ML16120A596

From kanterella
Jump to navigation Jump to search
Final Safety Analysis Report Update, Revision 32, Chapter 9 - Auxiliary Systems - Figures
ML16120A596
Person / Time
Site: Palisades Entergy icon.png
Issue date: 04/18/2016
From:
Entergy Nuclear Operations
To:
Office of Nuclear Reactor Regulation
Shared Package
ML16120A302 List:
References
PNP 2016-015
Download: ML16120A596 (40)


Text

FSAR CHAPTER 9 - AUXILIARY SYSTEMS FIGURE 9-1, SHT 1 Revision 32 SYSTEM DIAGRAM SERVICE WATER SYSTEM

FSAR CHAPTER 9 - AUXILIARY SYSTEMS FIGURE 9-1, SHT 1A Revision 32 PIPING & INSTRUMENT DIAGRAM SERVICE WATER SYSTEM

FSAR CHAPTER 9 - AUXILIARY SYSTEMS FIGURE 9-1, SHT 1B Revision 32 PIPING & INSTRUMENT DIAGRAM SERVICE WATER SYSTEM

FSAR CHAPTER 9 - AUXILIARY SYSTEMS FIGURE 9-1, SHT 2 Revision 32 PIPING & INSTRUMENT DIAGRAM SERVICE WATER, SCREEN STRUCTURE AND CHLORINATOR

FSAR CHAPTER 9 - AUXILIARY SYSTEMS FIGURE 9-2 Revision 32 PIPING & INSTRUMENT DIAGRAM SHIELD COOLING SYSTEM

FSAR CHAPTER 9 - AUXILIARY SYSTEMS FIGURE 9-3 Revision 26 NORMAL OPERATING CONDITIONS COOLING COIL CENTERLINE Structural Concrete Sacrificial Concrete

FSAR CHAPTER 9 - AUXILIARY SYSTEMS FIGURE 9-4 Revision 26 NORMAL OPERATING CONDITIONS MID-SPAN OF TWO COOLING COILS Structural Concrete Sacrificial Concrete

FSAR CHAPTER 9 - AUXILIARY SYSTEMS FIGURE 9-5 Revision 26 BOUNDING DESIGN COOLING COIL CENTERLINE Structural Concrete Sacrificial Concrete

FSAR CHAPTER 9 - AUXILIARY SYSTEMS FIGURE 9-6 Revision 26 BOUNDING DESIGN CONDITIONS AND MID-SPAN OF TWO COOLING COILS Structural Concrete Sacrificial Concrete

FSAR CHAPTER 9 - AUXILIARY SYSTEMS FIGURE 9-7, SHT 1 Revision 30 PIPING & INSTRUMENT DIAGRAM COMPONENT COOLING SYSTEM

FSAR CHAPTER 9 - AUXILIARY SYSTEMS FIGURE 9-7, SHT 2 Revision 27 PIPING & INSTRUMENT DIAGRAM COMPONENT COOLING SYSTEM

FSAR CHAPTER 9 - AUXILIARY SYSTEMS FIGURE 9-7, SHT 3 Revision 32 PIPING & INSTRUMENT DIAGRAM COMPONENT COOLING SYSTEM

FSAR CHAPTER 9 - AUXILIARY SYSTEMS FIGURE 9-8 Revision 32 PIPING & INSTRUMENT DIAGRAM SPENT FUEL POOL COOLING SYSTEM

FSAR CHAPTER 9 - AUXILIARY SYSTEMS FIGURE 9-9, SHT 1 Revision 32 PIPING & INSTRUMENT DIAGRAM SERVICE AND INSTRUMENT AIR SYSTEMS

FSAR CHAPTER 9 - AUXILIARY SYSTEMS FIGURE 9-9, SHT 2 Revision 32 PIPING & INSTRUMENT DIAGRAM MISCELLANEOUS GAS SUPPLY SYSTEMS

