENTS FOR INOPERABLE PZR HEATERS Alternate Path: (No)
Alt Path Failure: ____________________________________________________________
Time Critical: (No)
Time Critical Criteria: ________________________________________________________
Prepared By:                                                 Date:
Reviewed By:                                                 Date:
Approved By:                                                 Date:
 
ADM-S201 2.S Page 2 of 7 REGION II JOB PERFORMANCE MEASURE Task Title : Determine Tech Spec Requirements for Inoperable PZR Heaters Task Number : N/A Alternate Path: N/A Time Critical: No Validation Time: 15 minutes K/A Rating(s):
System: GEN K/A:     2.2.40 Rating: 3.4/4.7 Task Standard:
Determine that minimum number of PZR heaters for SSF operability are NOT operable and as a result TS 3.10.1 Condition A must be entered. The Required Action and Completion Time is to restore SSF ASW system to Operable within 7 days.


==References:==
==References:==
Technical Specifications  Tools/Equipment/Procedures Needed:  Technical Specifications      =====================================================================================
Candidate:  __________________________________                Time Start: _______________    NAME              Time Finish: ______________  Performance Rating:  SAT ______ UNSAT ______            Performance Time: _________  Examiner: ______________________________        ___________________________________/_________    NAME      SIGNATURE                            DATE ===================================================================================== Comments ADM-S201  2.S Page 3 of 7  SIMULATOR OPERATOR JPM SETUP INSTRUCTIONS  1. NONE ADM-S201  2.S Page 4 of 7  READ TO OPERATOR  DIRECTIONS TO STUDENT  When I tell you to begin, you are to DETERMINE TECH SPEC REQUIREMENTS FOR INOPERABLE PZR HEATERS. Before you begin, I will describe the general plant conditions, state the initiating cues, and answer any questions you have. Perform procedure steps as if you were actually performing the task. INITIAL CONDITIONS: Unit 2 is operating at 100% power. Pressurizer Steam Space Leakage = 0.2 gpm Number of SSF Bank 2 Pressurizer Heaters available = 16  INITIATING CUES: The SM directs you to: 1. Evaluate TS 3.10 (SSF) and determine if the required Pressurizer heaters are operable. 2. As a result of your evaluation above, document all applicable Conditions, Required Actions, and Completion Times (if any) below.   


ADM-S201 2.S Page 5 of 7 START TIME: _______ SEQ STEP PROC STEP DESCRIPTION  1    Candidate will evaluate Tech Spec requirements. Evaluate TS B 3.10.1 for Unit 2 STANDARD: Determine that:   For Unit 2 the maximum allowed PZR Steam Space Leakage with 16 PZR heaters available is 0.10 gpm. As a result the minimum number of PZR heaters for SSF operability are NOT operable. COMMENTS:   CRITICAL STEP  ___ SAT  ___ UNSAT      2    Candidate will evaluate the Table on Page B 3.10.1-4. STANDARD: Determine that the SSF ASW system inoperable,   TS 3.10.1 Condition A should be entered. Required Action and Completion Time is to restore SSF ASW system to Operable within 7 days Note: Normally the SSF ASW System being inoperable would render ALL of the SSF systems inoperable. However, if the SSF ASW System is inoperable due to inoperable PZR heaters, the other SSF systems remain operable. COMMENTS:     END OF TASK CRITICAL STEP  ___ SAT  ___ UNSAT      TIME STOP: ________
Technical Specifications Tools/Equipment/Procedures Needed:
ADM-S201 2.S Page 6 of 7   CRITICAL STEP EXPLANATIONS SEQ STEP # Explanation   1 Critical since this step is required to determine if required SSF PZR heaters are operable  2 Critical since this step is required to ensure compliance with Tech Specs 2.S     CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)
Technical Specifications
INITIAL CONDITIONS: Unit 2 is operating at 100% power. Pressurizer Steam Space Leakage = 0.2 gpm Number of SSF Bank 2 Pressurizer Heaters available = 16 INITIATING CUES: The SM directs you to: 1. Evaluate TS 3.10 (SSF) and determine if the required Pressurizer heaters are operable. 2. As a result of your evaluation above, document all applicable Conditions, Required Actions, and Completion Times (if any) below.
=====================================================================================
ADM-301a 3.B Page 1 of 7 REGION II JOB PERFORMANCE MEASURE   ADM-301a Determine Posting and Access Requirements of LPI Room Based on Plan View   Alternate Path: (No)
Candidate: __________________________________                                Time Start: _______________
Alt Path Failure: ____________________________________________________________
NAME                                          Time Finish: ______________
Time Critical: (No)
Performance Rating: SAT ______ UNSAT ______                                Performance Time: _________
Time Critical Criteria: ________________________________________________________   Prepared By:                                                                                                   Date:     Reviewed By:                                                                                                 Date:       Approved By:                                                                                                 Date:
Examiner: ______________________________            ___________________________________/_________
ADM-301a 3.B Page 2 of 7 REGION II JOB PERFORMANCE MEASURE Task Title : Determine Posting and Access Requirements of LPI Room Based on Plan View Task Number : (N/A) Alternate Path:  (N/A) Time Critical: No   Validation Time: 10 minutes       K/A Rating(s):   System: GEN K/A: 2.3.12 Rating:   3.2/3.7 Task Standard:   Determine that: 1. Area should be posted as a Locked High Radiation Area 2. Continuous RP coverage is required. 3. The total accumulated annual dose at completion of job is 1493 mrem.
NAME                                        SIGNATURE                    DATE
=====================================================================================
Comments
 
ADM-S201 2.S Page 3 of 7 SIMULATOR OPERATOR JPM SETUP INSTRUCTIONS
: 1. NONE
 
ADM-S201 2.S Page 4 of 7 READ TO OPERATOR DIRECTIONS TO STUDENT When I tell you to begin, you are to DETERMINE TECH SPEC REQUIREMENTS FOR INOPERABLE PZR HEATERS. Before you begin, I will describe the general plant conditions, state the initiating cues, and answer any questions you have. Perform procedure steps as if you were actually performing the task.
INITIAL CONDITIONS:
Unit 2 is operating at 100% power.
Pressurizer Steam Space Leakage = 0.2 gpm Number of SSF Bank 2 Pressurizer Heaters available = 16 INITIATING CUES:
The SM directs you to:
: 1. Evaluate TS 3.10 (SSF) and determine if the required Pressurizer heaters are operable.
: 2. As a result of your evaluation above, document all applicable Conditions, Required Actions, and Completion Times (if any) below.
 
ADM-S201 2.S Page 5 of 7 START TIME: _______
SEQ   PROC DESCRIPTION STEP   STEP Candidate will evaluate Tech Spec requirements.
CRITICAL
* Evaluate TS B 3.10.1 for Unit 2                                   STEP STANDARD: Determine that:
___ SAT
* For Unit 2 the maximum allowed PZR Steam Space Leakage with 16 PZR heaters available is     ___ UNSAT 0.10 gpm.
1
* As a result the minimum number of PZR heaters for SSF operability are NOT operable.
COMMENTS:
Candidate will evaluate the Table on Page B 3.10.1-4.
STANDARD: Determine that the SSF ASW system inoperable,
* TS 3.10.1 Condition A should be entered.
* Required Action and Completion Time is to restore   CRITICAL SSF ASW system to Operable within 7 days               STEP Note: Normally the SSF ASW System being inoperable would render
___ SAT 2            ALL of the SSF systems inoperable. However, if the SSF ASW System is inoperable due to inoperable PZR heaters, the other SSF systems
___ UNSAT remain operable.
COMMENTS:
END OF TASK TIME STOP: ________
 
ADM-S201 2.S Page 6 of 7 CRITICAL STEP EXPLANATIONS SEQ                                             Explanation STEP #
1   Critical since this step is required to determine if required SSF PZR heaters are operable 2   Critical since this step is required to ensure compliance with Tech Specs
 
2.S CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)
INITIAL CONDITIONS:
Unit 2 is operating at 100% power.
Pressurizer Steam Space Leakage = 0.2 gpm Number of SSF Bank 2 Pressurizer Heaters available = 16 INITIATING CUES:
The SM directs you to:
: 1. Evaluate TS 3.10 (SSF) and determine if the required Pressurizer heaters are operable.
: 2. As a result of your evaluation above, document all applicable Conditions, Required Actions, and Completion Times (if any) below.
 
ADM-301a 3.B Page 1 of 7 REGION II JOB PERFORMANCE MEASURE ADM-301a Determine Posting and Access Requirements of LPI Room Based on Plan View Alternate Path: (No)
Alt Path Failure: ____________________________________________________________
Time Critical: (No)
Time Critical Criteria: ________________________________________________________
Prepared By:                                                 Date:
Reviewed By:                                                 Date:
Approved By:                                                 Date:
 
ADM-301a 3.B Page 2 of 7 REGION II JOB PERFORMANCE MEASURE Task Title : Determine Posting and Access Requirements of LPI Room Based on Plan View Task Number :   (N/A)
Alternate Path:  (N/A)
Time Critical: No Validation Time: 10 minutes K/A Rating(s):
System: GEN K/A:     2.3.12 Rating: 3.2/3.7 Task Standard:
Determine that:
: 1. Area should be posted as a Locked High Radiation Area
: 2. Continuous RP coverage is required.
: 3. The total accumulated annual dose at completion of job is 1493 mrem.


