ML16120A596: Difference between revisions

From kanterella
Jump to navigation Jump to search
Created page by program invented by StriderTol
StriderTol Bot change
 
(3 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML16120A596
| number = ML16120A596
| issue date = 04/18/2016
| issue date = 04/18/2016
| title = Palisades - Final Safety Analysis Report Update, Revision 32, Chapter 9 - Auxiliary Systems - Figures
| title = Final Safety Analysis Report Update, Revision 32, Chapter 9 - Auxiliary Systems - Figures
| author name =  
| author name =  
| author affiliation = Entergy Nuclear Operations, Inc
| author affiliation = Entergy Nuclear Operations, Inc
Line 14: Line 14:
| document type = Drawing, Updated Final Safety Analysis Report (UFSAR)
| document type = Drawing, Updated Final Safety Analysis Report (UFSAR)
| page count = 40
| page count = 40
| revision = 0
}}
}}
=Text=
{{#Wiki_filter:FSAR CHAPTER 9 - AUXILIARY SYSTEMS FIGURE 9-1, SHT 1 Revision 32 SYSTEM DIAGRAM SERVICE WATER SYSTEM
FSAR CHAPTER 9 - AUXILIARY SYSTEMS FIGURE 9-1, SHT 1A Revision 32 PIPING & INSTRUMENT DIAGRAM SERVICE WATER SYSTEM
FSAR CHAPTER 9 - AUXILIARY SYSTEMS FIGURE 9-1, SHT 1B Revision 32 PIPING & INSTRUMENT DIAGRAM SERVICE WATER SYSTEM
FSAR CHAPTER 9 - AUXILIARY SYSTEMS FIGURE 9-1, SHT 2 Revision 32 PIPING & INSTRUMENT DIAGRAM SERVICE WATER, SCREEN STRUCTURE AND CHLORINATOR
FSAR CHAPTER 9 - AUXILIARY SYSTEMS FIGURE 9-2 Revision 32 PIPING & INSTRUMENT DIAGRAM SHIELD COOLING SYSTEM
FSAR CHAPTER 9 - AUXILIARY SYSTEMS FIGURE 9-3 Revision 26 NORMAL OPERATING CONDITIONS COOLING COIL CENTERLINE Structural Concrete Sacrificial Concrete
FSAR CHAPTER 9 - AUXILIARY SYSTEMS FIGURE 9-4 Revision 26 NORMAL OPERATING CONDITIONS MID-SPAN OF TWO COOLING COILS Structural Concrete Sacrificial Concrete
FSAR CHAPTER 9 - AUXILIARY SYSTEMS FIGURE 9-5 Revision 26 BOUNDING DESIGN COOLING COIL CENTERLINE Structural Concrete Sacrificial Concrete
FSAR CHAPTER 9 - AUXILIARY SYSTEMS FIGURE 9-6 Revision 26 BOUNDING DESIGN CONDITIONS AND MID-SPAN OF TWO COOLING COILS Structural Concrete Sacrificial Concrete
FSAR CHAPTER 9 - AUXILIARY SYSTEMS FIGURE 9-7, SHT 1 Revision 30 PIPING & INSTRUMENT DIAGRAM COMPONENT COOLING SYSTEM
FSAR CHAPTER 9 - AUXILIARY SYSTEMS FIGURE 9-7, SHT 2 Revision 27 PIPING & INSTRUMENT DIAGRAM COMPONENT COOLING SYSTEM
FSAR CHAPTER 9 - AUXILIARY SYSTEMS FIGURE 9-7, SHT 3 Revision 32 PIPING & INSTRUMENT DIAGRAM COMPONENT COOLING SYSTEM
FSAR CHAPTER 9 - AUXILIARY SYSTEMS FIGURE 9-8 Revision 32 PIPING & INSTRUMENT DIAGRAM SPENT FUEL POOL COOLING SYSTEM
FSAR CHAPTER 9 - AUXILIARY SYSTEMS FIGURE 9-9, SHT 1 Revision 32 PIPING & INSTRUMENT DIAGRAM SERVICE AND INSTRUMENT AIR SYSTEMS
FSAR CHAPTER 9 - AUXILIARY SYSTEMS FIGURE 9-9, SHT 2 Revision 32 PIPING & INSTRUMENT DIAGRAM MISCELLANEOUS GAS SUPPLY SYSTEMS
FSAR CHAPTER 9 - AUXILIARY SYSTEMS FIGURE 9-10, SHT 1 Revision 32 PIPING & INSTRUMENT DIAGRAM HIGH PRESSURE AIR OPERATED VALVES
