ML16120A321

From kanterella
Jump to navigation Jump to search
Final Safety Analysis Report Update, Revision 32
ML16120A321
Person / Time
Site: Palisades Entergy icon.png
Issue date: 04/18/2016
From: Vitale A J
Entergy Nuclear Operations
To:
Document Control Desk, Office of Nuclear Reactor Regulation
Shared Package
ML16120A302 List:
References
PNP 2016-015
Download: ML16120A321 (13)


Text

  • c:=tEntergy PNP 2016-015 April 18, 2016 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Entergy Nuclear Operations, Inc. Palisades Nuclear Plant 27780 Blue Star Memorial Highway Covert, Ml 49043-9530 Tel 269 764 2000 Anthony J. Vitale Site Vice President

SUBJECT:

-Final Safety Analysis Report Update -Revision 32 Palisades Nuclear Plant Docket 50-255 Renewed Facility Operating License No. DPR-20

Dear Sir or Madam:

In accordance with 10 CFR 50.71 (e) and 10 CFR 50.4(b)(6), Entergy Nuclear Operations, Inc. (ENO) is providing the Palisades Nuclear Plant (PNP) Final Safety Analysis Report (FSAR) update, Revision 32. This FSAR update is provided in its entirety on the CD-ROM in the enclosure.

Revision 32 changes, with the exception of typographical corrections and format changes, are denoted by vertical lines in the outboard margins of the text. All changes, other than those involving any typographical corrections, format changes, and removed information, were made under the provisions of 10 CFR 50 or in accordance with safety evaluations received from the Nuclear Regulatory Commission (NRG). The FSAR update incorporates changes made to the facility or to the procedures described in the FSAR, and all other applicable information and analyses submitted to the NRG or prepared pursuant to NRG requirements, up to six months prior to the date of this submittal.

The attachment contains a list of changes made in the FSAR revision.

Since the previous FSAR update submittal, no changes have been made under the provisions of 10 CFR 50.59 not previously submitted to the NRG. During this period, no information was removed from the FSAR per Regulatory Guide 1.181, "Content of the Updated Final Safety Analysis Report in Accordance with 10 CFR 50.71 (e)."

PNP 2016-015 Page 2 This letter identifies no new commitments and no revisions to existing commitments.

I declare under penalty of perjury that the foregoing is true and correct. Executed on April 18, 2016. Sincerely, AJV/jse

Attachment:

Palisades Nuclear Plant Final Safety Analysis Report (FSAR) Revision 32 List of Changes

Enclosure:

CD-ROM Containing Final Safety Analysis Report -Revision 32 cc: Administrator, Region Ill, USNRC Project Manager, Palisades, USNRC Resident Inspector, Palisades USNRC

  • c:=tEntergy PNP 2016-015 April 18, 2016 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Entergy Nuclear Operations, Inc. Palisades Nuclear Plant 27780 Blue Star Memorial Highway Covert, Ml 49043-9530 Tel 269 764 2000 Anthony J. Vitale Site Vice President

SUBJECT:

-Final Safety Analysis Report Update -Revision 32 Palisades Nuclear Plant Docket 50-255 Renewed Facility Operating License No. DPR-20

Dear Sir or Madam:

In accordance with 10 CFR 50.71 (e) and 10 CFR 50.4(b)(6), Entergy Nuclear Operations, Inc. (ENO) is providing the Palisades Nuclear Plant (PNP) Final Safety Analysis Report (FSAR) update, Revision 32. This FSAR update is provided in its entirety on the CD-ROM in the enclosure.

Revision 32 changes, with the exception of typographical corrections and format changes, are denoted by vertical lines in the outboard margins of the text. All changes, other than those involving any typographical corrections, format changes, and removed information, were made under the provisions of 10 CFR 50 or in accordance with safety evaluations received from the Nuclear Regulatory Commission (NRG). The FSAR update incorporates changes made to the facility or to the procedures described in the FSAR, and all other applicable information and analyses submitted to the NRG or prepared pursuant to NRG requirements, up to six months prior to the date of this submittal.

The attachment contains a list of changes made in the FSAR revision.

Since the previous FSAR update submittal, no changes have been made under the provisions of 10 CFR 50.59 not previously submitted to the NRG. During this period, no information was removed from the FSAR per Regulatory Guide 1.181, "Content of the Updated Final Safety Analysis Report in Accordance with 10 CFR 50.71 (e)."

PNP 2016-015 Page 2 This letter identifies no new commitments and no revisions to existing commitments.

I declare under penalty of perjury that the foregoing is true and correct. Executed on April 18, 2016. Sincerely, AJV/jse

Attachment:

Palisades Nuclear Plant Final Safety Analysis Report (FSAR) Revision 32 List of Changes

Enclosure:

CD-ROM Containing Final Safety Analysis Report -Revision 32 cc: Administrator, Region Ill, USNRC Project Manager, Palisades, USNRC Resident Inspector, Palisades USNRC