==Dear Mr. Shields:== | ==Dear Mr. Shields:== | ||
Th.e NRC staff is reviewing your letter dated March 1, 1985 relating to the termination of activities authorized under Construction Pemits Nos. CPPR-170 and CPPR-171 for the Marble Hill Nuclear Generating Station Unit Nos.. I and 2. | Th.e NRC staff is reviewing your {{letter dated|date=March 1, 1985|text=letter dated March 1, 1985}} relating to the termination of activities authorized under Construction Pemits Nos. CPPR-170 and CPPR-171 for the Marble Hill Nuclear Generating Station Unit Nos.. I and 2. | ||
Before we can terminate these construction permits the information ident,1fied | Before we can terminate these construction permits the information ident,1fied | ||
.. in the enclosure must be provided to the NRC staff for review. Additionally,a | .. in the enclosure must be provided to the NRC staff for review. Additionally,a |
Latest revision as of 12:40, 7 December 2021
ML20203E410 | |
Person / Time | |
---|---|
Site: | Marble Hill |
Issue date: | 07/21/1986 |
From: | Samworth R NRC |
To: | |
Shared Package | |
ML20203E373 | List: |
References | |
OL, NUDOCS 8607240141 | |
Download: ML20203E410 (16) | |
Text
.
UNITED STATES OF AMERICA NUCLEAR EEGULATORY COMMISSION BEFORE TIIE ATOMIC SAFETY AND LICENSINO BOARD In the Mc'.ter of )
)
PUBLIC SERVICE COMPANY OF ) Docket Nos. 50-546 INDIANA, INC. ) 50-547 WADASil VALLEY POWER )
' ASSOCIATION, INC. )
)
(f farble Hill Nuclear Generating )
Station, Units 1 and 2) )
SUPPLEf.1 ENTAL AFFIDAVIT OF DR. ROBERT D. SAMWORTH I, Robert D. Samworth, having first been sworn, hereby states as follows:
- 1. On March 27, 1986, I prepared an affidavit ". . . In Support of MRC Staff's Further Answer To Motion For Uithdrawal Of Application." In preparing this affidavit, I reviewed two documents:
" Site Stabilization Plan for Marble Hill Nuclear Generating Station, Units 1 and 2" (dated March 1, 1985), (Attachment 1) and " Marble 1i111 Nuclear Generating Station, Units 1 and 2, Response to Request for Additional Information" (dated May 1, 1985), (Attachment 2).
These documents set forth Public Service of Indiana (PSI's) intentions regarding the manner in which construction would be terminated in crder to reduce or avoid significant environmental impacts.
- 2. PSI gave particular attention to the major potential source of environmental stress, erosion from areas of the site exposed during construction.
8607240141 860721 PDR ADOCK 05000546 G PDR
I
.' 3. Erosion is the major effluent discharge from construction sites and thus is of concern when a project is abandoned in mid-construction.
- 4. Other effluent discharges continue to be regulated by the state under the NPDES Permit.
- 5. The staff's review consisted of 1) reviewing the Applicants' proposed Site Stabilization Plan (Attachment 1) as well as their answer to the staff's request for additional information (Attachment 2), and 2) a site visit inspection.
- 6. The site inspection had two objectives:
1.) To confirm that PSI had recognized all of the areas of high erosion potential; and 11.) To observe progress in accomplishing the objectives identified in the two documents.
- 7. The staff accomplished its two objectives: first, the staff confirmed that PSI had recognized all of the areas of high erosion potential and Staff therefore found the stabilization plan to be adequate; second, the staff observed that PSI had taken the necessary implementation steps to accomplish the objectives identified in the documents cited above.
- - - , - - - - - - - - - - - - - , , . . - - , , - , - - - ,, , -.,-,,,.r--,-----,m,
- . - - , ,, y, .,--,, -, -,--y- -, ,,,-
,- 8. The staff identified no further condition or requirement which should be imposed to achieve further mitigation of environmental impacts.
Ys yc A
-l 7).m -
Robert B. Samworth Subscribed and sworn to before ao s t ^W.,
s% day of July,1986
, E. ' [
Notary ,Public
~
c
%:y-c'ominission expires: July 1, 1990 i
l j
a.