FSAR CHAPTER 9 - AUXILIARY SYSTEMS FIGURE 9-10, SHT 1A Revision 30 PIPING & INSTRUMENT DIAGRAM HIGH PRESSURE AIR OPERATED VALVES
FSAR CHAPTER 9 - AUXILIARY SYSTEMS FIGURE 9-10, SHT 2 Revision 30 PIPING & INSTRUMENT DIAGRAM HIGH PRESSURE AIR OPERATED VALVES
FSAR CHAPTER 9 - AUXILIARY SYSTEMS FIGURE 9-11, SHT 1 Revision 32 PIPING & INSTRUMENT DIAGRAM FIRE PROTECTION SYSTEM
FSAR CHAPTER 9 - AUXILIARY SYSTEMS FIGURE 9-11, SHT 2 Revision 32 PIPING & INSTRUMENT DIAGRAM FIRE PROTECTION SYSTEM
FSAR CHAPTER 9 - AUXILIARY SYSTEMS FIGURE 9-11, SHT 3 Revision 32 PIPING & INSTRUMENT DIAGRAM FIRE PROTECTION SYSTEM
FSAR CHAPTER 9 - AUXILIARY SYSTEMS FIGURE 9-12 Revision 32 PIPING & INSTRUMENT DIAGRAM AUXILIARY FEEDWATER SYSTEM
FSAR CHAPTER 9 - AUXILIARY SYSTEMS FIGURE 9-13 Revision 32 PIPING & INSTRUMENT DIAGRAM AUXILIARY FEEDWATER STEAM SUPPLY
FSAR CHAPTER 9 - AUXILIARY SYSTEMS FIGURE 9-14, SHT 1 Revision 28 PIPING & INSTRUMENT DIAGRAM HEATING, VENTILATION AND AIR CONDITIONING, SWITCHGEAR AND CABLE SPREADING ROOMS
FSAR CHAPTER 9 - AUXILIARY SYSTEMS FIGURE 9-14, SHT 2 Revision 32 PIPING & INSTRUMENT DIAGRAM HEATING, VENTILATION AND AIR CONDITIONING, CONTAINMENT BUILDING
FSAR CHAPTER 9 - AUXILIARY SYSTEMS FIGURE 9-14, SHT 3 Revision 32 PIPING & INSTRUMENT DIAGRAM HEATING, VENTILATION AND AIR CONDITIONING, RADWASTE AREA
FSAR CHAPTER 9 - AUXILIARY SYSTEMS FIGURE 9-14, SHT 4 Revision 32 PIPING & INSTRUMENT DIAGRAM HEATING, VENTILATION AND AIR CONDITIONING, MISCELLANEOUS BUILDINGS
FSAR CHAPTER 9 - AUXILIARY SYSTEMS FIGURE 9-14, SHT 5 Revision 27 PIPING & INSTRUMENT DIAGRAM HEATING, VENTILATION AND AIR CONDITIONING, CONTROL ROOM
FSAR CHAPTER 9 - AUXILIARY SYSTEMS FIGURE 9-14, SHT 6 Revision 25 PIPING & INSTRUMENT DIAGRAM HEATING, VENTILATION AND AIR CONDITIONING, CONTROL ROOM
FSAR CHAPTER 9 - AUXILIARY SYSTEMS FIGURE 9-14, SHT 7 Revision 30 PIPING & INSTRUMENT DIAGRAM HEATING, VENTILATION AND AIR CONDITIONING, CONTROL ROOM
FSAR CHAPTER 9 - AUXILIARY SYSTEMS FIGURE 9-14, SHT 8 Revision 30 HEATING AND VENTILATION AIR FLOW DIAGRAM
FSAR CHAPTER 9 - AUXILIARY SYSTEMS FIGURE 9-14, SHT 9 Revision 32 PIPING & INSTRUMENT DIAGRAM HEATING, VENTILATION AND COOLING AUXILIARY BUILDING ADDITION
FSAR CHAPTER 9 - AUXILIARY SYSTEMS FIGURE 9-15 Revision 23 PIPING & INSTRUMENT DIAGRAM FLUID SYSTEM DIAGRAM POST ACCIDENT SAMPLE MONITOR SYSTEM
FSAR CHAPTER 9 - AUXILIARY SYSTEMS FIGURE 9-16 Revision 32 PIPING & INSTRUMENT DIAGRAM GAS ANALYZING SYSTEMS (CONTAINMENT HYDROGEN)
FSAR CHAPTER 9 - AUXILIARY SYSTEMS FIGURE 9-17 Revision 25 MONITORING AND SAMPLING SYSTEMS (RADWASTE ADDITION)
FSAR CHAPTER 9 - AUXILIARY SYSTEMS FIGURE 9-18, SHT 1 Revision 32 PIPING & INSTRUMENT DIAGRAM CHEMICAL AND VOLUME CONTROL SYSTEM
FSAR CHAPTER 9 - AUXILIARY SYSTEMS FIGURE 9-18, SHT 1A Revision 32 PIPING & INSTRUMENT DIAGRAM CHEMICAL AND VOLUME CONTROL SYSTEM
FSAR CHAPTER 9 - AUXILIARY SYSTEMS FIGURE 9-18, SHT 1B Revision 31 PIPING & INSTRUMENT DIAGRAM CHEMICAL AND VOLUME CONTROL SYSTEM
