|
|
Line 15: |
Line 15: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:}} | | {{#Wiki_filter:From: Wells, Russell Douglas <rdwells0@tva.gov> |
| | Sent: Monday, July 26, 2021 9:34 AM To: Green, Kimberly Cc: Hulvey, Kimberly Dawn; Brown, Michael Anthony; 'Paul Schoepf'; Carter, Thomas John |
| | |
| | ==Subject:== |
| | [External_Sender] RE: Correction to WBN Chiller Replacement LAR Kim I forgot to also mention that TVA performed a detailed review of the LAR, RAI response, and NRC SE and determined that there were no other incorrect statements. |
| | Russell D. Wells Senior Program Manager Nuclear Fleet Licensing W. 423-751-8130 M. 434-221-9318 E. rdwells0@tva.gov 1101 Market Street LP 4B-C, Chattanooga, TN 37402-2801 From: Wells, Russell Douglas Sent: Monday, July 26, 2021 9:31 AM To: Green, Kimberly <Kimberly.Green@nrc.gov> |
| | Cc: Hulvey, Kimberly Dawn <kdhulvey@tva.gov>; Brown, Michael Anthony <mabrown6@tva.gov>; 'Paul Schoepf' <PSCHOEPF@ENERCON.COM>; Carter, Thomas John <tjcarter@tva.gov> |
| | |
| | ==Subject:== |
| | Correction to WBN Chiller Replacement LAR Kim A very specific methodology for attaching temporary chilled water to the safety related chillers was included in TVA letter to NRC, CNL-20-012, dated May 19, 2020, Application to Modify the Watts Bar Nuclear Plant Unit 1 and Unit 2 Technical Specifications for Main Control Room Chiller Completion Time Extension (WBN-TS-18-16), (ML20140A342). Specifically, in Section 3.2.1 of the enclosure to the TVA letter, TVA informed NRC that Connection to the AHU coils will be made by isolating the chilled water piping, removing the flex hoses between the AHU coils and the chilled water piping and then connecting the temporary chilled water supply and return hoses to the AHU coils using existing flange connections. |
| | The above license amendment request was approved by the NRC in a letter to TVA, Watts Bar Nuclear Plant, Units 1 and 2 - Issuance of Amendment Nos. 145 and 51 for One-Time Change to Technical Specification 3.7.11 to Extend the Completion Time for Main Control Room Chiller Modifications (EPID L-2020-LLA-0114), dated May, 2021 (ML21078A484). Contrary to the quoted statement in the TVA letter to the NRC, TVA now plans to install permanent branch connections in order to connect the hoses using a permanent branch connection with isolation valve and flange. While this methodology is a more efficient and safer design it differs from what TVA informed the NRC. It is TVAs opinion that the difference in the design has no impact on the NRC safety evaluation. Therefore, TVA does not plan to submit a correction letter. |
| | Please let me know if you have questions or comments. Thanks Russell D. Wells Senior Program Manager Nuclear Fleet Licensing |
| | |
| | W. 423-751-8130 M. 434-221-9318 E. rdwells0@tva.gov 1101 Market Street LP 4B-C, Chattanooga, TN 37402-2801 |
| | |
| | Hearing Identifier: NRR_DRMA Email Number: 1298 Mail Envelope Properties (DM8PR09MB61204AB73B14ADC55DA7AA4F8EE89) |
| | |
| | ==Subject:== |
| | [External_Sender] RE: Correction to WBN Chiller Replacement LAR Sent Date: 7/26/2021 9:33:42 AM Received Date: 7/26/2021 9:35:02 AM From: Wells, Russell Douglas Created By: rdwells0@tva.gov Recipients: |
| | "Hulvey, Kimberly Dawn" <kdhulvey@tva.gov> |
| | Tracking Status: None "Brown, Michael Anthony" <mabrown6@tva.gov> |
| | Tracking Status: None |
| | "'Paul Schoepf'" <PSCHOEPF@ENERCON.COM> |