FSAR CHAPTER 9 - AUXILIARY SYSTEMS FIGURE 9-10, SHT 1 Revision 32 PIPING & INSTRUMENT DIAGRAM HIGH PRESSURE AIR OPERATED VALVES

FSAR CHAPTER 9 - AUXILIARY SYSTEMS FIGURE 9-10, SHT 1A Revision 30 PIPING & INSTRUMENT DIAGRAM HIGH PRESSURE AIR OPERATED VALVES

FSAR CHAPTER 9 - AUXILIARY SYSTEMS FIGURE 9-10, SHT 2 Revision 30 PIPING & INSTRUMENT DIAGRAM HIGH PRESSURE AIR OPERATED VALVES

FSAR CHAPTER 9 - AUXILIARY SYSTEMS FIGURE 9-11, SHT 1 Revision 32 PIPING & INSTRUMENT DIAGRAM FIRE PROTECTION SYSTEM

FSAR CHAPTER 9 - AUXILIARY SYSTEMS FIGURE 9-11, SHT 2 Revision 32 PIPING & INSTRUMENT DIAGRAM FIRE PROTECTION SYSTEM

FSAR CHAPTER 9 - AUXILIARY SYSTEMS FIGURE 9-11, SHT 3 Revision 32 PIPING & INSTRUMENT DIAGRAM FIRE PROTECTION SYSTEM

FSAR CHAPTER 9 - AUXILIARY SYSTEMS FIGURE 9-12 Revision 32 PIPING & INSTRUMENT DIAGRAM AUXILIARY FEEDWATER SYSTEM

FSAR CHAPTER 9 - AUXILIARY SYSTEMS FIGURE 9-13 Revision 32 PIPING & INSTRUMENT DIAGRAM AUXILIARY FEEDWATER STEAM SUPPLY

FSAR CHAPTER 9 - AUXILIARY SYSTEMS FIGURE 9-14, SHT 1 Revision 28 PIPING & INSTRUMENT DIAGRAM HEATING, VENTILATION AND AIR CONDITIONING, SWITCHGEAR AND CABLE SPREADING ROOMS

FSAR CHAPTER 9 - AUXILIARY SYSTEMS FIGURE 9-14, SHT 2 Revision 32 PIPING & INSTRUMENT DIAGRAM HEATING, VENTILATION AND AIR CONDITIONING, CONTAINMENT BUILDING

FSAR CHAPTER 9 - AUXILIARY SYSTEMS FIGURE 9-14, SHT 3 Revision 32 PIPING & INSTRUMENT DIAGRAM HEATING, VENTILATION AND AIR CONDITIONING, RADWASTE AREA

FSAR CHAPTER 9 - AUXILIARY SYSTEMS FIGURE 9-14, SHT 4 Revision 32 PIPING & INSTRUMENT DIAGRAM HEATING, VENTILATION AND AIR CONDITIONING, MISCELLANEOUS BUILDINGS

FSAR CHAPTER 9 - AUXILIARY SYSTEMS FIGURE 9-14, SHT 5 Revision 27 PIPING & INSTRUMENT DIAGRAM HEATING, VENTILATION AND AIR CONDITIONING, CONTROL ROOM

FSAR CHAPTER 9 - AUXILIARY SYSTEMS FIGURE 9-14, SHT 6 Revision 25 PIPING & INSTRUMENT DIAGRAM HEATING, VENTILATION AND AIR CONDITIONING, CONTROL ROOM

FSAR CHAPTER 9 - AUXILIARY SYSTEMS FIGURE 9-14, SHT 7 Revision 30 PIPING & INSTRUMENT DIAGRAM HEATING, VENTILATION AND AIR CONDITIONING, CONTROL ROOM

FSAR CHAPTER 9 - AUXILIARY SYSTEMS FIGURE 9-14, SHT 8 Revision 30 HEATING AND VENTILATION AIR FLOW DIAGRAM

FSAR CHAPTER 9 - AUXILIARY SYSTEMS FIGURE 9-14, SHT 9 Revision 32 PIPING & INSTRUMENT DIAGRAM HEATING, VENTILATION AND COOLING AUXILIARY BUILDING ADDITION