FSAR CHAPTER 9 - AUXILIARY SYSTEMS FIGURE 9-19 Revision 21 BORON CONCENTRATION VS CORE LIFETIME
FSAR CHAPTER 9 - AUXILIARY SYSTEMS FIGURE 9-20 Revision 31 PALISADES PLANT SPENT FUEL STORAGE RACK ARRANGEMENT NEW FUEL ELEVATOR AND INSPECTION STAND 3.11 8 x 8**
5 x 10 896***
* MAY ALSO BE USED FOR CONTROL ROD STORAGE
**NOMINAL, SOME SPACES NOT INSTALLED FOR NFE AND INSPECTION STAND
***PHYSICAL SPOTS. ONLY 892 LICENSED LOCATIONS DUE TO LACK OF ABILITY TO ACCESS
FSAR CHAPTER 9 - AUXILIARY SYSTEMS FIGURE 9-1, SHT 1 Revision 32 SYSTEM DIAGRAM SERVICE WATER SYSTEM
FSAR CHAPTER 9 - AUXILIARY SYSTEMS FIGURE 9-1, SHT 1A Revision 32 PIPING & INSTRUMENT DIAGRAM SERVICE WATER SYSTEM
FSAR CHAPTER 9 - AUXILIARY SYSTEMS FIGURE 9-1, SHT 1B Revision 32 PIPING & INSTRUMENT DIAGRAM SERVICE WATER SYSTEM
FSAR CHAPTER 9 - AUXILIARY SYSTEMS FIGURE 9-1, SHT 2 Revision 32 PIPING & INSTRUMENT DIAGRAM SERVICE WATER, SCREEN STRUCTURE AND CHLORINATOR
FSAR CHAPTER 9 - AUXILIARY SYSTEMS FIGURE 9-2 Revision 32 PIPING & INSTRUMENT DIAGRAM SHIELD COOLING SYSTEM
FSAR CHAPTER 9 - AUXILIARY SYSTEMS FIGURE 9-3 Revision 26 NORMAL OPERATING CONDITIONS COOLING COIL CENTERLINE Structural Concrete Sacrificial Concrete
FSAR CHAPTER 9 - AUXILIARY SYSTEMS FIGURE 9-4 Revision 26 NORMAL OPERATING CONDITIONS MID-SPAN OF TWO COOLING COILS Structural Concrete Sacrificial Concrete
FSAR CHAPTER 9 - AUXILIARY SYSTEMS FIGURE 9-5 Revision 26 BOUNDING DESIGN COOLING COIL CENTERLINE Structural Concrete Sacrificial Concrete
FSAR CHAPTER 9 - AUXILIARY SYSTEMS FIGURE 9-6 Revision 26 BOUNDING DESIGN CONDITIONS AND MID-SPAN OF TWO COOLING COILS Structural Concrete Sacrificial Concrete
FSAR CHAPTER 9 - AUXILIARY SYSTEMS FIGURE 9-7, SHT 1 Revision 30 PIPING & INSTRUMENT DIAGRAM COMPONENT COOLING SYSTEM
FSAR CHAPTER 9 - AUXILIARY SYSTEMS FIGURE 9-7, SHT 2 Revision 27 PIPING & INSTRUMENT DIAGRAM COMPONENT COOLING SYSTEM
FSAR CHAPTER 9 - AUXILIARY SYSTEMS FIGURE 9-7, SHT 3 Revision 32 PIPING & INSTRUMENT DIAGRAM COMPONENT COOLING SYSTEM
FSAR CHAPTER 9 - AUXILIARY SYSTEMS FIGURE 9-8 Revision 32 PIPING & INSTRUMENT DIAGRAM SPENT FUEL POOL COOLING SYSTEM
FSAR CHAPTER 9 - AUXILIARY SYSTEMS FIGURE 9-9, SHT 1 Revision 32 PIPING & INSTRUMENT DIAGRAM SERVICE AND INSTRUMENT AIR SYSTEMS
FSAR CHAPTER 9 - AUXILIARY SYSTEMS FIGURE 9-9, SHT 2 Revision 32 PIPING & INSTRUMENT DIAGRAM MISCELLANEOUS GAS SUPPLY SYSTEMS
FSAR CHAPTER 9 - AUXILIARY SYSTEMS FIGURE 9-10, SHT 1 Revision 32 PIPING & INSTRUMENT DIAGRAM HIGH PRESSURE AIR OPERATED VALVES
FSAR CHAPTER 9 - AUXILIARY SYSTEMS FIGURE 9-10, SHT 1A Revision 30 PIPING & INSTRUMENT DIAGRAM HIGH PRESSURE AIR OPERATED VALVES
FSAR CHAPTER 9 - AUXILIARY SYSTEMS FIGURE 9-10, SHT 2 Revision 30 PIPING & INSTRUMENT DIAGRAM HIGH PRESSURE AIR OPERATED VALVES
FSAR CHAPTER 9 - AUXILIARY SYSTEMS FIGURE 9-11, SHT 1 Revision 32 PIPING & INSTRUMENT DIAGRAM FIRE PROTECTION SYSTEM
FSAR CHAPTER 9 - AUXILIARY SYSTEMS FIGURE 9-11, SHT 2 Revision 32 PIPING & INSTRUMENT DIAGRAM FIRE PROTECTION SYSTEM