==References:==
==References:==


PD-RP-ALL-0001 Radiation Worker Responsibilities Survey Map of Room 61 Tools/Equipment/Procedures Needed:
PD-RP-ALL-0001 Radiation Worker Responsibilities Survey Map of Room 61 Tools/Equipment/Procedures Needed:
PD-RP-ALL-0001 Radiation Worker Responsibilities Survey Map of Room 61     =====================================================================================             Candidate: __________________________________                 Time Start: _______________     NAME               Time Finish: ______________ Performance Rating:   SAT ______ UNSAT ______           Performance Time: _________   Examiner: ______________________________         ___________________________________/_________   NAME     SIGNATURE                           DATE ===================================================================================== Comments ADM-301a 3.B Page 3 of 7 SIMULATOR OPERATOR JPM SETUP INSTRUCTIONS 1. NONE ADM-301a 3.B Page 4 of 7 READ TO OPERATOR DIRECTIONS TO STUDENT When I tell you to begin, you are to DETERMINE POSTING AND ACCESS REQUIREMENTS OF LPI ROOM BASED ON PLAN VIEW. Before you begin, I will describe the general plant conditions, state the initiating cues, and answer any questions you have. Perform procedure steps as if you were actually performing the task. INITIAL CONDITIONS You are a Reactor Operator. An event has occurred which resulted in a significant change in the radiological conditions in Room 61 (LPI and RBS Pumps). Your total whole body dose this year is 1265 mrem. INITIATING CUE Using the survey map provided, determine the following for Room 61: The RP related posting(s) you would expect to encounter at the entry to Room 61 If Continuous RP coverage is required for you to perform venting of the 1A LPI Pump If venting the 1A LPI pump takes three (3) hours, determine your total accumulated annual dose when the job is complete and you have exited the room.  
PD-RP-ALL-0001 Radiation Worker Responsibilities Survey Map of Room 61
=====================================================================================
Candidate: __________________________________                               Time Start: _______________
NAME                                         Time Finish: ______________
Performance Rating: SAT ______ UNSAT ______                                 Performance Time: _________
Examiner: ______________________________           ___________________________________/_________
NAME                                           SIGNATURE                   DATE
=====================================================================================
Comments
 
ADM-301a 3.B Page 3 of 7 SIMULATOR OPERATOR JPM SETUP INSTRUCTIONS
: 1. NONE
 
ADM-301a 3.B Page 4 of 7 READ TO OPERATOR DIRECTIONS TO STUDENT When I tell you to begin, you are to DETERMINE POSTING AND ACCESS REQUIREMENTS OF LPI ROOM BASED ON PLAN VIEW. Before you begin, I will describe the general plant conditions, state the initiating cues, and answer any questions you have. Perform procedure steps as if you were actually performing the task.
INITIAL CONDITIONS You are a Reactor Operator. An event has occurred which resulted in a significant change in the radiological conditions in Room 61 (LPI and RBS Pumps).
Your total whole body dose this year is 1265 mrem.
INITIATING CUE Using the survey map provided, determine the following for Room 61:
* The RP related posting(s) you would expect to encounter at the entry to Room 61
* If Continuous RP coverage is required for you to perform venting of the 1A LPI Pump
* If venting the 1A LPI pump takes three (3) hours, determine your total accumulated annual dose when the job is complete and you have exited the room.
 
ADM-301a 3.B Page 5 of 7 START TIME: _______
SEQ  PROC DESCRIPTION STEP  STEP Using the survey map provided, determine the area posting              CRITICAL requirements.                                                            STEP STANDARD: Candidate reviews the survey map and determines:
___ SAT
* Based on an area around LPI sump pumps being 1075 mr/hr (> 1000 mr/hr, but < 500 rad/hr), the  ___ UNSAT 1                              area should be posted as a Locked High Radiation Area (LHRA).
COMMENTS:
Determine RP coverage required to vent the 1A LPI Pump                CRITICAL STEP STANDARD: Candidate determines that continuous RP coverage is required since the area is a LHRA.
___ SAT 2                                                                                  ___ UNSAT COMMENTS:
Determine total accumulated annual dose after completion of job.      CRITICAL STEP STANDARD: Candidate determines the dose as a result of the venting as follows:
3 hours X 76 mr/hr = 228 mrem                            ___ SAT Determine the total accumulated annual dose            ___ UNSAT 3                          following completion of the job.
1265 + 228 = 1493 mrem COMMENTS:
END OF TASK TIME STOP: ________
 
ADM-301a 3.B Page 6 of 7 CRITICAL STEP EXPLANATIONS SEQ                                          Explanation STEP #
1  Determines General Area posting requirements for the room to be entered.
2  Determines RP continuous coverage requirements.
3  Determines total accumulated annual dose.
 
3.B CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)
INITIAL CONDITIONS You are a Reactor Operator. An event has occurred which resulted in a significant change in the radiological conditions in Room 61 (LPI and RBS Pumps).
Your total whole body dose this year is 1265 mrem.
INITIATING CUE Using the survey map provided, determine the following for Room 61:
* The RP related posting(s) you would expect to encounter at the entry to Room 61
* If Continuous RP coverage is required for you to perform venting of the 1A LPI Pump
* If venting the 1A LPI pump takes three (3) hours, determine your total accumulated annual dose when the job is complete and you have exited the room.
 
Room 61 LPI & RBS Pumps                                            Survey # M-021506-17        Date/Time Today 0412 ROOM 61 LPI AND RB PUMPS N
AHU 1-6                              *50
                                                              +30 112                                    1A 2                35 RBS Significant Dose Contriutor STAIRS SUMP PUMPS 88 1
            +1245
            *1947                            95                                          76
            +1075 433 3                1C LPI                                        1A LPI 95                                                  76 Summary of Highest Readings Comments: CONTACT RP REGARDING ANY ATTEMPTS TO CLEAN LPI ROOM SUMP                                                                  Smears                  Air Samples & Wipes
: 1) 554 DPM/100 cm2 /g
: 2) 485 DPM/100 cm2 /g
: 3) 978 DPM/100 cm2 /g Symol Legend (for example only)          Type: Jo Coverage Dose Rate
*150  Contact Reading HS-50  Hot Spot RWP: 5036
  +75  30 cm Reading      RCA    Posting  Reactor Power = 100%
20  General Area Drip Bag 15 Smear  15  Air Sample 15 Wipe Unless otherwise noted, dose rates in mrem/hr.
Surveyor: W. Walters                                Approved y: N. Wriston, Date: Today


ADM-301a  3.B Page 5 of 7  START TIME: _______  SEQ STEP PROC STEP DESCRIPTION  1  Using the survey map provided, determine the area posting  requirements. STANDARD: Candidate reviews the survey map and determines:  Based on an area around LPI sump pumps being 1075 mr/hr (> 1000 mr/hr, but < 500 rad/hr), the area should be posted as a Locked High Radiation Area (LHRA). COMMENTS:    CRITICAL STEP  ___ SAT  ___ UNSAT    2  Determine RP coverage required to vent the 1A LPI Pump  STANDARD: Candidate determines that continuous RP coverage is  required since the area is a LHRA. COMMENTS:    CRITICAL STEP  ___ SAT  ___ UNSAT    3  Determine total accumulated annual dose after completion of job. STANDARD: Candidate determines the dose as a result of the venting as follows: 3 hours X 76 mr/hr = 228 mrem Determine the total accumulated annual dose following completion of the job. 1265 + 228 = 1493 mrem  COMMENTS:  END OF TASK CRITICAL STEP    ___ SAT
ADM-S401 4.S Page 1 of 7 REGION II JOB PERFORMANCE MEASURE ADM-S401 DETERMINE EMERGENCY CLASSIFICATION Alternate Path: (No)
___ UNSAT TIME STOP: ________
Alt Path Failure: ____________________________________________________________
ADM-301a  3.B Page 6 of 7    CRITICAL STEP EXPLANATIONS SEQ STEP # Explanation  1 Determines General Area posting requirements for the room to be entered. 2  3  Determines RP continuous coverage requirements. Determines total accumulated annual dose.
Time Critical: (Yes)
3.B    CANDIDATE CUE SHEET  (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)
Time Critical Criteria: __Classify event within 15 minutes____________________________
INITIAL CONDITIONS  You are a Reactor Operator. An event has occurred which resulted in a significant change in the radiological conditions in Room 61 (LPI and RBS Pumps). Your total whole body dose this year is 1265 mrem. INITIATING CUE  Using the survey map provided, determine the following for Room 61:  The RP related posting(s) you would expect to encounter at the entry to Room 61  If Continuous RP coverage is required for you to perform venting of the 1A LPI Pump  If venting the 1A LPI pump takes three (3) hours, determine your total accumulated annual dose when the job is complete and you have exited the room.
Prepared By:                                                       Date:
Summary of Highest ReadingsSmearsAir Samples & Wipes          1) 554 DPM/100 cm2 2) 485 DPM/100 cm2 3) 978 DPM/100 cm2 Surveyor: W. WaltersUnless otherwise noted, dose rates in mrem/hr.Symbol Legend (for example only)Dose RateContact Reading30 cm ReadingGeneral Area*150+752015Smear15Air Sample15WipeHS-50Hot SpotRCAPostingDrip BagType: Job CoverageRWP: 5036Reactor Power = 100%Approved by: N. Wriston, Date: TodayComments:  CONTACT RP REGARDING ANY ATTEMPTS TO CLEAN LPI ROOM SUMP  Room 61 LPI & RBS PumpsSurvey # M-021506-17  Date/Time Today  0412ROOM 61 LPI AND RB PUMPSN112SUMPPUMPS+12451C LPI1A LPI1ARBSAHU1-6STAIRSSignificant Dose Contributor95763588*50+30132 *1947 +1075    433 76 95 ADM-S401 4.S Page 1 of 7 REGION II JOB PERFORMANCE MEASURE   ADM-S401 DETERMINE EMERGENCY CLASSIFICATION   Alternate Path: (No)
Reviewed By:                                                       Date:
Alt Path Failure: ____________________________________________________________
Approved By:                                                       Date:
Time Critical: (Yes)
 