| | Tracking Status: None "Carter, Thomas John" <tjcarter@tva.gov> |
| | Tracking Status: None "Green, Kimberly" <Kimberly.Green@nrc.gov> |
| | Tracking Status: None Post Office: DM8PR09MB6120.namprd09.prod.outlook.com Files Size Date & Time MESSAGE 2657 7/26/2021 9:35:02 AM Options Priority: Normal Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:}} |
Latest revision as of 18:16, 18 January 2022
|
---|
Category:E-Mail
MONTHYEARML24309A0552024-11-0101 November 2024 NRR E-mail Capture - Request for Additional Information - TVA LAR to Revised Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2 Re TS Table 3.3.2-1, Function 5 ML24304A3752024-10-29029 October 2024 NRR E-mail Capture - Request for Additional Information - License Amendment Request (LAR) to Revise Watts Bar Updated Final Safety Analysis Report (UFSAR) for Hydrologic Analysis ML24274A2762024-09-24024 September 2024 Email from K.Green to S.Hughes, Audit Plan Related to Review of the Watts Bar Nuclear Plant, Units 1 and 2, Hydrologic LAR to Revise the UFSAR ML24260A0322024-09-10010 September 2024 NRR E-mail Capture - Request for Additional Information Regarding the Watts Bar Unit 2 Steam Generator Tube Inspection Report for U2R5 ML24215A3152024-07-24024 July 2024 NRR E-mail Capture - Acceptance Review Results for Watts Bar Nuclear Plant, Units 1 and 2, License Amendment Request to Adopt TSTF-276-A, Revision 2 TS 3.8.1, AC Sources ML24177A1412024-06-11011 June 2024 NRR E-mail Capture - Audit Plan Related to Review of the Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2, LAR to Revise Technical Specification Table 3.3.2-1 Function 5 ML24157A3152024-06-0303 June 2024 2024 Sequoyah Commercial Grade Dedication Inspection Information Request ML24155A1372024-05-29029 May 2024 Email from K. Green to S. Hughes Request for Additional Information Related to License Amendment Request to Revise Residual Heat Removal Flow Rate ML24156A0062024-05-22022 May 2024 NRR E-mail Capture - Acceptance Review Results for Watts Bar Nuclear Plant, Unit 1, License Amendment Request to Recapture Low-Power Testing Time ML24130A0132024-05-0707 May 2024 NRR E-mail Capture - Acceptance Review Results for Watts Bar Nuclear Plant, Units 1 and 2, License Amendment Request to Revise Technical Specification 3.7.11 for MCR Chiller Completion Time ML24123A0882024-05-0202 May 2024 NRR E-mail Capture - Correction Acceptance Review Results for the Browns Ferry, Sequoyah, and Watts Bar License Amendment Request to Revise TS 5.4.1 or 5.7.1 (L-2024-LLA-0039) ML24122B4872024-04-30030 April 2024 NRR E-mail Capture - Acceptance Review Results for the Browns Ferry, Sequoyah, and Watts Bar License Amendment Request to Revise TS 5.4.1 or 5.7.1 (L-2024-LLA-0039) ML24082A0662024-04-17017 April 2024 Email to Stuart Rymer on Exemption Decision for Watts Bar ML24116A2012024-04-17017 April 2024 Nrctva ISFSI CBS (RFI) ML24082A0682024-04-10010 April 2024 Email to Stuart Rymer Re_ Availability of EA-FONSI for Watts Bar ML24100A8392024-04-0909 April 2024 Response from State of Tn Regarding Review of Environmental Assessment for Watts Bar Exemption Request ML24100A8402024-04-0808 April 2024 Email to State of Tn Requesting Review of Environmental Assessment for Watts Bar Exemption Request ML24071A0982024-03-0707 March 2024 NRR E-mail Capture - Audit Plan Related to Review of the Watts Bar Nuclear Plant, Units 1 and 2, License Amendment Request to Revise