FSAR CHAPTER 9 - AUXILIARY SYSTEMS FIGURE 9-11, SHT 3 Revision 32 PIPING & INSTRUMENT DIAGRAM FIRE PROTECTION SYSTEM
FSAR CHAPTER 9 - AUXILIARY SYSTEMS FIGURE 9-12 Revision 32 PIPING & INSTRUMENT DIAGRAM AUXILIARY FEEDWATER SYSTEM
FSAR CHAPTER 9 - AUXILIARY SYSTEMS FIGURE 9-13 Revision 32 PIPING & INSTRUMENT DIAGRAM AUXILIARY FEEDWATER STEAM SUPPLY
FSAR CHAPTER 9 - AUXILIARY SYSTEMS FIGURE 9-14, SHT 1 Revision 28 PIPING & INSTRUMENT DIAGRAM HEATING, VENTILATION AND AIR CONDITIONING, SWITCHGEAR AND CABLE SPREADING ROOMS
FSAR CHAPTER 9 - AUXILIARY SYSTEMS FIGURE 9-14, SHT 2 Revision 32 PIPING & INSTRUMENT DIAGRAM HEATING, VENTILATION AND AIR CONDITIONING, CONTAINMENT BUILDING
FSAR CHAPTER 9 - AUXILIARY SYSTEMS FIGURE 9-14, SHT 3 Revision 32 PIPING & INSTRUMENT DIAGRAM HEATING, VENTILATION AND AIR CONDITIONING, RADWASTE AREA
FSAR CHAPTER 9 - AUXILIARY SYSTEMS FIGURE 9-14, SHT 4 Revision 32 PIPING & INSTRUMENT DIAGRAM HEATING, VENTILATION AND AIR CONDITIONING, MISCELLANEOUS BUILDINGS
FSAR CHAPTER 9 - AUXILIARY SYSTEMS FIGURE 9-14, SHT 5 Revision 27 PIPING & INSTRUMENT DIAGRAM HEATING, VENTILATION AND AIR CONDITIONING, CONTROL ROOM
FSAR CHAPTER 9 - AUXILIARY SYSTEMS FIGURE 9-14, SHT 6 Revision 25 PIPING & INSTRUMENT DIAGRAM HEATING, VENTILATION AND AIR CONDITIONING, CONTROL ROOM
FSAR CHAPTER 9 - AUXILIARY SYSTEMS FIGURE 9-14, SHT 7 Revision 30 PIPING & INSTRUMENT DIAGRAM HEATING, VENTILATION AND AIR CONDITIONING, CONTROL ROOM
FSAR CHAPTER 9 - AUXILIARY SYSTEMS FIGURE 9-14, SHT 8 Revision 30 HEATING AND VENTILATION AIR FLOW DIAGRAM
FSAR CHAPTER 9 - AUXILIARY SYSTEMS FIGURE 9-14, SHT 9 Revision 32 PIPING & INSTRUMENT DIAGRAM HEATING, VENTILATION AND COOLING AUXILIARY BUILDING ADDITION
FSAR CHAPTER 9 - AUXILIARY SYSTEMS FIGURE 9-15 Revision 23 PIPING & INSTRUMENT DIAGRAM FLUID SYSTEM DIAGRAM POST ACCIDENT SAMPLE MONITOR SYSTEM
FSAR CHAPTER 9 - AUXILIARY SYSTEMS FIGURE 9-16 Revision 32 PIPING & INSTRUMENT DIAGRAM GAS ANALYZING SYSTEMS (CONTAINMENT HYDROGEN)
FSAR CHAPTER 9 - AUXILIARY SYSTEMS FIGURE 9-17 Revision 25 MONITORING AND SAMPLING SYSTEMS (RADWASTE ADDITION)
FSAR CHAPTER 9 - AUXILIARY SYSTEMS FIGURE 9-18, SHT 1 Revision 32 PIPING & INSTRUMENT DIAGRAM CHEMICAL AND VOLUME CONTROL SYSTEM
FSAR CHAPTER 9 - AUXILIARY SYSTEMS FIGURE 9-18, SHT 1A Revision 32 PIPING & INSTRUMENT DIAGRAM CHEMICAL AND VOLUME CONTROL SYSTEM
FSAR CHAPTER 9 - AUXILIARY SYSTEMS FIGURE 9-18, SHT 1B Revision 31 PIPING & INSTRUMENT DIAGRAM CHEMICAL AND VOLUME CONTROL SYSTEM
FSAR CHAPTER 9 - AUXILIARY SYSTEMS FIGURE 9-19 Revision 21 BORON CONCENTRATION VS CORE LIFETIME
FSAR CHAPTER 9 - AUXILIARY SYSTEMS FIGURE 9-20 Revision 31 PALISADES PLANT SPENT FUEL STORAGE RACK ARRANGEMENT NEW FUEL ELEVATOR AND INSPECTION STAND 3.11 8 x 8**
5 x 10 896***
* MAY ALSO BE USED FOR CONTROL ROD STORAGE
**NOMINAL, SOME SPACES NOT INSTALLED FOR NFE AND INSPECTION STAND
***PHYSICAL SPOTS. ONLY 892 LICENSED LOCATIONS DUE TO LACK OF ABILITY TO ACCESS}}