Time Critical Criteria: __Classify event within 15 minutes____________________________   Prepared By:                                                                                                   Date:     Reviewed By:                                                                                                 Date:       Approved By:                                                                                                 Date:
ADM-S401 4.S Page 2 of 7 REGION II JOB PERFORMANCE MEASURE Task Title : Determine Emergency Classification Task Number : N/A Alternate Path: N/A Time Critical: Yes (15 min).
ADM-S401 4.S Page 2 of 7 REGION II JOB PERFORMANCE MEASURE Task Title : Determine Emergency Classification Task Number : N/A Alternate Path: N/A Time Critical: Yes (15 min).
Validation Time: 15 minutes K/A Rating(s):
Validation Time: 15 minutes       K/A Rating(s):   System:   Gen K/A:     2.4.38 Rating:     2.4/4.4 Task Standard:   Appropriate classification is determined within 15 minutes.
System:   Gen K/A:     2.4.38 Rating:   2.4/4.4 Task Standard:
Appropriate classification is determined within 15 minutes.


==References:==
==References:==
RP/0/A/1000/001 (Emergency Classification) Tools/Equipment/Procedures Needed:
RP/0/A/1000/001 (Emergency Classification)   
        =====================================================================================              Candidate:  __________________________________                Time Start: _______________    NAME              Time Finish: ______________
Performance Rating:  SAT ______ UNSAT ______            Performance Time: _________
Examiner: ______________________________        ___________________________________/_________    NAME      SIGNATURE                            DATE ===================================================================================== Comments ADM-S401  4.S Page 3 of 7  SIMULATOR OPERATOR JPM SETUP INSTRUCTIONS  1. NONE ADM-S401  4.S Page 4 of 7  READ TO OPERATOR  DIRECTIONS TO STUDENT  When I tell you to begin, you are to DETERMINE EMERGENCY CLASSIFICATION. Before you begin, I will describe the general plant conditions, state the initiating cues, and answer any questions you have. Perform procedure steps as if you were actually performing the task.
INITIAL CONDITIONS:  0800 Unit 1 experiences a runback and trip due to a loss of Stator Coolant. 0805 The Operator dispatched to determine if the MS Relief Valves have reseated reports that 1A SG appears to have two MSRVs damaged and still passing steam. 0806 1B SG has been isolated due to excessive heat transfer and RCS Temperature stabilized at 520F CETCs. 0815 Calculations indicate a 1A S/G Tube leak of 240 gpm is occurring. 1RIA-40 = 1,245 cps and increasing. 0816 The 1A S/G is being fed by the 1A MDEFWP and is being used for RCS Temperature control. Feeding the 1B S/G for Tube to Shell Delta Temperature concerns is NOT required at this time. INITIATING CUE: Perform the required actions of the Emergency Coordinator: 1. Determine Emergency Classification at Time = 0816  THIS IS A TIME CRITICAL JPM  Note: Do not use Emergency Coordinator's judgment while classifying the event.   


ADM-S401 4.S Page 5 of 7 START TIME: _______ SEQ STEP PROC STEP DESCRIPTION  1    Classify the Event. STANDARD: Refer to RP/0/A/1000/01 (Emergency Classification) Encl. 4.1 (Fission Product Barrier Matrix)                         Determine 4 points are applicable due to "SGTR > 160 gpm" under Potential Loss of RCS Barriers.                     COMMENTS: CRITICAL STEP  ___ SAT  ___ UNSAT    2    Classify the Event. STANDARD: Refer to RP/0/A/1000/01 (Emergency Classification) Encl. 4.1 (Fission Product Barrier Matrix)                         Determine 3 points are applicable due to "Failure of secondary side of SG results in a direct opening to the environment with SG Tube Leak > 10 gpm in the SAME SG" under Loss of Containment Barriers.                         Add the points together (4 + 3) for a total of 7 points.                         Refer to the classifications across the bottom of Encl. 4.1 and determine a Site Area Emergency (SAE) is (7 - 10 points). Classify as a Site Area Emergency. Time of Classification: _________________ COMMENTS:     END OF TASK CRITICAL STEP  ___ SAT  ___ UNSAT TIME STOP: ________
RP/0/A/1000/001 (Emergency Classification)
ADM-S401 4.S Page 6 of 7   CRITICAL STEP EXPLANATIONS SEQ STEP # Explanation  2 This step is required for the candidate to utilize the procedure and determine the conditions meet a Site Area Emergency classification within 15 minutes. This step is required for the candidate to utilize the procedure and determine the conditions meet a Site Area Emergency classification within 15 minutes.                
Tools/Equipment/Procedures Needed:
RP/0/A/1000/001 (Emergency Classification)
=====================================================================================
Candidate: __________________________________                              Time Start: _______________
NAME                                      Time Finish: ______________
Performance Rating: SAT ______ UNSAT ______                                Performance Time: _________
Examiner: ______________________________                ___________________________________/_________
NAME                                          SIGNATURE                  DATE
=====================================================================================
Comments
 
ADM-S401 4.S Page 3 of 7 SIMULATOR OPERATOR JPM SETUP INSTRUCTIONS
: 1. NONE
 
ADM-S401 4.S Page 4 of 7 READ TO OPERATOR DIRECTIONS TO STUDENT When I tell you to begin, you are to DETERMINE EMERGENCY CLASSIFICATION. Before you begin, I will describe the general plant conditions, state the initiating cues, and answer any questions you have. Perform procedure steps as if you were actually performing the task.
INITIAL CONDITIONS:
0800 Unit 1 experiences a runback and trip due to a loss of Stator Coolant.
0805 The Operator dispatched to determine if the MS Relief Valves have reseated reports that 1A SG appears to have two MSRVs damaged and still passing steam.
0806 1B SG has been isolated due to excessive heat transfer and RCS Temperature stabilized at 520&deg;F CETCs.
0815 Calculations indicate a 1A S/G Tube leak of 240 gpm is occurring. 1RIA-40 = 1,245 cps and increasing.
0816 The 1A S/G is being fed by the 1A MDEFWP and is being used for RCS Temperature control. Feeding the 1B S/G for Tube to Shell Delta Temperature concerns is NOT required at this time.
INITIATING CUE:
Perform the required actions of the Emergency Coordinator:
: 1. Determine Emergency Classification at Time = 0816 THIS IS A TIME CRITICAL JPM Note: Do not use Emergency Coordinators judgment while classifying the event.
 
ADM-S401 4.S Page 5 of 7 START TIME: _______
SEQ   PROC DESCRIPTION STEP   STEP Classify the Event.                                                       CRITICAL STEP STANDARD: Refer to RP/0/A/1000/01 (Emergency Classification)
Encl. 4.1 (Fission Product Barrier Matrix)                   ___ SAT Determine 4 points are applicable due to "SGTR >
160 gpm" under Potential Loss of RCS Barriers.             ___ UNSAT 1
COMMENTS:
Classify the Event.                                                       CRITICAL STEP STANDARD: Refer to RP/0/A/1000/01 (Emergency Classification)
Encl. 4.1 (Fission Product Barrier Matrix)                   ___ SAT Determine 3 points are applicable due to "Failure of
___ UNSAT secondary side of SG results in a direct opening to the environment with SG Tube Leak > 10 gpm in the SAME SG" under Loss of Containment Barriers.
Add the points together (4 + 3) for a total of 7 points.
Refer to the classifications across the bottom of Encl.
4.1 and determine a Site Area Emergency (SAE) is (7 2                          - 10 points).
Classify as a Site Area Emergency.
Time of Classification: _________________
COMMENTS:
END OF TASK TIME STOP: ________
 
ADM-S401 4.S Page 6 of 7 CRITICAL STEP EXPLANATIONS SEQ                                               Explanation STEP #
1  This step is required for the candidate to utilize the procedure and determine the conditions meet a Site Area Emergency classification within 15 minutes.
This step is required for the candidate to utilize the procedure and determine the conditions meet a Site Area Emergency classification within 15 minutes.