ATTACHMENT 1
m s
/',7.77 ..e
/ ,) 4 w,iq :;r PUBLIC SERVICE INDIANA m rch 1, 1985 S W. Shields Senior Vice President -
Nuctear Division Mr. Harold R. Denton, Director Docket Nos. SIN-546 Office of Nuclear Reactor Regulation STN-547 U.S. Nuclear Regulatory Ccmnission Construction Permit Nos.:
Washington, D.C. 20555 CPPR-170 CPPR-171 SUBJil.r: '
Marble Hill Nuclear Generating Station, Lnits 1 and 2
Dear Mr. Denton:
Public Service Ccmpany of Indiana, Inc. (PSI) hereby surrenders Construction Permit Nos. CPPR-170 and 171 for the Marble Hill Nuclear Generating Station, Units 1 and 2. All construction-related activities at the site have been halted. Site activities have been conducted in accordance with my letter to you of January 18, 1984. 'Ihe attachment provides a sunmary of those activities PSI will conduct to stabilize the site.
'Ihe ccmnitments contained in the attached stabilization plan will govern future activities.
If you have any questions, please call.
Sincerely,
,- r
/ Qt mf ,
Attachment cc: J. G. Keppler w/att.
J. E. Konklin w/att.
J. F. Schapker w/att.
M W. O'Connor w/att.
P. O. Box 190, New Washington, Indiana 47162 812. 289. 1000
o SITE STABILIZATION PIRI FOR t%PSLE IIILL N'M1R GDEPATING STATION, IR!ITS 1 AND 2 Public Service Company of Indiana, Inc.
March 1985
1.0 Introduction on March 1,1985, Public Service Company of Indiana, Inc. (PSI) sur-renders the construction permit for its Marble Hill Nuclear Generating Station, Units 1 and 2. This Site Stabilization Plan provides a sum--
mary of activities PSI plans to conduct with respect to Marble Hill.
2.0 Permits Several activities associated with the Marble Hill Nuclear Generating Station are conducted under the permits issued by other regulatory agencies. PSI is in the process of discussing with these regulatory agencies the need to retain, modify, and/or renew those aspects of the
- permits which relate to the cancelled nuclear units.
PSI's U.S. NRC By-Product Materials License (#13-15544-03) will be maintained until the licensed sources are sold or otherwise renoved from the site.
3.0 Stabilization Activities 3.1 Environmental Monitoring / Redressing The Marble Hill site consists of approximately 960 acres of which approximately 440 acres have been disturbed by construction activities. Denuded areas will be graded for proper drainage, if necessary, and grass cover established to control erosion. Paved and graveled areas may be left as is.
The site sedimentation pond will be retained and used to collect and treat runoff for the duration of site stabilization. NPDES permit limitations for this discharge point will remain in effect at this time.
Spill Prevention, Control & Counterneasures (SPOC) activities and inspections will continue to be conducted. Appropriate changes to the SPCE Plan have been made to reflect project termination.
All terrestrial nonitoring programs have been terminated. The meteorological towers and associated equipment will remain in an inoperative mode at this time.
3.2 Structures & Equipment Plant structures may be left in place in essentially their pres-ent condition. Barriers, fencing, or manned security will be established to deter unauthorized entry and to limit conditions that could constitute a hazard to PSI employees or the public.
s b 3.3 Security A small security force is currently being maintained to prevent unauthorized access to the site. However, this measure may be discontinued at a later date consistent with non-radiological safety at the site.
4.0 Future Use of Site No decision has been made as to the future use of the Marble Hill site. At this time, the real estate will be retained. Existing tran-smission and distribution facilities will continue to be utilized.
t I
ATTACHMENT 2
- i i
l i
4 1 . ..
If ,_ . .,
,/ 7- J','
PUBLIC .
SERVICE May 1,1985 INDIANA S. W. Shields Senor Vce Pres 4ent .
Corporate Serv.ces 77 Mr. B. J. Youngblood, Chief Docket Nos.: STN 50-546 Licensing Branch No.1 STN 50-547 Division of Licensing U.S. Nuclear Regulatory Commission Construction Permit Nos.: CPPR-170 CPPR-171 Washington, D.C. 20555 Marble Hill Nuclear Generating Station Units 1 & 2
Subject:
Request for AdditionalInformation,4/2/85
Dear Mr. Youngblood:
In response to your letter of April 2,1985, Public Service Company of Indiana, Inc. (PSI) provides the requested information in the attached summary. .