Latest revision as of 00:35, 10 January 2025

Final Safety Analysis Report Update, Revision 32, Chapter 9 - Auxiliary Systems - Figures
ML16120A596
Person / Time
Site: Palisades 
Issue date: 04/18/2016
From:
Entergy Nuclear Operations
To:
Office of Nuclear Reactor Regulation
Shared Package
ML16120A302 List:
References
PNP 2016-015
Download: ML16120A596 (40)


Text

FSAR CHAPTER 9 - AUXILIARY SYSTEMS FIGURE 9-1, SHT 1 Revision 32 SYSTEM DIAGRAM SERVICE WATER SYSTEM

FSAR CHAPTER 9 - AUXILIARY SYSTEMS FIGURE 9-1, SHT 1A Revision 32 PIPING & INSTRUMENT DIAGRAM SERVICE WATER SYSTEM

FSAR CHAPTER 9 - AUXILIARY SYSTEMS FIGURE 9-1, SHT 1B Revision 32 PIPING & INSTRUMENT DIAGRAM SERVICE WATER SYSTEM

FSAR CHAPTER 9 - AUXILIARY SYSTEMS FIGURE 9-1, SHT 2 Revision 32 PIPING & INSTRUMENT DIAGRAM SERVICE WATER, SCREEN STRUCTURE AND CHLORINATOR

FSAR CHAPTER 9 - AUXILIARY SYSTEMS FIGURE 9-2 Revision 32 PIPING & INSTRUMENT DIAGRAM SHIELD COOLING SYSTEM

FSAR CHAPTER 9 - AUXILIARY SYSTEMS FIGURE 9-3 Revision 26 NORMAL OPERATING CONDITIONS COOLING COIL CENTERLINE Structural Concrete Sacrificial Concrete

FSAR CHAPTER 9 - AUXILIARY SYSTEMS FIGURE 9-4 Revision 26 NORMAL OPERATING CONDITIONS MID-SPAN OF TWO COOLING COILS Structural Concrete Sacrificial Concrete

FSAR CHAPTER 9 - AUXILIARY SYSTEMS FIGURE 9-5 Revision 26 BOUNDING DESIGN COOLING COIL CENTERLINE Structural Concrete Sacrificial Concrete

FSAR CHAPTER 9 - AUXILIARY SYSTEMS FIGURE 9-6 Revision 26 BOUNDING DESIGN CONDITIONS AND MID-SPAN OF TWO COOLING COILS Structural Concrete Sacrificial Concrete

FSAR CHAPTER 9 - AUXILIARY SYSTEMS FIGURE 9-7, SHT 1 Revision 30 PIPING & INSTRUMENT DIAGRAM COMPONENT COOLING SYSTEM

FSAR CHAPTER 9 - AUXILIARY SYSTEMS FIGURE 9-7, SHT 2 Revision 27 PIPING & INSTRUMENT DIAGRAM COMPONENT COOLING SYSTEM

FSAR CHAPTER 9 - AUXILIARY SYSTEMS FIGURE 9-7, SHT 3 Revision 32 PIPING & INSTRUMENT DIAGRAM COMPONENT COOLING SYSTEM

FSAR CHAPTER 9 - AUXILIARY SYSTEMS FIGURE 9-8 Revision 32 PIPING & INSTRUMENT DIAGRAM SPENT FUEL POOL COOLING SYSTEM

FSAR CHAPTER 9 - AUXILIARY SYSTEMS FIGURE 9-9, SHT 1 Revision 32 PIPING & INSTRUMENT DIAGRAM SERVICE AND INSTRUMENT AIR SYSTEMS

FSAR CHAPTER 9 - AUXILIARY SYSTEMS FIGURE 9-9, SHT 2 Revision 32 PIPING & INSTRUMENT DIAGRAM MISCELLANEOUS GAS SUPPLY SYSTEMS

FSAR CHAPTER 9 - AUXILIARY SYSTEMS FIGURE 9-10, SHT 1 Revision 32 PIPING & INSTRUMENT DIAGRAM HIGH PRESSURE AIR OPERATED VALVES

FSAR CHAPTER 9 - AUXILIARY SYSTEMS FIGURE 9-10, SHT 1A Revision 30 PIPING & INSTRUMENT DIAGRAM HIGH PRESSURE AIR OPERATED VALVES

FSAR CHAPTER 9 - AUXILIARY SYSTEMS FIGURE 9-10, SHT 2 Revision 30 PIPING & INSTRUMENT DIAGRAM HIGH PRESSURE AIR OPERATED VALVES