4.S   CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)
4.S CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)
INITIAL CONDITIONS: 0800 Unit 1 experiences a runback and trip due to a loss of Stator Coolant. 0805 The Operator dispatched to determine if the MS Relief Valves have reseated reports that 1A SG appears to have two MSRVs damaged and still passing   steam. 0806 1B SG has been isolated due to excessive heat transfer and RCS Temperature stabilized at 520F CETCs. 0815 Calculations indicate a 1A S/G Tube leak of 240 gpm is occurring. 1RIA-40 = 1,245 cps and increasing. 0816 The 1A S/G is being fed by the 1A MDEFWP and is being used for RCS Temperature control. Feeding the 1B S/G for Tube to Shell Delta Temperature concerns is NOT required at this time. INITIATING CUE: Perform the required actions of the Emergency Coordinator: 1. Determine Emergency Classification at Time = 0816 THIS IS A TIME CRITICAL JPM Note: Do not use Emergency Coordinator's judgment while classifying the event. Emergency Declaration: ________________________
INITIAL CONDITIONS:
Time: ________________   Examiner Initials: _____________}}
0800 Unit 1 experiences a runback and trip due to a loss of Stator Coolant.
0805 The Operator dispatched to determine if the MS Relief Valves have reseated reports that 1A SG appears to have two MSRVs damaged and still passing steam.
0806 1B SG has been isolated due to excessive heat transfer and RCS Temperature stabilized at 520&deg;F CETCs.
0815 Calculations indicate a 1A S/G Tube leak of 240 gpm is occurring. 1RIA-40 =
1,245 cps and increasing.
0816 The 1A S/G is being fed by the 1A MDEFWP and is being used for RCS Temperature control. Feeding the 1B S/G for Tube to Shell Delta Temperature concerns is NOT required at this time.
INITIATING CUE:
Perform the required actions of the Emergency Coordinator:
: 1. Determine Emergency Classification at Time = 0816 THIS IS A TIME CRITICAL JPM Note: Do not use Emergency Coordinators judgment while classifying the event.
Emergency Declaration: ________________________
Time: ________________
Examiner Initials: _____________}}

Latest revision as of 06:55, 31 October 2019

Initial Exam 2015-301 Draft Administrative JPMs
ML15247A410
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 09/04/2015
From:
NRC/RGN-II
To:
Duke Energy Carolinas
References
Download: ML15247A410 (60)


Text

ADM-105 1.1R Page 1 of 11 REGION II JOB PERFORMANCE MEASURE ADM-105 PERFORM A POWER IMBALANCE VERIFICATION Alternate Path: N/A Alt Path Failure: ____________________________________________________________

Time Critical: No Time Critical Criteria: ________________________________________________________

Prepared By: Date:

EP Review By: N/A Date:

Reviewed By: Date:

Approved By: Date:

ADM-105 1.1R Page 2 of 11 REGION II JOB PERFORMANCE MEASURE Task Title : Perform a power imbalance verification.

Task Number : N/A Alternate Path: N/A Time Critical: No Validation Time: 27 minutes K/A Rating(s):

System: G K/A: 2.1.25 Rating: 3.9/4.2 Task Standard:

Candidate determines that Axial Power Imbalance is NOT within the limits of the COLR.

References:

PT/1/A/0600/001 (Periodic Instrument Surveillance) procedure and Enclosures 13.1 OP/1/A/1105/014 (Control Room Instrumentation Operation and Information)

Core Operating Limits Report Tools/Equipment/Procedures Needed:

PT/1/A/0600/001 (Periodic Instrument Surveillance) procedure and Enclosures 13.1 OP/1/A/1105/014 (Control Room Instrumentation Operation and Information)

Core Operating Limits Report

=========================================================================

Candidate: __________________________________ Time Start: _______________

NAME Time Finish: ______________

Performance Rating: SAT ______ UNSAT ______ Performance Time: _________

Examiner: ______________________________ ___________________________________/_________

NAME SIGNATURE DATE

=========================================================================

Comments

ADM-105 1.1R Page 3 of 11 SIMULATOR OPERATOR JPM SETUP INSTRUCTIONS

1. NONE

ADM-105 1.1R Page 4 of 11 READ TO OPERATOR DIRECTIONS TO STUDENT When I tell you to begin, you are to PERFORM A POWER IMBALANCE VERIFICATION. Before you begin, I will describe the general plant conditions, state the initiating cues, and answer any questions you have. Perform procedure steps as if you were actually performing the task.

INITIAL CONDITIONS

  • Unit 1 had a transient from 100% power 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> ago.
  • The current time is 0800.
  • The Reactor Calculations package is NOT running.
  • PT/1/A/0600/001 (Periodic Instrument Surveillance), Enclosure 13.1 (Mode 1 & 2) has been completed up to page 7, Axial Power Imbalance Operating Limits.
  • Minimum incore detector operability requirements have been verified met per PT/0/A/1103/019 (Backup Incore Detector System).

INITIATING CUE The SRO directs you to:

1. Perform Axial Power Imbalance verification in accordance with PT/1/A/0600/001 (Periodic Instrument Surveillance), Enclosure 13.1 (Mode 1 & 2).

ADM-105 1.1R Page 5 of 11 START TIME: _______

SEQ PROC DESCRIPTION STEP STEP PT/1/A/0600/001, SR 3.2.2.1 Axial Power Imbalance Operating Limit:

IF > 40% RTP, verify Power imbalance within operational alarm limits in COLR.

IF Reactor Calculations package is NOT running on computer, refer to OP/1/A/1105/014 (Control Room Instrumentation Operation And ___ SAT Information).

1 STANDARD: Determine reactor power is greater than 40%.

___ UNSAT Determine Reactor Calculation package is NOT running per Initial Conditions and refer to OP/1/A/1105/014 (Control Room Instrumentation Operation And Information).

COMMENTS:

OP/1/A/1105/014 Encl. 4.13 IF Reactor Calculations package is NOT running, verify minimum incore detector operability requirements are met. Refer to ___ SAT PT/0/A/1103/019 (Backup Incore Detector System).

2 3.2.3 STANDARD: Determine the minimum incore detector operability requirements are met from the initiating cue. ___ UNSAT COMMENTS:

ADM-105 1.1R Page 6 of 11 Order of preference of measurement systems to determine axial imbalance and quadrant power tilt is as follows:

A. Incore Detectors (Computer Reactor Calculation Package). ___ SAT B. Outcore Detectors (Power Range Outcore Detectors).

C. Backup Incore Detectors. Refer to PT/0/A/1103/019 (Backup Incore Detector System).

___ UNSAT 3 3.2.4 STANDARD: Candidate reviews step and determines Outcore Detectors should be used. Continues to Step 3.2.5 COMMENTS:

IF at least one power range outcore detector is NOT operable in each quadrant (NI-5 thru NI-8), outcore detectors shall NOT be used to measure axial imbalance or quadrant power tilt

___ SAT STANDARD: Determine NI-5 thru NI-8 are operable and can be 4 3.2.5 used to measure axial imbalance.

___ UNSAT COMMENTS:

IF Outcore Detectors (Power Range Outcore Detectors) are needed for tilt calculations, contact Rx Engineering group to perform PT/0/A/1103/018 (Excore Tilt Calculations).

STANDARD: Determine this step does not apply because they are ___ SAT not determining tilt calculation at this time.

5 3.2.6 EXAMINER CUE: If asked, notify the candidate that tilt calculations are not required. ___ UNSAT COMMENTS:

ADM-105 1.1R Page 7 of 11 IF Outcore Detectors (Power Range Outcore Detectors) are needed for imbalance calculations, refer to the following alternate method for CRITICAL determining (%) Reactor Power Axial Imbalance:

STEP NI-5* + NI-6* + NI-7* + NI-8* = % Imbalance (Avg.)

4

___ SAT

  • Use Imbalance CR gauges reading for each NI.

6 3.2.7

___ UNSAT STANDARD: Using the attached NI graphic determine that %

Imbalance (Avg.) is - 19.2%.

COMMENTS:

Refer to the Unit 1 COLR to determine if the calculated outcore imbalance is within the limit for current plant conditions.

CRITICAL STEP STANDARD: Determine the calculated outcore imbalance (- 19.2%)

exceeds the limit (- 17.7%) for current plant conditions. ___ SAT 7

COMMENTS:

___ UNSAT END TASK TIME STOP: ________

ADM-105 1.1R Page 8 of 11 CRITICAL STEP EXPLANATIONS SEQ Explanation STEP #

6 This step is required to determine average imbalance.

7 This step is required to determine if imbalance is within the limits of the COLR.

1.1R BACKUP INCORE CHART A BACKUP INCORE CHART B POINT #  % Location POINT #  % Location 1 158.6 G09-L2 1 98.6 E07-L6 2 112.1 G09-L4 2 97.4 G11-L6 3 98.6 G09-L6 3 99.2 M09-L6 4 159.2 E09-L2 4 *OOS K05-L6 5 111.8 E09-L4 5 *OOS K05-L4 6 98.4 E09-L6 6 *OOS L06-L2 7 158.8 G05-L2 7 *OOS L06-L4 8 97.5 G05-L6 8 *OOS L06-L6 9 159.9 M07-L2 9 156.2 M09-L2 10 99.2 M07-L6 10 *OOS K05-L2 11 158.6 K11-L2 11 159.2 G11-L2 12 98.1 K11-L6 12 *OOS E07-L2 13 157.8 F13-L2 13 158.2 C10-L2 14 158.6 D05-L2 14 98.1 C10-L6 15 112.3 F13-L4 15 *OOS F03-L2 16 158.1 C06-L2 16 98.5 F03-L6 17 99.6 C06-L6 17 *OOS N04-L2 18 98.8 F13-L6 18 112.1 N04-L4 19 97.6 O10-L6 19 *OOS N04-L6 20 98.3 L03-L6 20 159.3 O06-L2 21 159.6 L03-L2 21 *OOS O06-L4 22 98.6 D05-L6 22 *OOS O06-L6 23 158.7 O10-L2 23 *OOS L13-L2 24 111.9 D05-L4 24 98.8 L13-L6 Note: Listed points with values are in calibration.