FSAR CHAPTER 9 - AUXILIARY SYSTEMS FIGURE 9-15 Revision 23 PIPING & INSTRUMENT DIAGRAM FLUID SYSTEM DIAGRAM POST ACCIDENT SAMPLE MONITOR SYSTEM

FSAR CHAPTER 9 - AUXILIARY SYSTEMS FIGURE 9-16 Revision 32 PIPING & INSTRUMENT DIAGRAM GAS ANALYZING SYSTEMS (CONTAINMENT HYDROGEN)

FSAR CHAPTER 9 - AUXILIARY SYSTEMS FIGURE 9-17 Revision 25 MONITORING AND SAMPLING SYSTEMS (RADWASTE ADDITION)

FSAR CHAPTER 9 - AUXILIARY SYSTEMS FIGURE 9-18, SHT 1 Revision 32 PIPING & INSTRUMENT DIAGRAM CHEMICAL AND VOLUME CONTROL SYSTEM

FSAR CHAPTER 9 - AUXILIARY SYSTEMS FIGURE 9-18, SHT 1A Revision 32 PIPING & INSTRUMENT DIAGRAM CHEMICAL AND VOLUME CONTROL SYSTEM

FSAR CHAPTER 9 - AUXILIARY SYSTEMS FIGURE 9-18, SHT 1B Revision 31 PIPING & INSTRUMENT DIAGRAM CHEMICAL AND VOLUME CONTROL SYSTEM

FSAR CHAPTER 9 - AUXILIARY SYSTEMS FIGURE 9-19 Revision 21 BORON CONCENTRATION VS CORE LIFETIME

FSAR CHAPTER 9 - AUXILIARY SYSTEMS FIGURE 9-20 Revision 31 PALISADES PLANT SPENT FUEL STORAGE RACK ARRANGEMENT NEW FUEL ELEVATOR AND INSPECTION STAND 3.11 8 x 8**

5 x 10 896***

    • NOMINAL, SOME SPACES NOT INSTALLED FOR NFE AND INSPECTION STAND
      • PHYSICAL SPOTS. ONLY 892 LICENSED LOCATIONS DUE TO LACK OF ABILITY TO ACCESS

FSAR CHAPTER 9 - AUXILIARY SYSTEMS FIGURE 9-1, SHT 1 Revision 32 SYSTEM DIAGRAM SERVICE WATER SYSTEM

FSAR CHAPTER 9 - AUXILIARY SYSTEMS FIGURE 9-1, SHT 1A Revision 32 PIPING & INSTRUMENT DIAGRAM SERVICE WATER SYSTEM

FSAR CHAPTER 9 - AUXILIARY SYSTEMS FIGURE 9-1, SHT 1B Revision 32 PIPING & INSTRUMENT DIAGRAM SERVICE WATER SYSTEM

FSAR CHAPTER 9 - AUXILIARY SYSTEMS FIGURE 9-1, SHT 2 Revision 32 PIPING & INSTRUMENT DIAGRAM SERVICE WATER, SCREEN STRUCTURE AND CHLORINATOR

FSAR CHAPTER 9 - AUXILIARY SYSTEMS FIGURE 9-2 Revision 32 PIPING & INSTRUMENT DIAGRAM SHIELD COOLING SYSTEM

FSAR CHAPTER 9 - AUXILIARY SYSTEMS FIGURE 9-3 Revision 26 NORMAL OPERATING CONDITIONS COOLING COIL CENTERLINE Structural Concrete Sacrificial Concrete

FSAR CHAPTER 9 - AUXILIARY SYSTEMS FIGURE 9-4 Revision 26 NORMAL OPERATING CONDITIONS MID-SPAN OF TWO COOLING COILS Structural Concrete Sacrificial Concrete

FSAR CHAPTER 9 - AUXILIARY SYSTEMS FIGURE 9-5 Revision 26 BOUNDING DESIGN COOLING COIL CENTERLINE Structural Concrete Sacrificial Concrete