FSAR CHAPTER 9 - AUXILIARY SYSTEMS FIGURE 9-11, SHT 1 Revision 32 PIPING & INSTRUMENT DIAGRAM FIRE PROTECTION SYSTEM

FSAR CHAPTER 9 - AUXILIARY SYSTEMS FIGURE 9-11, SHT 2 Revision 32 PIPING & INSTRUMENT DIAGRAM FIRE PROTECTION SYSTEM

FSAR CHAPTER 9 - AUXILIARY SYSTEMS FIGURE 9-11, SHT 3 Revision 32 PIPING & INSTRUMENT DIAGRAM FIRE PROTECTION SYSTEM

FSAR CHAPTER 9 - AUXILIARY SYSTEMS FIGURE 9-12 Revision 32 PIPING & INSTRUMENT DIAGRAM AUXILIARY FEEDWATER SYSTEM

FSAR CHAPTER 9 - AUXILIARY SYSTEMS FIGURE 9-13 Revision 32 PIPING & INSTRUMENT DIAGRAM AUXILIARY FEEDWATER STEAM SUPPLY

FSAR CHAPTER 9 - AUXILIARY SYSTEMS FIGURE 9-14, SHT 1 Revision 28 PIPING & INSTRUMENT DIAGRAM HEATING, VENTILATION AND AIR CONDITIONING, SWITCHGEAR AND CABLE SPREADING ROOMS

FSAR CHAPTER 9 - AUXILIARY SYSTEMS FIGURE 9-14, SHT 2 Revision 32 PIPING & INSTRUMENT DIAGRAM HEATING, VENTILATION AND AIR CONDITIONING, CONTAINMENT BUILDING

FSAR CHAPTER 9 - AUXILIARY SYSTEMS FIGURE 9-14, SHT 3 Revision 32 PIPING & INSTRUMENT DIAGRAM HEATING, VENTILATION AND AIR CONDITIONING, RADWASTE AREA

FSAR CHAPTER 9 - AUXILIARY SYSTEMS FIGURE 9-14, SHT 4 Revision 32 PIPING & INSTRUMENT DIAGRAM HEATING, VENTILATION AND AIR CONDITIONING, MISCELLANEOUS BUILDINGS

FSAR CHAPTER 9 - AUXILIARY SYSTEMS FIGURE 9-14, SHT 5 Revision 27 PIPING & INSTRUMENT DIAGRAM HEATING, VENTILATION AND AIR CONDITIONING, CONTROL ROOM

FSAR CHAPTER 9 - AUXILIARY SYSTEMS FIGURE 9-14, SHT 6 Revision 25 PIPING & INSTRUMENT DIAGRAM HEATING, VENTILATION AND AIR CONDITIONING, CONTROL ROOM

FSAR CHAPTER 9 - AUXILIARY SYSTEMS FIGURE 9-14, SHT 7 Revision 30 PIPING & INSTRUMENT DIAGRAM HEATING, VENTILATION AND AIR CONDITIONING, CONTROL ROOM

FSAR CHAPTER 9 - AUXILIARY SYSTEMS FIGURE 9-14, SHT 8 Revision 30 HEATING AND VENTILATION AIR FLOW DIAGRAM

FSAR CHAPTER 9 - AUXILIARY SYSTEMS FIGURE 9-14, SHT 9 Revision 32 PIPING & INSTRUMENT DIAGRAM HEATING, VENTILATION AND COOLING AUXILIARY BUILDING ADDITION

FSAR CHAPTER 9 - AUXILIARY SYSTEMS FIGURE 9-15 Revision 23 PIPING & INSTRUMENT DIAGRAM FLUID SYSTEM DIAGRAM POST ACCIDENT SAMPLE MONITOR SYSTEM

FSAR CHAPTER 9 - AUXILIARY SYSTEMS FIGURE 9-16 Revision 32 PIPING & INSTRUMENT DIAGRAM GAS ANALYZING SYSTEMS (CONTAINMENT HYDROGEN)

FSAR CHAPTER 9 - AUXILIARY SYSTEMS FIGURE 9-17 Revision 25 MONITORING AND SAMPLING SYSTEMS (RADWASTE ADDITION)

FSAR CHAPTER 9 - AUXILIARY SYSTEMS FIGURE 9-18, SHT 1 Revision 32 PIPING & INSTRUMENT DIAGRAM CHEMICAL AND VOLUME CONTROL SYSTEM

FSAR CHAPTER 9 - AUXILIARY SYSTEMS FIGURE 9-18, SHT 1A Revision 32 PIPING & INSTRUMENT DIAGRAM CHEMICAL AND VOLUME CONTROL SYSTEM

FSAR CHAPTER 9 - AUXILIARY SYSTEMS FIGURE 9-18, SHT 1B Revision 31 PIPING & INSTRUMENT DIAGRAM CHEMICAL AND VOLUME CONTROL SYSTEM

FSAR CHAPTER 9 - AUXILIARY SYSTEMS FIGURE 9-19 Revision 21 BORON CONCENTRATION VS CORE LIFETIME

FSAR CHAPTER 9 - AUXILIARY SYSTEMS FIGURE 9-20 Revision 31 PALISADES PLANT SPENT FUEL STORAGE RACK ARRANGEMENT NEW FUEL ELEVATOR AND INSPECTION STAND 3.11 8 x 8**

