(6 intermediate revisions by the same user not shown) |
Line 5: |
Line 5: |
| | author name = Gurdziel T | | | author name = Gurdziel T |
| | author affiliation = Public Commenter | | | author affiliation = Public Commenter |
| | addressee name = Svinicki K L | | | addressee name = Svinicki K |
| | addressee affiliation = NRC/Chairman | | | addressee affiliation = NRC/Chairman |
| | docket = 05000286 | | | docket = 05000286 |
Line 17: |
Line 17: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:CHAIRMAN Resource From: Sent: To: Cc: | | {{#Wiki_filter:CHAIRMAN Resource From: Tom Gurdziel <tgurdziel@twcny.rr.com> |
| | Sent: Sunday, June 11, 2017 3:21 PM To: CHAIRMAN Resource Cc: JNappi@entergy.com; Bridget Frymire; ESTRONSKl@aol.com |
|
| |
|
| ==Subject:== | | ==Subject:== |
| Good morning, Tom Gurdziel <tgurdziel@twcny.rr.com> Sunday, June 11, 2017 3:21 PM CHAIRMAN Resource JNappi@entergy.com; Bridget Frymire; ESTRONSKl@aol.com [External_Sender] A Serious and Repetitive Matter Back in 2015, Entergy/Indian Point 3 had a refuel outage that lasted about 32 days until they got back to 100% power. (Those days can be checked on the NRC website as being from 3 2015 to 4 2015.) About 5 Yz months after that refuel outage, they had to shutdown to "Repair RV 0-ring". This took them 13 days until they got back to 100% power. (You can check those days as well. They run from 9-14-2015 to 9-27-2015.) Last night I read that Entergy/Indian Point 3 will be shut down to tonight do the exact same thing. But things are a little different now. This time their most recent refueling outage lasted about 66 days or 73 days to return to full power. Notice that they had twice as long a time to actually work on the 0-ring grooves for the 0-rings, which go between the reactor vessel (below) and the removable reactor vessel (upper) head. And, this time, they didn't get 5 Yz months of use out of the installed 0-ring, no, they are getting less than one month of use. Something is wrong here. How many U.S. plants have to stop a run to fix reactor head 0-rings? How many U.S. plants have to stop to fix their reactor head 0-rings after each refuel outage as is the current Entergy/Indian Point 3 practice? believe the answer is none and none. So let me put it this way. I believe the current condition of the Entergy/Indian Point Unit 3 plant is UNSAFE to return to operation with just the installation of another set of 0-rings. I am requesting that the US NRC keep Entergy/Indian Point 3 shutdown cold until the condition of the upper surface of the reactor vessel, including 0-ring grooves be proved to be identical to the as purchased condition. (In particular, make sure you look for steam cutting.) And, I am requesting that the US NRC keep Entergy/Indian Point 3 shutdown cold until the condition of the lower surface of the upper head is found to be identical to the as purchased condition. This is a 2.206 request. Thank you, Tom Gurdziel I x K, Virus-free. www.avast.com 1
| | [External_Sender] A Serious and Repetitive Matter Good morning, Back in 2015, Entergy/Indian Point 3 had a refuel outage that lasted about 32 days until they got back to 100% |
| }} | | power. (Those days can be checked on the NRC website as being from 3-1-2015 to 4-2-2015.) About 5 Yz months after that refuel outage, they had to shutdown to "Repair RV 0-ring". This took them 13 days until they got back to 100% |
| | power. (You can check those days as well. They run from 9-14-2015 to 9-27-2015.) |
| | Last night I read that Entergy/Indian Point 3 will be shut down to tonight do the exact same thing. But things are a little different now. This time their most recent refueling outage lasted about 66 days or 73 days to return to full power. Notice that they had twice as long a time to actually work on the 0-ring grooves for the 0-rings, which go between the reactor vessel (below) and the removable reactor vessel (upper) head. And, this time, they didn't get 5 Yz months of use out of the installed 0-ring, no, they are getting less than one month of use. |
