| issue date = 08/16/2012
| issue date = 08/16/2012
| title = Acceptance Review of Beaver Valley License Amendment Request Regarding Mtc Measurement
| title = Acceptance Review of Beaver Valley License Amendment Request Regarding Mtc Measurement
| author name = Bamford P J
| author name = Bamford P
| author affiliation = NRC/NRR/DORL/LPLI-2
| author affiliation = NRC/NRR/DORL/LPLI-2
| addressee name = Lashley P H
| addressee name = Lashley P
| addressee affiliation = FirstEnergy Corp
| addressee affiliation = FirstEnergy Corp
| docket = 05000334, 05000412
| docket = 05000334, 05000412
| license number =  
| license number =  
| contact person = Bamford P J
| contact person = Bamford P
| package number = ml12230A089
| package number = ml12230A089
| document type = E-Mail
| document type = E-Mail
| page count = 1
| page count = 1
| project =
| stage = Acceptance Review
}}
}}
=Text=
{{#Wiki_filter:From:          Bamford, Peter To:            "phlashley@firstenergycorp.com" Cc:            "jfirestone@firstenergycorp.com"; Burkhardt, Janet
==Subject:==
Acceptance Review of Beaver Valley License Amendment Request Regarding MTC Measurement Date:          Thursday, August 16, 2012 2:19:00 PM By letter dated July 25, 2012 (ADAMS Accession No. ML12208A309), FirstEnergy Nuclear Operating Company submitted a license amendment request (LAR) for Beaver Valley Power Station, Units 1 and 2, proposing to modify Technical Specification 3.1.3 to allow the elimination of near-end of life Moderator Temperature Coefficient (MTC) testing under certain conditions. If the specified conditions were to be met, the MTC measurement would be replaced by a calculated value.
The purpose of this email is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staff's acceptance review of this amendment request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.
The NRC staff has reviewed your application, and concluded that it does provide technical information in sufficient detail to enable the staff to proceed with its detailed technical review and make an independent assessment regarding the acceptability of the proposed license amendment in terms of regulatory requirements and the protection of public health and safety and the environment. If additional information is needed for the staff to complete its technical review, you will be advised by separate correspondence.
Peter Bamford NRR/DORL/LPL 1-2 Beaver Valley & TMI-1 Project Manager 301-415-2833}}

Latest revision as of 23:41, 11 November 2019

Acceptance Review of Beaver Valley License Amendment Request Regarding Mtc Measurement
ML12229A465
Person / Time
Site: Beaver Valley
Issue date: 08/16/2012
From: Peter Bamford
Plant Licensing Branch 1
To: Lashley P
FirstEnergy Corp
Bamford P
Shared Package
ml12230A089 List:
References
Download: ML12229A465 (1)


Text

From: Bamford, Peter To: "phlashley@firstenergycorp.com" Cc: "jfirestone@firstenergycorp.com"; Burkhardt, Janet

Subject:

Acceptance Review of Beaver Valley License Amendment Request Regarding MTC Measurement Date: Thursday, August 16, 2012 2:19:00 PM By letter dated July 25, 2012 (ADAMS Accession No. ML12208A309), FirstEnergy Nuclear Operating Company submitted a license amendment request (LAR) for Beaver Valley Power Station, Units 1 and 2, proposing to modify Technical Specification 3.1.3 to allow the elimination of near-end of life Moderator Temperature Coefficient (MTC) testing under certain conditions. If the specified conditions were to be met, the MTC measurement would be replaced by a calculated value.

The purpose of this email is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staff's acceptance review of this amendment request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

The NRC staff has reviewed your application, and concluded that it does provide technical information in sufficient detail to enable the staff to proceed with its detailed technical review and make an independent assessment regarding the acceptability of the proposed license amendment in terms of regulatory requirements and the protection of public health and safety and the environment. If additional information is needed for the staff to complete its technical review, you will be advised by separate correspondence.

Peter Bamford NRR/DORL/LPL 1-2 Beaver Valley & TMI-1 Project Manager 301-415-2833