Technical Specification Surveillance Requirement 3.9.5.1 to Reduce RHR Flow Rate ML24058A0962024-02-26026 February 2024 NRR E-mail Capture - Acceptance Review Results for Watts Bar Nuclear Plant License Amendment Request to Revise UFSAR for Hydrologic Analysis ML24047A2792024-02-15015 February 2024 RAI Related to the Exemption Request for 10 CFR 37.11 ML24045A0312024-02-14014 February 2024 NRR E-mail Capture - Request for Additional Information Related to the Exemption Request for the 10 CFR Part 73 Enhanced Weapons Rule ML24033A0562024-02-0101 February 2024 NRR E-mail Capture - Correction Acceptance Review Results for Watts Bar Nuclear Plant, Units 1 and 2, License Amendment Request to Adopt TSTF-427-A, Revision 2 Regarding Degraded Barriers ML24036A0132024-01-23023 January 2024 NRR E-mail Capture - Acceptance Review Results for Sequoyah and Watts Bar Nuclear Plants, License Amendment Request to Revise TS Table 3.3.2-1, Function 5, Turbine Trip and Feedwater Isolation ML24022A2592024-01-22022 January 2024 NRR E-mail Capture - Acceptance Review Results for Watts Bar Nuclear Plant, Unit 1, License Amendment Request to Revise TS LCO 3.8.2 to Remove Note C-S Diesel Generator ML24016A0762024-01-16016 January 2024 NRR E-mail Capture - Acceptance Review Results for Watts Bar Nuclear Plant, Units 1 and 2 - License Amendment Request to Rebaseline of Sections 3.1 and 3.2 of the Technical Specifications ML23347A0642023-12-13013 December 2023 12-13-23 Email from Kimberly Green to Wells, Russell, Subject: Results of NRC SUNSI Review of Watts Bar Nuclear Plant Dual-Unit UFSAR, Amendment 5 ML23334A0932023-11-28028 November 2023 NRR E-mail Capture - Acceptance Review Results for Watts Bar Nuclear Plant, Units 1 and 2, License Amendment Request to Revise TS Surveillance Requirement 3.9.5.1 to Reduce RHR Flow Rate During Mode 6 ML23319A1662023-11-0202 November 2023 NRR E-mail Capture - Acceptance Review Results for Browns Ferry Nuclear Plant, Sequoyah Nuclear Plant, and Watts Bar Nuclear Plant, Exemption Request Related to 10 CFR 37.11(c)(2) ML23254A2872023-09-11011 September 2023 NRR E-mail Capture - Acceptance Review Results for Watts Bar Nuclear Plant, Units 1 and 2, License Amendment Request to Revise TS Table 1.1-1 Re Number of Required Rvh Closure Bolts ML23236A2562023-08-24024 August 2023 NRR E-mail Capture - Acceptance Review Results for the Sequoyah and Watts Bar License Amendment Request to Adopt TSTF-567 (L-2023-LLA-0106) ML23191A8672023-07-10010 July 2023 NRR E-mail Capture - Acceptance Review Results for Watts Bar, Units 1 and 2, License Amendment Request to Adopt TSTF-501-A, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control ML23166A1142023-06-15015 June 2023 Document Request for Watts Bar Nuclear Plant - Radiation Protection Inspection - Inspection Report 2023-03 ML23150A2472023-05-25025 May 2023 NRR E-mail Capture - Audit Plan Related to Review of the Watts Bar Nuclear Plant, Units 1 and 2, License Amendment Request to Increase the Number of Tritium Producing Burnable Absorber Rods ML23116A1492023-04-21021 April 2023 NRR E-mail Capture - Acceptance Review Results for Watts Bar Nuclear Plant, Units 1 and 2, License Amendment Request to Increase the Number of Tritium Producing Burnable Absorber Rods ML23075A0032023-03-13013 March 2023 NRR E-mail Capture - Acceptance Review Results for Watts Bar, Units 1, 2, and 3, License Amendment Request to Revise TS 3.7.11, Required