  • Work Request written

1.1R POWER RANGE NIS NI 5 NI 6 NI 7 NI 8

% FP  % FP  % FP  % FP 100.1 99.9 100.0 100.0

+60 +60 +60 +60 125 125 125 125 100 +40 100 +40 100 +40 100 +40 80 +20 80 +20 80 +20 80 +20 60 0 60 0 60 0 60 0 40 -20 40 -20 40 -20 40 -20 20 -40 20 -40 20 -40 20 -40 0 -60 0 -60 0 -60 0 -60

-19.3 -19.1 -19.2 -19.2

% IMB  % IMB  % IMB  % IMB

1.1R CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)

INITIAL CONDITIONS

  • Unit 1 had a transient from 100% power 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> ago.
  • The current time is 0800.
  • The Reactor Calculations package is NOT running.
  • PT/1/A/0600/001 (Periodic Instrument Surveillance), Enclosures 13.1 (Mode 1 &
2) has been completed up to page 7, Axial Power Imbalance Operating Limits.
  • Minimum incore detector operability requirements have been verified met per PT/0/A/1103/019 (Backup Incore Detector System).

INITIATING CUE The SRO directs you to:

1. Perform Axial Power Imbalance verification in accordance with PT/1/A/0600/001 (Periodic Instrument Surveillance), Enclosure 13.1 (Mode 1 & 2).

ADM-S105 1.1S Page 1 of 11 REGION II JOB PERFORMANCE MEASURE ADM-S105 PERFORM A POWER IMBALANCE VERIFICATION AND DETERMINE ANY REQUIRED ACTIONS AND COMPLETION TIMES Alternate Path: N/A Alt Path Failure: ____________________________________________________________

Time Critical: No Time Critical Criteria: ________________________________________________________

Prepared By: Date:

EP Review By: N/A Date:

Reviewed By: Date:

Approved By: Date:

ADM-S105 1.1S Page 2 of 11 REGION II JOB PERFORMANCE MEASURE Task Title : Perform a power imbalance verification and determine any required actions and completion times.

Task Number : N/A Alternate Path: N/A Time Critical: No Validation Time: 35 minutes K/A Rating(s):

System: G K/A: 2.1.25 Rating: 3.9/4.2 Task Standard:

Candidate determines that Axial Power Imbalance is NOT within the limits of the COLR and determines the appropriate TS requirements.

References:

PT/1/A/0600/001 (Periodic Instrument Surveillance) procedure and Enclosures 13.1 OP/1/A/1105/014 (Control Room Instrumentation Operation and Information)

Core Operating Limits Report Tech Specs Tools/Equipment/Procedures Needed:

PT/1/A/0600/001 (Periodic Instrument Surveillance) procedure and Enclosures 13.1 OP/1/A/1105/014 (Control Room Instrumentation Operation and Information)

Core Operating Limits Report Tech Specs

=========================================================================

Candidate: __________________________________ Time Start: _______________

NAME Time Finish: ______________

Performance Rating: SAT ______ UNSAT ______ Performance Time: _________

Examiner: ______________________________ ___________________________________/_________

NAME SIGNATURE DATE

=========================================================================

Comments

ADM-S105 1.1S Page 3 of 11 SIMULATOR OPERATOR JPM SETUP INSTRUCTIONS

1. NONE

ADM-S105 1.1S Page 4 of 11 READ TO OPERATOR DIRECTIONS TO STUDENT When I tell you to begin, you are to PERFORM A POWER IMBALANCE VERIFICATION. Before you begin, I will describe the general plant conditions, state the initiating cues, and answer any questions you have. Perform procedure steps as if you were actually performing the task.

INITIAL CONDITIONS

  • Unit 1 had a transient from 100% power 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> ago.
  • The current time is 0800.
  • The Reactor Calculations package is NOT running.
  • PT/1/A/0600/001 (Periodic Instrument Surveillance), Enclosure 13.1 (Mode 1 & 2) has been completed up to page 7, Axial Power Imbalance Operating Limits.
  • Minimum incore detector operability requirements have been verified met per PT/0/A/1103/019 (Backup Incore Detector System).

INITIATING CUE The SRO directs you to:

1. Perform Axial Power Imbalance verification in accordance with PT/1/A/0600/001 (Periodic Instrument Surveillance), Enclosure 13.1 (Mode 1 & 2).
2. Determine all Tech Spec/SLC required actions and completion times, if any.

ADM-S105 1.1S Page 5 of 11 START TIME: _______

SEQ PROC DESCRIPTION STEP STEP PT/1/A/0600/001, SR 3.2.2.1 Axial Power Imbalance Operating Limit:

IF > 40% RTP, verify Power imbalance within operational alarm limits in COLR.

IF Reactor Calculations package is NOT running on computer, refer to OP/1/A/1105/014 (Control Room Instrumentation Operation And ___ SAT Information).

1 STANDARD: Determine reactor power is greater than 40%.

___ UNSAT Determine Reactor Calculation package is NOT running per Initial Conditions and refer to OP/1/A/1105/014 (Control Room Instrumentation Operation And Information).

COMMENTS:

OP/1/A/1105/014 Encl. 4.13 IF Reactor Calculations package is NOT running, verify minimum incore detector operability requirements are met. Refer to ___ SAT PT/0/A/1103/019 (Backup Incore Detector System).

2 3.2.3 STANDARD: Determine the minimum incore detector operability requirements are met from the initiating cue. ___ UNSAT COMMENTS:

ADM-S105 1.1S Page 6 of 11 Order of preference of measurement systems to determine axial imbalance and quadrant power tilt is as follows:

A. Incore Detectors (Computer Reactor Calculation Package). ___ SAT B. Outcore Detectors (Power Range Outcore Detectors).

C. Backup Incore Detectors. Refer to PT/0/A/1103/019 (Backup Incore Detector System).

___ UNSAT 3 3.2.4 STANDARD: Candidate reviews step and determines Outcore Detectors should be used. Continues to Step 3.2.5 COMMENTS:

IF at least one power range outcore detector is NOT operable in each quadrant (NI-5 thru NI-8), outcore detectors shall NOT be used to measure axial imbalance or quadrant power tilt

___ SAT STANDARD: Determine NI-5 thru NI-8 are operable and can be 4 3.2.5 used to measure axial imbalance.

___ UNSAT COMMENTS:

IF Outcore Detectors (Power Range Outcore Detectors) are needed for tilt calculations, contact Rx Engineering group to perform PT/0/A/1103/018 (Excore Tilt Calculations).

STANDARD: Determine this step does not apply because they are ___ SAT not determining tilt calculation at this time.

5 3.2.6 EXAMINER CUE: If asked, notify the candidate that tilt calculations are not required. ___ UNSAT COMMENTS:

ADM-S105 1.1S Page 7 of 11 IF Outcore Detectors (Power Range Outcore Detectors) are needed for imbalance calculations, refer to the following alternate method for CRITICAL determining (%) Reactor Power Axial Imbalance:

STEP NI-5* + NI-6* + NI-7* + NI-8* = % Imbalance (Avg.)

4

___ SAT

  • Use Imbalance CR gauges reading for each NI.

6 3.2.7

___ UNSAT STANDARD: Using the attached NI graphic determine that %

Imbalance (Avg.) is - 19.2%.

COMMENTS:

Refer to the Unit 1 COLR to determine if the calculated outcore imbalance is within the limit for current plant conditions.

CRITICAL STEP STANDARD: Determine the calculated outcore imbalance (- 19.2%)

exceeds the limit (- 17.7%) for current plant conditions. ___ SAT 7

COMMENTS:

___ UNSAT Reference Tech Specs to determine required actions.

STANDARD: Enter TS 3.2.2 Condition A: CRITICAL STEP Restore AXIAL POWER IMBALANCE to within limits within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />.

8 ___ SAT COMMENTS:

___ UNSAT END TASK TIME STOP: ________

ADM-S105 1.1S Page 8 of 11 CRITICAL STEP EXPLANATIONS SEQ Explanation STEP #

6 This step is required to determine average imbalance.

7 This step is required to determine if imbalance is within the limits of the COLR.

8 This step is required to determine actions required by Tech Specs.

1.1S BACKUP INCORE CHART A BACKUP INCORE CHART B POINT #  % Location POINT #  % Location 1 158.6 G09-L2 1 98.6 E07-L6 2 112.1 G09-L4 2 97.4 G11-L6 3 98.6 G09-L6 3 99.2 M09-L6 4 159.2 E09-L2 4 *OOS K05-L6 5 111.8 E09-L4 5 *OOS K05-L4 6 98.4 E09-L6 6 *OOS L06-L2 7 158.8 G05-L2 7 *OOS L06-L4 8 97.5 G05-L6 8 *OOS L06-L6 9 159.9 M07-L2 9 156.2 M09-L2 10 99.2 M07-L6 10 *OOS K05-L2 11 158.6 K11-L2 11 159.2 G11-L2 12 98.1 K11-L6 12 *OOS E07-L2 13 157.8 F13-L2 13 158.2 C10-L2 14 158.6 D05-L2 14 98.1 C10-L6 15 112.3 F13-L4 15 *OOS F03-L2 16 158.1 C06-L2 16 98.5 F03-L6 17 99.6 C06-L6 17 *OOS N04-L2 18 98.8 F13-L6 18 112.1 N04-L4 19 97.6 O10-L6 19 *OOS N04-L6 20 98.3 L03-L6 20 159.3 O06-L2 21 159.6 L03-L2 21 *OOS O06-L4 22 98.6 D05-L6 22 *OOS O06-L6 23 158.7 O10-L2 23 *OOS L13-L2 24 111.9 D05-L4 24 98.8 L13-L6 Note: Listed points with values are in calibration.

