05000397/FIN-2015003-03: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
| Line 12: | Line 12: | ||
| identified by = NRC | | identified by = NRC | ||
| Inspection procedure = IP 71111.04 | | Inspection procedure = IP 71111.04 | ||
| Inspector = C Stott, D Bradley, J Groom, J O, | | Inspector = C Stott, D Bradley, J Groom, J O'Donnell, L Carson, M Phalen, N Greene, R Smith | ||
| CCA = P.2 | | CCA = P.2 | ||
| INPO aspect = PI.2 | | INPO aspect = PI.2 | ||
Latest revision as of 23:22, 21 February 2018
| Site: | Columbia |
|---|---|
| Report | IR 05000397/2015003 Section 1R04 |
| Date counted | Sep 30, 2015 (2015Q3) |
| Type: | NCV: Green |
| cornerstone | Mitigating Systems |
| Identified by: | NRC identified |
| Inspection Procedure: | IP 71111.04 |
| Inspectors (proximate) | C Stott D Bradley J Groom J O'Donnell L Carson M Phalen N Greene R Smith |
| Violation of: | Technical Specification - Procedures 10 CFR 50 Appendix B Criterion III, Design Control Technical Specification |
| CCA | P.2, Evaluation |
| INPO aspect | PI.2 |
| ' | |