Actions A.1 and E.1 Footnotes Re Date for the Modification ML23072A0722023-03-10010 March 2023 NRR E-mail Capture - (External_Sender) State Consultation - Sequoyah Nuclear Plant, Units 1 and 2; and Watts Bar Nuclear Plant, Units 1 and 2, License Amendment Request to Revise Technical Specification 3.4.12 (L-2022-LLA-0103) ML23067A2372023-03-0808 March 2023 WB_2023-02_RP_inspection_doc_request ML23013A0362023-01-12012 January 2023 NRR E-mail Capture - (External_Sender) State Consultation for Alabama - Browns Ferry, Units 1, 2 and 3; Sequoyah, Units 1 and 2; and Watts Bar, Units 1 and 2, License Amendment Request to Adopt TSTF-554-A, Revision 1 (L-2022-LLA-0100) ML23013A0382023-01-12012 January 2023 NRR E-mail Capture - (External_Sender) State Consultation for Alabama - Browns Ferry, Units 1, 2 and 3; Sequoyah, Units 1 and 2; and Watts Bar, Units 1 and 2, License Amendment Request to Adopt TSTF-529, Revision 4 (L-2022-LLA-0088) ML22356A2982022-12-22022 December 2022 Email Response to Letter, Dated November 22, 2022 Regarding Watts Bar Integrated Inspection Report ML22353A0812022-12-15015 December 2022 NRR E-mail Capture - Acceptance Review Results for Watts Bar, Unit 2, Alternative Request WBN-2-ISI-01 Regarding Examination of Upper Head Injection Nozzle Dissimilar Metal Piping Butt Welds ML22348A0972022-12-14014 December 2022 NRR E-mail Capture - State Consultation - Browns Ferry, Units 1, 2 and 3; Sequoyah, Units 1 and 2; and Watts Bar, Units 1 and 2, License Amendment Request to Adopt TSTF-529, Revision 4 (L-2022-LLA-0088) ML22348A0442022-12-13013 December 2022 NRR E-mail Capture - State Consultation - Browns Ferry, Units 1, 2 and 3; Sequoyah, Units 1 and 2; and Watts Bar, Units 1 and 2, License Amendment Request to Adopt TSTF-554-A, Revision 1 (L-2022-LLA-0100) ML22343A0692022-12-0808 December 2022 NRR E-mail Capture - Request for Additional Information - Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2, License Amendment Request to Revise Technical Specification 3.4.12 (L-2022-LLA-0103) ML22227A0712022-08-15015 August 2022 NRR E-mail Capture - Acceptance Review Results for Sequoyah and Watts Bar License Amendment Request to Revise TS 3.4.12 (EPID L-2022-LLA-0103) - Corrected ML22227A0262022-08-12012 August 2022 NRR E-mail Capture - Acceptance Review Results for Sequoyah and Watts Bar License Amendment Request to Revise TS 3.4.12 ML22227A0272022-08-11011 August 2022 NRR E-mail Capture - Request for Additional Information Related to Alternative Requests RP-11 for Sequoyah Nuclear Plant, Units 1 and 2, and IST-RR-9 for Watts Bar Nuclear Plant, Units 1 and 2 ML22215A2752022-08-0303 August 2022 NRR E-mail Capture - Acceptance Review Results for TVA Fleet License Amendment Request to Adopt TSTF-554 ML22194A8762022-07-13013 July 2022 NRR E-mail Capture - Acceptance Review Results for TVA Fleet License Amendment Request to Adopt TSTF-529 ML22166A4292022-06-0606 June 2022 NRR E-mail Capture - LAR to Adopt TSTF-577 2024-09-24
[Table view] |
Text
From: Wells, Russell Douglas <rdwells0@tva.gov>
Sent: Monday, July 26, 2021 9:34 AM To: Green, Kimberly Cc: Hulvey, Kimberly Dawn; Brown, Michael Anthony; 'Paul Schoepf'; Carter, Thomas John
Subject:
[External_Sender] RE: Correction to WBN Chiller Replacement LAR Kim I forgot to also mention that TVA performed a detailed review of the LAR, RAI response, and NRC SE and determined that there were no other incorrect statements.
