ML16120A421

From kanterella
Jump to navigation Jump to search
Final Safety Analysis Report Update, Revision 32, Chapter 6 - Engineered Safeguards Systems - Tables
ML16120A421
Person / Time
Site: Palisades Entergy icon.png
Issue date: 04/18/2016
From:
Entergy Nuclear Operations
To:
Office of Nuclear Reactor Regulation
Shared Package
ML16120A302 List:
References
PNP 2016-015
Download: ML16120A421 (23)


Text

FSAR CHAPTER 6 - ENGINEERED SAFEGUARDS SYSTEMSTABLE 6-13Revision 30Page 1 of 1INSERVICE PUMP TEST PROGRAM

SUMMARY

PUMPASMESAFETYCLASSP&IDTESTPROCEDURESP-7A, B, and C - Service Water 3M-213 QO-14P-8A - AFW (Constant Speed) 3M-207 QO-21P-8B - AFW (Variable Speed) 3M-205 QO-21P-8C - AFW (Constant Speed) 3M-205 QO-21P-52A, B, and C - Component Cooling 3M-209 QO-15P-54A, B, and C - Containment Spray 2M-204 QO-16P-67A and B - LPSI & Shutdown Cooling 2M-204QO-20/RO-98P-66A and B - HPSI 2M-204 QO-19P-211A and B - Diesel Jacket Water Cooling 3M-214MO-7ANOTE: SeeSite Engineering Program SEP-PLP-IST-102, "Inservice Testing ofSelected Safety-Related Pumps," for more detail on the pump test program.

FSAR CHAPTER 6 - ENGINEERED SAFEGUARDS SYSTEMSTABLE 6-14Revision 30Page 1 of 3TECHNICAL SPECIFICATION 3.6.3,CONTAINMENT ISOLATION VALVES, APPLICABILITYSEP-APJ-PLP-101 , Mechanical Containment Penetrations BasisProgram Section identifies bases forall penetrations. See FSAR Figure 6-5 (P&ID M-232), Containment Penetrations, for piping diagrams.PenetrationNumberEquipment IDMZ-1ACV-1805CV-1806MV-VA506 MZ-IBMV-VA100MV-VA101MV-VA507MZ-1CCV-1807CV-1808MV-VA508MZ-10MV-CA122MV-CA142MV-CA728MZ-11CV-0939 CK-CD401MV-CD536MZ-14 CK-CC910MV-CC507MZ-15CV-0911MZ-17MV-VA1802BMV-VA1802CMV-VA1804BMV-VA1804CMV-VA1812AMV-VA1812CMV-VA1814AMV-VA1814BMZ-17AMV-VA1814FMV-VA1814GPenetrationNumberEquipment IDMZ-18MZ-18MZ-18AMZ-21SV-2415ASV-2415BMV-WG531BMZ-21ASV-2413ASV-2413BMV-WG531AMZ-25CV-1064CV-1065MV-CRW512MZ-26CV-1358CK-N2/400MV-N2/581MZ-27MO-P1MV-VA604MZ-27-1MZ-33MV-ES3234MV-ES3234AMV-ES3348AMZ-36CV-2009MZ-37CV-1001CK-CRW403MV-CRW503MZ-40CV-1910CV-1911MV-PC1170A FSAR CHAPTER 6 - ENGINEERED SAFEGUARDS SYSTEMSTABLE 6-14Revision 30Page 2 of 3TECHNICAL SPECIFICATION 3.6.3,CONTAINMENT ISOLATION VALVES, APPLICABILITYSEP-APJ-PLP-101 , Mechanical Containment Penetrations BasisProgram Section identifies bases forall penetrations. See FSAR Figure 6-5 (P&ID M-232), Containment Penetrations, for piping diagrams.PenetrationNumberEquipment IDMZ-40ASV-2414ASV-2414BMV-WG530BMZ-40BSV-2412ASV-2412BMV-WG530AMZ-41CV-1004CK-CRW407MV-CRW506MZ-42CV-0155CK-PC155BMV-PC1126MZ-44CV-2083CV-2099MV-CVC2083MZ-46CV-1101CV-1102MV-WG511MZ-47CV-1002CV-1007MV-CRW502MZ-48MV-VA1801BMV-VA1801CMV-VA1803BMV-VA1803CMV-VA1805AMV-VA1805CMV-VA1815AMV-VA1815BPenetrationNumberEquipment IDMZ-49CV-1036CV-1038MV-CRW513MZ-52CV-1103CV-1104MV-DRW500MZ-52AMV-DRW618CMV-DRW618DMV-DRW618EMV-DRW618FMV-DRW618GMV-DRW618HMZ-52BMV-DRW619CMV-DRW619DMV-DRW619EMV-DRW619FMV-DRW619GMV-DRW619HMZ-56MV-VA606BMV-VA606CMZ-64MV-SFP120MV-SFP121MV-SFP514MZ-65CK-CA400MV-CA612MZ-66MV-VA-L-6MV-VA601MV-VA602MV-VA603 FSAR CHAPTER 6 - ENGINEERED SAFEGUARDS SYSTEMSTABLE 6-14Revision 30Page 3 of 3TECHNICAL SPECIFICATION 3.6.3,CONTAINMENT ISOLATION VALVES, APPLICABILITYSEP-APJ-PLP-101 , Mechanical Containment Penetrations BasisProgram Section identifies bases forall penetrations. See FSAR Figure 6-5 (P&ID M-232), Containment Penetrations, for piping diagrams.PenetrationNumberEquipment IDMZ-67CV-1037CK-CRW408MV-CRW515MZ-68CV-1813CV-1814MV-VA505MZ-69CV-1044CV-1045MV-CRW518MZ-72MV-SFP117MV-SFP118MV-SFP515