| | Something is wrong here . How many U.S. plants have to stop a run to fix reactor head 0-rings? How many U.S. plants have to stop to fix their reactor head 0-rings after each refuel outage as is the current Entergy/Indian Point 3 practice? |
| | believe the answer is none and none. |
| | So let me put it this way. I believe the current condition of the Entergy/Indian Point Unit 3 plant is UNSAFE to return to operation with just the installation of another set of 0-rings. I am requesting that the US NRC keep Entergy/Indian Point 3 shutdown cold until the condition of the upper surface of the reactor vessel, including 0-ring grooves be proved to be identical to the as purchased condition . (In particular, make sure you look for steam cutting.) And, I am requesting that the US NRC keep Entergy/Indian Point 3 shutdown cold until the condition of the lower surface of the upper head is found to be identical to the as purchased condition . |
| | This is a 2.206 request. |
| | Thank you, Tom Gurdziel I x K , Virus-free. www.avast.com 1}} |
Latest revision as of 03:13, 30 October 2019
|
---|
Category:E-Mail
MONTHYEARML24036A0162024-02-0101 February 2024 NRC Email - Acknowledge and Accept the Indian Point Energy Center Request to Be Removed from NRC Headquarters Operation Officer (Hoo) Morning Authentication Code Calls ML23341A2002023-12-0707 December 2023 Email - Indian Point Energy Center Generating Units 1, 2, and 3 – Implementation Notice of Amendment No. 67, 300 and 276 to Independent Spent Fuel Storage Installation Only Emergency Plan (Ioep) ML23332A0802023-11-0808 November 2023 Email from State of New York on the Revised License Amendment for Indian Point Energy Center ISFSI Only Emergency Plan ML23331A9542023-11-0808 November 2023 Email - State of New York Comments on the Revised License Amendment for Indian Point Unit 2 and 3 Technical Specification Changes Reflecting Permanent Removal of Spent Fuel ML23325A1632023-11-0808 November 2023 State of New York Comments on the Revised License Amendment for Indian Point Unit 2 and 3 Technical Specification Changes Reflecting Permanent Removal of Spent Fuel ML23144A3382023-05-25025 May 2023 Dawn Giambalvo of Jersey City, New Jersey Email Against Treated Water Release from Indian Point Site ML23144A3422023-05-25025 May 2023 Peter Duda of Pearl River, New York Email Against Treated Water Release from Indian Point Site ML23144A3452023-05-25025 May 2023 Adam Kahn of Monsey, New York Email Against Treated Water Release from Indian Point Site ML23144A3502023-05-25025 May 2023 Dan Kwilecki of Montebello, New York Email Against Treated Water Release from Indian Point Site ML23144A3392023-05-25025 May 2023 David Morris of New City, New York Email Against Treated Water Release from Indian Point Site ML23144A3442023-05-25025 May 2023 Peggy Kurtz of Rockland County, New York Email Against Treated Water Release from Indian Point Site ML23136B1622023-05-15015 May 2023 Town of North Salem, County of Westchester, New York Board Resolution Letter Regarding Treated Water Release from Indian Point Site ML23109A0632023-04-17017 April 2023 Email Acceptance Review for IP2 and IP3 Amended Facility License and Technical Specification to Reflect Permanent Removal of Spent Fuel from Spent Fuel Pits ML23055A1112023-02-23023 February 2023 Alyse Peterson Email- NYSERDA No Comments on Indian Point Unit 2 - Regarding Holtec License Amendment Request to Revise Permanently Defueled Technical Specifications and Staffing Requirements with Spent Fuel Transfer to ISFSI (Dockets 50-24 ML23049A0032023-02-14014 February 2023 NRC Acceptance Email to Holtec for License Amendment Request for Approval of New ISFSI-Only Emergency Plan and Associated EAL Scheme ML22313A1682022-11-0909 November 2022 NRC Response to Updates to the Proposed Amended IP2 Master Trust ML22308A0912022-11-0303 November 2022 Email Acknowledgement for IP2 and IP3 Amended