  • Work Request written

1.1S POWER RANGE NIS NI 5 NI 6 NI 7 NI 8

% FP  % FP  % FP  % FP 100.1 99.9 100.0 100.0

+60 +60 +60 +60 125 125 125 125 100 +40 100 +40 100 +40 100 +40 80 +20 80 +20 80 +20 80 +20 60 0 60 0 60 0 60 0 40 -20 40 -20 40 -20 40 -20 20 -40 20 -40 20 -40 20 -40 0 -60 0 -60 0 -60 0 -60

-19.3 -19.1 -19.2 -19.2

% IMB  % IMB  % IMB  % IMB

1.1S CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)

INITIAL CONDITIONS

  • Unit 1 had a transient from 100% power 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> ago.
  • The current time is 0800.
  • The Reactor Calculations package is NOT running.
  • PT/1/A/0600/001 (Periodic Instrument Surveillance), Enclosures 13.1 (Mode 1 &
2) has been completed up to page 7, Axial Power Imbalance Operating Limits.
  • Minimum incore detector operability requirements have been verified met per PT/0/A/1103/019 (Backup Incore Detector System).

INITIATING CUE The SRO directs you to:

1. Perform Axial Power Imbalance verification in accordance with PT/1/A/0600/001 (Periodic Instrument Surveillance), Enclosure 13.1 (Mode 1 & 2).
2. Determine all Tech Spec/SLC required actions and completion times, if any.

ADM-102 1.2B Page 1 of 9 REGION II JOB PERFORMANCE MEASURE ADM-102 CALCULATE REQUIREMENTS TO MAKEUP TO THE BWST Alternate Path: (N/A)

Alt Path Failure: ____________________________________________________________

Time Critical: (No)

Time Critical Criteria: ________________________________________________________

Prepared By: Date:

Reviewed By: Date:

Approved By: Date:

ADM-102 1.2B Page 2 of 9 REGION II JOB PERFORMANCE MEASURE Task Title : Calculate requirements to makeup to the BWST Task Number : N/A Alternate Path: N/A Time Critical: No Validation Time: 15 min K/A Rating(s):

System: GEN K/A: 2.1.37 Rating: 4.3/4.6 Task Standard:

Calculate volume of CBAST and DW needed to yield the proper volume at the correct Boron concentration to makeup to the BWST.

References:

EOP Encl. 5.4 (Makeup to the BWST)

OP/0/A/1108/001 (Curves and General Information) (Rev. 109)

COLR Tools/Equipment/Procedures Needed:

EOP Encl. 5.4 (Makeup to the BWST)

OP/0/A/1108/001 (Curves and General Information)

Calculator Straight edge/ruler

=========================================================================

Candidate: __________________________________ Time Start: _______________

NAME Time Finish: ______________

Performance Rating: SAT ______ UNSAT ______ Performance Time: _________

Examiner: ______________________________ ___________________________________/_________

NAME SIGNATURE DATE

=========================================================================

Comments

ADM-102 1.2B Page 3 of 9 SIMULATOR OPERATOR JPM SETUP INSTRUCTIONS

1. NONE

ADM-102 1.2B Page 4 of 9 READ TO OPERATOR DIRECTIONS TO STUDENT When I tell you to begin, you are to CALCULATE REQUIREMENTS TO MAKEUP TO THE BWST . Before you begin, I will describe the general plant conditions, state the initiating cues, and answer any questions. Perform procedure steps as if you were actually performing the task.

INITIAL CONDITIONS

  • OAC is not available
  • Unit 1 shutdown and cool down in progress due to a tube rupture in the 1A SG
  • SGTR Tab in progress
  • Unit 1 BWST level = 38 feet
  • Unit 1 BWST Boron concentration = 2600 ppm
  • 1A BHUT level = 40 inches
  • 1A BHUT Boron Concentration = 240 ppm
  • CBAST Boron Concentration = 12,501 ppm INITIATING CUES The CRS instructs you to initiate EOP Encl. 5.4 (Makeup to the BWST) to determine the required volumes of CBAST and DW to begin makeup to the BWST from 1A BHUT.

You are to calculate the required volumes of CBAST and DW to fill 1A BHUT to 168 inches and match the current BWST Boron concentration.

ADM-102 1.2B Page 5 of 9 START TIME: _______

SEQ PROC DESCRIPTION STEP STEP Determine current volume in 1A BHUT using any of the following:

  • OAC graphic CS01
  • BHUT Volume vs. Level Curve in OP/0/A/1108/001 (Curves and General Information)

CRITICAL STANDARD: Refer to Enclosure 4.1, BHUT Volume vs. Level Curve STEP in OP/0/A/1108/001 (Curves and General Information) and determine that the volume of water in the 1A

___ SAT 1 1 BHUT:

40 18,250 gallons (18,000 to 18,500 gal) ___ UNSAT 168 81,000 gallons (80,750 to 81,250 gal)

COMMENTS:

ADM-102 1.2B Page 6 of 9 Determine volume of CBAST required per the following to yield a volume in 1A BHUT of 81,000 gals at 2600 ppm:

(BHUTvf x BHUTcf)- ( BHUTvi x BHUTci ) = # gal of CBAST needed CRITICAL CBASTc, STEP (80,750 x 2,600) - (18,500 x 240 ) = 16,439 gal of CBAST needed 12,501 ___ SAT (81,250 x 2,600) - (18,000 x 240 ) = 16,553 gal of CBAST needed ___ UNSAT 12,501 STANDARD: Candidate calculates the required volumes from CBAST between:

16,439 and 16,553 gallons.

2 2 BHUTvf = Final BHUT volume (gal) 80,750 to 81,250 gals BHUTvi = Initial BHUT volume (gal) 18,000 to 18,500 gals BHUTcf = Final BHUT conc (ppmb) 2600 ppmb BHUTci = Initial BHUT conc (ppmb) 240 ppmb CBASTc = CBAST conc (ppmb) 12,501 ppmb Note: Instructions are to fill 1A BHUT to 168 which correlates to ~81,000 gal.

COMMENTS:

ADM-102 1.2B Page 7 of 9 Determine volume of DW required per the following to yield a volume in 1A BHUT of 80,750 to 81,250 gals at 2600 ppm:

CRITICAL BHUTvf - BHUTvi - # gallons CBAST needed = # gallons of DW STEP needed 81,250 - 18,000 - 16,439 = 46,811 gallons of DW needed ___ SAT 80,750 - 18,500 - 16,553 = 45,697 gallons of DW needed ___ UNSAT 3 2 STANDARD: Candidate calculates the required volumes from DW between:

45,697 and 46,811 gallons COMMENTS:

END OF TASK TIME STOP: ________

ADM-102 1.2B Page 8 of 9 CRITICAL STEP EXPLANATIONS SEQ Explanation STEP #

1 Required for determining the correct water volumes.

2 These calculations are required for determining the correct water volumes.

3 These calculations are required for determining the correct water volumes.

1.2B CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)

INITIAL CONDITIONS

  • OAC is not available
  • Unit 1 shutdown and cool down in progress due to a tube rupture in the 1A SG
  • SGTR Tab in progress
  • Unit 1 BWST level = 38 feet
  • Unit 1 BWST Boron concentration = 2600 ppm
  • 1A BHUT level = 40 inches
  • 1A BHUT Boron Concentration = 240 ppm
  • CBAST Boron Concentration = 12,501 ppm INITIATING CUES The CRS instructs you to initiate EOP Encl. 5.4 (Makeup to the BWST) to determine the required volumes of CBAST and DW to begin makeup to the BWST from 1A BHUT.

You are to calculate the required volumes of CBAST and DW to fill 1A BHUT to 168 inches and match the current BWST Boron concentration.

ADM-201 2.R Page 1 of 7 REGION II JOB PERFORMANCE MEASURE ADM-201 Determine SSF RCMU Pump Operability Alternate Path: (N/A)

Alt Path Failure: ____________________________________________________________

Time Critical: (N/A)

Time Critical Criteria: ________________________________________________________

Prepared By: Date:

Reviewed By: Date:

Approved By: Date:

ADM-201 2.R Page 2 of 7 REGION II JOB PERFORMANCE MEASURE Task Title : Determine SSF RCMU Pump Operability Task Number : N/A Alternate Path: N/A Time Critical: No Validation Time: 10 minutes K/A Rating(s):

System: GEN K/A: 2.2.42 Rating: 3.9/4.6 Task Standard:

Determine SSF RCMUP Operability as directed by OP/1/A/1105/014 (Control Room Instrumentation And Information) Encl. 4.1 (Mode 1 & 2). Curve on Page of Encl. 4.1 (Unit 1&2 Spent Fuel Pool Level Vs Temperature Curves) of OP/0/A/1108/001B (Spent Fuel Pool Level Vs Temperature Curves) is used to determine the RCMUP is Operable.