If you have any questions or comments, contact me at your convenience.
Sincerely, W. Shields DJH/vf Attachment cc: J. G. Keppler J. E. Konklin J. F. Schapker /
P. W. O' Conner
- U.S. NRC (42) l 1000 East Main Street. Plainfield,ind.ana 46168 317. 838.2208
( . - - - - . _ - . .. - _ _ _ _ _ _ _ ____ _ _ _
. MARBLE HILL NUCLEAR GENERATING STATION UNITS 1 & 2 RESPONSE TO REQUEST FOR ADDITIONAL INFORMATION
- 1. See Fig. 4.1-1 in the Marble Hill ER-CP; Figs. 1.2-21,1.2-22, and 2.1-6 ;
in the Marble Hill FSAR. Marble Hill ER-OL Section 4.3 and ER-CP Section 4.3 present further discussion of acreage disturbed by the project.
The transmission corridors and switchyard have not yet been abandoned and will be maintained according to company practices so long as they are not abandoned.
- 2. Structures erected on a foundation ntly wBI remain in place. Temporary construction trailers may be removed. Debris generated by such removal will be disposed of in an environmentally acceptable manner. Some semi-permanent structures may also be removed
- 3. The environmental control activities conducted during active construction continue to be effective. However, some deterioration of conditions is expected.
The spoils areas were graded and seeded adequately and are stable. Runoff from the power block and laydown areas is routed to the construction runoff pond for sedimentation prior to discharge. The NPDES permit discharge limitations are being met. ,
The EOF /JPIC site is in essentially the same condition as it stood when .
construction was halted. The following EOF site layup actions were taken: .
(1) Exposed foundation work below grade was backfilled with -
crushed stone to grade level.
l (2) Seeding operations were undertaken to provide ground cover.
Areas that were unseeded have overgrown with weeds.
(3) No large borrow excavations were left open other than the retention pond.
Some areas of the site are exhibiting signs of erosion. These areas wDI be handled in accordance with the response to Item 5 below.
- 4. See Section 4.0 of the Marble Hill Site Stabuization Plan submitted 3/1/85.
- 5. Restoration activities will consist primarily of erosion control activities.
'Ihe erosion control measures will consist of grading and seeding denuded areas, if necessary, in accordance with Indiana state highway standard specifications.
- 6. No additional permits or approvals from OFAs (Other Federal Agencies),
state, or local agencies are anticipated.
je' "%,, UNITED STATES ,
.3" ~ 7. NUCLEAR REGULATORY COMMISSION y WASHINGTON, D. C. 20555
~ APR 0 21985 * " '
Docket Nos.: 50-546 s-
- ff
~
and 50-547 ,
Mr. S. W. Shields Senior Vice President - ?:
Nuclear Division ,
Public Service of Indiana -
P. O. Box 190 ,
New Washington, Indiana 47102
Dear Mr. Shields:
Th.e NRC staff is reviewing your letter dated March 1, 1985 relating to the termination of activities authorized under Construction Pemits Nos. CPPR-170 and CPPR-171 for the Marble Hill Nuclear Generating Station Unit Nos.. I and 2.
Before we can terminate these construction permits the information ident,1fied
.. in the enclosure must be provided to the NRC staff for review. Additionally,a
- site visit will be required to determine thi,adequacyof the Site Stabilization
- Pla'n .- ,
- Please provide the information requested in the enclosure within 45 days of receipt of this letter.
l Sincerely,,
N g
. J. Youngb ood Chidf Lit.en sing Branch No. 1
- Division of Licensing
Enclosure:
As stated ,
cc: See next page 9
9
INFORMATION NEEDED l FOR ENVIRONMENTAL REVIEW OF PROJECT TERMINATION i
- 1. Provide a site plan showing areas (including transmission corridors) disturbed by construction related activities. Identify the specific use of.each disturbed area. . Estimate acreage for each such disturbed area.