Facility License and Technical Specification to Reflect Permanent Removal of Spent Fuel from Spent Fuel Pits ML22276A1642022-09-29029 September 2022 New York State Revised Draft EA Response E-Mail ML22271A8492022-09-28028 September 2022 E-Mail Transmitting Revised Indian Point Exemption Draft EA ML22269A3452022-09-22022 September 2022 Email Objection to Holtec IP2 Master Decommissioning Trust Agreement for Indian Point Nuclear Generating Facility Unit 1 and 2, EPID L-2022-LLA-0072 ML22259A1992022-09-0202 September 2022 Acceptance for License Amendment Request to Modify Staffing Requirements Following SFP Transfer to Dry Storage ML22265A0142022-08-31031 August 2022 Email Acknowledgement for Amended and Restated Holtec IP3 Master Decommissioning Trust Agreement for Indian Point Nuclear Generating Facility Unit 3 ML22242A2592022-08-19019 August 2022 E-mail from K. Sturzebecher, NRC, to B. Noval, HDI, Acknowledgement for Amended and Restated Holtec IP2 Master Decommissioning Trust Agreement for Indian Point Nuclear Generating Facility Unit 1 and 2 ML22228A1332022-08-0909 August 2022 Acknowledgement for License Amendment Request to Modify Staffing Requirements Following SFP Transfer to Dry Storage ML22215A0432022-08-0101 August 2022 E-Mail Transmitting NYS NSA Exemption Comments & Draft EA Review Completion ML22208A0292022-07-19019 July 2022 E-Mail Transmitting Indian Point Exemption Draft EA ML22168A0072022-06-16016 June 2022 Acceptance Review for License Amendment Request to Revise License Condition to Eliminate Cyber Security Plan Requirements ML22112A0102022-04-21021 April 2022 Acceptance Review: Request for Exemption from 10 CFR 50.54(w)(1) Concerning Indian Point Energy Center Onsite Property Damage Insurance ML22112A0122022-04-21021 April 2022 Acceptance Review: Request for Exemption from 10 CFR 140.11(a)(4) Concerning Primary and Secondary Liability Insurance for Indian Point Energy Center ML22103A2432022-04-13013 April 2022 E-mail - Request for Additional Information - License Amendment Request to Revise Emergency Plan and Emergency Action Level Scheme for Permanently Defueled Condition for Indian Point Energy Center ML22104A0342022-04-13013 April 2022 E-mail from Z. Cruz, NRC to J. Fleming, Holtec - Request for Additional Information Related to Request for Exemption from Portions of 10 CFR 50.47 and Part 50 Appendix E for Indian Point Energy Center ML22038A2572022-02-0707 February 2022 E-mail from Z. Cruz, NRC, to J. Fleming, HDI - Acceptance Review: License Amendment Request to Revise Emergency Plan and Emergency Action Level Scheme to Address Permanently Defueled Condition for Indian Point Energy Center ML22035A1862022-02-0404 February 2022 E-mail to J. Fleming, Holtec, from Z. Cruz Perez, NRC - Acceptance Review: Exemption Requests from Portions of 10 CFR 50.47 and 10 CFR Part 50, Appendix E, Section IV for Indian Point Energy Center ML22028A1032022-01-28028 January 2022 E-mail Dated 1/28/2022, Transmittal of Draft Safety Evaluation for Proposed License Amendment Revision to Licensing Basis to Incorporate the Installation and Use of of New Auxiliary Lifting Device ML22038A1592022-01-24024 January 2022 NRR E-mail Capture - (External_Sender) 2021 IPEC Annual Sturgeon Impingement Report ML22006A0442022-01-0505 January 2022 Email from Z Cruz to J Fleming Request for Additional Information - HDI Indian Point Post-Shutdown Decommissioning Activities Report ML21337A2952021-12-0303 December 2021 Subsequent Request for Additional Information License Amendment Request to Revise Licensing Basis for New Auxiliary Lifting Device (E-mail Dated 12/3/2021) ML21335A3692021-12-0101 December 2021 Acceptance Review: Indian Point Energy Center - Exemption Request from 10 CFR Part 20 App G Section Iii.E ML21266A2972021-08-18018 August 2021 8/18/2021 E-mail from H. Specter to R. Guzman Public Comments to NRC, Indian Point Post-Shutdown Decommissioning Activities Report Public Meeting on July 29, 2021 ML21225A5012021-08-0909 