5 x 10 896***

    • NOMINAL, SOME SPACES NOT INSTALLED FOR NFE AND INSPECTION STAND
      • PHYSICAL SPOTS. ONLY 892 LICENSED LOCATIONS DUE TO LACK OF ABILITY TO ACCESS

FSAR CHAPTER 9 - AUXILIARY SYSTEMS FIGURE 9-1, SHT 1 Revision 32 SYSTEM DIAGRAM SERVICE WATER SYSTEM

FSAR CHAPTER 9 - AUXILIARY SYSTEMS FIGURE 9-1, SHT 1A Revision 32 PIPING & INSTRUMENT DIAGRAM SERVICE WATER SYSTEM

FSAR CHAPTER 9 - AUXILIARY SYSTEMS FIGURE 9-1, SHT 1B Revision 32 PIPING & INSTRUMENT DIAGRAM SERVICE WATER SYSTEM

FSAR CHAPTER 9 - AUXILIARY SYSTEMS FIGURE 9-1, SHT 2 Revision 32 PIPING & INSTRUMENT DIAGRAM SERVICE WATER, SCREEN STRUCTURE AND CHLORINATOR

FSAR CHAPTER 9 - AUXILIARY SYSTEMS FIGURE 9-2 Revision 32 PIPING & INSTRUMENT DIAGRAM SHIELD COOLING SYSTEM

FSAR CHAPTER 9 - AUXILIARY SYSTEMS FIGURE 9-3 Revision 26 NORMAL OPERATING CONDITIONS COOLING COIL CENTERLINE Structural Concrete Sacrificial Concrete

FSAR CHAPTER 9 - AUXILIARY SYSTEMS FIGURE 9-4 Revision 26 NORMAL OPERATING CONDITIONS MID-SPAN OF TWO COOLING COILS Structural Concrete Sacrificial Concrete

FSAR CHAPTER 9 - AUXILIARY SYSTEMS FIGURE 9-5 Revision 26 BOUNDING DESIGN COOLING COIL CENTERLINE Structural Concrete Sacrificial Concrete

FSAR CHAPTER 9 - AUXILIARY SYSTEMS FIGURE 9-6 Revision 26 BOUNDING DESIGN CONDITIONS AND MID-SPAN OF TWO COOLING COILS Structural Concrete Sacrificial Concrete

FSAR CHAPTER 9 - AUXILIARY SYSTEMS FIGURE 9-7, SHT 1 Revision 30 PIPING & INSTRUMENT DIAGRAM COMPONENT COOLING SYSTEM

FSAR CHAPTER 9 - AUXILIARY SYSTEMS FIGURE 9-7, SHT 2 Revision 27 PIPING & INSTRUMENT DIAGRAM COMPONENT COOLING SYSTEM

FSAR CHAPTER 9 - AUXILIARY SYSTEMS FIGURE 9-7, SHT 3 Revision 32 PIPING & INSTRUMENT DIAGRAM COMPONENT COOLING SYSTEM

FSAR CHAPTER 9 - AUXILIARY SYSTEMS FIGURE 9-8 Revision 32 PIPING & INSTRUMENT DIAGRAM SPENT FUEL POOL COOLING SYSTEM

FSAR CHAPTER 9 - AUXILIARY SYSTEMS FIGURE 9-9, SHT 1 Revision 32 PIPING & INSTRUMENT DIAGRAM SERVICE AND INSTRUMENT AIR SYSTEMS

FSAR CHAPTER 9 - AUXILIARY SYSTEMS FIGURE 9-9, SHT 2 Revision 32 PIPING & INSTRUMENT DIAGRAM MISCELLANEOUS GAS SUPPLY SYSTEMS

FSAR CHAPTER 9 - AUXILIARY SYSTEMS FIGURE 9-10, SHT 1 Revision 32 PIPING & INSTRUMENT DIAGRAM HIGH PRESSURE AIR OPERATED VALVES

FSAR CHAPTER 9 - AUXILIARY SYSTEMS FIGURE 9-10, SHT 1A Revision 30 PIPING & INSTRUMENT DIAGRAM HIGH PRESSURE AIR OPERATED VALVES

FSAR CHAPTER 9 - AUXILIARY SYSTEMS FIGURE 9-10, SHT 2 Revision 30 PIPING & INSTRUMENT DIAGRAM HIGH PRESSURE AIR OPERATED VALVES

FSAR CHAPTER 9 - AUXILIARY SYSTEMS FIGURE 9-11, SHT 1 Revision 32 PIPING & INSTRUMENT DIAGRAM FIRE PROTECTION SYSTEM

FSAR CHAPTER 9 - AUXILIARY SYSTEMS FIGURE 9-11, SHT 2 Revision 32 PIPING & INSTRUMENT DIAGRAM FIRE PROTECTION SYSTEM

FSAR CHAPTER 9 - AUXILIARY SYSTEMS FIGURE 9-11, SHT 3 Revision 32 PIPING & INSTRUMENT DIAGRAM FIRE PROTECTION SYSTEM

FSAR CHAPTER 9 - AUXILIARY SYSTEMS FIGURE 9-12 Revision 32 PIPING & INSTRUMENT DIAGRAM AUXILIARY FEEDWATER SYSTEM

FSAR CHAPTER 9 - AUXILIARY SYSTEMS FIGURE 9-13 Revision 32 PIPING & INSTRUMENT DIAGRAM AUXILIARY FEEDWATER STEAM SUPPLY

FSAR CHAPTER 9 - AUXILIARY SYSTEMS FIGURE 9-14, SHT 1 Revision 28 PIPING & INSTRUMENT DIAGRAM HEATING, VENTILATION AND AIR CONDITIONING, SWITCHGEAR AND CABLE SPREADING ROOMS

FSAR CHAPTER 9 - AUXILIARY SYSTEMS FIGURE 9-14, SHT 2 Revision 32 PIPING & INSTRUMENT DIAGRAM HEATING, VENTILATION AND AIR CONDITIONING, CONTAINMENT BUILDING

FSAR CHAPTER 9 - AUXILIARY SYSTEMS FIGURE 9-14, SHT 3 Revision 32 PIPING & INSTRUMENT DIAGRAM HEATING, VENTILATION AND AIR CONDITIONING, RADWASTE AREA

FSAR CHAPTER 9 - AUXILIARY SYSTEMS FIGURE 9-14, SHT 4 Revision 32 PIPING & INSTRUMENT DIAGRAM HEATING, VENTILATION AND AIR CONDITIONING, MISCELLANEOUS BUILDINGS

FSAR CHAPTER 9 - AUXILIARY SYSTEMS FIGURE 9-14, SHT 5 Revision 27 PIPING & INSTRUMENT DIAGRAM HEATING, VENTILATION AND AIR CONDITIONING, CONTROL ROOM

FSAR CHAPTER 9 - AUXILIARY SYSTEMS FIGURE 9-14, SHT 6 Revision 25 PIPING & INSTRUMENT DIAGRAM HEATING, VENTILATION AND AIR CONDITIONING, CONTROL ROOM

FSAR CHAPTER 9 - AUXILIARY SYSTEMS FIGURE 9-14, SHT 7 Revision 30 PIPING & INSTRUMENT DIAGRAM HEATING, VENTILATION AND AIR CONDITIONING, CONTROL ROOM

FSAR CHAPTER 9 - AUXILIARY SYSTEMS FIGURE 9-14, SHT 8 Revision 30 HEATING AND VENTILATION AIR FLOW DIAGRAM

FSAR CHAPTER 9 - AUXILIARY SYSTEMS FIGURE 9-14, SHT 9 Revision 32 PIPING & INSTRUMENT DIAGRAM HEATING, VENTILATION AND COOLING AUXILIARY BUILDING ADDITION

FSAR CHAPTER 9 - AUXILIARY SYSTEMS FIGURE 9-15 Revision 23 PIPING & INSTRUMENT DIAGRAM FLUID SYSTEM DIAGRAM POST ACCIDENT SAMPLE MONITOR SYSTEM

FSAR CHAPTER 9 - AUXILIARY SYSTEMS FIGURE 9-16 Revision 32 PIPING & INSTRUMENT DIAGRAM GAS ANALYZING SYSTEMS (CONTAINMENT HYDROGEN)

FSAR CHAPTER 9 - AUXILIARY SYSTEMS FIGURE 9-17 Revision 25 MONITORING AND SAMPLING SYSTEMS (RADWASTE ADDITION)

FSAR CHAPTER 9 - AUXILIARY SYSTEMS FIGURE 9-18, SHT 1 Revision 32 PIPING & INSTRUMENT DIAGRAM CHEMICAL AND VOLUME CONTROL SYSTEM

FSAR CHAPTER 9 - AUXILIARY SYSTEMS FIGURE 9-18, SHT 1A Revision 32 PIPING & INSTRUMENT DIAGRAM CHEMICAL AND VOLUME CONTROL SYSTEM

FSAR CHAPTER 9 - AUXILIARY SYSTEMS FIGURE 9-18, SHT 1B Revision 31 PIPING & INSTRUMENT DIAGRAM CHEMICAL AND VOLUME CONTROL SYSTEM

FSAR CHAPTER 9 - AUXILIARY SYSTEMS FIGURE 9-19 Revision 21 BORON CONCENTRATION VS CORE LIFETIME

FSAR CHAPTER 9 - AUXILIARY SYSTEMS FIGURE 9-20 Revision 31 PALISADES PLANT SPENT FUEL STORAGE RACK ARRANGEMENT NEW FUEL ELEVATOR AND INSPECTION STAND 3.11 8 x 8**

5 x 10 896***

    • NOMINAL, SOME SPACES NOT INSTALLED FOR NFE AND INSPECTION STAND
      • PHYSICAL SPOTS. ONLY 892 LICENSED LOCATIONS DUE TO LACK OF ABILITY TO ACCESS