ML23107A04131 March 20236 to Updated Final Safety Analysis Report, Chapter 11, Figures
ML23107A01231 March 20236 to Updated Final Safety Analysis Report, Chapter 2, Figures
ML23107A05831 March 20236 to Updated Final Safety Analysis Report, Chapter 6, Figures
ML23107A03631 March 20236 to Updated Final Safety Analysis Report, Chapter 3, Figures
ML23107A06231 March 20236 to Updated Final Safety Analysis Report, Chapter 4, Figures
ML23107A02331 March 20236 to Updated Final Safety Analysis Report, Chapter 5, Figures
ML23107A05731 March 20236 to Updated Final Safety Analysis Report, Chapter 10, Figures
ML23107A04031 March 20236 to Updated Final Safety Analysis Report, Chapter 1, Figures
ML23107A02231 March 20236 to Updated Final Safety Analysis Report, Chapter 9, Figures
ML21125A31114 April 20215 to Updated Final Safety Analysis Report, Chapter 3, Figures
ML21125A32914 April 20215 to Updated Final Safety Analysis Report, Chapter 6, Figures (Redacted)
ML21125A29014 April 20215 to Updated Final Safety Analysis Report, Chapter 2, Figures
ML21125A31514 April 20215 to Updated Final Safety Analysis Report, Chapter 11, Figures (Redacted)
ML21125A31414 April 20215 to Updated Final Safety Analysis Report, Chapter 1, Figures (Redacted)
ML21125A33414 April 20215 to Updated Final Safety Analysis Report, Chapter 14, Figures (Redacted)Loop seal
ML21125A29514 April 20215 to Updated Final Safety Analysis Report, Chapter 7, Figures (Redacted)Boric Acid
ML21125A30314 April 20215 to Updated Final Safety Analysis Report, Chapter 4, Figures
ML21125A30614 April 20215 to Updated Final Safety Analysis Report, Chapter 8, Figures
ML21125A29914 April 20215 to Updated Final Safety Analysis Report, Chapter 5, Figures
ML16120A34418 April 2016Final Safety Analysis Report Update, Revision 32, Chapter 2 - Site and Environment - Figures
ML16120A35918 April 2016Final Safety Analysis Report Update, Revision 32, Chapter 3 - Reactor - Figures
ML16123A32618 April 2016Final Safety Analysis Report Update, Revision 32, Chapter 15 - Quality Assurance Program - Figures
ML16120A58818 April 2016Final Safety Analysis Report Update, Revision 32, Chapter 8 - Electrical Systems - Figures
ML16120A60218 April 2016Final Safety Analysis Report Update, Revision 32, Chapter 10 - Steam and Power Conversion System - Figures
ML16120A37918 April 2016Final Safety Analysis Report Update, Revision 32, Chapter 4 - Primary Coolant System - Figures
ML16120A41518 April 2016Final Safety Analysis Report Update, Revision 32, Chapter 5 - Design of Structures, Systems and Components - Figures
ML16120A59618 April 2016Final Safety Analysis Report Update, Revision 32, Chapter 9 - Auxiliary Systems - Figures
ML15190A26314 May 2015Report 1400669.401, Rev. 0, Evaluation of the Palisades Nuclear Plant Branch Line Nozzles for Primary Water Stress Corrosion CrackingHydrostatic
Finite Element Analysis
Dissimilar Metal Weld
ML12272A16822 August 2012E-mail from A. Shaikh to D. Alley, Et Al., Subject: (Untitled)
ML07268018826 June 2007Drawing C-52, Rev. 23, Heating & Ventilation Auxiliary & Containment Plan at Elevation 639'-0 & 649' -0'.
ML07254080712 January 2007Drawing M-15, Rev. 12, Equipment Location Turbine Building Sections.
ML07254080215 November 2006Drawing C-51, Rev. 30, Architectural Auxillary & Reacator Building Floor Plans at 639' - 0 and 649'-0.
ML07268017912 January 2006Drawing C-52, Rev. 15, Architectural Roof Plan.
ML07254079011 January 2006Drawing C-2, Rev. 16, Plant Area and Switchyard Plan. Sheet 1
ML0633901873 August 2004Drawing No. M-206, Rev. 6, System Diagram Safety Injection, Containment Spray & Shutdown Cooling System. Sheet a
ML0633901912 August 2004Drawing No. M-209, Rev. 7, System Diagram Component Cooling System. Sheet a
ML0633901832 August 2004Drawing No. M-204, Rev. 7, System Diagram Safety Injection, Conatinment Spray & Shutdown Cooling System. Sheet a
ML06283047714 August 2000Drawing C-51, Rev 29, Architectural Auxiliary Reactor Building Floor Plans.
ML06283047014 August 2000Drawing C-51, Rev 29, Architectural Auxiliary Reactor Building Floor Plans.
ML18347B29513 May 1999Submit Revised Dilution Water Increase - Proposed Modification, to Modify Requested Flow Changes & to Respond to Mdnr & Michigan Dept of Environmental Quality Concerns for NPDES Permit No. MI0001457Hydrostatic
ML0725408038 April 1999Drawing C-127, Rev. 2, Containment Vessel Typical Details.
ML07254080612 October 1998Drawing C-141, Rev. 5, Containment Ventilation Stack.
ML0725407955 October 1998Drawing C-38, Rev. 6, Field Erected Tanks. Sheet 2
ML07254079725 February 1998Drawing C-50, Rev. 20, Architectural Auxiliary & Reactor Buildings Floor Plan at El 625'-0.
ML07255005614 January 1998Drawing M-119, Rev. 8, Heating and Ventilation Mechanical Equipment Room Plan and Sections El. 629' -2. Sheet 4
ML0725408094 November 1997Drawing M-29, Rev. 13, Piping Drawing Area 2 Plan of El. 625' - 0.
ML07254081127 February 1997Drawing M-40, Rev. 29, Piping Drawing Area 3 Plan of El. 625' - 0 & Sections.
ML07254081617 January 1997Drawing M-65, Rev. 13, Piping Drawing Main Steam System.
ML07254082024 April 1996Drawing M-119, Rev. 7, Heating and Ventilating Mechanical Room Roof Plan Sections and Details. Sheet 3
ML07254081423 February 1996Drawing M-42, Rev. 32, Piping Drawing Area 3 Sections.