FSAR CHAPTER 6 - ENGINEERED SAFEGUARDS SYSTEMSTABLE 6-13Revision 30Page 1 of 1INSERVICE PUMP TEST PROGRAM

SUMMARY

PUMPASMESAFETYCLASSP&IDTESTPROCEDURESP-7A, B, and C - Service Water 3M-213 QO-14P-8A - AFW (Constant Speed) 3M-207 QO-21P-8B - AFW (Variable Speed) 3M-205 QO-21P-8C - AFW (Constant Speed) 3M-205 QO-21P-52A, B, and C - Component Cooling 3M-209 QO-15P-54A, B, and C - Containment Spray 2M-204 QO-16P-67A and B - LPSI & Shutdown Cooling 2M-204QO-20/RO-98P-66A and B - HPSI 2M-204 QO-19P-211A and B - Diesel Jacket Water Cooling 3M-214MO-7ANOTE: SeeSite Engineering Program SEP-PLP-IST-102, "Inservice Testing ofSelected Safety-Related Pumps," for more detail on the pump test program.

FSAR CHAPTER 6 - ENGINEERED SAFEGUARDS SYSTEMSTABLE 6-14Revision 30Page 1 of 3TECHNICAL SPECIFICATION 3.6.3,CONTAINMENT ISOLATION VALVES, APPLICABILITYSEP-APJ-PLP-101 , Mechanical Containment Penetrations BasisProgram Section identifies bases forall penetrations. See FSAR Figure 6-5 (P&ID M-232), Containment Penetrations, for piping diagrams.PenetrationNumberEquipment IDMZ-1ACV-1805CV-1806MV-VA506 MZ-IBMV-VA100MV-VA101MV-VA507MZ-1CCV-1807CV-1808MV-VA508MZ-10MV-CA122MV-CA142MV-CA728MZ-11CV-0939 CK-CD401MV-CD536MZ-14 CK-CC910MV-CC507MZ-15CV-0911MZ-17MV-VA1802BMV-VA1802CMV-VA1804BMV-VA1804CMV-VA1812AMV-VA1812CMV-VA1814AMV-VA1814BMZ-17AMV-VA1814FMV-VA1814GPenetrationNumberEquipment IDMZ-18MZ-18MZ-18AMZ-21SV-2415ASV-2415BMV-WG531BMZ-21ASV-2413ASV-2413BMV-WG531AMZ-25CV-1064CV-1065MV-CRW512MZ-26CV-1358CK-N2/400MV-N2/581MZ-27MO-P1MV-VA604MZ-27-1MZ-33MV-ES3234MV-ES3234AMV-ES3348AMZ-36CV-2009MZ-37CV-1001CK-CRW403MV-CRW503MZ-40CV-1910CV-1911MV-PC1170A FSAR CHAPTER 6 - ENGINEERED SAFEGUARDS SYSTEMSTABLE 6-14Revision 30Page 2 of 3TECHNICAL SPECIFICATION 3.6.3,CONTAINMENT ISOLATION VALVES, APPLICABILITYSEP-APJ-PLP-101 , Mechanical Containment Penetrations BasisProgram Section identifies bases forall penetrations. See FSAR Figure 6-5 (P&ID M-232), Containment Penetrations, for piping diagrams.PenetrationNumberEquipment IDMZ-40ASV-2414ASV-2414BMV-WG530BMZ-40BSV-2412ASV-2412BMV-WG530AMZ-41CV-1004CK-CRW407MV-CRW506MZ-42CV-0155CK-PC155BMV-PC1126MZ-44CV-2083CV-2099MV-CVC2083MZ-46CV-1101CV-1102MV-WG511MZ-47CV-1002CV-1007MV-CRW502MZ-48MV-VA1801BMV-VA1801CMV-VA1803BMV-VA1803CMV-VA1805AMV-VA1805CMV-VA1815AMV-VA1815BPenetrationNumberEquipment IDMZ-49CV-1036CV-1038MV-CRW513MZ-52CV-1103CV-1104MV-DRW500MZ-52AMV-DRW618CMV-DRW618DMV-DRW618EMV-DRW618FMV-DRW618GMV-DRW618HMZ-52BMV-DRW619CMV-DRW619DMV-DRW619EMV-DRW619FMV-DRW619GMV-DRW619HMZ-56MV-VA606BMV-VA606CMZ-64MV-SFP120MV-SFP121MV-SFP514MZ-65CK-CA400MV-CA612MZ-66MV-VA-L-6MV-VA601MV-VA602MV-VA603 FSAR CHAPTER 6 - ENGINEERED SAFEGUARDS SYSTEMSTABLE 6-14Revision 30Page 3 of 3TECHNICAL SPECIFICATION 3.6.3,CONTAINMENT ISOLATION VALVES, APPLICABILITYSEP-APJ-PLP-101 , Mechanical Containment Penetrations BasisProgram Section identifies bases forall penetrations. See FSAR Figure 6-5 (P&ID M-232), Containment Penetrations, for piping diagrams.PenetrationNumberEquipment IDMZ-67CV-1037CK-CRW408MV-CRW515MZ-68CV-1813CV-1814MV-VA505MZ-69CV-1044CV-1045MV-CRW518MZ-72MV-SFP117MV-SFP118MV-SFP515