August 2021 Email from NRC to the Shinnecock Indian Nation Announcing the IPEC PSDAR Public Meeting on August 18, 2021 ML21224A3032021-08-0909 August 2021 Email from NRC to the Mashantucket Pequot Tribe of Connecticut Announcing the IPEC PSDAR Public Meeting on August 18, 2021 ML21225A6142021-08-0909 August 2021 Email from NRC to the Tuscarora Nation Announcing the IPEC PSDAR Public Meeting on August 18, 2021 ML21225A5682021-08-0909 August 2021 Email from NRC to the Stockbridge-Munsee Community Band of Mohican Indians Announcing the IPEC PSDAR Public Meeting on August 18, 2021 ML21225A4252021-08-0909 August 2021 Email from NRC to the Oneida Nation of Wisconsin Announcing the IPEC PSDAR Public Meeting on August 18, 2021 ML21225A3142021-08-0606 August 2021 Email from NRC to the Oneida Indian Nation Announcing the IPEC PSDAR Public Meeting on August 18, 2021 ML21225A4402021-08-0606 August 2021 Email from NRC to the Onondaga Nation of Wisconsin Announcing the IPEC PSDAR Meeting on August 18, 2021 ML21225A5352021-08-0606 August 2021 Email from NRC to the Tonawanda Band of Seneca Announcing the IPEC PSDAR Public Meeting on August 18, 2021 ML21225A5462021-08-0606 August 2021 Email from NRC to the St. Regis Mohawk Tribe Announcing the IPEC PSDAR Public Meeting on August 18, 2021 ML21266A2942021-07-25025 July 2021 E-mail from Paul Blanch to NRC (N. Sheehan, D. Screnci) Public Comments to NRC, Indian Point Post-Shutdown Decommissioning Activities Report Public Meeting, July 29, 2021 ML21197A2002021-07-16016 July 2021 (E-mail 7/16/2021) NRC Staff Assessment and RAI Closeout HDI Fleet Decommissioning Quality Assurance Program and Indian Point Energy Center Quality Assurance Program Manual 2024-02-01
[Table view] |
Text
CHAIRMAN Resource From: Tom Gurdziel <tgurdziel@twcny.rr.com>
Sent: Sunday, June 11, 2017 3:21 PM To: CHAIRMAN Resource Cc: JNappi@entergy.com; Bridget Frymire; ESTRONSKl@aol.com
Subject:
[External_Sender] A Serious and Repetitive Matter Good morning, Back in 2015, Entergy/Indian Point 3 had a refuel outage that lasted about 32 days until they got back to 100%
power. (Those days can be checked on the NRC website as being from 3-1-2015 to 4-2-2015.) About 5 Yz months after that refuel outage, they had to shutdown to "Repair RV 0-ring". This took them 13 days until they got back to 100%
power. (You can check those days as well. They run from 9-14-2015 to 9-27-2015.)
Last night I read that Entergy/Indian Point 3 will be shut down to tonight do the exact same thing. But things are a little different now. This time their most recent refueling outage lasted about 66 days or 73 days to return to full power. Notice that they had twice as long a time to actually work on the 0-ring grooves for the 0-rings, which go between the reactor vessel (below) and the removable reactor vessel (upper) head. And, this time, they didn't get 5 Yz months of use out of the installed 0-ring, no, they are getting less than one month of use.
Something is wrong here . How many U.S. plants have to stop a run to fix reactor head 0-rings? How many U.S. plants have to stop to fix their reactor head 0-rings after each refuel outage as is the current Entergy/Indian Point 3 practice?
believe the answer is none and none.
So let me put it this way. I believe the current condition of the Entergy/Indian Point Unit 3 plant is UNSAFE to return to operation with just the installation of another set of 0-rings. I am requesting that the US NRC keep Entergy/Indian Point 3 shutdown cold until the condition of the upper surface of the reactor vessel, including 0-ring grooves be proved to be identical to the as purchased condition . (In particular, make sure you look for steam cutting.) And, I am requesting that the US NRC keep Entergy/Indian Point 3 shutdown cold until the condition of the lower surface of the upper head is found to be identical to the as purchased condition .
This is a 2.206 request.
Thank you, Tom Gurdziel I x K , Virus-free. www.avast.com 1