Russell D. Wells Senior Program Manager Nuclear Fleet Licensing W. 423-751-8130 M. 434-221-9318 E. rdwells0@tva.gov 1101 Market Street LP 4B-C, Chattanooga, TN 37402-2801 From: Wells, Russell Douglas Sent: Monday, July 26, 2021 9:31 AM To: Green, Kimberly <Kimberly.Green@nrc.gov>
Cc: Hulvey, Kimberly Dawn <kdhulvey@tva.gov>; Brown, Michael Anthony <mabrown6@tva.gov>; 'Paul Schoepf' <PSCHOEPF@ENERCON.COM>; Carter, Thomas John <tjcarter@tva.gov>
Subject:
Correction to WBN Chiller Replacement LAR Kim A very specific methodology for attaching temporary chilled water to the safety related chillers was included in TVA letter to NRC, CNL-20-012, dated May 19, 2020, Application to Modify the Watts Bar Nuclear Plant Unit 1 and Unit 2 Technical Specifications for Main Control Room Chiller Completion Time Extension (WBN-TS-18-16), (ML20140A342). Specifically, in Section 3.2.1 of the enclosure to the TVA letter, TVA informed NRC that Connection to the AHU coils will be made by isolating the chilled water piping, removing the flex hoses between the AHU coils and the chilled water piping and then connecting the temporary chilled water supply and return hoses to the AHU coils using existing flange connections.
The above license amendment request was approved by the NRC in a letter to TVA, Watts Bar Nuclear Plant, Units 1 and 2 - Issuance of Amendment Nos. 145 and 51 for One-Time Change to Technical Specification 3.7.11 to Extend the Completion Time for Main Control Room Chiller Modifications (EPID L-2020-LLA-0114), dated May, 2021 (ML21078A484). Contrary to the quoted statement in the TVA letter to the NRC, TVA now plans to install permanent branch connections in order to connect the hoses using a permanent branch connection with isolation valve and flange. While this methodology is a more efficient and safer design it differs from what TVA informed the NRC. It is TVAs opinion that the difference in the design has no impact on the NRC safety evaluation. Therefore, TVA does not plan to submit a correction letter.
Please let me know if you have questions or comments. Thanks Russell D. Wells Senior Program Manager Nuclear Fleet Licensing
W. 423-751-8130 M. 434-221-9318 E. rdwells0@tva.gov 1101 Market Street LP 4B-C, Chattanooga, TN 37402-2801
Hearing Identifier: NRR_DRMA Email Number: 1298 Mail Envelope Properties (DM8PR09MB61204AB73B14ADC55DA7AA4F8EE89)
Subject:
[External_Sender] RE: Correction to WBN Chiller Replacement LAR Sent Date: 7/26/2021 9:33:42 AM Received Date: 7/26/2021 9:35:02 AM From: Wells, Russell Douglas Created By: rdwells0@tva.gov Recipients:
"Hulvey, Kimberly Dawn" <kdhulvey@tva.gov>
Tracking Status: None "Brown, Michael Anthony" <mabrown6@tva.gov>
Tracking Status: None
"'Paul Schoepf'" <PSCHOEPF@ENERCON.COM>
Tracking Status: None "Carter, Thomas John" <tjcarter@tva.gov>
Tracking Status: None "Green, Kimberly" <Kimberly.Green@nrc.gov>
Tracking Status: None Post Office: DM8PR09MB6120.namprd09.prod.outlook.com Files Size Date & Time MESSAGE 2657 7/26/2021 9:35:02 AM Options Priority: Normal Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date: