ML16123A315

From kanterella
Jump to navigation Jump to search
Final Safety Analysis Report Update, Revision 32, Chapter 12 - Conduct of Operations - Sections
ML16123A315
Person / Time
Site: Palisades Entergy icon.png
Issue date: 04/18/2016
From:
Entergy Nuclear Operations
To:
Office of Nuclear Reactor Regulation
Shared Package
ML16120A302 List:
References
PNP 2016-015
Download: ML16123A315 (10)


Text

FSAR CHAPTER 12 - CONDUCT OF OPERATIONSRevision 30SECTION 12.6Page 12.6-1 of 12.6-1 12.6INDUSTRIAL SECURITYPlans for the physical protection of the Palisades Nuclear Plant aredescribed in aphysical security plan that is protected against unauthorizeddisclosure in accordance with 10 CFR 73.21(a). The physical protection ofthe Palisades Nuclear Plant meets the requirements of 10 CFR 73.55, as described in the Security Plan.Plans for the cyber protection of the Palisades Nuclear Plant are described ina cyber security plan that is protected against unauthorized disclosure inaccordance with 10 CFR 73.21(a). The cyber protection of the PalisadesNuclear Plant meets the requirements of 10 CFR 73.54, as described in the Cyber Security Plan.

FSAR CHAPTER 12 - CONDUCT OF OPERATIONSRevision 30SECTION 12.6Page 12.6-1 of 12.6-1 12.6INDUSTRIAL SECURITYPlans for the physical protection of the Palisades Nuclear Plant aredescribed in aphysical security plan that is protected against unauthorizeddisclosure in accordance with 10 CFR 73.21(a). The physical protection ofthe Palisades Nuclear Plant meets the requirements of 10 CFR 73.55, as described in the Security Plan.Plans for the cyber protection of the Palisades Nuclear Plant are described ina cyber security plan that is protected against unauthorized disclosure inaccordance with 10 CFR 73.21(a). The cyber protection of the PalisadesNuclear Plant meets the requirements of 10 CFR 73.54, as described in the Cyber Security Plan.