FSAR CHAPTER 9 - AUXILIARY SYSTEMS FIGURE 9-6 Revision 26 BOUNDING DESIGN CONDITIONS AND MID-SPAN OF TWO COOLING COILS Structural Concrete Sacrificial Concrete

FSAR CHAPTER 9 - AUXILIARY SYSTEMS FIGURE 9-7, SHT 1 Revision 30 PIPING & INSTRUMENT DIAGRAM COMPONENT COOLING SYSTEM

FSAR CHAPTER 9 - AUXILIARY SYSTEMS FIGURE 9-7, SHT 2 Revision 27 PIPING & INSTRUMENT DIAGRAM COMPONENT COOLING SYSTEM

FSAR CHAPTER 9 - AUXILIARY SYSTEMS FIGURE 9-7, SHT 3 Revision 32 PIPING & INSTRUMENT DIAGRAM COMPONENT COOLING SYSTEM

FSAR CHAPTER 9 - AUXILIARY SYSTEMS FIGURE 9-8 Revision 32 PIPING & INSTRUMENT DIAGRAM SPENT FUEL POOL COOLING SYSTEM

FSAR CHAPTER 9 - AUXILIARY SYSTEMS FIGURE 9-9, SHT 1 Revision 32 PIPING & INSTRUMENT DIAGRAM SERVICE AND INSTRUMENT AIR SYSTEMS

FSAR CHAPTER 9 - AUXILIARY SYSTEMS FIGURE 9-9, SHT 2 Revision 32 PIPING & INSTRUMENT DIAGRAM MISCELLANEOUS GAS SUPPLY SYSTEMS

FSAR CHAPTER 9 - AUXILIARY SYSTEMS FIGURE 9-10, SHT 1 Revision 32 PIPING & INSTRUMENT DIAGRAM HIGH PRESSURE AIR OPERATED VALVES

FSAR CHAPTER 9 - AUXILIARY SYSTEMS FIGURE 9-10, SHT 1A Revision 30 PIPING & INSTRUMENT DIAGRAM HIGH PRESSURE AIR OPERATED VALVES

FSAR CHAPTER 9 - AUXILIARY SYSTEMS FIGURE 9-10, SHT 2 Revision 30 PIPING & INSTRUMENT DIAGRAM HIGH PRESSURE AIR OPERATED VALVES

FSAR CHAPTER 9 - AUXILIARY SYSTEMS FIGURE 9-11, SHT 1 Revision 32 PIPING & INSTRUMENT DIAGRAM FIRE PROTECTION SYSTEM

FSAR CHAPTER 9 - AUXILIARY SYSTEMS FIGURE 9-11, SHT 2 Revision 32 PIPING & INSTRUMENT DIAGRAM FIRE PROTECTION SYSTEM

FSAR CHAPTER 9 - AUXILIARY SYSTEMS FIGURE 9-11, SHT 3 Revision 32 PIPING & INSTRUMENT DIAGRAM FIRE PROTECTION SYSTEM

FSAR CHAPTER 9 - AUXILIARY SYSTEMS FIGURE 9-12 Revision 32 PIPING & INSTRUMENT DIAGRAM AUXILIARY FEEDWATER SYSTEM

FSAR CHAPTER 9 - AUXILIARY SYSTEMS FIGURE 9-13 Revision 32 PIPING & INSTRUMENT DIAGRAM AUXILIARY FEEDWATER STEAM SUPPLY

FSAR CHAPTER 9 - AUXILIARY SYSTEMS FIGURE 9-14, SHT 1 Revision 28 PIPING & INSTRUMENT DIAGRAM HEATING, VENTILATION AND AIR CONDITIONING, SWITCHGEAR AND CABLE SPREADING ROOMS

FSAR CHAPTER 9 - AUXILIARY SYSTEMS FIGURE 9-14, SHT 2 Revision 32 PIPING & INSTRUMENT DIAGRAM HEATING, VENTILATION AND AIR CONDITIONING, CONTAINMENT BUILDING