- 2. Identify on the site plan all structures. Indicate which structures will be removed and which will remain. Provide a schedule for removal of structures and describe the method of debris dis ~posal.
- 3. Describe the status of the site, with particular attention to disturbed areas and to related erosion and runoff control measures.
- 4. Describe plans for future use of the site to the extent that such plans have influenced the selection of site restoration activity, if any. Indicate the anticipated schedule for future use and describe how the future use influences the proposal for restoration work.
- 5. Describe proposed restoration activities, if any, including procedures and schedules for grading, seeding, and planting which will b6 done to leave the site in a stable condition.
. ~ - ~
- 6. Indicate what permits and approvals-will be ageded for other federal, state, or local agencies for any of the site restoration work.
e e
l
UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of )
)
PUBLIC SERVICE COMPANY OF ) Docket Nos. 50-546 INDIANA, INC. ) 50-547 WABASH VALLEY POWER )
ASSOCIATION, INC. )
(Marble Hill Nuclear Generating )
Station, Units 1 and 2) )
NOTICE OF APPEARANCE Notice is hereby given that the undersigned attorney herewith enters an appearance in the captioned matter. In accordance with 10 C.F.R. S 2.713(b), the following information is provided:
Name -
Marjorie Ulman Rothschild Address -
U.S. Nuclear Regulatory Commission Office of the General Counsel Washington, DC 20555 Telephone Number -
Area Code (301) 492-7991 Admission -
Supreme Court of the United States District of Columbia Court of Appeals Supreme Court of the State of Florida Name of Party -
NRC Staff U.S. Nuclear Regulatory Commission Washington, DC 20555 MM k
- bibM MarjoMe Ulman Rothschild Counsel for NRC Staff Dated at Bethesda, Maryland this 17th day of July,1986
UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of PUBLIC SERVICE COMPANY OF INDIANA, INC.
WABASH VALLEY POWER ASSOCIATION, INC. Docket Nos. 50-546 50-547 (Marble Hill Nuclear Generating )
Station, Units 1 and 2) )
CERTI_FICATE OF SERVICE I hereby certify that copies of "NRC STAFF RESPONSE TO MEMORANDUM AND ORDER OF MAY 30,-1986" and " NOTICE OF APPEARANCE" for Marjorie U. Rothschild in the above -captioned proceeding have been servad on the following by deposit in the United States mail, first class, or, as indicated by an asterisk, through deposit in the Nuclear Regulatory Commission's internal mail system, this 22nd day of July,1986.
Ivan W. Smith, Esq., Chairman
- Administrative Judge John D. Noland, Esq.
Atomic Safety and Licensing Board Public Service Company of Indiana U.S. Nuclear Regulatory Comission 1000 East Main Street Washington, DC 20555 Plainfield, IN 46168 Mr. Gustave A. Linenberger*
Administrative Judge Atomic Safety and Licensing Board U.S. Nuclear Regulatory Comission Washington, DC 20555 Fred Hauck R.R. f3, Tower Heights Dr. Oscar H.. Paris
- Shelbyville, KY 40065 Administrative Judge Atomic Safety and Licensing Board Indiana Sassafras Audubon Society l U.S. Nuclear Regulatory Commission c/o Mary Kay Moody Washington, DC 20555 6620 East State Road.45 Bloomington, IN 47401 Harry H. Voigt, Esq.
LeBouef, Lamb, Leiby & MacRae Mr. Tom Zeller, Vice President 1333 New Hampshire Avenue, N.W. Valley Watch, Inc.
Washington, DC 20036 P. O. Box 2262
- Evansville, IN 47714
! Robert Gray i Chairman of the Board '
Save The Valley, Inc. -
P.O. Box 813 Madison, IN 47250
t '
5
?
Docketing and Service Section*
Office of the Secretary U.S. Nuclear Regulatory Commission Washington, DC 20555 Atomic Safety and Licensing Board Panel
- U.S. Nuclear Regulatory Comission Washington, DC 20555 Atomic Safety and Licensing Appeal Board Panel
- U.S. Nuclear Regulatory Comission Washington, DC 20555 Ih (1 b%eAild Marjofie U. Rothschild Counsel for NRC Staff I
. . . .