References:

OP/1/A/1105/014 (Control Room Instrumentation And Information), Encl. 4.1 (Mode 1 & 2)

Encl. 4.1 (Unit 1&2 Spent Fuel Pool Level Vs Temperature Curves) of OP/0/A/1108/001B (Spent Fuel Pool Level Vs Temperature Curves)

Tools/Equipment/Procedures Needed:

  • OP/1/A/1105/014 (Control Room Instrumentation And Information) Encl. 4.1 (Mode 1 & 2)
  • OP/0/A/1108/001B (Spent Fuel Pool Level Vs Temperature Curves) Encl. 4.1 (Unit 1&2 Spent Fuel Pool Level Vs Temperature Curves)
=========================================================================

Candidate: __________________________________ Time Start: _______________

NAME Time Finish: ______________

Performance Rating: SAT ______ UNSAT ______ Performance Time: _________

Examiner: ______________________________ ___________________________________/_________

NAME SIGNATURE DATE

=========================================================================

Comments

ADM-201 2.R Page 3 of 7 SIMULATOR OPERATOR JPM SETUP INSTRUCTIONS

1. NONE

ADM-201 2.R Page 4 of 7 READ TO OPERATOR DIRECTIONS TO STUDENT When I tell you to begin, you are to DETERMINE SSF RC MAKEUP PUMP OPERABILITY. Before you begin, I will describe the general plant conditions, state the initiating cues, and answer any questions you have. Perform procedure steps as if you were actually performing the task.

INITIAL CONDITIONS:

  • Unit 1 at 100%
  • Unit 2 was shutdown (subcritical) on 06/01 at 1900
  • Current date and time: 06/13 at 2300
  • Unit 2 core 2EOC26 defueling has just completed
  • Spent Fuel Pool Level = - 1.8 feet (0SF LT0001; OAC points O1A2186 and O1A2187)
  • Spent Fuel Pool Temperature = 120°F (0SF TT0002P)
  • OP/1/A/1105/014 Encl. 4.1 (Mode 1 & 2) in progress INITIATING CUES:

The CRS instructs you to continue with OP/1/A/1105/014 (Control Room Instrumentation and Information) Encl. 4.1 (Mode 1 & 2) starting on page 15 of 16, and determine Unit 1 SSF RCMUP Operability.

ADM-201 2.R Page 5 of 7 START TIME: _______

SEQ PROC DESCRIPTION STEP STEP Determine pages of Encl. 4.1 (Unit 1&2 Spent Fuel Pool Level Vs Temperature Curves) that apply.

___ SAT STANDARD: Refer to flowchart on page 2 of Encl. 4.1 (Unit 1&2 flow Spent Fuel Pool Level Vs Temperature Curves) of ___ UNSAT chart OP/0/A/1108/001B since the most recent RFO was on 1

page Unit 2 and determine that either Figure 20 or 27 is to 2 be used.

COMMENTS:

Determine appropriate curve. CRITICAL STEP flow STANDARD: Determine that Figure 20 on page 27 of 35 should be utilized since alternate temperature indication is not ___ SAT chart 2 being used per cue sheet.

page

___ UNSAT 2 COMMENTS:

Verify SFP level > specified on appropriate curve on Figure 20 (page CRITICAL 27 of 35). STEP STANDARD: Determine that correct curve is "Day > 12 & < 13". ___ SAT Determine from initiating cue that Spent Fuel Pool water temperature is 120°F.

Figure Determine from initiating cue that Spent Fuel Pool

___ UNSAT 3 water level is -1.8 feet.

20 Determine that SFP level is > than the appropriate curve and therefore the RCMUP is OPERABLE.

COMMENTS:

END OF TASK TIME STOP: ________

ADM-201 2.R Page 6 of 7 CRITICAL STEP EXPLANATIONS SEQ Explanation STEP #

2 This step is required to determine correct curves.

3 This step is required to determine SSF RCMUP is operable.

2.R CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)

INITIAL CONDITIONS:

  • Unit 1 at 100%
  • Unit 2 was shutdown (subcritical) on 06/01 at 1900
  • Current date and time: 06/13 at 2300
  • Unit 2 core 2EOC26 defueling has just completed
  • Spent Fuel Pool Level = - 1.8 feet (0SF LT0001; OAC points O1A2186 and O1A2187)
  • Spent Fuel Pool Temperature = 120°F (0SF TT0002P)
  • OP/1/A/1105/014 Encl. 4.1 (Mode 1 & 2) in progress INITIATING CUES:

The CRS instructs you to continue with OP/1/A/1105/014 (Control Room Instrumentation and Information) Encl. 4.1 (Mode 1 & 2) starting on page 15 of 16, and determine Unit 1 SSF RCMUP Operability.

ADM-S201 2.S Page 1 of 7 REGION II JOB PERFORMANCE MEASURE ADM-S201 DETERMINE TECH SPEC REQUIREMENTS FOR INOPERABLE PZR HEATERS Alternate Path: (No)

Alt Path Failure: ____________________________________________________________

Time Critical: (No)

Time Critical Criteria: ________________________________________________________

Prepared By: Date:

Reviewed By: Date:

Approved By: Date:

ADM-S201 2.S Page 2 of 7 REGION II JOB PERFORMANCE MEASURE Task Title : Determine Tech Spec Requirements for Inoperable PZR Heaters Task Number : N/A Alternate Path: N/A Time Critical: No Validation Time: 15 minutes K/A Rating(s):

System: GEN K/A: 2.2.40 Rating: 3.4/4.7 Task Standard:

Determine that minimum number of PZR heaters for SSF operability are NOT operable and as a result TS 3.10.1 Condition A must be entered. The Required Action and Completion Time is to restore SSF ASW system to Operable within 7 days.

References:

Technical Specifications Tools/Equipment/Procedures Needed:

Technical Specifications

=========================================================================

Candidate: __________________________________ Time Start: _______________

NAME Time Finish: ______________

Performance Rating: SAT ______ UNSAT ______ Performance Time: _________

Examiner: ______________________________ ___________________________________/_________

NAME SIGNATURE DATE

=========================================================================

Comments

ADM-S201 2.S Page 3 of 7 SIMULATOR OPERATOR JPM SETUP INSTRUCTIONS

1. NONE

ADM-S201 2.S Page 4 of 7 READ TO OPERATOR DIRECTIONS TO STUDENT When I tell you to begin, you are to DETERMINE TECH SPEC REQUIREMENTS FOR INOPERABLE PZR HEATERS. Before you begin, I will describe the general plant conditions, state the initiating cues, and answer any questions you have. Perform procedure steps as if you were actually performing the task.

INITIAL CONDITIONS:

Unit 2 is operating at 100% power.

Pressurizer Steam Space Leakage = 0.2 gpm Number of SSF Bank 2 Pressurizer Heaters available = 16 INITIATING CUES:

The SM directs you to:

1. Evaluate TS 3.10 (SSF) and determine if the required Pressurizer heaters are operable.
2. As a result of your evaluation above, document all applicable Conditions, Required Actions, and Completion Times (if any) below.

ADM-S201 2.S Page 5 of 7 START TIME: _______

SEQ PROC DESCRIPTION STEP STEP Candidate will evaluate Tech Spec requirements.

CRITICAL

  • Evaluate TS B 3.10.1 for Unit 2 STEP STANDARD: Determine that:

___ SAT

  • For Unit 2 the maximum allowed PZR Steam Space Leakage with 16 PZR heaters available is ___ UNSAT 0.10 gpm.

1

  • As a result the minimum number of PZR heaters for SSF operability are NOT operable.

COMMENTS:

Candidate will evaluate the Table on Page B 3.10.1-4.

STANDARD: Determine that the SSF ASW system inoperable,

  • Required Action and Completion Time is to restore CRITICAL SSF ASW system to Operable within 7 days STEP Note: Normally the SSF ASW System being inoperable would render

___ SAT 2 ALL of the SSF systems inoperable. However, if the SSF ASW System is inoperable due to inoperable PZR heaters, the other SSF systems

___ UNSAT remain operable.

COMMENTS:

END OF TASK TIME STOP: ________

ADM-S201 2.S Page 6 of 7 CRITICAL STEP EXPLANATIONS SEQ Explanation STEP #

1 Critical since this step is required to determine if required SSF PZR heaters are operable 2 Critical since this step is required to ensure compliance with Tech Specs

2.S CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)

INITIAL CONDITIONS:

Unit 2 is operating at 100% power.

Pressurizer Steam Space Leakage = 0.2 gpm Number of SSF Bank 2 Pressurizer Heaters available = 16 INITIATING CUES:

The SM directs you to:

1. Evaluate TS 3.10 (SSF) and determine if the required Pressurizer heaters are operable.
2. As a result of your evaluation above, document all applicable Conditions, Required Actions, and Completion Times (if any) below.

ADM-301a 3.B Page 1 of 7 REGION II JOB PERFORMANCE MEASURE ADM-301a Determine Posting and Access Requirements of LPI Room Based on Plan View Alternate Path: (No)

Alt Path Failure: ____________________________________________________________

Time Critical: (No)

Time Critical Criteria: ________________________________________________________

Prepared By: Date:

Reviewed By: Date:

Approved By: Date:

ADM-301a 3.B Page 2 of 7 REGION II JOB PERFORMANCE MEASURE Task Title : Determine Posting and Access Requirements of LPI Room Based on Plan View Task Number : (N/A)

Alternate Path: (N/A)

Time Critical: No Validation Time: 10 minutes K/A Rating(s):

System: GEN K/A: 2.3.12 Rating: 3.2/3.7 Task Standard:

Determine that:

1. Area should be posted as a Locked High Radiation Area
2. Continuous RP coverage is required.
3. The total accumulated annual dose at completion of job is 1493 mrem.

References:

PD-RP-ALL-0001 Radiation Worker Responsibilities Survey Map of Room 61 Tools/Equipment/Procedures Needed:

PD-RP-ALL-0001 Radiation Worker Responsibilities Survey Map of Room 61

=========================================================================

Candidate: __________________________________ Time Start: _______________

NAME Time Finish: ______________

Performance Rating: SAT ______ UNSAT ______ Performance Time: _________

Examiner: ______________________________ ___________________________________/_________

NAME SIGNATURE DATE

=========================================================================

Comments

ADM-301a 3.B Page 3 of 7 SIMULATOR OPERATOR JPM SETUP INSTRUCTIONS

1. NONE

ADM-301a 3.B Page 4 of 7 READ TO OPERATOR DIRECTIONS TO STUDENT When I tell you to begin, you are to DETERMINE POSTING AND ACCESS REQUIREMENTS OF LPI ROOM BASED ON PLAN VIEW. Before you begin, I will describe the general plant conditions, state the initiating cues, and answer any questions you have. Perform procedure steps as if you were actually performing the task.

INITIAL CONDITIONS You are a Reactor Operator. An event has occurred which resulted in a significant change in the radiological conditions in Room 61 (LPI and RBS Pumps).

Your total whole body dose this year is 1265 mrem.

INITIATING CUE Using the survey map provided, determine the following for Room 61:

  • The RP related posting(s) you would expect to encounter at the entry to Room 61
  • If Continuous RP coverage is required for you to perform venting of the 1A LPI Pump
  • If venting the 1A LPI pump takes three (3) hours, determine your total accumulated annual dose when the job is complete and you have exited the room.

ADM-301a 3.B Page 5 of 7 START TIME: _______

SEQ PROC DESCRIPTION STEP STEP Using the survey map provided, determine the area posting CRITICAL requirements. STEP STANDARD: Candidate reviews the survey map and determines:

___ SAT

COMMENTS:

Determine RP coverage required to vent the 1A LPI Pump CRITICAL STEP STANDARD: Candidate determines that continuous RP coverage is required since the area is a LHRA.

___ SAT 2 ___ UNSAT COMMENTS:

Determine total accumulated annual dose after completion of job. CRITICAL STEP STANDARD: Candidate determines the dose as a result of the venting as follows:

3 hours3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br /> X 76 mr/hr = 228 mrem ___ SAT Determine the total accumulated annual dose ___ UNSAT 3 following completion of the job.

1265 + 228 = 1493 mrem COMMENTS:

END OF TASK TIME STOP: ________

ADM-301a 3.B Page 6 of 7 CRITICAL STEP EXPLANATIONS SEQ Explanation STEP #

1 Determines General Area posting requirements for the room to be entered.

2 Determines RP continuous coverage requirements.

3 Determines total accumulated annual dose.

3.B CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)

INITIAL CONDITIONS You are a Reactor Operator. An event has occurred which resulted in a significant change in the radiological conditions in Room 61 (LPI and RBS Pumps).

Your total whole body dose this year is 1265 mrem.

INITIATING CUE Using the survey map provided, determine the following for Room 61:

  • The RP related posting(s) you would expect to encounter at the entry to Room 61
  • If Continuous RP coverage is required for you to perform venting of the 1A LPI Pump
  • If venting the 1A LPI pump takes three (3) hours, determine your total accumulated annual dose when the job is complete and you have exited the room.

Room 61 LPI & RBS Pumps Survey # M-021506-17 Date/Time Today 0412 ROOM 61 LPI AND RB PUMPS N

AHU 1-6 *50

+30 112 1A 2 35 RBS Significant Dose Contriutor STAIRS SUMP PUMPS 88 1

+1245

  • 1947 95 76

+1075 433 3 1C LPI 1A LPI 95 76 Summary of Highest Readings Comments: CONTACT RP REGARDING ANY ATTEMPTS TO CLEAN LPI ROOM SUMP Smears Air Samples & Wipes

1) 554 DPM/100 cm2 /g
2) 485 DPM/100 cm2 /g
3) 978 DPM/100 cm2 /g Symol Legend (for example only) Type: Jo Coverage Dose Rate
  • 150 Contact Reading HS-50 Hot Spot RWP: 5036

+75 30 cm Reading RCA Posting Reactor Power = 100%

20 General Area Drip Bag 15 Smear 15 Air Sample 15 Wipe Unless otherwise noted, dose rates in mrem/hr.

Surveyor: W. Walters Approved y: N. Wriston, Date: Today

ADM-S401 4.S Page 1 of 7 REGION II JOB PERFORMANCE MEASURE ADM-S401 DETERMINE EMERGENCY CLASSIFICATION Alternate Path: (No)

Alt Path Failure: ____________________________________________________________

Time Critical: (Yes)

Time Critical Criteria: __Classify event within 15 minutes____________________________

Prepared By: Date:

Reviewed By: Date:

Approved By: Date:

ADM-S401 4.S Page 2 of 7 REGION II JOB PERFORMANCE MEASURE Task Title : Determine Emergency Classification Task Number : N/A Alternate Path: N/A Time Critical: Yes (15 min).

Validation Time: 15 minutes K/A Rating(s):

System: Gen K/A: 2.4.38 Rating: 2.4/4.4 Task Standard:

Appropriate classification is determined within 15 minutes.

References:

RP/0/A/1000/001 (Emergency Classification)

Tools/Equipment/Procedures Needed:

RP/0/A/1000/001 (Emergency Classification)

=========================================================================

Candidate: __________________________________ Time Start: _______________

NAME Time Finish: ______________

Performance Rating: SAT ______ UNSAT ______ Performance Time: _________

Examiner: ______________________________ ___________________________________/_________

NAME SIGNATURE DATE

=========================================================================

Comments

ADM-S401 4.S Page 3 of 7 SIMULATOR OPERATOR JPM SETUP INSTRUCTIONS

1. NONE

ADM-S401 4.S Page 4 of 7 READ TO OPERATOR DIRECTIONS TO STUDENT When I tell you to begin, you are to DETERMINE EMERGENCY CLASSIFICATION. Before you begin, I will describe the general plant conditions, state the initiating cues, and answer any questions you have. Perform procedure steps as if you were actually performing the task.

INITIAL CONDITIONS:

0800 Unit 1 experiences a runback and trip due to a loss of Stator Coolant.

0805 The Operator dispatched to determine if the MS Relief Valves have reseated reports that 1A SG appears to have two MSRVs damaged and still passing steam.

0806 1B SG has been isolated due to excessive heat transfer and RCS Temperature stabilized at 520°F CETCs.

0815 Calculations indicate a 1A S/G Tube leak of 240 gpm is occurring. 1RIA-40 = 1,245 cps and increasing.

0816 The 1A S/G is being fed by the 1A MDEFWP and is being used for RCS Temperature control. Feeding the 1B S/G for Tube to Shell Delta Temperature concerns is NOT required at this time.

INITIATING CUE:

Perform the required actions of the Emergency Coordinator:

1. Determine Emergency Classification at Time = 0816 THIS IS A TIME CRITICAL JPM Note: Do not use Emergency Coordinators judgment while classifying the event.

ADM-S401 4.S Page 5 of 7 START TIME: _______

SEQ PROC DESCRIPTION STEP STEP Classify the Event. CRITICAL STEP STANDARD: Refer to RP/0/A/1000/01 (Emergency Classification)

Encl. 4.1 (Fission Product Barrier Matrix) ___ SAT Determine 4 points are applicable due to "SGTR >

160 gpm" under Potential Loss of RCS Barriers. ___ UNSAT 1

COMMENTS:

Classify the Event. CRITICAL STEP STANDARD: Refer to RP/0/A/1000/01 (Emergency Classification)

Encl. 4.1 (Fission Product Barrier Matrix) ___ SAT Determine 3 points are applicable due to "Failure of

___ UNSAT secondary side of SG results in a direct opening to the environment with SG Tube Leak > 10 gpm in the SAME SG" under Loss of Containment Barriers.

Add the points together (4 + 3) for a total of 7 points.

Refer to the classifications across the bottom of Encl.

4.1 and determine a Site Area Emergency (SAE) is (7 2 - 10 points).

Classify as a Site Area Emergency.

Time of Classification: _________________

COMMENTS:

END OF TASK TIME STOP: ________

ADM-S401 4.S Page 6 of 7 CRITICAL STEP EXPLANATIONS SEQ Explanation STEP #

1 This step is required for the candidate to utilize the procedure and determine the conditions meet a Site Area Emergency classification within 15 minutes.

2 This step is required for the candidate to utilize the procedure and determine the conditions meet a Site Area Emergency classification within 15 minutes.

4.S CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)

INITIAL CONDITIONS:

0800 Unit 1 experiences a runback and trip due to a loss of Stator Coolant.

0805 The Operator dispatched to determine if the MS Relief Valves have reseated reports that 1A SG appears to have two MSRVs damaged and still passing steam.

0806 1B SG has been isolated due to excessive heat transfer and RCS Temperature stabilized at 520°F CETCs.

0815 Calculations indicate a 1A S/G Tube leak of 240 gpm is occurring. 1RIA-40 =

1,245 cps and increasing.

0816 The 1A S/G is being fed by the 1A MDEFWP and is being used for RCS Temperature control. Feeding the 1B S/G for Tube to Shell Delta Temperature concerns is NOT required at this time.

INITIATING CUE:

Perform the required actions of the Emergency Coordinator:

1. Determine Emergency Classification at Time = 0816 THIS IS A TIME CRITICAL JPM Note: Do not use Emergency Coordinators judgment while classifying the event.

Emergency Declaration: ________________________

Time: ________________

Examiner Initials: _____________