FSAR CHAPTER 9 - AUXILIARY SYSTEMS FIGURE 9-14, SHT 3 Revision 32 PIPING & INSTRUMENT DIAGRAM HEATING, VENTILATION AND AIR CONDITIONING, RADWASTE AREA

FSAR CHAPTER 9 - AUXILIARY SYSTEMS FIGURE 9-14, SHT 4 Revision 32 PIPING & INSTRUMENT DIAGRAM HEATING, VENTILATION AND AIR CONDITIONING, MISCELLANEOUS BUILDINGS

FSAR CHAPTER 9 - AUXILIARY SYSTEMS FIGURE 9-14, SHT 5 Revision 27 PIPING & INSTRUMENT DIAGRAM HEATING, VENTILATION AND AIR CONDITIONING, CONTROL ROOM

FSAR CHAPTER 9 - AUXILIARY SYSTEMS FIGURE 9-14, SHT 6 Revision 25 PIPING & INSTRUMENT DIAGRAM HEATING, VENTILATION AND AIR CONDITIONING, CONTROL ROOM

FSAR CHAPTER 9 - AUXILIARY SYSTEMS FIGURE 9-14, SHT 7 Revision 30 PIPING & INSTRUMENT DIAGRAM HEATING, VENTILATION AND AIR CONDITIONING, CONTROL ROOM

FSAR CHAPTER 9 - AUXILIARY SYSTEMS FIGURE 9-14, SHT 8 Revision 30 HEATING AND VENTILATION AIR FLOW DIAGRAM

FSAR CHAPTER 9 - AUXILIARY SYSTEMS FIGURE 9-14, SHT 9 Revision 32 PIPING & INSTRUMENT DIAGRAM HEATING, VENTILATION AND COOLING AUXILIARY BUILDING ADDITION

FSAR CHAPTER 9 - AUXILIARY SYSTEMS FIGURE 9-15 Revision 23 PIPING & INSTRUMENT DIAGRAM FLUID SYSTEM DIAGRAM POST ACCIDENT SAMPLE MONITOR SYSTEM

FSAR CHAPTER 9 - AUXILIARY SYSTEMS FIGURE 9-16 Revision 32 PIPING & INSTRUMENT DIAGRAM GAS ANALYZING SYSTEMS (CONTAINMENT HYDROGEN)

FSAR CHAPTER 9 - AUXILIARY SYSTEMS FIGURE 9-17 Revision 25 MONITORING AND SAMPLING SYSTEMS (RADWASTE ADDITION)

FSAR CHAPTER 9 - AUXILIARY SYSTEMS FIGURE 9-18, SHT 1 Revision 32 PIPING & INSTRUMENT DIAGRAM CHEMICAL AND VOLUME CONTROL SYSTEM

FSAR CHAPTER 9 - AUXILIARY SYSTEMS FIGURE 9-18, SHT 1A Revision 32 PIPING & INSTRUMENT DIAGRAM CHEMICAL AND VOLUME CONTROL SYSTEM

FSAR CHAPTER 9 - AUXILIARY SYSTEMS FIGURE 9-18, SHT 1B Revision 31 PIPING & INSTRUMENT DIAGRAM CHEMICAL AND VOLUME CONTROL SYSTEM

FSAR CHAPTER 9 - AUXILIARY SYSTEMS FIGURE 9-19 Revision 21 BORON CONCENTRATION VS CORE LIFETIME

FSAR CHAPTER 9 - AUXILIARY SYSTEMS FIGURE 9-20 Revision 31 PALISADES PLANT SPENT FUEL STORAGE RACK ARRANGEMENT NEW FUEL ELEVATOR AND INSPECTION STAND 3.11 8 x 8**

5 x 10 896***

    • NOMINAL, SOME SPACES NOT INSTALLED FOR NFE AND INSPECTION STAND
      • PHYSICAL SPOTS. ONLY 892 LICENSED LOCATIONS DUE TO LACK OF ABILITY TO ACCESS